HomeMy WebLinkAbout112 W. MAGNOLIA STREET PARKING LOT - PDP - PDP160040 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDRAINAGE REPORT
FOR
Wells Fargo Parking Lot Improvements
112 West Magnolia Street
Fort Collins, CO 80524
Prepared for:
Cox Pavement Consulting, LLC
228 Stratton Park Road
Bellvue, CO, 80512
Prepared by:
www.quality-engineering.com
2637 Midpoint Drive, Suite E
Fort Collins, Colorado 80524
(970) 416-7891
QE Project No: 7060-001
Date: December 8, 2016
Parking at 112 West Magnolia Street
FINAL DRAINAGE REPORT
ENGINEER’S CERTIFICATION
I hereby certify that this Final Drainage Report for the design of stormwater management
facilities for the Parking at 112 West Magnolia Street Project was prepared by me, or under my
direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage
Design Criteria and Construction Standards for the owners thereof.
Cody Geisendorfer, P.E.
Registered Professional Engineer
State of Colorado No. 41326
I. Table of Contents
I. GENERAL LOCATION AND DESCRIPTION ......................................... 1
A. Location .................................................................................................................... 1
B. Description of Property ........................................................................................... 1
II. DRAINAGE BASINS AND SUB-BASINS .................................................. 2
A. Major Basin Description ......................................................................................... 2
B. Sub-Basin Description ............................................................................................. 2
III. DRAINAGE CRITERIA ............................................................................... 2
A. Regulations ............................................................................................................... 2
B. Implementation of the “Four Step Process” .......................................................... 2
C. Development Criteria Reference and Constraints ................................................ 3
D. Hydrological Criteria............................................................................................... 3
E. Hydraulic Criteria ................................................................................................... 4
F. Modifications of Criteria ......................................................................................... 4
IV. DRAINAGE FACILITY DESIGN ............................................................... 5
A. General Concept....................................................................................................... 5
B. Specific Details ......................................................................................................... 5
V. CONCLUSIONS ............................................................................................. 5
A. Compliance with Standards .................................................................................... 5
B. Drainage Concept..................................................................................................... 5
VI. REFERENCES ............................................................................................... 6
VII. APPENDICES
A. Hydrologic Computations
Vicinity Map
Fort Collins Flood Map
USGS Soil Map
Fort Collins Rainfall Intensity Curve
Fort Collins Rainfall Intensity Table
Table RO-3 Recommended Percentage Imperviousness Values
Rational Method Calculated Composite C Tables
Rational Method Calculated Imperviousness
Rational Method Calculated Flows
B. Hydraulic Computations
Modified FAA Method
Permeable Paver Sub-Base Detention Calculation
Orifice Sizing Calculation
C. Map Pocket
Drainage Plan
I. GENERAL LOCATION AND DESCRIPTION
A. Location
The proposed site is located in the northeast quarter (NE ¼) of Section 11, Township 7
North, Range 69 West of the 6th P.M. in Larimer County, Colorado. Specifically, the
property is located at the southeast corner of West Magnolia Street and College Avenue.
The property address is 112 West Magnolia Street, Fort Collins, Colorado, 80524.
(Please see the vicinity map located in the Appendix A).
B. Description of Property
The property’s parcel number is 9711424001. The site is located on Lots 1 and 2, Block
113 Fort Collins Subdivision and is currently 0.436 acres of undeveloped land
surrounded by the clock tower building to the north, Wells Fargo to the south, and office
buildings to the east and west. West Magnolia is located directly south, College Avenue
is located directly east, and an alley is located west of the property. There is an existing
access to the site on all three roadways. The existing accesses on College Avenue and
Magnolia Street are to be abandoned and replaced by a new access on Magnolia Street.
Both existing West Magnolia Street and College Avenue are paved with curb, gutter,
sidewalk, and utilities installed.
The existing property is a gravel parking lot that drains south to West Magnolia Street
and College Avenue. Existing West Magnolia Street drains west to the existing inlet,
where it is conveyed to the Poudre River. Existing College Avenue drains north towards
the existing storm inlet, where it conveyed to the Poudre River. There are generally no
offsite flows that drain toward the property. The entire site is located within the 100-year
floodplain. The northern half of the site is located in a moderate risk area, and the
southern half of the site is located within the city flood fringe (see City Flood Risk Map
in Appendix A).
According to the NRCS soils map survey, the native soils consist of the Type “C” soils.
These soils consist chiefly of soils having a layer that impedes the downward movement
of water or soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
There are no irrigation facilities located within the proposed site area.
The proposed development will consist of the construction of a 35 space off-street
parking lot that will act as employee parking for the Wells Fargo directly across West
Magnolia Street. The parking lot will be paved asphalt with curb and gutter. Seven on-
street parking stalls will be added to West Magnolia Street.
II. DRAINAGE BASINS AND SUB-BASINS
A. Major Basin Description
The proposed site is located within the Old Town Basin. The Old Town Drainage Basin is
located in north-central Fort Collins. The basin has a drainage area of approximately 2,120
acres, including approximately 400 acres of the Colorado State University campus. The
entire basin is urbanized, with some development dating back to the late 1800s. Generally,
the basin drains from west to east. The Old Town Basin receives some runoff water from
the Canal Importation Basin directly west of Old Town. Most of the water from Old Town
drains to the Poudre River, just to the east.
B. Sub-Basin Description
Historically, most of the site drains south to West Magnolia Street.
The developed site is delineated into one sub-basin, with underground detention designed to
provide the required water quality capture volume.
Sub-basin B1, (0.436 acres), consists of an asphalt/concrete parking lot, landscaped area,
and permeable pavers. Rainfall travels via overland flow from north to south, where it will
concentrate in the gutter flowlines. Once the flow is concentrated into the gutter flowline it
is conveyed to the flowline of West Magnolia Street through a 2’ u-channel. Overland flow
will also infiltrate the permeable pavers in the parking stalls, where it will be treated and
piped into the existing storm inlet.
Currently, offsite flows do not enter the site property. This will not change after the site has
been developed.
III. DRAINAGE CRITERIA
A. Regulations
Drainage design criteria specified in the City of Fort Collins Storm Drainage Design Criteria
and Construction Standards manual (FCSDCM) and the Urban Storm Drainage Criteria
Manual, Volume 3 by the Urban Drainage and Flood Control District (UDFCD) have been
referenced in the preparation of this study.
B. Implementation of the “Four Step Process”
The overall stormwater management strategy employed with this parking lot expansion
project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on
receiving waters. The following is a description of how the proposed development has
incorporated each step.
Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to
reduce the stormwater impacts of this development is the site selection itself. By selecting a
site with historically undetained runoff, the burden of development will be significantly less
with underground detention. Also, permeable pavers are used to reduce the area of
impervious surfaces, reducing the effects of imperviousness.
Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV)
with Slow Release. Urban development will cause stormwater runoff to increase from the
site. The primary water quality will occur in the permeable pavers, located in the parking
spaces of the lot. Refer to the map pocket for permeable paver details and cross-sections.
The permeable pavers will increase water quality and promote infiltration. Water quality
treatment for 50% of the site is provided for in the Udall Natural Area water treatment
facility.
Step 3 – Stabilize Drainageways. The Poudre River is the governing drainageway for the
proposed site. The proposed project indirectly helps achieve a better stabilized drainageway
nonetheless. By improving the water quality and increasing infiltration, the likelihood of
bed and bank erosion from this site is greatly reduced.
Step 4 – Implement Site Specific and Other Source Control BMPs.
The Parking at 112 West Magnolia Street site contains a plethora of source control BMPs.
Permeable Pavement Systems: Flow from the parking lot will directly flow into the void
area of the pavers avoiding any extra pollutant-flow contact time.
C. Development Criteria Reference and Constraints
The criteria used as the basis for analysis and design of stormwater management
improvements for this site are those found in the references cited.
To the knowledge of the author, there are no other capital drainage improvements planned
for this portion of the site; aside from those referred to above, that would constrain or
otherwise influence the design of the stormwater improvements for this site.
D. Hydrological Criteria
Stormwater runoff from the respective sub-basins of the site is analyzed for storms with 2-
year and 100-year return frequencies.
Due to the relatively small aggregate area of the tributary drainage sub-basins, the Rational
Method was chosen for use in the design of the stormwater management improvements.
The Rational Method provides that:
Q = CIA, where:
Q = Design flow in cubic feet per second (cfs)
C = Coefficient of runoff for the area under consideration
I = Rainfall intensity for the design storm duration (in/hr)
A = Area of the drainage sub-basin under consideration (ac)
Peak flows were calculated using the Rational Method for the 2-year and 100-year storm
events. This software uses the local 1-hour rainfall depth and Fort Collins rainfall
intensities developed calculate rainfall intensities as a function of the time of concentration.
These values were obtained by the City of Fort Collins Rainfall Intensity-Duration-
Frequency (IDF) curve/table; Figure 3-1 and Table 3-1a, and can be found in the Appendix.
Additionally, per City of Fort Collins, the coefficients have been multiplied by the
appropriate storm factors.
Percent imperviousness values were taken from Table RO-3, Recommended Percentage
Imperviousness Values, UDCM (See Appendix). Soils of hydrologic soil type “C”
dominate the site. Onsite runoff was calculated to determine the runoff differential between
existing and developed conditions for use in sizing the WQCV as required by the FCSDM.
The hydrologic basin parameters and runoff rates are included in the Appendices and
include quantification of the allowable volume reduction.
The USDFCD software UD-BMP v3.03 was used to calculate the required detention and
orifice sizing.
The design worksheets included in the Appendices to this Final Drainage Report present
documentation of the hydrologic calculations for the on-site storm drainage systems.
E. Hydraulic Criteria
Within this development, all runoff will be conveyed on the surface, initially as sheet flow
and subsequently as concentrated flow in shallow pans and gutters. The assessment of
required capacity and the sizing of the respective components of the drainage system are
based on the anticipated runoff from the 100-year storm event. The surface runoff will
culminate into the permeable pavers.
F. Modifications of Criteria
There are no modifications or variances requested in connection with the design of the
stormwater management for the Parking at 112 West Magnolia site development.
IV. DRAINAGE FACILITY DESIGN
A. General Concept
The storm drainage system is designed to safely convey developed storm flows by sheet
flow, concentrated pan, underdrain, and gutter flow to the permeable pavers and street
flowlines.
The design worksheets included in the Appendices to this Final Drainage Report present
details of the hydrologic and hydraulic calculations pertinent to the design of the on-site
storm drainage system. A drainage plan, showing the proposed development of the site and
developed drainage patterns is included in the map pocket following the Appendices.
B. Specific Details
There are a number of collection and conveyance scenarios within the drainage regime
associated with this development. The respective scenarios are described below.
Sub-basin B1, (0.436 acres), consists of an asphalt/concrete parking lot, landscaped area,
and permeable pavers. Rainfall travels via overland flow from north to south to the gutter
flowline of the parking area, where it will concentrate into a 2’ u-channel and will be
conveyed to Magnolia Street at a minimum of 0.6% slope. The Magnolia Street flowline
conveys runoff to an existing storm inlet to the west. Overland flow will also infiltrate the
permeable pavers in the parking stalls, where it will be treated. The 100-year flow is
released at the 2-year historic rate, via an 8” pipe with an orifice plate with a 4.5” opening
into the back of an existing storm inlet. After treatment within the permeable pavers, the
WQCV will also be released into the back of the curb inlet, where it will be eventually be
conveyed to the Poudre River. Sub-basin B1 produces a 100-year flow of 3.03 cfs. If the
paver system overflows due to clogging, the runoff will be directed to Magnolia Street.
V. CONCLUSIONS
A. Compliance with Standards
The drainage design for the Parking at 112 West Magnolia Street is in compliance with the
requirements of the City of Fort Collins Storm Drainage Design Criteria and Construction
Standards Manual as well as the City’s floodplain regulations. The criteria and
recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the
design of the drainage systems.
B. Drainage Concept
The drainage design for the Parking at 112 West Magnolia Street will be adequate to safely
convey onsite flows through the development. Development of the site, as proposed, should
have a beneficial impact on water quality in downstream drainage facilities and drainage
ways by reducing and delaying the initial discharge of runoff from the site such that
sediments and other potential pollutants typically carried by this first flush are removed
from the flow.
VI. REFERENCES
“City of Fort Collins Stormwater Criteria Manual”, City of Fort Collins, Adopted December
2011
“City of Fort Collins Municipal Code”, Chapter 10 – Flood Protection and Prevention City of
Fort Collins, 1987
Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3, Urban Drainage and Flood Control
District, April 2008
VII. APPENDICIES
APPENDIX A: Hydrologic Computations
Vicinity Map
Fort Collins Flood Map
USGS Soil Map
Loveland Rainfall Intensity Curve
Loveland Rainfall Intensity Table
Table RO-3 Recommended Percentage Imperviousness Values
Rational Method Calculated Runoff Coefficients
Rational Method Calculated Imperviousness
Rational Method Calculated Flows
S COLLEGE AVE
W MAGNOLIA ST
. Printed: 03/25/2016
All floodplain boundaries
are approximate.
This information is based on the Federal Emergency Management
Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of
Fort Collins Master Drainageway Plans. This letter does not imply
that the referenced property will or will not be free from flooding or
damage. A property not in the Special Flood Hazard Area or in a
City Designated Floodplain may be damaged by a flood greater
than that predicted on the map or from a local drainage problem
not shown on the map. This map does not create liability on the
part of the City, or any officer or employee thereof, for any damage
that results from reliance on this information.
City Flood Risk Map
Moderate Risk
May include:
- Areas of FEMA 500-year floodplain (FEMA Zone X-shaded).
- Areas of FEMA or City 100-year floodplain (sheet flow) with
average depths of less than 1 foot.
- Areas protected by levees from the 100-year flood.
Low Risk
Areas outside of FEMA and City mapped 100-year and 500-year
floodplains. Local drainage problems may still exist.
City Flood Fringe - May Include:
- Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH)
- Areas of City 100-year floodplain including ponding areas and sheet
flow areas with average depths of 1-3 feet.
There is a 1% annual chance that these areas will be flooded.
High Risk
City Floodway - Area of 100-year floodplain with greatest depths and
fastest velocities.
0 15 30 60 90 120
Feet
35 C
0.5
0.5
112 W Magnolia Street
8/18/2016
DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF
Table RO-3—Recommended Percentage Imperviousness Values
Land Use or
Surface Characteristics
Percentage
Imperviousness
Business:
Commercial areas 95
Neighborhood areas 85
Residential:
Single-family *
Multi-unit (detached) 60
Multi-unit (attached) 75
Half-acre lot or larger *
Apartments 80
Industrial:
Light areas 80
Heavy areas 90
Parks, cemeteries 5
Playgrounds 10
Schools 50
Railroad yard areas 15
Undeveloped Areas:
Historic flow analysis 2
Greenbelts, agricultural 2
Off-site flow analysis
(when land use not defined)
45
Streets:
Paved 100
Gravel (packed) 40
Drive and walks 90
Roofs 90
Lawns, sandy soil 0
Lawns, clayey soil 0
* See Figures RO-3 through RO-5 for percentage imperviousness.
C K 1 . 31 i 3 1 . 44 i 2 1 . 135 i 0 . 12
A A for CA 0, otherwise CA = 0 (RO-6)
C K 0 . 858 i 3 0 . 786 i 2 0 . 774 i 0 . 04
CD CD (RO-7)
C 2
B A CD
C C
2007-01 RO-9
Urban Drainage and Flood Control District
Composite C Values
WELLS FARGO PARKING EXPANSION
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Minor (2-YR) Major (100-YR)
(C = 0.95) (C = 0.95) (C = 0.50) (C = 0.95) (C = 0.15) (acres) Composite "C" Composite "C" (Cf x C)
P1 E1 0.00 0.00 0.44 0.00 0.00 0.44 0.50 0.63
D1 B1 0.21 0.01 0.00 0.00 0.21 0.44 0.56 0.70
Notes:
Composite C values obtained from Table R0-11
Major Storm Runoff factored per Table R0-12
Developed
Design Point Basin(s)
Existing
MAP Wells Fargo Rational Method.xlsx 8/31/2016
Impeviousness
WELLS FARGO PARKING EXPANSION
Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent
(I = 100) (I = 100) (I = 40) (I = 90) (I = 0) (acres) Imperviousness
P1 E1 0.000 0.000 0.4360 0.0000 0.0000 0.4360 40%
D1 B1 0.21 0.01 0.00 0.00 0.21 0.436 51%
Notes:
Percent Impervious Values per Table R0-3, Urban Drainage Manual
Developed
Design Point Basin (s)
Existing
CAG Wells Fargo Rational Method.xlsx 8/31/2016
Basin Flow Calculations
WELLS FARGO PARKING EXPANSION
Area Minor Major
(acres) Composite "C" Composite "C" Length (ft) Slope (%)
Minor tov
(min)a
Major tov
(min)a Length (ft)
Slope
(%)
Channel
Type
Velocity
(fps)c tt (min)
Minor TC
(min)
Major TC (min) 2-yr 10-yr 100-yr 2-yr 10-yr 100-yr
P1 E1 0.4360 0.50 0.63 117 1.77 10.03 7.94 71 0.60 PA 1.55 0.76 10.80 8.71 2.13 3.63 8.21 0.46 0.79 2.24
D1 B1 0.4354 0.56 0.70 69 2.00 6.67 4.95 0 1.00 PA 2.00 0.0000 6.67 5.00 2.60 4.44 9.95 0.63 1.08 3.03
Notes:
a
b
HM = Heavy Meadow, TF = Tillage/field, PL = Short pasture and lawns, BG = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas
c
Velocity alues from Figure 3-3/Table RO-2 Estimate of Average Flow Velocity for use with the Rational Method
Design
Point
Developed
Existing
Initial/Overland Time Final TC Intensity (in/hr) Basin Flows (cfs)
Basin (s)
Travel Time
1 / 3
1 . 87 ( 1 . 1 ) 1 / 2
S
CC D
t f
ov
CAG Wells Fargo Rational Method.xlsx 8/31/2016
APPENDIX B: Hydraulic Computations
Modified FAA Method
Permeable Paver Sub-Base Detention Calculation
Orifice Sizing Calculation
Project:
Basin ID:
Design Information (Input): Design Information (Input):
Catchment Drainage Imperviousness Ia = 51.00 percent Catchment Drainage Imperviousness I
a = 51.00 percent
Catchment Drainage Area A = 0.436 acres Catchment Drainage Area A = 0.436 acres
Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D
Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100)
Time of Concentration of Watershed Tc = 11 minutes Time of Concentration of Watershed Tc = 11 minutes
Allowable Unit Release Rate q = 1.05 cfs/acre Allowable Unit Release Rate q = 1.05 cfs/acre
One-hour Precipitation P1 = 0.82 inches One-hour Precipitation P
1 = 2.83 inches
Design Rainfall IDF Formula i = C1* P
1/(C2
+Tc)^C
3 Design Rainfall IDF Formula i = C1
* P1/(C
2+Tc
)^C3
Coefficient One C1 = 28.50 Coefficient One C
1 = 28.50
Coefficient Two C2 = 10 Coefficient Two C
2 = 10
Coefficient Three C3 = 0.789 Coefficient Three C
3 = 0.789
Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated):
Runoff Coefficient C = 0.34 Runoff Coefficient C = 0.61
Inflow Peak Runoff Qp-in = 0.32 cfs Inflow Peak Runoff Qp-in = 1.96 cfs
Allowable Peak Outflow Rate Qp-out = 0.46 cfs Allowable Peak Outflow Rate Qp-out = 0.46 cfs
Mod. FAA Minor Storage Volume = 4 cubic feet Mod. FAA Major Storage Volume = 1,732 cubic feet
Mod. FAA Minor Storage Volume = 0.000 acre-ft Mod. FAA Major Storage Volume = 0.040 acre-ft
1 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes)
Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage
Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume
minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet
(input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output)
1 3.52 0.001 1.00 0.46 0.001 0.000 1 12.16 0.004 1.00 0.46 0.001 0.004
2 3.29 0.001 1.00 0.46 0.001 0.000 2 11.35 0.008 1.00 0.46 0.001 0.007
3 3.09 0.002 1.00 0.46 0.002 0.000 3 10.66 0.012 1.00 0.46 0.002 0.010
4 2.91 0.002 1.00 0.46 0.003 0.000 4 10.05 0.015 1.00 0.46 0.003 0.012
5 2.76 0.003 1.00 0.46 0.003 0.000 5 9.52 0.017 1.00 0.46 0.003 0.014
6 2.62 0.003 1.00 0.46 0.004 -0.001 6 9.05 0.020 1.00 0.46 0.004 0.016
7 2.50 0.004 1.00 0.46 0.004 -0.001 7 8.63 0.022 1.00 0.46 0.004 0.018
8 2.39 0.004 1.00 0.46 0.005 -0.001 8 8.25 0.024 1.00 0.46 0.005 0.019
9 2.29 0.004 1.00 0.46 0.006 -0.001 9 7.90 0.026 1.00 0.46 0.006 0.020
10 2.20 0.004 1.00 0.46 0.006 -0.002 10 7.59 0.028 1.00 0.46 0.006 0.021
11 2.12 0.005 0.99 0.45 0.007 -0.002 11 7.30 0.029 0.99 0.45 0.007 0.023
12 2.04 0.005 0.95 0.43 0.007 -0.002 12 7.04 0.031 0.95 0.43 0.007 0.024
13 1.97 0.005 0.92 0.42 0.008 -0.002 13 6.80 0.032 0.92 0.42 0.008 0.025
14 1.90 0.005 0.89 0.41 0.008 -0.002 14 6.57 0.034 0.89 0.41 0.008 0.026
15 1.84 0.006 0.86 0.39 0.008 -0.002 15 6.36 0.035 0.86 0.39 0.008 0.027
16 1.79 0.006 0.84 0.38 0.008 -0.003 16 6.17 0.036 0.84 0.38 0.008 0.028
17 1.74 0.006 0.82 0.37 0.009 -0.003 17 5.99 0.037 0.82 0.37 0.009 0.029
18 1.69 0.006 0.80 0.37 0.009 -0.003 18 5.82 0.038 0.80 0.37 0.009 0.029
19 1.64 0.006 0.78 0.36 0.009 -0.003 19 5.66 0.039 0.78 0.36 0.009 0.030
20 1.60 0.007 0.77 0.35 0.010 -0.003 20 5.51 0.040 0.77 0.35 0.010 0.031
21 1.56 0.007 0.76 0.35 0.010 -0.003 21 5.37 0.041 0.76 0.35 0.010 0.031
22 1.52 0.007 0.75 0.34 0.010 -0.004 22 5.24 0.042 0.75 0.34 0.010 0.032
23 1.48 0.007 0.73 0.34 0.011 -0.004 23 5.11 0.043 0.73 0.34 0.011 0.032
24 1.45 0.007 0.73 0.33 0.011 -0.004 24 4.99 0.044 0.73 0.33 0.011 0.033
Project:
Basin ID:
Design Information (Input):
Width of Basin Bottom, W = ft Right Triangle OR…
Length of Basin Bottom, L = ft Isosceles Triangle OR…
Dam Side-slope (H:V), Zd
= ft/ft Rectangle OR…
Circle / Ellipse OR…
Irregular (Use Overide values in cells G32:G52)
MINOR MAJOR
Storage Requirement from Sheet 'Modified FAA': 0.00 0.04 acre-ft.
Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft.
Storage Requirement from Sheet 'Full-Spectrum': acre-ft.
Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes
for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor,
& Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage
Stages ft ft/ft ft ft ft
2
ft
2
User ft
3
acres acre-ft Volumes
(input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek)
93.33 (input) 720 0 0.017 0.000
93.58 0.00 0.00 1,440 270 0.033 0.006
93.64 0.00 0.00 1,716 365 0.039 0.008
93.78 0.00 0.00 2,264 643 0.052 0.015
94.03 0.00 0.00 2,264 1,209 0.052 0.028
94.28 0.00 0.00 2,264 1,775 0.052 0.041 100-YR
94.53 0.00 0.00 2,264 2,341 0.052 0.054
94.66 0.00 0.00 1,544 2,589 0.035 0.059
94.91 0.00 0.00 824 2,885 0.019 0.066
94.98 0.00 0.00 548 2,933 0.013 0.067
95.12 0.00 0.00 548 3,010 0.013 0.069
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
Project:
Basin ID:
Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert.
Circular Opening: Diameter in Inches Dia. = 4.50 inches
OR
Rectangular Opening: Width in Feet W = ft.
Length (Height for Vertical) L or H = ft.
Percentage of Open Area After Trash Rack Reduction % open = 100 %
Orifice Coefficient Co = 0.60
Weir Coefficient Cw =
Orifice Elevation (Bottom for Vertical) Eo = 93.33 ft.
Calculation of Collection Capacity:
Net Opening Area (after Trash Rack Reduction) Ao = 0.11 sq. ft.
OPTIONAL: User-Overide Net Opening Area Ao = sq. ft.
Perimeter as Weir Length Lw = ft.
OPTIONAL: User-Overide Weir Length Lw = ft.
Top Elevation of Vertical Orifice Opening, Top = 93.71 ft.
Center Elevation of Vertical Orifice Opening, Cen = 93.52 ft.
Horizontal Orifices Vertical Orifices
Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes
for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor,
& Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage
W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes
(input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek)
93.33 #N/A 0.00 0.00 0.00 0.00 0.00 0.00 #N/A
93.58 #N/A 0.00 0.00 0.00 0.00 0.13 0.00 #N/A
93.64 #N/A 0.00 0.00 0.00 0.00 0.17 0.00 #N/A
93.78 #N/A 0.00 0.00 0.00 0.00 0.27 0.00 #N/A
94.03 #N/A 0.00 0.00 0.00 0.00 0.38 0.00 #N/A
94.28 #N/A 0.00 0.00 0.00 0.00 0.46 0.00 #N/A 100-YR
94.53 #N/A 0.00 0.00 0.00 0.00 0.54 0.00 #N/A
94.66 #N/A 0.00 0.00 0.00 0.00 0.57 0.00 #N/A
94.91 #N/A 0.00 0.00 0.00 0.00 0.63 0.00 #N/A
94.98 #N/A 0.00 0.00 0.00 0.00 0.64 0.00 #N/A
95.12 #N/A 0.00 0.00 0.00 0.00 0.67 0.00 #N/A
Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied
to culvert sheet (#2 vertical & horizontal openings is not used).
Wells Fargo Parking Improvements
Current Routing Order is #3
W.S. EL. WQ
W.S. EL. Minor
W.S. EL. Major
WQ
H1
H2
V1 V2
Routing Order #1 (Standard)
V1
W.S. EL. WQ
W.S. EL. Design Storm
WQ
H1
Routing Order #3 (Single Stage) Routing Order #4
V2
V1
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ
APPENDIX C: Map Pocket
Drainage Plan
PLANTING AREA
7
8
5
MAGNOLIA STREET
UNDERDRAIN
INV: 93.58'
UNDERDRAIN
INV: 93.33'
UNDERDRAIN
INV: 93.77'
UNDERDRAIN
INV: 93.51'
UNDERDRAIN
INV: 93.75'
UNDERDRAIN
INV: 94.06'
PROPOSED
18" CATCH BASIN
UNDER DRAIN
INV: 93.13'
UNDERDRAIN
INV: 93.79'
UNDERDRAIN
INV: 93.60'
C5.0
10'
SCALE: 1" = 10'
0 20'
WELLS FARGO PARKING LOT IMPROVEMENTS
112 WEST MAGNOLIA STREET
FORT COLLINS CO, 80525
FOR BURIED UTILITY INFORMATION
THREE (3) BUSINESS DAYS
BEFORE YOU DIG
CALL 811
(OR 1-800-922-1987)
UTILITY NOTIFICATION
CENTER OF COLORADO (UNCC)
WWW.UNCC.ORG
R
BASIN ID
MINOR "C" COEFFICIENT
MAJOR "C" COEFFICIENT
DRAINAGE AREA
CITY OF FORT COLLINS, COLORADO
UTILITY PLAN APPROVAL
W.S. EL. Emergency Spillway
Emergency Overflow into Pipe- H2
V2
H1
WQ
W.S. EL. Major
W.S. EL. Minor
W.S. EL. WQ V1
Routing Order #2
UD-Detention_v2.34 underground.xls, Outlet 8/31/2016, 10:03 AM
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
#N/A #N/A
STAGE-STORAGE SIZING FOR DETENTION BASINS
Wells Fargo Parking Improvements
Check Basin Shape
Underground Storage
UD-Detention_v2.34 underground.xls, Basin 8/31/2016, 9:59 AM
25 1.41 0.007 0.72 0.33 0.011 -0.004 25 4.88 0.045 0.72 0.33 0.011 0.033
26 1.38 0.007 0.71 0.32 0.012 -0.004 26 4.77 0.045 0.71 0.32 0.012 0.034
27 1.35 0.007 0.70 0.32 0.012 -0.004 27 4.67 0.046 0.70 0.32 0.012 0.034
28 1.32 0.008 0.69 0.32 0.012 -0.005 28 4.57 0.047 0.69 0.32 0.012 0.035
29 1.30 0.008 0.69 0.31 0.013 -0.005 29 4.48 0.048 0.69 0.31 0.013 0.035
30 1.27 0.008 0.68 0.31 0.013 -0.005 30 4.39 0.048 0.68 0.31 0.013 0.035
31 1.25 0.008 0.67 0.31 0.013 -0.005 31 4.31 0.049 0.67 0.31 0.013 0.036
32 1.22 0.008 0.67 0.31 0.013 -0.005 32 4.23 0.050 0.67 0.31 0.013 0.036
33 1.20 0.008 0.66 0.30 0.014 -0.006 33 4.15 0.050 0.66 0.30 0.014 0.036
34 1.18 0.008 0.66 0.30 0.014 -0.006 34 4.07 0.051 0.66 0.30 0.014 0.037
35 1.16 0.008 0.65 0.30 0.014 -0.006 35 4.00 0.051 0.65 0.30 0.014 0.037
36 1.14 0.008 0.65 0.30 0.015 -0.006 36 3.93 0.052 0.65 0.30 0.015 0.037
37 1.12 0.008 0.65 0.30 0.015 -0.007 37 3.87 0.052 0.65 0.30 0.015 0.037
38 1.10 0.009 0.64 0.29 0.015 -0.007 38 3.80 0.053 0.64 0.29 0.015 0.038
39 1.08 0.009 0.64 0.29 0.016 -0.007 39 3.74 0.053 0.64 0.29 0.016 0.038
40 1.07 0.009 0.64 0.29 0.016 -0.007 40 3.68 0.054 0.64 0.29 0.016 0.038
41 1.05 0.009 0.63 0.29 0.016 -0.008 41 3.63 0.054 0.63 0.29 0.016 0.038
42 1.03 0.009 0.63 0.29 0.017 -0.008 42 3.57 0.055 0.63 0.29 0.017 0.038
43 1.02 0.009 0.63 0.29 0.017 -0.008 43 3.52 0.055 0.63 0.29 0.017 0.038
44 1.00 0.009 0.62 0.29 0.017 -0.008 44 3.47 0.056 0.62 0.29 0.017 0.039
45 0.99 0.009 0.62 0.28 0.018 -0.008 45 3.42 0.056 0.62 0.28 0.018 0.039
46 0.98 0.009 0.62 0.28 0.018 -0.009 46 3.37 0.057 0.62 0.28 0.018 0.039
47 0.96 0.009 0.61 0.28 0.018 -0.009 47 3.32 0.057 0.61 0.28 0.018 0.039
48 0.95 0.009 0.61 0.28 0.019 -0.009 48 3.28 0.058 0.61 0.28 0.019 0.039
49 0.94 0.009 0.61 0.28 0.019 -0.009 49 3.23 0.058 0.61 0.28 0.019 0.039
50 0.92 0.009 0.61 0.28 0.019 -0.010 50 3.19 0.058 0.61 0.28 0.019 0.039
51 0.91 0.009 0.61 0.28 0.019 -0.010 51 3.15 0.059 0.61 0.28 0.019 0.039
52 0.90 0.010 0.60 0.28 0.020 -0.010 52 3.11 0.059 0.60 0.28 0.020 0.039
53 0.89 0.010 0.60 0.28 0.020 -0.010 53 3.07 0.060 0.60 0.28 0.020 0.039
54 0.88 0.010 0.60 0.27 0.020 -0.011 54 3.03 0.060 0.60 0.27 0.020 0.040
55 0.87 0.010 0.60 0.27 0.021 -0.011 55 2.99 0.060 0.60 0.27 0.021 0.040
56 0.86 0.010 0.60 0.27 0.021 -0.011 56 2.96 0.061 0.60 0.27 0.021 0.040
57 0.85 0.010 0.59 0.27 0.021 -0.012 57 2.92 0.061 0.59 0.27 0.021 0.040
58 0.84 0.010 0.59 0.27 0.022 -0.012 58 2.89 0.061 0.59 0.27 0.022 0.040
59 0.83 0.010 0.59 0.27 0.022 -0.012 59 2.86 0.062 0.59 0.27 0.022 0.040
60 0.82 0.010 0.59 0.27 0.022 -0.012 60 2.82 0.062 0.59 0.27 0.022 0.040
61 0.81 0.010 0.59 0.27 0.023 -0.013 61 2.79 0.062 0.59 0.27 0.023 0.040
Mod. FAA Minor Storage Volume (cubic ft.) = 4 Mod. FAA Major Storage Volume (cubic ft.) = 1,732
Mod. FAA Minor Storage Volume (acre-ft.) = 0.0001 Mod. FAA Major Storage Volume (acre-ft.) = 0.0398
Determination of MAJOR Detention Volume Using Modified FAA Method
(For catchments less than 160 acres only. For larger catchments, use hydrograph routing method)
(NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended)
UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.34, Released November 2013
Determination of MINOR Detention Volume Using Modified FAA Method
DETENTION VOLUME BY THE MODIFIED FAA METHOD
Wells Fargo Parking Lot Improvements
UD-Detention_v2.34 underground.xls, Modified FAA 8/31/2016, 9:57 AM