July 21, 2017
Katy Thompson
Ripley Design, Inc.
419 Canyon Ave, Ste 200
Fort Collins, CO 80521
RE: South College Storage, FDP170019, Round Number 1
Comment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com
Topic: General
07/18/2017: Variance responses will be sent as soon as possible.
Comment Number: 1 Comment Originated: 07/18/2017
07/18/2017: Please update both street cross sections on the cover sheet to reflect
new standard. Please add a note to the Skyway striping plan to indicate that this is
the interim striping and the standard will be implemented at such a time as it
becomes necessary.
Comment Number: 2 Comment Originated: 07/18/2017
07/18/2017: The 130 foot vertical curve on C 4.01 and the 170 foot vertical curve on
C 4.02 do not meet LCUASS Figure 7-17 length requirements.
Comment Number: 3 Comment Originated: 07/18/2017
07/18/2017: The Mars Drive storm inlets are shown to be within vertical curves. Per
LCUASS 7.4.1.B.4.c. The grade into an inlet located in a sump shall have a 0.5%
percent grade into and out of the inlet.
Comment Number: 4 Comment Originated: 07/18/2017
07/18/2017: At ST 11+00 for Skyway Drive, the reconstructed cross slope is less
than the existing - this is not allowed per LCUASS 7.4.2.C.
Comment Number: 5 Comment Originated: 07/18/2017
07/18/2017: Please include cross section details showing cross slopes for Mars
Drive.
Comment Number: 6 Comment Originated: 07/18/2017
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Pete Wray, at
970-221-6754 or pwray@fcgov.com.
Page 1 of 6
07/18/2017: For the intersection detail on sheet C 4.01, please add spot elevations,
similar to the required centerline spot elevations, where the reconstructed portion of
the Skyway roadway will begin. Please also add a scale.
Comment Number: 7 Comment Originated: 07/18/2017
07/18/2017: Please submit shallow bedrock mitigation plans in accordance with
LCUASS Chapter 5 requirements.
Comment Number: 8 Comment Originated: 07/18/2017
07/19/2017: Above-ground utility cabinets/transformers in parkways in the ROW are
prohibited by City Ordinance. In order for an underground utility cabinet or
transformer, which serves a single private development, to be located in the
parkway in the ROW, an easement would need to be granted to the developer by
the City Council. In order for this to be taken to Council, upper management in City
Engineering and City Utilities departments would need to agree that this is the most
appropriate solution. If you have further questions about this please contact Sheri
Langenberger, Development Review Manager, at 970-221-6573.
Comment Number: 9 Comment Originated: 07/19/2017
07/19/2017: Engineering requests at least 1 more formal submittal for the project.
The submittal can be electronic rather than paper for Engineering's purposes.
Comment Number: 10 Comment Originated: 07/19/2017
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
07/19/2017: Language regarding natural resource protection will be included in the
Development Agreement for this project.
Comment Number: 5 Comment Originated: 07/19/2017
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
07/07/2017: Thank you for providing a prairie dog removal plan prepared by Jerry
Powell, M.S., Certified Wildlife Biologist / Ecologist, with Wildlife Specialties LLC.
Environmental Planning has reviewed the document in detail and performed a
review of similar plans in other jurisdictions. Please reference the three-page
comment letter that is specific to the proposed prairie dog removal plan and dated
July 12, 2017. Staff is requesting additional information, requests and clarification.
Staff will follow up directly with Wildlife Specialties LLC.
Comment Number: 1 Comment Originated: 07/07/2017
Page 2 of 6
07/07/2017: Thank you for adding the note (included below) requested on site and
landscape plans for both the ditch setback and associated natural habitat and
features and the wetland habitat and features. The approximate buffer hatching is
sufficient for the ditch. However, please also add and label the approximate
boundary of the 1.5 to 2.0 acre wetland on the northeast portion of the area to be
platted on both the site and landscape plans. See redlines on page 2 of 8 of
submitted Site Plan.
NOTE: "This plan shows the general location and approximate size of all natural
areas, habitats, and features within its boundaries pursuant to City of Fort Collins
Land Use Code Section 3.4.1(E). Detailed mapping of a site's natural areas,
habitats, and features will be provided at the time of individual PDP submittals for
these areas. General natural habitat buffer zones may be reduced or enlarged by
the decision maker during the PDP process."
Comment Number: 2 Comment Originated: 07/07/2017
07/07/2017: See redlines on 4 of 8 of Landscape Plan. Minor details but please:
1) add the word "Total" for the total pounds/acre seeding rate to be used if drill seed
method is used.
2) reduce gap between text in "f" of Native Seed Notes.
Comment Number: 4 Comment Originated: 07/07/2017
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
07/21/2017: The existing transformer shown on the existing conditions plan is
actually a 3-phase switching cabinet. The utility plan shows this cabinet being
relocated into the utility easement. Moving this cabinet will require re-pulling approx..
4 different runs of 3-phase cable. This will be quite extensive and require a lengthy
outage most likely outside of normal business hours.
Comment Number: 1 Comment Originated: 07/21/2017
07/21/2017: Any relocation or modification to existing electric facilities will be at the
expense of the owner/developer. If Light & Power’s existing electric facilities are to
remain within the limits of the project they must be located within a utility easement.
Comment Number: 2 Comment Originated: 07/21/2017
07/21/2017: The proposed transformer is shown on the utility plan as being fed from
the relocated switching cabinet. This cabinet is already full. A new vault will need to
be placed along the proposed Mars Dr. This new vault will serve as the feed for the
new transformer.
Comment Number: 3 Comment Originated: 07/21/2017
07/21/2017: A commercial service information form (C-1 form) and a one line
diagram will need to be submitted to Light & Power Engineering for all proposed
commercial buildings and multi-family (commercial) buildings larger than a duplex or
greater than 200amps. A link to the C-1 form is below:
http://www.fcgov.com/utilities/business/builders-and-developers/development-forms
-guidelines-regulations
Comment Number: 4 Comment Originated: 07/21/2017
Page 3 of 6
07/21/2017: Electric Capacity Fee, Building Site charges, and any system
modification charges necessary will apply to this development. Please contact Light
& Power Engineering if you have any questions at 970-221-6700. Please reference
our Electric Service Standards, development charges and fee estimator at the
following link: http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 5 Comment Originated: 07/21/2017
Department: Outside Agencies
Contact: Terry Ferrill, ,
Topic: General
The Fort Collins -Loveland Water District and the South Fort Collins Sanitation
District have reviewed the above mentioned project and submit the following
comments.
The District does not allow a long dead-end water line. The proposed water line is to
end at the service line or looped.
The District will require the proposed water line connection to be at the location of
the existing tee in Skyway drive. The existing tee is to be replaced with a cross.
The District signature block is to be replaced with the most current signature block.
The District will require another review due t the nature of the above comments.
Please do not hesitate to contact me at 226-3104, ext. 104, if you have any
questions or require additional information.
Comment Number: Comment Originated: 07/18/2017
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
07/17/2017: FIRE LANE SIGNS
One sign along the west side of the development is not labeled "FIRE LANE SIGN"
and requires a label identifying it as a fire lane sign on the site plan.
Per sign detail, the appropriate directional arrows will be accepted by the fire
department, not "BY ORDER OF THE FIRE MARSHAL".
Comment Number: 1 Comment Originated: 07/17/2017
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: Building Elevations
07/18/2017: Need more information on building exterior finish schedule so that the
elevation call outs match finish schedule.
Comment Number: 2 Comment Originated: 07/18/2017
Topic: General
Page 4 of 6
07/21/2017: Based on the staff review discussion on July 19, another round of
review is needed. This next round can be an informal PDF review set for a standard
3 week turnaround. In the event staff can determine the project is ready for mylars
sooner, we will inform the applicant at that time, but understand with the summer
season, this is a challenge.
Comment Number: Comment Originated: 07/21/2017
Topic: Site Plan
07/18/2017: Clarify on site plan extent of new sidewalk along Skyway and location of
connection to existing walk. Label 5' walk on Mars Drive. Is our minimum walk
standard 6' wide?
Comment Number: 1 Comment Originated: 07/18/2017
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
07/05/2017: Current Erosion Control Materials Submitted do not meet
requirements. Please submit; an Erosion Control Plan (Based upon returned
redlines), an Erosion Control Report (Based upon comments on the returned CD),
and an Escrow / Security Calculation (Will need to be recalculated based upon
redlines on the plans). If you need clarification concerning the erosion control
section, or if there are any questions please contact Jesse Schlam 970-218-2932 or
email @ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 07/05/2017
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
07/19/2017: Please identify the area on the grading plan where the soil media is to
be placed for the rain garden.
Comment Number: 2 Comment Originated: 07/19/2017
07/19/2017: The two outfall locations on the parcel to the east need to be stable
through this area and to the culvert under College Avenue. This is required to
ensure stability for the long term.
Comment Number: 3 Comment Originated: 07/19/2017
07/19/2017: The 6-inch underdrain for the rain garden can be revised to 4 inches.
Comment Number: 4 Comment Originated: 07/19/2017
07/19/2017: Please increase the outfall pipe from the rain garden to capture at least
the 10-year storm. The pipe is currently shown to be 6 inches.
Comment Number: 5 Comment Originated: 07/19/2017
07/19/2017: The riprap detail proposed may not be the best option in this
application. Limited vegetation growth is likely for these side slopes which may not
be desirable.
Comment Number: 6 Comment Originated: 07/19/2017
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
07/17/2017: The Basis Of Bearings statement should match the Subdivision Plat.
Comment Number: 4 Comment Originated: 07/17/2017
Page 5 of 6
07/17/2017: Some of the sheet titles in the sheet index do not match the sheet titles
on the noted sheets. See redlines.
Comment Number: 5 Comment Originated: 07/17/2017
07/17/2017: All benchmark statements must match on all sheets.
Comment Number: 6 Comment Originated: 07/17/2017
07/18/2017: All Basis Of Bearings statements must match on all sheets.
Comment Number: 7 Comment Originated: 07/18/2017
07/18/2017: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 07/18/2017
07/18/2017: There are text over text issues. See redlines.
Comment Number: 9 Comment Originated: 07/18/2017
07/18/2017: There are cut off text issues. See redlines.
Comment Number: 10 Comment Originated: 07/18/2017
07/18/2017: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Comment Number: 11 Comment Originated: 07/18/2017
Topic: Lighting Plan
07/17/2017: There are cut off text issues. See redlines.
Comment Number: 3 Comment Originated: 07/17/2017
Topic: Plat
07/17/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response
letter.
Comment Number: 1 Comment Originated: 07/17/2017
Topic: Site Plan
07/17/2017: Some of the easement descriptions shown are incorrect. If they are
going to stay on the plan, they should match what is shown on the Subdivision Plat.
Comment Number: 2 Comment Originated: 07/17/2017
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
07/18/2017: Striping final comments were submitted to Northern Engineering on
7/18.
Comment Number: 1 Comment Originated: 07/18/2017