Loading...
HomeMy WebLinkAbout2106 S. TAFT HILL ROAD (WEST VILLAGE OFF TAFT) - FDP - FDP170015 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTFINAL DRAINAGE REPORT WEST VILLAGE OFF TAFT Fort Collins, Colorado May 16, 2017 Prepared for: Laura Olive 125 S. Howes Street, Suite 120 Fort Collins, CO 80525 Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1076-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. May 16, 2017 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Final Drainage Report for West Village Off Taft Dear Staff: Northern Engineering is pleased to submit this Final Drainage Report for your review. This report accompanies the Conceptual Review submittal for the proposed West Village Off Taft. This report has been prepared in accordance with the City of Fort Collins Stormwater Criteria Manual (FCSCM) and the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and serves to document the stormwater impacts associated with the proposed West Village Off Taft project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Bud Curtiss Blaine Mathisen, EI Vice President Project Engineer West Village Off Taft Final Drainage Report TABLE OF CONTENTS I. General Location and Description ............................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 1 C. Floodplain.......................................................................................................................................... 2 II. drainage basins and sub-basins .................................................................................. 3 A. Major Basin Description .................................................................................................................... 3 B. Sub-Basin Description ....................................................................................................................... 3 III. drainage DESIGN CRITERIA ...................................................................................... 4 A. Regulations........................................................................................................................................ 4 B. Four Step Process .............................................................................................................................. 4 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 5 E. Hydraulic Criteria .............................................................................................................................. 5 F. Floodplain Regulations Compliance .................................................................................................. 6 G. Modifications of Criteria ................................................................................................................... 6 IV. drainage FACILITY DESIGN ....................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 7 V. CONCLUSIONS ........................................................................................................ 9 A. Compliance with Standards .............................................................................................................. 9 B. Drainage Concept .............................................................................................................................. 9 References ....................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Detention Facilities APPENDIX C – Water Quality Design Computations APPENDIX D – Erosion Control Report APPENDIX E – Soils Resource Report LIST OF TABLES AND FIGURES: Figure 1 - Aerial Photograph - Google Earth ............................................................................ 1 Figure 2 - Proposed Site Plan ............................................................................................... 2 Figure 3 - Existing City Floodplain ......................................................................................... 3 Figure 4 - LID Table ............................................................................................................ 4 West Village Off Taft Final Drainage Report MAP POCKET: C7.00 - Drainage Exhibit C7.01 – Historic Drainage Exhibit West Village Off Taft Final Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 - Aerial Photograph - Google Earth 2. West Village Off Taft is in Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located on the east side of S. Taft Hill Rd. near the intersection of S. Taft Hill Rd. and Sheffield Dr. It is directly across the street from Blevins Middle School. The project site is surrounded by residential homes to the north, east, and south. 4. Currently the existing lot remains mostly undeveloped. However, there is currently a two-story house with an associated detached garage and landscaping. This house has a historical tag and therefore cannot be demolished but instead must be incorporated into the over plan for the proposed subdivision. The house sits along the western property line adjacent to the pedestrian cross walk across S. Taft Hill. B. Description of Property 1. West Village Off Taft project site is 2.35 net acres. West Village Off Taft is not proposing any improvements to S. Taft Hill Rd. However, due the lack of storm sewer infrastructure the proposed project will be discharging east into Dover Dr. through a sidewalk chase therefore additional offsite improvements will be necessary near the south-east corner of the project site. Also, West Village Off Taft will leave the historical house untouched other than two landscaping walls that jutted to far south into the private drive aisle. Overall, the proposed site will maintain the historic drainage West Village Off Taft Final Drainage Report 2 patterns. 2. West Village Off Taft will be maintaining the overall historic drainage characteristics of this site. There are currently no water quality amenities or any existing storm infrastructure on site. West Village Off Taft is proposing to install a porous paver section as well as several retaining walls to help meet required detention and water quality volumes, this will be discussed in Section IV.B. There is no offsite runoff entering the site from S. Taft Hill Rd. 3. Per the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, 100 percent of the site consists of Altvan- Satanta loams, which fall into Hydrologic Soil Groups B. 4. The proposed development will include the clearing of existing vegetation, two (2) tress, the removal of 180 sf. of sidewalk where the proposed entrance is and the removal of roughly 135 sf. of concrete walls behind the existing detached garage. Figure 2 - Proposed Site Plan 5. There are no irrigation facilities, erosion buffer zones, or major drainage ways within the property limits. 6. The project site is within a Low Density Residential zoning district. Therefore, the proposed use is permitted within this zone district. C. Floodplain 1. The subject property does not lie within a FEMA floodplain. The project site falls within the FIRM Panel 08069C986G for Larimer County, dated May 2nd, 2012. 2. West Village Off Taft does not fall within a city floodplain. West Village Off Taft Final Drainage Report 3 Figure 3 - Existing City Floodplain II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. West Village Off Taft is within the Canal Importation drainage basin. This basin, which suffered significant property damage in the flood of 1997, is almost completely urbanized with primarily mixed density residential and isolated commercial land uses. Runoff from the basin empties into the Old Town or Spring creek basins. 2. There are no previous drainage studies for the area associated with this project site. B. Sub-Basin Description 1. West Village Off Taft historically sheet flows from the northwest towards the southeast corner of the project site. This historic condition will be maintained to the best of the engineer’s ability. Basin H1 Basin H1 is associated with the entire project site and has an overall area of 2.35 acres. Basin H1 has one two story house with a detached garage and an associated gravel driveway. There is currently no stormwater infrastructure or water quality amenities. Additionally, there are no offsite flows entering Basin H1. Basin H1 has a historic 2-year flow of 1.26 cfs. 2. A more detailed description of the projects proposed drainage patterns follows in Section IV.A.4., below. West Village Off Taft Final Drainage Report 4 3. There are no offsite flows associated with West Village Off Taft. 4. A full-size copy of the Historic and Proposed Drainage Exhibit can be found in the Map Pocket at the end of this report. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the West Village Off Taft project. B. Four Step Process The overall stormwater management strategy employed with the West Village Off Taft project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low-Impact Development (LID) strategies including: Providing as much vegetated open areas as possible along the north, east, west and south portion of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through either a bio-swale or across concrete pavers. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on downstream storm infrastructure. Below is a table that shows the breakdown of the proposed LID amenities compared to the proposed impervious area. Figure 4 - LID Table Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff and provide the necessary BMPs required for water quality. Stormwater generated along the northern portion of the project site will sheet flow north where it will be collected and routed through a grass lined swale. Runoff generated near the middle of the project site will sheet flow south across the Design Point Basin ID Basin Area Treatment Type LID System Impervious Area Treated by LID System Percent of Impervious Area Treated by LID System a1 A1 1.168 ac. Extended Detention No 0.227 ac. 0.00% b1 B1 0.733 ac. Pavers Yes 0.493 ac. 57.59% b1 B2 0.452 ac. Extended Detention No 0.136 ac. 0.00% Total 2.353 ac. 0.856 ac. 58% West Village Off Taft Final Drainage Report 5 private drive aisle where it will pass over concrete pavers. Eventually all the runoff is routed to one of the two ponds that border the southern property line. where it will be released into Dover Drive at the historic 2-year runoff. Step 3 – Stabilize Drainageways As stated in Section I.B.5, above, there are no drainageways associated with the project site. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments and is not applicable for this project. C. Development Criteria Reference and Constraints 1. There are no known drainage studies for the existing property. 2. The subject property is essentially an "in-fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during this analysis that will impact the proposed drainage system including: Existing elevations along the east, west, north, and south property lines will be maintained. During the construction of West Village Off Taft, it is imperative that the house that currently sites on the project site remains untouched except for the two concrete walls behind the detached garage that will need to be removed. Overall drainage patterns of the existing site will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains from the northwest to the southeast. The entire site drains stormwater via overland flow. 2. All drainage facilities proposed with the West Village Off Taft project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. West Village Off Taft Final Drainage Report 6 3. As stated in Section I.C.1, above, the subject property is not located within a City regulatory floodplain. 4. West Village Off Taft does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, the project site does not fall within a City regulatory floodplain. G. Modifications of Criteria The proposed West Village Off Taft development is requesting that the required amount of freeboard be reduced from a foot to seven (7) inches. Due to the lack of space for the detention ponds and to insure the walls along the southern property edge can tie into existing grade and still be under 30” tall Pond A has a freeboard height of 7.08”. Pond B has a freeboard height of 8.16”. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the West Village Off Taft drainage design is to maintain existing drainage patterns and ensure no adverse impacts to any adjacent properties or existing infrastructure occurs. 2. As previously mentioned, there are no off-site flows draining onto the project property. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. West Village Off Taft has been broken down into three (3) major drainage basins, designated as Basins A1, B1, and B2. Basin A1 Basin A1 is located along the northern and eastern edges of the project site. Runoff from Basin A1 is generated from roofs, back porches, and landscaping. Basin A1 sheet flows south to north where it is collected in grass lined swale. The swale conveys the collected runoff into Pond A which is situated at the southeast corner of the project site. From there the runoff will be released east into a swale and concrete chase into Dover Drive at the historic 2-year rate. Basin B1 Basin B1 is in the middle of the project site and drains stormwater via overland flow from the north to the south. Runoff from Basin B1 is generated from roofs, driveways, sidewalk, landscaping, and the drive aisle. All the runoff generated in Basin B1 sheet flows across concrete pavers that are in the middle of the drive aisle. Once, the a portion runoff has been treated by the concrete pavers an underdrain system will then convey the runoff south into Pond A. Any surface flow that was not picked up in the porous pavers will continue to sheet flow south until it enters Pond B via 5’ curb cut. Pond B releases into Pond A at a reduced release rate. Once the runoff has entered West Village Off Taft Final Drainage Report 7 Pond A it will then be released east into a swale and concrete chase into Dover Drive at the historic 2-year rate. Basin B2 Basin B2 wraps around the southwest corner of the project site and drains via overland flow from north to south. Runoff from Basin B2 is generated from the drive aisle entrance, the roof of the existing house, and landscaping areas. All the runoff generated in Basin B2 will initially be collected in Pond B1 and just like Basin B1 it will then be released into Pond A and then conveyed to Dover Drive at the historic 2- year rate. B. Specific Details 1. The main drainage problems associated with this project site is the deficiency of existing stormwater infrastructure present and lack of developable area. Basins A1, B1, and B2 will all be treated either by an LID amenity or via extended detention. A restrictor plate will be placed at the outfall of Pond A to ensure that the site is not discharging at a rate greater than the 2-year. Pond B and Pond A were both sized using a reduced historic 2-year release rate. Ultimately though, Pond A will be releasing the entire site at the historic 2-year release rate. 2. The release rate for the undeveloped land (pre-development) was established by calculating the Historic 2-year peak runoff rate for the entire project area (Basin H1) with no reduction because all the runoff generated on the site is being captured and treated. The overall historic 2-year peak runoff rate was calculated to be 1.26 cfs. This release rate was utilized in the FAA procedure detention storage computations (Refer to Appendix B for these calculations). 3. Detention Pond Calculations West Village Off Taft has two ponds that are right next to one another and act hydraulically independent of each other. Pond B is situated directly west of Pond A and they are separated by a berm and headwall that has a weir and restrictor plate on it. However, Pond A will have all runoff from the site eventually passing through it because it is the ultimate discharge location. Pond A will discharge east into a proposed swale and concrete chase into Dover Drive at the historic 2-year rate (1.26 cfs). Pond B will be releasing into Pond A at 1.00 cfs which will be bypassing Pond A because Pond A was sized using a release rate of 0.26 cfs. Pond A The FAA method was used to size Pond A. The overall historic 2-year release rate is 1.26 cfs and Pond A was sized using a release rate of 0.26 cfs and Pond B was sized using a release rate of 1.00 cfs. Based on the characteristics of Basins A1 and an adjusted release rate of 0.26 cfs, formulate a detention volume of 6390 cu. ft. However, Basin A1 is receiving water quality in the form of extended detention and following UDFCD standards Basin A1 requires 435 cu. ft. of volume for water quality. Therefore, the required volume for the 100-yr detention plus the WQCV is 6825 cu ft. The top of pond for Pond A is at an elevation of 5084.02’ and the top of freeboard is at 5084.61’ therefore there is slightly more than 7 inches of free board (7.08”). West Village Off Taft Final Drainage Report 8 Pond A will be releasing at the full 2-year historic rate (1.26 cfs) and the emergency flow path for Pond A is at the southeast corner of the site and discharges east into the swale that will convey the flows into Dover Drive. Pond B The FAA method was used to size Pond B as well. As mentioned in the description of Pond A, Pond B was sized using a release rate of 1.00 cfs. The reason different flow rates were used in sizing the two ponds was because Pond B is in a spot within the project site that allows for a larger pond. Based on characteristics from Basins B1 and B2 with an adjusted release rate of 1.00 cfs, formulate a detention volume of 7542 cu. ft. However, Basin B2 will is receiving water quality in the form of extended detention and following UDFCD standards Basin B2 requires 232 cu. ft. of volume for water quality. Basin B1 is receiving its water quality through the porous pavers. Therefore, the required volume for the 100-yr detention plus the WQCV is 7774 cu. ft. The top of Pond B is at an elevation of 5084.97’ and the top of freeboard is at 5085.65 therefore there is slightly more than 8 inches of free board (8.16”). Pond B will release at a rate of 1.00 cfs into Pond A through a pipe that connects the two ponds. Once into Pond A it will release at the historic 2-year rate of 1.26 cfs with Pond A’s runoff. The emergency spillway for Pond B is located at the headwall that divides Pond A and Pond B. The excess runoff will flow east until it reaches the swale east of Pond A where it will be conveyed to Dover Drive. 4. Water Quality Results Basin A1 Water quality for Basin A1 will be provided vai extended detention in Pond A. Following UDFCD Standards, a required WQCV for Basin A1 is 435.35 cu. ft. This volume is included within Pond A. Pond A will have an outlet structure located at design point a1 that detains and attenuates runoff and promotes the settlement of pollutants. Basin B1 Basin B1 will have water quality provided via concrete pavers located in the middle of the private drive aisle. Following UDFCD standards, a required WQCV for Basin B1 is 457 cu. ft. and the volume provided within the permeable pavers is 1464 cu. ft. Once the runoff has gone through the permeable pavers it will be conveyed to Pond A via a 6” perforated pipe. Basin B2 Water quality for Basin B2 will be provided via extended detention in Pond B. Following UDFCD Standards, a required WQCV for Basin B2 is 231.57 cu. ft. This volume is included within Pond B. Pond B will have an outlet structure located at design point b1 that detains and attenuates runoff and promotes the settlement of pollutants. 5. Pond B’s emergency overflow conveys excess runoff east over the berm/headwall into Pond A. Pond A’s emergency overflow path is located at design point a1. From there all excess flow will overtop the pond wall and flow east via swale into Dover Drive. West Village Off Taft Final Drainage Report 9 V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the West Village Off Taft project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the West Village Off Taft project complies with the City of Fort Collins’ Master Drainage Plan. 3. There are no city regulatory floodplains and/or erosion buffer zones associated with the West Village Off Taft project. 4. The drainage plan and stormwater management measures proposed with the West Village Off Taft development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. West Village Off Taft will detain and treat the entire project site and release at the historic 2-year rate east into Dover Drive during the developed 100-year storm. 2. West Village Off Taft will provide water quality via an LID feature as well as extended detention. West Village Off Taft Final Drainage Report 10 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: Taft Hill Village Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year C f = 1.00 100-year C f = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 102457.9 2.352 0.000 0.025 0.043 0.124 0.000 2.16 0.28 0.28 0.35 5% TOTAL 102458 2.352 0.000 0.025 0.043 0.124 0.000 2.16 0.19 0.19 0.24 5% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 Overland Flow, Time of Concentration: Project: Taft Hill Village Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, Rational Method Equation: Project: Taft Hill Village Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: h1 H1 2.35 15 15 14 0.28 0.28 0.35 1.90 3.24 6.82 1.26 2.16 5.68 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) B. Mathisen May 12, 2017 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) Page 3 of 23 D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\Direct-Runoff SUMMARY DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) h1 H1 2.35 0.28 0.35 14.6 13.7 1.26 5.68 Page 7 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\SUMMARY-TABLE CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: West Village Off Taft Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year C f = 1.00 100-year C f = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A1 50891.7 1.168 0.000 0.014 0.213 0.000 0.000 0.94 0.39 0.39 0.48 17% B1 31938.0 0.733 0.000 0.251 0.164 0.000 0.079 0.24 0.66 0.66 0.83 53% B2 19673.7 0.452 0.000 0.128 0.008 0.000 0.000 0.32 0.46 0.46 0.58 27% TOTAL 102503 2.353 0.000 0.393 0.385 0.000 0.079 1.58 0.43 0.43 0.53 30% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Overland Flow, Time of Concentration: Project: West Village Off Taft Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, Rational Method Equation: Project: West Village Off Taft Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: a1 A1 1.17 16 16 15 0.39 0.39 0.48 1.81 3.08 6.62 0.82 1.39 3.73 b1 B1 0.73 6 6 5 0.66 0.66 0.83 2.67 4.56 9.95 1.30 2.21 6.03 b1 B2 0.45 10 10 9 0.46 0.46 0.58 2.21 3.78 8.21 0.46 0.79 2.14 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) B. Mathisen May 12, 2017 Q = C f ( C )( i )( A ) Page 3 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Direct-Runoff CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: West Village Off Taft Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….. 0.95 100% Date: May 12, 2017 Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….. 0.50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Design Point Basin IDs Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. b B1 and B2 51612 1.18 0.00 0.38 0.17 0.00 0.08 0.56 0.59 0.59 0.73 42% COMBINED DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS **Soil Classification of site is Sandy Loam** 10-year Cf = 1.00 Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. Page 4 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Comb-C-Values Overland Flow, Time of Concentration: Project: West Village Off Taft Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, Rational Method Equation: Project: West Village Off Taft Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: b B1 and B2 1.18 9 9 7 0.59 0.59 0.73 2.35 4.02 9.06 1.6 2.8 7.8 Flow, Q100 (cfs) C2 C10 C100 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) COMBINED DEVELOPED RUNOFF COMPUTATIONS B. Mathisen May 12, 2017 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) Flow, Q2 (cfs) Flow, Q10 (cfs) Q = C f ( C )( i )( A ) Page 6 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Comb-Direct-Runoff DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) a1 A1 1.17 0.39 0.48 16.3 14.6 0.82 3.73 b1 B1 0.73 0.66 0.83 6.1 5.0 1.30 6.03 b1 B2 0.45 0.46 0.58 10.0 8.5 0.46 2.14 Page 7 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\SUMMARY-TABLE APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Detention Facilities APPENDIX B.1 DETENTION FACILITIES Pond No : a2 100-yr 0.48 13.00 min 6390 ft3 1.17 acres 0.147 ac-ft Max Release Rate = 0.26 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 1674 1.00 0.26 78 1596 10 7.720 2597 1.00 0.26 156 2441 15 6.520 3290 0.93 0.24 218 3071 20 5.600 3768 0.83 0.21 257 3510 25 4.980 4188 0.76 0.20 296 3892 30 4.520 4561 0.72 0.19 335 4226 35 4.080 4804 0.69 0.18 374 4429 40 3.740 5032 0.66 0.17 413 4619 45 3.460 5237 0.64 0.17 452 4785 50 3.230 5433 0.63 0.16 491 4941 55 3.030 5606 0.62 0.16 530 5075 60 2.860 5772 0.61 0.16 569 5203 65 2.720 5947 0.60 0.16 608 5339 70 2.590 6099 0.59 0.15 647 5451 75 2.480 6257 0.59 0.15 686 5570 80 2.380 6405 0.58 0.15 725 5679 85 2.290 6548 0.58 0.15 764 5783 90 2.210 6691 0.57 0.15 803 5887 95 2.130 6807 0.57 0.15 842 5964 100 2.060 6930 0.57 0.15 881 6048 105 2.000 7064 0.56 0.15 920 6144 110 1.940 7178 0.56 0.15 959 6219 115 1.890 7311 0.56 0.14 998 6313 120 1.840 7427 0.55 0.14 1037 6390 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1076-001 West Village Off Taft Project Number : Project Name : Pond A A = Project Title Date: Project Number Calcs By: Client Pond Designation Invert Elevation Water Quality Volume 100-yr Detention Volume Total Pond Volume Min Sc D = Depth between contours (ft.) A1 = Surface Area lower contour (ft 2 ) t A2 = Surface Area upper contour (ft 2 ) Area/Row No. of Rows 5082.20 170.82 0.14 7.97 7.97 0.0002 5082.40 798.07 0.20 89.21 97.18 0.0022 5082.60 1565.84 0.20 232.12 329.30 0.0076 5082.80 2502.34 0.20 403.18 732.47 0.0168 WQCV 5083.00 3616.63 0.20 608.49 1340.96 0.0308 5083.20 4557.27 0.20 815.58 2156.54 0.0495 5083.40 5166.43 0.20 971.73 3128.27 0.0718 5083.60 5640.89 0.20 1080.38 4208.66 0.0966 5083.80 6251.10 0.20 1188.68 5397.34 0.1239 5084.00 6821.74 0.20 1306.87 6704.20 0.1539 100-yr Vol 5084.20 7394.76 0.20 1421.26 8125.47 0.1865 Total Vol 5084.40 7980.53 0.20 1537.16 9662.63 0.2218 5084.60 8508.61 0.20 1648.63 11311.26 0.2597 5084.80 11116.06 0.20 1956.67 13267.93 0.3046 Elevation Depth Volume WQCV 5082.65 0.59 0.0100 100-yr Detention 5083.95 1.89 0.1470 Overall Detention 5084.02 1.96 0.1570 Circular Perforation Sizing Dia (in.) 1 Pond A 0.05 5 0.0100 ac-ft 5082.06 ft Pond A Volume Elevation (ft) n 1/4 0.027 sq-in Surface Area (ft 2 ) Total Outlet Area 0.25 sq. in. Taft Hill Village 5/15/2017 1076-001 B. Mathisen 0.1570 ac-ft Project Title Date: Project Number Calcs By: Client Pond Designation Q = 1.26 cfs C = 0.605 Q = Release Rate (cfs) Eh = 5084.12 ft C = Discharge Coefficients (unitless) Ei = 5082.06 ft Aa = Area Allowed of Opening (ft2) g = Gravity (32.2 ft/s2) 0.180817 ft2 Eh = High Water Surface Elevation (ft) 26.03761 in2 Ei = Elevation of Outlet Invert (ft) H = Height of Opening (in.) R = Inner Radius of Outfall Pipe (in.) Δ = Top of Plate to Center of Pipe (in.) S = Arc Length of Open Area (in.) Ac = Area of Opening (in2) θ = Angle of Plate on Pipe to Center Pipe (radians) Calculated Area of Opening (Ac) Design Height of Opening (H) Proposed Outfall Pipe Diameter 24.74 sq. in. B. Mathisen May 15, 2017 Aa = 3-1/4 in 12 in 1076-001 West Village Off Taft Pond A [ ( ( ) ) ] 2 2 R Sin S R R S K − = QCA = 2 g ( E h − E i ) S = R θ ( ) ( R ) Cos R Cos → = ∆ = ∆ 2 −1 θ 2 θ Ac = π R 2 − K Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, May 15 2017 Pond A - Emergency Overflow Weir Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 15.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 15.47 Highlighted Depth (ft) = 0.46 Q (cfs) = 15.47 Area (sqft) = 7.75 Velocity (ft/s) = 2.00 Top Width (ft) = 18.68 0 2 4 6 8 10 12 14 16 18 20 22 24 Depth (ft) Pond A - Emergency Overflow Weir Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft) Weir W.S. Pond No : b1 100-yr 0.73 9.00 min 7542 ft3 1.18 acres 0.173 ac-ft Max Release Rate = 1.00 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 2571 1.00 1.00 300 2271 10 7.720 3990 0.95 0.95 570 3420 15 6.520 5055 0.80 0.80 720 4335 20 5.600 5789 0.73 0.73 870 4919 25 4.980 6435 0.68 0.68 1020 5415 30 4.520 7008 0.65 0.65 1170 5838 35 4.080 7380 0.63 0.63 1320 6060 40 3.740 7732 0.61 0.61 1470 6262 45 3.460 8047 0.60 0.60 1620 6427 50 3.230 8347 0.59 0.59 1770 6577 55 3.030 8613 0.58 0.58 1920 6693 60 2.860 8869 0.58 0.58 2070 6799 65 2.720 9138 0.57 0.57 2220 6918 70 2.590 9370 0.56 0.56 2370 7000 75 2.480 9613 0.56 0.56 2520 7093 80 2.380 9841 0.56 0.56 2670 7171 85 2.290 10060 0.55 0.55 2820 7240 90 2.210 10280 0.55 0.55 2970 7310 95 2.130 10458 0.55 0.55 3120 7338 100 2.060 10647 0.55 0.55 3270 7377 105 2.000 10854 0.54 0.54 3420 7434 110 1.940 11029 0.54 0.54 3570 7459 115 1.890 11234 0.54 0.54 3720 7514 120 1.840 11412 0.54 0.54 3870 7542 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1076-001 West Village Off Taft Project Number : Project Name : Pond B A = Project Title Date: Project Number Calcs By: Client Pond Designation Invert Elevation Water Quality Volume 100-yr Detention Volume Total Pond Volume Min Sc D = Depth between contours (ft.) A1 = Surface Area lower contour (ft 2 ) t A2 = Surface Area upper contour (ft 2 ) Area/Row No. of Rows 5083.20 194.77 0.17 10.91 10.91 0.0003 5083.40 811.59 0.20 93.60 104.50 0.0024 5083.60 1718.55 0.20 247.41 351.91 0.0081 WQCV 5083.80 2931.71 0.20 459.66 811.57 0.0186 5084.00 4439.40 0.20 731.92 1543.49 0.0354 5084.20 5751.29 0.20 1016.24 2559.73 0.0588 5084.40 6558.62 0.20 1230.11 3789.84 0.0870 5084.60 6861.29 0.20 1341.88 5131.71 0.1178 5084.80 7146.38 0.20 1400.67 6532.38 0.1500 5085.00 7465.95 0.20 1461.12 7993.50 0.1835 Total Vol 5085.20 7820.36 0.20 1528.49 9522.00 0.2186 5085.40 8188.25 0.20 1600.72 11122.72 0.2553 5085.60 9272.45 0.20 1744.95 12867.66 0.2954 Elevation Depth Volume WQCV 5083.50 0.47 0.0053 100-yr Detention 5084.94 1.91 0.1730 Overall Detention 5084.97 1.94 0.1783 Required Area Per Row Total Vol. (ac-ft) Total Vol. (ft3) Incremental Vol. (ft3) Incremental Depth (ft) Surface Area (ft2) Total Outlet Area 0.25 sq. in. Taft Hill Village 5/15/2017 1076-001 B. Mathisen 0.1783 ac-ft 0.1730 ac-ft Pond B 0.05 5 0.0053 ac-ft 5083.03 ft Pond B Volume Project Title Date: Project Number Calcs By: Client Pond Designation Q = 1.00 cfs C = 0.605 Q = Release Rate (cfs) Eh = 5084.83 ft C = Discharge Coefficients (unitless) Ei = 5083.03 ft Aa = Area Allowed of Opening (ft2) g = Gravity (32.2 ft/s2) 0.153606 ft2 Eh = High Water Surface Elevation (ft) 22.1192 in2 Ei = Elevation of Outlet Invert (ft) H = Height of Opening (in.) R = Inner Radius of Outfall Pipe (in.) Δ = Top of Plate to Center of Pipe (in.) S = Arc Length of Open Area (in.) Ac = Area of Opening (in2) θ = Angle of Plate on Pipe to Center Pipe (radians) 3 in 12 in 1076-001 West Village Off Taft Pond B Calculated Area of Opening (Ac) Design Height of Opening (H) Proposed Outfall Pipe Diameter 22.11 sq. in. B. Mathisen May 15, 2017 Aa = [ ( ( ) ) ] 2 2 R Sin S R R S K − = Q = CA 2 g ( E h − E i ) S = R θ ( ) ( R ) Cos R Cos → = ∆ = ∆ 2 −1 θ 2 θ Ac = π R 2 − K Weir Report Hydraflow Express Extension for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Monday, May 15 2017 Pond B - Emergency Overflow Weir Trapezoidal Weir Crest = Sharp Bottom Length (ft) = 10.00 Total Depth (ft) = 0.50 Side Slope (z:1) = 4.00 Calculations Weir Coeff. Cw = 3.10 Compute by: Known Q Known Q (cfs) = 10.92 Highlighted Depth (ft) = 0.46 Q (cfs) = 10.92 Area (sqft) = 5.45 Velocity (ft/s) = 2.00 Top Width (ft) = 13.68 0 2 4 6 8 10 12 14 16 18 Depth (ft) Pond B - Emergency Overflow Weir Depth (ft) -0.50 -0.50 0.00 0.00 0.50 0.50 1.00 1.00 Length (ft) Weir W.S. APPENDIX C WATER QUALITY DESIGN COMPUTATIONS Project Title Date: Project Number Calcs By: Client Pond Designation 1 WQCV = Watershed inches of Runoff (inches) 17.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.103 in A = 1.17 ac V = 0.0100 ac-ft 435.35 cu. ft. V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) West Village Off Taft May 15, 2017 1076-001 B. Mathisen Pond A Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event 0.103 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq /100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV    Project Title Date: Project Number Calcs By: Client Pond Designation 1 WQCV = Watershed inches of Runoff (inches) 27.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.142 in A = 0.45 ac V = 0.0053 ac-ft 231.57 cu. ft. V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event West Village Off Taft May 15, 2017 1076-001 B. Mathisen Pond B 0.142 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq /100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV    Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia Ia = 53.0 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.530 C) Tributary Watershed Area ATotal = 31,938 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 3,445 sq ft (Minimum recommended permeable pavement area = 6691 sq ft) E) Impervious Tributary Ratio RT = 4.4 IMPERVIOUS TRIBUTARY RATIO EXCEEDS 2.0 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 457 cu ft (WQCV = (0.8 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal = cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 18.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.30 D) Slope of the Base Course/Subgrade Interface S = ft / ft E) Length Between Lateral Flow Barriers L = ft F) Volume Provided Based on Depth of Base Course V = 1,464 cu ft Flat or Stepped: V = P * ((Dmin-1)/12) * Area Sloped: V = P * [(Dmin - (Dmin - 6*SL-1)) / 12] * Area 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 1 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? (Recommeded for PICP, concrete grid pavement, or for any no-infiltration section.) West Village Off Taft Basin B1 Design Procedure Form: Permeable Pavement Systems (PPS) Blaine Mathisen Northern Engineering May 15, 2017 Choose One No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) Detention Vault no Underdrain C) Distance from the Lowest Elevation of the Storage Volume y = 0.1 ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV = 5.31 inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice = 0.95 inches (Use a minimum orifice diameter of 3/8-inches) Notes: West Village Off Taft Design Procedure Form: Permeable Pavement Systems (PPS) Blaine Mathisen Northern Engineering May 15, 2017 Basin B1 Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A 1076-001 Basin B1 PAVER UD-BMP_v3.02.xls, PPS 5/15/2017, 1:31 PM APPENDIX D EROSION CONTROL REPORT South Taft Hill Final Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CB2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET HISTORIC DRAINAGE EXHIBIT PROPOSED DRAINAGE EXHIBIT CONTROL CONTROL IRR IRR G CTV G G W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOT 5 OWNER: BLACK J/M/S OWNER: BLACK M/J LOT 8 LOT 21 LOT 22 LOT 23 VILLAGE WEST NINTH FILING VILLAGE WEST FOURTH FILING VILLAGE WEST THIRD FILING LOT 1 LOT 2 LOT 3 LOT 4 LOT 6 LOT 5 LOT 4 SOUTH TAFT HILL (ROW VARIES) B1 A1 a1 B2 UD UD UD UD UD UD UD UD b1 20' EMERGENCY 12' UTILITY ACCESS EASEMENT EASEMENT 15' DRAINAGE EASEMENT 6' UTILITY EASEMENT CONTROL CONTROL IRR IRR G CTV CTV CTV CTV CTV CTV G G T T T T T W X S S M W X X X X SS SS SS SS SS M X X X X X X X X X X X X X X X X X X X X X X X X X 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W H1 LOT 5 OWNER: BLACK J/M/S OWNER: BLACK M/J LOT 8 LOT 21 LOT 22 LOT 23 VILLAGE WEST NINTH FILING VILLAGE WEST FOURTH FILING VILLAGE WEST THIRD FILING LOT 1 LOT 2 LOT 3 LOT 4 LOT 6 LOT 5 LOT 4 SOUTH TAFT HILL (ROW VARIES) h1 Sheet of 15 WEST VILLAGE OFF TAFT These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com 4:1 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A2 a3 FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION 1. REFER TO THE "FINAL DRAINAGE REPORT FOR WEST VILLAGE OFF TAFT" BY NORTHERN ENGINEERING, DATED 05/16/2017 FOR ADDITIONAL INFORMATION. ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 LEGEND: LEGEND: C7.01 HISTORIC DRAINAGE EXHIBIT 15 SUMMARY TABLE: DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) h1 H1 2.35 0.28 0.35 14.6 13.7 1.26 5.68 LOT 1 LOT 8 LOT 7 LOT 6 LOT 5 LOT 4 LOT 3 LOT 2 TRACT A WQCV EXTENTS WQCV EXTENTS 5' CURB CUT POND B STORAGE VOLUME=7993.5 CU. FT. 100-YR ELEV.=5084.94 WQCV ELEV.=5083.50 POND A STORAGE VOLUME=9662.63 CU. FT. 100-YR ELEV.=5083.95 WQCV ELEV.=5082.65 FES A1 OUTLET STRUCTURE EXISTING INLET GRATE EXISTING DECID. TREE EXISTING CONIF. TREE EXISTING LIGHT POLE EXISTING STUMP EXISTING CURB/GUTTER FLOWLINE 4950 4:1 BANK SLOPE PROPOSED OVERLAND FLOW DIRECTION CONCENTRATED FLOW DIRECTION PROPOSED CONTOUR EXISTING CONTOUR CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A2 a3 DRAINAGE BASIN AREA DESIGN POINT DRAINAGE BASIN ID DRAINAGE BASIN MINOR/MAJOR COEFF. FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION 1. REFER TO THE "FINAL DRAINAGE REPORT FOR WEST VILLAGE OFF TAFT" BY NORTHERN ENGINEERING, DATED 05/16/2017 FOR ADDITIONAL INFORMATION. LID TABLE: Sheet of 15 WEST VILLAGE OFF TAFT These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C7.00 DRAINAGE EXHIBIT ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 14 LEGEND: LEGEND: TOP OF POND ELEVATION DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) a1 A1 1.17 0.39 0.48 16.3 14.6 0.82 3.73 b1 B1 0.73 0.66 0.83 6.1 5.0 1.30 6.03 b1 B2 0.45 0.46 0.58 10.0 8.5 0.46 2.14 SUMMARY TABLE: WQCV ELEVATION PROPOSED POROUS PAVERS Design Point Basin ID Basin Area Treatment Type LID System Impervious Area Treated by LID System Percent of Impervious Area Treated by LID System a1 A1 1.168 ac. Extended Detention No 0.227 ac. 0.00% b1 B1 0.733 ac. Pavers Yes 0.493 ac. 57.59% b1 B2 0.452 ac. Extended Detention No 0.136 ac. 0.00% Total 2.353 ac. 0.856 ac. 58% PROPOSED 18" VERTICAL CURB AND GUTTER PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel 1076-001 Basin B1 PAVER UD-BMP_v3.02.xls, PPS 5/15/2017, 1:31 PM    = 40 hr    = 40 hr Elevation (ft) n 1/4 0.014 sq-in Circular Perforation Sizing Dia (in.) 1 Calc. Depths ( ) 3 D * A 1 A 2 A 1 * A 2 V = + + Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1076-001_DetentionVolume_PondB_FAAModified Method.xls 0.1470 ac-ft Required Area Per Row Total Vol. (ac-ft) Total Vol. (ft 3 ) Incremental Vol. (ft 3 ) Incremental Depth (ft) Calc. Depths ( ) 3 D * A 1 A 2 A 1 * A 2 V = + + Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1076-001_DetentionVolume_PondA_FAAModified Method.xls S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) b B1 and B2 No 0.59 0.59 0.73 113 3.00% 7.1 7.1 5.1 255 1.60% 2.53 1.7 N/A N/A 9 9 7 COMBINED DEVELOPED TIME OF CONCENTRATION COMPUTATIONS B. Mathisen May 12, 2017 Design Point Basin IDs Overland Flow Gutter/Pipe Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 5 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Comb-Tc-10-yr_&_100-yr S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) a1 A1 No 0.39 0.39 0.48 95 1.20% 12.2 12.2 10.6 N/A N/A 380 1.10% 1.57 4.0 16 16 15 b1 B1 No 0.66 0.66 0.83 113 2.90% 6.1 6.1 3.8 N/A N/A N/A N/A N/A 6 6 5 b1 B2 No 0.46 0.46 0.58 75 1.90% 8.4 8.4 6.8 255 1.60% 2.53 1.7 N/A N/A N/A 10 10 9 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter/Pipe Flow Swale Flow Design Point Basin Overland Flow B. Mathisen May 12, 2017 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 2 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Tc-10-yr_&_100-yr 10-year Cf = 1.00 May 12, 2017 **Soil Classification of site is Clay Loam** Page 1 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\C-Values S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) h1 H1 No 0.28 0.28 0.35 100 3.00% 10.6 10.6 9.7 N/A N/A 380 1.10% 1.57 4.0 15 15 14 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter/Pipe Flow Swale Flow Design Point Basin Overland Flow B. Mathisen May 12, 2017 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 2 of 23 D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\Tc-10-yr_&_100-yr May 12, 2017 **Soil Classification of site is Clay Loam** Page 1 of 23 D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\C-Values