HomeMy WebLinkAboutSOUTH COLLEGE STORAGE (6020 S. COLLEGE) - PDP - PDP170012 - PLANS - UTILITY PLANSFossil Creek Pkwy.
Lemay Ave.
South College Ave.
Skyway Dr.
8' TRAVEL TRAVEL 8'
MARS DRIVE
PARK PARK
WALK
(MIN)
5'
76' ROW (MIN.)
50' ROADWAY
LN. 11'
BIKE
6'
8'
5' WALK
(MIN)
PKWY
6'
LN.
BIKE
(MIN.)
8'
11'
ESM'T.
UTIL.
9'
9' UTIL.
ESM'T.
PKWY
(MIN.)
MAJOR COLLECTOR
(10+00.00 - 15+14.80)
FUTURE
TRAVEL 8'
SKYWAY DR.
PARK
36' HALF ROW (MIN.)
25' ROADWAY
5' WALK
(MIN)
PKWY
5'
LN.
BIKE
(MIN.)
6'
12'
9' UTIL.
ESM'T.
HALF OF COMMERCIAL LOCAL
(10+00.00 - 19+61.89)
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
A. GENERAL NOTES
1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer
County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the
specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort
Collins.
2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise.
3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer.
Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of
any work shown in these plans.
4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as
beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins
Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer
hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and
demands which may arise from any errors and omissions contained in these plans.
5. All storm sewer construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and
specifications current at the date of approval of the plans by the City of Fort Collins Engineer.
6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of
the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The
Developer shall be responsible for unknown underground utilities.
7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning
excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be
located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be
the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans.
8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any
utility crossings required.
9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer
to modify the design. Design modification(s) must be approved by the City of Fort Collins prior to beginning construction.
10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is
accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all
parties affected by any disruption of any utility service as well as the utility companies.
SKYWAY DRIVE
(80' R.O.W.)
SOUTH COLLEGE AVENUE
(ROW VARIES)
OWNER: TRILBY HOLDINGS
GROUP LLC
OWNER: TRILBY HOLDINGS
GROUP LLC
BARB WIRE
FENCE
GATE
CONCRETE
IRRIGATION
STRUCTURE
EXISTING 12'
DIRT ROAD
EXISTING 30" FES
FL ELEV: 4997.75
15.00 LF 30" RCP @ 7.67%
EX. STORM INLET
RIM=5005.55
INV IN=4997.99 (N)
INV IN=4996.60 (W)
INV OUT=4996.35 (E)
SPEED LIMIT 55 MPH
EX. SAN MH 3
RIM=5016.40
INV IN=5003.30 (S)
INV OUT=5003.19 (E)
BM 2-12
ELEV=5005.56
20' UTILITY
EASEMENT
20' UTILITY
EASEMENT
BUS STOP
"BUS STOP"
SIGN
OVERHEAD
UTILITY
EXISTING
FIRE HYDRANT
EX. SAN MH 4
RIM=5014.90
INV. IN=5005.29 (SE)
INV. OUT=5004.73 (N)
EX. SAN MH 5
RIM=5012.38
INV. IN=5006.54 (S)
INV. OUT=5006.44 (NW)
EX SAN MH 6
RIM=5016.24
INV. IN=5007.45 (SW)
INV. OUT=5007.26 (N)
ABANDONED
IRRIGATION
DITCH
BARB WIRE
FENCE
± 720 LF OF
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
SS
SS
SS
S
G
G
G G G G G G G
G
G G
UD
W
W
W W W
W
W
W
W W
W
W W
W W
W
W
W W
W F
E
E
E
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
UD
VAULT
ELEC ELEC
T S
B M
CABLE
D
VAULT
ELEC
V.P.
V.P.
V.P.
V.P.
V.P. V.P.
F
E
S
ST
X
X X
X
X X
E
E
E
E
E
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD LOD LOD LOD
LOD
LOD
LOD LOD
OWNER: TRILBY HOLDING
GROUP LLC
MARS DRIVE
50' - 76' ROW
5' SIDEWALK
9' UTILITY
EASEMENT
TEMPORARY
CUL-DE-SAC
9' UTILITY EASEMENT
X
X
X
X
X
X
SAWCUT
FUTURE ℄
30" VERTICAL
CURB AND GUTTER
FUTURE 30" VERTICAL
CURB AND GUTTER
5' FUTURE
SIDEWALK
RAMP
RAMP
RAMP
30" VERTICAL
9' UTILITY CURB AND GUTTER
EASEMENT
30" VERTICAL
CURB AND GUTTER
5' SIDEWALK
6' CROSS PAN
STA.=10+27.00
STA.=16+18.54
SKYWAY DRIVE
MARS DRIVE
50' -
ULTIMATE DESIGN
END SIDEWALK
W/ TYPE III
BARRICADE
END CURB
AND GUTTER
TRANSITION TO CUL-DE-SAC
STA.=15+14.80
LOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
10+00
16+00 15+00 14+00
19+00 18+00 17+00
20+00
PI = 10+20.79
PI = 15+73.44
PI = 15+93.54
PI = 16+43.54
PI = 16+63.64
PI = 19+61.89 PI = 19+18.35
STA.=16+18.54
SKYWAY DRIVE MARS DRIVE
30" VERTICAL
CURB AND GUTTER
SAWCUT
EXISTING
EDGE OF
ASPHALT
SKYWAY DRIVE
(80' R.O.W.)
MARS DRIVE
(SEE SHEET C3.01)
TIE TO EXISTING
RAMP RAMP
8' CROSS PAN
5' SIDEWALK
9' UTILITY EASEMENT
80' ROW
VAULT
ELEC ELEC
T S
B M
CABLE
VAULT
ELEC
V.P.
V.P.
V.P.
V.P.
X
X X X
X
X
X
X
X
X
X
X
X X
X
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
10+50
4998
5000
5004
5008
5012
4998
5000
5004
5008
5012
-40 -20 0 20 40
2.17%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
11+00
4998
5000
5004
5008
5012
4998
5000
5004
5008
5012
-40 -20 0 20 40
3.91%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
11+50
4998
5000
5004
5008
5012
5016
4998
5000
5004
5008
5012
5016
-40 -20 0 20 40
1.83%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
12+00
5002
5004
VAULT
ELEC ELEC
T S
B M
CABLE
D
VAULT
ELEC
V.P.
V.P.
V.P.
V.P.
V.P. V.P.
F
E
S
ST
H
Y
D
X X
X
X
X X
X
X
X
X
X
X
X
X
X X X
X
X X
X
X
X
X
X
X
X X
X
X X
X X X
X
X
OHU OHU OHU
OHU OHU OHU
OHU
OHU
OHU OHU OHU
OHU
OHU
X X X
X
X
X
X X X
X
X
X
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD
LOD LOD
LOD
LOD
LOD
LOD
UD
F
FDC
m5
(16.0:1)
(11.8:1)
(15.7:1)
(15.7:1)
(17.2:1)
(15.7:1)
(10.3:1)
(13.1:1)
(10.8:1)
m4
m2
m1
h1
OS
HISTORIC FLOWS
FROM NEIGHBORHOOD
TO THE WEST
EXISTING FLARED
END SECTION
DETENTION POND M
WQCV ELEV. = 5021.82 FT.
100-YEAR ELEV. = 5025.09 FT.
TOTAL VOLUME = 5645.24 CU. FT.
RAIN GARDEN M
SKYWAY DRIVE
(80' R.O.W.)
MARS DRIVE
SOUTH COLLEGE AVENUE
(ROW VARIES)
INLET
INLET
INLET
INLET
INLET
EXISTING
DRAINAGE WAY
m7 m6
M1
W1 E1
OS1
M2
M3
M4
M5
M6
M7
INLET
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
C4.00
DRAINAGE EXHIBIT
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
City Engineer Date
Date
Date
Date
Date
Stormwater Utility
Parks & Recreation
Traffic Engineer
Date
Water & Wastewater Utility
City of Fort Collins, Colorado
UTILITY PLAN APPROVAL
Environmental Planner
1. REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR SKYWAY STORAGE" BY
NORTHERN ENGINEERING, DATED MAY 10, 2017 FOR ADDITIONAL INFORMATION.
NOTES:
EXISTING INLET GRATE
EXISTING DECID. TREE
EXISTING CONIF. TREE
EXISTING LIGHT POLE
EXISTING STUMP
EXISTING CURB/GUTTER FLOWLINE
A2
a3
4:1
79.45
HP
SLOPE
PROPOSED OVERLAND FLOW DIRECTION
CONCENTRATED FLOW DIRECTION
EXISTING STORM DRAIN
FUTURE CURB AND GUTTER
PROPOSED STORM DRAIN
DRAINAGE BASIN
PROPOSED CONTOUR
PROPOSED FLOWLINE ELEVATION
EXISTING CONTOUR
DRAINAGE BASIN MINOR/MAJOR COEFF.
DESIGN POINT
DRAINAGE BASIN ID
DRAINAGE BASIN AREA
EXISTING OVERLAND FLOW DIRECTION
RUNOFF SUMMARY TABLE:
FOR DRAINAGE REVIEW ONLY
NOT FOR CONSTRUCTION
LEGEND:
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
ST
08
DESIGN
POINT
BASIN
ID
TOTAL
AREA
(acres)
h1 E1 4.81 0.25 0.31 20.0 18.6 1.93 8.77
m1 M1 0.62 0.85 1.00 5.0 5.0 1.50 6.15
m2 M2 0.26 0.82 1.00 5.0 5.0 0.60 2.54
M3 0.83 0.95 1.00 5.0 5.0 2.24 8.23
m4 M4 0.33 0.81 1.00 5.0 5.0 0.77 3.32
m5 M5 1.09 0.26 0.33 5.0 5.0 0.81 3.55
m6 M6 0.29 0.71 0.89 5.0 5.0 0.59 2.58
m7 M7 0.22 0.88 1.00 5.0 5.0 0.56 2.21
h1 W1 4.12 0.27 0.34 26.0 23.8 1.58 7.27
h1 OS1 0.44 0.31 0.39 13.5 12.2 0.27 1.21
PROPOSED UNDERDRAIN UD
PROPOSED CURB AND GUTTER
5008
5012
5016
5002
5004
5008
5012
5016
-40 -20 0 20 40
1.90%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
13+00
5006
5008
5012
5016
5020
5024
5006
5008
5012
5016
5020
5024
-40 -20 0 20 40
2.51%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
13+50
5010
5012
5016
5020
5024
5028
5010
5012
5016
5020
5024
5028
-40 -20 0 20 40
2.47%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
14+00
5014
5016
5020
5024
5028
5032
5014
5016
5020
5024
5028
5032
-40 -20 0 20 40
2.73%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
14+50
5018
5020
5024
5028
5032
5036
5018
5020
5024
5028
5032
5036
-40 -20 0 20 40
2.08%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
15+50
5022
5024
5028
5032
5036
5040
5022
5024
5028
5032
5036
5040
-40 -20 0 20 40
2.04%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
16+00
5026
5028
5032
5036
5040
5044
5026
5028
5032
5036
5040
5044
-40 -20 0 20 40
2.83%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
16+50
5026
5028
5032
5036
5040
5044
5026
5028
5032
5036
5040
5044
-40 -20 0 20 40
1.95%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
17+00
5026
5028
5032
5036
5040
5044
5026
5028
5032
5036
5040
5044
-40 -20 0 20 40
3.63%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
18+00
5030
5032
5036
5040
5044
5030
5032
5036
5040
5044
-40 -20 0 20 40
2.67%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
18+50
5030
5032
5036
5040
5044
5048
5030
5032
5036
5040
5044
5048
-40 -20 0 20 40
2.98%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
19+00
5030
5032
5036
5040
5044
5048
5030
5032
5036
5040
5044
5048
-40 -20 0 20 40
2.66%
FLOW
LINE
Horizontal Scale 1" = 20'
Vertical Scale 1" = 2'
19+50
5030
5032
5036
5040
5044
5048
5030
5032
5036
5040
5044
5048
-40 -20 0 20 40
2.00%
5005.6
5005.62
5007.0
5007.00
5008.7
5008.68
5011.0
5010.98
5017.5
5017.46
5021.3
5021.31
5025.2
5025.16
5028.7
5028.74
5033.5
5033.46
5035.3
5035.26
5036.7
5036.69
5037.3
5037.25
5039.0
5038.95
5039.7
5039.70
5040.4
5040.35
5041.1
5041.10
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
EXISTING RIGHT-OF-WAY
LEGEND:
PROPOSED STORM SEWER
EXISTING STORM SEWER
EXISTING EDGE OF ASPHALT / / / / / / / /
PROPOSED CURB & GUTTER
PROPOSED CENTERLINE
PROPOSED CONCRETE
CROSSPAN (TYP.)
PROPOSED RIGHT-OF-WAY
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND
RECOMMENDATIONS.
3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE.
IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING
LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS.
4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50
FEET.
5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN
THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN
ACCORDANCE WITH TOWN STREET REPAIR STANDARDS.
6. SEE SHEETS C4.17-C4.18 FOR INTERSECTION DETAILS
PROPOSED STORM INLET
PROPERTY BOUNDARY
PROPOSED LOT LINE
EASEMENT LINE
SAWCUT LINE
EXISTING LOT LINE
08
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
0
1 INCH = 20 FEET
20 20 40 60
C3.03
PLAN, PROFILE, & CROSS SECTIONS
SKYWAY DRIVE
X
G
X X X
5' SIDEWALK
TIE TO EXISTING
COLLEGE AVENUE
MARS
DRIVE
EXISTING
EDGE OF
ASPHALT
SAWCUT
25' ℄-
STA.=10+27.00
5000
5005
5010
5015
5020
5025
5030
5035
5040
5045
5050
5000
5005
5010
5015
5020
5025
5030
5035
5040
5045
5050
20+00 19+00 18+00 17+00 16+00 15+00 14+00 13+00 12+00 11+00 10+00 9+75
2.60%
1.60%
1.30%
2.90%
2.80%
1.70%
7.70%
144.0' VC
PVI STA = 14+82.40
PVI ELEV = 5031.50
BVCS: 14+10.40
BVCE: 5025.96
EVCS: 15+54.40
EVCE: 5033.59
A.D. = 4.80
K = 30.00
196.0' VC
PVI STA = 12+00.99
PVI ELEV = 5009.83
BCVS: 11+02.99
BVCE: 5007.09
ECVS: 12+98.99
EVCE: 5017.38
A.D. = 4.90
K = 40.00
PVI STA = 10+00.00
PVI ELEV = 5004.32
PVI STA = 16+53.63
PVI ELEV = 5036.47
PVI STA = 18+25.00
PVI ELEV = 5039.38
PVI STA = 19+61.89
PVI ELEV = 5041.29
5004.32
5004.97
5005.62
5006.30
5007.00
5007.76
5008.68
5009.75
5010.98
5012.36
5013.91
5015.60
5017.46
5019.38
5021.31
5023.23
5025.16
5027.04
5028.74
5030.23
5031.52
5032.59
5033.46
5034.19
5034.91
5035.64
5036.36
5036.83
5037.25
5037.68
5038.10
5038.53
5038.95
5039.38
5039.70
5040.03
5040.35
5040.70
5041.10
EXISTING
GRADE
PROPOSED
GRADE
PROPOSED
GRADE
EXISTING
GRADE
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
EXISTING RIGHT-OF-WAY
LEGEND:
PROPOSED STORM SEWER
EXISTING STORM SEWER
EXISTING EDGE OF ASPHALT / / / / / / / /
PROPOSED CURB & GUTTER
PROPOSED CENTERLINE
PROPOSED CONCRETE
CROSSPAN (TYP.)
PROPOSED RIGHT-OF-WAY
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND
RECOMMENDATIONS.
3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE.
IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING
LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS.
4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50
FEET.
5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN
THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN
ACCORDANCE WITH TOWN STREET REPAIR STANDARDS.
6. SEE SHEETS C4.17-C4.18 FOR INTERSECTION DETAILS
PROPOSED STORM INLET
PROPERTY BOUNDARY
PROPOSED LOT LINE
EASEMENT LINE
SAWCUT LINE
EXISTING LOT LINE
07
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
C3.02
PLAN, PROFILE, & CROSS SECTIONS
SKYWAY DRIVE
LEFT FLOWLINE
SKYWAY DRIVE
SCALE : 1" = 30' (H) 1" = 5' (V)
R50' TEMPORARY
CUL-DE-SAC
SKYWAY DRIVE
(80' R.O.W.)
(SEE SHEET C3.02)
5030
5035
5040
5045
5050
5055
5030
5035
5040
5045
5050
5055
9+50 10+00 11+00 12+00 13+00 14+00 15+00 16+00 16+75
PVI STA = 10+00.16
PVI ELEV = 5036.02
PVI STA = 11+06.16
PVI ELEV = 5037.82
PVI STA = 16+55.93
PVI ELEV = 5041.21
120.0' VC
HP ELEV = 5039.78
HP STA = 12+90.34
PVI STA = 12+61.92
PVI ELEV = 5040.00
BVCS: 12+01.92
BVCE: 5039.16
EVCS: 13+21.92
EVCE: 5039.70
A.D. = 1.90
K = 63.16
120.0' VC
LP ELEV = 5039.13
LP STA = 14+53.05
PVI STA = 14+79.77
PVI ELEV = 5038.91
BCVS: 14+19.77
BVCE: 5039.21
ECVS: 15+39.77
EVCE: 5039.69
A.D. = 1.80
K = 66.57
1.80%
1.30%
1.40%
-0.50%
5036.36
5036.81
5037.26
5037.71
5038.08
5038.43
5038.78
5039.13
5039.44
5039.65
5039.76
5039.77
5039.68
5039.56
5039.43
5039.31
5039.19
5039.13
5039.16
5039.29
5039.52
5039.83
5040.15
5040.48
5040.80
5041.13
EXISTING
GROUND
PROPOSED
GRADE
EXISTING
GROUND
PROPOSED
GRADE
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
EXISTING RIGHT-OF-WAY
LEGEND:
PROPOSED STORM SEWER
LIMITS OF DISTURBANCE LOD
FUTURE CURB & GUTTER
PROPOSED CENTERLINE
PROPOSED CONCRETE
CROSSPAN (TYP.)
PROPOSED RIGHT-OF-WAY
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2. SEE SOILS REPORT FOR PAVEMENT AND SUBGRADE PREPARATION, DESIGN AND
RECOMMENDATIONS.
3. MANHOLE RIM ELEVATIONS ARE TO BE ADJUSTED TO 1/4" BELOW FINISHED GRADE.
IF NECESSARY, CONE SECTIONS SHALL BE ROTATED TO PREVENT LIDS BEING
LOCATED WITHIN VEHICLE OR BICYCLE WHEEL PATHS.
4. EXPANSION JOINTS SHALL BE PROVIDED IN ALL TRAILS AT MAXIMUM SPACING OF 50
FEET.
5. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN
THE FIELD BY THE TOWN ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN
ACCORDANCE WITH TOWN STREET REPAIR STANDARDS.
PROPOSED STORM INLET
PROPERTY BOUNDARY
PROPOSED LOT LINE
EASEMENT LINE
SAWCUT LINE
06
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
CENTERLINE
MARS DRIVE
SCALE : 1" = 40' (H) 1" = 5' (V)
C3.01
PLAN & PROFILE
MARS DRIVE
PROPOSED CURB & GUTTER
EDGE OF ASPHALT / / / / / / / /
SEE SHEET C3.00
FOR CUL-DE-SAC
GRADING
X
X
X
X
X
X
X
X
X X X
X
X X
X
X
X
X
X
X
X X
X
X X
X X X
X
X
CTV
CTV
G
OHU OHU OHU
OHU
OHU
OHU OHU
OHU
OHU OHU OHU
OHU OHU
X X
X
X X X
X X X
X
X X
37.00
35.47
35.70
27.03
29.25
26.26
26.48
26.82
26.35
26.83
27.03
36.27
35.69
36.51
36.87
36.77
36.95
37.15
37.70
37.70
36.54
39.08
37.46
37.32
37.33
37.66
36.45
37.26
35.64
21.68
21.14
21.31
20.70
21.06
21.29
29.75
29.36
29.48
29.60
26.40
21.88
26.38
26.38
26.38
26.38
26.38
26.38
38.15
39.08
39.90
39.90
29.48
32.61
FG
35.92
35.96
36.02
35.81
35.74
24.00
24.00
24.00
24.00
24.00
24.00
23.00
23.00
23.00
23.00
23.00
23.00
39.00
FFE=27.03
25.7%
26.32
FG
25.98
FG
25.76
FG
25.85
FG
26.40
FG
36.24
FG
35.31
FG
35.55
FG
36.46
FG
36.47
SKYWAY DRIVE
(80' R.O.W.)
(SEE SHEET C3.02)
9' UTILITY
EASEMENT
5'
SIDEWALK
31' -BLDG
SAWCUT
4:1
4:1
5:1
5:1
4:1
6:1
5:1
4:1
4:1
4:1
5:1
5:1
3:1
8:1
9.1%
3.1%
3.4%
2.7%
1.3%
2.8%
2.0%
0.8%
9.8%
1.2%
1.2%
0.8%
1.3%
1.1%
7.9%
MARS DRIVE
(SEE SHEET C3.01)
20' DRAINAGE
EASEMENT
20' DRAINAGE
EASEMENT
EXPOSED
BACK OF CURB
EXPOSED
BACK OF CURB
EXPOSED
BACK OF CURB
18" VERTICAL
CURB AND GUTTER
30" VERTICAL
CURB AND GUTTER
RAISED
CROSS WALK
DRAINAGE
EASEMENT
RAMP
RAMP
12" BACK OF
CURB
RIPRAP
RIPRAP
RIPRAP
RIPRAP
HANDICAP
PARKING
9' UTILITY EASEMENT
5' SIDEWALK
SOUTH COLLEGE AVENUE
(EXISTING ROW VARIES)
OWNER: TRILBY HOLDINGS
GROUP LLC
OWNER: TRILBY HOLDINGS
GROUP LLC
29.35
FG
32.11
37.29
37.24
37.75
36.11
9' UTILITY
EASEMENT
36.95
36.93
36.90
38.46
38.46
38.57
38.57
37.32
37.34
38.05
40.38
40.38
39.84
39.94
40.17
40.27
39.76
40.00
39.19
39.22
39.36
40.07
39.07
38.83
38.83
25.0%
15.1%
15.1%
3.4%
5.1%
3.8%
1.0%
5.1%
10.1%
12.5%
26.1%
25.0%
25.0%
24.9%
25.0%
19.6%
25.0%
26.38
26.38
26.38
26.40
26.38 26.38
22.21
22.53
21.98
21.92
21.55
21.14
26.38
1.3%
1.1%
0.0%
7.5%
8.0%
7.0%
37.15
41' -BLDG
R50' TEMPORARY
CUL-DE-SAC
25.0%
25.0%
25.1%
25.0%
6.6%
ABANDONED
IRRIGATION DITCH
36.97
FG
"FIRE LANE
NO PARKING"
SIGN
"FIRE LANE
NO PARKING"
SIGN
"FIRE LANE
NO PARKING"
SIGN
70.50
HALF ROW
ADDITIONAL ROW
(WIDTH VARIES)
ADDITIONAL ROW
(WIDTH VARIES)
DRAINAGE
EASEMENTE4
PROPOSED
"STOP" SIGN
PROPOSED
"STOP" SIGN
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
LEGEND:
PROPOSED CONTOUR
PROPOSED UNDERDRAIN
PROPOSED STORM SEWER
PROPOSED SWALE
EXISTING CONTOUR
FUTURE CURB AND GUTTER
LIMITS OF DISTURBANCE
PROPOSED SPOT ELEVATION
PROPOSED SLOPES
PROPOSED STORM INLET
EXISTING SPOT ELEVATION
PROPOSED LOT LINE
EXISTING RIGHT OF WAY
LOD
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE AND LOCATION
BOTH HORIZONTAL AND VERTICAL OF ALL UNDERGROUND UTILITIES IN THE AREA
OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR
SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL
BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES.
2. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
3. ALL CURB SPOTS SHOWN ARE FLOWLINE ELEVATIONS. ALL OTHER SPOTS ARE
FINISHED GRADE ELEVATIONS.
4. THE TOP OF FOUNDATION ELEVATIONS SHOWN ARE THE MINIMUM ELEVATIONS
REQUIRED FOR PROTECTION FROM THE 100-YEAR STORM.
5. CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES
SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE.
6. ALL PROJECT DATA IS ON THE CITY OF FORT COLLINS VERTICAL CONTROL
NETWORK DATUM: NAVD 88. SEE COVER SHEET FOR BENCHMARK REFERENCES.
7. CONTRACTOR SHALL OBTAIN THE MOST CURRENT SOILS AND SUBSURFACE
EXPLORATION REPORT FOR MORE INFORMATION REGARDING PAVEMENT DESIGN,
SUBSURFACE TREATMENT AND COMPACTION.
8. CONTRACTOR SHALL CONFIRM DOORWAY, FOUNDATION WALLS, AND SLOPED
SLABS WITH STAMPED ARCHITECTURAL AND STRUCTURAL DRAWINGS PRIOR TO
STAKING.
9. SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION ON PLANTING,
REVEGETATION, HARDSCAPE AND OTHER PERMANENT SITE STABILIZATION
METHODS
NOTES:
UD
12" CURB FACE
C3.00
GRADING PLAN
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
05
PROPOSED CURB AND GUTTER
PROPERTY BOUNDARY
PROPOSED EDGE OF ASPHALT
/ / / / / / / /
EXISTING STORM SEWER ST
EXISTING SLOPES
12" EXPOSED BACK OF CURB
E E E
E E E
E
FDC
S
S
S
VAULT
ELEC ELEC
T S
B M
CABLE
D
VAULT
ELEC
V.P.
V.P.
V.P.
V.P.
V.P. V.P.
F
E
S
S
SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS
SS SS
SS
SS SS
SS SS SS
SS
SS SS
ST
H
Y
D
X X
X
X
X X
E
E
E
E
E
X
X
X
X
X
X
X
X
X X X
X
X X
X
X
X
X
X
X
X X
X
X X
X X X
X
X
CTV
CTV
G
OHU
OHU OHU OHU
OHU
OHU OHU
OHU OHU OHU OHU
OHU
OHU
X
X
X
X
X X X X
X
X
X
X
S
W W W W W W W W W W W W W W W W W W W W W W W
W
EX. SAN MH 3
RIM=5016.40
INV IN=5003.30 (S)
INV OUT=5003.19 (E)
EX. SAN MH 2
RIM=5008.08
INV IN=5002.50 (W)
INV OUT=5002.26 (N)
20' UTILITY
EASEMENT
OVERHEAD
UTILITY
EXISTING
FIRE HYDRANT
EX. SAN MH 4
RIM=5014.90
INV. IN=5005.29 (SE)
INV. OUT=5004.73 (N)
EX. SAN MH 5
RIM=5012.38
INV. IN=5006.54 (S)
INV. OUT=5006.44 (NW)
EX SAN MH 6
RIM=5016.24
INV. IN=5007.45 (SW)
INV. OUT=5007.26 (N)
INLET A2.1.1
INV. IN=5034.24 (W)
INV. OUT=5034.23 (E)
FG=5038.58
MH A2.1
INV. IN=5030.51 (N)
INV. IN=5030.51 (W)
INV. OUT=5030.51 (E)
FG=5036.48
INLET A2.2
INV. OUT=5033.57 (S)
FG=5036.54
INLET B2
INV. OUT=5032.82 (E)
FG=5035.83
FES B1
INV. IN=5032.20 (W)
FG=5032.20
INLET A2
INV. IN=5023.30 (N)
INV. IN=5023.30 (W)
INV. OUT=5023.30 (SW)
FG=5026.28
INLET A3
INV. OUT=5024.33 (S)
FG=5026.36
OVERFLOW INLET D1
INV. OUT=5021.63 (S)
FG=5023.00
FES A1
INV. IN=5023.00 (NE)
FG=5023.00
FES D2
INV. IN=5021.24 (N)
FG=5021.16
OUTFALL INLET C1
INV. OUT=5020.72 (NE)
FG=5020.72
FES C2
INV. IN=5020.20 (SW)
FG=5020.20
60.52 LF
12" HDPE
@ 0.50%
205.43 LF 12" HDPE @ 0.50%
180.34 LF 12" HDPE @ 4.00%
132.88 LF 12" HDPE @ 2.30%
53.11 LF 15" HDPE @ 7.00%
130.82 LF 15" HDPE @ 0.40%
38.97 LF
15" HDPE
@ 1.00%
8" x 8" TEE
8" G.V. (S) & T.B.
(APPROXIMATE LOCATION)
N:100067.77
E:193987.85
CONNECT TO EXISTING 8"
SANITARY SEWER
(CONTRACTOR TO FIELD VERIFY)
3/4" METER PIT
EXISTING 30" FES
FL ELEV: 4997.75
15.00 LF 30" RCP @ 7.67%
EX. STORM INLET
RIM=5005.55
INV IN=4997.99 (N)
INV IN=4996.60 (W)
INV OUT=4996.35 (E)
CONNECT TO EXISTING
GAS LINE
(APPROXIMATE LOCATION)
N:100044.94
E:193724.62
EXISTING 3-PHASE
ELECTRIC FEED
COORDINATE CONNECTION
WITH CITY LIGHT & POWER
N:100024.62
E:194551.16
9'' UTILITY
EASEMENT
20' DRAINAGE
EASEMENT
9' UTILITY EASEMENT
20' DRAINAGE
EASEMENT
DRAINAGE
EASEMENT
3/4" SERVICE CONNECTION
N:99929.59
E:193985.69
8" x 6" REDUCER
6" GV (S)
N:99437.19
E:193978.00
6" TEMPORARY F.H. ASSEMBLY
N:99424.19
E:193977.77
OWNER: TRILBY HOLDINGS
GROUP LLC
OWNER: TRILBY HOLDINGS
GROUP LLC
±126 L.F. OF 4"
PVC @ 2.00%
S89°06'11"E
MECHANICAL
WATERLINE
LOWERING
4"x4" TEE
W/ 4"- G.V.(E) & T.B.
N:99939.59
E:193985.84
48.97 LF
15" RCP
@ 2.00%
Inlet A2.1.2
INV. OUT=5035.22 (E)
FG=5038.58
±107 L.F. OF 3/4" WATER SERVICE
S89°06'11"E
±16 L.F. OF 3/4" WATER SERVICE
S45°00'00"E
±111 L.F. OF 4" FIRE LINE
S89°06'11"E
±24 L.F. OF 4" FIRE LINE
S45°00'00"E
±10 L.F. OF 4" FIRE LINE
S00°00'00"E
ELECTRIC
TRANSFORMER
ELECTRIC
METER
8" x 6" SWIVEL TEE
W/ 6" G.V.(E) & T.B.
N:99978.66
E:193985.69
6" F.H. ASSEMBLY
N:99979.79
E:194025.84
GAS
METER
9' UTILITY
EASEMENT
RIPRAP
RIPRAP
DRAINAGE
EASEMENT
80' PUBLIC
RIGHT-OF-WAY
76' PUBLIC
RIGHT-OF-WAY
TEMPORARY
ACCESS EASEMENT
15' UTILITY
EASEMENT
ADDITIONAL ROW
(WIDTH VARIES)
COLLEGE AVENUE
(EXISTING ROW VARIES)
MARS DRIVE
(76' ROW)
SKYWAY DRIVE
(80' ROW)
70.5' HALF PUBLIC
RIGHT-OF-WAY
ELECTRIC
SERVICE LINE
GAS SERVICE
LINE
FIRE DEPARTMENT
CONNECTION
4" FIRE SERVICE
3
4" WATER SERVICE
123.65 LF 15" RCP @ 0.50%
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
C2.00
UTILITY PLAN
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
EXISTING WATER MAIN
PROPOSED WATER MAIN
PROPOSED STORM SEWER
LEGEND:
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2. ALL WATER CONSTRUCTION SHALL BE PER THE FORT COLLINS-LOVELAND WATER
DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION.
3. ALL SANITARY CONSTRUCTION SHALL BE PER THE SOUTH FORT COLLINS SANITATION
DISTRICT STANDARD CONSTRUCTION SPECIFICATIONS LATEST EDITION.
4. ALL WATER FITTINGS AND VALVES ARE ONLY GRAPHICALLY REPRESENTED AND ARE
NOT TO SCALE.
5. UTILITY SERVICES ARE SHOWN IN A SCHEMATIC FASHION ONLY. EXACT LOCATIONS
SHALL BE PER THE REQUIREMENTS OF THE RESPECTIVE UTILITY PROVIDERS, AND
ARE SUBJECT TO CHANGE IN THE FIELD.
6. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL MINIMUM SEPARATION BETWEEN ALL
SANITARY SEWER MAINS, WATER MAINS & SERVICES.
7. REFER TO THE PLAT FOR LOT AREAS, TRACT SIZES, EASEMENTS, LOT DIMENSIONS,
UTILITY EASEMENTS, OTHER EASEMENTS, AND OTHER SURVEY INFORMATION.
8. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED
IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN
ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND
POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF
ANY POTENTIAL CONFLICTS.
10. REFER TO PLUMBING PLANS FOR ALL WATER SERVICE AND SANITARY SEWER
SERVICE LOCATIONS. IF CONFLICT OCCURS, BOTH THE PLUMBING ENGINEER AND
CIVIL ENGINEER SHALL BE CONTACTED PRIOR TO INSTALLATION OR ORDERING OF
MATERIALS.
11. ALL STORM SEWER IS TO BE OWNED AND MAINTAINED BY PROPERTY MANAGER.
12. ANY DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO CONSTRUCTION,
AS WELL AS STREETS, SIDEWALKS, CURBS AND GUTTERS, DESTROYED, DAMAGED
OR REMOVED DUE TO CONSTRUCTION OF THIS PROJECT, SHALL BE REPLACED OR
RESTORED TO CITY OF FORT COLLINS STANDARDS AT THE DEVELOPER'S EXPENSE
PRIOR TO THE ACCEPTANCE OF COMPLETED IMPROVEMENTS AND/OR PRIOR TO THE
ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY.
13. CONTRACTOR TO COORDINATE FINAL LOCATION OF ALL GAS AND ELECTRIC METERS
WITH ARCHITECT AND UTILITY PROVIDERS.
14. CONTRACTOR TO COORDINATE FINAL LOCATION OF IRRIGATION SHUT-OFF VALVE
AND BACKFLOW DEVICE WITH LANDSCAPE ARCHITECT AND SPRINKLER
CONTRACTOR.
15. CONTRACTOR TO COORDINATE SITE LIGHTING (LANDSCAPE) TO ENSURE NO
CONFLICTS WITH OTHER UTILITIES.
16. CROSSPANS ALONG PUBLIC STREETS AT THE INTERSECTION OF PRIVATE DRIVES
SHALL HAVE CONCRETE EXTENDED TO THE RIGHT-OF-WAY LINE.
W
G
T
EXISTING STORM SEWER ST
EXISTING TELEPHONE
EXISTING GAS
EXISTING ELECTRIC METER
EXISTING WATER METER
EXISTING IRRIGATION BOX
EXISTING POWER POLE
EXISTING GAS METER
EXISTING TELEPHONE PEDESTAL
EXISTING SANITARY SEWER SS
PROPOSED STORM INLET
EXISTING LIGHT POLE
PROPOSED SANITARY SEWER
PROPOSED FIRE HYDRANT
EXISTING FIRE HYDRANT
PROPOSED LOTLINE
EASEMENT LINE
CONTROL
IRR
PROPERTY BOUNDARY
SS
S
PROPOSED SEWER SERVICE
PROPOSED CURB STOP & METER PIT
PROPOSED ELECTRIC TRANSFORMER
W
TF
04
PROPOSED CURB & GUTTER
UNDERDRAIN UD
BARB WIRE FENCE
TO BE REMOVED
/
/ / / /
/ / /
/ / / / /
/ / /
/ / / /
/ / /
/ / / / /
/ / /
/ / / /
/ / /
/ / / / /
/ / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/
/ /
/ / / / /
/ / /
/ / / /
/ / /
/ / / / /
/ / /
/ / / /
/ / /
/ / / / /
/ / /
/ / / /
/ / /
/ / / / /
/ / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/ / / /
/ / /
/ / / /
/ / / /
/
/ / /
/ / / / / / / / / / / /
/
/ /
/
/
/ /
/
/ /
/
/ /
/
/ /
/ /
/ /
/
/ /
/
/ /
/
/ /
/
/ /
/ /
/ /
/
/
/
/ / /
/ / / /
S
S
S
VAULT
ELEC ELEC
T S
B M
CABLE
D
VAULT
ELEC
C
V.P.
V.P.
V.P.
V.P.
V.P. V.P.
F
E
S
S
SS SS SS SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS SS
SS SS
SS
SS
SS
SS
ST
H
Y
D
X X
X
X
X
X X
X
X X X X X
X X
X
X
X
X
X
E
E
E
E
E
E
X
X
X
X
X
X X
X
X X X
X
X X
X
X
X
X X
X
X
X
X
X
X
X X X
X
X
X
X
CTV
CTV
G
OHU OHU
OHU OHU
OHU OHU
OHU
OHU OHU OHU
OHU
OHU
OHU
X
X
X
X X
X
X
X
X X X
X
X
X
S
W W W W W W W W W W W W W W W W W W W W W W W
W
APPROXIMATE
LOCATION OF
EXISTING 8"
WATERLINE
177.00 LF 8" PVC @ 0.42%
358.39 LF 8" PVC @ 0.40%
287.95 LF 8" PVC @ 0.40%
190.00 LF 8" PVC @ 0.43%
229.48 LF 8" PVC @ 0.30%
EX. SAN MH 2
RIM=5008.08
INV IN=5002.50 (W)
INV OUT=5002.26 (N)
± 2809 SQ. FT. OF
CONCRETE FLATWORK
TO BE REMOVED
PATCH OF TRESS
TO BE REMOVED
RIPRAP TO BE
REMOVED
ELECTRIC
VAULTS
TO REMAIN
TRAFFIC
SIGNAL
TO REMAIN
CABLE VAULT TO
BE RELOCATED
±6300 SF OF SAW
CUT AND PATCH
CABLE VAULT
TO BE RELOCATED
BOLLARDS TO
REMAIN
REMOVE ± 110 LF
OF FENCE
REMOVE TREES
N:100018.18
E:194590.18
N:100024.19
E:193682.10
N:99393.22
E:193702.13
N:99379.52
E:194591.38
CONCRETE CHASE
TO BE REMOVED
RIPRAP TO BE
REMOVED
No. Revisions: By: Date:
REVIEWED BY:
N. Haws
DESIGNED BY:
DRAWN BY:
SCALE:
DATE:
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
C1.00
DEMOLITION PLAN
EXISTING CONDITIONS &
03
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
NORTH
( IN FEET )
0
1 INCH = 40 FEET
40 40 80 120
EXISTING ELECTRIC E
LEGEND:
G
FO
EXISTING STORM SEWER
ST
EXISTING FIBER OPTIC
EXISTING GAS
EXISTING IRRIGATION BOX
EXISTING GAS METER
EXISTING UTILITY POLE
FIELD SURVEY BY:
NOTES:
1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE
APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL
UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW
CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL
UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR ALL UNKNOWN
UNDERGROUND UTILITIES.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING DEMOLITION, REMOVAL,
REPLACEMENT, AND DISPOSAL OF ALL FACILITIES AND MATERIAL.
3. CONTRACTOR IS ENCOURAGED TO PERFORM DEMOLITION IN A MANNER THAT
MAXIMIZES SALVAGE, RE-USE, AND RECYCLING OF MATERIALS. THIS INCLUDES
APPROPRIATE SORTING AND STORING. IN PARTICULAR, DEMOLISHED CONCRETE,
ASPHALT, AND BASE COURSE SHOULD BE RECYCLED IF POSSIBLE. THE CITY OF FORT
COLLINS STREET DEPARTMENT OPERATES A CRUSHING OPERATION THAT WILL
ACCEPT CONCRETE MATERIAL AT NO COST FOR CRUSHING AND RE-USE AS
RECYCLED AGGREGATE. THIS OPERATION IS LOCATED AT 1380 HOFFMAN MILL ROAD
AND CAN BE REACHED AT (970) 482-1249.
4. ALL SYMBOLS ARE ONLY GRAPHICALLY REPRESENTED AND ARE NOT TO SCALE.
5. CONTACT THE PROJECT SURVEYOR FOR ANY INQUIRIES RELATED TO THE EXISTING
SITE SURVEY.
6. LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE DETERMINED IN
THE FIELD BY THE CITY ENGINEERING INSPECTOR. ALL REPAIRS TO BE IN
ACCORDANCE WITH CITY STREET REPAIR STANDARDS.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY NECESSARY FIELD LOCATES AND
POTHOLING OF SUBSURFACE UTILITIES. ENGINEER AND CITY SHALL BE NOTIFIED OF
ANY POTENTIAL CONFLICTS.
8. PROJECT DATUM: NAVD 88
City of Fort Collins Benchmark 3-07
Northwest corner of Timberline Road and Prospect Road on the northwest corner of a traffic
signal base.
Elevation = 4919.13
City of Fort Collins Benchmark 4-07
Southwest corner of Timberline Road and Bear Mountain Drive due north of the new police
building on the southwest corner of a catch basin.
Elevation = 4942.84
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR
VERTICAL DATUMS.
IF NGVD 29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED: NGVD 29 Unadjusted = NAVD88 - 3.19'
Basis of Bearings
The East line OF THE Southeast Quarter of Section 11, as bearing North 00° 23' 09"
Northern Engineering Services, Inc.
Project No. 1269-001
Date: April 2016
EXISTING SANITARY SEWER SS
EXISTING WATER W
EXISTING FENCE X
EXISTING WATER METER
EXISTING FIRE HYDRANT
EXISTING ELECTRIC VAULT
PROJECT BOUNDARY
EXISTING RIGHT-OF-WAY
EXISTING MAJOR CONTOUR
EXISTING MINOR CONTOUR
VAULT
ELEC
CONTROL
IRR
GAS
EXISTING TELEPHONE PEDESTAL
11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider.
Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a
pre-construction meeting may be required prior to commencement of any work.
12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary
sewer should be constructed prior to installation of the water lines and dry utilities.
13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water
Utility.
14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is
discharged into a storm sewer, channel, irrigation ditch or any waters of the United States.
15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of
Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan.
16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage,
whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the
City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development.
19. All recommendations of the Preliminary Drainage Report for Skyway Storage dated 05.10.2017 by Northern Engineering shall be followed and
implemented.
20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be
maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping.
21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must
be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by
the the City of Fort Collins street inspector.
22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit
is obtained, if applicable.
23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The
Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort
Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If
the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work
in the Engineer absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an
improper installation.
24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is
complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the
results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may
use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be
prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement
of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final
report.
25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at
all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to
the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then
resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets.
26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the
purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the
property lines and marked so as to reduce the excavation necessary for building connections.
27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for
roads within these districts.
28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the
Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval.
29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree
removal requiring a permit.
30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security.
Refer to OSHA Publication 2226, Excavating and Trenching.
31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The City of
Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall
be responsible for providing any and all traffic control devices as may be required by the construction activities.
32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic
Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic
sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed.
33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's
local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and
from the Development.
34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site
construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins.
35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these
drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise.
36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for
clarification, and annotate the dimension on the as-built record drawings.
37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and
specifications, and a copy of any permits and extension agreements needed for the job.
38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications,
the Developer shall contact the Designer and the City of Fort Collins Engineer immediately.
39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the
Larimer County's Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins
Engineer.
40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as
the basis of bearings. The information shall be as follows:
PROJECT DATUM: NAVD 88
City of Fort Collins Benchmark 2-12
Southwest corner of South College Ave. and Skyway Dr. on a concrete traffic signal base.
Elevation = 5005.56
City of Fort Collins Benchmark 3-96
On the south side of Derry Dr. approximately 150 feet east of O'Leary Ct., on the southeast
corner of a storm inlet structure.
Elevation = 4958.99
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM SURROUNDING DEVELOPMENTS HAVE USED
NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD 29
UNADJUSTED = NAVD88 - 3.19'
Basis of Bearings
The East line OF THE Southeast Quarter of Section 11, as bearing North 00° 23' 09" West (assumed bearing)
41. All stationing is based on centerline of roadways unless otherwise noted.
42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters,
landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like
kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the
issuance of the first Certificate of Occupancy.
43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in
accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large
patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width,
including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer
and/or the City of Fort Collins Inspector at the time the cuts are made.
44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before
construction, or to the grades and condition as required by these plans.
45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections.
46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and
workmanship defects for a minimum period of two years from the date of acceptance.
47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage
structures and pipes, for the following private streets:
a. N/A
48. Approved Variances are listed as follows:
a. N/A
CONSTRUCTION NOTES
A. Grading and Erosion Control Notes
1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site.
2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans.
3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All
other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project
schedule, construction plans, and erosion control report.
4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property
sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion
control facilities shown herein.
5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the
area(s) required for immediate construction operations, and for the shortest practical period of time.
6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition
by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside
project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent
erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County.
7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall:
a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in
order to ensure the continued performance of their intended function.
b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector.
c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector.
8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and
debris from all drainage infrastructure and other public facilities.
9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of
way, and make sure streets and walkways are cleaned at the end of each working day.
10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to
cause their release into any waters of the United States.
11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering,
and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched.
12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and
before turning the maintenance over to the City/County or Homeowners Association (HOA).
13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant
or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout,
chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the
proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations.
14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and
located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout
material will be removed and properly disposed of prior to the area being restored.
15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever
measures are determined necessary, as directed by the City.
16. For additional information see separate SWMP Report for Timberline Storage.
B. Street Improvement Notes
1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here.
2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval,
prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall
be submitted for approval prior to placement of any asphalt.
3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to
create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can
be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins.
4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the
subgrade has been inspected and approved by the City of Fort Collins Engineer.
5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings
are not allowed.
6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing
street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter
25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay
shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not
cut the new asphalt overlay work.
7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as
per the Right-of-Way Work Permit traffic control plan.
8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt.
Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly.
9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full
depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required.
The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single
axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than
3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins
Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be
notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector.
C. Traffic Signing and Pavement Marking Construction Notes
1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction
Notes listed here.
2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic.
3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD.
4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads.
5. All lane lines for concrete pavement should be epoxy paint.
6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement
of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols.
7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards.
8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction.
9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings.
10. All sign posts shall utilize break-away assemblies and fasteners per the Standards.
11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer. All discrepancies identified
during the field inspection must be corrected before the 2-year warranty period will begin.
12. The Developer installing signs shall be responsible for locating and protecting all underground utilities.
13. Special care shall be taken in sign location to ensure an unobstructed view of each sign.
14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort
Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an
unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the
requirements of the 2-year warranty period for new construction (except fair wear on traffic markings).
15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail.
D. Storm Drainage Notes
1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite
drainage facilities shall be the responsibility of the property owner(s).
2. All recommendations of the Preliminary Drainage Report for Skyway Storage dated 05.10.2017 by Northern Engineering shall be followed and
implemented.
3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by
submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two
weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the
Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the
Development Agreement.
E. Utility Notes
1. All waterlines shall be C900, DR 18 PVC pipe with a minimum 12 gage insulated tracer wire.
2. The size, type and location of all known underground utilities are approximate when shown on these drawings. It shall be the responsibility of the
contractor to verify the existence of all underground utilities in the area of the work. Before commencing new construction, the contractor shall be
responsible for locating all underground utilities and shall be responsible for all unknown underground utilities.
3. Water service provided by Fort Collins-Loveland Water District. Sanitary service provided by South Fort Collins Sanitation District.
4. Utility services are shown in a schematic fashion only. Exact locations shall be per the requirements of the respective utility providers, and are
subject to change in the field.
5. All water fittings and valves are only graphically represented and are not to scale.
6. Minimum depth of cover over water mains shall be 5.0'. maximum cover shall be 6.0'.
7. Maintain 10' horizontal and 18" vertical minimum separation between all sanitary sewer mains, water mains and services.
8. Manhole rim elevations are to be adjusted to 1/4" below finished grade. If necessary, cone sections shall be rotated to prevent lids being located
within bicycle or vehicle wheel paths.
9. All connections to existing manholes shall be core drilled according to the South Fort Collins Sanitation District standard construction
specifications
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
C0.01
CONSTRUCTION NOTES
GENERAL NOTES &
02
05.10.2017
PROJECT:
1269-002
Sheet
of 07
SOUTH COLLEGE STORAGE These drawings are
instruments of service
provided by Northern
Engineering Services, Inc.
and are not to be used for
any type of construction
unless signed and sealed by
a Professional Engineer in
the employ of Northern
Engineering Services, Inc.
NOT FOR CONSTRUCTION
REVIEW SET
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
E NGINEER ING
N O R T H E RN
PHONE: 970.221.4158
www.northernengineering.com
I hereby affirm that these final
construction plans were prepared
under my direct supervision, in
accordance with all applicable City
of Fort Collins and State of
Colorado standards and statutes,
respectively; and that I am fully
responsible for the accuracy of all
design. revisions, and record
conditions that I have noted on
these plans.
These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility
by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness
of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities
required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort
Collins for additional quantities of items shown that may be required during the construction phase.
DISCLAIMER STATEMENT:
CERTIFICATION STATEMENT:
VICINITY MAP
NORTH
ORIGINAL FIELD SURVEY BY:
PROJECT BENCHMARKS:
CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
CONTACT INFORMATION
COVER SHEET
SHEET INDEX
GENERAL NOTES & CONSTRUCTION NOTES
PRELIMINARY UTILITY PLANS FOR
EXISTING CONDITIONS & DEMOLITION PLAN
A TRACT OF LAND LOCATED IN THE SOUTHEAST QUARTER OF SECTION 11, TOWNSHIP 6 NORTH,
RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
DEVELOPER/APPLICANT
PROJECT TEAM:
SITE ENGINEER
SURVEYOR
PLANNER/
LANDSCAPE ARCHITECT
PROJECT DATUM: NAVD 88
City of Fort Collins Benchmark 2-12
Southwest corner of South College Ave. and Skyway Dr. on a concrete traffic signal base.
Elevation = 5005.56
City of Fort Collins Benchmark 3-96
On the south side of Derry Dr. approximately 150 feet east of O'Leary Ct., on the southeast
corner of a storm inlet.
Elevation = 4958.99
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR
VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING
EQUATION SHOULD BE USED: NGVD 29 UNADJUSTED = NAVD88 - 3.19'
Basis of Bearings
The East line of the Southeast Quarter of Section 11, as bearing North 00° 23' 09" West
SOUTH COLLEGE STORAGE
MARS DRIVE PLAN & PROFILE
MAY 2017
VICINITY MAP
NORTH
Northern Engineering Services, Inc.
Project No. 1269-002
Date: April 2016
E NGINEER ING
N O R T H E RN
E NGINEER ING
N O R T H E RN Northern Engineering Services, Inc.
Eric Smith, PLS
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
Northern Engineering Services, Inc.
Nick Haws, PE, LEED AP
301 North Howes Street, Suite 100
Fort Collins, Colorado 80521
(970) 221-4158
Brandon Grebe, MBA, LEED AP BD+C
(970) 556-9111
Ripley Design Inc.
Sam Coutts
419 Canyon Avenue, Suite 200
Fort Collins, Colorado 80521
(970) 224-5828
DRAINAGE EXHIBIT
UTILITY CONTACT LIST: *
UTILITY COMPANY
* This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for
the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for
locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of
Colorado (UNCC) at 811 for additional information.
PHONE NUMBER
PROJECT
LOCATION
C0.00
C0.01
C1.00
C3.01
C4.00
C3.00 GRADING PLAN
C2.00 UTILITY PLAN
MEP ENGINEER
Rossi Engineering Inc.
Vince Rossi
(303) 720-9827
ARCHITECT
Vaught Frye Larson Architects
Chris Aronson
419 Canyon Avenue, Suite 200
Fort Collins, Colorado 80521
VAUGHT FRYE LARSON architects (970) 224-1191
CONTRACTOR
GYS General Contracting, LLC
David Harvey
(719) 510-4202
C0.00
COVER SHEET
01
GAS----------------- Xcel Energy-----------------------------------Stephanie Rich (970) 225-7857
ELECTRIC-------- City of Fort Collins Light & Power------- Justin Fields (970) 224-6150
CABLE------------- Comcast--------------------------------------- Don Kapperman (970) 567-0425
TELECOM.--------CenturyLink----------------------------------- William Johnson (970) 377-6401
WATER------------ Fort Collins-Loveland Water District---- Terry Farrill (970) 226-3104
WASTEWATER--South Fort Collins Sanitation District--- Terry Farrill (970) 226-3104
STORMWATER- City of Fort Collins Utilities---------------- Shane Boyle (970) 221-6339