April 28, 2017
John Beggs
Russell + Mills Studios
141 S COLLEGE AVE STE 104
Fort Collins, CO 80524
RE: East Ridge Third Filing (formerly East Ridge - Residential), PDP170006, Round Number 2
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
04/26/2017: The improvements with the corresponding phases listed below still
apply even with the proposed phases with this proposal. Please note language will
be added in the Development Agreement to detail this out.
02/27/2017: The north portion of this development is Parts of Phase 8 and 9 and the
west portion is Phase 5. Per the development agreement of East Ridge Second
Filing, Phase 8 can only be done after or concurrently with Phase 1A, Phase 1B,
Phase 3, Phase 4, Phase 6 and Phase 7. Phase 9 can only be done after or
concurrently with Phase 1A, Phase 1B, Phase 3, Phase 4 and Phase 6. Phase 5
can only be done after or concurrently with Phase 1A, Phase 1B and Phase 2.
Comment Number: 2 Comment Originated: 02/27/2017
02/27/2017: Prior to the finalizing of this project, Utility Plan revisions will need to be
finalized with East Ridge Second Filing.
Comment Number: 3 Comment Originated: 02/27/2017
04/26/2017: Some existing conditions to not match the revisions provided with East
Ridge Second Filing. Please see redlines.
02/27/2017: Since plans will be approved after the revisions to East Ridge Second
Filing, the Existing Conditions sheets should reflect these revisions.
Comment Number: 4 Comment Originated: 02/27/2017
04/26/2017: A formal variance request has not been received by Engineering yet.
02/27/2017: The minimum distance between high volume driveways and
intersection is 150 feet. Please adjust the driveway spacing on Barnstormer.
Comment Number: 7 Comment Originated: 02/27/2017
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Pete Wray, at
970-221-6754 or pwray@fcgov.com.
Page 1 of 11
04/26/2017: Please show the access easements on the Utility Plans. The Plat
should reflect this by separate document with reception numbers as well.
02/27/2017: The meandering sidewalk along Timberline Road will need to be
modified with East Ridge Second Filing. The sidewalk will need to be within an
access easement. Since second filing plans will be approved prior to this proposal,
it will need to be done be separate document.
Comment Number: 11 Comment Originated: 02/27/2017
02/27/2017: Private Drive signs will be needed at every driveway. It shall read:
"Private Drive-Privately Maintained". Insert the actual private drive name if the drive
will be named.
Comment Number: 15 Comment Originated: 02/27/2017
04/26/2017: Please clearly delineate and label all the Private Drives (Comet Street,
Vigilante Lane, Helldiver Drive, Skyraider Way, and Thunderstreak Lane) with
"Private Drive" on all sheets of the Utility Plan as well as the site and landscape plan.
Comment Number: 17 Comment Originated: 04/26/2017
04/26/2017: Please make sure the Sheet Index on the cover sheet matches all the
individual sheets of the Utility Plan.
Comment Number: 18 Comment Originated: 04/26/2017
04/26/2017: The variance in the general notes should be a variance to remove the
temporary turnaround on both Barnstormer and Zeppelin Way
Comment Number: 19 Comment Originated: 04/26/2017
04/26/2017: Barnstormer Street will need to be completed prior to the issuance of
any building permit for Phase 8 and 9 (Second Filing). Unless the Private Drive
(Helldiver Drive) is completed concurrently with Barnstormer Street, the temporary
turnaround on Barnstormer Street will be needed. The temporary turnaround on
Zeppelin Way is being built with Phase 1 (Second Filing), so it should be shown on
the existing conditions and removal.
Comment Number: 20 Comment Originated: 04/26/2017
04/26/2017: The water and sanitary sewer stubs are not being shown on Crusader
Street. The Second Filing revisions show these stubs. Please revise.
Comment Number: 21 Comment Originated: 04/26/2017
04/26/2017: Engineering has revisions for East Ridge Second Filing. Utility Plans
can't be finalized until the offsite easements are completed. Engineering is still
waiting on the easement vacations and dedications for the irrigation lines. Formal
submittal hasn't been completed for the access easement needed for the sidewalk
widening for the trail. Legals have been submitted, but deeds, applications and fees
have not.
Comment Number: 22 Comment Originated: 04/26/2017
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com
Topic: General
04/21/2017: No further Environmental Planning comments at this time.
Environmental Planning does not need paper copy - electronic only is fine - for East
Ridge Third Filing Final Plans. Thank you.
Comment Number: 4 Comment Originated: 04/21/2017
Department: Forestry
Contact: Molly Roche, , mroche@fcgov.com
Topic: Landscape Plans
Page 2 of 11
4/26/2017:
Continued:
03/03/2017:
Please show the existing plum thicket, which is shown to be retained. On the
original submittal, it is show on the north edge of the project, and should continue to
be shown for reference on the plans.
Comment Number: 2 Comment Originated: 03/03/2017
04/26/2017:
There appears to be some discrepancies in the number of trees listed in the
landscape schedule versus the actual number of trees on the landscape plans.
Please correct the following figures.
Species # of Trees Schedule # of Trees Plans Discrepancy
Shademaster Honeylocust 31 32 (+1)
Hotwings Tatarian Maple 50 89 (+39)
Spring Snow Crabapple 67 131 (+64)
Chanticleer Pear 84 142 (+58)
Vanderwolf’s Limber Pine33 32 (-1)
Comment Number: 3 Comment Originated: 04/26/2017
04/26/2017:
If tree counts are changed to account for the number of trees shown on the
landscape plans, proper diversity percentages must be met, specifically for Spring
Snow Crabapple and Chanticleer Pear. With my counts, there are 677 proposed
trees on the plans. Please refer to the following chart that details current diversity
proportions.
Species # of Trees Landscape Plans Diversity %
Spring Snow Crabapple 131 19%
Chanticleer Pear 142 21%
Minimum Species Diversity. To prevent uniform insect or disease susceptibility and
eventual uniform senescence on a development site or in the adjacent area or the
district, species diversity is required and extensive monocultures are prohibited. The
following minimum requirements shall apply to any development plan.
Number of trees on site: 60 or more --> Maximum percentage of any one species:
15%
Please evaluate and provide additional ornamental trees to meet the LUC standards.
Comment Number: 4 Comment Originated: 04/26/2017
04/26/2017:
There appears to be a few clusters of tree symbols that are not accounted for on the
Landscape Schedule. Please clarify what the clusters of trees are on pages LP403
and LP 403.
Comment Number: 5 Comment Originated: 04/26/2017
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
03/08/2017: Adoption of the 2015 I-Codes is anticipated for mid-April, 2017. Be
advised that permit applications submitted after the code adoption date will be
subject to the new codes and standards, as amended.
Comment Number: 1 Comment Originated: 03/08/2017
Page 3 of 11
03/08/2017: Construction shall comply with adopted codes as amended. Current
adopted codes are:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code for Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012
IECC.
Comment Number: 2 Comment Originated: 03/08/2017
03/08/2017: City of Fort Collins IBC amendments require a full NFPA-13 sprinkler
system in multifamily units with an exception for buildings with up to 6 dwelling units
that are not more than 2 stories nor more 5000 sqft per floor. Single family attached
dwellings are required to be sprinkled with either an IRC P2904 system or NFPA
13D sprinkler.
Comment Number: 3 Comment Originated: 03/08/2017
03/08/2017: Colorado CRS 9-5 compliance is required for developments with more
than 7 units for all buildings containing more than 2 dwelling units. CRS 9-5 uses a
points-based system for compliance. With 306 dwelling units, 130 accessibility
points will be required for the project.
Comment Number: 4 Comment Originated: 03/08/2017
Department: Light And Power
Contact: Coy Althoff, 970-224-6150, CAlthoff@fcgov.com
Topic: General
02/28/2017: Light and Power will have both single and 3-phase power to this
development as a part of the East Ridge 2nd filing subdivision (which is currently
under construction.)
Comment Number: 1 Comment Originated: 02/28/2017
02/28/2017: Development charges, electric Capacity Fee, Building Site charges
and any system modification charges necessary will apply to this development.
Comment Number: 2 Comment Originated: 02/28/2017
02/28/2017: Multi family buildings (anything beyond a duplex) are treated as
commercial services; therefore a(C 1) form must be filled out and submitted to Light
& Power Engineering. All secondary electric service work is the responsibility of the
developer and their electrical consultant or contractor. The C-1 form can be found
at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
Comment Number: 3 Comment Originated: 02/28/2017
Page 4 of 11
02/28/2017: As your project continues to move forward please contact Light and
Power Engineering to coordinate the streetlight, transformer and electric meter
locations, please show the locations on the utility plans.
Comment Number: 4 Comment Originated: 02/28/2017
02/28/2017: Streetlights will be placed along public streets. A 40 feet separation on
both sides of the light is required between canopy trees and streetlights. A 15 feet
separation on both sides of the light is required between ornamental trees and
streetlights.
Comment Number: 5 Comment Originated: 02/28/2017
02/28/2017: The location of the water and electric services will need to be
coordinated with Light and Power Engineering.
Comment Number: 6 Comment Originated: 02/28/2017
03/03/2017: You may contact FCU Light & Power, project engineering if you have
questions. (970) 221-6700. You may reference Light & Power¿s Electric Service
Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_F
INAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers.
Comment Number: 7 Comment Originated: 03/03/2017
04/26/2017: Swimming pool facilities will be considered "commercial electric"
services; therefore C-1 form and one-line diagram will need to be submitted to Light
& Power Engineering. (Reference comment No. 3 for link to C-1 form.)
Comment Number: 8 Comment Originated: 04/26/2017
04/26/2017: All previous comments from 2/28/17 are still valid at this time.
Comment Number: 9 Comment Originated: 04/26/2017
Department: Outside Agencies
Contact: Brian Zick, ,
Topic: General
04/28/2017:
Boxelder Sanitation:
Comments:
1) To provide access, relocate MH on 18-inch sanitary sewer to the end of the 8
-foot access sidewalk (centered in the sidewalk) and extend the 18-inch sewer and
plug north of that MH to within the 30-foot landscape setback area (Sheet UT01).
2) Please submit final construction drawings.
The District has adequate capacity to service the property referenced above. The
District is in full compliance with Federal and State water quality requirements. We
look forward to review future submittals on this project. Please feel free to contact
me if you have any questions.
Comment Number: Comment Originated: 04/28/2017
Contact: Randy Siddens, ,
Topic: General
Page 5 of 11
04/26/2017:
RE: Project: PDP170006 East Ridge Third Filing PDP – Type 1: 2nd Round of
Review
The East Larimer County Water District (District) staff has reviewed material
delivered to the District for the proposed project referenced above and has the
following comments:
1. Utility Plans:
a. Water Meters in Private Drives: For the final review phase the District will need
to see a proposed typical layout of the water services in the private drives that will
feed the properties to verify appropriate water meter locations.
b. Sheet UT04 – Irrigation Tap: The District highly recommends the location of the
irrigation tap (if one is to be installed) be identified during final design phase. This will
prevent issues frequently seen when the irrigation tap is not located and connected
until after paving work is completed.
c. Sheet UT04 – Backflow Preventer: A reduced pressure zone (RPZ) type
backflow preventer will be required for the water service to the pool/clubhouse
facility.
d. Water Service Line Size: For the attached single family residence buildings, the
District has recently been informed that current fire code dictates these units have
sprinklers installed within them and that a ¾” water service line may not be of
adequate size for fire flow capacity. The District encourages the developer to identify
the service line (and meter) size required for these units during the final design
phase and show this sizing on the final design drawings.
2. Plat:
a. District Signature Block on Sheet 1: Remove
b. Waterline Easements: Waterline easements will be required to be granted
before the plat is recorded for areas within Tracts B and F where the waterlines are
in private drives. The District plans to work with the developer to secure these
easements. Redlines concerning needed waterline easements have sent to the
project engineer (Galloway).
3. Water Rights: The District encourages the developer to contact the
District General Manager to begin discussions on raw water dedication for the
project.
Any written agreements required to complete waterline connections to the property
must be completed prior to final approval of the project construction drawings.
Sincerely,
Randy
P.E. District Engineer
Comment Number: Comment Originated: 04/26/2017
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org
Topic: General
04/20/2017: LANDSCAPE PLAN
The proposed Landscape Plan indicates that tree canopy diameters may encroach
on the fire lane over time. PFA would like to ensure the integrity of the EAE remains
as the trees mature and a canopy develops. The EAE shall be maintained to 14' in
height. This is mostly relevant through the parking areas, where the EAE diminishes
in width. This comment is aimed to preserve the trees and the fire apparatus.
Comment Number: 6 Comment Originated: 04/20/2017
Page 6 of 11
04/21/2017: POOL CHEMISTRY - HAZARDOUS MATERIALS
A MSDS list of pool chemistry and chemical quantities in use or in storage shall be
submitted with permit application.
Comment Number: 7 Comment Originated: 04/21/2017
04/21/2017: POOL ACCESS
The proposed gates that control access to the pool complex shall be equipped with
approved means of access for emergency personal. A Knox Box is recommended.
Details to be coordinated with PFA as development continues.
Comment Number: 8 Comment Originated: 04/21/2017
04/21/2017: STREET NAMING
Some private drives have been named while others have not. An updated plan is
required with FDP submittal.
Comment Number: 9 Comment Originated: 04/21/2017
04/25/2017: FIRE LANE SIGNS
No Parking - Fire lane signs will be required on private drives dedicated as an EAE.
Sign locations should be indicated on future plan sets at time of FDP.
Comment Number: 10 Comment Originated: 04/25/2017
04/25/2017: ADDRESSING
Due to the orientation of dwelling units on this site, every unit will require addressing
posted on the front and rear of every unit. Posting of the full street name along with
address numerals will also be required on some buildings, as defined by local
amendments provided below. A comprehensive plan will be required prior to FDP
approval. Please contact PFA with any questions or to seek assistance with this
matter. Code language provided below.
ADDRESS POSTING - LOCAL AMENDMENT
> IFC 505.1.8: Buildings that are addressed on one street, but are accessible from
other streets, shall have the address numbers AND STREET NAME on each side
that is accessible form another street.
Comment Number: 11 Comment Originated: 04/25/2017
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com
Topic: General
04/28/2017: Based on comments at the staff review meeting on April 26, we are
ready for hearing. A tentative date for the Type I hearing is May 24. I will need a full
PDF plan set by 5/7 that includes revisions for R2.
Comment Number: 9 Comment Originated: 04/28/2017
Topic: Landscape Plans
04/25/2017: LP501: Show enlargement of community gathering spaces for detailed
design of amenities and planting, paving etc.
Comment Number: 7 Comment Originated: 04/25/2017
Topic: Plat
Page 7 of 11
04/25/2017: Revise Planning signature block - Director of Community Development
and Neighborhood Services (CDNS).
Comment Number: 8 Comment Originated: 04/25/2017
Topic: Site Plan
04/25/2017: LS101 - add update note on Filing 3 is consistent with approved
capacity based on proposed 209 SFA dwelling units. Filing 2 and 3 include 345
units which is less than the approved ODP having 361 SFA units.
Comment Number: 5 Comment Originated: 04/25/2017
04/25/2017: LS403-404: Clarify sidewalk fronting Timberline is part of Filing 2 as an
existing condition. The legend is showing new concrete. Sykes Drive median at
Timberline should show a 10' wide sidewalk refuge in median to match path to
south. LS404 - show end of sidewalk and barricade on SW corner of property.
Comment Number: 6 Comment Originated: 04/25/2017
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: Construction Drawings
04/23/2017: The response to this comment indicated that the fine grading design in
this area would be done at final. However, please note in the drainage report and
make a note on the drainage and/or grading plan somewhere that the site will be
graded to drain to the proposed storm pipes shown and not to Timberline.
02/28/2017: Grading Plan: There are storm lines shown along the west side of the
buildings in Tract G. These don¿t appear to be placed in conjunction with low points.
What is the intent of these lines? Are you connecting roof drains into them? Please
include some callouts or labels in the plans to clarify.
Comment Number: 5 Comment Originated: 02/28/2017
04/23/2017: Sheet CV02 - please expand the storm drainage note regarding vertical
separation requirements to include storm pipes and irrigation mains.
Comment Number: 18 Comment Originated: 04/23/2017
04/23/2017: Grading Plans - Please label the slopes on the northerly side of the
site. It looks like these are steep in some locations. If you think you are going to need
retaining walls in certain areas, please include a note on the plans indicating that this
may be the case.
Comment Number: 19 Comment Originated: 04/23/2017
04/23/2017: Grading and Utility Plans for Pool Site - There are two lateral tie-ins to
the public storm sewer shown for the pool site. This isn't allowed. Please tie these
laterals into the nearby manhole or inlets.
Comment Number: 20 Comment Originated: 04/23/2017
Topic: Drainage Report
04/23/2017: Drainage Map: The report references design points (DP) A1, A2/3, B1
and I don't know which design points these are. Please label these on the drainage
plans.
02/28/2017: Drainage Map: It would be helpful to also include the original basin
labels (maybe ghosted back) on the map since these original basins are referenced
in this report (i.e. Fut A, Fut B, Fut H, Fut I)
Comment Number: 15 Comment Originated: 02/28/2017
Page 8 of 11
04/23/2017: For the Barnstormer street capacity calculations, please include the
original street capacity calculation sheets from ERSF for these design points so I
can see how the runoff amount and ponding depths changed.
Also please state in the report that the additional depth in the street still allows you to
meet the encroachment limits allowed in Tables ST-2 and ST-3.
02/28/2017: Drainage Map: It looks like the basins fronting Barnstormer Drive and
Timberline Road drain onto the roadways. For Barnstormer, street capacity and inlet
capacities should be re-analyzed to verify that they can handle the additional runoff.
For Timberline, the original report did not show or assume runoff onto Timberline
and we won¿t allow developed runoff onto Timberline. Please clarify your intent and
the design along Timberline.
Comment Number: 16 Comment Originated: 02/28/2017
Topic: Landscape Plans
04/23/2017: It looks like there are still a few trees that are located too close to storm
pipes. Locations are noted on the redlined plans. Please verify that you're meeting
separation requirements.
02/28/2017: Please include the proposed storm pipes in these plans and ensure
that you¿re meeting the required separation distances between the storm lines and
trees and shrubs. Also, swale centerlines should be shown on these plans and
trees should not be placed along the centerline.
Comment Number: 17 Comment Originated: 02/28/2017
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
04/18/2017: Repeat will look for materials at FDP.
02/15/2017: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials Submitted do
not meet requirements. Please submit; an Erosion Control Plan, an Erosion Control
Report, and an Escrow / Security Calculation. Also, based upon the area of
disturbance State permits for stormwater will be required since the site is over an
acre. If you need clarification concerning the erosion control section, or if there are
any questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Comment Number: 1 Comment Originated: 02/15/2017
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
04/28/2017: This will be reviewed next round.
03/02/2017: Please change the sub-title to match the Subdivision Plat.
Comment Number: 7 Comment Originated: 03/02/2017
04/28/2017: This will be reviewed next round.
03/02/2017: Please revise the Benchmark Statement as marked. See redlines.
Comment Number: 8 Comment Originated: 03/02/2017
04/28/2017: This will be reviewed next round.
03/02/2017: There are text over text issues. See redlines.
Comment Number: 9 Comment Originated: 03/02/2017
Page 9 of 11
04/28/2017: This will be reviewed next round.
03/02/2017: There are line over text issues. See redlines.
Comment Number: 10 Comment Originated: 03/02/2017
Topic: Landscape Plans
04/28/2017: This will be reviewed next round.
03/01/2017: Please remove the "Dash" from the title & title blocks. See redlines.
Comment Number: 5 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
03/01/2017: There are line over text issues. See redlines.
Comment Number: 6 Comment Originated: 03/01/2017
Topic: Plat
04/28/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response
letter.
03/01/2017: Please make changes as marked. If changes are not made or you
disagree with comments, please provide written response of why corrections were
not made. Please provide any responses on redlined sheets and/or in response
letter.
Comment Number: 1 Comment Originated: 03/01/2017
Topic: Site Plan
04/28/2017: This will be reviewed next round.
03/01/2017: Please remove the "Dash" from the title & title blocks. See redlines.
Comment Number: 2 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
03/01/2017: There are line over text issues. See redlines.
Comment Number: 3 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
03/01/2017: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Comment Number: 4 Comment Originated: 03/01/2017
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
03/01/2017: Please include an accounting of reserve trips at Vine and Lemay. If the
previously approved trips plus the trips from this development are under the
reserved capacity no additional traffic analysis is needed.
Comment Number: 1 Comment Originated: 03/01/2017
03/01/2017: Please provide raised crosswalks along barnstormer.
Comment Number: 2 Comment Originated: 03/01/2017
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Page 10 of 11
03/01/2017: Irrigation plans are required no later than at the time of building permit.
The irrigation plans must comply with the provisions outlined in Section 3.2.1(J) of
the Land Use Code. Direct questions concerning irrigation requirements to Eric
Olson, at 221-6704 or eolson@fcgov.com
Comment Number: 1 Comment Originated: 03/01/2017
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcgov.com
Topic: General
03/01/2017: Please include detailed elevations of all proposed building types.
Comment Number: 3 Comment Originated: 03/01/2017
03/01/2017: Elevations will need to include how mechanical equipment is screened
from public view and how conduit, meters and vents are painted to match
surrounding building surfaces.
Comment Number: 4 Comment Originated: 03/01/2017