Loading...
HomeMy WebLinkAbout112 W. MAGNOLIA STREET PARKING LOT - PDP - PDP160040 - REPORTS - DRAINAGE REPORTDRAINAGE REPORT FOR Wells Fargo Parking Lot Improvements 112 West Magnolia Street Fort Collins, CO 80524 Prepared for: Cox Pavement Consulting, LLC 228 Stratton Park Road Bellvue, CO, 80512 Prepared by: www.quality-engineering.com 4045 St. Cloud Drive, Suite 180 Loveland, CO 80538 (970) 416-7891 QE Project No: 7060-001 Date: May 2017 Parking at 112 West Magnolia Street FINAL DRAINAGE REPORT ENGINEER’S CERTIFICATION I hereby certify that this Final Drainage Report for the design of stormwater management facilities for the Parking at 112 West Magnolia Street Project was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the owners thereof. Cody Geisendorfer, P.E. Registered Professional Engineer State of Colorado No. 41326 I. Table of Contents I. GENERAL LOCATION AND DESCRIPTION....................................... 1 A. Location..................................................................................................................1 B. Description of Property ...........................................................................................1 II. DRAINAGE BASINS AND SUB-BASINS ................................................ 2 A. Major Basin Description .........................................................................................2 B. Sub-Basin Description ............................................................................................2 III. DRAINAGE CRITERIA ............................................................................ 2 A. Regulations .............................................................................................................2 B. Implementation of the “Four Step Process” .............................................................3 C. Development Criteria Reference and Constraints ....................................................4 D. Hydrological Criteria ..............................................................................................4 E. Hydraulic Criteria ...................................................................................................5 F. Modifications of Criteria .........................................................................................5 IV. DRAINAGE FACILITY DESIGN ............................................................ 5 A. General Concept .....................................................................................................5 B. Specific Details .......................................................................................................5 V. CONCLUSIONS ......................................................................................... 6 A. Compliance with Standards .....................................................................................6 B. Drainage Concept ...................................................................................................6 VI. REFERENCES ........................................................................................... 7 VII. APPENDICES A. Hydrologic Computations Vicinity Map Fort Collins Flood Map USGS Soil Map Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Rational Method Calculated Composite C Tables Rational Method Calculated Imperviousness Rational Method Calculated Flows B. Hydraulic Computations Modified FAA Method Permeable Paver Sub-Base Detention Calculation Orifice Sizing Calculation C. Map Pocket Drainage Plan PG. 1 I. GENERAL LOCATION AND DESCRIPTION A. Location The proposed site is located in the northeast quarter (NE ¼) of Section 11, Township 7 North, Range 69 West of the 6th P.M. in Larimer County, Colorado. Specifically, the property is located at the southeast corner of West Magnolia Street and College Avenue. The property address is 112 West Magnolia Street, Fort Collins, Colorado, 80524. (Please see the vicinity map located in the Appendix A). B. Description of Property The property’s parcel number is 9711424001. The site is located on Lots 1 and 2, Block 113 Fort Collins Subdivision and is currently 0.436 acres of gravel parking lot surrounded by the clock tower building to the north, Wells Fargo to the south, and office buildings to the east and west. West Magnolia is located directly south, College Avenue is located directly east, and an alley is located west of the property. There is an existing access to the site on all three roadways. The existing accesses on College Avenue and Magnolia Street are to be abandoned. The access on Magnolia Street will be replaced with a new access. Both existing West Magnolia Street and College Avenue are paved with curb, gutter, sidewalk, and utilities installed. The existing property is a gravel parking lot that drains south to West Magnolia Street and College Avenue. Existing West Magnolia Street drains west to the existing inlet, where it is conveyed to the Poudre River. Existing College Avenue drains north towards the existing storm inlet, where it is conveyed to the Poudre River. There are generally no offsite flows that drain toward the property. The entire site is located within the 100-year floodplain. The northern half of the site is located in a moderate risk area, and the southern half of the site is located within the city flood fringe (see City Flood Risk Map in Appendix A). According to the NRCS soils map survey, the native soils consist of the Type “C” soils. These soils consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. There are no irrigation facilities located within the proposed site area. Irrigation for landscaping is proposed for the new development. The proposed development will consist of the construction of a 35-space off-street parking lot that will act as employee parking for the Wells Fargo directly across West Magnolia Street. The parking lot will be paved concrete with curb and gutter. The existing alley will PG. 2 be repaved with concrete. Seven on-street parking stalls will be added to West Magnolia Street. II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description The proposed site is located within the Old Town Drainage Basin, located in north-central Fort Collins. The basin has a drainage area of approximately 2,120 acres, including approximately 400 acres of the Colorado State University campus. The entire basin is urbanized, with some development dating back to the late 1800s. Generally, the basin drains from west to east. The Old Town Basin receives some runoff water from the Canal Importation Basin directly west of Old Town. Most of the water from Old Town drains to the Poudre River, just to the east. B. Sub-Basin Description Historically, most of the site drains south to West Magnolia Street. The developed site is delineated into one sub-basin, with underground detention designed to provide the required water quality capture volume. Sub-basin B1, (0.436 acres), consists of an asphalt parking lot, landscaped area, and permeable pavers. Rainfall travels via overland flow for short distances to gutters and to permeable pavers in the parking stalls. The parking stalls incorporate the City of Fort Collins LID water quality feature, which treats the water by filtering it through a layer of #57 Base, followed by a layer of #2 Rock Sub-Base. The water is then collected in perforated PVC sub- drains, and routed to the existing City stormwater collection system. Currently, offsite flows do not enter the site property. This will not change after the site has been developed. III. DRAINAGE CRITERIA A. Regulations Drainage design criteria specified in the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual (FCSDCM) and the Urban Storm Drainage Criteria Manual, Volume 3 by the Urban Drainage and Flood Control District (UDFCD) have been referenced in the preparation of this study. PG. 3 B. Implementation of the “Four Step Process” Our stormwater management strategy utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters, as follows: Step 1 – Employ Runoff Reduction Practices. The first consideration taken in trying to reduce the stormwater impacts of this development is the site selection itself. The land use for the site remains unchanged: it has been a gravel parking lot, but to provide a higher level of service to their employees, Wells Fargo is paving the parking lot. This will reduce the amount of dirt that is tracked on to the paved streets in the area by vehicles during precipitation events. By selecting a site with historically undetained runoff, the burden of development will be reduced, because underground detention is being provided. Underground detention allows this high value downtown site to be fully utilized, whereas a pond would consume space in this busy area. Permeable pavers are used to reduce the area of impervious surfaces. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release. Urban development will cause stormwater runoff to increase from the site. The primary water quality control will occur in the permeable paver detention, located under the parking spaces of the lot. Refer to the map pocket for permeable paver details and cross- sections. The detention will increase water quality and promote infiltration. Water quality treatment for 50% of the site is provided for in the Udall Natural Area water treatment facility. Step 3 – Stabilize Drainageways. The Poudre River is the governing drainageway for the proposed site. By improving the water quality and increasing infiltration, the likelihood of bed and bank erosion from this site is reduced. Step 4 – Implement Site Specific and Other Source Control BMPs. Permeable Pavement Systems: Flow from the parking lot will directly flow into the void area of the pavers, avoiding any extra pollutant-flow contact time. Landscaping: Personnel from Quality Engineering and CS Design worked with the City of Fort Collins Forestry Department to preserve a large tree on the west side of the parking lot. Interception storage, the water caught by plants at the onset of a rainstorm, is significant when a large tree shades a small lot. Some amount of the intercepted water evaporates, never PG. 4 reaching the ground. Additionally, water retained by the leaves and branches moves more slowly through the hydrograph. In the case of this tree, the canopy hangs directly over existing impervious asphalt area. With infill development, we need to work around numerous existing infrastructure items, in three dimensions. The stormwater piping had to be routed around the tree in both the lateral and vertical directions, and the pavement design slightly altered in the alley in order to retain the tree. C. Development Criteria Reference and Constraints The criteria used as the basis for analysis and design of stormwater management improvements for this site are found in the references cited. To the knowledge of the author, there are no other capital drainage improvements planned for the site that would constrain or otherwise influence the design of the stormwater improvements for this site. D. Hydrological Criteria Stormwater runoff is analyzed for storms with 2-year and 100-year return frequencies. The Rational Method was chosen for this small site. The Rational Method provides that: Q = CIA, where: Q = Design flow in cubic feet per second (cfs) C = Coefficient of runoff for the area under consideration I = Rainfall intensity for the design storm duration (in/hr) A = Area of the drainage sub-basin under consideration (ac) Peak flows were calculated using the Rational Method for the 2-year and 100-year storm events. We used the local 1-hour rainfall depth and Fort Collins rainfall intensities, calculated as a function of the time of concentration. These values were obtained by the City of Fort Collins Rainfall Intensity-Duration-Frequency (IDF) curve/table; Figure 3-1 and Table 3-1a, and can be found in Appendix A. Additionally, per the City of Fort Collins, the coefficients have been multiplied by the appropriate storm factors. Percent imperviousness values were taken from Table RO-11, Rational Method Runoff Coefficients for Composite Analysis, FCSCM (See Appendix A). Soils of hydrologic soil type “C” dominate the site. Onsite runoff was calculated to determine the runoff differential between existing and developed conditions for use in sizing the WQCV as required by the FCSDM. The hydrologic basin parameters and runoff rates are included in the Appendices and include quantification of the allowable volume reduction. PG. 5 The standards from UDFCD Volume 2, Chapter 10, Section 3.2.3 were used to calculate the required detention. The design worksheets included in the Appendices to this Final Drainage Report present documentation of the hydrologic calculations for the on-site storm drainage systems. We modified Urban Drainage spreadsheets to incorporate Fort Collins criteria as follows: • The Modified FAA spreadsheet incorporates the rainfall data from the Fort Collins Criteria Manual, Volume 1, Table RA-7 and RA-8. The numbers from RA-7 and RA- 8 were manually entered in the first two columns of the UDFCD spreadsheet, which overrides the automatic table normally provided in the spreadsheet. • A modified UDFCD Stage Storage Sizing for Detention Basins sheet was used to calculate the volumes for the underground detention. The volumes corresponding to drawing C5.0, Drainage Plan are referenced as P1 through P4. The media under the pavers conforms to Fort Collins Detail D-54, Interlocking Pavers Cross Section, with the #57 Base thickness 4” and the #2 Rock thickness 16”. The #2 Rock provides the detention volume. The void space of the #2 Rock is set to 30% in the calculations. E. Hydraulic Criteria Within this development, all runoff will be conveyed on the surface, initially as sheet flow and subsequently as concentrated flow in shallow pans and gutters. The assessment of required capacity and the sizing of the respective components of the drainage system are based on the anticipated runoff from the 100-year storm event. The surface runoff will culminate into the permeable pavers. F. Modifications of Criteria There are no modifications or variances requested in connection with the design of the stormwater management for the parking at 112 West Magnolia site development. IV. DRAINAGE FACILITY DESIGN A. General Concept The storm drainage system is designed to safely convey developed storm flows by sheet flow, concentrated pan, underdrain, and gutter flow to the permeable pavers and street flowlines. The design worksheets included in the Appendices to this Final Drainage Report present details of the hydrologic and hydraulic calculations pertinent to the design of the on-site storm drainage system. A drainage plan, showing the proposed development of the site and developed drainage patterns is included in the map pocket following the Appendices. B. Specific Details PG. 6 Sub-basin B1, (0.436 acres), consists of a concrete parking lot, landscaped area, and permeable pavers. Rainfall travels via overland flow to the gutter flowline of the parking area into the permeable pavers. Overland flow will also infiltrate the permeable pavers in the parking stalls, where it will be treated. The 100-year flow is released at the 2-year historic rate, via an 8” pipe with an orifice plate with a 3.25” opening into the storm drain system. After treatment within the permeable pavers, the WQCV will also be released into storm drain system, where it will be eventually conveyed to the Poudre River. If the paver system overflows due to clogging, catch basins at the low point of the pavers will direct runoff into the underdrain system. Sub-basin B1 produces a 100-year flow of 2.80 cfs. The UDFCD FAA spreadsheet was modified to incorporate rainfall data from the Fort Collins Criteria Manual, Volume 1, Table RA-7 and RA-8. This spreadsheet was used to calculate the outflows and inflows from the basin, and to generate a Stage Storage Table. A key parameter is the Major Stage Storage Volume, 2033 ft3. The underground detention under the pavers is designed per Fort Collins Detail D-54, Interlocking Pavers Cross Section. The detention volume is the #2 rock, with a height of 16 inches, and a surface area of 5658 ft2 (see sheet C5.0 for a tabulation of areas). 30% of the volume of the rock is void space. The detention volume is: (5658 𝑓𝑡 2)( 16 12 𝑓𝑡) (0.3) = 2263 𝑓𝑡3 This compares favorably with our Major Stage Storage Volume of 2033 ft3. Water quality parameters were also checked in the calculations. V. CONCLUSIONS A. Compliance with Standards The drainage design for the Parking at 112 West Magnolia Street follows the requirements of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards Manual as well as the City’s floodplain regulations. The criteria and recommendations of the Urban Storm Drainage Criteria Manual are also reflected in the design of the drainage systems. B. Drainage Concept The drainage design for the Parking at 112 West Magnolia Street will safely convey onsite flows from the parking lot into the storm drains, by way of the permeable paver detention system. Underground detention and the preservation of an existing large tree help to minimize PG. 7 the impact of the development. Excellent water quality treatment will be achieved by the underground detention system. VI. REFERENCES “City of Fort Collins Stormwater Criteria Manual”, City of Fort Collins, Adopted December 2011. “City of Fort Collins Municipal Code”, Chapter 10 – Flood Protection and Prevention City of Fort Collins, 1987. Urban Storm Drainage Criteria Manual, Volumes 1, 2, and 3, Urban Drainage and Flood Control District, April 2008. VII. APPENDICES APPENDIX A: Hydrologic Computations Vicinity Map Fort Collins Flood Map USGS Soil Map Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Rational Method Calculated Runoff Coefficients Rational Method Calculated Imperviousness Rational Method Calculated Flows S COLLEGE AVE W MAGNOLIA ST . Printed: 03/25/2016 All floodplain boundaries are approximate. This information is based on the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) and the City of Fort Collins Master Drainageway Plans. This letter does not imply that the referenced property will or will not be free from flooding or damage. A property not in the Special Flood Hazard Area or in a City Designated Floodplain may be damaged by a flood greater than that predicted on the map or from a local drainage problem not shown on the map. This map does not create liability on the part of the City, or any officer or employee thereof, for any damage that results from reliance on this information. City Flood Risk Map Moderate Risk May include: - Areas of FEMA 500-year floodplain (FEMA Zone X-shaded). - Areas of FEMA or City 100-year floodplain (sheet flow) with average depths of less than 1 foot. - Areas protected by levees from the 100-year flood. Low Risk Areas outside of FEMA and City mapped 100-year and 500-year floodplains. Local drainage problems may still exist. City Flood Fringe - May Include: - Areas of FEMA 100-year floodplain (FEMA Zones A, AE, AO, and AH) - Areas of City 100-year floodplain including ponding areas and sheet flow areas with average depths of 1-3 feet. There is a 1% annual chance that these areas will be flooded. High Risk City Floodway - Area of 100-year floodplain with greatest depths and fastest velocities. 0 15 30 60 90 120 Feet 35 C 0.5 0.5 112 W Magnolia Street 8/18/2016 41 Table RO-11 Rational Method Runoff Coefficients for Composite Analysis Character of Surface Runoff Coefficient Streets, Parking Lots, Drives: Asphalt 0.95 Concrete 0.95 Gravel 0.5 Roofs 0.95 Recycled Asphalt 0.8 Lawns, Sandy Soil: Flat <2% 0.1 Average 2 to 7% 0.15 Steep >7% 0.2 Lawns, Heavy Soil: Flat <2% 0.2 Average 2 to 7% 0.25 Steep >7% 0.35 (4) A new Section 2.9 is added, to read as follows: 2.9 Composite Runoff Coefficient Drainage sub-basins are frequently composed of land that has multiple surfaces or zoning classifications. In such cases a composite runoff coefficient must be calculated for any given drainage sub-basin. The composite runoff coefficient is obtained using the following formula: ( ) t n i i i A C A C ∑ = = 1 * (RO-8) Where: C = Composite Runoff Coefficient Ci = Runoff Coefficient for Specific Area (Ai) Ai = Area of Surface with Runoff Coefficient of Ci, acres or feet2 n = Number of different surfaces to be considered At = Total Area over which C is applicable, acres or feet2 (5) A new Section 2.10 is added, to read as follows: Composite C Values WELLS FARGO PARKING EXPANSION Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Minor (2-YR) Major (100-YR) (C = 0.95) (C = 0.95) (C = 0.50) (C = 0.95) (C = 0.15) (acres) Composite "C" Composite "C" (Cf x C) P1 E1 0.00 0.00 0.44 0.00 0.00 0.44 0.50 0.63 Alley Alley 0.042 0.00 0.00 0.00 0.01 0.047 0.87 1.00 D1 B1 0.21 0.01 0.00 0.00 0.21 0.44 0.53 0.67 Alley Alley 0.00 0.047 0.00 0.00 0.00 0.047 0.95 1.00 Notes: Composite C values obtained from Table R0-11 Major Storm Runoff factored per Table R0-12 Developed Design Point Basin(s) Existing MAP Wells Fargo Rational Method.xlsx 4/7/2017 Impeviousness WELLS FARGO PARKING EXPANSION Asphalt Area (acres) Concrete Area (acres) Gravel (acres) Roofs (acres) Lawns (acres) Total Area Percent (I = 100) (I = 100) (I = 40) (I = 90) (I = 0) (acres) Imperviousness P1 E1 0.00 0.00 0.436 0.00 0.00 0.4360 40% Alley Alley 0.042 0.00 0.00 0.00 0.006 0.0480 88% D1 B1 0.21 0.01 0.00 0.00 0.21 0.436 51% Alley Alley 0.00 0.047 0.00 0.00 0.00 0.047 100% Notes: Percent Impervious Values per Table R0-3, Urban Drainage Manual Developed Design Point Basin (s) Existing CAG Wells Fargo Rational Method.xlsx 4/7/2017 Basin Flow Calculations WELLS FARGO PARKING EXPANSION Area Minor Major (acres) Composite "C" Composite "C" Length (ft) Slope (%) Minor tov (min) a Major tov (min) a Length (ft) Slope (%) Channel Type Velocity (fps) c t t (min) Minor TC (min) Major TC (min) 2-yr 10-yr 100-yr 2-yr 10-yr 100-yr P1 E1 0.4360 0.50 0.63 117 1.77 10.03 7.94 71 0.60 PA 1.55 0.76 10.80 8.71 2.13 3.63 8.21 0.46 0.79 2.24 Alley Alley 0.0470 0.87 1.00 20 1.50 1.69 0.73 88 1.00 PA 2.00 0.73 5.00 5.00 2.85 4.87 9.95 0.12 0.20 0.47 D1 B1 0.4354 0.53 0.67 69 2.00 6.98 5.33 0 1.00 PA 2.00 0.0000 6.98 5.33 2.52 4.31 9.63 0.59 1.00 2.80 Alley Alley 0.0470 0.95 1.00 20 1.50 1.10 0.73 88 1.00 PA 2.00 0.7333 5.00 5.00 2.85 4.87 9.95 0.13 0.22 0.47 Notes: a b HM = Heavy Meadow, TF = Tillage/field, PL = Short pasture and lawns, BG = Nearly bare ground, GW = Grassed Waterway, PA = Paved Areas c Velocity alues from Figure 3-3/Table RO-2 Estimate of Average Flow Velocity for use with the Rational Method Design Point Developed Existing Initial/Overland Time Final TC Intensity (in/hr) Basin Flows (cfs) Basin (s) Travel Time 1 / 3 1 . 87 ( 1 . 1 ) 1 / 2 S CC D t f ov   CAG Wells Fargo Rational Method.xlsx 4/7/2017 APPENDIX B: Hydraulic Computations Modified FAA Method Permeable Paver Sub-Base Detention Calculation Orifice Sizing Calculation Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 51.00 percent Catchment Drainage Imperviousness I a = 51.00 percent Catchment Drainage Area A = 0.436 acres Catchment Drainage Area A = 0.436 acres Predevelopment NRCS Soil Group Type = C A, B, C, or D Predevelopment NRCS Soil Group Type = C A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 11 minutes Time of Concentration of Watershed Tc = 11 minutes Allowable Unit Release Rate q = 1.05 cfs/acre Allowable Unit Release Rate q = 1.05 cfs/acre Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.53 Runoff Coefficient C = 0.67 Inflow Peak Runoff Qp-in = 0.59 cfs Inflow Peak Runoff Qp-in = 2.80 cfs Allowable Peak Outflow Rate Qp-out = 0.46 cfs Allowable Peak Outflow Rate Qp-out = 0.46 cfs Mod. FAA Minor Storage Volume = 60.233 cubic feet Mod. FAA Major Storage Volume = 2,033 cubic feet 5 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr cubic feet "m" cfs cubic feet cubic feet minutes inches / hr cubic feet "m" cfs cubic feet cubic feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 5 2.85 197.573 1.00 0.46 137.340 60.233 5 9.95 871.978 1.00 0.46 137.340 734.638 10 2.21 306.412 1.00 0.46 274.680 31.732 10 7.72 1,353.100 1.00 0.46 274.680 1,078.420 15 1.87 388.908 0.86 0.39 354.337 34.570 15 6.52 1,714.160 0.87 0.40 357.084 1,357.076 20 1.61 446.447 0.77 0.35 423.007 23.439 20 5.60 1,963.046 0.78 0.35 425.754 1,537.292 25 1.43 495.667 0.72 0.33 491.677 3.989 25 4.98 2,182.136 0.72 0.33 494.424 1,687.712 30 1.30 540.727 0.68 0.31 560.347 -19.620 30 4.52 2,376.688 0.68 0.31 563.094 1,813.594 35 1.17 567.764 0.65 0.30 629.017 -61.254 35 4.08 2,502.884 0.66 0.30 631.764 1,871.120 40 1.07 593.413 0.64 0.29 697.687 -104.274 40 3.74 2,622.069 0.64 0.29 700.434 1,921.635 45 0.99 617.677 0.62 0.28 766.357 -148.680 45 3.46 2,728.985 0.62 0.28 769.104 1,959.881 50 0.92 637.781 0.61 0.28 835.027 -197.246 50 3.23 2,830.643 0.61 0.28 837.774 1,992.869 55 0.87 663.431 0.60 0.27 903.697 -240.267 55 3.03 2,920.908 0.60 0.27 906.444 2,014.464 60 0.82 682.148 0.59 0.27 972.367 -290.219 60 2.86 3,007.668 0.59 0.27 975.114 2,032.554 Determination of MINOR Detention Volume Using Modified FAA Method Determination of MAJOR Detention Volume Using Modified FAA Method DETENTION VOLUME BY THE MODIFIED FAA METHOD Wells Fargo Parking Lot Improvements (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = ft Right Triangle OR… Length of Basin Bottom, L = ft Isosceles Triangle OR… Dam Side-slope (H:V), Zd = ft/ft Rectangle OR… Circle / Ellipse OR… Irregular (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': 0.04 acre-ft. Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft 2 ft 2 User ft 3 acres acre-ft Volumes (input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek) 92.47 (input) 207 0 0.005 0.000 P1 92.60 0.00 0.00 747 62 0.017 0.001 P1 & P2 92.73 0.00 0.00 1,287 194 0.030 0.004 P1, P2, & P3 92.87 0.00 0.00 1,698 403 0.039 0.009 P1, P2, P3, &P4 93.80 0.00 0.00 1,491 1,886 0.034 0.043 P2, P3, &P4 93.93 0.00 0.00 951 2,045 0.022 0.047 100-YR 94.06 0.00 0.00 411 2,133 0.009 0.049 P4 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Date: By: Qreq = 0.46 cfs D = 3.20 in (diameter of orifice) g = 32.2 ft/s2 Ao = 0.056 ft2 (area of orifice) H = 2.5 ft Cd = 0.65 Qall = CdAo[(2gH)^1/2] Qall = 0.46 cfs vs. Qreq = 0.46 cfs 7060-001 1/10/2017 RJP Directions: Input all known variables. Change the orifice diameter, D, to match Q all to Q req . Orifice Calculator Inputs Orifice Inputs Orifice Flow Calculation www.quality-engineering.com 1501 Academy Court, #201 Fort Collins, CO 80524 (970) 416-7891 APPENDIX C: Map Pocket Drainage Plan PLANTING AREA 7 5 8 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W EXISTING BUILDING MAGNOLIA STREET UNDERDRAIN INV: 93.83' UNDERDRAIN INV: 93.79' C/O INV: 94.22' C/O INV: 93.75' UNDERDRAIN INV: 93.57' UNDERDRAIN INV: 93.61' UNDERDRAIN INV: 93.61' UNDERDRAIN INV: 93.33' UNDERDRAIN INV: 93.33' UNDERDRAIN INV: 93.29' UNDERDRAIN INV: 92.89' UNDERDRAIN INV: 93.03' C/O INV: 93.11' UNDERDRAIN INV: 93.34' UNDERDRAIN INV: 93.30' C/O INV: 93.77' C/O INV: 93.51' UNDERDRAIN INV: 92.7' PLANTING AREA EXISTING STORM INLET C5.0 10' SCALE: 1" = 10' 0 20' WELLS FARGO PARKING LOT IMPROVEMENTS 112 WEST MAGNOLIA STREET FORT COLLINS CO, 80525 FOR BURIED UTILITY INFORMATION THREE (3) BUSINESS DAYS BEFORE YOU DIG CALL 811 (OR 1-800-922-1987) UTILITY NOTIFICATION CENTER OF COLORADO (UNCC) WWW.UNCC.ORG R D1 BASIN ID MINOR "C" COEFFICIENT MAJOR "C" COEFFICIENT DRAINAGE AREA CITY OF FORT COLLINS, COLORADO UTILITY PLAN APPROVAL SYMBOL LEGEND G G G (UP) (UT) SS X X WS WS WS WS SS R/W WS WS W W R/W (OHP) 10.00 W FS E E #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS Wells Fargo Parking Improvements Check Basin Shape Underground Storage UD-Detention_v2.34 underground.xls, Basin 3/15/2017, 8:23 AM