Loading...
HomeMy WebLinkAbout2106 S. TAFT HILL ROAD (WEST VILLAGE OFF TAFT) - FDP - FDP170015 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number: 1076-001 Location: Fort Collins, CO Date: May 16, 2017 Total Acres: 2.35 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price each 2 $100.00 $200.00 L.F. 1568 $1.10 $1,724.80 Wattle Dikes each 20 $125.00 $2,500.00 each 3 $125.00 $375.00 each 1 $300.00 $300.00 each 1 $200.00 $200.00 Erosion Control Matting sq. yd. 497 $3.00 $1,491.00 acre 1.5 $1,000.00 $1,500.00 TOTAL = $8,290.80 TOTAL = $12,436.20 TOTAL = $3,525.00 REQUIRED AMOUNT OF SECURITY = $12,436.20 NOTE: 'Total Acres' represents total disturbed area. Concrete Washout Area Silt Fence - OR - COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5 (WHICHEVER IS GREATER) West Village Off Taft Erosion Control Cost Estimate Vehicle Tracking Control Pads AMOUNT OF SECURITY = 1.5 x $8,290.80 Vegetate Landscaped Areas Inlet Protection Rock Socks = = D:\Projects\1076-001\Drainage\Erosion\1076-001_Erosion-Escrow-Estimate.xls