HomeMy WebLinkAboutPOUDRE RIVER WHITEWATER PARK (FORMERLY POUDRE RIVER DOWNTOWN PARK) - FDP170017 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (3)COLLEGE AVENUE
BNSF RAILROAD
UNION PACIFIC RAILROAD
JEROME STREET
CACHE LA POUDRE RIVER
COY DITCH
VINE DRIVE
1 1
Know what's
R
OWNER:
CITY OF FORT COLLINS
PARK PLANNING & DEVELOPMENT
215 NORTH MASON STREET
FORT COLLINS, CO 80524
PHONE (970) 221-6618
UTILITY PLANS FOR
POUDRE WHITEWATER PARK PROJECT
LOCATED IN NORTHEAST QUARTER OF SECTION 11 AND
NORTHWEST QUARTER OF SECTION 12 OF TOWNSHIP 7N, RANGE
69W OF LARIMER COUNTY, COLORADO AND IS LOCATED ENTIRELY
WITHIN THE LIMITS OF THE CITY OF FORT COLLINS.
JUNE 6, 2017
DESIGN ENGINEERS:
ANDERSON CONSULTING ENGINEERS, INC.
375 EAST HORSETOOTH ROAD, BUILDING 5
FORT COLLINS, CO 80525
PHONE (970) 226-0120
LANDSCAPE ARCHITECTS:
BHA DESIGN INC.
1603 OAKRIDGE DRIVE
FORT COLLINS, CO 80525
PHONE (970) 223-7577
BENCHMARKS:
PROJECT DATUM: NAVD88
CITY OF FORT COLLINS BENCHMARK #1-00.
LOCATED ON CATCH BASIN AT THE SOUTHEAST
CORNER OF VINE DRIVE AND COLLEGE AVENUE
ELEVATION = 4968.74
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A
VERTICAL DATUM. SURROUNDING DEVELOPMENTS
HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL
DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY
PURPOSE, THE FOLLOWING EQUATION SHOULD BE
USED: NGVD29 UNADJSUTED=NAVD88 - 3.17'.
HORIZONTAL DATUM:
CITY OF FORT COLLINS - GROUND MASTER COORDINATE
SYSTEM. HORIZONTAL CONTROL BASED ON THE LARIMER
COUNTY HARN DENSIFICATION OF THE COLORADO STATE
PLANE NETWORK
INDEMNIFICATION STATEMENT:
THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR
CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY
BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER,
OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF
THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT
IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL
QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED
IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY
GENERAL NOTES
1. ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF PUBLIC IMPROVEMENTS SHALL MEET OR
EXCEED THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE LARIMER COUNTY URBAN AREA
STREET STANDARDS AND APPLICABLE STATE AND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT
BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLE STANDARDS, THE MOST
RESTRICTIVE STANDARD SHALL APPLY. ALL WORK SHALL BE INSPECTED AND APPROVED BY THE LOCAL
ENTITY.
2. ALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID
STANDARD, UNLESS SPECIFICALLY STATED OTHERWISE.
3. THESE PUBLIC IMPROVEMENT CONSTRUCTION PLANS SHALL BE VALID FOR A PERIOD OF THREE YEARS
FROM THE DATE OF APPROVAL BY THE LOCAL ENTITY ENGINEER. USE OF THESE PLANS AFTER THE
EXPIRATION DATE WILL REQUIRE A NEW REVIEW AND APPROVAL PROCESS BY THE LOCAL ENTITY PRIOR
TO COMMENCEMENT OF ANY WORK SHOWN IN THESE PLANS.
4. THE ENGINEER WHO HAS PREPARED THESE PLANS, BY EXECUTION AND/OR SEAL HEREOF, DOES
HEREBY AFFIRM RESPONSIBILITY TO THE LOCAL ENTITY, AS BENEFICIARY OF SAID ENGINEER’S WORK,
FOR ANY ERRORS AND OMISSIONS CONTAINED IN THESE PLANS, AND APPROVAL OF THESE PLANS BY THE
LOCAL ENTITY ENGINEER SHALL NOT RELIEVE THE ENGINEER WHO HAS PREPARED THESE PLANS OF ALL
SUCH RESPONSIBILITY. FURTHER, TO THE EXTENT PERMITTED BY LAW, THE ENGINEER HEREBY AGREES TO
HOLD HARMLESS AND INDEMNIFY THE LOCAL ENTITY, AND ITS OFFICERS AND EMPLOYEES, FROM AND
AGAINST ALL LIABILITIES, CLAIMS, AND DEMANDS WHICH MAY ARISE FROM ANY ERRORS AND
OMISSIONS CONTAINED IN THESE PLANS.
5. ALL SANITARY SEWER, STORM SEWER, AND WATER LINE CONSTRUCTION, AS WELL AS POWER AND
OTHER “DRY” UTILITY INSTALLATIONS, SHALL CONFORM TO THE LOCAL ENTITY STANDARDS AND
SPECIFICATIONS CURRENT AT THE DATE OF APPROVAL OF THE PLANS BY THE LOCAL ENTITY ENGINEER.
6. THE TYPE, SIZE, LOCATION AND NUMBER OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER
TO VERIFY THE EXISTENCE AND LOCATION OF ALL UNDERGROUND UTILITIES ALONG THE ROUTE OF THE
WORK BEFORE COMMENCING NEW CONSTRUCTION. THE DEVELOPER SHALL BE RESPONSIBLE FOR
UNKNOWN UNDERGROUND UTILITIES.
7. THE ENGINEER SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) AT 1-
800-922-1987, AT LEAST 2 WORKING DAYS PRIOR TO BEGINNING EXCAVATION OR GRADING, TO HAVE
ALL REGISTERED UTILITY LOCATIONS MARKED. OTHER UNREGISTERED UTILITY ENTITIES (I.E. DITCH /
IRRIGATION COMPANY) ARE TO BE LOCATED BY CONTACTING THE RESPECTIVE REPRESENTATIVE. UTILITY
SERVICE LATERALS ARE ALSO TO BE LOCATED PRIOR TO BEGINNING EXCAVATION OR GRADING. IT SHALL
BE THE RESPONSIBILITY OF THE DEVELOPER TO RELOCATE ALL EXISTING UTILITIES THAT CONFLICT WITH THE
PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.
8. THE DEVELOPER SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES DURING CONSTRUCTION AND
FOR COORDINATING WITH THE APPROPRIATE UTILITY COMPANY FOR ANY UTILITY CROSSINGS REQUIRED.
9. IF A CONFLICT EXISTS BETWEEN EXISTING AND PROPOSED UTILITIES AND/OR A DESIGN MODIFICATION
IS REQUIRED, THE DEVELOPER SHALL COORDINATE WITH THE ENGINEER TO MODIFY THE DESIGN. DESIGN
MODIFICATION(S) MUST BE APPROVED BY THE LOCAL ENTITY PRIOR TO BEGINNING CONSTRUCTION.
10. THE DEVELOPER SHALL COORDINATE AND COOPERATE WITH THE LOCAL ENTITY, AND ALL UTILITY
COMPANIES INVOLVED, TO ASSURE THAT THE WORK IS ACCOMPLISHED IN A TIMELY FASHION AND WITH
A MINIMUM DISRUPTION OF SERVICE. THE DEVELOPER SHALL BE RESPONSIBLE FOR CONTACTING, IN
ADVANCE, ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE AS WELL AS THE UTILITY
COMPANIES.
11. NO WORK MAY COMMENCE WITHIN ANY PUBLIC STORM WATER, SANITARY SEWER OR POTABLE
WATER SYSTEM UNTIL THE DEVELOPER NOTIFIES THE UTILITY PROVIDER. NOTIFICATION SHALL BE A
MINIMUM OF 2 WORKING DAYS PRIOR TO COMMENCEMENT OF ANY WORK. AT THE DISCRETION OF THE
WATER UTILITY PROVIDER, A PRE-CONSTRUCTION MEETING MAY BE REQUIRED PRIOR TO
COMMENCEMENT OF ANY WORK.
12. THE DEVELOPER SHALL SEQUENCE INSTALLATION OF UTILITIES IN SUCH A MANNER AS TO MINIMIZE
POTENTIAL UTILITY CONFLICTS. IN GENERAL, STORM SEWER AND SANITARY SEWER SHOULD BE
CONSTRUCTED PRIOR TO INSTALLATION OF THE WATER LINES AND DRY UTILITIES.
13. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS 5.5 FEET
UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER UTILITY.
14. A STATE CONSTRUCTION DEWATERING WASTEWATER DISCHARGE PERMIT IS REQUIRED IF
DEWATERING IS REQUIRED IN ORDER TO INSTALL UTILITIES OR WATER IS DISCHARGED INTO A STORM
SEWER, CHANNEL, IRRIGATION DITCH OR ANY WATERS OF THE UNITED STATES.
15. THE DEVELOPER SHALL COMPLY WITH ALL TERMS AND CONDITIONS OF THE COLORADO PERMIT FOR
ABBREVIATIONS MAPPING LEGEND
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
3 3
PROJECT INFORMATION
SHEET
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CACHE LA POUDRE RIVER
BNSF RAILROAD
CACHE LA POUDRE RIVER
COLLEGE AVENUE
UNION PACIFIC RAILROAD
LAKE CANAL
JEROME STREET
VINE DRIVE
COY DITCH
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
4 4
SURVEY CONTROL AND
GEOTECHNICAL BOREHOLE
LOCATIONS
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
5 5
BOREHOLE LOGS
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
UNION PACIFIC RAILROAD
COLLEGE AVENUE
VINE DRIVE
JEROME STREET
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
6 C1
DEMOLITION PLAN (1 OF 2)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31)
WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A
NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS
ARE FOUND, THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY.
VINE DRIVE
BNSF RAILROAD
JEROME STREET
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
7 C2
DEMOLITION PLAN (2 OF 2)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
NO TREES SHALL BE REMOVED DURING THE SONGBIRD NESTING SEASON (FEBRUARY 1 TO JULY 31)
WITHOUT FIRST HAVING A PROFESSIONAL ECOLOGIST OR WILDLIFE BIOLOGIST COMPLETE A
NESTING SURVEY TO IDENTIFY ANY ACTIVE NESTS EXISTING ON THE PROJECT SITE. IF ACTIVE NESTS
ARE FOUND, THE CITY ENVIRONMENTAL PLANNER WILL DETERMINE WHETHER ADDITIONAL
RESTRICTIONS ON TREE REMOVAL AND CONSTRUCTION APPLY.
UNION PACIFIC RAILROAD
COLLEGE AVENUE
VINE DRIVE
JEROME STREET
VINE DRIVE
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
8 C3
UTILITY AND HORIZONTAL
PLAN (1 OF 2)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
VINE DRIVE
BNSF RAILROAD
JEROME STREET
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
9 C4
UTILITY AND HORIZONTAL
PLAN (2 OF 2)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
UNION PACIFIC RAILROAD
COLLEGE AVENUE
VINE DRIVE
JEROME STREET
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
10 C5
GRADING PLAN (1 OF 4)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
VINE DRIVE
BNSF RAILROAD
JEROME STREET
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
11 C6
GRADING PLAN (2 OF 4)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
12 C7
GRADING PLAN (3 OF 4)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
VINE DRIVE
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
13 C8
GRADING PLAN (4 OF 4)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
VINE DRIVE
JEROME
STREET
4955
4960
4965
4955
4960
4965
8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50
EX SLOPE =1.4%
LINE TABLE
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
BEARING
N89.090554W
N89.004784W
S89.240585W
N89.324733W
N89.181829W
N89.115395W
N89.115396W
N89.221548W
N89.230650W
N89.230650W
N89.233755W
N89.340711W
N89.213468W
N89.212887W
N89.212887W
N89.212887W
N73.471472W
LENGTH
24.82
8.77
7.27
3.03
6.10
20.25
20.25
92.01
42.84
45.91
37.73
VINE DRIVE
JEROME
STREET
4955
4960
4965
4955
4960
4965
3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00 -0+50
EX SLOPE = 0.54%
CURVE TABLE
CURVE #
C1
C2
C3
C4
C5
C6
ARC LENGTH
11.81
11.20
11.20
11.81
6.38
24.63
RADIUS
20.00
20.00
20.00
20.00
20.00
60.00
CHORD BEARING
S73°04'42"W
S73°35'58"W
N72°25'10"W
N71°53'54"W
S75°57'21"W
S78°46'54"W
CHORD LENGTH
11.64
11.05
11.05
11.64
6.35
24.45
DELTA ANGLE
033°50'35"
032°04'38"
032°04'38"
033°50'35"
018°16'49"
023°31'05"
LINE TABLE
LINE #
L1
L2
L3
L4
0+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
0+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
1+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
1+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
2+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
2+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
3+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
3+50.00
4955
4960
4965
VINE DRIVE
JEROME ST.
4955
4960
4965
4970
4955
4960
4965
4970
10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00
4955
4960
4965
4970
4955
4960
4965
4970
10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00
4955
4960
4965
4970
4955
4960
4965
4970
10+50 10+00 9+50 9+00 8+50 8+00 7+50 7+00 6+50 6+00 5+50 5+00 4+50 4+00 3+50 3+00 2+50 2+00 1+50 1+00 0+50 0+00
NORTH FLOWLINE
CENTERLINE
SOUTH FLOWLINE
CURVE TABLE
CURVE #
C1
C2
C3
C4
C5
C6
C7
C8
ARC LENGTH
11.81
11.20
11.20
11.81
6.50
24.84
27.18
8.19
RADIUS
20.00
20.00
20.00
20.00
20.00
60.00
60.00
20.00
ONLY ONLY
COLLEGE AVENUE
JEROME ST.
VINE DRIVE
ONLY ONLY
COLLEGE AVENUE
JEROME ST.
VINE DRIVE
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
18 C13
VINE DRIVE PROPOSED AND
ULTIMATE STRIPING PLAN
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
FUTURE/ULTIMATE STRIPING PLAN
PROPOSED/INTERIM STRIPING PLAN
NOTE:
SEE DETAIL SHEET D5 FOR GENERAL
STRIPING AND SIGNAGE DETAILS
BNSF RAILROAD
COY DITCH
VINE DRIVE
A
A
4940
4945
4950
4955
4960
4965
4940
4945
4950
4955
4960
4965
0+00 0+50 1+00 1+50 2+00 2+50 3+00
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
0+00 0+50 0+65
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
19 C14
WATER QUALITY PLAN AND
DETAILS
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
1+61 1+50 1+00 0+50 0+00
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
CACHE LA POUDRE RIVER
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE
MAINTAINED IN A NATIVE AND/OR
DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR
ALLOWABLE USES AND REQUIREMENTS FOR
PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN
IDENTIFIED ON THE SURVEY CONTROL SHEET FOR
REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
20 C15
STORM SEWER LINE A PLAN
& PROFILE
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
0+00 0+50 1+00 1+50 1+71
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
21 C16
STORM SEWER LINE B PLAN
& PROFILE
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
VINE DRIVE
4949
4950
4955
4960
4949
4950
4955
4960
1+90 1+50 1+00 0+50 0+00
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
22 C17
STORM SEWER LINE C PLAN
& PROFILE
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
VINE DRIVE
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
0+00 0+50 1+00 1+50 1+89
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT LANDSCAPE. PLEASE SEE
SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
23 C18
STORM SEWER LINE D PLAN
& PROFILE
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
1+77 1+50 1+00 0+50 0+00
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE INTENDED TO BE
MAINTAINED IN A NATIVE AND/OR DROUGHT-TOLERANT
LANDSCAPE. PLEASE SEE SECTION 3.4.1 OF THE LAND
USE CODE FOR ALLOWABLE USES AND REQUIREMENTS
FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE BEEN
IDENTIFIED ON THE SURVEY CONTROL SHEET FOR
REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
24 C19
STORM SEWER LINE E PLAN
& PROFILE
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
0+60 0+50 0+00
4945
4950
4955
4960
4965
4945
4950
4955
4960
4965
0+85 0+50 0+00
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE
INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT
LANDSCAPE. PLEASE SEE SECTION 3.4.1
OF THE LAND USE CODE FOR
ALLOWABLE USES AND REQUIREMENTS
FOR PROTECTING NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES HAVE
BEEN IDENTIFIED ON THE SURVEY
CONTROL SHEET FOR REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
25 C20
STORM SEWER LINE F AND
FIRE HYDRANT PLAN &
PROFILES
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
CACHE LA POUDRE RIVER
4940
4945
4950
4955
4960
4965
4970
4975
4940
4945
4950
4955
4960
4965
4970
4975
1+00 0+50 0+00
MAIN LINE
CACHE LA POUDRE RIVER
CACHE LA POUDRE RIVER
4945
4950
4955
4960
4965
4970
4975
4980
4945
4950
4955
4960
4965
4970
4975
4980
0+90 0+50 0+00
WEST LINE
4945
4950
4955
4960
4965
4970
4975
4980
4945
4950
4955
4960
4965
4970
4975
4980
0+00 0+50 0+80
EAST LINE
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
CACHE LA POUDRE RIVER
BNSF RAILROAD
CACHE LA POUDRE RIVER
COLLEGE AVENUE
UNION PACIFIC RAILROAD
LAKE CANAL
JEROME STREET
VINE DRIVE
COY DITCH
RS RS RS RS
IP
IP
IP-EL
IP-EL
IP IP
OP
OP
OP
OP
OP
OP
OP
IP
IP
IP-EL
ST
ST
ST
ECM
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
27 C22
EROSION CONTROL PLAN
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
RS
IP
OP
IP-EL
ST
ECM
230930
230969
231062
229596
230464
230021
230626
230549
229943
AH ZONE
WSEL=4962.1
CACHE LA POUDRE RIVER
BNSF RAILROAD
CACHE LA POUDRE RIVER
COLLEGE AVENUE
UNION PACIFIC RAILROAD
LAKE CANAL
JEROME STREET
VINE DRIVE
COY DITCH
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
28 C23
FLOODPLAIN PLAN
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. PORTIONS OF THE PROJECT AREA ARE LOCATED IN THE FEMA
REGULATORY CACHE LA POUDRE RIVER 100-YEAR FLOODPLAIN AND
FLOODWAY. ALL DEVELOPMENT MUST SATISFY REQUIREMENTS OF
CHAPTER 10 OF CITY CODE.
2. PRIOR TO BEGINNING ANY WORK IN THE FLOODWAY FRINGE A
FLOODPLAIN USE PERMIT IS REQUIRED.
3. PRIOR TO BEGINNING ANY WORK IN THE FLOODWAY AN APPROVED
NO-RISE CERTIFICATE IS REQUIRED
4. NO STORAGE OF MATERIALS OR EQUIPMENT IN THE FLOODWAY
5. NO FILL IN THE FLOODWAY UNLESS A HYDRAULIC ANALYSIS SHOWS
"NO-RISE". NO MANUFACTURED HOMES, EXCEPT IN AN EXISTING PARK,
CAN BE PLACED IN THE FLOODWAY. NO CHANGING A
NONCONFORMING NON-RESIDENTIAL OR MIXED USE STRUCTURE TO A
RESIDENTIAL STRUCTURE. LANDSCAPING MEETS REQUIREMENTS FOR
NO ENCROACHMENT IN THE FLOODWAY WITHOUT A HYDRAULIC
BEDDING REQUIRMENTS
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
29 D1
DETAIL SHEET (1 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
Sidewalk
Driveway
LIP
F.L.
T.C.
DRIVEWAY SIDEWALK
SECTION A-A
NOTE:
1. Sidewalk grade shall remain consistent across driveway
3. This detail applies to Residential & Commercial driveways.
6"
6" Residential
Detached Sidewalk
Attached Sidewalk
A
A
2. For driveway design requirements, see CONST. DWG. 706 & 707.
DETACHED ATTACHED
3'-0" 6'-0"
All Sidewalk Thickness Shall Be 6" minimum.
Min.
SIDEWALK
8" Commercial
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
30 D2
DETAIL SHEET (2 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
or equivalent. (typical both sides)
With curb walk, cover plate extends
from property line to top of walk face.
6" VERTICAL CURB, GUTTER, AND SIDEWALK
SECTION A-A (2 VIEWS)
COMBINATION CURB, GUTTER, AND SIDEWALK
center, Nelson Standard Anchor
3" #4 Bar Welded at 12" on
L = 1 1/4" x 1 1/4" x 1/4"
5/8" Rolled Steel Tread Plate
SECTION C-C
1.0' (minimum)
approved by the Engineer.
Right of Way line to flow line unless
2. Chase and cover plate run from
1. Length of steel plate varies.
Notes:
Dimension Variable
(diamond pattern)
5/8" Rolled Steel Tread Plate
4'-0" or as Directed
Retaining Screws at
Top of Curb
C B
A
C B
PLAN VIEW
A
Street
10 3/8" SECTION B-B
6"
1 1/4"
Attached
Ft. Collins only
Detached Sidewalk
finish 12" on center
Screw Brass or Electro-galv.
1/2" x 1" Flat Head Mach.
threaded to receive screw.
Angle iron to be drilled and
screw to extend into the
Concrete to be drilled to allow
Lip of Gutter
concrete
(typical both sides).
(typical both sides)
F L
Sidewalk
X (Varies, See Plans
Xmax=2.0')
d (Varies,
See Plans)
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
31 D3
DETAIL SHEET (3 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
Chapter 25
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
32 D4
DETAIL SHEET (4 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
PAVEMENT MARKINGS
NO
PARKING
BY ORDER OF THE
FIRE MARSHAL
STANDARD
FIRE LANE SIGN DETAIL
UNIVERSAL
FIRE LANE SIGN DETAIL
(FORT COLLINS ONLY)
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
33 D5
DETAIL SHEET (5 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
34 D6
DETAIL SHEET (6 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
Drawn on: 3-16-11
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
NOTES:
* Use ECMDS for more accurate
staple pattern selection.
2"-5"
(5-12.5cm)
3.3'
(1m)
6'
(1.8m)
3'
(0.9m)
4'
(1.2m)
1.6'
(0.5m)
2'
(0.6m)
10"
(25cm)
10"(25cm)
20"(0.5m)
0.7 Staples per SQ.YD. 1.15 Staples per SQ.YD.
1.7 Staples per SQ.YD. 3.4 Staples per SQ.YD. 3.75 Staples per SQ.YD.
4:1 Slopes (A)
3:1 Slopes (B)
2:1 Slopes (C)
1:1 & Steeper Slopes (D)
Medium/High Flow Channel (D)
High Flow Channel And
Shoreline (E)
Drawing Not To Scale
A B
C D E
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
2"-5"
(5-12.5cm)
6'
(1.8m)
3.3'
(1m)
3.3'
(1m)
3'
(0.9m)
3.3'
(1m)
3.3'
(1m)
3.3'
(1m)
1.6'
(0.5m)
4'
(1.2m)
4'
(1.2m)
2'
(0.6m)
2'
(0.6m)
20"(0.5m)
R
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-722-2040
www.nagreen.com
Drawing Not To Scale
1. Prepare soil before installing rolled
erosion control products (RECPs),
including any necessary application of
lime, fertilizer, and seed.
2. Begin at the top of the channel by
anchoring the RECPs in a 6"(15cm)
deep X 6"(15cm) wide trench with
approximately 12"(30cm) of RECPs
extended beyond the up-slope portion
of the trench. Use ShoreMax mat at the
channel/culvert outlet as supplemental
scour protection as needed. Anchor the
RECPs with a row of staples/stakes
approximately 12"(30cm) apart in the
bottom of the trench. Backfill and
compact the trench after stapling. Apply
seed to the compacted soil and fold the
remaining 12"(30cm) portion of RECPs
back over the seed and compacted soil.
Secure RECPs over compacted soil
with a row of staples/stakes spaced
approximately 12" apart across the
width of the RECPs.
3. Roll center RECPs in direction of water
flow in bottom of channel. RECPs will
unroll with appropriate side against the
soil surface. All RECPs must be
securely fastened to soil surface by
placing staples/stakes in appropriate
locations as shown in the staple pattern
guide.
4. Place consecutive RECPs end-over-end
(Shingle style) with a 4"-6" overlap. Use
a double row of staples staggered 4"
apart and 4" on center to secure
RECPs.
5. Full length edge of RECPs at top of side
slopes must be anchored with a row of
staples/stakes approximately 12"(30cm)
apart in a 6"(15cm) deep X 6"(15cm)
wide trench. Backfill and compact the
trench after stapling.
6. Adjacent RECPs must be overlapped
approximately 2"-5" (5-12.5cm)
(Depending on RECPs type) and
stapled.
7. In high flow channel applications a
staple check slot is recommended at 30
to 40 foot (9 -12m) intervals. Use a
double row of staples staggered
4"(10cm) apart and 4"(10cm) on center
over entire width of the channel.
8. The terminal end of the RECPs must be
anchored with a row of staples/stakes
approximately 12" (30cm) apart in a
6"(15cm) deep X 6"(15cm) wide trench.
Backfill and compact the trench after
stapling.
Drawn on: 3-16-11
Disclaimer:
The information presented herein is general design information only. For specific applications,
consult an independent professional for further design guidance.
2"-5"
(5-12.5cm)
6
2
4
12"(30cm)
6"
(15cm)
6"
(15cm)
4"-6"
(10-15cm)
8
6"
(15cm)
5 7
4"(10cm)
3
1
A
B
C
A
B C
NOTES:
*Horizontal staple spacing should be
altered if necessary to allow staples to
secure the critical points along the channel
surface.
**In loose soil conditions, the use of staple
or stake lengths greater than 6"(15cm) may
be necessary to properly secure the
RECP's.
CRITICAL POINTS
A. Overlaps and Seams
B. Projected Water Line
C. Channel Bottom/Side Slope Vertices
4"(10cm)
6"
(15cm)
5401 St. Wendel - Cynthiana Rd.
Poseyville, IN 47633
PH: 800-722-2040
www.nagreen.com
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
35 D7
DETAIL SHEET (7 OF 7)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
ANALYSIS TO SHOW "NO-RISE". NO STORAGE OF MATERIALS OR
EQUIPMENT.
6. ALL PERMANENT FLOATABLE INFRASTRUCTURE TO BE ANCHORED.
7. NO OVERNIGHT PARKING ALLOWED IN PARKING LOTS
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
NOTES
1. ALL UNDISTURBED AREAS ARE
INTENDED TO BE MAINTAINED IN A
NATIVE AND/OR DROUGHT-TOLERANT
LANDSCAPE. PLEASE SEE SECTION
3.4.1 OF THE LAND USE CODE FOR
ALLOWABLE USES AND
REQUIREMENTS FOR PROTECTING
NATURAL FEATURES.
2. PROPERTY CORNER COORDINATES
HAVE BEEN IDENTIFIED ON THE
SURVEY CONTROL SHEET FOR
REFERNCE.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
26 C21
POWERHOUSE STORM
SEWER IMPROVEMENTS
PLAN & PROFILES
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
SURVEY CONTROL SHEET FOR REFERNCE.
CHORD BEARING
S73°04'42"W
S73°35'58"W
N72°25'10"W
N71°53'54"W
S76°02'20"W
S78°46'54"W
N77°03'52"W
N75°03'25"W
CHORD LENGTH
11.64
11.05
11.05
11.64
6.48
24.66
26.95
8.14
DELTA ANGLE
033°50'35"
032°04'38"
032°04'38"
033°50'35"
018°37'53"
023°43'02"
025°57'07"
023°28'08"
LINE TABLE
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
L20
L21
L22
L23
L24
L25
L26
BEARING
N89.391818W
N89.474279W
N89.115396W
N89.221548W
N89.230650W
S83.021850W
N89.231672W
N81.482151W
N89.240428W
S82.504733W
N89.223258W
N82.115068W
N88.405794W
N89.212887W
N89.212887W
N89.315033W
N89.395286W
N89.235924W
S83.325058W
N89.223258W
N82.121000W
N89.120361W
S89.441142W
N89.221548W
N89.254194W
S88.532161W
LENGTH
14.11
12.14
40.49
92.01
41.96
8.00
32.00
8.01
40.03
8.13
12.00
8.01
3.40
305.80
89.81
2.65
143.71
14.45
8.12
24.00
8.01
10.96
21.21
26.27
773.73
28.64
LINE TABLE
LINE #
L27
L28
L29
L30
L31
L32
L33
L34
L35
L36
L37
L38
L39
L40
L41
L42
L43
L44
L45
L46
L47
L48
L49
L50
L51
L52
BEARING
S88.283976W
S88.400266W
N89.323348W
N89.233262W
N89.053138W
N88.245214W
N89.235388W
N85.192224W
S89.515642W
S85.033834W
N89.483158W
N89.221548W
N89.114297W
N82.121000W
N89.223258W
S83.325058W
N89.223258W
N89.223258W
N88.574318W
N88.313071W
N89.053683W
N89.245072W
N89.473500W
N89.072201W
N89.015689W
N89.245610W
LENGTH
65.34
33.49
130.18
2.73
15.34
5.52
189.15
23.85
48.34
23.90
5.16
109.36
10.61
8.01
24.00
8.12
15.81
336.39
80.25
29.51
26.14
13.30
23.57
9.82
36.80
10.77
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
17 C12
VINE DRIVE ULTIMATE
DESIGN PLAN & PROFILE
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
4+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
4+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
5+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
5+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
6+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
6+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
7+00.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
7+50.00
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
7+63.49
4955
4960
4965
4955
4960
4965
-80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
2.0%
EX ROW
VINE DRIVE
TYPICAL SECTION
NTS
EX ROW
EX ROW
PP ROW
PP UE
2.6%
2.5%
3.0%
3.7%
3.8%
3.0%
2.5%
2.0%
2.0%
2.2%
2.1%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
2.0%
4:1
4:1
4:1
4:1
4:1
4:1
3.0:1
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
VINE DR ULTIMATE CL
(EX SECTION LINE)
PP ROW
PP UE
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
PP ROW
PP UE
EX ROW
EX ROW
EX ROW
EX ROW
EX ROW
EX ROW
3.8%
2.0%
1:24
2.0%
3.9%
3.5%
1.8%
1.6%
2.0%
2.0%
3.7%
4:1
4:1
4:1
2.2%
2.0%
3.0%
3.2%
1.5%
2.1%
1.5%
2.2%
2.6%
2.0%
2.0%
2.2%
2.4%
2.2%
1.8%
2.4%
2.2%
2.0%
1.8%
1.8%
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
VINE DR ULTIMATE CL
(EX SECTION LINE)
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
EX CL/CROWN
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
16 C11
VINE DRIVE CROSS
SECTIONS
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
L5
L6
L7
L8
L9
BEARING
N89.090554W
N89.004784W
S89.240585W
N89.324733W
N89.181829W
N89.115395W
N89.115396W
N89.221548W
N89.230650W
LENGTH
24.82
8.77
7.27
3.03
6.10
20.25
20.25
92.01
42.84
LINE TABLE
LINE #
L10
L11
L12
L13
L14
L15
L16
L17
BEARING
N89.230650W
N89.233755W
N89.340711W
N89.213468W
N89.212887W
N89.212887W
N89.212887W
N73.471472W
LENGTH
45.91
37.73
34.99
2.80
152.90
152.90
89.71
30.59
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
15 C10
VINE DRIVE PLAN & PROFILE
(2 OF 2)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
34.99
2.80
152.90
152.90
89.71
30.59
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
14 C9
VINE DRIVE PLAN & PROFILE
(1 OF 2)
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
STORM WATER DISCHARGE (CONTACT COLORADO DEPARTMENT OF HEALTH, WATER QUALITY CONTROL
DIVISION, (303) 692-3590), THE STORM WATER MANAGEMENT PLAN, AND THE EROSION CONTROL
PLAN.
16. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF STORM DRAINAGE
FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF ONSITE DRAINAGE FACILITIES SHALL BE
THE RESPONSIBILITY OF THE PROPERTY OWNER(S).
17. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE LOCAL ENTITY, CERTIFICATION OF THE
DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BE SUBMITTED TO AND APPROVED BY THE
STORMWATER UTILITY DEPARTMENT. CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY
DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE
FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BE SUBMITTED TO THE
STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE RELEASE OF ANY BUILDING
PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
18. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR ANY DAMAGES OR INJURIES SUSTAINED IN THIS
DEVELOPMENT AS A RESULT OF GROUNDWATER SEEPAGE, WHETHER RESULTING FROM GROUNDWATER FLOODING,
STRUCTURAL DAMAGE OR OTHER DAMAGE UNLESS SUCH DAMAGE OR INJURIES ARE SUSTAINED
AS A RESULT OF THE LOCAL ENTITY FAILURE TO PROPERLY MAINTAIN ITS WATER, WASTEWATER, AND/OR
STORM DRAINAGE FACILITIES IN THE DEVELOPMENT.
19. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY (NAME OF THE
STUDY AND DATE) BY (ENGINEERING FIRM) SHALL BE FOLLOWED AND IMPLEMENTED.
20. TEMPORARY EROSION CONTROL DURING CONSTRUCTION SHALL BE PROVIDED AS SHOWN ON THE
EROSION CONTROL PLAN. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY
THE DEVELOPER, UNTIL SUCH TIME AS THE ENTIRE DISTURBED AREAS IS STABILIZED WITH HARD SURFACE
OR LANDSCAPING.
21. THE DEVELOPER SHALL BE RESPONSIBLE FOR INSURING THAT NO MUD OR DEBRIS SHALL BE TRACKED
ONTO THE EXISTING PUBLIC STREET SYSTEM. MUD AND DEBRIS MUST BE REMOVED WITHIN 24 HOURS
BY AN APPROPRIATE MECHANICAL METHOD (I.E. MACHINE BROOM SWEEP, LIGHT DUTY FRONT-END
LOADER, ETC.) OR AS APPROVED BY THE LOCAL ENTITY STREET INSPECTOR.
22. NO WORK MAY COMMENCE WITHIN ANY IMPROVED OR UNIMPROVED PUBLIC RIGHT-OF-WAY
UNTIL A RIGHT-OF-WAY PERMIT OR DEVELOPMENT CONSTRUCTION PERMIT IS OBTAINED, IF
APPLICABLE.
23. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FOR ALL
APPLICABLE AGENCIES PRIOR TO COMMENCEMENT OF CONSTRUCTION. THE DEVELOPER SHALL NOTIFY
THE LOCAL ENTITY ENGINEERING INSPECTOR (FORT COLLINS - 221-6605) AND THE LOCAL ENTITY
EROSION CONTROL INSPECTOR (FORT COLLINS – 221-6700) AT LEAST 2 WORKING DAYS PRIOR TO THE
START OF ANY EARTH DISTURBING ACTIVITY, OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS.
IF THE LOCAL ENTITY ENGINEER IS NOT AVAILABLE AFTER PROPER NOTICE OF CONSTRUCTION ACTIVITY
HAS BEEN PROVIDED, THE DEVELOPER MAY COMMENCE WORK IN THE ENGINEER ABSENCE.
HOWEVER, THE LOCAL ENTITY RESERVES THE RIGHT NOT TO ACCEPT THE IMPROVEMENT IF SUBSEQUENT
TESTING REVEALS AN IMPROPER INSTALLATION.
24. THE DEVELOPER SHALL BE RESPONSIBLE FOR OBTAINING SOILS TESTS WITHIN THE PUBLIC RIGHTOF-WAY
AFTER RIGHT OF WAY GRADING AND ALL UTILITY TRENCH WORK IS COMPLETE AND PRIOR TO THE
PLACEMENT OF CURB, GUTTER, SIDEWALK AND PAVEMENT. IF THE FINAL SOILS/PAVEMENT DESIGN
REPORT DOES NOT CORRESPOND WITH THE RESULTS OF THE ORIGINAL GEOTECHNICAL REPORT, THE
DEVELOPER SHALL BE RESPONSIBLE FOR A RE-DESIGN OF THE SUBJECT PAVEMENT SECTION OR, THE
DEVELOPER MAY USE THE LOCAL ENTITY’S DEFAULT PAVEMENT THICKNESS SECTION(S). REGARDLESS
OF THE OPTION USED, ALL FINAL SOILS/PAVEMENT DESIGN REPORTS SHALL BE PREPARED BY A LICENSED
PROFESSIONAL ENGINEER. THE FINAL REPORT SHALL BE SUBMITTED TO THE INSPECTOR A MINIMUM OF
10 WORKING DAYS PRIOR TO PLACEMENT OF BASE AND ASPHALT. PLACEMENT OF CURB, GUTTER,
SIDEWALK, BASE AND ASPHALT SHALL NOT OCCUR UNTIL THE LOCAL ENTITY ENGINEER APPROVES THE
FINAL REPORT.
25. THE CONTRACTOR SHALL HIRE A LICENSED ENGINEER OR LAND SURVEYOR TO SURVEY THE
CONSTRUCTED ELEVATIONS OF THE STREET SUBGRADE AND THE GUTTER FLOWLINE AT ALL INTERSECTIONS,
INLETS, AND OTHER LOCATIONS REQUESTED BY THE LOCAL ENTITY INSPECTOR. THE ENGINEER OR
SURVEYOR MUST CERTIFY IN A LETTER TO THE LOCAL ENTITY THAT THESE ELEVATIONS CONFORM TO THE
APPROVED PLANS AND SPECIFICATIONS. ANY DEVIATIONS SHALL BE NOTED IN THE LETTER AND THEN
RESOLVED WITH THE LOCAL ENTITY BEFORE INSTALLATION OF BASE COURSE OR ASPHALT WILL BE
ALLOWED ON THE STREETS.
26. ALL UTILITY INSTALLATIONS WITHIN OR ACROSS THE ROADBED OF NEW RESIDENTIAL ROADS MUST BE
COMPLETED PRIOR TO THE FINAL STAGES OF ROAD CONSTRUCTION. FOR THE PURPOSES OF THESE
STANDARDS, ANY WORK EXCEPT C/G ABOVE THE SUBGRADE IS CONSIDERED FINAL STAGE WORK. ALL
SERVICE LINES MUST BE STUBBED TO THE PROPERTY LINES AND MARKED SO AS TO REDUCE THE
EXCAVATION NECESSARY FOR BUILDING CONNECTIONS.
27. PORTIONS OF LARIMER COUNTY ARE WITHIN OVERLAY DISTRICTS. THE LARIMER COUNTY
FLOODPLAIN RESOLUTION SHOULD BE REFERRED TO FOR ADDITIONAL CRITERIA FOR ROADS WITHIN THESE
DISTRICTS.
28. ALL ROAD CONSTRUCTION IN AREAS DESIGNATED AS WILD FIRE HAZARD AREAS SHALL BE DONE IN
ACCORDANCE WITH THE CONSTRUCTION CRITERIA AS ESTABLISHED IN THE WILD FIRE HAZARD AREA
MITIGATION REGULATIONS IN FORCE AT THE TIME OF FINAL PLAT APPROVAL.
29. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION, THE CONTRACTOR SHALL CONTACT THE LOCAL
ENTITY FORESTER TO SCHEDULE A SITE INSPECTION FOR ANY TREE REMOVAL REQUIRING A PERMIT.
30. THE DEVELOPER SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED
TO, EXCAVATION, TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. REFER TO OSHA
PUBLICATION 2226, EXCAVATING AND TRENCHING.
31. THE DEVELOPER SHALL SUBMIT A CONSTRUCTION TRAFFIC CONTROL PLAN, IN ACCORDANCE WITH
MUTCD, TO THE APPROPRIATE RIGHT-OF-WAY AUTHORITY. (LOCAL ENTITY, COUNTY OR STATE), FOR
APPROVAL, PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN, OR AFFECTING, THE RIGHT-OF-WAY. THE
DEVELOPER SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFIC CONTROL DEVICES AS MAY BE
REQUIRED BY THE CONSTRUCTION ACTIVITIES.
32. PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION THAT WILL AFFECT TRAFFIC SIGNS OF ANY
TYPE, THE CONTRACTOR SHALL CONTACT LOCAL ENTITY TRAFFIC OPERATIONS DEPARTMENT, WHO WILL
TEMPORARILY REMOVE OR RELOCATE THE SIGN AT NO COST TO THE CONTRACTOR; HOWEVER, IF THE
CONTRACTOR MOVES THE TRAFFIC SIGN THEN THE CONTRACTOR WILL BE CHARGED FOR THE LABOR,
MATERIALS AND EQUIPMENT TO REINSTALL THE SIGN AS NEEDED.
33. THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR THE INITIAL INSTALLATION OF TRAFFIC SIGNING
AND STRIPING FOR THE DEVELOPMENT RELATED TO THE DEVELOPMENT’S LOCAL STREET OPERATIONS. IN
ADDITION, THE DEVELOPER IS RESPONSIBLE FOR ALL COSTS FOR TRAFFIC SIGNING AND STRIPING RELATED
TO DIRECTING TRAFFIC ACCESS TO AND FROM THE DEVELOPMENT.
34. THERE SHALL BE NO SITE CONSTRUCTION ACTIVITIES ON SATURDAYS, UNLESS SPECIFICALLY
APPROVED BY THE LOCAL ENTITY ENGINEER, AND NO SITE CONSTRUCTION ACTIVITIES ON SUNDAYS OR
HOLIDAYS, UNLESS THERE IS PRIOR WRITTEN APPROVAL BY THE LOCAL ENTITY.
35. THE DEVELOPER IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE
COMPLETION OF THE INTENDED IMPROVEMENTS, SHOWN ON THESE DRAWINGS, OR DESIGNATED TO BE
PROVIDED, INSTALLED, OR CONSTRUCTED, UNLESS SPECIFICALLY NOTED OTHERWISE.
36. DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. IF
PERTINENT DIMENSIONS ARE NOT SHOWN, CONTACT THE DESIGNER FOR CLARIFICATION, AND ANNOTATE
THE DIMENSION ON THE AS-BUILT RECORD DRAWINGS.
37. THE DEVELOPER SHALL HAVE, ONSITE AT ALL TIMES, ONE (1) SIGNED COPY OF THE APPROVED
PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDS AND SPECIFICATIONS, AND A COPY OF ANY
PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB.
38. IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED WHICH COULD INDICATE A
SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THE DEVELOPER SHALL CONTACT
THE DESIGNER AND THE LOCAL ENTITY ENGINEER IMMEDIATELY.
39. THE DEVELOPER SHALL BE RESPONSIBLE FOR RECORDING AS-BUILT INFORMATION ON A SET OF
RECORD DRAWINGS KEPT ON THE CONSTRUCTION SITE, AND AVAILABLE TO THE LOCAL ENTITY’S
INSPECTOR AT ALL TIMES. UPON COMPLETION OF THE WORK, THE CONTRACTOR(S) SHALL SUBMIT RECORD
DRAWINGS TO THE LOCAL ENTITY ENGINEER.
40. PROJECT DATUM = NAVD88
BENCHMARK #1-00.
LOCATED ON CATCH BASIN AT THE SOUTHEAST
CORNER OF VINE DRIVE AND COLLEGE AVENUE
ELEVATION = 4968.74
41. ALL STATIONING IS BASED ON CENTERLINE/FLOWLINE (INSERT PROPER WORD) OF ROADWAYS
UNLESS OTHERWISE NOTED.
42. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION, AS WELL AS EXISTING
FENCES, TREES, STREETS, SIDEWALKS, CURBS AND GUTTERS, LANDSCAPING, STRUCTURES, AND
IMPROVEMENTS DESTROYED, DAMAGED OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL
BE REPLACED OR RESTORED IN LIKE KIND AT THE DEVELOPER’S EXPENSE, UNLESS OTHERWISE
INDICATED ON THESE PLANS, PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR
TO THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
43. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO A CONDITION
EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET CONDITION SHALL BE
DOCUMENTED BY THE LOCAL ENTITY CONSTRUCTION INSPECTOR BEFORE ANY CUTS ARE MADE.
PATCHING SHALL BE DONE IN ACCORDANCE WITH THE LOCAL ENTITY STREET REPAIR STANDARDS. THE
FINISHED PATCH SHALL BLEND IN SMOOTHLY INTO THE EXISTING SURFACE. ALL LARGE PATCHES SHALL BE
PAVED WITH AN ASPHALT LAY-DOWN MACHINE. IN STREETS WHERE MORE THAN ONE CUT IS MADE, AN
OVERLAY OF THE ENTIRE STREET WIDTH, INCLUDING THE PATCHED AREA, MAY BE REQUIRED. THE
DETERMINATION OF NEED FOR A COMPLETE OVERLAY SHALL BE MADE BY THE LOCAL ENTITY ENGINEER
AND/OR THE LOCAL ENTITY INSPECTOR AT THE TIME THE CUTS ARE MADE.
44. UPON COMPLETION OF CONSTRUCTION, THE SITE SHALL BE CLEANED AND RESTORED TO A CONDITION
EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED BEFORE CONSTRUCTION, OR TO THE GRADES AND
CONDITION AS REQUIRED BY THESE PLANS.
45. STANDARD HANDICAP RAMPS ARE TO BE CONSTRUCTED AT ALL CURB RETURNS AND AT ALL “T”
INTERSECTIONS.
46. AFTER ACCEPTANCE BY THE LOCAL ENTITY, PUBLIC IMPROVEMENTS DEPICTED IN THESE PLANS
SHALL BE GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP DEFECTS FOR A MINIMUM
PERIOD OF TWO YEARS FROM THE DATE OF ACCEPTANCE.
47. THE LOCAL ENTITY SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF ROADWAY AND
APPURTENANT IMPROVEMENTS, INCLUDING STORM DRAINAGE STRUCTURES AND PIPES, FOR THE
FOLLOWING PRIVATE STREETS: (LIST).
48. APPROVED VARIANCES ARE LISTED AS FOLLOWS: (PLAN SET MUST HAVE A LIST OF ALL APPLICABLE
VARIANCES FOR THE PROJECT).
CONSTRUCTION NOTES
A. GRADING AND EROSION AND SEDIMENT CONTROL PLAN NOTES
1. THE EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST TWENTY-FOUR (24) HOURS
PRIOR TO ANY CONSTRUCTION ON THIS SITE.
2. THERE SHALL BE NO EARTH-DISTURBING ACTIVITY OUTSIDE THE LIMITS DESIGNATED ON THE
ACCEPTED PLANS.
3. ALL REQUIRED PERIMETER SILT AND CONSTRUCTION FENCING SHALL BE INSTALLED PRIOR TO ANY
LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL OTHER REQUIRED
EROSION CONTROL MEASURES SHALL BE INSTALLED AT THE APPROPRIATE TIME IN THE
CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION
PLANS, AND EROSION CONTROL REPORT.
4. AT ALL TIMES DURING CONSTRUCTION, THE DEVELOPER SHALL BE RESPONSIBLE FOR PREVENTING
AND CONTROLLING ON-SITE EROSION INCLUDING KEEPING THE PROPERTY SUFFICIENTLY
WATERED SO AS TO MINIMIZE WIND BLOWN SEDIMENT. THE DEVELOPER SHALL ALSO BE
RESPONSIBLE FOR INSTALLING AND MAINTAINING ALL EROSION CONTROL FACILITIES SHOWN
HEREIN.
5. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE.
REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA(S)
REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL
PERIOD OF TIME.
6. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY
INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY
RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT
EROSION CONTROL BMPS ARE INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTSOF-WAY
SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30)
DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH,
LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE LOCAL ENTITY.
7. IN ORDER TO MINIMIZE EROSION POTENTIAL, ALL TEMPORARY (STRUCTURAL) EROSION CONTROL
MEASURES SHALL:
a. BE INSPECTED AT A MINIMUM OF ONCE EVERY TWO (2) WEEKS AND AFTER EACH
SIGNIFICANT STORM EVENT AND REPAIRED OR RECONSTRUCTED AS NECESSARY IN ORDER
TO ENSURE THE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION.
b. REMAIN IN PLACE UNTIL SUCH TIME AS ALL THE SURROUNDING DISTURBED AREAS ARE
SUFFICIENTLY STABILIZED AS DETERMINED BY THE EROSION CONTROL INSPECTOR.
c. BE REMOVED AFTER THE SITE HAS BEEN SUFFICIENTLY STABILIZED AS DETERMINED BY
THE EROSION CONTROL INSPECTOR.
8. WHEN TEMPORARY EROSION CONTROL MEASURES ARE REMOVED, THE DEVELOPER SHALL BE
RESPONSIBLE FOR THE CLEAN UP AND REMOVAL OF ALL SEDIMENT AND DEBRIS FROM ALL
DRAINAGE INFRASTRUCTURE AND OTHER PUBLIC FACILITIES.
9. THE CONTRACTOR SHALL CLEAN UP ANY INADVERTENT DEPOSITED MATERIAL IMMEDIATELY AND
MAKE SURE STREETS ARE FREE OF ALL MATERIALS BY THE END OF EACH WORKING DAY.
10. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE
REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE
INTO ANY WATERS OF THE UNITED STATES.
11. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE
PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER
SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER THIRTY (30) DAYS SHALL BE SEEDED
AND MULCHED.
12. THE STORMWATER VOLUME CAPACITY OF DETENTION PONDS WILL BE RESTORED AND STORM
SEWER LINES WILL BE CLEANED UPON COMPLETION OF THE PROJECT AND BEFORE TURNING THE
MAINTENANCE OVER TO THE LOCAL ENTITY OR HOMEOWNERS ASSOCIATION (HOA).
13. CITY ORDINANCE AND COLORADO DISCHARGE PERMIT SYSTEM (CDPS) REQUIREMENTS
MAKE IT UNLAWFUL TO DISCHARGE OR ALLOW THE DISCHARGE OF ANY POLLUTANT OR
CONTAMINATED WATER FROM CONSTRUCTION SITES. POLLUTANTS INCLUDE, BUT ARE NOT
LIMITED TO DISCARDED BUILDING MATERIALS, CONCRETE TRUCK WASHOUT, CHEMICALS, OIL AND
GAS PRODUCTS, LITTER, AND SANITARY WASTE. THE DEVELOPER SHALL AT ALL TIMES TAKE
WHATEVER MEASURES ARE NECESSARY TO ASSURE THE PROPER CONTAINMENT AND DISPOSAL OF
POLLUTANTS ON THE SITE IN ACCORDANCE WITH ANY AND ALL APPLICABLE LOCAL, STATE, AND
FEDERAL REGULATIONS.
14. A DESIGNATED AREA SHALL BE PROVIDED ON SITE FOR CONCRETE TRUCK CHUTE WASHOUT. THE
AREA SHALL BE CONSTRUCTED SO AS TO CONTAIN WASHOUT MATERIAL AND LOCATED AT LEAST
FIFTY (50) FEET AWAY FROM ANY WATERWAY DURING CONSTRUCTION. UPON COMPLETION OF
CONSTRUCTION ACTIVITIES THE CONCRETE WASHOUT MATERIAL WILL BE REMOVED AND
PROPERLY DISPOSED OF PRIOR TO THE AREA BEING RESTORED.
15. TO ENSURE THAT SEDIMENT DOES NOT MOVE OFF OF INDIVIDUAL LOTS ONE OR MORE OF THE
FOLLOWING SEDIMENT/EROSION CONTROL BMPS SHALL BE INSTALLED AND MAINTAINED UNTIL
THE LOTS ARE SUFFICIENTLY STABILIZED, AS DETERMINED BY THE EROSION CONTROL INSPECTOR,
(WITHIN LOVELAND GMA AND CITY LIMITS ONLY).
a. BELOW ALL GUTTER DOWNSPOUTS.
b. OUT TO DRAINAGE SWALES.
c. ALONG LOT PERIMETER.
d. OTHER LOCATIONS, IF NEEDED.
16. CONDITIONS IN THE FIELD MAY WARRANT EROSION CONTROL MEASURES IN ADDITION TO WHAT
IS SHOWN ON THESE PLANS. THE DEVELOPER SHALL IMPLEMENT WHATEVER MEASURES ARE
DETERMINED NECESSARY, AS DIRECTED BY THE CITY/COUNTY.
17. A VEHICLE TRACKING CONTROL PAD SHALL BE INSTALLED WHEN NEEDED FOR CONSTRUCTION
EQUIPMENT, INCLUDING BUT NOT LIMITED TO PERSONAL VEHICLES EXITING EXISTING
ROADWAYS. NO EARTHEN MATERIALS, I.E. STONE, DIRT, ETC. SHALL BE PLACED IN THE CURB &
GUTTER OR ROADWAY AS A RAMP TO ACCESS TEMPORARY STOCKPILES, STAGING AREAS,
CONSTRUCTION MATERIALS, CONCRETE WASHOUT AREAS, AND/OR BUILDING SITES.
18. ADD NOTES TO REFLECT THE STORMWATER RUNOFF CONTROL PLAN OF THE INDIVIDUAL
DEVELOPMENT.
B. STREET IMPROVEMENTS NOTES
1. ALL STREET CONSTRUCTION IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET OF
THESE PLANS AS WELL AS THE STREET IMPROVEMENTS NOTES LISTED HERE.
2. A PAVING SECTION DESIGN, SIGNED AND STAMPED BY A COLORADO LICENSED
ENGINEER, MUST BE SUBMITTED TO THE LOCAL ENTITY ENGINEER FOR APPROVAL,
PRIOR TO ANY STREET CONSTRUCTION ACTIVITY, (FULL DEPTH ASPHALT SECTIONS ARE NOT
PERMITTED AT A DEPTH GREATER THAN 8 INCHES OF ASPHALT). THE JOB MIX SHALL BE
SUBMITTED FOR APPROVAL PRIOR TO PLACEMENT OF ANY ASPHALT.
3. WHERE PROPOSED PAVING ADJOINS EXISTING ASPHALT, THE EXISTING ASPHALT SHALL
BE SAW CUT, A MINIMUM DISTANCE OF 12 INCHES FROM THE EXISTING EDGE, TO
CREATE A CLEAN CONSTRUCTION JOINT. THE DEVELOPER SHALL BE REQUIRED TO
REMOVE EXISTING PAVEMENT TO A DISTANCE WHERE A CLEAN CONSTRUCTION JOINT
CAN BE MADE.
4. STREET SUBGRADES SHALL BE SCARIFIED THE TOP 12 INCHES AND RE-COMPACTED
PRIOR TO SUBBASE INSTALLATION. NO BASE MATERIAL SHALL BE LAID UNTIL THE
SUBGRADE HAS BEEN INSPECTED AND APPROVED BY THE LOCAL ENTITY ENGINEER.
5. FT. COLLINS ONLY. VALVE BOXES AND MANHOLES ARE TO BE BROUGHT UP TO GRADE
AT THE TIME OF PAVEMENT PLACEMENT OR OVERLAY. VALVE BOX ADJUSTING RINGS
ARE NOT ALLOWED.
6. WHEN AN EXISTING ASPHALT STREET MUST BE CUT, THE STREET MUST BE RESTORED TO
A CONDITION EQUAL TO OR BETTER THAN ITS ORIGINAL CONDITION. THE EXISTING STREET
CONDITION SHALL BE DOCUMENTED BY THE INSPECTOR BEFORE ANY CUTS ARE MADE.
CUTTING AND PATCHING SHALL BE DONE IN CONFORMANCE WITH CHAPTER 25,
RECONSTRUCTION AND REPAIR. THE FINISHED PATCH SHALL BLEND SMOOTHLY INTO
THE EXISTING SURFACE. THE DETERMINATION OF NEED FOR A COMPLETE OVERLAY
SHALL BE MADE BY THE LOCAL ENTITY ENGINEER. ALL OVERLAY WORK SHALL BE
COORDINATED WITH ADJACENT LANDOWNERS SUCH THAT FUTURE PROJECTS DO NOT CUT
THE NEW ASPHALT OVERLAY WORK.
7. ALL TRAFFIC CONTROL DEVICES SHALL BE IN CONFORMANCE WITH THESE PLANS OR AS
OTHERWISE SPECIFIED IN M.U.T.C.D. (INCLUDING COLORADO SUPPLEMENT) AND
AS PER THE RIGHT-OF-WAY WORK PERMIT TRAFFIC CONTROL PLAN.
8. THE DEVELOPER IS REQUIRED TO PERFORM A GUTTER WATER FLOW TEST IN THE
PRESENCE OF THE LOCAL ENTITY INSPECTOR AND PRIOR TO INSTALLATION OF ASPHALT.
GUTTERS THAT HOLD MORE THAN ¼ INCH DEEP OR 5 FEET LONGITUDINALLY, OF WATER,
SHALL BE COMPLETELY REMOVED AND RECONSTRUCTED TO DRAIN PROPERLY.
9. PRIOR TO PLACEMENT OF H.B.P. OR CONCRETE WITHIN THE STREET AND AFTER
MOISTURE/DENSITY TESTS HAVE BEEN TAKEN ON THE SUBGRADE MATERIAL (WHEN A
FULL DEPTH SECTION IS PROPOSED) OR ON THE SUBGRADE AND BASE MATERIAL (WHEN
A COMPOSITE SECTION IS PROPOSED), A MECHANICAL "PROOF ROLL" WILL BE
REQUIRED. THE ENTIRE SUBGRADE AND/OR BASE MATERIAL SHALL BE ROLLED WITH A
HEAVILY LOADED VEHICLE HAVING A TOTAL GVW OF NOT LESS THAN 50,000 LBS.
AND A SINGLE AXLE WEIGHT OF AT LEAST 18,000 LBS. WITH PNEUMATIC TIRES
INFLATED TO NOT LESS THAT 90 P.S.I.G. “PROOF ROLL” VEHICLES SHALL NOT TRAVEL AT
SPEEDS GREATER THAN 3 M.P.H. ANY PORTION OF THE SUBGRADE OR BASE MATERIAL
WHICH EXHIBITS EXCESSIVE PUMPING OR DEFORMATION, AS DETERMINED BY THE
LOCAL ENTITY ENGINEER, SHALL BE REWORKED, REPLACED OR OTHERWISE MODIFIED
TO FORM A SMOOTH, NON-YIELDING SURFACE. THE LOCAL ENTITY ENGINEER SHALL
BE NOTIFIED AT LEAST 24 HOURS PRIOR TO THE “PROOF ROLL.” ALL “PROOF ROLLS” SHALL
BE PREFORMED IN THE PRESENCE OF AN INSPECTOR.
C. TRAFFIC SIGNING AND PAVEMENT MARKING NOTES
1. ALL SIGNAGE AND MARKING IS SUBJECT TO THE GENERAL NOTES ON THE COVER SHEET
OF THESE PLANS, AS WELL AS THE TRAFFIC SIGNING AND MARKING CONSTRUCTION
NOTES LISTED HERE.
2. ALL SYMBOLS, INCLUDING ARROWS, ONLYS, CROSSWALKS, STOP BARS, ETC. SHALL
BE PRE-FORMED THERMO-PLASTIC.
3. ALL SIGNAGE SHALL BE PER LOCAL ENTITY STANDARDS AND THESE PLANS OR AS
OTHERWISE SPECIFIED IN MUTCD.
4. ALL LANE LINES FOR ASPHALT PAVEMENT SHALL RECEIVE TWO COATS OF LATEX PAINT
WITH GLASS BEADS.
5. ALL LANE LINES FOR CONCRETE PAVEMENT SHOULD BE EPOXY PAINT.
6. PRIOR TO PERMANENT INSTALLATION OF TRAFFIC STRIPING AND SYMBOLS, THE
DEVELOPER SHALL PLACE TEMPORARY TABS OR TAPE DEPICTING ALIGNMENT AND
PLACEMENT OF THE SAME. THEIR PLACEMENT SHALL BE APPROVED BY THE LOCAL
ENTITY ENGINEER PRIOR TO PERMANENT INSTALLATION OF STRIPING AND SYMBOLS.
7. PRE-FORMED THERMO-PLASTIC APPLICATIONS SHALL BE AS SPECIFIED IN THESE PLANS
AND/OR THESE STANDARDS.
8. EPOXY APPLICATIONS SHALL BE APPLIED AS SPECIFIED IN CDOT STANDARD
SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION.
9. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR
MARKINGS.
10. ALL SIGN POSTS SHALL UTILIZE BREAK-AWAY ASSEMBLIES AND FASTENERS PER THE
STANDARDS.
11. A FIELD INSPECTION OF LOCATION AND INSTALLATION OF ALL SIGNS SHALL BE
PERFORMED BY THE LOCAL ENTITY ENGINEER. ALL DISCREPANCIES IDENTIFIED
DURING THE FIELD INSPECTION MUST BE CORRECTED BEFORE THE 2-YEAR WARRANTY
PERIOD WILL BEGIN.
12. THE DEVELOPER INSTALLING SIGNS SHALL BE RESPONSIBLE FOR LOCATING AND
PROTECTING ALL UNDERGROUND UTILITIES.
13. SPECIAL CARE SHALL BE TAKEN IN SIGN LOCATION TO ENSURE AN UNOBSTRUCTED VIEW
OF EACH SIGN.
14. SIGNAGE AND STRIPING HAS BEEN DETERMINED BY INFORMATION AVAILABLE AT THE
TIME OF REVIEW. PRIOR TO INITIATION OF THE WARRANTY PERIOD, THE LOCAL ENTITY
ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL SIGNAGE AND/OR STRIPING IF
THE LOCAL ENTITY ENGINEER DETERMINES THAT AN UNFORESEEN CONDITION
WARRANTS SUCH SIGNAGE ACCORDING TO THE MUTCD OR THE CDOT M AND S
STANDARDS. ALL SIGNAGE AND STRIPING SHALL FALL UNDER THE REQUIREMENTS OF THE
2-YEAR WARRANTY PERIOD FOR NEW CONSTRUCTION (EXCEPT FAIR WEAR ON TRAFFIC
MARKINGS).
15. SLEEVES FOR SIGN POSTS SHALL BE REQUIRED FOR USE IN ISLANDS/MEDIANS. REFER
TO CHAPTER 14, TRAFFIC CONTROL DEVICES, FOR ADDITIONAL DETAIL.
D. STORM DRAINAGE NOTES
1. THE CITY OF FORT COLLINS SHALL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF
STORM DRAINAGE FACILITIES LOCATED ON PRIVATE PROPERTY. MAINTENANCE OF
ONSITE DRAINAGE FACILITIES SHALL BE THE RESPONSIBILITY OF THE PROPERTY
OWNER(S).
2. ALL RECOMMENDATIONS OF THE FINAL DRAINAGE AND EROSION CONTROL STUDY
(NAME OF THE STUDY AND DATE) BY (ENGINEERING FIRM) SHALL BE FOLLOWED
AND IMPLEMENTED.
3. PRIOR TO FINAL INSPECTION AND ACCEPTANCE BY THE CITY OF FORT COLLINS,
CERTIFICATION OF THE DRAINAGE FACILITIES, BY A REGISTERED ENGINEER, MUST BY
SUBMITTED TO AND APPROVED BY THE STORMWATER UTILITY DEPARTMENT.
CERTIFICATION SHALL BE SUBMITTED TO THE STORMWATER UTILITY DEPARTMENT AT
LEAST TWO WEEKS PRIOR TO THE RELEASE OF A CERTIFICATE OF OCCUPANCY FOR SINGLE
FAMILY UNITS. FOR COMMERCIAL PROPERTIES, CERTIFICATION SHALL BY SUBMITTED
TO THE STORMWATER UTILITY DEPARTMENT AT LEAST TWO WEEKS PRIOR TO THE
RELEASE OF ANY BUILDING PERMITS IN EXCESS OF THOSE ALLOWED PRIOR TO
CERTIFICATION PER THE DEVELOPMENT AGREEMENT.
E. WATERLINE NOTE
1. THE MINIMUM COVER OVER WATER LINES IS 4.5 FEET AND THE MAXIMUM COVER IS
5.5 FEET UNLESS OTHERWISE NOTED IN THE PLANS AND APPROVED BY THE WATER
UTILITY.
Civil ▪ Water Resources ▪ Environmental
375 East Horsetooth Road, Building 5, Fort Collins, CO 80525
Phone (970) 226-0120 / Fax (970) 226-0121
www.acewater.com
2 2
GENERAL NOTES
CITY OF FORT COLLINS
POUDRE RIVER
WHITEWATER PARK
FINAL DEVELOPMENT PLAN
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS
SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION
PHASE.
WATER, SEWER, ELECTRIC
CITY OF FORT COLLINS
700 WOOD STREET
FORT COLLINS, CO 80521
970-221-6700
NATURAL GAS
XCEL ENERGY
1901 E. HORSETOOTH ROAD
FORT COLLINS, CO 80525
970-225-7828
I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS
WERE PREPARED UNDER MY DIRECT SUPERVISION, IN
ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS
AND STATE OF COLORADO STANDARDS AND STATUTES,
RESPECTIVELY; AND THAT I AM FULLY RESPONSIBLE FOR THE
ACCURACY OF ALL DESIGN, REVISIONS, AND RECORD
CONDITIONS THAT I HAVE NOTED ON THESE PLANS
UTILITY PROVIDERS:
CABLE
COMCAST
1201 UNIVERSITY AVE.
FORT COLLINS, CO 80521
(800) 934-6489
TELEPHONE SERVICE
CENTURY LINK
3702 AUTIMATION DR, SUITE 106
FORT COLLINS, CO 80525
970-490-7508
GEOTECHNICAL ANALYSIS BY EEC, LLC
"SUBSURFACE EXPLORATION REPORT PROPOSED CITY OF FORT COLLINS -
POUDRE RIVER WHITEWATER PARK AND VINE DRIVE IMPROVEMENTS"
EEC PROJECT NO. 1132044
DECEMBER 8, 2016
APPROVED:
CITY ENGINEER DATE
CHECKED BY:
WATER & WASTEWATER UTILITY DATE
STORMWATER UTILITY DATE
PARKS & RECREATION DATE
TRAFFIC ENGINEER DATE
ENVIRONMENTAL PLANNER DATE
CHECKED BY:
CHECKED BY:
CHECKED BY:
CHECKED BY:
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
INDEX OF SHEETS
SHEET NO. INDEX NO. DESCRIPTIONS