Administrative Type I Hearing – May 24, 2017
East Ridge Filing Three PDP170006
Background
2
Block 1
Block 2
Block 3
East Ridge Filing Three PDP
3
Request for PDP for Filing Three, on Blocks 1, 2 and 3
209 Single-Family attached dwelling units on 33.4 acres
L-M-N gross density of 6.26 DU/Acre; net density of 10.2 DU/acre
Providing 418 garage parking spaces (2/unit), 101 off-street spaces,
and 139 on-street parallel spaces
Neighborhood meeting not required with Type I review
Includes three requests for Modification of Standards
Modification of Standard
4
Section 3.5.2(D) - Relationship of Dwellings to Streets and Parking:
The proposed project is in compliance with this standard, with the exception
of Block 1, Lots 1-60
Block 1 is exceptionally narrow due to the BNSF Rail tracks and buffer
setback, and proximity of Barnstormer Street
The building entrances facing north do not have a direct sidewalk connection
to East Vine Drive or Barnstormer Street
Walkway connections to Barnstormer include enhanced landscaping
East Ridge Filing Three PDP
5
Block 1
(Lots 1-30)
East Ridge Filing Three PDP
6
Block 1
(Lots 31-60)
East Ridge Filing Three PDP
7
Block 2
Block 2
Block 3
Modification of Standard
8
Section 3.5.2(E) (3) – Side and Rear Yard Setbacks:
The proposed project includes a rear yard setback along an alley from 8’ to 6’
from rear lot line for the dwelling units in Block 1, Lots 1-20; Block 2, Lots 1-
75; Block 3, Lots 1-14
The proposed project is equal to a compliant plan in that it provides sufficient
parking along strategic locations on the private drives, and along adjacent
public streets
The proposed alley design, without parallel parking in front of the garages, is
enhanced with additional landscaping and planting islands
East Ridge Filing Three PDP
9
Proposed 6’ Rear Setback off Alley
6’ vs. 8’
6’ vs. 8’
Modification of Standard
10
Section 3.6.2(E) – Streets, Streetscapes, Alleys and Easements:
In lieu of the temporary turn around, the Applicant proposes a private drive
connection from Barnstormer Street to Vicot Way.
The proposed circulation is equal to or better than a compliant plan; the
proposed vehicle access allows circulation through adjacent private drives that
connects to public streets in the area
A concurrent variance was supported by Engineering staff for this change
East Ridge Filing Three PDP
11
Alternative return
loop via private drive
Block 1
Block 2
Block 3
End of Street
End of
Street
Alternative return
loop via private drive
East Ridge Filing Three PDP
12
Resource Slides
East Ridge Filing Three PDP
13
East Ridge Filing Three PDP
14
Block 1
East Ridge Filing Three PDP
15
Block 1
East Ridge Filing Three PDP
16
Block 2
Block 2
Block 3
East Ridge Filing Three PDP
Block 3 17
Pool/Rec Area
East Ridge Filing Three PDP
18
Existing Zoning
LMN
East Ridge Filing Three PDP
19
East Vine Drive
Master Street Plan
East Ridge Filing Three PDP
20
LUC Section 3.5.2(D) - Relationship of Dwellings to Streets and Parking:
Orientation to a Connecting Walkway. Every front facade with a primary entrance to a
dwelling unit shall face the adjacent street to the extent reasonably feasible. Every front
facade with a primary entrance to a dwelling unit shall face a connecting walkway with no
primary entrance more than two hundred (200) feet from a street sidewalk.
LUC Article 5 – Definitions:
Connecting walkway shall mean (1) any street sidewalk, or (2) any walkway that directly
connects a main entrance of a building to the street sidewalk without requiring pedestrians to
walk across parking lots or driveways, around buildings or around parking lot outlines which
are not aligned to a logical route.
East Ridge Filing Three PDP
21
Section 3.5.2(E) (3) – Side and Rear Yard Setbacks
(3) Side and Rear Yard Setbacks. The minimum side yard setback for all
residential buildings and for all detached accessory buildings that are incidental
to the residential building shall be five (5) feet from the property line, except for
alley-accessed garages, for which the minimum setback from an alley shall be
eight (8) feet.
East Ridge Filing Three PDP
22
Modification of Standard to Section 3.6.2 (E):
Except as provided in subsection (D) above for cul-de-sacs, no dead-end
streets shall be permitted except in cases where such streets are designed to
connect with future streets on abutting land, in which case a temporary
turnaround easement at the end of the street with a diameter of at least one
hundred (100) feet must be dedicated and constructed. Such turnaround
easement shall not be required if no lots in the subdivision are dependent
upon such street for access.
Findings of Fact
23
In evaluating the request for the East Ridge Filing Three P.D.P., staff makes the following
findings of fact:
The P.D.P. complies with the East Mulberry Corridor Sub-area Plan.
The P.D.P. and proposed Modifications of Standard comply with the applicable procedural
and administrative requirements of Article 2 of the Land Use Code.
The P.D.P. complies with the land use and the applicable development standards of the L-
M-N zone district as found in Article 4 of the Land Use Code.
The P.D.P. complies with the applicable General Development Standards of Article 3 of the
Land Use Code, with the exception of a request for three Modification of Standards to
Section 3.5.2 (D), Section 3.5.2 (E)(3), and Section 3.6.2 (E).
Findings of Fact
24
Modification of Standard:
Staff finds that the request for a Modification of Standard to Section 3.5.2(D) is
justified by the applicable standards in 2.8.2(H) (3).
A. The granting of the Modification would not be detrimental to the public
good and;
B. The project design satisfies Criteria 3 (2.8.2(H)(3):
(3) …by reason of exceptional physical conditions or other extraordinary and
exceptional situations, unique to such property…
Findings of Fact
25
Modification of Standard:
Staff finds that the request for a Modification of Standard to Section 3.5.2(E) (3)
is justified by the applicable standards in 2.8.2(H) (1).
A. The granting of the Modification would not be detrimental to the public
good and;
B. The project design satisfies Criteria 1 (2.8.2(H)(1):
(1) the plan as submitted will promote the general purpose of the standard for
which the modification is requested equally well or better than would a plan
which complies with the standard for which a modification is requested;
Findings of Fact
26
Modification of Standard:
Staff finds that the request for a Modification of Standard to Section 3.6.2(E) is
justified by the applicable standards in 2.8.2(H) (1).
A. The granting of the Modification would not be detrimental to the public good
and;
B. The project design satisfies Criteria 1 (2.8.2(H)(1):
(1) the plan as submitted will promote the general purpose of the standard for
which the modification is requested equally well or better than would a plan which
complies with the standard for which a modification is requested;