HomeMy WebLinkAboutSCHRADER PROPANE OFFICE & MINOR VEHICLE REPAIR - PDP - PDP170015 - CORRESPONDENCE - REVISIONS
June 12, 2017 (Updated 08-22-17)
Mr. Clay Frickey
City Planner
City of Fort Collins
281 North College Ave.
Fort Collins, CO 80524
RE: Schrader Propane Office and Minor Vehicle Repair, PDP170015, Round Number 1
Please see our responses to the comments from City staff and outside reviewing agencies for the above
referenced project. Please let me know if you have any further questions or comments.
Thank you,
Don Shields
Project Manager
WG Architects
P.O. Box 270788
Fort Collins, CO 80527
Ph.: 970-493-2025
Fax: 970-493-2026
Email dons@wgarchitects.com
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 05/16/2017
05/16/2017: A sidewalk chase will be needed to the south of the property. A pipe can't outlet
directly to the curb and gutter. Please add a headwall behind the sidewalk into a pan and add a
sidewalk chase.
RESPONSE: A sidewalk chase and pan have been added at the outfall from the pond.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
Comment Number: 3 Comment Originated: 05/16/2017
05/16/2017: Please update the Utility Plans to reflect what's being proposed. All the existing
property lines/information can be on the Existing Conditions sheet. Please update, lot lines,
property info and ROW limits.
RESPONSE: Information updated.
Comment Number: 4 Comment Originated: 05/16/2017
05/16/2017: There is a retaining wall within the Utility easement/drainage easement. The wall
ranges in height, with portions greater than 30". Structural walls are not allowed within easements.
RESPONSE: Wall is shown to have a maximum height of 30” from top to ground. Wall will be no greater than 48” from top
of wall to bottom of footer.
Comment Number: 5 Comment Originated: 05/16/2017
05/16/2017: All detention ponds need to be in a drainage easement.
RESPONSE: A blanket drainage easement is provided across the site.
Comment Number: 6 Comment Originated: 05/16/2017
05/16/2017: Please verify the ramp/walk at the south of the driveway will need to meet ADA
standards (2% cross slope). Typically sidewalks attach behind the ramp, so verify that the 2%
cross section in all directions.
RESPONSE: Slope arrows were added at handicap ramps.
Comment Number: 7 Comment Originated: 05/16/2017
05/16/2017: What are the existing flowline elevations at the chase locations. Please verify that the
drainage will work in these areas.
RESPONSE: Elevation points were added at tie-in to curb.
Comment Number: 8 Comment Originated: 05/16/2017
05/16/2017: A reimbursement is due to the City for the construction of the public alley to the west
of the site prior to the issuance of the first building permit. The alley was installed with the North
College Improvements. The amount of the actual construction in July 2016 is $10,021.13 for half
the alley construction along the property frontage. The final amount will need to be adjusted for
inflation, which is dependent on the time this is paid. Please contact Sheri Langenberger at
970-221-6573 at time of payment to get the final amount.
RESPONSE: Acknowledged.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/02/2017
05/02/2017: The project owes an additional $143 for the PDP TDRFees. The project did not
include the full acerage being platted on the application form.
RESPONSE: Acknowledged.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 05/15/2017
05/15/2017: Please add the following notes to the landscape plan (for installation and
establishment of the bioretention mix):
RESPONSE: Added notes to Landscape Plan
NATIVE SEED MIX NOTES
1. PREPARE SOIL AS NECESSARY AND APPROPRIATE FOR NATIVE SEED MIX SPECIES
THROUGH AERATION AND ADDITION OF AMENDMENTS, THEN SEED IN TWO DIRECTIONS TO
DISTRIBUTE SEED EVENLY OVER ENTIRE AREA.
2. IF CHANGES ARE TO BE MADE TO SEED MIX BASED ON SITE CONDITIONS THEN
APPROVAL MUST BE PROVIDED BY CITY ENVIRONMENTAL PLANNER.
3. APPROPRIATE NATIVE SEEDING EQUIPMENT WILL BE USED (STANDARD TURF SEEDING
EQUIPMENT OR AGRICULTURE EQUIPMENT SHALL NOT BE USED).
4. DRILL SEED APPLICATION RECOMMENDED PER SPECIFIED APPLICATION RATE TO NO
MORE THAN ½ INCH DEPTH. FOR BROADCAST SEEDING INSTEAD OF DRILL SEEDING
METHOD DOUBLE SPECIFIED APPLICATION RATE. REFER TO NATIVE SEED MIX TABLE FOR
SPECIES, PERCENTAGES AND APPLICATION RATES.
5. TREAT NATIVE SEED MIX AREA PRIOR TO INSTALLATION OF SEED WITH APPROPRIATE
HERBICIDE TO PROACTIVELY MITIGATE HERBACEOUS WEED SPECIES GROWTH DURING
ESTABLISHMENT PERIOD THEN AFTER APPROPRIATE TIME PERIOD APPLY NATIVE SEED AS
CALLED FOR ON APPROVED PLANS.
6. AFTER SEEDING THE AREA SHALL BE COVERED WITH CRIMPED STRAW OR OTHER
APPROPRIATE METHODS AND PROVIDED TEMPORARY IRRIGATION UNTIL SEED IS
ESTABLISHED.
7. CONTRACTOR SHALL MONITOR SEEDED AREA FOR PROPER IRRIGATION, EROSION
CONTROL, GERMINATION AND RESEEDING AS NEEDED TO ESTABLISH COVER.
8. THE APPROVED SEED MIX AREA IS INTENDED TO BE MAINTAINED IN A NATURAL LIKE
LANDSCAPE AESTHETIC. IF AND WHEN MOWING OCCURS IN NATIVE GRASS SEED MIX
AREAS DO NOT MOW LOWERTHAN 6 TO 8 INCHES IN HEIGHT TO AVOID INHIBITING NATIVE
PLANT GROWTH.
9. NATIVE SEED AREA WILL BE CONSIDERED ESTABLISHED WHEN SEVENTY PERCENT
TOTAL COVER IS REACHED WITH NO LARGER THAN ONE FOOT SQUARE BARE SPOTS
AND/OR UNTIL DEEMED ESTABLISHED BY CITY PLANNING SERVICES.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
Topic: Lighting Plan
Comment Number: 2 Comment Originated: 05/15/2017
05/15/2017: There are light fixtures on the photometric plan labeled as WW4, but that fixture does
not appear in the luminaire schedule or cut sheets. Please clarify/update.
RESPONSE: Deleted WW4 from luminaire schedule.
Comment Number: 3 Comment Originated: 05/15/2017
05/15/2017: In regard to lighting, especially LED light fixtures, cooler color temperatures are
harsher at night and cause more disruption to circadian (biological) rhythms for both humans and
wildlife. Warmer color temperature (warm white, 3000K or less) for any LED light fixtures is
preferred.
Thank you for selecting a 3000K light fixture for your parking lot fixtures. According to the
manufacturer cut sheets, warmer versions of light fixtures WW1, WW2, WW3 and C are also
available. Staff recommends selecting the 3000K or 2700K versions of these fixtures to minimize
impacts to adjacent properties, drivers passing the site, and residents/wildlife in the vicinity.
RESPONSE: Revised fixtures to 3000K.
Department: Forestry
Contact: Molly Roche, , mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 05/18/2017
05/18/2017:
If there are any existing trees on-site, please contact the City Forester to schedule an on-site
meeting to obtain tree inventory and mitigation information.
RESPONSE: There are no existing trees on-site.
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 05/15/2017
05/15/2017: 2015 IFC CODE ADOPTION
The Poudre Fire Authority and the City of Fort Collins have adopted the 2015 International Fire
Code. Building plan reviews shall be subject to the adopted version of the fire code in place at the
time of plan review submittal and permit application.
RESPONSE: Acknowledged.
Comment Number: 2 Comment Originated: 05/15/2017
05/15/2017: FIRE LANE SIGNS
Clearly label fire lane sign locations on the Site Plan and Horizontal Control Plan.
RESPONSE: Signs have been marked on the Site Plan and Horizontal Control Plan.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
Comment Number: 3 Comment Originated: 05/15/2017
05/15/2017: WATER SUPPLY
PFA does not mandate hydrant testing. Hydrant testing is recommended in such cases where
hydrant output may be in question. Hydrant testing may be scheduled as needed at
https://www.poudre-fire.org/services/contractors-plan-reviews-and-permits/request-a-fire-hydrant-flow-test.
RESPONSE: Acknowledged.
Comment Number: 4 Comment Originated: 05/15/2017
05/15/2017: PREMISE IDENTIFICATION & WAYFINDING
Addresses shall be posted on each structure and where otherwise needed to aid in wayfinding.
Code language provided below.
> IFC 505.1: New and existing buildings shall have approved address numbers, building numbers
or approved building identification placed in a position that is plainly legible, visible from the street
or road fronting the property, and posted with a minimum of six-inch numerals on a contrasting
background. Where access is by means of a private road and the building cannot be viewed from
the public way, a monument, pole or other sign or means shall be used to identify the structure.
RESPONSE: Acknowledged.
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 05/16/2017
05/16/2017: The proposed landscape plan does not meet the parking lot perimeter landscaping
requirements outlined in 3.2.1(E)(4). There should be one tree planted every 25 lineal feet along Red
Cedar Cir. or there should be trees planted in groupings that average out to one tree per 25 lineal feet.
RESPONSE: Added three (3) ornamental trees in front of east parking spaces to Landscape Plan.
Topic: Site Plan
Comment Number: 1 Comment Originated: 05/16/2017
05/16/2017: For the minimum bike parking requirement on the parking table, you reference 0.62
parking spaces. Please remove this from the parking table since this information is superfluous.
RESPONSE: Reference has been removed.
Comment Number: 2 Comment Originated: 05/16/2017
05/16/2017: The southernmost parking space is only 8' wide. Please make this spot 9' wide to
comply with the minimum dimensions required.
RESPONSE: Parking has been restriped for 9’ parking stalls typical (8’ handicap).
Comment Number: 3 Comment Originated: 05/16/2017
05/16/2017: Where are the covered bike parking spaces located? This is not clear on the site plan.
Please clearly indicate the location of the enclosed bike parking spaces on the site plan.
RESPONSE: The covered bike parking spaces have been noted in the maintenance bay on the Site Plan.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
Comment Number: 4 Comment Originated: 05/16/2017
05/16/2017: The parking maximums in the parking table are incorrect. The maximum for the office
portion of the development is 8 spaces (3 * 2.463 = 7.389, rounded up to 8). This means the overall
maximum for the development is 18 spaces, not 19. Please revise these numbers.
Department: Stormwater Engineering
Contact: Basil Hamdan, 970-224-6035, bhamdan@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 05/15/2017
05/15/2017:
05/15/2017: The disturbed area in this proposed development is greater than one acre. A Sate
Discharge permit will be required as well as all City Erosion control requirements will need to be met.
At preliminary no ESC report was submitted. Additionally no preliminary ESC plan was prepared. All
City and State ESC requirements will need to be met with Final submittal. Requirements can be found
at: http://www.fcgov.com/utilities/img/site_specific/uploads/Accomp_Doc.pdf Please contact Basil
Hamdan at (970) 224-6045 or bhamdan@fcgov.com for any questions or clarifications.
RESPONSE: Acknowledged.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 05/17/2017
05/17/2017: More detail is needed for the grading around the perimeter of the site to ensure
grading matches the sub-basins.
RESPONSE: A few more elevation points were added for clarity.
Comment Number: 3 Comment Originated: 05/17/2017
05/17/2017: The drainage report shows an older site plan, not the currently proposed plan.
RESPONSE: Updated.
Comment Number: 4 Comment Originated: 05/17/2017
05/17/2017: Please discuss the sizing of the LID StormTech devise in the text of the drainage
report. The chambers need to be sized for the area that drains to it.
RESPONSE: Updated.
Comment Number: 5 Comment Originated: 05/17/2017
05/17/2017: The City is OK with the free release of the perimeter basins of .19 cfs due to these
being pervious and having grading restrictions.
RESPONSE: Thank you.
Comment Number: 6 Comment Originated: 05/17/2017
05/17/2017: Water Utilities Engineering is ready for a hearing.
RESPONSE: Thank you.
P.O. Box 270788. Fort Collins, CO 80527-0788 Ph: 970-493-2025 Fax: 970-493-2026 Email: dons@wgarchitects.com
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/15/2017
05/15/2017: Irrigation plans are required no later than at the time of building permit. The irrigation
plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct
questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
RESPONSE: Acknowledged.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 05/17/2017
05/17/2017: Please define the exact size of the water service.
RESPONSE: Updated.
Comment Number: 2 Comment Originated: 05/17/2017
05/17/2017: Please add a cleanout for the sewer service.
RESPONSE: Cleanout has been added.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 05/16/2017
05/16/2017: The trash and recycling needs to be inside an enclosure or the chain link fence along
the north property line needs to be replaced with the 6 foot tall metal fence.