September 02, 2016
Terrence Hoaglund
VIGNETTE STUDIOS
PO BOX 1889
Fort Collins, CO 80522
RE: Oakridge Crossing (Affordable Senior Housing, FDP160034, Round Number 1
Comment Summary:
Department: Engineering Development Review
Contact: Katie Andrews, 970-221-6501, kandrews@fcgov.com
Topic: General
08/26/2016: Rather than a modified alley detail, the driveway should be built as the
standard driveway approach with detached walk, LCUASS drawing 706.1.
Comment Number: 1 Comment Originated: 08/26/2016
08/26/2016: The indemnification statement is not needed on each page. Please
move the signature block to the lower right hand corner on each page.
Comment Number: 2 Comment Originated: 08/26/2016
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
08/31/2016: A C-1 form and one-line diagram will need to be submitted for the
project for any commercial
portion. A link to a C-1 form is below.
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 1 Comment Originated: 08/31/2016
08/31/2016: Primary power will be coming from the unit to the northwest and is
stubbed out at th northwest corner of the lot. Utility plans currently show the primary
power being fed from McMurry.
Comment Number: 2 Comment Originated: 08/31/2016
08/31/2016: Site plan shows a 20' wide utility easement located at the north lot and
plat shows 13.9' easement.
Comment Number: 3 Comment Originated: 08/31/2016
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Ryan Mounce, at
970-224-6186 or rmounce@fcgov.com.
Page 1 of 5
08/31/2016: Please provide AutoCAD drawings for site and utility plan once final
drawings are submitted. An approved plat, site plan, utilty plan and landscape plan
will need to be provided.
Comment Number: 4 Comment Originated: 08/31/2016
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
08/29/2016: WALL HYDRANTS
The proposed wall hydrants are not consistently labeled. Any reference to wall
hydrants as also being an FDC location should be corrected. The FDC will need to
be on the opposite side of the building near the main entrance. Wall hydrants in
contrast, should have two, 2.5" outlets (not 5" as indicated on the plan), are locally
valved, and are clearly labeled Wall Hydrant on the side of the building. Wall hydrant
details will need to be reviewed and approved no later than at time of building permit.
Comment Number: 1 Comment Originated: 08/29/2016
08/29/2016: VEGETATION NEAR ALL HYDRANTS
It's unclear if mature landscaping will block the ability to visually locate and obtain
access to the two wall hydrants in the future. Some large trees suggest that
proposed vegetation may interfere with the operation of the Hydrants and Wall
Hydrants when mature. Please ensure at least a 3ft clear area around Hydrants and
Wall Hydrants at time of landscaping maturity.
Comment Number: 3 Comment Originated: 08/29/2016
08/29/2016:FIRE LANE
Entering the Facility from McMurray Avenue the Fire Lane is shown to curve to the
edge of the first parking island. It is requested that the Fire Lane 'fill in' the small
triangular area to the property line to the north.
Comment Number: 4 Comment Originated: 08/29/2016
08/29/2016: MISCELLANEOUS - LABELING
> On the Site Plan, near the front entry, there is a measurement indicating "37'3" to
Fire Lane." This measure is not indicating the edge of fire lane but rather the
distance to a building envelope line I believe.
> Please label proposed hydrant location on the Site Plan.
Comment Number: 5 Comment Originated: 08/29/2016
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
08/29/2016: Please update the subdivision plat with the new vacation statement
discussed at the August 18th meeting.
Comment Number: 1 Comment Originated: 08/29/2016
08/29/2016: For discussion at the staff review meeting: will the car share be using
dedicated or signed vehicle spaces? If so, let's mark those on the site plan.
Comment Number: 2 Comment Originated: 08/29/2016
Page 2 of 5
08/29/2016: Several minor edits or tweaks are needed on the following drawings:
- Site & Landscape Plan: Please show the location and extent of proposed fencing
areas.
- Elevations: Add a small fencing exhibit showing fence height, design, materials,
etc.
-Site Plan: Dimension the width of the walkway leading to the park/central feature
area (adjacent to parking stalls).
Comment Number: 3 Comment Originated: 08/29/2016
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
08/24/2016: Please provide evidence that the detention basin is in compliance with
drain times per Colorado Revised Statute 37-92-602(8). More information on this
statute is available at http://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to
show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com with any questions about this requirement or
for assistance with the spreadsheet.
Comment Number: 2 Comment Originated: 08/24/2016
08/24/2016: Please include discussion in the drainage report of the pond overflow in
a clogged outlet condition. No discussion of a spillway or overflow was seen and it
appears that the spill would not allow for the required 1' of freeboard to the building.
Comment Number: 3 Comment Originated: 08/24/2016
08/24/2016: Please provide profile for the proposed stormwater inlets and pipes
(roof drain and leaders can be left off).
Comment Number: 4 Comment Originated: 08/24/2016
08/24/2016: Please see redlined drainage report.
Comment Number: 5 Comment Originated: 08/24/2016
08/31/2016: Please detail or include notes regarding the grading around the
elevated Type-C inlets. The expectation is to not have concrete boxes rising up
from the rain garden and detention facility and improve the aesthetics.
Comment Number: 6 Comment Originated: 08/31/2016
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
08/30/2016: There is text that needs the size increased. See redlines.
Comment Number: 9 Comment Originated: 08/30/2016
08/30/2016: Please remove the address from the title block. With the project being
replatted, the address could change.
Comment Number: 10 Comment Originated: 08/30/2016
Topic: Construction Drawings
08/31/2016: No comments.
Comment Number: 12 Comment Originated: 08/31/2016
Topic: Landscape Plans
Page 3 of 5
08/30/2016: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 08/30/2016
Topic: Lighting Plan
08/31/2016: Please remove the address from the title block. With the project being
replatted, the address could change.
Comment Number: 11 Comment Originated: 08/31/2016
Topic: Plat
08/30/2016: Please move the bearing & distance as marked. See redlines.
Comment Number: 1 Comment Originated: 08/30/2016
08/30/2016: There is text that needs the size increased. See redlines.
Comment Number: 2 Comment Originated: 08/30/2016
08/30/2016: It is our understanding that per a meeting with the City Attorneys Office
about cross access easements, the plat is to be revised showing new easements.
Comment Number: 3 Comment Originated: 08/30/2016
Topic: Site Plan
08/30/2016: Please keep line work within the borders of the sheets.
Comment Number: 4 Comment Originated: 08/30/2016
08/30/2016: There are line over text issues. See redlines.
Comment Number: 5 Comment Originated: 08/30/2016
08/30/2016: Some of the easement descriptions shown are incorrect. If they are
going to stay on the plan, they should match what is shown on the Subdivision Plat.
This has not been corrected from the 05/03/2016 comment: The easements shown
within the boundary of this project should match what the Subdivision Plat is
dedicating & retaining, not the existing easements as they are now. The Utility Plans
are showing existing conditions.
Comment Number: 6 Comment Originated: 08/30/2016
08/30/2016: Please remove the address from the title block. With the project being
replatted, the address could change.
Comment Number: 7 Comment Originated: 08/30/2016
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
08/30/2016: No additional comments.
Comment Number: 1 Comment Originated: 08/30/2016
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
08/29/2016: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Comment Number: 1 Comment Originated: 08/29/2016
Page 4 of 5
Department: Water-Wastewater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
08/24/2016: Please relocate the sewer service tie ins to the west so the services do
not run thru the rain garden cross section.
Comment Number: 1 Comment Originated: 08/24/2016
08/31/2016: The encasement detail is seen; however, I do not see where
encasement is called for. Please clarify or remove this detail if it is not needed.
Comment Number: 2 Comment Originated: 08/31/2016
Page 5 of 5