Loading...
HomeMy WebLinkAbout2620 W. ELIZABETH ST., SINGLE-FAMILY DETACHED - PDP - PDP160037 - CORRESPONDENCE - RESPONSE TO STAFF REVIEW COMMENTSCommunity Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview December 09, 2016 Mike Walker TB GROUP 444 MOUNTAIN AVE Fort Collins, CO 80513 RE: 2620 W Elizabeth St - Single-family Detached, PDP160037, Round Number 1 Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com. Comment Summary: Department: Engineering Development Review Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com Topic: General Comment Number: 2 Comment Originated: 12/06/2016 12/06/2016: Section 3.8.8 (A) of the Land Use Code states: “No part of an area or dimension required for a lot to comply with the provisions of this code shall be included as an area or dimension required another lot, nor shall such required area or dimension be burdened by any easement for an abutting private street or private drive that provides access to the lot or to any other lot.” This requirement may change the layout of the site and should be addressed as soon as possible. Response: Understood. Lot lines have been adjusted Comment Number: 3 Comment Originated: 12/06/2016 12/06/2016: Please review the “West Elizabeth Enhanced Travel Corridor Plan” which was adopted in 10/16. The ultimate cross section in the plan (including detached walk) should be implemented with this development. Interim and ultimate striping plans should be included with development plans. Response: Reviewed and incorporated. Striping plan provided. Comment Number: 4 Comment Originated: 12/06/2016 12/06/2016: ROW will only need to be dedicated to the back of the ultimate sidewalk (ultimate cross section found in above referenced plan). The 30’ noted on the PUD was back when the street was master-planned as a 4 lane arterial and is no longer planned as such. Response: R.O.W. revised Comment Number: 5 Comment Originated: 12/06/2016 12/06/2016: A 15 foot utility easement will need to be dedicated behind the ROW along Elizabeth Street. Response: 15’ Utility easement shown Comment Number: 6 Comment Originated: 12/06/2016 12/06/2016: Elizabeth Street cross section on cover sheet will need to be updated to reflect WEETC plan cross section. Response: Updated Comment Number: 7 Comment Originated: 12/06/2016 12/06/2016: Residential private drive cross section on cover shows parking - this entire drive is within an emergency access easement and parking may not be permitted on the easement - work with PFA to determine if this is OK. Response: No parking sign will be located along both sides of the private drive Comment Number: 8 Comment Originated: 12/06/2016 12/06/2016: The WEETC plan shows a bus pullout adjacent to the property. Please coordinate with Transfort to determine bus pullout location and design. Response: Coordination started with Transfort. Pad for amenities will be incorporated with next submittal Comment Number: 9 Comment Originated: 12/06/2016 12/06/2016: The public street is not being continued; therefore, the driveway into the subdivision will need to be constructed as LCUASS 707.2 driveway standard – pedestrian ramps and concrete to the back of the walk. Response: Updated Comment Number: 10 Comment Originated: 12/06/2016 12/06/2016: Please add a spot for the ditch company to sign the plat/accept the ditch easement. Response: Added Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/18/2016 11/18/2016: The project owes an additional $516.25 for the PDP TDRFees. The acreage was not included in the fee calculation submitted. Response: Fee will be paid at 2nd submittal Department: Environmental Planning Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/23/2016 11/23/2016: Thank you for submitting an Ecological Characterization Study for this site. Per the ECS, the only significant natural features on the site are mature trees, which provide habitat for songbird and other avian species. An on-site meeting with the City Forester still needs to occur to determine mitigation requirements for the trees proposed to be removed. Please include Environmental Planning staff (Stephanie Blochowiak or myself) in that meeting. A tree mitigation plan should be included with the next submittal. For any native trees that will be removed (cottonwood and boxelder), please mitigate with other native tree species to account for the habitat value that will be lost. Response: Tree Inventory Plan is now included based on the Site Visit with Forestry Comment Number: 2 Comment Originated: 11/23/2016 11/23/2016: Please include a water budget chart with the next submittal that identifies all hydrozones and total annual water use on the site, per LUC section 3.2.1(E)(3). Total annual water use should not exceed 15 gallons/square foot over the site, including all hydrozones used on the landscape plan. Response: Table included on landscape plan Comment Number: 3 Comment Originated: 11/23/2016 11/23/2016: It does not appear that the proposed street light fixture is offered in a "warm white" option (color temperature of 3000K or less). This fixture meets the City's standards as proposed. However, if a new fixture is selected at any point in the process, staff encourages the applicant to select a version with a warmer (lower) color temperature to reduce glare and light pollution. Response: Acknowledged Department: Forestry Contact: Molly Roche, , mroche@fcgov.com Topic: Landscape Plans Comment Number: 1 Comment Originated: 12/07/2016 12/07/2016: It appears that there are existing trees within the property lines. Please contact the City Forester for an onsite meeting to obtain tree inventory and mitigation information for landscape plans. Existing significant trees should be retained to the extent reasonably feasible. Response: Tree Inventory Plan is now included based on the Site Visit with Forestry Comment Number: 2 Comment Originated: 12/07/2016 12/07/2016: Please use the City of Fort Collins General Landscape Notes, Street Tree Notes, and Tree Protection Notes. Also, please include the Tree Permit note in the bolded box on all landscape sheets. The Street Tree Notes and the Tree Permit box that are currently on the plans are not the right versions. The correct notes are available through the project planner or the City Forester. Response: Notes have been revised Comment Number: 3 Comment Originated: 12/07/2016 12/07/2016: Please confirm that the extension of Pear Street and Bartlett Drive will be private roads. Response: yes these will be private drives with a 30’ EAE Comment Number: 4 Comment Originated: 12/07/2016 12/07/2016: Street Tree Comments: Northern Red Oak is not expected to survive long-term in Fort Collins soils. Please replace with a species on the Fort Collins Street Tree list, such as Bur Oak. Arterial roads, such as Elizabeth St, are heavily treated with deicing salts. Lindens do not survive or thrive well under these conditions, so we typically do not recommend their placement in such proposed locations. Please replace with a species on the Fort Collins Street Tree list, such as Hackberry. Response: Revised and suggested Comment Number: 5 Comment Originated: 12/07/2016 12/07/2016: Will proposed street trees along Elizabeth be impacted by future widening of W. Elizabeth? It would be helpful to show sidewalk location to determine if trees will be impacted by future widening of the road. Please review tree placement with City of Fort Collins Transportation Planner, Amy Lewin. Response: Trees have been relocated within Tree lawn closer to sidewalk. Impacts should be minimal Comment Number: 6 Comment Originated: 12/07/2016 12/07/2016: The proposed street tree appear to be very close (3 feet) to the privacy fence. Please adjust location to keep trees 4-5 feet off fence. Response: Trees have been relocated within Tree Lawn. Comment Number: 7 Comment Originated: 12/07/2016 12/07/2016: For street tree planting in front of lots, it doesn’t appear feasible to place them in the parkway because of the proposed swale. In lieu of placing the trees in the parkway, please show canopy shade trees behind walk as directed in Land Use Code 3.2.1 2(b). It may be necessary to use an upright ornamental tree, such as Chanticleer Pear and Red Barron Crabapple, if the face of the building and sidewalk are too close. Explore locations of a suitable tree behind the walk. Response: Design of drives and walks have been revised Department: Outside Agencies Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/02/2016 12/02/2016: Comment from Real Estate Services: "In reviewing the plat note 6 identifying the overlap it might be a good idea to add to the language in the note that the East line of the new plat of Elizabeth Street Farms is being revised by this plat to remove the overlap or some such language so it is clear in the language that the overlap is being corrected on the plat." Response: Added Comment Number: 2 Comment Originated: 12/06/2016 12/06/2016: Comments from property owners that use the irrigation lateral on the north side of the property: 1. It is our understanding Bartlett Drive will be a private road and not be maintained or repaired by the City? Therefor, we are requesting a legal binding agreement be initiated prior to any development which clearly stipulates the HOA and/or all lot owners will be responsible for all expenses incurred by the lateral users, including any attorney fees, for any efforts to unplug and/or repair the lateral should problems arise. This agreement will be binding for as long a time period s the lateral is in use. Response: Noted 2. The concrete pipe used to line the lateral will be a minimum of 14 inches in all segments and sealed according to the same standards as stipulated for the City's storm sewers. Response: Irrigation profile shown. 3. Three (3) "clean outs" be installed in the lateral; two spaced out from the existing west clean out and the third at the east boundary where the lateral exists the development. Response: Manholes provided to act as cleanouts 4. We will be running water in the lateral from the first part of May until the end of September. Our use of the lateral cannot be interrupted or interfered with in any manner during this time period. Response: Noted We believe it may be beneficial for all parties involved to meet and discuss re-locating the lateral any potential problems which may become occur. Response: Noted Comment Number: 3 Comment Originated: 12/07/2016 12/07/2016: Comments from GIS: 1. Bartlett Dr has been added to the street name reservation list at larimer.org/streets Response: Thank You 2. Pear St (Private Drive) should be marked on the subdivision plat in place of Drive A. Response: Updated Comment Number: 4 Comment Originated: 12/09/2016 12/09/2016: Comment from Comcast: Developer needs to open trench - rear lot. See image attached to the comment letter. Response: Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General Comment Number: 1 Comment Originated: 11/21/2016 11/21/2016: FIRE ACCESS (NR) PFA will need to see a plan as to how the project team will keep the Emergency Access from Elizabeth open to emergency apparatus while simultaneously keeping it clear of private vehicles and obstructions. Response: No parking sign will be added along both sides of drive Comment Number: 2 Comment Originated: 12/09/2016 12/09/2016: WATER SUPPLY Relocation of the existing hydrant to the dead-end, private drive with hammerhead turnaround will dramatically delay access to water supply for the exiting homes on Pear St that are south of W Plum. The existing hydrant on the cul-de-sac will need to be relocated so as to remain available in it's current location. Response: Hydrant added per request Comment Number: 3 Comment Originated: 12/09/2016 12/09/2016: STREET NAMING Where possible, the naming of private drives is typically recommended to aid in wayfinding. Addresses shall be posted on each structure and where otherwise needed to aid in wayfinding. If the street is not named, monument signage may be required to facilitate wayfinding. Code language provided below. > IFC 505.1: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible, visible from the street or road fronting the property, and posted with a minimum of six-inch numerals on a contrasting background. Where access is by means of a private road and the building cannot be viewed from the public way, a monument, pole or other sign or means shall be used to identify the structure. Response: Understood Comment Number: 4 Comment Originated: 12/09/2016 12/09/2016: FIRE LANE SIGNS The limits of the fire lane shall be fully defined. Fire lane sign locations should be indicated on future plan sets. Signage will also be required at both entrances to the "fire only" drive lane. Code language provided below. > IFC D103.6: Where required by the fire code official, fire apparatus access roads shall be marked with permanent NO PARKING - FIRE LANE signs complying with Figure D103.6. Signs shall have a minimum dimension of 12 inches wide by 18 inches high and have red letters on a white reflective background. Signs shall be posted on one or both sides of the fire apparatus road as required by Section D103.6.1 or D103.6.2. Response: Signage added Comment Number: 5 Comment Originated: 12/09/2016 12/09/2016: GATING As indicated in comment #1 above, should the "fire only" drive lane be required to have access control, an approved plan needs to be submitted for review and approval by the fire authority. Code language provided below. > IFC 503.6: The installation of security gates across a fire apparatus access road shall be approved by the fire chief. Where security gates are installed, they shall have an approved means of emergency operation. The security gates and the emergency operation shall be maintained operational at all times. > IFC D103.5: Gates securing fire apparatus access roads shall comply with all of the following criteria: 1. The minimum gate width for vehicle access shall be 20 feet. 2. Gates shall be of the swinging or sliding type. 3. Construction of gates shall be of materials that allow manual operation by one person. 4. Gate components shall be maintained in an operative condition at all times and replaced or repaired when defective. 5. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. 6. Manual opening gates shall not be locked with an unapproved padlock, or chain and padlock, unless they are capable of being opened by means of forcible entry tools or when a key box containing the key(s) to the lock is installed at the gate location. 7. Gate design and locking device specifications shall be submitted for approval by the fire code official prior to installation. 8. Electric gate operators, where provided, shall be listed in accordance with UL 325. 9. Gates intended for automatic operation shall be designed, constructed and installed to comply with the requirements of ASTM F 2200. Response: Inground roll over delineators have been added. See site plan Comment Number: 6 Comment Originated: 12/09/2016 12/09/2016: "FIRE ONLY" ACCESS LANE TO W ELIZABETH > The fire access connection to W Elizabeth does not appear to meet minimum fire lane standards. Minimum turning radii is 25' and the plan describes an abrupt turn with a 7' radius. > The surface for the connection to W Elizabeth is required to be a hard surface. Compacted road base would require approval of the fire marshal. Fire lane standards provided below. > Roll over curb is allowable at the connection to W Elizabeth, however vertical curbing is not allowable and further discussion is required. FIRE LANE SPECIFICATIONS A fire lane plan shall be submitted for approval prior to installation. In addition to the design criteria already contained in relevant standards and policies, any new fire lane must meet the following general requirements: > Shall be designated on the plat as an Emergency Access Easement. > Maintain the required 20 foot minimum unobstructed width & 14 foot minimum overhead clearance. > Be designed as a flat, hard, all-weather driving surface capable of supporting 40 tons. > Dead-end fire access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. > The required turning radii of a fire apparatus access road shall be a minimum of 25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans. > Be visible by painting and/or signage, and maintained unobstructed at all times. Sign locations or red curbing should be labeled and detailed on final plans. > Additional access requirements exist for buildings greater than 30' in height. Refer to Appendix D of the 2012 IFC or contact PFA for details. International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D; FCLUC 3.6.2(B)2006 and Local Amendments. Response: Acknowledged see site plan Comment Number: 7 Comment Originated: 12/09/2016 12/09/2016: AUTOTURN EXHIBIT The fire marshal has requested that all projects provide turning templates to indicate fire apparatus movement along private drives and throughout Emergency Access Easements within the development site. This is particularly needed as proposed turning radii are described at less than 25' on the hammerhead. Response: Provided Comment Number: 8 Comment Originated: 12/09/2016 12/09/2016: FIRE LANE DEDICATION The proposed EAE is shown to be 28.75' wide while the width of the private drive is shown to be 30'. For clarity, the width of the EAE should be described as flow line to flow line (i.e. also 30' in width). On the other hand, if the intent of the project is to allow on-street parking in the area, further redesign will be required as parking cannot overlap with a dedicated fire lane. Response: EAE is 30’ wide from FL to FL Department: Planning Services Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com Topic: General Comment Number: 3 Comment Originated: 12/09/2016 12/09/2016: If you are looking to seek approval for the site plan submitted for first round of PDP, you will be required to seek modifications to the following standards. Staff would not support this group of modification requests: 3.6.2(G) - Lot depth along an arterial street 3.8.8(A) - Lots - Area and Dimension 4.4(D)(1) - Density (minimum lot size of 6,000 sq. ft. in the RL) 4.4(D)(2)(a) - Minimum lot width of 60' Response: The above modifications are being requested and submitted. Topic: Site Plan Comment Number: 1 Comment Originated: 12/02/2016 12/02/2016: Lots with rear or front yard lines on arterial streets must have a lot depth of at least 150' per Land Use Code section 3.6.2(G). Please submit a modification request to this standard. Response: The above modifications are being requested and submitted. Comment Number: 2 Comment Originated: 12/02/2016 12/02/2016: You are not allowed to count portions of the lot encumbered by access easements/a private drive towards your minimum lot size as outlined in Land Use Code section 3.8.8(A). Due to this, none of the lots meet the minimum lot size in section 4.4(D)(1). You must get a modification to both of these standards to proceed with your current site plan. Staff will not support these modification requests. Response: The above modifications are being requested and submitted. Department: Stormwater Engineering Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control Comment Number: 1 Comment Originated: 11/23/2016 11/23/2016: Current Erosion Control Materials Submitted do not meet requirements. Please submit; an Erosion Control Plan (Based upon redlines), an Erosion Control Report (was not received in packet or was not submitted) , and an Escrow / Security Calculation (was not received in packet or was not submitted). Also, based upon the area of disturbance State permits for storm water will be required since the site is over an acre. If you need clarification concerning the erosion control section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Response: EC plan updated per redlines, SWMP will be provided at final. Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 2 Comment Originated: 12/08/2016 12/08/2016: The City's Low Impact Development standards are required for the development with 50% of the site's proposed impervious surface treated. Response: Comment acknowledged. During our meeting, we discussed the feasibility of several water quality and Low Impact Development (LID) strategies. In lieu of providing WQCV, we propose disconnecting impervious area, to the maximum extent practicable, by routing runoff from the lots and internal private roadway to landscaped swales. We elected to use swales because the site outfall is the flowline of West Elizabeth Street (i.e., no underground infrastructure to tie into), the site is flat and the subsurface study findings do not support infiltration strategies. We did discuss underdrains, with a modified cross-section (i.e., BSM depth), in the swales. Comment Number: 3 Comment Originated: 12/08/2016 12/08/2016: The City's water quality requirements are required for the development. Response: Comment acknowledged. Refer to the response for Comment Number 2. Comment Number: 4 Comment Originated: 12/08/2016 12/08/2016: The limits of the proposed quantity detention must be in a tract within a drainage easement and not located on individual lots. Response: Comment acknowledged. The 100-year water surface elevation limits shown on sheet C9.0 encroach into the 10’ DRAINAGE & UTILITY EASEMENT behind lots 7, 8 and 9. During final design, we’ll revise the grading design to prevent this from occurring. Comment Number: 5 Comment Originated: 12/08/2016 12/08/2016: Lot drainage cannot travel across more than 3 additional lots. The drainage conveyance must be in a tract & drainage easement. Response: Comment acknowledged. Comment Number: 6 Comment Originated: 12/08/2016 12/08/2016: The release rate for the detention pond is not the 2-year existing rate. Please revise. Response: Comment acknowledged. Per the May 25th , 2017 meeting, we discussed an allowable release rate of ±1.2 cfs. The re-submitted detention pond design is based on this release rate. Comment Number: 7 Comment Originated: 12/08/2016 12/08/2016: Basin E1 does not get routed into the detention pond. This 100-year flows from this basin need to be subtracted from the release rate of the pond or routed into the pond. The overall release rate from the site needs to equal the 2-year existing flow. Response: Comment acknowledged. Basin E1 has been renamed to basin B1 in this submittal. The City of Fort Collins (CoFC) acknowledged the site grading restrictions and supports the free release of the basin into Pear Street (existing) without detention or water quality. Comment Number: 8 Comment Originated: 12/08/2016 12/08/2016: Please add detention pond and LID summary tables to the Drainage Plan. Response: Comment acknowledged. The detention pond summary table has been added to sheet C9.0. Comment Number: 9 Comment Originated: 12/08/2016 12/08/2016: The detention pond needs to meet the City's Detention Pond Landscape Standards. This includes more natural grading patterns. Response: Comment acknowledged. Comment Number: 10 Comment Originated: 12/08/2016 12/08/2016: Drainage easements are required for detention ponds, LID facilities, and conveyance elements for the 100-year storm. Response: Comment acknowledged. The detention pond is located in OUTLOT A, DRAINAGE, PEDESTRIAN ACCESS AND LANDSCAPE EASEMENT. Along the north property line, the detention pond’s 100-year water surface elevation spreads west into the 10’ DRAINAGE & UTILITY EASEMENT behind lots 7, 8 and 9. Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Construction Drawings Comment Number: 22 Comment Originated: 12/06/2016 12/06/2016: Please provide the following information for the Benchmark Statement in the EXACT format shown below. PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - X.XX¿. Response: Updated Comment Number: 23 Comment Originated: 12/06/2016 12/06/2016: Please remove the address from the plans. With the project being replatted, the address could change. Response: Acknowledged Comment Number: 24 Comment Originated: 12/06/2016 12/06/2016: There are line over text issues. See redlines. Response: Updated Comment Number: 25 Comment Originated: 12/06/2016 12/06/2016: There is text that needs to be rotated 180°. See redlines. Response: Updated Comment Number: 26 Comment Originated: 12/06/2016 12/06/2016: There are cut off text issues. See redlines. Response: Updated Comment Number: 27 Comment Originated: 12/06/2016 12/06/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Response: Updated Comment Number: 28 Comment Originated: 12/06/2016 12/06/2016: There are text over text issues. See redlines. Response: Updated Comment Number: 29 Comment Originated: 12/06/2016 12/06/2016: There are line over text issues. See redlines. Response: Updated Topic: Landscape Plans Comment Number: 20 Comment Originated: 12/06/2016 12/06/2016: Please remove the address from the plans. With the project being replatted, the address could change. Response: Acknowledged Topic: Lighting Plan Comment Number: 21 Comment Originated: 12/06/2016 12/06/2016: Please correct the project name in the title block. See redlines. . Response: Acknowledged Topic: Plat Comment Number: 1 Comment Originated: 12/06/2016 12/06/2016: There is plat language missing. See redlines. Response: Updated Comment Number: 2 Comment Originated: 12/06/2016 12/06/2016: Are there any Lienholders for this property? If so, please add a signature block. If not, please add a note stating there are none, and include response in written comments. Response: No Lienholders Comment Number: 3 Comment Originated: 12/06/2016 12/06/2016: There are spelling issues. See redlines. Response: Updated Comment Number: 4 Comment Originated: 12/06/2016 12/06/2016: Please add title commitment information as available. Response: Noted and added Comment Number: 5 Comment Originated: 12/06/2016 12/06/2016: Please provide current acceptable monument records for the aliquot corners shown. These should be emailed directly to Jeff at jcounty@fcgov.com Response: Acknowledged Comment Number: 6 Comment Originated: 12/06/2016 12/06/2016: Please label all surrounding properties with "Unplatted" or the subdivision name. This includes properties across right of ways. See redlines. Response: Acknowledged Comment Number: 7 Comment Originated: 12/06/2016 12/06/2016: Please add Private Drive name. Response: Added Comment Number: 8 Comment Originated: 12/06/2016 12/06/2016: Private Drive may need to be in a Tract. Please refer to comments by other departments. Response: Private drive is located in Tract A Comment Number: 9 Comment Originated: 12/06/2016 12/06/2016: The easements along Elizabeth self extinguish with dedication of right of way. See redlines. Response: Noted Comment Number: 10 Comment Originated: 12/06/2016 12/06/2016: Please explain why the found monuments were not accepted per Board Rule 6.5.4.1. See redlines. Response: Acknowledged and will follow up with John Von Nieda Comment Number: 11 Comment Originated: 12/06/2016 12/06/2016: Please add "See Note #6" to the labels as marked. See redlines. Response: Updated Comment Number: 12 Comment Originated: 12/06/2016 12/06/2016: Please add bearings as marked. See redlines. Response: Updated Comment Number: 13 Comment Originated: 12/06/2016 12/06/2016: Please add angle breaks to the right of way lines to match the section line. See redlines. Response: Updated Comment Number: 14 Comment Originated: 12/06/2016 12/06/2016: Per a 11/29/16 phone call, please call John Von Nieda to discuss the pins in Detail A. See redlines. Response: Acknowledged and will follow up with John Von Nieda Topic: Site Plan Comment Number: 15 Comment Originated: 12/06/2016 12/06/2016: Please remove the address from the plans. With the project being replatted, the address could change. Response: Acknowledged Comment Number: 16 Comment Originated: 12/06/2016 12/06/2016: Some of the sheet titles in the sheet index do not match the sheet titles on the noted sheets. See redlines. Response: Acknowledged Comment Number: 17 Comment Originated: 12/06/2016 12/06/2016: Some of the easement descriptions shown are incorrect. If they are going to stay on the plan, they should match what is shown on the Subdivision Plat. Response: Acknowledged Comment Number: 18 Comment Originated: 12/06/2016 12/06/2016: There is text that needs to be rotated 180°. See redlines. Response: Acknowledged Comment Number: 19 Comment Originated: 12/06/2016 12/06/2016: Please revise the legal description to match the legal description on the Subdivision Plat. See redlines. Response: Acknowledged Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General Comment Number: 1 Comment Originated: 11/29/2016 11/29/2016: Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Response: Understood. Thanks Department: Water-Wastewater Engineering Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/08/2016 12/08/2016: The main trunk of the new water main needs to be 8-inches in diameter. The water main serving lots 7 & 8 can remain 6 inches. Response: Water main shown as 8” Comment Number: 2 Comment Originated: 12/08/2016 12/08/2016: Please show all water and sewer services. Response: Added Comment Number: 3 Comment Originated: 12/08/2016 12/08/2016: Please include water main restraint for the dead end fire hydrant line. Response: There is no dead end with revised site plan. Comment Number: 4 Comment Originated: 12/08/2016 12/08/2016: Please label size of existing water mains. Response: Labeled Comment Number: 5 Comment Originated: 12/08/2016 12/08/2016: A thrust block is required for the water main connection in Elizabeth Street. Response: Added Department: Zoning Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com Topic: General Comment Number: 1 Comment Originated: 12/07/2016 12/07/2016: In addition to the 6,000 minimum lot square footage there is also a minimum lot width of 60 feet. Several of these lots are under 60 feet wide. On the corner lots which require a 15 foot side setback, 15 foot rear setback and 20 foot front setback you are left with a very restricted buildable area. Response: The above modifications will be requested and submitted. Thank you for the info on the additional setback. We have accounted for it. 2620 W Elizabeth St- Single Family Detached Light and Power Comments 1. Light and Power has existing single phase electric facilities stubbed at the north property line from Pear St. Power will most likely need to be extend from Pear St into the proposed development. A utility easement will need to be provided to bring power through the site. Response: Acknowledged 2. Any relocation or modification to our existing electric facilities will be at the expense of the owner/developer. If Light and Power existing facilities are to remain within the limits of the project then they must be located within a utility easement. Response: Acknowledged 3. Transformer locations will need to be coordinated with Light & Power. Transformer must be placed within 10 ft of a drivable surface for installation and maintenance purposes. The transformer must also have a front clearance of 10 ft and side/rear clearance of 3 ft minimum. Response: Acknowledged. Transformers and final locations for street lights will be located during final 4. Electric capacity fees, development fees, building site charges and any system modification charges necessary to feed the site will apply to this development. Please visit the following website for an estimate of charges and fees: http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-development-fees Response: Understood. Thank you 5. Please contact Tyler Siegmund at Light & Power Engineering if you have any questions at 970.416.2772. Please reference our policies, construction practices, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers Response: Understood. Thank you