Loading...
HomeMy WebLinkAboutFORT COLLINS JEEP - PDP - PDP170013 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTFINAL DRAINAGE REPORT Fort Collins Jeep Dealership Fort Collins, Colorado Project #PDP170013 May 26, 2017 PREPARED FOR: Commercial Building Services 7561 S. Grant Street, Suite A-4 Littleton, CO 80122 Contact: Steve Morel (303) 730-3001 PREPARED BY: PARAGON ENGINEERING CONSULTANTS, INC. 7852 South Elati Street, Suite 106 Littleton, CO, CO. 80120 (303) 794-8604 Paragon Project No. 16-018 Paragon Engineering Consultants, Inc. Page 1 Table of Contents I. GENERAL LOCATION AND DESCRIPTION............................................................. 2 A. Site Location .................................................................................................................... 2 B. Description of Property .................................................................................................... 3 C. Floodplain Submittal Requirements ................................................................................. 4 II. MAJOR DRAINAGE BASINS AND SUB-BASINS ...................................................... 4 A. Major Drainage Basins ..................................................................................................... 4 B. Sub-basins ........................................................................................................................ 4 III. DRAINAGE DESIGN CRITERIA .................................................................................. 5 A. Regulations ....................................................................................................................... 5 B. Directly Connected Impervious Area ............................................................................... 6 C. Development Criteria Reference and Constraints ............................................................ 6 D. Hydrologic Criteria .......................................................................................................... 6 E. Hydraulic Criteria ............................................................................................................. 6 F. Floodplain Regulations Compliance ................................................................................ 7 G. Modifications of Criteria .................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN ................................................................................... 7 A. General Concept ............................................................................................................... 7 B. Specific Details ................................................................................................................ 7 V. CONCLUSIONS ................................................................................................................ 8 VI. REFERENCES ................................................................................................................... 8 Appendix A – Vicinity Map, Soils Map, Floodplain Checklist Appendix B – Hydrologic Computations Appendix C – Hydraulic Calculations Paragon Engineering Consultants, Inc. Page 2 I. GENERAL LOCATION AND DESCRIPTION A. Site Location Fort Collins Jeep Dealership is located on a site currently containing 4.48 acres northwest of the intersection of South Mason Street and West County Road 38 in the City of Fort Collins, Larimer County, Colorado. The site lies in the Southeast ¼ of Section 35, Township 7 North, Range 69 West of the 5 th Principal Meridian. It is bounded on the north by an existing car dealership (Pedersen Volvo), on the east by South Mason Street with existing commercial development beyond, on the south by existing West County Road 38, with existing educational development beyond, and on the west by existing bus road, with railroad with existing railway, greenbelt and residential area beyond. Paragon Engineering Consultants, Inc. Page 3 B. Description of Property The existing site was built as a lumber yard, but has not been used for that purpose for some time. Detention appears not to have been required for the site when it was built in 1974, as none is in evidence. Paragon Engineering Consultants, Inc. Page 4 The current area of the site is 4.48 acres. However, South Mason Street is slated for “midtown” redevelopment, and an additional 0.13 acres of additional right-of-way is being requested by the City of Fort Collins to expand South Mason Street. The main building of the site will remain (will be remodeled), with two areas of expansion, one on the west side of the building, and one on the north. An outdoor lumber storage area on the east side of the existing building will be removed, as well as a raised concrete loading dock on the west side of the site and other concrete pad areas. The aging pavement on the site will be removed and replaced. The proposed use is car dealership. Soils on the site, according to USDA National Soil Conservation website, consist of Nunn clay loam- Hydrologic Soil Type C (94% of site) with a small area of Altvan-Satanta loams (6%) – Hydrologic Soil Type B, in the northeast corner of the site. Fort Collins Jeep Dealership is located outside the 100-year floodplain, according to FEMA FIRM map panel 08069C1000F (Map Panel Not Printed.) C. Floodplain Submittal Requirements Fort Collins Jeep Dealership is located outside the 100-year floodplain, according to FEMA FIRM map panel 08069C1000F (Map Panel Not Printed). See “City of Fort Collins Floodplain Review Checklist 50% Development Review Submittals” in Appendix A. II. MAJOR DRAINAGE BASINS AND SUB-BASINS A. Major Drainage Basins The site is located within the Mail Creek Basin, a basin of approximately 1,676 acres in southwest Fort Collins. To the east of the site is College Avenue, which runs north-south and consists of commercial development along the length. The remainder of the basin consists of mixed-use residential development. The basin generally drains west to east to the confluence of Mail Creek and Fossil Creek, and ultimately to Fossil Creek Reservoir. (City of Fort Collins 2017) B. Sub-basins The current drainage pattern consists of a large shallow swale within the west parking area of the site, which directs runoff south to W. County Road 38 via an existing sidewalk chase. The east side of the site slopes to the east from the east side of the main building, towards South Mason Street via a drive entrance located near the south end of the South Mason Street frontage. Both streets drain to the intersection of South County Road 38, and South Mason Street to an existing 10’ Type R inlet located on the South Mason Street side of the intersection. This inlet will be moved west approximately 7’ to be in line with the proposed street widening of South Mason Street There is also a low area in the southwest corner of the site, with no apparent outlet. Proposed Sub-basins The proposed grading will follow a similar pattern. The entrance locations will both change. The W. County Road 38 entrance will be reduced in width to accommodate a bus pullout proposed to Paragon Engineering Consultants, Inc. Page 5 be built immediately west of the drive (eliminating traffic hazard from buses stopping in the lane of this busy street.) The South Mason Street entrance will be moved approximately 300 feet north to near the northeast corner of the site. The runoff which previously drained to the entrance will be re-routed to South Mason Street with a small channel and chase section located near the southeast corner of the new proposed parking lot. A low area in the southwest corner of the site, with no apparent outlet, will be raised such that the runoff can be directed to the sidewalk chase at the low point in the parking area east of the West County Road 38 drive entrance. Proposed Basin A (0.22 acres of pavement) sheet flows to a 2-foot wide concrete pan which directs runoff to Bioretention Pond A. Proposed Basin B (0.33 acres of pavement) sheet flows to a 2-foot wide concrete pan which directs runoff to Bioretention Pond B. Proposed Basin C (1.72 acres of pavement and roof) sheet flows to a 2-foot wide concrete pan which directs runoff to Bioretention Pond C. Proposed Basin D (0.15 acres of pavement) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the north flowline of West Harmony Road. Runoff then flows east to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. Proposed Basin E (0.39 acres of pavement and roof) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the west flowline of South Mason Street. Runoff the flows south to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. Proposed Basin F (0.42 acres of pavement and roof) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the west flowline of South Mason Street. Runoff the flows south to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. Proposed Basin G (0.56 acres of pavement and roof) sheet flows to a 2-foot wide sidewalk chase which directs runoff to the north flowline of West Harmony Road. Runoff then flows east to the relocated Type R inlet at the NW corner of West Harmony Road and South Mason Street. III. DRAINAGE DESIGN CRITERIA A. Regulations The design of the proposed stormwater management system was done in compliance with Fort Collins Amendments to the Urban Drainage and Flood Control District, Urban Storm Drainage Criteria Manual Volumes 1, 2 and 3. (UDFCD 2017) When improvements are proposed to an existing developed site and there is an increase in Paragon Engineering Consultants, Inc. Page 6 impervious area greater than 1000 square feet, onsite detention is required. The existing site impervious area is 158,473 square feet and the proposed impervious area is 159,188 resulting in a net increase in impervious area of 715 square feet therefore detention is not required. Low Impact Development (LID) requirements are required on all redeveloped property. 75% of all newly added or modified impervious are must be treated by LID techniques. There is 122,865 square feet of redeveloped area onsite and 75% of this area is 92,149 square feet or 2.12 acres. This area will be treated with three onsite Rain Gardens aka Bioretention Ponds. The Bioretention Ponds will drain to the 10’ Type R Inlet at the SE corner of the site via a common 6” HPDE outfall pipe. B. Directly Connected Impervious Area The existing site will be redeveloped with a minimum increase in Directly Connected Impervious Area. The increase in impervious area is 715 square feet, a 0.45% increase. C. Development Criteria Reference and Constraints The existing site has no stormwater management infrastructure, and drains undetained off-site. The proposed stormwater management improvements meet Low Impact Development requirements and will improve water quality and impact. D. Hydrologic Criteria Design rainfall values from “Table RA-8 – City of Forst Collins Rainfall Intensity-Duration- Frequency Table for Use with the Rational Method” were used for the design rainfall. (Fort Collins 2016) The Rational Method was used to determine peak runoff from sub-basins A, B, and C, for which the methodology and tables as presented in the Urban Storm Drainage Criteria Manual were used to determine Rational “C” coefficients, and time of concentrations. Calculations can be found in Appendix B of this report. E. Hydraulic Criteria The UDFCD spreadsheet titled “UD-Detention” (Version 3.07, February 2017) was used to calculate both the required water quality capture volume for the three rain gardens and the geometry of the rain gardens. In accordance with LID requirements, Water Quality will be provided for 75% of the redeveloped area, 2.12 acres. The Water Quality Volume is calculated on a per basin basis. The calculations can be found in Appendix C of this report. Autodesk Hydroflow Express was used to calculate the sizing of the rain garden underdrain. The calculation can be found in Appendix C of this report. Paragon Engineering Consultants, Inc. Page 7 F. Floodplain Regulations Compliance Fort Collins Jeep Dealership is located outside the 100-year floodplain, according to FEMA FIRM map panel 08069C1000F (Map Panel Not Printed). See “City of Fort Collins Floodplain Review Checklist 50% Development Review Submittals” in Appendix A. G. Modifications of Criteria No modifications of the criteria are proposed. IV. DRAINAGE FACILITY DESIGN A. General Concept The general drainage concept is to capture 75% of the redeveloped impervious area and treat it by LID techniques via rain gardens. Sub-basins A, B, and C have been designed to total this area. Runoff will drain to these three rain gardens, where it will be treated. Treated water will discharge via a 6” HPDE storm pipe to the existing storm sewer at West County Road 38 and South Mason Street. Sub-basins D, E, F, and G will not be detained or treated and will drain off-site. B. Specific Details Surface runoff from sub-basins A, B, and C will sheet flow over pavement to concrete pans, then collect in rain garden bioretention BMPs. The rain gardens are individually sized to the water quality capture volume (WQCV) of their associated basins. The three rain garden bioretention BMPs will be constructed with an impermeable liner on the bottom, a 4” slotted PVC under-drain pipe embedded in a 6” thick layer of CDOT Class B filter material, and an 18” layer of filter media on top. The 4” under-drain will have 4” cleanouts to provide maintenance access. A concrete outlet structure will have inlet(s) to receive discharge from the under-drain pipe(s) to receive discharge from the WQCV and an inlet grate to receive discharge in excess of the WQCV. A 6” HDPE outlet pipe will discharge from the outlet structure to a proposed 10’ Type R Inlet at the intersection of West County Road 38 and South Mason Street. The storm water will then discharge to the existing storm sewer via a proposed manhole constructed on the existing storm sewer. In accordance with the LID techniques pertinent to the site, only the WQCV must be detained and treated, and only for 75% of the total redeveloped area. Runoff in excess of the WQCV will pond and discharge into the outlet structure inlet grate. If the ponding capacity is exceeded, the runoff discharge off-site to West County Road 38. Sub-basins D, E, F, and G will not be detained or treated and will drain off-site. These areas do not require detention or treatment, as the LID requirement is satisfied by the rain garden bioretention BMPs for sub-basins A, B, and C. Sub-basins D and G will discharge to West County Road 38 via a curb cut. Sub-basins E and F will discharge to South Mason Street via the driveway Paragon Engineering Consultants, Inc. Page 8 at the northeast corner of the site. V. CONCLUSIONS The stormwater management system for the site has been designed in compliance to the Fort Collins Amendments to the Urban Storm Drainage Criteria Manual Volumes 1, 2, and 3. Low Impact Development (LID) requirements were followed to determine BMP requirements. The development of the site will increase the impervious area of the site from 158,473 square feet to 159,188 square feet, an increase of 715 square feet. The stormwater management system will capture and treat stormwater in accordance with the above criteria, and overall will improve the water quality of stormwater and reduce the discharge off-site into the roadway. VI. REFERENCES 1. City of Fort Collins, 2017. Mail Creek. Retrieved July 17, 2017, from https://www.fcgov.com/utilities/what-we-do/stormwater/drainage-basins/mail-creek- basin 2. Urban Drainage and Flood Control District (UDFCD). 2017. Drainage Criteria Manual, Volumes 1, 2, & 3, Urban Drainage and Flood Control District. 3. City of Fort Collins, 2016. Fort Collins Amendments to the Urban Drinage and Flood Control District Criteria Manual. Appendix A – Vicinity Map, Soils Map, Floodplain Checklist Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/12/2017 Page 1 of 4 4485860 4485880 4485900 4485920 4485940 4485960 4485980 4486000 4486020 4486040 4486060 4485860 4485880 4485900 4485920 4485940 4485960 4485980 4486000 4486020 4486040 4486060 493170 493190 493210 493230 493250 493270 493290 493310 493170 493190 493210 493230 493250 493270 493290 493310 40° 31' 31'' N 105° 4' 50'' W 40° 31' 31'' N 105° 4' 44'' W 40° 31' 24'' N 105° 4' 50'' W 40° 31' 24'' N 105° 4' 44'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 45 90 180 270 Feet 0 10 20 40 60 Meters Map Scale: 1:1,010 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 4 Altvan-Satanta loams, 3 to 9 percent slopes B 0.2 5.0% 74 Nunn clay loam, 1 to 3 percent slopes C 4.4 92.1% 75 Nunn clay loam, 3 to 5 percent slopes C 0.1 2.8% Totals for Area of Interest 4.7 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/12/2017 Page 3 of 4 Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/12/2017 Page 4 of 4 City of Fort Collins Floodplain Review Checklist 50% Development Review Submittals Instructions: Complete this checklist by marking all boxes that have been adequately completed. Put an “NA” next to any items that are not applicable to this particular submittal. Any boxes that are left blank and do not have an “NA” marked next to them are considered incomplete. Date of Review:_____________ Reviewer’s Name:____________________________ Plat Map  The following required items are on the plat:  100-year floodplain boundary  City  FEMA  Floodway boundary  City  FEMA  The benchmark number and elevation of benchmark  These items match the FIRM. (FEMA Basin)  These items match the Master Plan. (City Basin)  The benchmark number and elevation match with those published in the City of Fort Collins benchmark system. Site Plan The following required items are on the site plan:  100-year floodplain boundary- FEMA and City  500-year floodplain boundary (if proposed structure is a “critical facility” and a 500-year floodplain is mapped)  Floodway boundary  Erosion buffer zones  Restriction related to use (i.e. critical facility or no residential use of lower floor if floodproofed mixed-use structure) Drainage and/or Grading Plan (or a separate Floodplain Sheet if it is too cluttered on Drainage and Grading Plan) The following required items are on the drainage and/or grading plan:  100-year floodplain boundary- FEMA and City  500-year floodplain boundary (if proposed structure is a “critical facility” and a 500-year floodplain is mapped)  Floodway boundary  Erosion buffer zones  Cross-section locations  BFE lines  Regulatory Flood Protection Elevation for individual lots or groups of lots if structures are to be built in the floodplain.  The floodplain and floodway boundaries are in the correct location and labeled properly.  The cross-section and BFE lines are in the correct location and labeled properly.  Elevations are referred to the appropriate datum:  FEMA basins – list in both NGVD 29 and NAVD 88  City basins – list only in NGVD 29  Floodway regulations have been met.  No fill in the floodway unless a hydraulic analysis shows “no-rise”.  No manufactured homes, except in an existing park, can be placed in the floodway.  No changing a nonconforming non-residential or mixed use structure to a residential structure.  Landscaping meets requirements for no encroachment in the floodway without a hydraulic analysis to show “no-rise”.  No storage of materials or equipment.  Critical facilities regulations have been met:  100 year – No life safety, emergency response, or hazardous material critical facilities  500 year Poudre – No life safety or emergency response critical facilities  Any items in the floodway that can float (Example: picnic tables, bike racks, etc.) are noted as being anchored.  Erosion Buffer Zone requirements have been met:  Design of any allowed development minimizes disturbance to channel bed and banks.  No structures allowed.  No additions to existing structures allowed.  Any fencing is split-rail design and break-away, but cabled. Must be oriented parallel to general flow direction.  No detention or water quality ponds.  No bike or pedestrian paths or trails except as required to cross streams or waterways.  Road, bicycle and pedestrian bridges must span erosion buffer zone.  No fill.  No outdoor storage of non-residential materials or equipment.  No driveways or parking areas.  No irrigated vegetation and non-native trees, grasses, or shrubs.  No utilities except as necessary to cross streams or waterways.  No grading or excavation except as required for permitted activities in erosion buffer zone.  No construction traffic except as required for permitted activities in erosion buffer zone.  Any construction in the erosion buffer zone shows that it will not impact the channel stability.  Any necessary floodplain modeling has been submitted and approved. All modeling must follow the City’s floodplain modeling guidelines. Special Poudre River Regulations  Poudre River Floodway Regulations have been met.  No construction of new residential, non-residential or mixed-use structures.  No redevelopment of residential, non-residential or mixed-use structures.  No additions to residential, non-residential or mixed-use structures.  No fill unless hydraulic analysis shows “no-rise”.  Poudre River floodplain regulations have been met  No construction of new residential or mixed-use structures  No additions to residential structures  No additions to mixed-use structures if there is an expansion in the residential-use area of the structure.  No floatable materials on non-residential sites Information Related to Structures in the Floodplain  The regulatory flood protection elevation shown on the plans is at least 2 ft above the BFE for the Poudre River and at least 18” above the BFE for new development and redevelopment, 6” above the BFE for additions, substantial improvement and accessory structures for all other floodplains.  A note is on the plans that the lowest floor (including basement or crawl space) and HVAC will be required to be elevated above the regulatory flood protection elevation. Non-residential structures can be floodproofed instead of elevated to the regulatory flood protection elevation.  A typical drawing detail is included for each foundation type proposed (slab-on- grade, basement, crawl space) showing the elevation of the HVAC and lowest floor elevation (which includes bottom of the basement or crawl space) relative to the BFE.  If garages are not going to be elevated to the regulatory flood protection elevation, then a note is included stating the following requirements:  There shall be 1 square inch of venting for every 1 square foot of enclosed area.  The bottom of the venting shall not be higher than 1 foot above grade.  The venting shall be on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally).  For manufactured homes, a note is included stating that all submittal requirements on separate sheet titled “Installation of a Mobile Home Located in a Floodplain: Submittal Requirements” shall be met.  A note is on the plans stating that a floodplain use permit will be required for each structure and each site construction element (detention ponds, bike paths, parking lots, utilities, etc.) in the floodplain.  A note is on the plans stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued for any structures in the floodplain. This is required even if property is only in a City floodplain. Drainage Report  The site is described as being in the floodplain. Floodplain name and if the floodplain is a FEMA or City-designated is described. Any floodway or erosion buffer zones on the site are described.  The FEMA FIRM panel # and date and/or the Master Plan information is cited.  A copy of the FIRM panel with the site location marked is included in the report.  If a floodplain modeling report has been submitted, that report is referenced. The reason for the floodplain modeling report is described.  If a FEMA CLOMR or LOMR is going to be needed, the reason for the CLOMR or LOMR is described.  If a FEMA LOMR is required after construction, this is stated in the report.  The location of the structures relative to the floodplain is described. If there is both a FEMA and a City floodplain on the site, the location of the structures relative to both is described.  The use of the structures is described. This is to determine if the structure is residential, non-residential, or mixed-use. Also, structures in all 100- year and Poudre River 500-year floodplains cannot be used as a critical facility. (See Chapter 10 of City Code for definitions.)  The report describes how the development will be in compliance with the applicable floodplain regulations (Chapter 10 of City Code). (Examples: elevation of lowest floor above regulatory flood protection elevation, floodproofing, floodway regulations, erosion buffer zone regulations, no-rise, etc.)  The type of foundation construction for the structures (i.e. slab-on-grade, crawl space, basement, etc.) is discussed in the report.  The type of foundation matches with the details shown on the grading plan.  The report states that the lowest floor (including basement or crawl space) and HVAC will be required to be elevated above the regulatory flood protection elevation. Non- residential structures can be floodproofed instead of elevated to the regulatory flood protection elevation.  If garages are not going to be elevated to the regulatory flood protection elevation, then a note is included stating the following requirements:  There shall be 1 square inch of venting for every 1 square foot of enclosed area.  There bottom of the venting shall not be higher than 1 foot above grade.  The venting shall be on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally).  If a non-residential structure is to be floodproofed, then a note is included stating that all requirements on separate sheet titled “Floodproofing Guidelines” shall be met. (Floodproofing guidelines can be obtained at http://fcgov.com/stormwater/pdf/fp- floodproofing.pdf)  For manufactured homes, a note is included stating that all submittal requirements on separate sheet titled “Installation of a Mobile Home Located in a Floodplain: Submittal Requirements” shall be met. (Mobile Home guidelines can be obtained at http://fcgov.com/stormwater/pdf/fp-mobilhome.pdf)  The report states that a floodplain use permit will be required for each structure and each site construction element (detention ponds, bike paths, parking lots, utilities, etc.) in the floodplain.  A note is in the report stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued.  In the compliance section, Chapter 10 of City Code is listed. FEMA CLOMR Approval  If a FEMA CLOMR is required, the necessary modeling has been submitted and approved by the City. Additional Comments: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Updated 11/29/2007 Terms to Note Lowest Floor Elevation – Elevation of the lowest floor of the lowest enclosed area (including bottom of basement or crawlspace). This is not the same as finished floor. The lowest floor should be distinguished from finished floor on plans and reports. Regulatory Flood Protection Elevation – For all floodplains except the Poudre River, the regulatory flood protection elevation is eighteen (18) inches above the base flood elevation. For the Poudre River floodplain, the regulatory flood protection elevation is twenty-four (24) inches above the base flood elevation. If there is both a FEMA and a City BFE, the higher BFE should be used to determine the regulatory flood protection elevation. Additional floodplain terminology is defined in Chapter 10 of City Code. NOTE: Issues specific to individual sites may arise that result in additional requirements. These will be discussed during initial meetings with the applicant. Appendix B – Hydrologic Computations RUNOFF COEFFICIENTS - DEVELOPED Fort Collins Jeep DATE: 16-018 TWD TWD Type D Soils Type C Soil Type C Soil Historic / Open Space Roof Tract / Open Space Pavement Streets Yard/Landscape 2-Yr Coeff. 0.04 0.95 0.10 0.95 0.89 0.11 5-YEAR Coeff. 0.15 0.95 0.10 0.95 0.90 0.13 Note: Runoff coefficients shown were obtained 100-YEAR Coeff. 0.50 1.19 0.13 1.19 0.96 0.15 from UDFCD Table RO-3 and RO-5 Impervious 2% 95% 10% 95% 100% 0% Historic / Open Space Roof Tract / Open Space Pavement Streets Yard/Landscape Design Design Area Area Area Area Area Area Area Basin Point (AC) (AC) (AC) (AC) (AC) (AC) (AC) CC2 CC5 CC100 % Imp. A 1 0.000 0.005 0.215 0.22 0.93 0.93 1.16 93% B 2 0.02 0.31 0.33 0.89 0.89 1.11 89% C 3 0.35 0.11 1.25 1.72 0.89 0.89 1.12 89% D 4 0.00 E 5 0.00 F 6 0.00 G 7 0.00 0.00 0.35 0.14 1.78 0.00 0.00 2.27 0.90 0.90 1.12 90% 0.0% 15.6% 6.2% 78.3% 0.0% 0.0% 100% 0.00 0.35 0.14 1.78 0.00 0.00 2.27 0.90 0.90 1.12 89.8% 0.0% 15.6% 6.2% 78.3% 0.0% 0.0% 0.0% June 26, 2017 Type B Soils PROJECT NUMBER: CALCULATED BY: CHECKED BY: PROJECT NAME: TOTAL STUDY AREA SUBTOTAL FOR BASIN A Fort Collins Jeep DATE: 16-018 TWD TWD FINAL tc DESIGN AREA C5 LENGTH SLOPE Ti LENGTH SLOPE Cv Land Surface VEL Tt COMP. TOTAL tc=(L/180)+10 C10 C100 BASIN Ac Ft % Min. Ft. % fps Min. tc LENGTH Min. Min. (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) A 0.22 0.93 60 2.2% 1.8 105 0.42% 20.0 Paved Areas 1.3 1.4 3.2 165 10.9 5.0 0.93 1.16 B 0.33 0.89 70 2.4% 2.4 130 44.00% 20.0 Paved Areas 13.3 0.2 2.6 200 11.1 5.0 0.89 1.11 C 1.72 0.89 70 1.1% 3.1 350 0.68% 20.0 Paved Areas 1.7 3.5 6.6 420 12.3 6.6 0.89 1.12 STANDARD FORM SF-2 - DEVELOPED tc CHECK (URBANIZED BASINS) PROJECT NAME: PROJECT NUMBER: DATA INITIAL TIME (Ti ) TRAVEL TIME (Tt ) CALCULATED BY: CHECKED BY: Time of Concentration SUB-BASIN June 26, 2017 1 / 3 0 . 395 ( 1 . 1 ) 1 / 2 S C L Ti = − T L V t = 60 Fort Collins Jeep DATE: 16-018 P1 (1-Hour Rainfall) = 0.99 TWD TWD DESIGN BASIN AREA (AC) RUNOFF COEFF C5 tc (min) C*A(ac) I (in/hr) Q (cfs) tc(min) ∑(C*A) (ac) I (in/hr) Q (cfs) SLOPE (%) STREET FLOW(cfs) DESIGN FLOW(cfs) SLOPE (%) PIPE SIZE (in) LENGTH (ft) VELOCITY (fps) tt (min) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) A 0.22 0.93 CHECKED BY: STORM LINE DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET STANDARD FORM SF-3 - DEVELOPED STORM DRAINAGE DESIGN - RATIONAL METHOD 2-YEAR EVENT PROJECT NAME: June 26, 2017 PROJECT NUMBER: CALCULATED BY: PIPE TRAVEL TIME REMARKS B 0.33 0.89 5.0 5.0 0.20 3.36 0.69 0.29 3.36 0.99 C 1.72 0.89 6.6 1.54 3.10 4.78 Fort Collins Jeep DATE: 16-018 P1 (1-Hour Rainfall) = 1.10 TWD TWD DESIGN BASIN AREA (AC) RUNOFF COEFF C5 tc (min) C*A(ac) I (in/hr) Q (cfs) tc(min) ∑(C*A) (ac) I (in/hr) Q (cfs) SLOPE (%) STREET FLOW(cfs) DESIGN FLOW(cfs) SLOPE (%) PIPE SIZE (in) LENGTH (ft) VELOCITY (fps) tt (min) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) 6.6 1.54 3.45 5.31 0.93 (1) 5.0 0.20 3.73 0.76 5.0 0.29 3.73 1.10 A 0.22 C 1.72 0.89 STANDARD FORM SF-3 - DEVELOPED STORM DRAINAGE DESIGN - RATIONAL METHOD 5-YEAR EVENT PROJECT NAME: June 26, 2017 PROJECT NUMBER: CALCULATED BY: PIPE TRAVEL TIME REMARKS CHECKED BY: STORM LINE DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET B 0.33 0.89 Fort Collins Jeep DATE: 16-018 P1 (1-Hour Rainfall) = 2.86 TWD TWD DESIGN BASIN AREA (AC) RUNOFF COEFF C100 tc (min) C*A(ac) I (in/hr) Q (cfs) tc(min) ∑(C*A) (ac) I (in/hr) Q (cfs) SLOPE (%) STREET FLOW(cfs) DESIGN FLOW(cfs) SLOPE (%) PIPE SIZE (in) LENGTH (ft) VELOCITY (fps) tt (min) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) STREET 2.48 B 0.33 17.25 1.11 5.0 0.37 9.70 3.56 STANDARD FORM SF-3 - DEVELOPED STORM DRAINAGE DESIGN - RATIONAL METHOD 100-YEAR EVENT PROJECT NAME: June 26, 2017 PROJECT NUMBER: CALCULATED BY: (1) A 0.22 1.16 PIPE TRAVEL TIME REMARKS 9.70 CHECKED BY: DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF C 1.72 1.12 6.6 1.92 8.97 5.0 0.26 Appendix C – Hydraulic Calculations Project: Basin ID: Depth Increment = 0.1 ft Required Volume Calculation Media Surface 0.00 33.7 6.2 210 0.005 Selected BMP Type = RG 0.10 33.7 6.2 210 0.005 21 0.000 Watershed Area = 0.22 acres 0.20 33.7 6.3 211 0.005 40 0.001 Watershed Length = 178 ft 0.30 33.7 6.3 212 0.005 61 0.001 Watershed Slope = 0.005 ft/ft 0.40 33.7 6.3 212 0.005 82 0.002 Watershed Imperviousness = 90.00% percent 0.50 33.7 6.3 213 0.005 104 0.002 Percentage Hydrologic Soil Group A = 0.0% percent 0.60 33.8 6.3 214 0.005 125 0.003 Percentage Hydrologic Soil Group B = 0.0% percent 0.70 33.8 6.3 214 0.005 146 0.003 Percentage Hydrologic Soil Groups C/D = 100.0% percent 0.80 33.8 6.4 215 0.005 168 0.004 Desired WQCV Drain Time = 12.0 hours 0.90 33.8 6.4 216 0.005 189 0.004 Location for 1-hr Rainfall Depths = User Input 1.00 33.8 6.4 216 0.005 211 0.005 Water Quality Capture Volume (WQCV) = 0.006 acre-feet 1.10 33.8 6.4 217 0.005 233 0.005 Excess Urban Runoff Volume (EURV) = 0.020 acre-feet 1.20 33.9 6.4 218 0.005 254 0.006 2-yr Runoff Volume (P1 = 0.99 in.) = 0.016 acre-feet 0.99 inches Zone 1 (WQCV) 1.20 33.9 6.4 218 0.005 257 0.006 5-yr Runoff Volume (P1 = 1.1 in.) = 0.019 acre-feet 1.10 inches 1.30 33.9 6.4 218 0.005 276 0.006 10-yr Runoff Volume (P1 = 1.4 in.) = 0.024 acre-feet 1.40 inches 1.40 33.9 6.5 219 0.005 298 0.007 25-yr Runoff Volume (P1 = 1.99 in.) = 0.035 acre-feet 1.99 inches 1.50 33.9 6.5 220 0.005 320 0.007 50-yr Runoff Volume (P1 = 2.15 in.) = 0.038 acre-feet 2.15 inches 1.60 33.9 6.5 220 0.005 342 0.008 100-yr Runoff Volume (P1 = 2.86 in.) = 0.052 acre-feet 2.86 inches 1.70 33.9 6.5 221 0.005 364 0.008 500-yr Runoff Volume (P1 = 3.89 in.) = 0.073 acre-feet 3.89 inches 1.80 34.0 6.5 222 0.005 386 0.009 Approximate 2-yr Detention Volume = 0.015 acre-feet 1.90 34.0 6.5 222 0.005 408 0.009 Approximate 5-yr Detention Volume = 0.017 acre-feet 2.00 34.0 6.6 223 0.005 431 0.010 Approximate 10-yr Detention Volume = 0.022 acre-feet 2.10 34.0 6.6 224 0.005 455 0.010 Approximate 25-yr Detention Volume = 0.029 acre-feet 2.20 34.0 6.6 225 0.005 478 0.011 Approximate 50-yr Detention Volume = 0.029 acre-feet 2.30 34.0 6.6 225 0.005 500 0.011 Approximate 100-yr Detention Volume = 0.035 acre-feet 2.40 34.1 6.6 226 0.005 523 0.012 2.50 34.1 6.6 227 0.005 545 0.013 Stage-Storage Calculation 2.60 34.1 6.7 227 0.005 568 0.013 Zone 1 Volume (WQCV) = 0.006 acre-feet 2.70 34.1 6.7 228 0.005 591 0.014 Select Zone 2 Storage Volume (Optional) = acre-feet 2.80 34.1 6.7 229 0.005 614 0.014 Select Zone 3 Storage Volume (Optional) = acre-feet 2.90 34.1 6.7 229 0.005 636 0.015 Total Detention Basin Volume = 0.006 acre-feet 3.00 34.2 6.7 230 0.005 659 0.015 Initial Surcharge Volume (ISV) = N/A ft^3 3.10 34.2 6.7 231 0.005 682 0.016 Initial Surcharge Depth (ISD) = N/A ft 3.20 34.2 6.8 231 0.005 706 0.016 Total Available Detention Depth (Htotal ) = 1.20 ft 3.30 34.2 6.8 232 0.005 729 0.017 Depth of Trickle Channel (HTC) = N/A ft 3.40 34.2 6.8 233 0.005 752 0.017 Slope of Trickle Channel (STC ) = N/A ft/ft 3.50 34.2 6.8 233 0.005 775 0.018 Slopes of Main Basin Sides (Smain ) = 0.0833 H:V Smain not typical. 3.60 34.3 6.8 234 0.005 799 0.018 Basin Length-to-Width Ratio (RL/W ) = 5.4 3.70 34.3 6.8 235 0.005 822 0.019 3.80 34.3 6.9 235 0.005 846 0.019 Initial Surcharge Area (AISV) = 0 ft^2 3.90 34.3 6.9 236 0.005 869 0.020 Surcharge Volume Length (LISV) = 0.0 ft 0 User Defined Stage-Area Boolean for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA 0 Calc_S_TC H_FLOOR 33.6556 L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.20 Zone 1 (WQCV) 1.20 Zone 1 (WQCV) 0.00 Zone 2 0.00 Zone 2 0.00 Zone 3 0.00 Zone 3 DETENTION BASIN STAGE-STORAGE TABLE BUILDER UD-Detention, Version 3.07 (February 2017) 0.015 0.030 0.045 0.060 0.005 0.010 0.015 0.020 Volume (ac-ft) Area (acres) 0 100 200 300 400 0 10 20 30 40 0.00 2.50 5.00 7.50 10.00 Area (sq.ft.) Length, Width (ft.) Stage (ft) Length (ft) Width (ft) Area (sq.ft.) Bioretention Pond A.xlsm, Basin 7/17/2017, 3:31 PM Project: Basin ID: Depth Increment = 0.1 ft Required Volume Calculation Media Surface 0.00 69.5 4.5 313 0.007 Selected BMP Type = RG 0.10 69.5 4.5 314 0.007 31 0.001 Watershed Area = 0.33 acres 0.20 69.5 4.5 316 0.007 60 0.001 Watershed Length = 195 ft 0.30 69.5 4.6 317 0.007 91 0.002 Watershed Slope = 0.005 ft/ft 0.40 69.5 4.6 318 0.007 123 0.003 Watershed Imperviousness = 90.00% percent 0.50 69.5 4.6 319 0.007 155 0.004 Percentage Hydrologic Soil Group A = 0.0% percent 0.60 69.6 4.6 321 0.007 187 0.004 Percentage Hydrologic Soil Group B = 0.0% percent 0.70 69.6 4.6 322 0.007 219 0.005 Percentage Hydrologic Soil Groups C/D = 100.0% percent 0.80 69.6 4.6 323 0.007 251 0.006 Desired WQCV Drain Time = 12.0 hours 0.90 69.6 4.7 324 0.007 284 0.007 Location for 1-hr Rainfall Depths = User Input 1.00 69.6 4.7 325 0.007 316 0.007 Water Quality Capture Volume (WQCV) = 0.009 acre-feet 1.10 69.6 4.7 327 0.008 349 0.008 Excess Urban Runoff Volume (EURV) = 0.029 acre-feet 1.20 69.7 4.7 328 0.008 382 0.009 2-yr Runoff Volume (P1 = 0.99 in.) = 0.024 acre-feet 0.99 inches Zone 1 (WQCV) 1.20 69.7 4.7 328 0.008 385 0.009 5-yr Runoff Volume (P1 = 1.1 in.) = 0.028 acre-feet 1.10 inches 1.30 69.7 4.7 329 0.008 414 0.010 10-yr Runoff Volume (P1 = 1.4 in.) = 0.036 acre-feet 1.40 inches 1.40 69.7 4.7 330 0.008 447 0.010 25-yr Runoff Volume (P1 = 1.99 in.) = 0.053 acre-feet 1.99 inches 1.50 69.7 4.8 332 0.008 480 0.011 50-yr Runoff Volume (P1 = 2.15 in.) = 0.058 acre-feet 2.15 inches 1.60 69.7 4.8 333 0.008 514 0.012 100-yr Runoff Volume (P1 = 2.86 in.) = 0.078 acre-feet 2.86 inches 1.70 69.7 4.8 334 0.008 547 0.013 500-yr Runoff Volume (P1 = 3.87 in.) = 0.108 acre-feet 3.87 inches 1.80 69.8 4.8 335 0.008 581 0.013 Approximate 2-yr Detention Volume = 0.022 acre-feet 1.90 69.8 4.8 337 0.008 614 0.014 Approximate 5-yr Detention Volume = 0.026 acre-feet 2.00 69.8 4.8 338 0.008 648 0.015 Approximate 10-yr Detention Volume = 0.033 acre-feet 2.10 69.8 4.9 339 0.008 685 0.016 Approximate 25-yr Detention Volume = 0.044 acre-feet 2.20 69.8 4.9 340 0.008 719 0.017 Approximate 50-yr Detention Volume = 0.043 acre-feet 2.30 69.8 4.9 342 0.008 753 0.017 Approximate 100-yr Detention Volume = 0.053 acre-feet 2.40 69.9 4.9 343 0.008 787 0.018 2.50 69.9 4.9 344 0.008 822 0.019 Stage-Storage Calculation 2.60 69.9 4.9 345 0.008 856 0.020 Zone 1 Volume (WQCV) = 0.009 acre-feet 2.70 69.9 5.0 347 0.008 891 0.020 Select Zone 2 Storage Volume (Optional) = acre-feet 2.80 69.9 5.0 348 0.008 926 0.021 Select Zone 3 Storage Volume (Optional) = acre-feet 2.90 69.9 5.0 349 0.008 960 0.022 Total Detention Basin Volume = 0.009 acre-feet 3.00 70.0 5.0 350 0.008 995 0.023 Initial Surcharge Volume (ISV) = N/A ft^3 3.10 70.0 5.0 352 0.008 1,031 0.024 Initial Surcharge Depth (ISD) = N/A ft 3.20 70.0 5.0 353 0.008 1,066 0.024 Total Available Detention Depth (Htotal ) = 1.20 ft 3.30 70.0 5.1 354 0.008 1,101 0.025 Depth of Trickle Channel (HTC) = N/A ft 3.40 70.0 5.1 355 0.008 1,137 0.026 Slope of Trickle Channel (STC ) = N/A ft/ft 3.50 70.0 5.1 357 0.008 1,172 0.027 Slopes of Main Basin Sides (Smain ) = 0.0833 H:V Smain not typical. 3.60 70.1 5.1 358 0.008 1,208 0.028 Basin Length-to-Width Ratio (RL/W ) = 15.4 3.70 70.1 5.1 359 0.008 1,244 0.029 3.80 70.1 5.1 360 0.008 1,280 0.029 Initial Surcharge Area (AISV) = 0 ft^2 3.90 70.1 5.2 362 0.008 1,316 0.030 Surcharge Volume Length (LISV) = 0.0 ft 0 User Defined Stage-Area Boolean for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA 0 Calc_S_TC H_FLOOR 69.4549 L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.20 Zone 1 (WQCV) 1.20 Zone 1 (WQCV) 0.00 Zone 2 0.00 Zone 2 0.00 Zone 3 0.00 Zone 3 DETENTION BASIN STAGE-STORAGE TABLE BUILDER UD-Detention, Version 3.07 (February 2017) 0.025 0.050 0.075 0.100 0.005 0.010 0.015 0.020 Volume (ac-ft) Area (acres) 0 200 400 600 800 0 20 40 60 80 0.00 2.50 5.00 7.50 10.00 Area (sq.ft.) Length, Width (ft.) Stage (ft) Length (ft) Width (ft) Area (sq.ft.) Bioretention Pond B.xlsm, Basin 7/17/2017, 3:32 PM Project: Basin ID: Depth Increment = 0.1 ft Required Volume Calculation Media Surface 0.00 176.2 8.6 1,507 0.035 Selected BMP Type = RG 0.10 176.2 8.6 1,510 0.035 151 0.003 Watershed Area = 1.57 acres 0.20 176.2 8.6 1,513 0.035 287 0.007 Watershed Length = 453 ft 0.30 176.2 8.6 1,516 0.035 438 0.010 Watershed Slope = 0.005 ft/ft 0.40 176.3 8.6 1,519 0.035 590 0.014 Watershed Imperviousness = 90.00% percent 0.50 176.3 8.6 1,522 0.035 742 0.017 Percentage Hydrologic Soil Group A = 0.0% percent 0.60 176.3 8.7 1,525 0.035 894 0.021 Percentage Hydrologic Soil Group B = 0.0% percent 0.70 176.3 8.7 1,528 0.035 1,047 0.024 Percentage Hydrologic Soil Groups C/D = 100.0% percent 0.80 176.3 8.7 1,531 0.035 1,200 0.028 Desired WQCV Drain Time = 12.0 hours 0.90 176.3 8.7 1,534 0.035 1,353 0.031 Location for 1-hr Rainfall Depths = Erie 1.00 176.4 8.7 1,537 0.035 1,507 0.035 Water Quality Capture Volume (WQCV) = 0.042 acre-feet 1.10 176.4 8.7 1,541 0.035 1,661 0.038 Excess Urban Runoff Volume (EURV) = 0.140 acre-feet 1.20 176.4 8.8 1,544 0.035 1,815 0.042 2-yr Runoff Volume (P1 = 0.99 in.) = 0.113 acre-feet 0.99 inches Zone 1 (WQCV) 1.20 176.4 8.8 1,544 0.035 1,831 0.042 5-yr Runoff Volume (P1 = 1.1 in.) = 0.133 acre-feet 1.10 inches 1.30 176.4 8.8 1,547 0.036 1,970 0.045 10-yr Runoff Volume (P1 = 1.4 in.) = 0.171 acre-feet 1.40 inches 1.40 176.4 8.8 1,550 0.036 2,124 0.049 25-yr Runoff Volume (P1 = 1.99 in.) = 0.251 acre-feet 1.99 inches 1.50 176.4 8.8 1,553 0.036 2,280 0.052 50-yr Runoff Volume (P1 = 2.15 in.) = 0.274 acre-feet 2.15 inches 1.60 176.5 8.8 1,556 0.036 2,435 0.056 100-yr Runoff Volume (P1 = 2.86 in.) = 0.373 acre-feet 2.86 inches 1.70 176.5 8.8 1,559 0.036 2,591 0.059 500-yr Runoff Volume (P1 = 3.89 in.) = 0.519 acre-feet inches 1.80 176.5 8.9 1,562 0.036 2,747 0.063 Approximate 2-yr Detention Volume = 0.106 acre-feet 1.90 176.5 8.9 1,565 0.036 2,903 0.067 Approximate 5-yr Detention Volume = 0.125 acre-feet 2.00 176.5 8.9 1,568 0.036 3,060 0.070 Approximate 10-yr Detention Volume = 0.158 acre-feet 2.10 176.5 8.9 1,572 0.036 3,233 0.074 Approximate 25-yr Detention Volume = 0.208 acre-feet 2.20 176.6 8.9 1,575 0.036 3,390 0.078 Approximate 50-yr Detention Volume = 0.204 acre-feet 2.30 176.6 8.9 1,578 0.036 3,548 0.081 Approximate 100-yr Detention Volume = 0.251 acre-feet 2.40 176.6 9.0 1,581 0.036 3,706 0.085 2.50 176.6 9.0 1,584 0.036 3,864 0.089 Stage-Storage Calculation 2.60 176.6 9.0 1,587 0.036 4,022 0.092 Zone 1 Volume (WQCV) = 0.042 acre-feet 2.70 176.6 9.0 1,590 0.037 4,181 0.096 Select Zone 2 Storage Volume (Optional) = acre-feet 2.80 176.7 9.0 1,593 0.037 4,340 0.100 Select Zone 3 Storage Volume (Optional) = acre-feet 2.90 176.7 9.0 1,596 0.037 4,500 0.103 Total Detention Basin Volume = 0.042 acre-feet 3.00 176.7 9.1 1,600 0.037 4,660 0.107 Initial Surcharge Volume (ISV) = N/A ft^3 3.10 176.7 9.1 1,603 0.037 4,820 0.111 Initial Surcharge Depth (ISD) = N/A ft 3.20 176.7 9.1 1,606 0.037 4,980 0.114 Total Available Detention Depth (Htotal ) = 1.20 ft 3.30 176.7 9.1 1,609 0.037 5,141 0.118 Depth of Trickle Channel (HTC) = N/A ft 3.40 176.8 9.1 1,612 0.037 5,302 0.122 Slope of Trickle Channel (STC ) = N/A ft/ft 3.50 176.8 9.1 1,615 0.037 5,463 0.125 Slopes of Main Basin Sides (Smain ) = 0.0833 H:V Smain not typical. 3.60 176.8 9.2 1,618 0.037 5,625 0.129 Basin Length-to-Width Ratio (RL/W ) = 20.6 3.70 176.8 9.2 1,621 0.037 5,787 0.133 3.80 176.8 9.2 1,624 0.037 5,949 0.137 Initial Surcharge Area (AISV) = 0 ft^2 3.90 176.8 9.2 1,627 0.037 6,112 0.140 Surcharge Volume Length (LISV) = 0.0 ft 0 User Defined Stage-Area Boolean for Message 0 Equal Stage-Area Inputs Watershed L:W 1 CountA 0 Calc_S_TC H_FLOOR 176.192 L_FLOOR_OTHER 0.00 ISV 0.00 ISV 0.00 Floor 0.00 Floor 1.20 Zone 1 (WQCV) 1.20 Zone 1 (WQCV) 0.00 Zone 2 0.00 Zone 2 0.00 Zone 3 0.00 Zone 3 DETENTION BASIN STAGE-STORAGE TABLE BUILDER UD-Detention, Version 3.07 (February 2017) 0.000 0.095 0.190 0.285 0.380 0.000 0.015 0.030 0.045 0.060 Volume (ac-ft) Area (acres) 0 500 1000 1500 2000 0 45 90 135 180 0.00 2.50 5.00 7.50 10.00 Area (sq.ft.) Length, Width (ft.) Stage (ft) Length (ft) Width (ft) Area (sq.ft.) Bioretention Pond C.xlsm, Basin 7/17/2017, 3:33 PM W W W W S S S S S S S S S S S S S M S S S S S S S S W W W W W W 4 X X X X X X X X X X X X X X X X SS SS S S S S S S W W W W W W W W W W S S S S S S W W W W W W W W W W W W W S S S S S X X X X X X X X X X X X X X X X X X X X X X X ONLY ONLY 5045 5043 5044 5045 5044 5046 5045 5046 5047 5045 5044 5045 5042 5043 5044 5041 5042 5040 5045 5041 5042 5043 5044 5045 5046 5047 5048 . . . . . . . . . . . . . . .. . . . .. . .. .. .... .. . .... ... .... . .. ... . .... .. .... ...... .. .... . . . . .... . . . . . . . .. . ... ... . .............. . .. ....... .. ... . . . . . ... . . .... ..... . ......... .. ...... . . . . . .................................... ...... . ..... . .................... ...... . ..................... . .......... . . . ... ............ ............ . ..... .... ... . . .. ............... .. . .. .. ... .. ... . ...... ... .......... .. ........... . .. ............ . .. . .. . . . A 0.22 .80 .89 E 0.39 .80 .89 F 0.42 .80 .89 G 0.56 .80 .89 C 1.72 .80 B .89 0.33 .80 .89 . . . . .. . . . D 0.15 .80 .89 . . .. . . .. . .. . . .. . .. . ....... . .. . . . . . .... . .... . .... . . . .... .. ... . . . . . . . . . .. .. . . . . .... . . .. .. . .. . .. . . . . .. . . . . . . . . . . . . 1 2 3 PROPOSED 15' TYPE R INLET PROPOSED 4' DIA. STORM MANHOLE CONNECT AND OUTLET TO EXISTING STORM SEWER EXISTING STORM SEWER REVISIONS DESIGN: SCALE: DRAWN: PROJECT NO: DATE: SHEET PARAGON ENGINEERING CONSULTANTS, INC. LITTLETON, CO 80120 303-794-8604 7852 SOUTH ELATI STREET, SUITE 106 Know what'sbelow. Call before you dig. R FORT COLLINS JEEP DEALERSHIP DRAINAGE PLAN TWD 7/17/2017 1" = 30' MSG 16-018 D1.0 1 SUBMIT TO CITY 07/17/2017 Feet 0 30 60 INFORMATION SHOWN IS SUBJECT TO CHANGE. NOT FOR CONSTRUCTION 4.00 176.9 9.2 1,631 0.037 6,275 0.144 Surcharge Volume Width (WISV) = 0.0 ft 4.10 176.9 9.2 1,634 0.038 6,438 0.148 Depth of Basin Floor (HFLOOR) = 0.00 ft 4.20 176.9 9.3 1,637 0.038 6,601 0.152 Length of Basin Floor (LFLOOR) = 176.2 ft 4.30 176.9 9.3 1,640 0.038 6,765 0.155 Width of Basin Floor (WFLOOR) = 8.6 ft 4.40 176.9 9.3 1,643 0.038 6,929 0.159 Area of Basin Floor (AFLOOR) = 1,507 ft^2 4.50 176.9 9.3 1,646 0.038 7,094 0.163 Volume of Basin Floor (VFLOOR) = 0 ft^3 4.60 177.0 9.3 1,649 0.038 7,259 0.167 Depth of Main Basin (HMAIN) = 1.20 ft 4.70 177.0 9.3 1,652 0.038 7,424 0.170 Length of Main Basin (LMAIN) = 176.4 ft 4.80 177.0 9.4 1,655 0.038 7,589 0.174 Width of Main Basin (WMAIN) = 8.8 ft 4.90 177.0 9.4 1,658 0.038 7,755 0.178 Area of Main Basin (AMAIN) = 1,544 ft^2 5.00 177.0 9.4 1,662 0.038 7,921 0.182 Volume of Main Basin (VMAIN) = 1,831 ft^3 5.10 177.0 9.4 1,665 0.038 8,087 0.186 Calculated Total Basin Volume (Vtotal) = 0.042 acre-feet 5.20 177.1 9.4 1,668 0.038 8,254 0.189 Optional User Override 1-hr Precipitation Total detention volume is less than 100-year volume. Volume (ft^3) Volume (ac-ft) Area (acre) DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft^2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft^2) Width (ft) 16-018 Fort Collins Jeep Bioretention Pond C UD-Detention, Version 3.07 (February 2017) Example Zone Configuration (Retention Pond) Bioretention Pond C.xlsm, Basin 7/17/2017, 3:33 PM 4.00 70.1 5.2 363 0.008 1,352 0.031 Surcharge Volume Width (WISV) = 0.0 ft 4.10 70.1 5.2 364 0.008 1,389 0.032 Depth of Basin Floor (HFLOOR) = 0.00 ft 4.20 70.2 5.2 365 0.008 1,425 0.033 Length of Basin Floor (LFLOOR) = 69.5 ft 4.30 70.2 5.2 367 0.008 1,462 0.034 Width of Basin Floor (WFLOOR) = 4.5 ft 4.40 70.2 5.2 368 0.008 1,498 0.034 Area of Basin Floor (AFLOOR) = 313 ft^2 4.50 70.2 5.3 369 0.008 1,535 0.035 Volume of Basin Floor (VFLOOR) = 0 ft^3 4.60 70.2 5.3 371 0.009 1,572 0.036 Depth of Main Basin (HMAIN) = 1.20 ft 4.70 70.2 5.3 372 0.009 1,609 0.037 Length of Main Basin (LMAIN) = 69.7 ft 4.80 70.3 5.3 373 0.009 1,647 0.038 Width of Main Basin (WMAIN) = 4.7 ft 4.90 70.3 5.3 374 0.009 1,684 0.039 Area of Main Basin (AMAIN) = 328 ft^2 5.00 70.3 5.3 376 0.009 1,721 0.040 Volume of Main Basin (VMAIN) = 385 ft^3 5.10 70.3 5.4 377 0.009 1,759 0.040 Calculated Total Basin Volume (Vtotal) = 0.009 acre-feet 5.20 70.3 5.4 378 0.009 1,797 0.041 DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft^2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft^2) Width (ft) 16-018 Fort Collins Jeep Bioretention Pond B UD-Detention, Version 3.07 (February 2017) Volume (ft^3) Volume (ac-ft) Area (acre) Optional User Override 1-hr Precipitation Total detention volume is less than 100-year volume. Example Zone Configuration (Retention Pond) Bioretention Pond B.xlsm, Basin 7/17/2017, 3:32 PM 4.00 34.3 6.9 237 0.005 893 0.020 Surcharge Volume Width (WISV) = 0.0 ft 4.10 34.3 6.9 237 0.005 917 0.021 Depth of Basin Floor (HFLOOR) = 0.00 ft 4.20 34.4 6.9 238 0.005 940 0.022 Length of Basin Floor (LFLOOR) = 33.7 ft 4.30 34.4 6.9 239 0.005 964 0.022 Width of Basin Floor (WFLOOR) = 6.2 ft 4.40 34.4 7.0 240 0.005 988 0.023 Area of Basin Floor (AFLOOR) = 210 ft^2 4.50 34.4 7.0 240 0.006 1,012 0.023 Volume of Basin Floor (VFLOOR) = 0 ft^3 4.60 34.4 7.0 241 0.006 1,036 0.024 Depth of Main Basin (HMAIN) = 1.20 ft 4.70 34.4 7.0 242 0.006 1,060 0.024 Length of Main Basin (LMAIN) = 33.9 ft 4.80 34.5 7.0 242 0.006 1,084 0.025 Width of Main Basin (WMAIN) = 6.4 ft 4.90 34.5 7.0 243 0.006 1,109 0.025 Area of Main Basin (AMAIN) = 218 ft^2 5.00 34.5 7.1 244 0.006 1,133 0.026 Volume of Main Basin (VMAIN) = 257 ft^3 5.10 34.5 7.1 244 0.006 1,157 0.027 Calculated Total Basin Volume (Vtotal) = 0.006 acre-feet 5.20 34.5 7.1 245 0.006 1,182 0.027 DETENTION BASIN STAGE-STORAGE TABLE BUILDER Optional Override Area (ft^2) Length (ft) Optional Override Stage (ft) Stage (ft) Stage - Storage Description Area (ft^2) Width (ft) 16-018 Fort Collins Jeep Bioretention Pond A UD-Detention, Version 3.07 (February 2017) Volume (ft^3) Volume (ac-ft) Area (acre) Optional User Override 1-hr Precipitation Total detention volume is less than 100-year volume. Example Zone Configuration (Retention Pond) Bioretention Pond A.xlsm, Basin 7/17/2017, 3:31 PM of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 1/12/2017 Page 2 of 4