HomeMy WebLinkAboutFTC EASTSIDE PARK SC WTF VERIZON - PDP170029 - SUBMITTAL DOCUMENTS - ROUND 1 - SUBMITTAL CHECKLISTSUBMITTAL CHECKLIST:
WIRELESS-TELECOMMUNICATIONS
EQUIPMENT (NEW FACILITY) REVIEW
Community Development & Neighborhood Services – 281 N College Ave – Fort Collins, CO 80522-0580
The following information is required to be submitted, unless waived, with all applications. Any item waived
must be dated and initialed by a planner with the City of Fort Collins Community Development and
Neighborhood Services Department.
Application form, $3,887.00 filing fee (plus .75 cents for each APO label), and $50.00 sign posting fee.
Application Form.pdf
Transportation Development Review Fee – please contact Engineering at 221-6605 for
information. TDR Fees and Application.pdf
Two (2) lists of names and address of all owners of record of real property within at least 800’ of the
property lines for the parcel on which the project is proposed, exclusive of public rights-of-way. One (1)
list typed on mailing labels and the other list a reproducible copy of those labels.
Legal description of property (2 copies) on 8 ½” x 11” sheet.
Planning Objectives (11 copies)
Architectural Elevations (5 copies – folded)
Site Plan (11 copies – folded)
Utility Plans (electric utility easements?) (6 copies – unfolded)
Photo Simulations
Co-location Documentation (details existing towers in area, carrier, date, name and contact
information regarding who you spoke to and why you can’t co-locate.)
**Note: This checklist is for a brand new facility including the pole and ground equipment.
x
x
x
x
x
x
x
x
x
x