HomeMy WebLinkAboutFORT COLLINS EMERGENCY CENTER, 4858 S. COLLEGE AVE. - PDP - PDP160001 - CORRESPONDENCE -Community Development and
Neighborhood Services
281 North College Avenue
PO Box 580
Fort Collins, CO 80522
970.221.6750
970.224.6134 - fax
fcgov.com/developmentreview
January 29, 2016
Perception Design Group Inc
6901 S Pierce St Suite 350
Littleton, CO 80128
RE: Fort Collins Emergency Center - 4858 S College Ave, PDP160001, Round Number 1
Comment Summary:
Department: Planning Services
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
01/26/2016: For this type of land-use, a minimum of 4 bicycle parking spaces are
required, at least one of which needs to be protected or enclosed. If the same
location is utilized for the additional spaces, the building canopy will qualify these as
protected spaces.
Please update the site plan data block to include the percentage or number of bike
spaces that are protected or enclosed.
Comment Number: 1 Comment Originated: 01/26/2016
01/26/2016: Please dimension the full extent of the drive-aisle and emergency
vehicle parking width on the south side of the building.
Comment Number: 2 Comment Originated: 01/26/2016
01/26/2016: The trash enclosure needs a separate walk-in access without needing
to open the main gates. A simple elevation exhibit for the enclosure should be
included on the site plan or elevations.
Materials for the trash and generator enclosure should be similar to the materials
used for the primary building.
Comment Number: 3 Comment Originated: 01/26/2016
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Ryan Mounce, at
970-224-6186 or rmounce@fcgov.com.
Page 1 of 11
01/26/2016: A couple minor fixes and typos should be corrected on the site plan:
- Typo on the easternmost easement (bridle instead of brindle).
- Update the planning signature block to 2016 from 2012.
- Please change the land-use in the site data block to hospital (emergency room).
- When the plat for the site is submitted, please be sure to update the legal
descriptions on the drawings accordingly.
Comment Number: 4 Comment Originated: 01/26/2016
01/26/2016: On the lighting plan, please add a catalog cut-sheet for the lighting
fixtures proposed. In regard to LED light fixtures, cooler color temperatures are
harsher at night and cause more disruption to circadian rhythms for both humans
and wildlife. Please consider a warmer color temperature (3000K or less) for your
LED light fixtures. Please also consider fixtures with dimming capabilities so that
light levels can be adjusted as needed.
Comment Number: 5 Comment Originated: 01/26/2016
01/26/2016: On the building elevations, please remove the cross emblems; signage
is not approved as part of the development review process, rather through a
separate sign-permit with zoning.
Comment Number: 6 Comment Originated: 01/26/2016
01/26/2016: The east (rear) side of the building needs to include some additional
design elements to meet the minimum façade and wall articulation standards found
in LUC 3.5.3(E)(2). Elements such as windows, trellis with vines, or
projecting/recessed building elements would help meet this standard where large
blank walls exist.
Also consider this side of the structure will see higher visibility in the future when the
frontage road is removed and access comes from the rear.
Comment Number: 7 Comment Originated: 01/26/2016
01/26/2016: On the landscaping plan, please consider even spacing for the street
trees. These trees should be canopy shade trees spaced 30-to-40 feet apart.
Comment Number: 8 Comment Originated: 01/26/2016
01/26/2016: The ground cover table will need to be updated with the approximate
square footage on the site. Please also see water conservation's comments
regarding the need for a water budget table.
Comment Number: 9 Comment Originated: 01/26/2016
01/26/2016: Additional perimeter landscaping is needed to the east of the
parking/drive areas. Please see environmental planning's comments about
suggested groupings for a more natural look.
Comment Number: 10 Comment Originated: 01/26/2016
01/26/2016: Please add standard Fort Collins landscaping and street tree notes to
the landscaping plan (see handout or digital copy).
Comment Number: 11 Comment Originated: 01/26/2016
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
Page 2 of 11
01/25/2016: Please remove the site plan from the utility plan set.
Please see appendix E-4 of the LCUASS for pre and post-hearing requirements for
the utility plans.
Comment Number: 1 Comment Originated: 01/25/2016
01/25/2016: The future “local access circulator” area will need to lie within an
emergency access easement as well as public access easement.
Comment Number: 2 Comment Originated: 01/25/2016
01/25/2016: The project will need to obtain 2 access permits from CDOT. One for
the new driveway and one for the existing driveway.
Comment Number: 3 Comment Originated: 01/25/2016
01/25/2016: Payment in lieu of construction will need to be provided for the local
access circulator as well as for the sidewalk. Payment amounts are to be
determined.
Comment Number: 4 Comment Originated: 01/25/2016
01/28/2016: The frontage road has been annexed by the City and was not accepted
by the county for maintenance.
Comment Number: 5 Comment Originated: 01/28/2016
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
01/26/2016: Thank you for providing an Ecological Characterization Study for the
site. Based on the findings and recommendations of the ECS, a 50-foot buffer from
the irrigation ditch will not be required. However, some additional habitat
improvement will be required.
Along the top and/or side slopes of the detention area, please provide additional
shrub plantings to (1) provide additional habitat and (2) meet the parking lot
screening requirements. A mix of evergreen and deciduous shrubs (fruit-bearing
and/or flowering species) should be planted in groupings of 3-5 plants and
distributed along the western edge of the detention area.
Comment Number: 1 Comment Originated: 01/26/2016
01/26/2016: A detailed seed mix for the native seed area should be included on the
plans. I will provide a seed mix that was recently prepared by our Natural Areas
Department for detention areas, which includes a mix of native grasses and
perennials.
Comment Number: 2 Comment Originated: 01/26/2016
01/26/2016: Please update the square footage calculations in the ground cover
legend.
Comment Number: 3 Comment Originated: 01/26/2016
01/26/2016: Please vary the grading of the detention area to create a more
naturalistic, undulating landform. Side slopes shoudl vary and range from 4:1 to
20:1, per the Stormwater Standards and Guidelines. This may help to create
planting areas for the shrub groupings described above.
http://www.fcgov.com/utilities/img/site_specific/uploads/Detention_Pond_Landscapi
ng_Standards.pdf
Comment Number: 4 Comment Originated: 01/26/2016
Topic: Lighting Plan
Page 3 of 11
01/26/2016: As noted in the Planning Services comments, please provide
cutsheets for the light fixtures that are proposed. I would recommend adding back
shields to the light fixtures near property lines and the detention area to reduce
spillover impacts.
Comment Number: 5 Comment Originated: 01/26/2016
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
01/29/2016:
Use the Standard City of Fort Collins General Landscape notes and street tree
notes on the landscape plan. These notes are available from the Project Planner
Ryan Mounce or from the City Forester Tim Buchanan 970 221 6361
tbuchanan@fcgov.com.
Comment Number: 1 Comment Originated: 01/29/2016
01/29/2016:
Cologreen Juniper is a tree and should be listed under the heading Evergreen Trees
in the Plant Schedule. It should be listed as 6 feet height and B&B.
Comment Number: 2 Comment Originated: 01/29/2016
01/29/2016:
If there are any City street lights? If so please show there locations and provide the
following light-tree separations with street trees.
Canopy Shade tree - 40 feet from the streetlight
Ornamental tree -15 feet from the streetlight
Comment Number: 3 Comment Originated: 01/29/2016
01/29/2016:
List the percentage of each tree species used in the Plant Schedule and check that
the quantities used meet the minimum species diversity standard LUC 3.2.1 D 3.
Comment Number: 4 Comment Originated: 01/29/2016
01/29/2016:
The standard for Street tree planting in parkways between sidewalk and curb is to
use canopy shade trees ( LUC 3.2.1 D 2 a). Trees should be selected from the City
of Fort Collins street tree list. Kentucky Coffeetree could be a good selection for this
area. The Fastigiate English Oak is not a canopy shade tree. It appears three
canopy shade trees could be placed in the area in front of the building and one south
of the south entry. Evaluate if this is feasible.
Comment Number: 5 Comment Originated: 01/29/2016
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
Page 4 of 11
01/27/2016:
Building Permit Pre-Submittal Meeting:
Pre-Submittal meetings are required to assist the designer/builder by assuring, early
on in the design,
that the new commercial or multi-family projects are on track to complying with all of
the adopted City
codes and Standards listed below. The proposed project should be in the early to
mid-design stage for
this meeting to be effective and is typically scheduled after the Current Planning
conceptual review
meeting. Applicants of new commercial or multi-family projects are advised to call
416-2341 to schedule
a pre-submittal meeting. Applicants should be prepared to present site plans, floor
plans, and elevations
and be able to discuss code issues of occupancy, square footage and type of
construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the fcgov.com
web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter.
Project specific concerns:
1. Upgraded insulation is required for buildings using electric heat or cooling.
2. Low-flow Watersense plumbing fixtures (toilet, faucets, shower heads) are
required.
3. Special combustion safety requirements for natural draft gas appliances.
4. Low VOC interior finishes.
City of Fort Collins
Building Services
Plan Review
416-2341
Comment Number: 1 Comment Originated: 01/27/2016
Department: Light And Power
Contact: Coy Althoff, , CAlthoff@fcgov.com
Topic: General
Page 5 of 11
01/18/2016: 3-Phase Primary electric facilities exists along the East side of this
property.
Comment Number: 1 Comment Originated: 01/18/2016
01/18/2016: A utility easement may need to be dedicated for the existing electric
facilities on the East side, as well as the future new electric infrastructure.
Comment Number: 2 Comment Originated: 01/18/2016
01/18/2016: Please provide a one line diagram and a C-1 form to Light and Power
Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 3 Comment Originated: 01/18/2016
01/18/2016: Development charges, electric Capacity Fee, Building Site charges
and any system modification charges necessary will apply to this development.
(We urge you to use our fee estimator to help better understand these charges.)
http://www.fcgov.com/utilities/business/builders-and-developers
Comment Number: 4 Comment Originated: 01/18/2016
01/18/2016: Contact Light and Power Engineering to coordinate the transformer
and electric meter locations, please show the locations on the utility plans.
Transformer locations shall be within 10' of a paved surface and must have a
minimum of an 8' clearance from the front side and a 3' clearance around the sides
and rear. (1000 kVA up to 2500 kVA requires 4' around the sides and rear.)
Comment Number: 5 Comment Originated: 01/18/2016
01/18/2016: Please contact Light & Power Engineering if you have any questions at
221-6700. Please reference our policies, development charge processes, and use
our fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 6 Comment Originated: 01/18/2016
Department: Outside Agencies
Contact: Ryan Mounce, 970-224-6186, rmounce@fcgov.com
Topic: General
01/25/2016: The following comments are from Terry Farrill, Fort Collins - Loveland
Water District and South Fort Collins Sanitation District. Terry may be reached at
970-226-3104, ext. 104.
- The District's signature block is required on sheet C0.00.
- The District requires a minimum and maximum depth of cover over the water line
of 5 feet and 6 feet respectively, unless otherwise noted.
- All water line construction shall conform to the Fort Collins - Loveland Water
District standards and specifications current to the date of construction.
- The District requires a Reduced Pressure Principle Back-Flow-Prevention-Device
(RP Device) on the fire line and the domestic water service.
- The District will require a grease trap/interceptor on the sanitary sewer service.
- The District's Industrial Pretreatment Business Questionnaire needs to be
completed and submitted to the District for review and approval. The Questionnaire
can be obtained on the District's website, fclwd.com.
Comment Number: 1 Comment Originated: 01/25/2016
Page 6 of 11
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
01/26/2016: EMERGENCY ACCESS EASEMENT
An Emergency Access Easement will be required by separate document and
labeled as such on future plans. Fire lane signage will also be required and should
be indicated on future plans. Code language provided below.
MARKING
> IFC503.3: Where required by the fire code official, approved signs or other
approved notices that include the words NO PARKING - FIRE LANE shall be
provided for fire apparatus access roads to identify such roads or prohibit the
obstruction thereof. The means by which fire lanes are designated shall be
maintained in a clean and legible condition at all times ad be replaced or repaired
when necessary to provide adequate visibility.
SIGNS
> IFC D103.6: Where required by the fire code official, fire apparatus access roads
shall be marked with permanent NO PARKING - FIRE LANE signs complying with
Figure D103.6. Signs shall have a minimum dimension of 12 inches wide by 18
inches high and have red letters on a white reflective background. Signs shall be
posted on one or both sides of the fire apparatus road as required by Section
D103.6.1 or D103.6.2.
Comment Number: 1 Comment Originated: 01/26/2016
01/26/2016: AUTOMATIC FIRE SPRINKLER SYSTEM
This building will require an automatic fire sprinkler system under a separate permit.
Please contact Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related
questions at 970-416-2868.
Comment Number: 2 Comment Originated: 01/26/2016
01/26/2016: FDC
> IFC 912.2: Fire Department Connections shall be installed in accordance with
NFPA standards. Fire department connections shall be located on the street side of
buildings, fully visible and recognizable from the street or nearest point of fire
department vehicle access. The location of the FDC shall be approved by the fire
department.
Comment Number: 3 Comment Originated: 01/26/2016
01/26/2016: KEY BOXES REQUIRED
> IFC 506.1 and Poudre Fire Authority Bureau Policy 88-20: Poudre Fire Authority
requires at least one key box ("Knox Box") to be mounted in an approved, exterior
location (or locations) on every new or existing building equipped with a required fire
sprinkler or fire alarm system. The box shall be positioned 3 to 7 feet above finished
floor and within 10 feet of the front door, or closest door to the fire alarm panel.
Exception can be made by the PFA if it is more logical to have the box located
somewhere else on the structure.
Comment Number: 4 Comment Originated: 01/26/2016
Department: Stormwater Engineering
Contact: Dan Mogen, 970-224-6192, dmogen@fcgov.com
Topic: General
01/26/2016: Please review City of Fort Collins Criteria and design detention basin
accordingly.
Comment Number: 2 Comment Originated: 01/26/2016
Page 7 of 11
01/26/2016: Please provide evidence that the detention basin is in compliance with
drain times per Colorado Revised Statute 37-92-602(8). More information on this
statute is available at http://tinyurl.com/RevisedStatuteMemo, and a spreadsheet to
show compliance is available for download at
http://tinyurl.com/ComplianceSpreadsheet. Please contact Dan Mogen at
(970)224-6192 or dmogen@fcgov.com with any questions about this requirement or
for assistance with the spreadsheet.
Comment Number: 3 Comment Originated: 01/26/2016
01/26/2016: Please show where the proposed outlet is located and verify capacity
and that any required easements are in place. Please clarify existing and any
proposed easements.
Comment Number: 4 Comment Originated: 01/26/2016
01/26/2016: Please show areas being treated with LID techniques and verify that
LID requirements are being met. A table verifying this would be helpful and a
sample table can be downloaded at http://tinyurl.com/SampleLIDTable.
Comment Number: 5 Comment Originated: 01/26/2016
01/26/2016: Please include all site areas in basins including those that are not
currently shown to be detained on the west and south sides.
Comment Number: 6 Comment Originated: 01/26/2016
01/26/2016: If future site access is from the east, how will this affect the proposed
drainage plan? Will any modifications be needed even though the detention basin is
outside the access easement?
Comment Number: 7 Comment Originated: 01/26/2016
01/26/2016: Please see redlined drainage report and civil plans.
Comment Number: 8 Comment Originated: 01/26/2016
01/26/2016: Please note that additional comments may be forthcoming upon future
submittals as additional details are discovered.
Comment Number: 9 Comment Originated: 01/26/2016
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
01/11/2016: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do
not meet requirements. Please submit; Erosion Control Plan (based upon redline
comments), Erosion Control Report (a few minor redlines), and an Escrow /
Security Calculation (Not found with submitted materials template can be found at
www.fcgov.com/erosion . Also, based upon the area of disturbance State permits
for stormwater will be required since the site is over an acre. If you need clarification
concerning the erosion control section, or if there are any questions please contact
Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com
Comment Number: 1 Comment Originated: 01/11/2016
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
01/25/2016: Please revise the sub-title as marked. See redlines.
Comment Number: 9 Comment Originated: 01/25/2016
Page 8 of 11
01/25/2016: There are line over text issues. See redlines.
Comment Number: 10 Comment Originated: 01/25/2016
Topic: Construction Drawings
01/25/2016: Please revise the sub-title as marked. See redlines.
Comment Number: 14 Comment Originated: 01/25/2016
01/25/2016: Please remove the legal description. It is not necessary. It is a
duplication of the sub-title.
Comment Number: 15 Comment Originated: 01/25/2016
01/25/2016: The City has moved to the NAVD88 vertical datum, and as of January
1, 2015 all projects are required to be on NAVD88 datum. Please provide the
following information for the Benchmark Statement in the EXACT format shown
below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88
- X.XX’.
Comment Number: 16 Comment Originated: 01/25/2016
01/25/2016: The titles in the sheet index do not match the titles on the noted sheets.
See redlines.
Comment Number: 17 Comment Originated: 01/25/2016
01/25/2016: All benchmark statements must match on all sheets.
Comment Number: 18 Comment Originated: 01/25/2016
01/25/2016: Sheet C0.02 is numbered wrong.
Comment Number: 19 Comment Originated: 01/25/2016
01/25/2016: There are line over text issues. See redlines.
Comment Number: 20 Comment Originated: 01/25/2016
01/25/2016: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Comment Number: 21 Comment Originated: 01/25/2016
01/25/2016: There are text over text issues. See redlines.
Comment Number: 22 Comment Originated: 01/25/2016
01/26/2016: All reception numbers for documents recorded by separate document
must be added prior to mylars.
Comment Number: 23 Comment Originated: 01/26/2016
Page 9 of 11
01/26/2016: Please correct the 10' Bridle Path & Utility Easement note as marked.
See redlines.
Comment Number: 24 Comment Originated: 01/26/2016
Topic: Landscape Plans
01/25/2016: Please revise the sub-title as marked. See redlines.
Comment Number: 7 Comment Originated: 01/25/2016
01/25/2016: There are line over text issues. See redlines.
Comment Number: 8 Comment Originated: 01/25/2016
Topic: Lighting Plan
01/25/2016: Please revise the sub-title as marked. See redlines.
Comment Number: 11 Comment Originated: 01/25/2016
01/25/2016: Please correct the 10' Bridle Path & Utility Easement note as marked.
See redlines.
Comment Number: 12 Comment Originated: 01/25/2016
01/25/2016: The plan is very busy. We suggest removing the contours, if not
needed.
Comment Number: 13 Comment Originated: 01/25/2016
Topic: Site Plan
01/25/2016: Please revise the sub-title as marked. See redlines.
Comment Number: 1 Comment Originated: 01/25/2016
01/25/2016: Please remove the legal description. It is not necessary. It is a
duplication of the sub-title.
Comment Number: 2 Comment Originated: 01/25/2016
01/25/2016: There are line over text issues. See redlines.
Comment Number: 3 Comment Originated: 01/25/2016
01/25/2016: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Comment Number: 4 Comment Originated: 01/25/2016
01/25/2016: All reception numbers for documents recorded by separate document
must be added prior to mylars.
Comment Number: 5 Comment Originated: 01/25/2016
01/25/2016: Please correct the 10' Bridle Path & Utility Easement note as marked.
See redlines.
Comment Number: 6 Comment Originated: 01/25/2016
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
01/28/2016: The traffic impact memo has been received and the conclusions
accepted.
Comment Number: 1 Comment Originated: 01/28/2016
Page 10 of 11
01/28/2016: The internal circulation may be something to consider. The drop off is
such that inbound vehicles will likely cross over to the left side of the street to drop
off patients. It feels a little odd.
Comment Number: 2 Comment Originated: 01/28/2016
01/28/2016: The front door is shown towards the Frontage Road. Once the
connector roadway is built to the east, this may be an ackward layout. Maybe the
front door on a 45 degree angle might be more useful in the future?
Comment Number: 3 Comment Originated: 01/28/2016
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
01/19/2016: A landscape plan shall contain accurate and identifiable hydrozones,
including a water budget chart that shows the total annual water use, which shall not
exceed fifteen (15) gallons per square foot over the site. If you have questions
contact Eric Olson at eolson@fcgov.com or 970-221-6704.
Comment Number: 1 Comment Originated: 01/19/2016
01/19/2016: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Comment Number: 2 Comment Originated: 01/19/2016
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
01/27/2016: Signage is not approved with the PDP and Final Plan. Signage is
reviewed through separate sign permits. The Symbol on the west and south side of
the building is considered a sign.
Comment Number: 1 Comment Originated: 01/27/2016
01/27/2016: What is the purpose of the turn around?
Comment Number: 2 Comment Originated: 01/27/2016
01/27/2016: If there is no curb and gutter along the landscaped area, how are
vehicles restricted from driving over the landscaping?
Comment Number: 3 Comment Originated: 01/27/2016
01/27/2016: The trash enclosure needs to have a walk-in access separate from the
main service gate.
Comment Number: 4 Comment Originated: 01/27/2016
01/27/2016: Where is the mechanical equipment locations? How are they
screened?
Comment Number: 5 Comment Originated: 01/27/2016
01/27/2016: The signature block for the Planning needs to be updated to the
Director of Community Development and Neighborhood Services
Comment Number: 6 Comment Originated: 01/27/2016
01/27/2016: The Site plan is part of the planning set. The Planning set will need
sheet index
Comment Number: 7 Comment Originated: 01/27/2016
Page 11 of 11