Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
CHRISTIAN BROTHERS AUTOMOTIVE - PDP - PDP170018 - SUBMITTAL DOCUMENTS - ROUND 2 - CITY STAFF
Project: Comm.No. Date 7/27/17 Designer jtc Combined Ea. Total Ea. Total Ea. Water Closet (1.6 gpf) 10.00 0.00 0.00 10.00 0.00 Water Closet (1.28 gpf) 2 5.00 0.00 0.00 5.00 10.00 Bidet 1.50 0.00 1.50 0.00 2.00 0.00 Urinal 0 5.00 0.00 0.00 5.00 0.00 Lavatory 3 1.50 4.50 1.50 4.50 2.00 6.00 Service Sink 0 2.25 0.00 2.25 0.00 3.00 0.00 Bathtub 3.00 0.00 2.00 0.00 4.00 0.00 Shower 3.00 0.00 3.00 0.00 4.00 0.00 Kitchen Sink 1 1.00 1.00 1.00 1.00 1.40 1.40 Dishwashing Machine 0.00 1.40 0.00 1.40 0.00 Clothes Washer Comm.. see mfg see mfg 15.00 0.00 Hose Bibb 3 2.25 6.75 0.00 2.25 6.75 Water Cooler 1 0.25 0.25 0.00 0.25 0.25 Wall Hydrant 0 2.25 0.00 0.00 2.25 0.00 Total SFU Load 12.50 5.50 24.40 GPM 21.5 GPM 20.0 GPM 41.5 1-1/2" Estimated Peak Flow GPM Cold Water The above calculation does not include: Penthouse Suites, Restaurants, Pool Make-up, Fountain Make- up, Mechanical System make-up, or Public Toilets on Uppermost Floors. Qty Total CBA Fort Collins Co. WATER SERVICE CALCULATION Fixture Type Hot Water Proposed pipe size based on maximium velocity of 8 ft/sec. Total SFU to GPM conversion (IPC Table E-102) Additional Flow GPM (Irrigation Negligible)