Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
LOT 2, HARMONY COMMONS - FDP - FDP170018 - SUBMITTAL DOCUMENTS - ROUND 1 - ROUTING SHEET
Project Routing Sheet New: X Revision: Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): Labels Received Y/N: N/A N/A N/A N/A N/A RETURN ALL REDLINES 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 28 26 17 18 8 8 4 0 15 0 0 0 2 1 0 0 0 1 0 Revised: 7-31-2015 P P P P P P P CD P P P P P CD CD P P P CD P 0 30 30 20 23 8 8 4 0 15 0 0 0 2 1 0 0 0 1 0 T.I.A.(letter or full report) Utility Plans 6/13/2017 Planning Objectives Comment Response Letter Site Plan Landscape Plan New projects: APO labels & list: Ted Shepard Marc Virata Wetland Delineation Ecological Study Hazmat Review Soils Study- New/Update Digital copy of all materials L.U.C. Mod. Requests Drainage Report Building Materials Exhibit Easements (As Needed) SWMP (Erosion Report) Utility Plan Site Plan Landscape Plan Plat Building Elevations Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Outside Agency Sanitation Dist: N/A Outside Agency Water District: N/A Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Received: County Assessor CDOT Ditch Co: Railroad: ___________________ Other: 1 Total: Format Required: (P)aper, Digital (CD) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Lighting Plan Plat Building Elevations Lighting Plan Drainage Report Turnaround Time: 4 WEEKS Comments Due: JUNE 12, 2017 Lot 2 Harmony Commons Final Development Plan FDP170018