Loading...
HomeMy WebLinkAboutEAST RIDGE THIRD FILING (FORMERLY EAST RIDGE - RESIDENTIAL) - PDP - PDP170006 - CORRESPONDENCE - OTHER WATER AND OR SANITATION DISTRICTSEast Larimer County Water District 232 South Link Lane, P.O. Box 2044 • Fort Collins, Colorado 80522 Phone (970) 493-2044 • Fax (970) 493-1801 • www.elcowater.org S:\_Project_Files\Development\_Active Projects\East Ridge 3rd Filing - Townhomes\Plans\2017-04-25 PDP 3\2017.04.25 East Ridge 3rd Filing PDP 3 Review.doc 25 March 2017 Via Email: pwray@fcgov.com Pete Wray City of Ft. Collins Planning and Zoning P.O. Box 580 Ft. Collins, CO 80522-0580 RE: Project: PDP170006 East Ridge Third Filing PDP – Type 1: 2nd Round of Review The East Larimer County Water District (District) staff has reviewed material delivered to the District for the proposed project referenced above and has the following comments: 1. Utility Plans: a. Water Meters in Private Drives: For the final review phase the District will need to see a proposed typical layout of the water services in the private drives that will feed the properties to verify appropriate water meter locations. b. Sheet UT04 – Irrigation Tap: The District highly recommends the location of the irrigation tap (if one is to be installed) be identified during final design phase. This will prevent issues frequently seen when the irrigation tap is not located and connected until after paving work is completed. c. Sheet UT04 – Backflow Preventer: A reduced pressure zone (RPZ) type backflow preventer will be required for the water service to the pool/clubhouse facility. d. Water Service Line Size: For the attached single family residence buildings, the District has recently been informed that current fire code dictates these units have sprinklers installed within them and that a ¾” water service line may not be of adequate size for fire flow capacity. The District encourages the developer to identify the service line (and meter) size required for these units during the final design phase and show this sizing on the final design drawings. 2. Plat: a. District Signature Block on Sheet 1: Remove b. Waterline Easements: Waterline easements will be required to be granted before the plat is recorded for areas within Tracts B and F where the waterlines are in private drives. The District plans to work with the developer to secure these easements. Redlines concerning needed waterline easements have sent to the project engineer (Galloway). 3. Water Rights: The District encourages the developer to contact the District General Manager to begin discussions on raw water dedication for the project. S:\_Project_Files\Development\_Active Projects\East Ridge 3rd Filing - Townhomes\Plans\2017-04-25 PDP 3\2017.04.25 East Ridge 3rd Filing PDP 3 Review.doc Any written agreements required to complete waterline connections to the property must be completed prior to final approval of the project construction drawings. Sincerely, Randy Siddens, P.E. District Engineer