Loading...
HomeMy WebLinkAboutSOUTH COLLEGE STORAGE - FDP - FDP170019 - CORRESPONDENCE -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview July 21, 2017 Katy Thompson Ripley Design, Inc. 419 Canyon Ave, Ste 200 Fort Collins, CO 80521 RE: South College Storage, FDP170019, Round Number 1 Comment Summary: Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com Topic: General 07/18/2017: Variance responses will be sent as soon as possible. Comment Number: 1 Comment Originated: 07/18/2017 07/18/2017: Please update both street cross sections on the cover sheet to reflect new standard. Please add a note to the Skyway striping plan to indicate that this is the interim striping and the standard will be implemented at such a time as it becomes necessary. Comment Number: 2 Comment Originated: 07/18/2017 07/18/2017: The 130 foot vertical curve on C 4.01 and the 170 foot vertical curve on C 4.02 do not meet LCUASS Figure 7-17 length requirements. Comment Number: 3 Comment Originated: 07/18/2017 07/18/2017: The Mars Drive storm inlets are shown to be within vertical curves. Per LCUASS 7.4.1.B.4.c. The grade into an inlet located in a sump shall have a 0.5% percent grade into and out of the inlet. Comment Number: 4 Comment Originated: 07/18/2017 07/18/2017: At ST 11+00 for Skyway Drive, the reconstructed cross slope is less than the existing - this is not allowed per LCUASS 7.4.2.C. Comment Number: 5 Comment Originated: 07/18/2017 07/18/2017: Please include cross section details showing cross slopes for Mars Drive. Comment Number: 6 Comment Originated: 07/18/2017 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com. Page 1 of 6 07/18/2017: For the intersection detail on sheet C 4.01, please add spot elevations, similar to the required centerline spot elevations, where the reconstructed portion of the Skyway roadway will begin. Please also add a scale. Comment Number: 7 Comment Originated: 07/18/2017 07/18/2017: Please submit shallow bedrock mitigation plans in accordance with LCUASS Chapter 5 requirements. Comment Number: 8 Comment Originated: 07/18/2017 07/19/2017: Above-ground utility cabinets/transformers in parkways in the ROW are prohibited by City Ordinance. In order for an underground utility cabinet or transformer, which serves a single private development, to be located in the parkway in the ROW, an easement would need to be granted to the developer by the City Council. In order for this to be taken to Council, upper management in City Engineering and City Utilities departments would need to agree that this is the most appropriate solution. If you have further questions about this please contact Sheri Langenberger, Development Review Manager, at 970-221-6573. Comment Number: 9 Comment Originated: 07/19/2017 07/19/2017: Engineering requests at least 1 more formal submittal for the project. The submittal can be electronic rather than paper for Engineering's purposes. Comment Number: 10 Comment Originated: 07/19/2017 Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General 07/19/2017: Language regarding natural resource protection will be included in the Development Agreement for this project. Comment Number: 5 Comment Originated: 07/19/2017 Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com Topic: General 07/07/2017: Thank you for providing a prairie dog removal plan prepared by Jerry Powell, M.S., Certified Wildlife Biologist / Ecologist, with Wildlife Specialties LLC. Environmental Planning has reviewed the document in detail and performed a review of similar plans in other jurisdictions. Please reference the three-page comment letter that is specific to the proposed prairie dog removal plan and dated July 12, 2017. Staff is requesting additional information, requests and clarification. Staff will follow up directly with Wildlife Specialties LLC. Comment Number: 1 Comment Originated: 07/07/2017 Page 2 of 6 07/07/2017: Thank you for adding the note (included below) requested on site and landscape plans for both the ditch setback and associated natural habitat and features and the wetland habitat and features. The approximate buffer hatching is sufficient for the ditch. However, please also add and label the approximate boundary of the 1.5 to 2.0 acre wetland on the northeast portion of the area to be platted on both the site and landscape plans. See redlines on page 2 of 8 of submitted Site Plan. NOTE: "This plan shows the general location and approximate size of all natural areas, habitats, and features within its boundaries pursuant to City of Fort Collins Land Use Code Section 3.4.1(E). Detailed mapping of a site's natural areas, habitats, and features will be provided at the time of individual PDP submittals for these areas. General natural habitat buffer zones may be reduced or enlarged by the decision maker during the PDP process." Comment Number: 2 Comment Originated: 07/07/2017 07/07/2017: See redlines on 4 of 8 of Landscape Plan. Minor details but please: 1) add the word "Total" for the total pounds/acre seeding rate to be used if drill seed method is used. 2) reduce gap between text in "f" of Native Seed Notes. Comment Number: 4 Comment Originated: 07/07/2017 Department: Light And Power Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General 07/21/2017: The existing transformer shown on the existing conditions plan is actually a 3-phase switching cabinet. The utility plan shows this cabinet being relocated into the utility easement. Moving this cabinet will require re-pulling approx.. 4 different runs of 3-phase cable. This will be quite extensive and require a lengthy outage most likely outside of normal business hours. Comment Number: 1 Comment Originated: 07/21/2017 07/21/2017: Any relocation or modification to existing electric facilities will be at the expense of the owner/developer. If Light & Power’s existing electric facilities are to remain within the limits of the project they must be located within a utility easement. Comment Number: 2 Comment Originated: 07/21/2017 07/21/2017: The proposed transformer is shown on the utility plan as being fed from the relocated switching cabinet. This cabinet is already full. A new vault will need to be placed along the proposed Mars Dr. This new vault will serve as the feed for the new transformer. Comment Number: 3 Comment Originated: 07/21/2017 07/21/2017: A commercial service information form (C-1 form) and a one line diagram will need to be submitted to Light & Power Engineering for all proposed commercial buildings and multi-family (commercial) buildings larger than a duplex or greater than 200amps. A link to the C-1 form is below: http://www.fcgov.com/utilities/business/builders-and-developers/development-forms -guidelines-regulations Comment Number: 4 Comment Originated: 07/21/2017 Page 3 of 6 07/21/2017: Electric Capacity Fee, Building Site charges, and any system modification charges necessary will apply to this development. Please contact Light & Power Engineering if you have any questions at 970-221-6700. Please reference our Electric Service Standards, development charges and fee estimator at the following link: http://www.fcgov.com/utilities/business/builders-and-developers Comment Number: 5 Comment Originated: 07/21/2017 Department: Outside Agencies Contact: Terry Ferrill, , Topic: General The Fort Collins -Loveland Water District and the South Fort Collins Sanitation District have reviewed the above mentioned project and submit the following comments. The District does not allow a long dead-end water line. The proposed water line is to end at the service line or looped. The District will require the proposed water line connection to be at the location of the existing tee in Skyway drive. The existing tee is to be replaced with a cross. The District signature block is to be replaced with the most current signature block. The District will require another review due t the nature of the above comments. Please do not hesitate to contact me at 226-3104, ext. 104, if you have any questions or require additional information. Comment Number: Comment Originated: 07/18/2017 Department: PFA Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org Topic: General 07/17/2017: FIRE LANE SIGNS One sign along the west side of the development is not labeled "FIRE LANE SIGN" and requires a label identifying it as a fire lane sign on the site plan. Per sign detail, the appropriate directional arrows will be accepted by the fire department, not "BY ORDER OF THE FIRE MARSHAL". Comment Number: 1 Comment Originated: 07/17/2017 Department: Planning Services Contact: Pete Wray, 970-221-6754, pwray@fcgov.com Topic: Building Elevations 07/18/2017: Need more information on building exterior finish schedule so that the elevation call outs match finish schedule. Comment Number: 2 Comment Originated: 07/18/2017 Topic: General Page 4 of 6 07/21/2017: Based on the staff review discussion on July 19, another round of review is needed. This next round can be an informal PDF review set for a standard 3 week turnaround. In the event staff can determine the project is ready for mylars sooner, we will inform the applicant at that time, but understand with the summer season, this is a challenge. Comment Number: Comment Originated: 07/21/2017 Topic: Site Plan 07/18/2017: Clarify on site plan extent of new sidewalk along Skyway and location of connection to existing walk. Label 5' walk on Mars Drive. Is our minimum walk standard 6' wide? Comment Number: 1 Comment Originated: 07/18/2017 Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control 07/05/2017: Current Erosion Control Materials Submitted do not meet requirements. Please submit; an Erosion Control Plan (Based upon returned redlines), an Erosion Control Report (Based upon comments on the returned CD), and an Escrow / Security Calculation (Will need to be recalculated based upon redlines on the plans). If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 1 Comment Originated: 07/05/2017 Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General 07/19/2017: Please identify the area on the grading plan where the soil media is to be placed for the rain garden. Comment Number: 2 Comment Originated: 07/19/2017 07/19/2017: The two outfall locations on the parcel to the east need to be stable through this area and to the culvert under College Avenue. This is required to ensure stability for the long term. Comment Number: 3 Comment Originated: 07/19/2017 07/19/2017: The 6-inch underdrain for the rain garden can be revised to 4 inches. Comment Number: 4 Comment Originated: 07/19/2017 07/19/2017: Please increase the outfall pipe from the rain garden to capture at least the 10-year storm. The pipe is currently shown to be 6 inches. Comment Number: 5 Comment Originated: 07/19/2017 07/19/2017: The riprap detail proposed may not be the best option in this application. Limited vegetation growth is likely for these side slopes which may not be desirable. Comment Number: 6 Comment Originated: 07/19/2017 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings 07/17/2017: The Basis Of Bearings statement should match the Subdivision Plat. Comment Number: 4 Comment Originated: 07/17/2017 Page 5 of 6 07/17/2017: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. Comment Number: 5 Comment Originated: 07/17/2017 07/17/2017: All benchmark statements must match on all sheets. Comment Number: 6 Comment Originated: 07/17/2017 07/18/2017: All Basis Of Bearings statements must match on all sheets. Comment Number: 7 Comment Originated: 07/18/2017 07/18/2017: There are line over text issues. See redlines. Comment Number: 8 Comment Originated: 07/18/2017 07/18/2017: There are text over text issues. See redlines. Comment Number: 9 Comment Originated: 07/18/2017 07/18/2017: There are cut off text issues. See redlines. Comment Number: 10 Comment Originated: 07/18/2017 07/18/2017: There is text that needs to be masked. Mask all text in hatched areas. See redlines. Comment Number: 11 Comment Originated: 07/18/2017 Topic: Lighting Plan 07/17/2017: There are cut off text issues. See redlines. Comment Number: 3 Comment Originated: 07/17/2017 Topic: Plat 07/17/2017: Please make changes as marked. If changes are not made or you disagree with comments, please provide written response of why corrections were not made. Please provide any responses on redlined sheets and/or in response letter. Comment Number: 1 Comment Originated: 07/17/2017 Topic: Site Plan 07/17/2017: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Comment Number: 2 Comment Originated: 07/17/2017 Department: Traffic Operation Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com Topic: General 07/18/2017: Striping final comments were submitted to Northern Engineering on 7/18. Comment Number: 1 Comment Originated: 07/18/2017 Page 6 of 6