HomeMy WebLinkAboutBOARDWALK OFFICE BUILDING - PDP - PDP170032 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESPage 1
Boardwalk Office Building
Statement of Planning Objectives
August 22, 2017
The project is located on Block 2 of the Landings Office Park P.U.D. The proposed use is
for a 7,351 sq. ft. building containing professional offices along the street frontages. The
property is zoned E- Employment. The site is currently a vacant parcel of land and contains
.54 acres. This office building is a continuation of the existing Landings Office Park
development.
The area surrounding the site contains a mix of residential, retail, restaurant, office, and
employment. The site is ideal for this use as it provides an office building that is consistent
with the employment base. The site is also located within walking and biking distance to
retail and restaurants, as well and the surrounding residential subdivisions and major
employers in the area.
Primary vehicular access is via a right-in/right-out pork chop from JFK Parkway. Secondary
access is from two existing drives that have been constructed by the first phases of the
office park. All of the interior drives will be private and will continue the patterns established
by the first phases of the park. Parking areas are located internally to minimize impacts on
the neighborhood. There will be multiple pedestrian connections into and through the site. .
There also will be connectivity within the site in an east to west direction connecting the
building uses and tying them into the perimeter walks and adjacent properties.
The building architecture consists of light colored lap siding, 8 x 16 CMU Veneer, brick
veneer, storefront windows, standing seam metal roof and high profile asphalt shingles.
Statement of appropriate City Plan Principles and Policies achieved by the proposed
plan:
Economic Health
Principle EH 3: The City will support local, unique, and creative businesses.
Policy EH 3.1 – Support Programs Emphasizing Local Business
Policy EH 4.1 –Prioritize Targeted Redevelopment Areas
Principle EH 4: The City will encourage the redevelopment of strategic areas within
the community as defined in the Community and Neighborhood Livability and
Neighborhood Principles and Policies.
Policy EH 4.2 – Reduce Barriers to Infill Development and Redevelopment
The Boardwalk Office Building will continue to promote and sustain local businesses thereby
further enhancing the economic health of Fort Collins. This represents job creation and
business retention for businesses that are successful and unique to Fort Collins.
Page 2
Environmental Health
Principle ENV 19: The City will pursue opportunities to protect and restore the natural
function of the community’s urban watersheds and streams as a key component of
minimizing flood risk, reducing urban runoff pollution, and improving the ecological
health of urban streams.
Policy ENV 19.2 – Pursue Low Impact Development
The Boardwalk Office Building is implementing LID by incorporating new permeable
pavement areas with under drain systems (25% of new pavement area will consist of
permeable pavement).
Community and Neighborhood Livability
Principle LIV 38: Employment Districts will be the major employment centers in the
community, and will also include a variety of complementary uses to meet the needs
of employees. By design, they will be accessible to the City’s multimodal
transportation system and encourage walking, bicycling, car and van pooling, and
transit use.
Policy LIV 38.1 – Mix of Uses
Policy LIV 38.5 – Coordinate District Design
Policy LIV 38.7 – Address Parking
Policy LIV 38.8 – Provide Walkways and Bikeways
The Boardwalk Office Building consists of an office building, representing a primary use in
the Employment District. The area surrounding the development contains a mix of
residential, institutional, employment, office and retail. The site is located in the Landings
Office Park, which provides a campus-like setting, with platted lots, drives, sidewalks, and
infrastructure already in place. The visual impacts of the parking lot has been reduced by
placing the parking to the interior of the project.
Transportation
Principle T 9: Enhanced Travel Corridors will contain amenities and designs that
specifically promote walking, the use of mass transit, and bicycling.
Policy T 9.1 – Locating Enhanced Travel Corridors
Principle T10: Using transit will be a safe, affordable, easy, and convenient mobility
option for all ages and abilities.
Policy T 10.1 – Transit Stops
Policy T 10.6 – High Frequency Transit Service
Principle T11: Bicycling will be a safe, easy, and convenient mobility option for all
ages and abilities
There is an existing bus stop directly adjacent to the site on JFK Parkway. The project will
be providing enhancements as requested by Transfort staff.
Page 3
(ii) Description of proposed open space, wetlands, natural habitats and
features, landscaping, circulation, transition areas, and associated
buffering on site and in the general vicinity of the project.
There are no wetlands or significant natural habitats within the boundaries of
the site.
(iii) Statement of proposed ownership and maintenance of public and
private open space areas; applicant's intentions with regard to future
ownership of all or portions of the project development plan.
The buildings will be owned by the building developer/owner and will be
leased to individual tenants.
(iv) Estimate of number of employees for business, commercial, and
industrial uses.
10-20
(v) Description of rationale behind the assumptions and choices made by
the applicant.
The impetus of this project is to create a professional office building that is a
complimentary use to the existing office park campus.
(vi) The applicant shall submit as evidence of successful completion of the
applicable criteria, the completed documents pursuant to these
regulations for each proposed use. The planning Director may require,
or the applicant may choose to submit, evidence that is beyond what is
required in that section. Any variance from the criteria shall be
described.
The submittal documents address the applicable criteria. No variances are
anticipated at this time.
(vii) Narrative description of how conflicts between land uses or
disturbances to wetlands, natural habitats and features and or wildlife
are being avoided to the maximum extent feasible or are mitigated.
There are not existing wetlands, natural habitats or features currently located
on site.
(viii) Written narrative addressing each concern/issue raised at the
neighborhood meeting(s), if a meeting has been held.
No neighborhood meeting was held.
(ix) Name of the project as well as any previous name the project may have
had during Conceptual Review.
The project name is Boardwalk Office Building. The project name at the
Conceptual Review meeting was “300 Boardwalk Dr. – Office”.