HomeMy WebLinkAboutFORT COLLINS EMERGENCY CENTER, 4858 S. COLLEGE AVE. - PDP - PDP160001 - CORRESPONDENCE - REVISIONS6901 South Pierce Street, Suite 350 Littleton, Colorado 80128 Voice 303-232-8088 Fax 303-232-5255
July 28, 2016
Mr. Ryan Mounce
Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
RE: Fort Collins Emergency Center - 4858 S College Ave, PDP160001, Round
Number 2 Comment Response
Dear Ryan,
Revised Project Development Plan, Drainage Report and Construction Documents for the above referenced project
are attached. Revisions to the referenced plans are based on comments and redlines received from your office dated
April 15, 2016. Please find below a summary of comments as well as a responses noted in red.
Comment Summary:
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
Comment Number: 12
04/08/2016: Is there a corresponding access easement north of the property
boundary? A full 24 foot access easement (two-way drive aisle width) is needed to
access the parking stalls north of the building. The easement exists on the adjacent property.
Documentation sent via prior email.
Comment Number: 13
04/08/2016: At the staff review meeting, potential ideas for the drop-off area were
discussed to help direct or restrict flow and avoid confusion. Please identify what
kind of devices (signs, striping, etc) will be used on the site plan. Directional striping is added to
the plan.
Comment Number: 14
04/08/2016: Will/where are the location of exterior utility meters? If unknown at this
time, please add the following note on the site plan: Conduits, meters, vents, and
other equipment attached to the building or protruding from the roof shall be painted
to match surrounding building surfaces. Requested note added to the plan on sheet 2.
Comment Number: 15
04/08/2016: Please specify or list potential colors for the building materials for
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 2 of 7
evaluation. Are color or materials samples available for review? A table indicating material
colors is added to the building elevations.
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
No comments at this time to address.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
No comments at this time to address.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Comment Number: 6
There are two trees that appear not to be labeled. The shade tree SW corner of the
building and the shade tree near the NW corner of the building. Please label. Labels are added.
Note the NW corner trees are labeled as a pair.
Comment Number: 7
Three Northern Red oaks Quercus rubra are used on the plans. This oak species is
not adapted to the alkaline soils found in Fort Collins. Shumrad Oak is very similar
and is compatible with Fort Collins soils. Change the Northern Red oak to Shumard
Oak or to another adapted shade tree. The Red Oaks are replaced with Bur Oak.
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Comment Number: 1
3-Phase Primary electric facilities exists along the East side of this property. Comment noted.
Comment Number: 3
Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be
found at: Requested info will be provided as the building design progresses.
Comment Number: 4
Development charges, electric Capacity Fee, Building Site charges and any system modification charges
necessary will apply to this development. (We urge you to use our fee estimator to help better understand
these charges.) Comment noted.
Comment Number: 6
Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our
policies, development charge processes, and use our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers. Comment noted.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 3 of 7
Department: Outside Agencies
Comment Number: 2
04/04/2016: The following comments are from the Megan Harrity, Larimer County
Assessor, 970-498-7065:
At the end of the second line of the legal description, please correct east line to west
line. Line reads:
;thence leaving said east line S 89' 22' 55'' etc This correction is made on the Plat.
Comment Number: 3
The following comment is from Terry Farrill, Fort Collins - Loveland Water District
and South Fort Collins Sanitation District. Terry may be reached at 970-226-3104,
ext. 104.
The fence cannot be located within the 20 foot wide access easement. The fence over the
easement is called for removal on sheets C6.10 and C7.10 in the Utility Plan set.
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
Comment Number: 2
04/13/2016: Comment still applies. Please see redlines in drainage report. The
detention volume calculation needs to be completed using FC Criteria. The supplied
spreadsheet is now used for detention calculations.
Comment Number: 3
04/13/2016: Please update once detention volume is revised. The State Statute spreadsheet is
updated.
Comment Number: 4
04/13/2016: Comment still applies. I see that there is a proposed easement for the
detention basin; however, it does not appear that the outfall pipe is included within
this easement (it needs to be) prior to entering the existing easement on the
property to the south. Coordination of the outfall construction with the property
owner to the south will be required. Is it possible that the outfall location could be
revised to daylight further north, possibly with some swale grading? The proposed easement is
expanded. Additional survey was performed on the outfall ditch and the pipe has been shorten.
Comment Number: 5
04/13/2016: Please include discussion within the drainage report along with table
describing how the LID requirements are being met. Discussion is added.
Comment Number: 6
04/13/2016: Please provide a discussion of all drainage basins within the text of the
drainage report. Discussion is added.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 4 of 7
Comment Number: 8
04/13/2016: Please see updated redlined report (provided in pdf format) and plans. Redlined
comments are addressed
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1
04/12/2016: Erosion Control Report is acceptable. The Erosion Control Plan has
redlines. The Erosion Control Escrow Calculation could not be found. Redlined comments have
been addressed. The escrow calculation is now included in the submitted materials.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 9
Please revise the sub-title as marked. See redlines. Title revised per redlines.
Comment Number: 10
There are line over text issues. See redlines. Line over text issues are resolved.
Comment Number: 38
04/13/2016: Please add sheet numbering. Sheet numbers are added.
Comment Number: 39
04/13/2016: There are cut off text issues. See redlines. The cut off text is corrected.
Topic: Construction Drawings
Comment Number: 14
Please revise the sub-title as marked. See redlines. Title revised per redlines.
Comment Number: 15
04/13/2016: The legal description on sheet C4.11 is not necessary. It needs to be
corrected or removed. See redlines. The legal description is removed.
Comment Number: 16
04/13/2016: Please add the NAVD88 elevation for the benchmark shown. The elevation is
added.
Comment Number: 17
The titles in the sheet index do not match the titles on the noted sheets. See redlines. Sheet index
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 5 of 7
corrected.
Comment Number: 20
There are line over text issues. See redlines. Line over text issues are addressed.
Comment Number: 21
There is text that needs to be masked. Mask all text in hatched areas. See redlines. Text masked added.
Comment Number: 23
04/13/2016: These are being dedicated on the Subdivision Plat, so why are they still
being dedicated by separate document? The reception number call outs for easements by plat
are removed.
Comment Number: 24
Please correct the 10' Bridle Path & Utility Easement note as marked. See redlines. Text corrected.
Topic: Landscape Plans
Comment Number: 7
Please revise the sub-title as marked. See redlines. Title revised.
Comment Number: 8
There are line over text issues. See redlines. Line over text issues are addressed.
Comment Number: 34
04/13/2016: There is text that needs to be moved. See redlines. Text is moved.
Comment Number: 35
04/13/2016: Please correct the sheet numbering. See redlines. Sheet numbering is corrected.
Comment Number: 36
04/13/2016: There are text over text issues. See redlines. Text issues are corrected.
Comment Number: 37
04/13/2016: There are cut off text issues. See redlines. Cut off text issues are corrected.
Topic: Lighting Plan
Comment Number: 11
Please revise the sub-title as marked. See redlines. Title text is revised
Topic: Plat
Comment Number: 25
04/13/2016: Please add a title at the top of the sheet. See redlines. Title added.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 6 of 7
Comment Number: 26
04/13/2016: Please change the subdivision name to "Fairway Estates Filing Four".
See redlines. Title changed.
Comment Number: 27
04/13/2016: Are there any Lienholders for this property? If so, please add a
signature block. If not, please add a note stating there are none, and include
response in written comments. The No Lienholder note is added as note 3.
Comment Number: 28
04/13/2016: Please remove note #3. This address could change. See redlines. The address is
removed.
Comment Number: 29
04/13/2016: Please add dedication information for all street rights of way. See
redlines. There are no street ROW dedications.
Comment Number: 30
04/13/2016: Please label the Point Of Beginning. The point of beginning is added.
Comment Number: 31
04/13/2016: What is the triangular area at the northwest corner of the plat? See
redlines. The triangular easement is labeled.
Comment Number: 32
04/13/2016: Please add record bearings & distances for the boundary. See
redlines. Record information is added.
Comment Number: 33
04/13/2016: Please add distances as marked. See redlines. Distances added.
Topic: Site Plan
Comment Number: 1
Please revise the sub-title as marked. See redlines. Title text revised.
Comment Number: 2
Please remove the legal description. It is not necessary. It is a duplication of the sub-title. Legal description
removed.
Comment Number: 5
04/13/2016: These are being dedicated on the Subdivision Plat, so why are they still
being dedicated by separate document? The reception number call outs for easements by plat
are removed.
Mr. Ryan Mounce
Fort Collins Emergency Center - 4858 S College Ave, PDP160001
Page 7 of 7
Comment Number: 6
Please correct the 10' Bridle Path & Utility Easement note as marked. See redlines. Easement text
corrected.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1
A landscape plan shall contain accurate and identifiable hydrozones, including a water budget chart that
shows the total annual water use, which shall not exceed fifteen (15) gallons per square foot over the site. If
you have questions contact Eric Olson at eolson@fcgov.com or 970-221-6704. Hydrozone plan and water
use chart included.
Comment Number: 2
Irrigation plans are required no later than at the time of building permit. The irrigation plans must comply
with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Comment noted.
Thank you for your review and comments. Please let me know if you require anything further.
Professionally,
Jerry W. Davidson, P.E.
Perception Design Group, Inc.