Loading...
HomeMy WebLinkAboutLOT 1, HARMONY COMMONS - PDP - PDP170023 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPDP DRAINAGE REPORT Harmony Commons Second Filing Lot 1 Prepared for: Brinkman Development 3528 Precision Drive, Suite 100 Fort Collins, CO 80528 (970) 667-0954 Prepared by: Interwest Consulting Group 1218 West Ash, Suite A Windsor, Colorado 80550 (970) 674-3300 June 28, 2017 Job Number 1254-045-03 June 28, 2017 Mr. Wes Lamarque City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522-0580 RE: PDP Drainage Report for Harmony Commons Second Filing – Lot 1 Dear Wes, I am pleased to submit for your review and approval, this PDP Drainage Report for the Harmony Commons Second Filing – Lot 1 development. A Final Drainage Report for Lot 2 (which includes calculations for Lot 1) is currently at the City for review. This report is truncated as that report covers most of the Lot 1 development. I certify that this report for the drainage design was prepared in accordance with the criteria in the City of Fort Collins Storm Drainage Manual. I appreciate your time and consideration in reviewing this submittal. Please call if you have any questions. Sincerely, Reviewed By: Erika Schneider, P.E. Michael Oberlander, P.E., LEED AP Colorado Professional Colorado Professional Engineer No. 41777 Engineer No. 34288 TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................ iii 1. GENERAL LOCATION AND DESCRIPTION ................................................................ 1 1.1 Location ........................................................................................................................... 1 1.2 Description of Property ................................................................................................. 1 1.3 Floodplain Submittal Requirements ............................................................................. 1 2. DRAINAGE BASINS AND SUB-BASINS .......................................................................... 2 2.1 Major Basin Description ................................................................................................ 2 2.2 Sub-basin Description .................................................................................................... 2 3. DRAINAGE DESIGN CRITERIA ...................................................................................... 2 3.1 Regulations ...................................................................................................................... 2 3.2 Directly Connected Impervious Area (DCIA) Discussion .......................................... 2 3.3 Development Criteria Reference and Constraints ...................................................... 4 3.4 Hydrological Criteria ..................................................................................................... 4 3.5 Hydraulic Criteria .......................................................................................................... 5 3.6 Floodplain Regulations Compliance ............................................................................. 5 3.7 Modifications of Criteria ............................................................................................... 5 4. DRAINAGE FACILITY DESIGN ....................................................................................... 5 4.1 General Concept ............................................................................................................. 5 4.2 Specific Details ................................................................................................................ 5 5. CONCLUSIONS .................................................................................................................... 8 5.1 Compliance with Standards .......................................................................................... 8 5.2 Drainage Concept ........................................................................................................... 8 6. REFERENCES ...................................................................................................................... 9 APPENDIX VICINITY MAP AND DRAINAGE PLAN .............................................................................. A HYDROLOGIC COMPUTATIONS .......................................................................................... B HYDRAULIC COMPUTATIONS .............................................................................................. C WATER QUALITY AND LID INFORMATION .................................................................... D EXCERPTS FROM REFERENCE REPORTS......................................................................... E 1 1. GENERAL LOCATION AND DESCRIPTION 1.1 Location The Harmony Commons Second Filing – Lot 1 is located in the Northwest Quarter of Section 4, Township 6 North, Range 68 West of the Sixth Principal Meridian, in the City of Fort Collins, Larimer County, Colorado. Please refer to the vicinity map in Appendix A. The project site is located at the southwest corner of E. Harmony Road and Lady Moon Drive. Lot 2 of Harmony Commons bounds the property on the east, E. Harmony Road and Outlot A on the north, Harmony Commons, Lot 7 on the west and Lot 6 of Harmony Commons on the south. 1.2 Description of Property The property consists of about 1.62 acres of land and will consist of a new building, new parking and drive aisles. The site generally slopes in an easterly direction at approximately 0.5% to 1.0%. The land is currently vacant. According to FEMA Panel 08069C0994F there are no mapped FEMA Floodways on this property. 1.3 Floodplain Submittal Requirements Because the project is not within any FEMA or City of Fort Collins mapped floodway, a Floodplain Submittal is not required and a “City of Fort Collins Floodplain Review Checklist for 100% Submittals” has not been included with this report. 2 2. DRAINAGE BASINS AND SUB-BASINS 2.1 Major Basin Description The proposed development lies within the McClellands Basin and McClellands Creek Master Drainage Plan. The overall development has been designed with a master plan by Stantec Consulting, Inc. and titled “Final Drainage and Erosion Control Study Harmony Technology Park Site Master Plan”, dated May 19, 2008. The area was also designed with a drainage report by Interwest Consulting Group, Inc. and titled “Final Drainage Report Harmony Commons Subdivision”, dated March 11, 2016 and approved by the City on May 16, 2016. The “Final Drainage Report – Harmony Commons Second Filing Lot 2” is currently under review by the City, this report also studied Lot 1. 2.2 Sub-basin Description Historically, the site generally drains to the storm system in Lady Moon Drive and Rock Creek Drive and eventually reaches the Fossil Creek Reservoir Inlet Ditch (FCRID). 3. DRAINAGE DESIGN CRITERIA 3.1 Regulations This report was prepared to meet or exceed the “City of Fort Collins Storm Drainage Design Criteria Manual” specifications. Where applicable, the criteria established in the “Urban Storm Drainage Criteria Manual” (UDFCD), developed by the Denver Regional Council of Governments, has been used. 3.2 Directly Connected Impervious Area (DCIA) Discussion Urban Drainage and Flood Control District (UDFCD) recommends a Four Step Process for receiving water protection that focuses on reducing runoff volumes, treating the water quality capture volume (WQCV), stabilizing drainageways and implementing long-term source controls. The Four Step Process applies to the management of smaller, frequently occurring events. 3 Step 1: Employ Runoff Reduction Practices To reduce runoff peaks, volumes, and pollutant loads from urbanizing areas, implement Low Impact Development (LID) strategies, including Minimizing Directly Connected Impervious Areas (MDCIA). Runoff from the parking lot and surrounding sidewalks shall drain directly into porous pavement systems thereby slowing runoff and also promoting infiltration Step 2: Implement BMPs that Provide a Water Quality Capture Volume with Slow Release Once runoff has been minimized, the remaining runoff shall be treated through the porous pavement system. The porous pavement system allows for settlement of sediments. Step 3: Stabilize Drainageways Natural Drainageways are subject to bed and bank erosion due to increases in frequency, duration, rate and volume of runoff during and following development. Because the site will drain to a master planned regional water quality and detention pond, bank stabilization is unnecessary with this project. Step 4: Implement Site Specific and Other Source Control BMPs Proactively controlling pollutants at their source by preventing pollution rather than removing contaminants once they have entered the stormwater system or receiving waters is important when protecting storm systems and receiving waters. This can be accomplished through site specific needs such as construction site runoff control, post- construction runoff control and pollution prevention / good housekeeping. It will be the responsibility of the contractor to develop a procedural best management practice for the site. 4 3.3 Development Criteria Reference and Constraints The runoff from this site has been routed to conform to the requirements of the City Stormwater Department and the approved Harmony Technology and Harmony Commons drainage plans. Because water quality capture volume from this site will be provided for in the downstream regional detention and water quality pond 301, water quality facilities are not required for the site. However, City LID requirements are necessary therefore; additional water quality will be accomplished through the use of the porous pavement systems that include 24” of storage in the voids below the pavers. The impervious area for the site has also already been accounted for in Pond 301 and was assumed to have a C value of 0.80 and an impervious value of 80%. Please refer to supporting documentation in Appendix E. Runoff reduction practices (LID techniques) are also required. No less than fifty percent of any newly added impervious area must be treated using one or a combination of LID techniques. The project adds 51,393 sf of new impervious area. Using the porous paver LID technique, 35,957 sf of new impervious area (70%) will be treated which exceeds the 50% requirement. No less than twenty five percent of any newly added pavement areas must be treated using a permeable pavement technology. The project adds 32,530 sf of new pavement area. This project will incorporate 8,952 sf of porous pavers which is 28% of the newly added pavement which meets the required 25%. Please refer to Appendix D for LID calculations and information. 3.4 Hydrologic Criteria Runoff computations were prepared for the 10-year minor and 100-year major storm frequency utilizing the rational method. All hydrologic calculations associated with the basins are included in Appendix B of this report. Standard Form 8 (SF-8) provides time of concentration calculations for all sub- basins. Standard Form 9 (SF-9) provides a summary of the design flows for all Sub- basins and Design Points associated with this site. 5 Water quality capture volume and detention has been provided for in the downstream regional detention and water quality pond 301. 3.5 Hydraulic Criteria All hydraulic calculations are presented in Appendix C of this report and are prepared in accordance with the City of Fort Collins Drainage Criteria. Hydraulic calculations include inlet capacity spreadsheets and StormCAD calculations. 3.6 Floodplain Regulations Compliance The project is not within any FEMA or City of Fort Collins mapped floodway; therefore, Floodplain Regulations Compliance is not required. 3.7 Modifications of Criteria There are no Modifications of Criteria for this development. 4. DRAINAGE FACILITY DESIGN 4.1 General Concept The majority of the proposed development will be collected and conveyed to the proposed storm drain system via porous pavement systems before being conveyed under Timberwood Drive to Pond 301. 4.2 Specific Details A summary of the drainage patterns within each basin is provided in the following paragraphs. Please refer to Appendix A for the drainage plan. 6 PROPOSED DEVELOPMENT (LOT 1) Basin J1 and J2 are 0.92 and 0.65 acres, respectively and contain Lot 1’s parking lot and building. Basin J1 is calculated to have a 10-year discharge of 3.2 cfs and a 100-year discharge of 8.8 cfs. Flows from Basin J1 will be captured by the porous paver system where the 100- year flow will be detained and reduced to 1.1 cfs. An underdrain system will release this flow into the proposed storm system of Lot 2 that will release into the existing double 5’x2’ box culvert under Timberwood Drive. Basin J2 is calculated to have a 10-year discharge of 1.7 cfs and a 100-year discharge of 4.5 cfs. Flows from the building roof will be collected in 15 inch roof drains that will drain to the same proposed storm system that releases into the existing double 5’x2’ box culvert under Timberwood Drive. Basin C2 was adjusted from the original area of the Harmony Commons drainage study. The area is 0.26 acres and is calculated to have a 10-year discharge of 1.0 cfs and a 100- year discharge of 2.6 cfs. Flow from this basin is captured by the existing 5’ Type R sump inlet in the drive aisle at design point c2. This inlet directs flow to the existing storm system that releases to the existing double 5’x2’ box culvert under Timberwood Drive. 7 5. CONCLUSIONS 5.1 Compliance with Standards All computations that have been completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria Manual. 5.2 Drainage Concept The proposed drainage concepts presented in this report and on the construction plans adequately provides for stormwater quantity and quality treatment of proposed impervious areas. Conveyance elements have been designed to pass required flows and to minimize future maintenance. If, at the time of construction, groundwater is encountered, a Colorado Department of Health Construction Dewatering Permit will be required. 8 6. REFERENCES 1. Interwest Consulting Group, “Final Drainage Report Harmony Commons Subdivision”, dated March 11, 2016. 2. City of Fort Collins, “Fort Collins Stormwater Criteria Manual Amendments to the Urban Drainage and Flood Control District Criteria Manual”, adopted December 2011. 3. Urban Drainage and Flood Control District, “Urban Storm Drainage Criteria Manual”, Volumes 1 and 2, dated June 2001, and Volume 3 dated November 2010. 4. JR Engineering, “Final Drainage and Erosion Control Report Harmony Technology Park Second Filing”, dated June 20, 2001. 5. Stantec Consulting, Inc., “Final Drainage and Erosion Control Study Harmony Technology Park Site Master Plan”, dated May 19, 2008. A APPENDIX A VICINITY MAP AND DRAINAGE PLAN B APPENDIX B HYDROLOGIC COMPUTATIONS SUMMARY DRAINAGE SUMMARY TABLE Design Tributary Area C (10) C (100) tc (10) tc (100) Q(10)tot Q(100)tot Sub-basin REMARKS Point (ac) (min) (min) (cfs) (cfs) C2 C2 0.26 0.80 1.00 5.3 5.0 1.0 2.6 EX 5' TYPE R SUMP INLET J1 J1 0.92 0.77 0.97 6.2 5.0 3.2 8.8 POROUS PAVERS J2 J2 0.65 0.58 0.73 6.6 5.7 1.7 4.5 ROOF STORM SYSTEM K1 K1 0.42 0.74 0.92 5.6 5.0 1.4 3.9 EX POROUS PAVERS K2 K2 0.37 0.76 0.95 6.3 5.0 1.3 3.4 EX POROUS PAVERS K3 K3 0.40 0.67 0.84 11.1 8.6 1.0 2.7 EX ROOF STORM SYSTEM Page 7 Interwest Consulting Group RUNOFF COEFFICIENTS & % IMPERVIOUS LOCATION: Lot 1 - Harmony Commons Subdivision PROJECT NO: 1254-045-02 COMPUTATIONS BY: es DATE: 6/20/2017 Recommended Runoff Coefficients from Table RO-11 of City of Fort Collins Stormwater Code, Volume I Recommended % Impervious from Table RO-3 Urban Storm Drainage Criteria Manual, Volume I Type B Soils Runoff % coefficient Impervious C Streets, parking lots (asphalt): 0.95 100 Sidewalks (concrete): 0.95 96 Roofs: 0.95 90 Gravel or Pavers: 0.50 40 Landscape Areas (Flat, heavy) : 0.20 0 Landscape Areas (Steep, heavy) : 0.35 0 SUBBASIN TOTAL TOTAL ROOF PAVED PAVERS SIDEWALK LANDSCAPE RUNOFF % DESIGNATION AREA AREA AREA AREA AREA AREA AREA COEFF. Impervious REMARKS (ac.) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (sq.ft) (C) C2 0.26 11,301 0 6,991 0 2,016 2,294 0.80 79 I 1.47 64,152 15,656 17,447 10,162 7,427 13,460 0.72 67 J1 0.92 40,086 0 23,578 8,952 3,427 4,129 0.77 76 J2 0.65 28,464 12,871 0 0 1,674 13,920 0.58 46 K1 0.42 18,415 0 11,264 4,813 0 2,338 0.74 72 K2 0.37 16,137 0 7,030 4,649 3,173 1,285 0.76 74 K3 0.40 17,336 8,956 0 0 1,881 6,498 0.67 57 TOTAL J 1.57 68550.73 12871.02 23578.28 8952.00 5100.26 18049.17 0.69 64 Equations - Calculated C coefficients & % Impervious are area weighted C = Σ (Ci Ai) / At Ci = runoff coefficient for specific area, Ai Ai = areas of surface with runoff coefficient of Ci n = number of different surfaces to consider At = total area over which C is applicable; the sum of all Ai's 6-20-17 FC FLOW LOT 1 PDP.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION - 2 and 10 YR LOCATION: Lot 1 - Harmony Commons Subdivision PROJECT NO: 1254-045-02 COMPUTATIONS BY: es DATE: 6/20/2017 2 and 10-yr storm Cf = 1.00 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) c2 C2 0.26 0.80 12 2.0 1.6 375 0.7 0.016 1.7 3.7 5.3 387 12.2 5.3 i I 1.47 0.72 60 2.0 4.4 350 0.5 0.03 0.8 7.7 12.1 410 12.3 12.1 j1 J1 0.92 0.77 20 2.0 2.2 200 0.6 0.03 0.8 4.0 6.2 220 11.2 6.2 j2 J2 0.65 0.58 20 2.0 3.4 160 0.6 0.03 0.8 3.2 6.6 180 11.0 6.6 k1 K1 0.42 0.74 20 2.0 2.4 160 0.6 0.03 0.8 3.2 5.6 180 11.0 5.6 k2 K2 0.37 0.76 20 2.0 2.3 200 0.6 0.03 0.8 4.0 6.3 220 11.2 6.3 k3 K3 0.40 0.67 60 1.0 6.2 170 0.3 0.03 0.6 4.8 11.1 230 11.3 11.1 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves 6-20-17 FC FLOW LOT 1 PDP.xls Interwest Consulting Group STANDARD FORM SF-2 TIME OF CONCENTRATION - 100 YR LOCATION: Lot 1 - Harmony Commons Subdivision PROJECT NO: 1254-045-02 COMPUTATIONS BY: es DATE: 6/20/2017 100-yr storm Cf = 1.25 from Table RO-12 of City of Fort Collins Stormwater Code, Volume I SUB-BASIN INITIAL /OVERLAND TRAVEL TIME / GUTTER OR CHANNEL FLOW tc CHECK FINAL REMARKS DATA TIME (ti) (tt) (URBANIZED BASIN) tc DESIGN SUBBASIN(s) Area C C*Cf Length Slope ti Length Slope n Vel. tt tc = Total L tc=(l/180)+10 PONIT (ac) (ft) (%) (min) (ft) (%) Manning (ft/s) (min) ti + tt (ft) (min) (min) (1) (2) (3) (4) (5) (6) (7) (8) rough. (9) (10) (11) (12) (13) (14) c2 C2 0.26 0.80 1.00 12 2.0 0.5 375 0.7 0.016 1.7 3.7 4.2 387 12.2 5.0 i I 1.47 0.72 0.90 60 2.0 2.3 350 0.5 0.03 0.8 7.7 10.0 410 12.3 10.0 j1 J1 0.92 0.77 0.97 20 2.0 0.9 200 0.6 0.03 0.8 4.0 4.9 220 11.2 5.0 j2 J2 0.65 0.58 0.73 20 2.0 2.5 160 0.6 0.03 0.8 3.2 5.7 180 11.0 5.7 k1 K1 0.42 0.74 0.92 20 2.0 1.2 160 0.6 0.03 0.8 3.2 4.4 180 11.0 5.0 k2 K2 0.37 0.76 0.95 20 2.0 1.0 200 0.6 0.03 0.8 4.0 5.0 220 11.2 5.0 k3 K3 0.40 0.67 0.84 60 1.0 3.8 170 0.3 0.03 0.6 4.8 8.6 230 11.3 8.6 EQUATIONS: tc = ti + tt ti = [1.87 (1.1 - CCf ) L0.5 ] / S 1/3 tt = L/Vel. Velocity from Manning's Equation with R=0.1 (corresponds to Figure 3-3 of City of Fort Collins Design Manual) final tc = minimum of ti + tt and urbanized basin check min. tc = 5 min. due to limits of IDF curves 6-20-17 FC FLOW LOT 1 PDP.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 2-Yr Storm) LOCATION: Lot 1 - Harmony Commons Subdivision PROJECT NO: 1254-045-02 COMPUTATIONS BY: es DATE: 6/20/2017 2 yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (2) from Q (2) Q(2)tot Sub-basin Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) c2 C2 0.26 0.80 5.3 2.76 0.6 0.6 i I 1.47 0.72 12.1 2.06 2.2 2.2 j1 J1 0.92 0.77 6.2 2.63 1.9 1.9 j2 J2 0.65 0.58 6.6 2.58 1.0 1.0 k1 K1 0.42 0.74 5.6 2.71 0.8 0.8 k2 K2 0.37 0.76 6.3 2.62 0.7 0.7 k3 K3 0.40 0.67 11.1 2.14 0.6 0.6 Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 24.221 / (10+ tc)0.7968 6-20-17 FC FLOW LOT 1 PDP.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 10-Yr Storm) LOCATION: Lot 1 - Harmony Commons Subdivision PROJECT NO: 1254-045-02 COMPUTATIONS BY: es DATE: 6/20/2017 10 yr storm, Cf = 1.00 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Design Tributary A C Cf tc i Q (10) from Q (10) Q(10)tot Sub-basin Design Point (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) c2 C2 0.26 0.80 5.3 4.71 1.0 1.0 i I 1.47 0.72 12.1 3.52 3.7 3.7 j1 J1 0.92 0.77 6.2 4.50 3.2 3.2 j2 J2 0.65 0.58 6.6 4.40 1.7 1.7 k1 K1 0.42 0.74 5.6 4.63 1.4 1.4 k2 K2 0.37 0.76 6.3 4.48 1.3 1.3 k3 K3 0.40 0.67 11.1 3.65 1.0 1.0 Q = Cf C iA Q = peak discharge (cfs) C = runoff coefficient Cf = frequency adjustment factor i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 41.44 / (10+ tc)0.7974 6-20-17 FC FLOW LOT 1 PDP.xls Interwest Consulting Group RATIONAL METHOD PEAK RUNOFF (City of Fort Collins, 100-Yr Storm) LOCATION: Lot 1 - Harmony Commons Subdivision PROJECT NO: 1254-045-02 COMPUTATIONS BY: es DATE: 6/20/2017 100 yr storm, Cf = 1.25 DIRECT RUNOFF CARRY OVER TOTAL REMARKS Des. Area A C Cf tc i Q (100) from Q (100) Q(100)tot Design Point Design. (ac) (min) (in/hr) (cfs) Point (cfs) (cfs) c2 C2 0.26 1.00 5.0 9.95 2.6 2.6 i I 1.47 0.90 10.0 7.77 10.3 10.3 j1 J1 0.92 0.97 5.0 9.95 8.8 8.8 j2 J2 0.65 0.73 5.7 9.43 4.5 4.5 k1 K1 0.42 0.92 5.0 9.95 3.9 3.9 k2 K2 0.37 0.95 5.0 9.77 3.4 3.4 k3 K3 0.40 0.84 8.6 8.21 2.7 2.7 Q = C iA Q = peak discharge (cfs) C = runoff coefficient i = rainfall intensity (in/hr) from City of Fort Collins IDF curve (4/16/99) A = drainage area (acres) i = 84.682 / (10+ tc) 0.7975 6-20-17 FC FLOW LOT 1 PDP.xls ❞ ✣ ★ ✥ ✩ ✪ ✎ ✘ ✏ ✔ ✞ ☛ ☛ ☛ ✙ ✌ ✕ ✟ ✍ ☛ ✆ ✫ ☛ ✂ ✡ ✬ ✎ ✭ ✌ ✍ ✮ ✄ ✞ ✯ ✰ ✟ ✗ ☛ ✱ ☛ ✴ ✓ ✳ ✵ ☛ ✍ ✝ ✔ ✆ ✔ ✌ ☛ ✡ ✌ ✡ ✍ ☛ ✥ ✡ ✗ ✚ ✁ ✂ ✞ ✎ ✆ ✍ ☛ ✎ ✌ ✄ ✡ ☛ ✌ ✝ ✆ ✞ ✏ ✆ ✎ ✂ ✌ ✠ ✠ ✞ ✎ ✟ ✕ ☛ ✆ ✆ ✶ ✂ ✑ ☛ ▲ ❑ ❑ ✘ ✔ ☛ ✌ ✍ ✆ ✂ ✎ ✍ ✄ ✍ ✎ ☎ ✂ ✝ ✞ ✒ ✎ ✏ ✍ ☎ ✞ ✎ ✏ ✏ ✕ ✝ ✠ ✠ ✞ ✎ ✂ ✖ ☛ ✂ ✑ ☛ ✆ ✌ ✄ ☛ ✌ ✆ ✂ ✑ ✌ ✂ ✏ ✎ ✍ ✂ ✑ ☛  ✣ ❁ ✥ ✪ ☞ ✡ ✔ ✷ ❻ ⑥ ⑥ ⑥ ⑥ ⑥ ❸ ⑨ ⑤ ❷ ⑩ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑨ ❸ ⑦ ⑨ ❶ ❷ ❸ ⑩ ⑥ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑦ ⑤ ⑨ ⑨ ❸ ❸ ⑤ ❶ ⑨ ❶ ⑨ ⑤ ⑨ ⑨ ⑨ ⑤ ⑦ ⑦ ⑦ ⑦ ❺ ❶ ⑧ ⑩ ⑦ ⑥ ❶ ⑧ ⑩ ⑧ ⑥ ⑥ ❸ ⑧ ❶ ❺ ❹ ❹ ❹ ⑦ ⑦ ❸ ❸ ⑦ ❸ ⑨ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑥ ⑥ ⑥ ❶ ⑤ ❹ ⑨ ⑨ ⑨ ⑦ ⑦ ❷ ⑤ ⑦ ❷ ❶ ⑥ 7DEOH5$ &LW\RI)RUW&ROOLQV5DLQIDOO,QWHQVLW\±'XUDWLRQ±)UHTXHQF\7DEOHIRU8VHZLWKWKH5DWLRQDO0HWKRG ❢ ❣ ❤ ✐ ❥ ❦ ❧ ❸ ❸ ❸ ❸ ♠ ❹ ⑥ ❸ ⑨ ♥ ♦ ❦ ♠ ♣ q r s t ✐ ❤ ✉ ♠ ❥ ❹ ❹ ❹ ❹ t ⑦ ⑦ ⑦ ⑦ ♠ ⑥ ⑥ ⑥ ❹ ✈ ⑩ ⑨ ⑥ ❶ ❦ ❥ ✇ ♥ ❦ PLQXWHVWRPLQXWHV ♠ ① ② ❤ ♣ ③ ④ r s t ✐ ❤ ✉ ♠ ⑥ ⑥ ⑥ ⑥ ❥ t ⑦ ⑦ ⑦ ⑦ ❹ ❹ ❺ ❺ ♠ ❷ ⑥ ⑧ ⑨ ✈ ❦ ❥ ✇ C APPENDIX C HYDRAULIC CALCULATIONS SEE LOT 2 – FINAL DRAINAGE REPORT CURRENTLY UNDER REVIEW D APPENDIX D WATER QUALITY AND LID INFORMATION New Impervious Area 51,393 acre/sq. ft. Required Minimum Impervious Area to be Treated 25,697 acre/sq. ft. Ratio Area of Paver Section #1 (BASIN J1) 8,952 acre/sq. ft. Pavement area for Paver Section #1 23,525 acre/sq. ft. 2.6 Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 26,952 acre/sq. ft. 3.0 Total Impervious Area Treated 35,904 acre/sq. ft. Actual % On-Site Treated by LID 70 % New Pavement Area 32,477 acre/sq. ft. Required Minimum Area of Porous Pavement 8,119 acre/sq. ft. Area of Paver Section #1 8,952 acre/sq. ft. Total Porous Pavement Area 8,952 acre/sq. ft. Actual % of Porous Pavement Provided 28 % NOTE: City recommended ratio is 3:1 for impervious areas. All pavement areas are less than 3:1. Total areas vary. 50% On-Site Treatment by LID Requirement 25% Porous Pavement Requirement LID Table New Impervious Area 51,393 acre/sq. ft. Required Minimum Impervious Area to be Treated 25,697 acre/sq. ft. Ratio Area of Paver Section #1 (BASIN J1) 8,952 acre/sq. ft. Pavement area for Paver Section #1 23,578 acre/sq. ft. 2.6 Impervious Area Treated by LID Treatment Method #1 (Pervious Pavement System) 27,005 acre/sq. ft. 3.0 Total Impervious Area Treated 35,957 acre/sq. ft. Actual % On-Site Treated by LID 70 % New Pavement Area 32,530 acre/sq. ft. Required Minimum Area of Porous Pavement 8,133 acre/sq. ft. Area of Paver Section #1 8,952 acre/sq. ft. Total Porous Pavement Area 8,952 acre/sq. ft. Actual % of Porous Pavement Provided 28 % 50% On-Site Treatment by LID Requirement 25% Porous Pavement Requirement LID Table FLOW REDUCTION CALCULATIONS BASED ON PAVER VOLUME Rational Volumetric (FAA) Method OVERALL 100-Year Event LOCATION: HCS Lot 1 Basin J1 Paver Area 8952 ft PROJECT NO: 1254-045-03 Void Depth 2 ft COMPUTATIONS BY: es 30% Void 5371 cf DATE: 6/20/2017 Equations: Area trib. to pavers = 40086 sf Developed flow = QD = CIA C (100) = 0.92 Vol. In = Vi = T C I A = T QD Developed C A = 36879 sf Vol. Out = Vo =K QPO T Release rate, QPO = 1.1 cfs storage = S = Vi - Vo K = 0.9 Rainfall intensity from City of Fort Collins IDF Curve with (3.67") rainfall Storm Rainfall QD Vol. In Vol. Out Storage Duration, T Intensity, I (cfs) Vi Vo S (min) (in/hr) (ft3) (ft3) (ft3) 5 9.95 8.4 2527 297 2230 6 9.31 7.9 2838 356 2481 7 8.80 7.5 3129 416 2713 8 8.38 7.1 3405 475 2930 9 8.03 6.8 3671 535 3137 10 7.72 6.5 3922 594 3328 11 7.42 6.3 4146 653 3493 12 7.16 6.1 4365 713 3652 13 6.92 5.9 4570 772 3798 14 6.71 5.7 4772 832 3940 15 6.52 5.5 4968 891 4077 16 6.30 5.3 5120 950 4170 17 6.10 5.2 5268 1010 4258 18 5.92 5.0 5413 1069 4344 19 5.75 4.9 5550 1129 4421 20 5.60 4.7 5689 1188 4501 21 5.46 4.6 5824 1247 4577 22 5.32 4.5 5945 1307 4639 23 5.20 4.4 6075 1366 4709 24 5.09 4.3 6205 1426 4780 25 4.98 4.2 6324 1485 4839 26 4.87 4.1 6432 1544 4888 27 4.78 4.0 6556 1604 4952 28 4.69 4.0 6671 1663 5008 29 4.60 3.9 6776 1723 5054 30 4.52 3.8 6888 1782 5106 31 4.42 3.7 6960 1841 5119 32 4.33 3.7 7039 1901 5138 33 4.24 3.6 7108 1960 5147 34 4.16 3.5 7185 2020 5165 35 4.08 3.5 7254 2079 5175 36 4.01 3.4 7333 2138 5195 37 3.93 3.3 7386 2198 5189 38 3.87 3.3 7470 2257 5213 39 3.80 3.2 7528 2317 5212 40 3.74 3.2 7599 2376 5223 41 3.68 3.1 7664 2435 5229 42 3.62 3.1 7723 2495 5228 43 3.56 3.0 7776 2554 5222 44 3.51 3.0 7845 2614 5232 45 3.46 2.9 7909 2673 5236 46 3.41 2.9 7968 2732 5236 47 3.36 2.8 8022 2792 5230 48 3.31 2.8 8071 2851 5220 E APPENDIX E EXCERPTS FROM REFERENCE REPORTS SEE LOT 2 – FINAL DRAINAGE REPORT CURRENTLY UNDER REVIEW 49 3.27 2.8 8139 2911 5229 50 3.23 2.7 8204 2970 5234 51 3.18 2.7 8238 3029 5209 52 3.14 2.7 8294 3089 5205 53 3.10 2.6 8346 3148 5198 54 3.07 2.6 8421 3208 5214 55 3.03 2.6 8465 3267 5198 56 2.99 2.5 8506 3326 5179 57 2.96 2.5 8571 3386 5185 58 2.96 2.5 8721 3445 5276 59 2.89 2.4 8662 3505 5157 60 2.86 2.4 8717 3564 5153 Storage Volume for Design Flow: 5276 ft3 6-28-17 FAA POND PAVER FLOW REDUCTION 2FT DEEP.xls,HTP J1  ♥ ❦ ♠ ① ② ❤ ♣ ③ ④ ④ r s t ✐ ❤ ✉ ♠ ⑨ ⑨ ⑨ ⑨ ❥ ⑦ ⑦ ⑦ ⑦ t ⑨ ❸ ⑥ ❹ ♠ ⑥ ❸ ⑨ ❷ ✈ ❦ ❥ ✇ ♥ ❦ ♠ ① ② ❤ ♣ ❸ ❸ ❸ ❸ ❸ ⑤ ❷ ⑩ ⑧ ❶ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ❹ ❹ ❹ ❹ ❺ ⑩ ⑤ ❷ ❹ ❶ ❹ ❹ ❹ ❹ ⑥ ⑦ ⑦ ⑦ ⑦ ❶ ❶ ⑧ ⑧ ⑦ ❺ ❷ ❸ ❶ ❷ ⑨ ⑨ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ❺ ❺ ❶ ⑧ ⑦ ⑧ ⑧ ❹ ❸ ⑩ ⑨ ⑨ ⑨ ⑨ ⑨ ❺ ❹ ⑥ ❸ ⑨ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ❺ ❺ ❺ ❺ ⑩ ⑤ ⑨ ⑥ ❹ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑧ ⑩ ⑩ ⑩ ⑦ ⑧ ❸ ⑩ ⑨ ⑥ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ⑦ ⑩ ❷ ❷ ⑤ ⑤ ⑨ ⑧ ⑥ ❷ ❹ ⑨ ⑨ ⑨ ⑨ ⑨ ⑤ ❷ ⑩ ⑧ ❶ ⑦ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ❶ ❶ ❶ ❶ ❶ ❶ ⑧ ❷ ⑤ ⑨ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ❷ ❷ ❷ ❷ ⑦ ❷ ❶ ⑩ ⑨ ⑥ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ❸ ❸ ⑥ ❷ ❹ ❷ ❹ ⑩ ⑤ ⑤ ⑤ ⑤ ⑤ ❺ ❹ ⑥ ❸ ⑨ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ❶ ❶ ⑧ ⑧ ⑦ ❶ ⑥ ❹ ❶ ⑧ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑤ ⑤ ⑤ ⑤ ⑦ ⑤ ⑧ ❷ ⑨ ⑥ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ⑥ ❹ ❹ ❺ ⑦ ❹ ❸ ⑧ ⑨ ⑩ ⑤ ⑤ ⑤ ⑤ ⑤ ⑤ ❷ ⑩ ⑧ ❶ ❺ ❺ ❺ ❺ ❺ ⑦ ⑦ ⑦ ⑦ ⑦ ⑧ ⑧ ⑧ ⑧ ⑧ ⑩ ❷ ⑤ ⑨ ❸ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ⑦ ⑨ ⑨ ⑨ ⑨ ⑨ ⑧ ⑩ ⑤ ❸ ⑥ ❸ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ❶ ❶ ❶ ⑧ ❸ ❶ ❷ ❷ ❶ ✣ ▲ ✩ ✥ ✪ ✞ ☛ ✕ ✫ ✬ ✭ ✮ ✯ ✰ ✱ ❆ ✳ ✴ ✝ ✆ ❷ ❺ ✌ ✡ ✡ ☛ ✡ ✚ ✂ ✎ ✍ ☛ ✌ ✡ ✌ ✆ ❺ ✏ ✎ ⑦ ⑧ ✠ ⑥ ✠ ✎ ✕ ✆ ✶ ❹ ⑦ ⑨ ⑥ ⑦ ⑧ ❷  ❂ ✷ ,QWHQVLW\❑ ✑ ✘ ☛ ✌ ✑ ✞ ✔ ✡ ☛ ✂ ▲ ✎ 'XUDWLRQ)❑ ✒ ❑ ✍ ✘ ✌ ✔ ☞ ☛ ✑ ✌ ✍ ✝ ✞ ✜ ☞ ✝ ☎ ✂ ✔ ✂ ✎ UHTXHQF\✎ ☞ ✏ ✂ ✦ ✝ ✎ ✎ ✞ ✍ ✂ ✄ ✜ ☎ ✎ &✆ ✠ ✂ ✠ ✝ XUYHVIRU6:✖ ✞ ☛ ✆ ✍ ✆ ✌ ☛ ✝ ✠ ✞ ☛ ✟ ✏ ✌ ✂ ☛ ✠ ✠ ✡ ☛ ✕ ✓ ☛ ✑ 00 ✞ ☛ ✂ ✞ ✆ ✟ ✌ ✍ ✍ ☛ ☛ ✌ ☞ ✂ ✝ ✍ ✞ ✎ ✒ ✓ ✝ ❝ ✡ ❼ ☛ ✡ ✽ ✝ ✞ ✽ ✷ ✌ ✝ ✞ ✖ ☞ ✠ ☛ ☎ ✂ ▼ ✏ ✪ ✝ ✠ ✘ ☛ ❏ ✆ ✗ ✗ ✸ ✔ ☛ ✂ ✎ ✒ ✍ ✌ ☞ ✑ ✆ ✏ ✎ ✍ ✂ ✑ ☛ ✩ ✘ ✚ ❂ ✘ ✚ ▲ ❑ ✘ ✚ ✩ ❂ ✘ ✚ 6WRUP3URYLVLRQV 0LQRU ☛ ✎ ✌ ✑ ✌ ✄ ✞ ✞ ☛ ✍ ☛ ✡ ✌ ✎ ✕ ✆ ✆ ✒ ✂ ✚ ✖ ☛ ✎ ✛ ✫ ✍ <✍ ☛ ✝ ✬ ✌ ✓ ✄ ✟ ✭ ✞ ☛ ✂ ✮ ✝ ✡ ✍ ✯ ✡ ✓ ✆ ✰ HDU ✍ ☛ ✚ ✂ ✱ ✌ ✎ ✆ ✆ ✝ ✂ ✴ ✞ ✎ ✍ ✍ ✳ ✌ ☛ ☛ ❄ ✏ ✒ ✌ ✡ ✆ ☛ ✄ ✝ ☎ ✆ ☎ ✟ ✆ ✆ ✟ ✌ ☛ ✔ ✚ ✑ ✡ ✆ ✌ ✄ ✡ ✂ ✞ ✡ ☛ ☛ ✌ ✡ ✍ ✄ ✡ ✌ ✝ ✞ ✚ ✡ ✝ ✞ ✂ ✄ ✂ ☛ ☛ ✎ ✌ ✂ ✞ ✌ ☛ ✒ ✍ ✌ ✔ ✞ ☛ ☛ ✞ ✂ ✌ ✝ ✝ ✆ ✟ ✞ ✎ ✡ ✔ ☛ ✟ ✞ ✆ ✌ ✠ ✟ ✂ ☎ ✆ ✏ ☛ ✎ ✌ ✡ ✏ ✄ ✟ ✆ ✎ ☛ ✂ ✝ ✠ ✆ ✠ ✆ ✠ ☞ ✝ ✎ ✂ ☎ ✝ ✠ ✝ ✞ ✕ ✌ ✟ ☛ ✞ ✑ ✆ ✆ ✎ ✗ ✞ ✶ ✍ ✏ ✝ ✡ ✌ ✞ ✟ ☛ ✒ ✝ ✍ ✠ ✝ ✌ ✂ ✂ ✎ ✍ ✝ ☛ ☛ ✆ ✟ ✂ ✍ ✎ ✌ ☛ ✆ ✌ ✄ ✂ ✟ ☛ ☎ ✝ ✞ ✍ ✌ ✝ ✖ ✞ ✄ ✌ ✎ ✝ ✞ ❡ ✍ ✡ ☛ ✡ ☛ ✒ ✝ ✍ ✞ ☎ ✠ ✟ ✔ ✂ ✎ ✂ ☛ ✡ ✞ ✍ ✍ ✓ ✚ ✌ ☛ ✆ ✝ ✞ ✞ ✂ ✎ ✝ ✌ ☛ ✍ ✒ ✄ ✞ ☛ ✟ ☛ ✆ ✆ ☛ ✚ ✔ ✕ ✆ ✂ ✎ ✂ ☛ ☛ ✍ ✄ ☞ ✚ ✍ ✎ ✎ ✌ ☞ ✂ ✂ ☛ ☛ ✟ ✌ ✞ ✂ ✍ ✟ ✌ ☛ ✑ ✒ ✌ ✌ ✌ ✆ ✞ ✎ ✝ ✞ ✞ ✞ ✆ ☛ ✌ ✂ ✠ ✖ ✆ ✍ ✠ ✚ ☛ ☛ ✡ ✟ ✍ ✟ ☎ ✌ ✎ ✍ ✝ ✍ ✆ ✞ ✝ ✂ ✞ ✌ ✗ ✒ ✒ ☛ ✷ ✄ ✕ ✑ ✝ ☛ ✌ ✞ ✔ ✎ ✩ ✆ ✍ ✘ ✚  ✣ ❂ ✥ ✫ ✡ ✡ ✟ ✷ 0DMRU ✎ ✬ ✌ ☛ ✑ ✭ ✄ ✂ ✎ ☛ ☛ ✮ ✍ ✯ ✞ ✌ ✡ ✰ ✎ ✒ ✂ ✝ ✱ ✝ ✖ ✞ ☛ ✎ ✛ <✌ ✗ ✵ ✞ ☛ ✂ ✟ ✳ ☛ ✽ ❀ ✏ ✂ ✡ ✌ ✝ ✓ ✝ ✌ ✟ ✡ ✆ ✛ ☛ ✝ ✠ ✎ ✍ ✆ ✡ ✝ ✌ HDU ✍ ✂ ☛ ✝ ✝ ✎ ✞ ✠ ✡ ☛ ☛ ✏ ✆ ✌ ✍ 6WRUP3URYLVLRQV ✂ ✌ ✗ ✒ ✂ ☛ ✑ ✝ ☛ ✡ ✞ ✷ ☛ ✌ ✆ ✝ ✑ ✞ ✔ ✒ ▲ ☛ ✆ ☛ ❑ ✝ ✂ ✟ ✂ ❑ ☛ ✆ ✆ ✎ ✔ ✘ ✄ ✍ ☛ ✔ ✆ ✍ ✞ ☛ ✂ ☛ ✝ ☛ ✂ ✌ ✆ ✠ ✝ ✄ ✌ ✍ ✍ ✡ ✂ ☛ ✆ ✝ ✆ ☛ ✂ ✎ ✂ ✔ ✆ ✄ ✎ ✞ ✝ ✗ ✒ ✍ ✌ ✖ ✄ ✞ ✔ ☛ ☛ ✂ ✡ ✝ ✡ ✕ ✞ ✍ ✌ ✟ ☛ ✌ ✞ ✠ ☛ ✝ ☎ ✞ ✡ ✞ ✡ ✌ ✟ ☛ ✂ ✒ ✑ ✎ ☛ ✆ ☛ ✞ ✂ ✎ ✆ ✆ ✄ ✂ ✔ ✍ ✍ ✄ ✝ ✆ ☎ ✞ ✂ ✟ ☛ ✎ ✆ ✂ ✄ ✍ ☛ ☛ ✡ ✕ ✌ ☞ ✗ ✞ ☛ ✠ ✡ ✍ ✌ ✆ ✞ ✄ ✚ ✞ ✎ ✌ ✝ ☞ ✛ ✞ ✎ ☛ ✒ ✍ ✞ ✌ ✆ ✟ ✂ ✍ ✑ ✎ ☛ ✌ ✍ ✄ ✂ ✞ ✎ ✞ ✆ ☛ ☛ ✔ ✠ ✠ ✆ ✆ ✝ ✚ ✄ ✂ ☛ ✡ ✝ ✄ ✍ ✞ ✌ ✌ ✝ ✄ ✂ ✞ ☛ ✌ ☎ ✒ ✆ ✆ ☎ ☛ ✂ ✕ ✖ ✖ ✆ ☛ ✌ ✂ ✔ ✌ ✌ ✞ ✆ ✞ ✚ ✂ ✌ ✝ ☞ ✠ ✌ ✔ ✎ ✠ ❡ ✞ ✠ ☛ ✡ ✎ ✡ ✆ ✆ ✚ ✆ ✂ ✎ ✍ ✎ ✝ ✓ ☛ ✏ ☛ ✞ ✠ ✍ ✆ ✝ ✆ ✏ ☎ ✚ ☛ ✍ ✆ ☛ ✂ ✎ ✍ ✂ ✍ ☛ ✑ ✌ ✌ ☞ ✄ ✂ ✍ ✎ ✌ ✆ ☞ ✚ ✕ ☛ ✌ ✍ ☛ ✞ ✂ ✠ ✡ ✔ ✠ ✣ ✣ ✣ ✣ ✣ ❏ ❇ ❅ ❃ ▲ ❑ ✥ ✥ ✥ ✥ ✥ ✫ ✫ ✫ ✫ ✫ ✬ ✬ ✬ ✬ ✬ ✭ ✭ ✭ ✭ ✭ ✮ ✮ ✮ ✮ ✮ ✯ ✯ ✯ ✯ ✯ ✰ ✰ ✰ ✰ ✰ ✱ ✱ ✱ ✱ ✱ ❄ ❄ ❄ ✵ ✵ ✳ ✳ ✳ ✳ ✳ ✵ ✴ ❀ ✵ ✴ ✝ ✝ ✝ ✝ ✝ ✆ ✆ ✆ ✆ ✆ ✡ ✡ ✡ ✡ ✡ ☛ ☛ ☛ ☛ ☛ ✠ ✠ ✠ ✠ ✠ ☛ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✂ ☛ ☛ ☛ ☛ ☛ ✡ ✡ ✡ ✡ ✡ ✝ ✝ ✝ ✝ ✝ ✞ ✞ ✞ ✞ ✞ ✝ ✝ ✝ ✝ ✝ ✂ ✂ ✂ ✂ ✂ ✆ ✆ ✆ ✆ ✆ ☛ ☛ ☛ ☛ ☛ ✞ ✞ ✞ ✞ ✞ ✂ ✂ ✂ ✂ ✂ ✝ ✝ ✝ ✝ ✝ ✍ ✍ ✍ ✍ ✍ ☛ ☛ ☛ ☛ ☛ ✂ ✂ ✂ ✂ ✂ ✔ ✔ ✔ ✔ ✔ ✗ ✗ ✗ ✗ ✗ ✣ ▲ ▲ ✥ ✫ ✬ ✭ ✮ ✯ ✰ ✱ ❆ ✳ ❀ ✝ ✆ ✌ ✄ ☛ ✞ ✡ ☛ ✡ ✂ ✎ ✍ ☛ ✌ ✡ ✌ ✆ ✏ ✎ ✠ ✠ ✎ ✕ ✆ ✶  ✷ ☞ ,QWHQVLW\✍ ✑ ✎ ☛ ✓ ✝ ✎ ✡ ✞ ☛ ☛ ✡ ✘ ✑ 'XUDWLRQ)✝ ✞ ✎ ☎ ✷ ✍ ✌ ✖ ✍ ✌ ✠ ☛ ✝ ✞ ▼ ✏ ✌ ✪ ✠ ✠ ✘ UHTXHQF\❅ ✁ ✞ ✌ ✂ ✞ ☛ ✞ ✡ ✆ ✝ ✝ ✞ ✂ ✔ ✷ ✘ &✻ ✌ ✖ ☎ XUYHVIRU5DWLRQDO0HWKRG ✠ ✍ ☛ ✌ ✂ ▼ ✝ ✎ ✪ ✞ ✘ ✘ ❇ ✦ ✗ ✍ ☛ ✧ ☎ ☛ ✞ ✟ ✔ ✂ ✌ ✖ ✠ ☛ ✆ ✏ ✎ ✍ ☎ ✆ ☛ ✕ ✝ ✂ ✑ ✂ ✑ ☛ ▼ ✌ ✂ ✝ ✎ ✞ ✌ ✠ ✽ ☛ ✂ ✑ ✎ ✡ ✎ ✏ ✍ ☎ ✞ ✎ ✏ ✏ ✌ ✞ ✌ ✠ ✔ ✆ ✝ ✆ ✌ ✍ ☛ 7DEOH5$ &LW\RI)RUW&ROOLQV5DLQIDOO,QWHQVLW\±'XUDWLRQ±)UHTXHQF\7DEOHIRU8VH:LWKWKH5DWLRQDO0HWKRG ❢  ❣ ❤ ✐ ❥ ❦ ❧ ⑤ ❷ ⑩ ⑧ ♠ ♥ ♦ ❦ ♠ ♣ q r s t ✐ ❤ ✉ ♠ ❥ ⑥ ⑥ ⑥ t ⑥ ⑦ ⑦ ⑦ ♠ ⑧ ❷ ⑤ ⑦ ⑨ ✈ ⑤ ⑩ ⑥ ❦ ❥ ✇ ♥ ❦ ♠ PLQXWHVWRPLQXWHV ① ② ❤ ♣ ③ ④ r s t ✐ ❤ ✉ ♠ ⑨ ⑨ ⑨ ❥ ⑨ t ⑦ ⑦ ⑦ ⑧ ⑤ ❸ ⑦ ♠ ❹ ⑩ ❷ ❹ ✈ ❦ ❥ ✇ ♥ ❦ ♠ ① ② ❤ ♣ ③ ④ ④ r s t ✐ ❤ ✉ ♠ ❶ ❶ ⑧ ⑧ ❥ ⑦ ⑦ ⑦ t ❶ ❸ ❸ ⑦ ⑧ ♠ ⑤ ❹ ⑧ ✈ ❦ ❥ ✇ ♥ ❦ ♠ ① ② ❤ ♣ ❹ ❹ ❹ ❹ ❶ ❺ ❹ ⑥ ❸ ⑥ ⑥ ⑥ ❹ ⑥ ⑦ ⑦ ⑦ ⑦ ⑥ ❹ ❺ ❶ ⑦ ❸ ❹ ❸ ⑤ ⑧ ❸ ❸ ❸ ❸ ❸ ⑦ ⑦ ⑦ ⑦ ❶ ⑩ ❷ ❸ ⑦ ⑤ ❸ ⑧ ❸ ❶ ⑧ ⑩ ⑩ ⑩ ❷ ⑦ ⑦ ⑦ ⑦ ⑦ ❺ ⑩ ⑨ ❹ ❶ ❸ ⑥ ⑥ ❷ ⑥ ❹ ❹ ❹ ❹ ❹ ⑨ ⑤ ❷ ⑩ ⑧ ❹ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ❶ ⑧ ⑧ ⑩ ⑦ ⑩ ⑥ ⑩ ❹ ⑤ ❸ ❸ ❸ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑥ ❹ ❺ ❶ ⑦ ❶ ❶ ❶ ⑧ ❶ ❷ ❷ ⑤ ❷ ❷ ⑦ ⑦ ⑦ ⑩ ⑤ ❶ ⑦ ⑦ ❸ ❹ ❹ ⑥ ⑥ ❹ ⑥ ⑥ ⑥ ❶ ❺ ❹ ⑥ ❹ ❹ ❹ ❹ ⑦ ⑦ ⑦ ⑦ ❷ ❷ ⑤ ⑤ ⑤ ❹ ❷ ❸ ⑥ ⑥ ⑥ ⑥ ⑦ ⑦ ⑦ ⑦ ⑧ ⑩ ❷ ❷ ⑥ ⑨ ⑩ ❹ ⑤ ⑤ ⑤ ⑤ ⑦ ⑦ ⑦ ⑩ ⑨ ❸ ⑦ ❷ ⑤ ❷ ⑥