HomeMy WebLinkAboutSCHRADER PROPANE OFFICE & MINOR VEHICLE REPAIR - FDP - FDP170026 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTSUBMITTAL CHECKLIST:
FINAL PLAN REVIEW
PROJECT DEVELOPMENT PLAN (PDP)
Community Development & Neighborhood Services – 281 N College Ave – Fort Collins, CO 80522-0580
Development Review Guide – STEP 6 of 8
Application form and filing fee. Application Form.pdf
Transportation Development Review Fee – please contact Engineering at 221-6605 for information.
TDR Fees and Application.pdf
Name and address of each owner of property within the boundaries of the development plan area.
List of names of all general and/or limited partners, managers and directors and/or officers and directors of
the corporation involved as either applicants or owners.
Final Site Plan* (30 copies, 24” x 36” - folded)
Subdivision Plat* (23 copies, 24” x 36” - folded)
Architectural Elevations* (8 copies, 24” x 36” - folded)
Landscape Plan* (20 copies, 24” x 36” - folded)
Drainage and Erosion Control Report* (4 copies)
Final Utility and Drainage Plans* (15 copies, 24” x 36” – unfolded)
Requirements for utility plans checklist (1 copy). Utility Plans Checklist.pdf
Transportation Impact Analysis* (TIA), updated* (7 copies).
Soils Report* (2 copies).
Deeds* (contingent on final approval)
Mylars and PMT* (Mylars not needed until Final plans are approved)
Certification of Notice to Mineral Owner(s)* (1 copy) Mineral Rights Certificate.pdf
Other information Director may require:
- Subsurface Hydrologic Study* (4 copies)
- Easements/Agreements* (2 copies, each)
- Environmental Reports*
*This document is meant to be used as a checklist only. For a more detailed list and explanation of each of
these items, please see the handout: “Submittal Requirements: Final Plan Review”
The following information is required to be submitted with all applications, unless waived by staff. Any item
waived must be dated and initialed by a planner with the City of Fort Collins Community Development and
Neighborhood Services Department.