RE: 112 W. Magnolia Street Parking Lot, PDP160040, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Meaghan Overton, at 970-416-2283 or moverton@fcgov.com.
Comment Summary:
Department: Engineering Development Review
Contact: Morgan Uhlman, 970-416-4344, muhlman@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/27/2016
12/27/2016: The Traffic Signs and Pavement Marking Construction Notes are
missing number 7: 7. Pre-formed thermo-plastic applications shall be as specified in these Plans
and/or these Standards.
This comment has been added to the Construction Notes.
Comment Number: 2 Comment Originated: 12/27/2016
12/27/2016: There needs to be a reference to two benchmarks, General Notes #40.
Two benchmarks have been referenced.
Comment Number: 3 Comment Originated: 12/27/2016
12/27/2016: Please add a legend to all the sheets of the plan set.
A legend has been added to all applicable sheets.
Comment Number: 4 Comment Originated: 12/27/2016
12/27/2016: Add the limits of street cut notes to sheet C2.0, C4.0.
Street Cut Note:
Limits of street cut are approximate. Final limits are to be determined in the
Page 2 of 11
field by the City Engineering Inspector. All repairs to be in accordance with City street repair standards.
The street cut notes have been added to sheets C2.0 and C4.0.
Comment Number: 5 Comment Originated: 12/27/2016
12/27/2016: This project is responsible for dedicating any right-of-way and
easements that are necessary or required by the City for this project. This shall
including the standard utility easements that are to be provided behind the
right-of-way, 15 foot along an arterial, 8 foot along an alley, 9 foot along all other
street classifications. This can be done in the platting process or through
separate document if the lot will not be platted. A variance to the LCUASS
standard can be requested (LCUASS 1.9.4) but it may or may not be approved.
Information on the dedication process can be found at:
http://www.fcgov.com/engineering/devrev.php
The right‐of‐way and easements documents are complete for College Ave, Magnolia St, and the alley.
They will be forwarded as soon as they are ready for recording.
Comment Number: 6 Comment Originated: 12/27/2016
12/27/2016: The applicant will need to obtain access permits from CDOT for
closing the access point on S College Ave.
Noted. An access permits are in process for CDOT approval prior to closing the access point on S
College Ave.
Comment Number: 7 Comment Originated: 12/27/2016
12/27/2016: On the Utility plans, please ghost the trees (or different visual with
less branches) and any existing sign posts.
A different symbol has been used for trees and existing sign posts on the Utility Plan.
Comment Number: 8 Comment Originated: 12/27/2016
12/27/2016: Please label the property line and easements more clearly.
The property line and easements have been labeled more clearly.
Comment Number: 9 Comment Originated: 12/27/2016
12/27/2016: The driveway to alleyway flare does not meet the standards in
LCUASS Figure 7-11F.
The existing alley driveway is to remain per meeting with city.
Comment Number: 10 Comment Originated: 12/27/2016
12/27/2016: The existing alleyway adjacent to this site will need to be
assessed by the city and improvements may be necessary.
The alleyway adjacent to the site has been assessed and will be repaved, as required by the city.
Comment Number: 11 Comment Originated: 12/27/2016
12/27/2016: The driveway/alleyway material is not specified on the plan set.
The driveway and alleyway need to be concrete up to the property line.
The access and alley have been labeled with the existing and proposed material to be used.
Comment Number: 12 Comment Originated: 12/27/2016
12/27/2016: Curves C7 and C8 do not meet LCUASS standard 8.2.9, the
minimum curb return radii is 15'.
Curves C7 and C8 have been changed to a radius of 10’ and a variance is requested as part of the
Page 3 of 11
approval of this project.
Comment Number: 13 Comment Originated: 12/27/2016
12/27/2016: LCUASS 7.7.C.1.H states that a clay cut off wall should be
provided at the boundaries of the development.
A clay cut‐off wall has been provided at the outlet of the 18” catch basin.
Comment Number: 14 Comment Originated: 12/27/2016
12/27/2016: The alleyway approach will have to be re-constructed after the
installation of the underdrain system to detail 803.
The existing alley approach meets Detail 803 and the underdrain system will be bored to help
prevent any damage to the access.
Comment Number: 15 Comment Originated: 12/27/2016
12/27/2016: The chase will need to be designed per detail D-10B.
The sidewalk chase has been removed from the plans.
Comment Number: 16 Comment Originated: 12/27/2016
12/27/2016: On sheet C4.0, construction note 13 is too specific in dimensions.
2' Saw cut is not allowed, please follow the patching and reconstruction
requirements in LCUASS chapter 25.
The note has been change to be less specific.
Comment Number: 17 Comment Originated: 12/27/2016
12/27/2016: Need to detail the sidewalk connection on the east side of the
driveway to show how this will meet ADA requirements.
The sidewalk has been removed from the plans.
Comment Number: 18 Comment Originated: 12/27/2016
12/27/2016: There can not be more than 750sqft of water draining over the
sidewalk.
There is less than 750 square feet of water draining over the sidewalk. (See sheet C5.0)
Comment Number: 19 Comment Originated: 12/27/2016
12/27/2016: On the drainage plans, where is design point E and Basin E1?
Design point E1 and basin E1 have been labeled on the Drainage Plan.
Comment Number: 20 Comment Originated: 12/27/2016
12/27/2016: On detail sheet, remove detail 708 and 709.
Details 708 and 709 have been removed.
Comment Number: 21 Comment Originated: 12/27/2016
12/27/2016: On detail sheet, need to add 7-11F, 1601, 1602, 1607, 2201, 701,
803, D-10B.
The details have been added to the plans, as applicable.
Comment Number: 22 Comment Originated: 12/27/2016
12/27/2016: See redlines for additional comments. Please return redlines with
Page 4 of 11
next round submittal.
The redlines have been addressed.
Contact: Sheri Langenberger, 970-221-6573, slangenberger@fcgov.com
Topic: General
Comment Number: 23 Comment Originated: 01/06/2017
01/06/2017: The project owes an additional $71 for the TDRFees. This is
based on the site being .72 acres.
The fee is included with the re submittal.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/15/2016
12/15/2016: The tree protection plan notes that there are 16 existing trees on
the site, but there only appear to be 9 shown on the plans. Please update/clarify.
The table has been corrected to accurately reflect the 9 existing trees.
Comment Number: 2 Comment Originated: 12/15/2016
12/15/2016: No additional comments, though I will review any updates to the
tree protection/mitigation plan as needed.
Acknowledged.
Department: Forestry
Contact: Molly Roche, , mroche@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 01/05/2017
01/04/2017:
Please schedule a site visit with the City Forester to obtain Tree Inventory and
Mitigation information to include on the Landscape Plans.
This was conducted on January 17th and the information is now included in the tree inventory/
mitigation table.
Comment Number: 2 Comment Originated: 01/05/2017
01/04/2017:
Please replace the existing Permit Box note with the correct Required Street
Tree note, which is placed in a bolded box. This is available from the City
Forester. This has been replaced.
Comment Number: 3 Comment Originated: 01/05/2017
01/04/2017:
Please explore widening the parking lot island widths, if at all possible. The City
Forester suggests Regal Prince Oak or Prairie Sentinel Hackberry as
alternative species that would fit better in these narrow spaces. This option was explored and
is not possible without losing parking spaces. The Regal Prince Oak was chosen for these narrow
spaces.
Comment Number: 4 Comment Originated: 01/05/2017
Page 5 of 11
01/04/2017:
Please consider using Red Barron Crabapple where Adirondack Crabapples
are currently proposed. Red Barron will likely have better availability. The Red Barron Crabapple
has replaced the Adirondack.
Comment Number: 5 Comment Originated: 01/05/2017
01/04/2016:
Please explore using Linden in place of Honeylocust, due to their adaptability to
shade. The Honeylocusts have been replaced with the Little Leaf Linden.
Department: Light And Power
Contact: Coy Althoff, 970-224-6150, CAlthoff@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: Light & Power have existing facilities in this area. There is
primary 3-phase power available in the alley way east of this property as well as
streetlight and flood light circuits along Magnolia St. and College Ave. Noted.
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: The existing 400W HPS light on the north-central part of this
property is part of the Fort Collins Light & Power "floodlight" program. At this
time, the monthly fee is part of the Wells Fargo utility bill. Please contact Light &
Power, Project Engineering to have this structure removed prior to demolition. Acknowledged.
Comment Number: 3 Comment Originated: 01/03/2017
01/03/2017: As your project begins to move forward please contact Light and
Power Engineering to coordinate the streetlight, transformer and electric meter
locations, please show the locations on the utility plans. This will be coordinated at final or the
time of permitting.
Comment Number: 4 Comment Originated: 01/03/2017
01/03/2017: Please provide a one line diagram and a C-1 form to Light and
Power Engineering. The C-1 form can be found at:
http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf
This will be provided at final or the time of permitting.
Comment Number: 5 Comment Originated: 01/03/2017
01/03/2017: You may contact FCU Light & Power, project engineering if you
have questions. (970) 221-6700. You may reference Light & Power’s Electric
Service Standards at
http://www.fcgov.com/utilities/img/site_specific/uploads/ElectricServiceStandar
ds_FINAL_17June2016.pdf
You may reference our policies, development charge processes, and use our
fee estimator at
http://www.fcgov.com/utilities/business/builders-and-developers.
Noted.
Page 6 of 11
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 12/12/2016
12/12/2016: NO COMMENT
PFA has no comment related to improvement of the parking lot at 112 W.
Magnolia.
Department: Planning Services
Contact: Meaghan Overton, 970-416-2283, moverton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: It would be helpful if the site and landscape plans were larger.
Right now it’s difficult to see the detail. Plans have been reformatted to 10 scale, with the exception
of the legend as it did not fit on the page at that scale. It remains at 20 scale.
Comment Number: 7 Comment Originated: 01/04/2017
01/04/2017: Per street maintenance - please remove drive on College and
replace with sod/turf or similar. Access permit for CDOT is in process to close this access and show
sod/turf.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: Please cross-reference the legend on the landscape plan with the
plant schedule. I can’t easily tell how many of each species are shown on the
landscape plan the way it’s currently organized. Plans have been updated with call outs for
clarification.
Comment Number: 3 Comment Originated: 01/03/2017
01/03/2017: The existing trees need to be more clearly shown. The tree notes
show 16 trees, but the existing landscape plan only shows 9 trees. Where are
the other 7 trees? In particular, the deciduous trees are hard to see because the
linework overlaps. Any trees removed from the site should be noted as such
along with detail for mitigation. The numbers provided in the tree notes were incorrect; there
are indeed 9 existing trees and these are now shown more clearly and the notes have been
corrected. The tree symbols have also been scaled down for clarification.
Topic: Modification of Standard
Comment Number: 5 Comment Originated: 01/03/2017
01/03/2017: The justification for the modification of standard should focus more
on why the proposed solutions meet the general purpose of the standard in
3.2.2(J) "equally well or better than" a plan that complied with the standard. The
justification as written emphasizes the impact to the parking lot, not how well the
proposed solution meets the purpose of the standard. Also note that the 15 foot
setback applies only to the College Avenue side of the parking lot. The setback
from the alley only needs to be a minimum of 5 feet. The modification of standard has been
revised to focus on how it meets the general purpose of the standard rather than the impact on
the parking design.
Comment Number: 6 Comment Originated: 01/03/2017
Page 7 of 11
01/03/2017: Staff's analysis of the requested modification of standard will
consider the consistency of the setback with the adjacent building to the north,
the efficacy and aesthetic compatibility of the materials chosen for screening,
and the movement of pedestrians around the site (e.g. the closure of the
College Avenue access point). Please address these points in your revised
modification request. Noted. The modification will address this.
Department: Stormwater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 12/30/2016
12/30/2016: The grading plan should be reconfigured such that runoff will
infiltrate into the paver sections and not bypass the pavers at an unknown rate
into the public street. The proposed u-channel is actually the low point for one of
the paver sections, which means that an unspecified amount of runoff is going to
simply escape through the u-channel. This channel should either be eliminated
or modified so that it is not at the low point.
The u‐channel has been removed. All the runoff from the site now drains to the paver sections.
Comment Number: 3 Comment Originated: 12/30/2016
12/30/2016: The underdrains don’t appear to be located at the low end of the
paver sections. This should be revised.
The underdrains are now located at the low points of the pavers.
Comment Number: 4 Comment Originated: 12/30/2016
12/30/2016: The drainage plan includes a table for each paver section and
run-on ratios. Please label each paver section in the plan view so I know which
one is which. In addition, the run-on area for each paver section will need to be
shown on an exhibit that is included within the drainage report. Currently, the
run-on areas are not clear.
The paver sections have been labeled, and run‐on areas to the pavers have been added to the Drainage
Plan.
Topic: Drainage Report
Comment Number: 5 Comment Originated: 12/30/2016
12/30/2016: Please note that Table RO-11 from the FCSCM should be
referenced and utilized for runoff coefficients instead of Table RO-3 from the
USDCM.
Table RO‐3 has been replaced with Table RO‐11.
Comment Number: 6 Comment Originated: 12/30/2016
12/30/2016: The 100-year orifice calculations need to be included in the report.
A calculation has been added for the outlet orifice.
Comment Number: 7 Comment Originated: 12/30/2016
12/30/2016: The UD-Detention spreadsheet uses Denver rainfall data to
calculate runoff and therefore detention volume. We don’t allow this spreadsheet
to compute detention volume. Please put together your own mass-balance
spreadsheet, using Fort Collins rainfall data and following the requirements of
Page 8 of 11
Chapter 10, Section 3.2.3.
A new spreadsheet for calculating detention volume has been created using the Fort Collins
storm and following the requirements of Chapter 10, Section 3.23.
Comment Number: 8 Comment Originated: 12/30/2016
12/30/2016: The UD-Detention spreadsheet can be utilized for stage storage
computations but I can’t tell how you’re including only the void space volume in
the paver sub-grade. You should be assuming a 30% void space and this
should be stated in the report. Also, the elevations shown on this spreadsheet
need to be related back to the paver sub-grade section so I can verify that the
detention volume is within the rock layer of the sub-grade and/or verify that the
12-inch depth of this layer is adequate.
A note has been added to state that 30% imperviousness is used for #2 subbase. The #2
subbase depth has been increased to 16 inches to provide enough storage for the 100‐year
event.
Topic: General
Comment Number: 11 Comment Originated: 02/03/2017
02/03/2017: Please note that stormwater PIF's (and water fees if needed) will
need to be paid prior to us signing mylars on this project because there is no
building permit process associated with this project.
Contact: Heidi Hansen, 970-221-6854, hhansen@fcgov.com
Topic: Floodplain
Comment Number: 9 Comment Originated: 01/03/2017
01/03/2017: Per the Floodplain Review Checklist, please add and label the
100-year floodplain and floodway boundaries on the Site Plan.
The 100‐year floodplain and floodway boundaries have been labeled on the Site Plan.
Comment Number: 10 Comment Originated: 01/03/2017
01/03/2017: Staff will provide comments on the Floodplain Use Permit
separately. The floodplain use permit with no-rise certification must be
approved prior to construction. An as-built survey will be required after
construction for no-rise recertification.
We have received the comments on the Floodplain Use Permit and have addressed them accordingly.
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 12/20/2016
12/20/2016: The site disturbs more than 10,000 sq. ft., therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; an Erosion Control Plan
(Based upon redlines), an Erosion Control Report, and an Escrow / Security
Calculation. If you need clarification concerning the erosion control section, or if
there are any questions please contact Jesse Schlam 970-218-2932 or email
@ jschlam@fcgov.com
Page 9 of 11
The Erosion Control Report has been fixed per the comments, and an Erosion Control Report,
Erosion Control Plan, and Escrow are being submitted with the revised plans.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Construction Drawings
Comment Number: 9 Comment Originated: 01/03/2017
01/03/2017: Please change the titles so they match the other plan sets. See
redlines.
Comment Number: 10 Comment Originated: 01/03/2017
01/03/2017: The City has moved to the NAVD88 vertical datum, and as of
January 1, 2015, all projects are required to be on NAVD88 datum. Please
provide the following information for the Benchmark Statement in the EXACT
format shown below.
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL
DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29
UNADJUSTED FOR THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE,
THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED
= NAVD88 - X.XX’.
The Benchmark Statement now matches the above format.
Comment Number: 11 Comment Originated: 01/03/2017
01/03/2017: Please revise the legal description as marked. See redlines.
The legal description has been revised as marked.
Comment Number: 12 Comment Originated: 01/03/2017
01/03/2017: All benchmark statements must match on all sheets.
All benchmark statements now match on all sheets.
Comment Number: 13 Comment Originated: 01/03/2017
01/03/2017: There are line over text issues. See redlines.
All line over text issues have been addressed.
Topic: Landscape Plans
Comment Number: 5 Comment Originated: 01/03/2017
01/03/2017: Please revise the legal description in the title block as marked.
See redlines. This has been revised.
Comment Number: 6 Comment Originated: 01/03/2017
01/03/2017: There are line over text issues. See redlines. This has been revised.
Page 10 of 11
Topic: Lighting Plan
Comment Number: 7 Comment Originated: 01/03/2017
01/03/2017: Please revise the legal description in the title block as marked. This has been revised.
See redlines.
Comment Number: 8 Comment Originated: 01/03/2017
01/03/2017: Please change the titles so they match. See redlines. This has been revised.
Topic: Site Plan
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: Some of the sheet titles in the sheet index do not match the sheet
titles on the noted sheets. See redlines. This has been corrected.
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: Please revise the legal description as marked. See redlines. This has been revised.
Comment Number: 3 Comment Originated: 01/03/2017
01/03/2017: There are notes with missing text. See redlines. This has been revised.
Comment Number: 4 Comment Originated: 01/03/2017
01/03/2017: There are line over text issues. See redlines. This has been revised.
Department: Traffic Operation
Contact: Nicole Hahn, 970-221-6820, nhahn@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: Work with engineering staff to determine scope of alley
improvements.
The alleyway is to be repaved with concrete per Cox Paving.
Comment Number: 2 Comment Originated: 01/03/2017
01/03/2017: Consider adding some type of connection to the College Ave.
sidewalk to improve pedestrian connectivity.
There is already a proposed connection to the College Ave. sidewalk.
Department: Water Conservation
Contact: Eric Olson, 970-221-6704, eolson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 01/03/2017
01/03/2017: Irrigation plans are required no later than at the time of building
permit. The irrigation plans must comply with the provisions outlined in Section
3.2.1(J) of the Land Use Code. Direct questions concerning irrigation
requirements to Eric Olson, at 221-6704 or eolson@fcgov.com
Noted.
Department: Water-Wastewater Engineering
Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com
Page 11 of 11
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 12/30/2016
12/30/2016: There is an existing 4-inch waterline in Magnolia and a 6-inch
sanitary sewer main in the alley that are not shown on your plans. Please include
these and make sure to survey the depth of the sanitary sewer main to ensure
no conflict with the proposed storm pipe that crosses it.
The 4” waterline and 6” sanitary line have been added to the plans, and a utility crossing callout has
been added to the Utility Plan to confirm there is no conflict with the storm and sanitary lines.
Topic: Landscape Plans
Comment Number: 2 Comment Originated: 12/30/2016
12/30/2016: How are you planning to irrigate the landscaping on this project? If
you plan to have an irrigation tap and meter, these need to be shown on the
Landscape Plan and Utility Plan with the tap size and location shown and any
roadway excavation limits also shown.
The irrigation tap and meter have been added to the plans.
Department: Zoning
Contact: Marcus Glasgow, 970-416-2338, mglasgow@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 12/21/2016
12/21/2016: Site and landscape plan will to be on a larger scale.
Site and landscape plans have been reformatted to 10 scale with the exception of the legends