April 28, 2017
John Beggs
Russell + Mills Studios
141 S COLLEGE AVE STE 104
Fort Collins, CO 80524
RE: East Ridge Third Filing (formerly East Ridge - Residential), PDP170006, Round Number 2
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about any
comments, you may contact the individual commenter or direct your questions through the
Project Planner, Pete Wray, at 970-221-6754 or pwray@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603,
mragasa@fcgov.com Topic: General
Comment Number: 2 Comment Originated:
02/27/2017
04/26/2017: The improvements with the corresponding phases listed below still apply
even with the proposed phases with this proposal. Please note language will be added
in the Development Agreement to detail this out.
02/27/2017: The north portion of this development is Parts of Phase 8 and 9 and the
west portion is Phase 5. Per the development agreement of East Ridge Second Filing,
Phase 8 can only be done after or concurrently with Phase 1A, Phase 1B, Phase 3,
Phase 4, Phase 6 and Phase 7. Phase 9 can only be done after or concurrently with
Phase 1A, Phase 1B, Phase 3, Phase 4 and Phase 6. Phase 5 can only be done after
or concurrently with Phase 1A, Phase 1B and Phase 2.
Reply: Noted Thank You.
Comment Number: 3 Comment Originated:
02/27/2017
02/27/2017: Prior to the finalizing of this project, Utility Plan revisions will need to be
finalized with East Ridge Second Filing.
Reply: This has been addressed.
Comment Number: 4 Comment Originated:
02/27/2017
04/26/2017: Some existing conditions to not match the revisions provided with East
Ridge Second Filing. Please see redlines.
02/27/2017: Since plans will be approved after the revisions to East Ridge Second
Filing, the Existing Conditions sheets should reflect these revisions.
Reply: This has been addressed.
Comment Number: 7 Comment Originated:
02/27/2017
04/26/2017: A formal variance request has not been received by Engineering yet.
02/27/2017: The minimum distance between high volume driveways and intersection
is 150 feet. Please adjust the driveway spacing on Barnstormer.
Reply: These have been provided.
04/26/2017: Please show the access easements on the Utility Plans. The Plat should
reflect this by separate document with reception numbers as well.
Reply: This is shown on the plat, Reception number will be updated once
it is received.
02/27/2017: The meandering sidewalk along Timberline Road will need to be modified with
East Ridge Second Filing. The sidewalk will need to be within an access easement. Since
second filing plans will be approved prior to this proposal, it will need to be done be
separate document.
Comment Number: 15 Comment Originated: 02/27/2017
02/27/2017: Private Drive signs will be needed at every driveway. It shall read: "Private
Drive-Privately Maintained". Insert the actual private drive name if the drive will be named.
Reply: Please see the Signage Plan.
Comment Number: 17 Comment Originated: 04/26/2017
04/26/2017: Please clearly delineate and label all the Private Drives (Comet Street, Vigilante
Lane, Helldiver Drive, Skyraider Way, and Thunderstreak Lane) with "Private Drive" on all
sheets of the Utility Plan as well as the site and landscape plan.
Reply: This has been addressed.
Comment Number: 18 Comment Originated: 04/26/2017
04/26/2017: Please make sure the Sheet Index on the cover sheet matches all the
individual sheets of the Utility Plan.
Reply: This has been addressed.
Comment Number: 19 Comment Originated: 04/26/2017
04/26/2017: The variance in the general notes should be a variance to remove the
temporary turnaround on both Barnstormer and Zeppelin Way
Reply: This has been addressed.
Comment Number: 20 Comment Originated: 04/26/2017
04/26/2017: Barnstormer Street will need to be completed prior to the issuance of any
building permit for Phase 8 and 9 (Second Filing). Unless the Private Drive (Helldiver
Drive) is completed concurrently with Barnstormer Street, the temporary turnaround on
Barnstormer Street will be needed. The temporary turnaround on Zeppelin Way is being
built with Phase 1 (Second Filing), so it should be shown on the existing conditions and
removal.
Reply: This has been addressed.
Comment Number: 21 Comment Originated: 04/26/2017
04/26/2017: The water and sanitary sewer stubs are not being shown on Crusader Street. The
Second Filing revisions show these stubs. Please revise.
Reply: This has been addressed.
Comment Number: 22 Comment Originated: 04/26/2017
04/26/2017: Engineering has revisions for East Ridge Second Filing. Utility Plans can't be
finalized until the offsite easements are completed. Engineering is still waiting on the
easement vacations and dedications for the irrigation lines. Formal submittal hasn't been
completed for the access easement needed for the sidewalk widening for the trail. Legals
have been submitted, but deeds, applications and fees have not.
Reply: The Access easement has been completed, Irrigation is in process.
Department: Environmental Planning
Contact: Stephanie Blochowiak, 970-416-4290, sblochowiak@fcgov.com Topic:
General
Comment Number: 4 Comment Originated: 04/21/2017
04/21/2017: No further Environmental Planning comments at this time. Environmental
Planning does not need paper copy - electronic only is fine - for East Ridge Third Filing
Final Plans. Thank you.
Response: Thank you.
Department: Forestry
Contact: Molly Roche, , mroche@fcgov.com Topic:
Landscape Plans
4/26/2017:
Continued:
03/03/2017:
Please show the existing plum thicket, which is shown to be retained. On the original
submittal, it is show on the north edge of the project, and should continue to be shown for
reference on the plans.
Comment Number: 3 Comment Originated: 04/26/2017
04/26/2017:
There appears to be some discrepancies in the number of trees listed in the landscape
schedule versus the actual number of trees on the landscape plans. Please correct the
following figures.
Species # of Trees Schedule # of Trees Plans Discrepancy
Shademaster Honeylocust 31 32 (+1)
Hotwings Tatarian Maple 50 89 (+39)
Spring Snow Crabapple 67 131 (+64)
Chanticleer Pear 84 142 (+58)
Vanderwolf’s Limber Pine 33 32 (-1)
Response: Tree counts have been updated.
Comment Number: 4 Comment Originated: 04/26/2017
04/26/2017:
If tree counts are changed to account for the number of trees shown on the landscape
plans, proper diversity percentages must be met, specifically for Spring Snow Crabapple
and Chanticleer Pear. With my counts, there are 677 proposed trees on the plans. Please
refer to the following chart that details current diversity proportions.
Species # of Trees Landscape Plans Diversity %
Spring Snow Crabapple 131 19%
Chanticleer Pear 142 21%
Minimum Species Diversity. To prevent uniform insect or disease susceptibility and eventual
uniform senescence on a development site or in the adjacent area or the district, species
diversity is required and extensive monocultures are prohibited. The following minimum
requirements shall apply to any development plan.
Number of trees on site: 60 or more --> Maximum percentage of any one species: 15%
Please evaluate and provide additional ornamental trees to meet the LUC standards.
Response: Additional ornamental tree species have been added as to meet
LUC standards.
Comment Number: 5 Comment Originated: 04/26/2017
04/26/2017:
There appears to be a few clusters of tree symbols that are not accounted for on the
Landscape Schedule. Please clarify what the clusters of trees are on pages LP403 and LP
403.
Response: LP 406 has been added to the landscape plans showing the entry
planting scheme.
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com Topic:
Building Insp Plan Review
Comment Number: 1 Comment Originated: 03/08/2017
03/08/2017: Adoption of the 2015 I-Codes is anticipated for mid-April, 2017. Be advised
that permit applications submitted after the code adoption date will be subject to the new
codes and standards, as amended
03/08/2017: Construction shall comply with adopted codes as amended. Current adopted
codes are:
2012 International Building Code (IBC) 2012
International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado 2014
National Electrical Code (NEC) as amended by the State of Colorado Fort Collins has
amendments to most of the codes listed above. See the fcgov.com/building web page
to view them.
Response: Acknowledged
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow
Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost
Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code for Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
Comment Number: 3 Comment Originated: 03/08/2017
03/08/2017: City of Fort Collins IBC amendments require a full NFPA-13 sprinkler system in
multifamily units with an exception for buildings with up to 6 dwelling units that are not more
than 2 stories nor more 5000 sqft per floor. Single family attached dwellings are required to
be sprinkled with either an IRC P2904 system or NFPA 13D sprinkler.
Response: Acknowledged
Comment Number: 4 Comment Originated: 03/08/2017
03/08/2017: Colorado CRS 9-5 compliance is required for developments with more than 7
units for all buildings containing more than 2 dwelling units. CRS 9-5 uses a points-based
system for compliance. With 306 dwelling units, 130 accessibility points will be required for
the project.
Response: Acknowledged
Department: Light And Power
Contact: Coy Althoff, 970-224-6150, CAlthoff@fcgov.com Topic:
General
Comment Number: 1 Comment Originated: 02/28/2017
02/28/2017: Light and Power will have both single and 3-phase power to this
development as a part of the East Ridge 2nd filing subdivision (which is currently under
construction.)
Response: Acknowledged
Comment Number: 2 Comment Originated: 02/28/2017
02/28/2017: Development charges, electric Capacity Fee, Building Site charges and any
system modification charges necessary will apply to this development.
Response: Acknowledged
Comment Number: 3 Comment Originated: 02/28/2017
02/28/2017: Multi family buildings (anything beyond a duplex) are treated as commercial
services; therefore a(C 1) form must be filled out and submitted to Light & Power
Engineering. All secondary electric service work is the responsibility of the developer and
their electrical consultant or contractor. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
02/28/2017: As your project continues to move forward please contact Light and Power
Engineering to coordinate the streetlight, transformer and electric meter locations, please
show the locations on the utility plans.
Response: Acknowledged
Comment Number: 5 Comment Originated: 02/28/2017
02/28/2017: Streetlights will be placed along public streets. A 40 feet separation on both
sides of the light is required between canopy trees and streetlights. A 15 feet separation on
both sides of the light is required between ornamental trees and streetlights.
Response: Acknowledged
Comment Number: 6 Comment Originated: 02/28/2017
02/28/2017: The location of the water and electric services will need to be coordinated with
Light and Power Engineering.
Response: Acknowledged
Comment Number: 7 Comment Originated: 03/03/2017
03/03/2017: You may contact FCU Light & Power, project engineering if you have questions.
(970) 221-6700. You may reference Light & Power¿s Electric Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandards_F
INAL_18November2016_Amendment.pdf
You may reference our policies, development charge processes, and use our fee
estimator at http://www.fcgov.com/utilities/business/builders-and-developers.
Response: Acknowledged
Comment Number: 8 Comment Originated: 04/26/2017
04/26/2017: Swimming pool facilities will be considered "commercial electric" services;
therefore C-1 form and one-line diagram will need to be submitted to Light & Power
Engineering. (Reference comment No. 3 for link to C-1 form.)
Response: Acknowledged
Comment Number: 9 Comment Originated: 04/26/2017
04/26/2017: All previous comments from 2/28/17 are still valid at this time.
Response: Acknowledged
Department: Outside Agencies
Contact: Brian Zick, ,
Topic: General
Comment Number: Comment Originated: 04/28/2017
04/28/2017:
Boxelder Sanitation:
Comments:
1) To provide access, relocate MH on 18-inch sanitary sewer to the end of the 8
-foot access sidewalk (centered in the sidewalk) and extend the 18-inch sewer and plug
north of that MH to within the 30-foot landscape setback area (Sheet UT01).
Reply: This will be updated as final documents are close to mylars to assure
no additional changes will be required.
2) Please submit final construction drawings.
Reply: Provided.
The District has adequate capacity to service the property referenced above. The District
is in full compliance with Federal and State water quality requirements. We look forward to
review future submittals on this project. Please feel free to contact me if you have any
questions.
Contact: Randy Siddens, , Topic:
General
04/26/2017:
RE: Project: PDP170006 East Ridge Third Filing PDP – Type 1: 2nd Round of
Review
The East Larimer County Water District (District) staff has reviewed material delivered
to the District for the proposed project referenced above and has the following
comments:
1. Utility Plans:
a. Water Meters in Private Drives: For the final review phase the District will need to see
a proposed typical layout of the water services in the private drives that will feed the
properties to verify appropriate water meter locations.
Reply: Locations shown on Utility sheets.
b. Sheet UT04 – Irrigation Tap: The District highly recommends the location of the irrigation
tap (if one is to be installed) be identified during final design phase. This will prevent issues
frequently seen when the irrigation tap is not located and connected until after paving work is
completed.
Reply: Location and size is being coordinated with LS.
c. Sheet UT04 – Backflow Preventer: A reduced pressure zone (RPZ) type backflow
preventer will be required for the water service to the pool/clubhouse facility.
Reply: Call out added.
d. Water Service Line Size: For the attached single family residence buildings, the District
has recently been informed that current fire code dictates these units have sprinklers
installed within them and that a ¾” water service line may not be of adequate size for fire
flow capacity. The District encourages the developer to identify the service line (and meter)
size required for these units during the final design phase and show this sizing on the final
design drawings.
Reply: ¾” water service are what the developer has requested.
2. Plat:
a. District Signature Block on Sheet 1: Remove
Reply: Removed.
b. Waterline Easements: Waterline easements will be required to be granted before the
plat is recorded for areas within Tracts B and F where the waterlines are in private drives.
The District plans to work with the developer to secure these easements. Redlines
concerning needed waterline easements have sent to the project engineer (Galloway).
Reply: These are being completed.
3. Water Rights: The District encourages the developer to contact the District
General Manager to begin discussions on raw water dedication for the project.
Reply: Noted.
Any written agreements required to complete waterline connections to the property must
be completed prior to final approval of the project construction drawings.
Sincerely,
Randy
P.E. District Engineer
Department: PFA
Contact: Cal Sheesley, 970-416-2599, csheesley@poudre-fire.org Topic:
General
Comment Number: 6 Comment Originated: 04/20/2017
04/20/2017: LANDSCAPE PLAN
The proposed Landscape Plan indicates that tree canopy diameters may encroach on the
fire lane over time. PFA would like to ensure the integrity of the EAE remains as the trees
mature and a canopy develops. The EAE shall be maintained to 14' in height. This is mostly
relevant through the parking areas, where the EAE diminishes in width. This comment is
aimed to preserve the trees and the fire apparatus.
Reply: Tree species have been evaluated and should not encroach into the
fire lane. Trees have also been moved a minimum of 5’ from the edge of the
lane.
04/21/2017: POOL CHEMISTRY - HAZARDOUS MATERIALS
A MSDS list of pool chemistry and chemical quantities in use or in storage shall be
submitted with permit application.
Reply: Noted.
Comment Number: 8 Comment Originated: 04/21/2017
04/21/2017: POOL ACCESS
The proposed gates that control access to the pool complex shall be equipped with
approved means of access for emergency personal. A Knox Box is recommended. Details
to be coordinated with PFA as development continues.
Reply: A note has been added to the plan set
Comment Number: 9 Comment Originated: 04/21/2017
04/21/2017: STREET NAMING
Some private drives have been named while others have not. An updated plan is required
with FDP submittal.
Reply: The private drives fronting homes have been named.
Comment Number: 10 Comment Originated: 04/25/2017
04/25/2017: FIRE LANE SIGNS
No Parking - Fire lane signs will be required on private drives dedicated as an EAE. Sign
locations should be indicated on future plan sets at time of FDP.
Reply: See signage plan.
Comment Number: 11 Comment Originated: 04/25/2017
04/25/2017: ADDRESSING
Due to the orientation of dwelling units on this site, every unit will require addressing posted
on the front and rear of every unit. Posting of the full street name along with address
numerals will also be required on some buildings, as defined by local amendments provided
below. A comprehensive plan will be required prior to FDP approval. Please contact PFA with
any questions or to seek assistance with this matter. Code language provided below.
ADDRESS POSTING - LOCAL AMENDMENT
> IFC 505.1.8: Buildings that are addressed on one street, but are accessible from other
streets, shall have the address numbers AND STREET NAME on each side that is
accessible form another street.
Reply: Noted.
Department: Planning Services
Contact: Pete Wray, 970-221-6754, pwray@fcgov.com Topic:
General
Comment Number: 9 Comment Originated: 04/28/2017
04/28/2017: Based on comments at the staff review meeting on April 26, we are ready for
hearing. A tentative date for the Type I hearing is May 24. I will need a full PDF plan set by
5/7 that includes revisions for R2.
Response: Tree counts have been updated.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 04/25/2017
04/25/2017: LP501: Show enlargement of community gathering spaces for detailed design of
amenities and planting, paving etc.
Response: Enlargements of the community spaces have been added to the
site plan set.
Topic: Plat
04/25/2017:
Revise Planning signature block - Director of Community Development and Neighborhood
Services (CDNS).
Response: Planning signature block has been updated.
Topic: Site Plan
Comment Number: 5 Comment Originated: 04/25/2017
04/25/2017: LS101 - add update note on Filing 3 is consistent with approved
capacity based on proposed 209 SFA dwelling units. Filing 2 and 3 include 345 units which
is less than the approved ODP having 361 SFA units.
Response: Note has been added to LS101 outlining proposed capacity vs
approved capacity outlined in ODP.
Comment Number: 6 Comment Originated: 04/25/2017
04/25/2017: LS403-404: Clarify sidewalk fronting Timberline is part of Filing 2 as an existing
condition. The legend is showing new concrete. Sykes Drive median at Timberline should
show a 10' wide sidewalk refuge in median to match path to south. LS404 - show end of
sidewalk and barricade on SW corner of property.
Response: Sidewalk is labeled as existing sidewalk and referencing Filing 2
docs.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic:
Construction Drawings
Comment Number: 5 Comment Originated: 02/28/2017
04/23/2017: The response to this comment indicated that the fine grading design in this
area would be done at final. However, please note in the drainage report and make a note
on the drainage and/or grading plan somewhere that the site will be graded to drain to the
proposed storm pipes shown and not to Timberline.
02/28/2017: Grading Plan: There are storm lines shown along the west side of the buildings
in Tract G. These don¿t appear to be placed in conjunction with low points. What is the intent
of these lines? Are you connecting roof drains into them? Please include some callouts or
labels in the plans to clarify.
Reply: Grading has been updated to reflect this.
Comment Number: 18 Comment Originated: 04/23/2017
04/23/2017: Sheet CV02 - please expand the storm drainage note regarding vertical separation
requirements to include storm pipes and irrigation mains.
Reply: Updated.
Comment Number: 19 Comment Originated: 04/23/2017
04/23/2017: Grading Plans - Please label the slopes on the northerly side of the site. It looks
like these are steep in some locations. If you think you are going to need retaining walls in
certain areas, please include a note on the plans indicating that this may be the case.
Reply: Grading updated.
Comment Number: 20 Comment Originated: 04/23/2017
04/23/2017: Grading and Utility Plans for Pool Site - There are two lateral tie-ins to the
public storm sewer shown for the pool site. This isn't allowed. Please tie these laterals into
the nearby manhole or inlets.
Reply: Updated.
Topic: Drainage Report
Comment Number: 15 Comment Originated: 02/28/2017
04/23/2017: Drainage Map: The report references design points (DP) A1, A2/3, B1 and I
don't know which design points these are. Please label these on the drainage plans.
02/28/2017: Drainage Map: It would be helpful to also include the original basin labels
(maybe ghosted back) on the map since these original basins are referenced in this report
(i.e. Fut A, Fut B, Fut H, Fut I)
Reply: Noted Thank You.
04/23/2017: For the Barnstormer street capacity calculations, please include the original
street capacity calculation sheets from ERSF for these design points so I can see how the
runoff amount and ponding depths changed.
Also please state in the report that the additional depth in the street still allows you to meet
the encroachment limits allowed in Tables ST-2 and ST-3.
Reply: Noted Thank You.
02/28/2017: Drainage Map: It looks like the basins fronting Barnstormer Drive and
Timberline Road drain onto the roadways. For Barnstormer, street capacity and inlet
capacities should be re-analyzed to verify that they can handle the additional runoff. For
Timberline, the original report did not show or assume runoff onto Timberline and we won¿t
allow developed runoff onto Timberline. Please clarify your intent and the design along
Timberline.
Reply: Noted Thank You.
Topic: Landscape Plans
Comment Number: 17 Comment Originated: 02/28/2017
04/23/2017: It looks like there are still a few trees that are located too close to storm pipes.
Locations are noted on the redlined plans. Please verify that you're meeting separation
requirements.
Response: Tree locations have been updated to meet separation
requirements.
02/28/2017: Please include the proposed storm pipes in these plans and ensure that
you¿re meeting the required separation distances between the storm lines and trees and
shrubs. Also, swale centerlines should be shown on these plans and trees should not be
placed along the centerline.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic:
Erosion Control
Comment Number: 1 Comment Originated: 02/15/2017
04/18/2017: Repeat will look for materials at FDP.
02/15/2017: The site disturbs more than 10,000 sq. ft., therefore Erosion and Sediment
Control Materials need to be submitted for FDP. The erosion control requirements are in the
Stormwater Design Criteria under the Amendments of Volume 3 Chapter 7 Section 1.3.3.
Current Erosion Control Materials Submitted do not meet requirements. Please submit; an
Erosion Control Plan, an Erosion Control Report, and an Escrow / Security Calculation.
Also, based upon the area of disturbance State permits for stormwater will be required
since the site is over an acre. If you need clarification concerning the erosion control
section, or if there are any questions please contact Jesse Schlam 970-218-2932 or email
@ jschlam@fcgov.com
Reply: Erosion Control Sheet provided. This will need to be added to the
existing East Ridge 2nd Filing SWMP. I will contact to coordinate additional
requirements.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic:
Construction Drawings
Comment Number: 7 Comment Originated: 03/02/2017
04/28/2017: This will be reviewed next round.
03/02/2017: Please change the sub-title to match the Subdivision Plat.
Reply: Noted Thank You.
Comment Number: 8 Comment Originated: 03/02/2017
04/28/2017: This will be reviewed next round.
03/02/2017: Please revise the Benchmark Statement as marked. See redlines.
Reply: Noted Thank You.
Comment Number: 9 Comment Originated: 03/02/2017
04/28/2017: This will be reviewed next round. 03/02/2017:
There are text over text issues. See redlines. 04/28/2017: This
will be reviewed next round. 03/02/2017: There are line over
text issues. See redlines.
Reply: Noted Thank You.
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
Reply: Noted Thank You.
03/01/2017: Please remove the "Dash" from the title & title blocks. See redlines.
Comment Number: 6 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
03/01/2017: There are line over text issues. See redlines.
Reply: Noted Thank You.
Topic: Plat
Comment Number: 1 Comment Originated: 03/01/2017
04/28/2017: Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not made. Please
provide any responses on redlined sheets and/or in response letter.
Reply: Noted Thank You.
03/01/2017: Please make changes as marked. If changes are not made or you disagree
with comments, please provide written response of why corrections were not made. Please
provide any responses on redlined sheets and/or in response letter.
Topic: Site Plan
Comment Number: 2 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
Response: No redlines were received from Technical Services.
03/01/2017: Please remove the "Dash" from the title & title blocks. See redlines.
Reply: Noted Thank You.
Comment Number: 3 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round. 03/01/2017:
There are line over text issues. See redlines.
Reply: Noted Thank You.
Comment Number: 4 Comment Originated: 03/01/2017
04/28/2017: This will be reviewed next round.
03/01/2017: There is text that needs to be masked. Mask all text in hatched areas. See
redlines.
Reply: Noted Thank You.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com Topic:
General
Comment Number: 1 Comment Originated: 03/01/2017
03/01/2017: Please include an accounting of reserve trips at Vine and Lemay. If the
previously approved trips plus the trips from this development are under the reserved
capacity no additional traffic analysis is needed.
Comment Number: 2 Comment Originated: 03/01/2017
03/01/2017: Please provide raised crosswalks along barnstormer.
Reply: Noted on Signage Plan.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic:
General
03/01/2017: Irrigation plans are required no later than at the time of building permit. The irrigation
plans must comply with the provisions outlined in Section 3.2.1(J) of the Land Use Code. Direct
questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Reply: Noted Thank You.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcgov.com Topic:
General
Comment Number: 3 Comment Originated: 03/01/2017
03/01/2017: Please include detailed elevations of all proposed building types.
Response: The building elevations are still being developed by the owner.
The previously submitted building elevations have been resubmitted.
Comment Number: 4 Comment Originated: 03/01/2017
03/01/2017: Elevations will need to include how mechanical equipment is screened from
public view and how conduit, meters and vents are painted to match surrounding building
surfaces.
Response: The future building elevations will address the mechanical
equipment screening.