Loading...
HomeMy WebLinkAboutCHRISTIAN BROTHERS AUTOMOTIVE - PDP - PDP170018 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTPrepared For: CHRISTIAN BROTHERS AUTOMOTIVE CENTER 17725 KATY FREEWAY, SUITE 200 HOUSTON, TX 77094 BLOCK 1– UPLANDS PROSPECT BUSINESS PARK P.U.D. FORT COLLINS, CO PDP DRAINAGE REPORT May 17, 2017 Job #co 15298 PROJECT SITE INDEX ITEM PAGE GENERAL LOCATION & DESCRIPTION......................................................................... 1 DRAINAGE BASINS & SUB-BASINS............................................................................... 2 DRAINAGE DESIGN CRITERIA...................................................................................... 2 DRAINAGE FACILITY DESIGN........................................................................................ 5 CONCLUSIONS.............................................................................................................. 6 REFERENCES................................................................................................................. 6 ATTACHMENTS Appendix A: Vicinity Map Appendix B: Hydrologic Computations Historic and Developed  Weighted C Factor  Time of Concentration  Peak Runoff  Design Tables Appendix C: Hydraulic Computations Appendix D: NRCS Soils Map Appendix E: Flood Insurance Rate Map Appendix F: Proposed Drainage Plan Page | 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. A vicinity map has been provided in Appendix A. 2. The project is located in Block 1, Uplands Prospect Business Park P.U.D. in the East ½ of Section 18, Township 7 North, Range 68 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located at the northeast corner of the intersection of East Prospect Road and Academy Court. 4. There are no major drainage ways, facilities or easements within or adjacent to the site. 5. To the northeast, the property is bound by the Great Western Railway, to the south by East Prospect Road and to the west, Academy Court. Life Church of Fort Collins and Front Range Community College are located on the west side of Academy Court, The Coterie Natural Area lies south of East Prospect Road, and Bath Garden Center and Nursery lies to the east of the site. B. Description of Property 1. The total area of the Lot is 1.147 acres. The project will impact approximately 0.735 acres of the western lot area. The remaining 0.412 acres is covered by a 35- foot wide Platte River Power Authority and an overall 40.5-foot wide Utility Easement, minimal disturbance will occur in the easement. 2. The eastern 40.5 feet of the property is an occupied utility easement, storm and sanitary mains have been installed, and along the eastern edge is a Platte River Power Authority transmission line. The remainder of the property is undeveloped and is covered primarily with native grass and vegetation. The site was over-lot graded at the time of development of the subdivision. The majority of the site has a slight 1 to 3 percent slope to the northeast; the eastern edge has a slope of 3 to 5 percent to the east. The NRCS Soil Report classifies the soil as well drained. A copy of the report is provided in Appendix D. 3. No major drainage ways directly impact the site. The Cache La Poudre River lies to the north and Spring Creek lies to the south. 4. The project will include the construction of the service facility, parking, associated utility installation & landscaping. On-site detention is provided on the east side of the service facility. 5. There are no irrigation facilities on or near the project site. 6. Proposed land use is for a light automotive repair and service facility. The site is zoned Industrial District (I) which allows this use. Page | 2 C. Floodplain Submittal Requirements 1. The site is not in a floodplain. 2. The FEMA FIRM panel number 08069C0983H, revised May 2, 2012, was reference and a copy is included in Appendix E. 3. A copy of the “City of Fort Collins Floodplain Review Checklist for 50% Submittals” is included in Appendix E. II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. This project is in the Spring Creek Drainage Basin. A copy of the Spring Creek Master Drainage Plan was not available from the City of Fort Collins website, due to a statement that the master plan update is currently underway. 2. The area of the Spring Creek Drainage Basin the project is located in is mostly developed. The project site is a single lot infill development. 3. No irrigation facilities are known to influence or be influenced by the local drainage design of this project. B. Sub-Basin Description 1. Historic drainage patterns for the property are typically from west to east and northeast. The subdivision currently has internal streets and utility infrastructure installed. 2. This Lot is protected from offsite flows, on the west and south sides by the existing curb & gutters of Academy Court and E Prospect Road respectively. This site slopes away from the existing streets and has no offsite flow impacts. III. DRAINAGE DESIGN CRITERIA A. Regulations 1. There are no deviations from the criteria. The site was designed to accommodate the allowable parking numbers, emergency vehicle easements with the most efficient layout. Runoff from impervious surfaces is conveyed in vegetated swales with gentle slopes or overland on landscape surfaces to the on-site detention pond. The detention pond was designed with Water Quality Capture Volume (WQCV) in addition to the 100-year storm developed runoff volume. The outlet structure is designed to slowly release flows from frequent storm events and release flows up to a 100-year storm event at no more than the 2-year historic runoff rate. 2. The project site has an existing storm sewer with catch basins installed in the utility easement along the east boundary. The site’s detained flows will be released into this existing storm sewer. By releasing site flows up to a 100- Page | 3 year storm event at the 2-year historic rate into the existing storm sewer, flows to the existing catch basins will be reduced over current condition events which exceed a 2-year event. B. Directly Connected Impervious Area (DCIA) and Four Step Process Compliance 1. Employ Runoff Reduction Practices: This site uses a vegetated swale to convey site runoff from the building, drive isle and parking areas to the detention pond. 2. Implement BMPs that provide a WQCV with slow release: This site uses a vegetated swale in addition to a WQCV. The release rate of the WQCV is 40 hours. 3. Stabilize Drainageways: This site will release developed flows at a 2-yr historic rate into an existing storm sewer system on the project site. 4. Implement Site Specific and Other Source Control BMPs: A separate Erosion and Sediment Control Plan has been developed with source control BMPs used from ground breaking operations to permanent stabilization installations. C. Development Criteria Reference and Constraints 1. No adjacent drainage studies were available at the time this report was written. All developed lots in the subject subdivision have on-site detention ponds. This project site is protected from off-site runoff by existing curb and gutter on the upslope sides. Developed flow from this site will be detained on- site and released directly into the existing storm sewer at the 2-year historic rate. 2. There are no known adjacent drainage studies. The Uplands Prospect Business Park is bound on the east and west sides by existing railroad tracts. There are no effects from adjacent drainage studies. 3. This Project Site is an infill development in an older subdivision. Development of this site will not cause any drainage impact any existing infrastructure. D. Hydrological Criteria 1. Rainfall data was obtained from the City of Fort Collins Storm Drainage Design Criteria Manual, Table RA-8. Rainfall data used for this design is as follows: 2 year 0.82 in. 10 year 1.40 in. 100 year 2.86 in. 2. The Rational Method was used to calculate runoff. Per the Fort Collins Storm water Criteria, the runoff coefficients were adjusted for infrequent storms. Therefore the C100 was applied a frequency factor of Cf=1.25. Page | 4 3. Detention pond sizing, outlet structure configuration, and discharge rates were calculated using UDFCD equations and spreadsheets. Results were compared to the City of Fort Collins, Rational Method Spreadsheet Template. The detention storage was sized for WQCV plus the 100-year developed flows, the release rate is the 2-year historic flow. Calculations in this study are based on the disturbed area of 0.735 acres per discussions with City of Fort Collins staff. 4. For the purposes of this design, the 2-year storm will be considered the Minor storm, and the 100-year storm will be considered the Major storm. 5. No other calculation methods were used for this report. A. E. Hydraulic Criteria 1. Per the Fort Collins Storm water Criteria, detention volume is calculated using the Rational FAA method and per criteria, increased by 20% to account for the larger resulting storage volume that would be obtained from SWMM modeling. Per discussions with City of Fort Collins staff, the volume increase is not required. This site is also less than 5 acres. 2. No additional drainage facility design criteria were used. 3. No modifications to any 100-year floodplain or floodway are proposed as part of this project. 4. No modifications to any natural drainage ways are proposed as part of this project. F. Floodplain Regulations Compliance 1. A FEMA Map and a completed “City of Fort Collins Floodplain Review Checklist for 50% Submittals” is included in Appendix E. G. Modifications of Criteria 1. There is no modification of criteria requested. H. Modifications of Criteria 2. There is no modification of criteria requested. Storm Return Period Frequency Factor, Cf 2 to 10 1.00 11 to 25 1.10 26 to 50 1.20 51 to 100 1.25 Page | 5 IV. DRAINAGE FACILITY DESIGN A. General Concept 1. Typical drainage patterns for this Lot are generally to the east and northeast, toward the existing Great Western Railway tracks. Developed flows will be a combination of sheet flow, concentrated gutter flow and grass swale. The time of concentration for the project was calculated to the detention pond outlet. 2. There are no off-site flows to consider on this project site. 3. Input and Output results of the Historic Condition and Developed Condition UD-Rational analysis are in Appendix B. Input and Output results of the Modified FAA Volume, WQCV and Stage Storage Table and the Fort Collins Rational Method Spreadsheet, Detention Volume (Mass Balance) and WQCV are in Appendix C. 4. The proposed drainage pattern will generally follow these existing drainage patterns of west to east. B. Specific Details 1. This site has a triangular shape with the low point being at the narrow end of the lot and a wide utility easement on the east side of the lot. Detention area was obtained by moving the building west on the lot to minimize impervious areas and using the open space between the back of the building and utility easement. LID requirements were met by designing a bio-swale above the detention pond to provide water quality benefits prior to the detention area. This bio- swale has an area of approximately 10% of the impervious area of the paving and ½ of the building. The east half of the building will drain directly into the swale or the detention pond which will provide additional water quality control for frequent, low intensity storms. 2. Detention storage & outlet design: The calculated 100-yr detention volume plus Water Quality Capture Volume (WQCV) is 0.222 acre-ft using the UD- FAA method spreadsheet. The calculated 100-yr detention volume plus Water Quality Capture Volume (WQCV) is 0.221 acre-ft using the using the City of Fort Collins Rational Method spreadsheet. This project used the more conservative volume of 0.222 acre-ft for the project. The outlet will consist of a single stage structure to release WQCV, then release at the 2-year historic runoff rate up to the 100-yr plus WQCV elevation. WQCV of 0.030 acre-feet is provided in addition to the bio-swale benifits. 3. An overflow weir is designed to release flows that exceed the 100-yr storm event runoff volume. The emergency flows will be directed towards existing inlets installed on the storm sewer on the site. 4. Summary table: The required information can be found in Appendix C of this report. Page | 6 5. Maintenance access: The maintenance access will be from the north in the drainage swale. 6. Easements: No easements are impacted as part of this project. 7. Offsite facilities: No new offsite facilities are required as part of this project. V. CONCLUSIONS A. Compliance with standards 1. This report and drainage design is in compliance with all known criteria published by the City of Fort Collins. 2. This drainage plan complies with the Spring Creek Master Plan based on criteria conveyed from the City of Fort Collins. The updated Spring Creek Master Plan was not available at the time of this study. 3. Compliance w/ City floodplain regulations. No floodplains are impacted as part of this project. 4. Compliance w/ State & Federal regulations. This project is in compliance with all known City, State and Federal regulations. B. Drainage Concept 1. The concepts put forth in this study will be effective in maintaining the historic flow rates for this site while providing adequate water quality treatment. 2. This drainage plan complies with the City of Fort Collins Storm water Criteria Manual and all know Master Drainage Plan recommendations. VI. REFERENCES 1. City of Fort Collins, Colorado, 2011 and 2013. 2. Urban Storm Drainage Criteria Manual, Vol. 1, 2 and 3, Urban Drainage and Flood Control District, Denver, Colorado, June 2001. APPENDIX A VICINITY MAP APPENDIX B HYDROLOGIC COMPUTATIONS Project Title: Catchment ID: Illustration Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output HISTORIC 0.74 0.12 0.09 I=20% 0.00 0.00 0.00 Sum: 0.74 Sum: 0.09 Area-Weighted Runoff Coefficient (sum CA/sum A) = 0.12 *See sheet "Design Info" for inperviousness-based runoff coefficient values. Area-Weighting for Runoff Coefficient Calculation Historic Condition, 2-yr Calcs I=20% Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 15298 UD-Rational HIST.xls, Weighted C 4/28/2017, 3:10 PM Project Title: Catchment ID: I. Catchment Hydrologic Data Catchment ID = 1 Area = 0.74 Acres Percent Imperviousness = 20.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr = 2 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.12 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0.20 Overide 5-yr. Runoff Coefficient, C = 0.20 (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/ Short Nearly Grassed Type Meadow Field Pasture/ Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations: Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey- Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0229 86 0.20 N/A 0.13 11.46 1 0.0265 102 7.00 1.14 1.49 2 0.0209 90 7.00 1.01 1.48 3 4 5 278 Computed Tc = 14.44 Regional Tc = 11.54 User-Entered Tc = 11.54 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 1.90 inch/hr Peak Flowrate, Qp = 0.160 cfs Rainfall Intensity at Regional Tc, I = 2.09 inch/hr Peak Flowrate, Qp = 0.177 cfs Rainfall Intensity at User-Defined Tc, I = 2.09 inch/hr Peak Flowrate, Qp = 0.177 cfs Calculated values for Tc & Qp are based on overide values entered for C & C-5. (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Fort Collins CBA Historic 2-yr Calcs I=45%, 100-yr Calcs I=73% Paved Areas & 15298 UD-Rational HIST.xls, Tc and PeakQ 4/28/2017, 3:11 PM Project Title: Catchment ID: I. Catchment Hydrologic Data Catchment ID = 1 Area = 0.74 Acres Percent Imperviousness = 55.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr = 100 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.54 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0.38 Overide 5-yr. Runoff Coefficient, C = 0.20 (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/ Short Nearly Grassed Type Meadow Field Pasture/ Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations: Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey- Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0229 86 0.20 N/A 0.13 11.46 1 0.0265 102 7.00 1.14 1.49 2 0.0209 90 7.00 1.01 1.48 3 4 5 278 Computed Tc = 14.44 Regional Tc = 11.54 User-Entered Tc = 11.54 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 6.61 inch/hr Peak Flowrate, Qp = 2.636 cfs Rainfall Intensity at Regional Tc, I = 7.30 inch/hr Peak Flowrate, Qp = 2.911 cfs Rainfall Intensity at User-Defined Tc, I = 7.30 inch/hr Peak Flowrate, Qp = 2.911 cfs Calculated values for Tc & Qp are based on overide values entered for C & C-5. (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Fort Collins CBA Historic 2-yr Calcs I=45%, 100-yr Calcs I=73% Paved Areas & 15298 UD-Rational HIST.xls, Tc and PeakQ 4/28/2017, 3:12 PM Project Title: Catchment ID: Illustration Instructions: For each catchment subarea, enter values for A and C. Subarea Area Runoff Product ID acres Coeff. A C* CA input input input output LS 0.25 0.37 0.09 PAVE 0.38 0.81 0.31 ROOF 0.11 0.81 0.09 Sum: 0.735 Sum: 0.49 Area-Weighted Runoff Coefficient (sum CA/sum A) = 0.66 *See sheet "Design Info" for inperviousness-based runoff coefficient values. Area-Weighting for Runoff Coefficient Calculation 100-yr Coefficients, I=75% (UNADJUSTED) 15298 UD-Rational DEV_Disturbedarea.xls, Weighted C 4/28/2017, 3:13 PM Project Title: Catchment ID: I. Catchment Hydrologic Data Catchment ID = 1 Area = 0.74 Acres Percent Imperviousness = 75.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr = 2 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 0.82 inches (input one-hr precipitation--see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.51 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0.54 Overide 5-yr. Runoff Coefficient, C = 0.54 (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/ Short Nearly Grassed Type Meadow Field Pasture/ Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations: Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey- Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0200 35 0.54 N/A 0.12 4.76 1 0.0200 26 20.00 2.83 0.15 2 0.0050 228 20.00 1.41 2.69 3 4 5 289 Computed Tc = 7.60 Regional Tc = 11.61 User-Entered Tc = 7.60 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 2.45 inch/hr Peak Flowrate, Qp = 0.914 cfs Rainfall Intensity at Regional Tc, I = 2.09 inch/hr Peak Flowrate, Qp = 0.778 cfs Rainfall Intensity at User-Defined Tc, I = 2.45 inch/hr Peak Flowrate, Qp = 0.914 cfs Calculated values for Tc & Qp are based on overide values entered for C & C-5. (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Fort Collins CBA Developed 2-yr Calcs I=75%, 100-yr Calcs I=92% Paved Areas & 15298 UD-Rational DEV_Disturbedarea.xls, Tc and PeakQ 4/28/2017, 3:16 PM Project Title: Catchment ID: I. Catchment Hydrologic Data Catchment ID = 1 Area = 0.74 Acres Percent Imperviousness = 92.00 % NRCS Soil Type = B A, B, C, or D II. Rainfall Information I (inch/hr) = C1 * P1 /(C2 + Td)^C3 Design Storm Return Period, Tr = 100 years (input return period for design storm) C1 = 28.50 (input the value of C1) C2= 10.00 (input the value of C2) C3= 0.786 (input the value of C3) P1= 2.86 inches (input one-hr precipitation--see Sheet "Design Info") III. Analysis of Flow Time (Time of Concentration) for a Catchment Runoff Coefficient, C = 0.84 Overide Runoff Coefficient, C = (enter an overide C value if desired, or leave blank to accept calculated C.) 5-yr. Runoff Coefficient, C-5 = 0.76 Overide 5-yr. Runoff Coefficient, C = 0.54 (enter an overide C-5 value if desired, or leave blank to accept calculated C-5.) Illustration NRCS Land Heavy Tillage/ Short Nearly Grassed Type Meadow Field Pasture/ Bare Swales/ Lawns Ground Waterways Conveyance 2.5 5 7 10 15 Calculations: Reach Slope Length 5-yr NRCS Flow Flow ID S L Runoff Convey- Velocity Time Coeff ance V Tf ft/ft ft C-5 fps minutes input input output input output output Overland 0.0200 35 0.54 N/A 0.12 4.76 1 0.0200 26 20.00 2.83 0.15 2 0.0050 228 20.00 1.41 2.69 3 4 5 289 Computed Tc = 7.60 Regional Tc = 11.61 User-Entered Tc = 7.60 IV. Peak Runoff Prediction Rainfall Intensity at Computed Tc, I = 8.56 inch/hr Peak Flowrate, Qp = 5.256 cfs Rainfall Intensity at Regional Tc, I = 7.28 inch/hr Peak Flowrate, Qp = 4.473 cfs Rainfall Intensity at User-Defined Tc, I = 8.56 inch/hr Peak Flowrate, Qp = 5.256 cfs Calculated values for Tc & Qp are based on overide values entered for C & C-5. (Sheet Flow) 20 Shallow Paved Swales Sum CALCULATION OF A PEAK RUNOFF USING RATIONAL METHOD Fort Collins CBA Developed 2-yr Calcs I=75%, 100-yr Calcs I=92% Paved Areas & 15298 UD-Rational DEV_Disturbedarea.xls, Tc and PeakQ 4/28/2017, 3:14 PM Runoff Coefficient vs. Watershed Imperviousness Based on Runoff Coefficient estimating equation published by Urbonas, et.al. (1990) & WEF (1998) Basic equation for NRCS Soil Types C & D: C CD = K CD + (0.858*i 3 - 0.786*i 2 + 0.774*i + 0.04) Basic equation for NRCS Soil Type A: C A = K A + (1.31*i 3 - 1.44*i 2 + 1.135*i - 0.12) in which use values for C A > 0 in which: i = I a /100, imperviousness ratio I a = watershed imperviousness in percent C A = Runoff Coefficient for NRCS Soil Type A K A = Correction factor for C A when the storm return period is greater than 2-years C CD = Runoff Coefficient for NRCS Soil Types C and D K CD = Correction factor for C CD when the storm return period is greater than 2-years NRCS Soil Types 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr C & D 0.00 [-0.10*i +0.11] [-0.18*i +0.21] [-0.28*i +0.33] [-0.33*i +0.40] [-0.39*i +0.46] A 0.00 [-0.08*i +0.09] [-0.14*i +0.17] [-0.19*i +0.24] [-0.22*i +0.28] [-0.25*i +0.32] Imperv. Ratio ( i ) 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0.00 0.04 0.15 0.25 0.37 0.44 0.50 -0.12 -0.03 0.05 0.12 0.16 0.20 0.05 0.08 0.18 0.28 0.39 0.46 0.52 -0.07 0.02 0.10 0.16 0.20 0.24 0.10 0.11 0.21 0.30 0.41 0.48 0.53 -0.02 0.06 0.14 0.20 0.24 0.28 0.15 0.14 0.24 0.32 0.43 0.49 0.54 0.02 0.10 0.17 0.23 0.27 0.30 0.20 0.17 0.26 0.34 0.44 0.50 0.55 0.06 0.13 0.20 0.26 0.30 0.33 0.25 0.20 0.28 0.36 0.46 0.52 0.56 0.09 0.16 0.23 0.29 0.32 0.35 0.30 0.22 0.30 0.38 0.47 0.53 0.57 0.13 0.19 0.25 0.31 0.34 0.37 0.35 0.25 0.33 0.40 0.48 0.54 0.57 0.16 0.22 0.28 0.33 0.36 0.39 0.40 0.28 0.35 0.42 0.50 0.55 0.58 0.19 0.25 0.30 0.35 0.38 0.41 0.45 0.31 0.37 0.44 0.51 0.56 0.59 0.22 0.27 0.33 0.37 0.40 0.43 0.50 0.34 0.40 0.46 0.53 0.57 0.60 0.25 0.30 0.35 0.40 0.42 0.45 0.55 0.37 0.43 0.48 0.55 0.59 0.62 0.29 0.33 0.38 0.42 0.45 0.47 0.60 0.41 0.46 0.51 0.57 0.61 0.63 0.33 0.37 0.41 0.45 0.47 0.50 0.65 0.45 0.49 0.54 0.59 0.63 0.65 0.37 0.41 0.45 0.49 0.51 0.53 0.70 0.49 0.53 0.57 0.62 0.66 0.68 0.42 0.45 0.49 0.53 0.54 0.56 0.75 0.54 0.58 0.62 0.66 0.69 0.71 0.47 0.50 0.54 0.57 0.59 0.61 0.80 0.60 0.63 0.66 0.70 0.73 0.74 0.54 0.56 0.60 0.63 0.64 0.66 0.85 0.66 0.68 0.71 0.75 0.78 0.79 0.61 0.63 0.66 0.69 0.70 0.72 0.90 0.73 0.75 0.77 0.80 0.83 0.83 0.69 0.71 0.73 0.76 0.77 0.79 0.95 0.80 0.82 0.84 0.87 0.89 0.89 0.78 0.80 0.82 0.84 0.85 0.86 1.00 0.89 0.90 0.92 0.94 0.96 0.96 0.89 0.90 0.92 0.94 0.95 0.96 Notes: For Type B Soils, use the average of coefficients C CD and C A I. One-hr Precipitation Values for Metro Denver Area Return period in years 2 5 10 50 100 Depth in inches 0.93 1.35 1.61 2.20 2.60 II. Recommended Runoff Coefficients for Metro Denver Business: Commercial areas Neighborhood areas Residential: Single-family Multiunit (detached) Multiunit (attached) Half-acre lot or larger Apartments Industrial: Light areas Heavy areas Parks, cemeteries: Playgrounds: Schools: Railroad yard areas: Undeveloped areas: Historical Flow Analysis Greenbelts, agricultural Off-site flow analysis (when land use not defined) Streets: Paved Gravel (packed) Driveways and sidewalks: Roofs: Lawns, sandy soil Lawns, clayey soil *Refer to Figures RO-3 through RO-5 in Runoff Chapter of USDCM. 0 0 100 40 90 90 50 15 2 45 80 80 90 5 10 85 * 60 75 * Percent Imper- viousness Land Use or Surface Characteristics 95 Page 2 Rational Input Coefficients using UD-Rational Spreadsheet HISTORIC CONDITIONS with 0.735 acres of Project Disturbed Area IHISTORIC = 20% Off-site analysis (when land use not defined) using Table RO-11 from COFC_Amendments_V_1_Chapter _5_Runoff for Lawns, Heavy Soil: Flat <2% C100 = .44, Adjusted C100 = 0.55 C5 = .20 C2 = .12 I100 = 55% I2 = 20% Q100 = 2.91 cfs Q2 = 0.18 cfs DEVELOPED CONDITIONS with 0.735 acres of Project Disturbed Area IDEVELOPED = 75% C100 = .66, Adjusted C100 = .0.83 C5 = .54 C2 = .51 I100 = 92% I2 = 75% Q100 = 5.26 cfs Q2 = 0.91 cfs APPENDIX C HYDRAULIC COMPUTATIONS Project: Basin ID: Design Information (Input): Design Information (Input): Catchment Drainage Imperviousness Ia = 92.00 percent Catchment Drainage Imperviousness Ia = 92.00 percent Catchment Drainage Area A = 0.74 acres Catchment Drainage Area A = 0.736 acres Predevelopment NRCS Soil Group Type = B A, B, C, or D Predevelopment NRCS Soil Group Type = B A, B, C, or D Return Period for Detention Control T = 2 years (2, 5, 10, 25, 50, or 100) Return Period for Detention Control T = 100 years (2, 5, 10, 25, 50, or 100) Time of Concentration of Watershed Tc = 8 minutes Time of Concentration of Watershed Tc = 8 minutes Allowable Unit Release Rate q = 0.24 cfs/acre Allowable Unit Release Rate q = 0.24 cfs/acre One-hour Precipitation P1 = 0.82 inches One-hour Precipitation P1 = 2.86 inches Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Design Rainfall IDF Formula i = C1* P1/(C2+Tc)^C3 Coefficient One C1 = 28.50 Coefficient One C1 = 28.50 Coefficient Two C2 = 10 Coefficient Two C2 = 10 Coefficient Three C3 = 0.789 Coefficient Three C3 = 0.789 Determination of Average Outflow from the Basin (Calculated): Determination of Average Outflow from the Basin (Calculated): Runoff Coefficient C = 0.74 Runoff Coefficient C = 0.84 Inflow Peak Runoff Qp-in = 1.32 cfs Inflow Peak Runoff Qp-in = 5.24 cfs Allowable Peak Outflow Rate Qp-out = 0.18 cfs Allowable Peak Outflow Rate Qp-out = 0.18 cfs Mod. FAA Minor Storage Volume = 1,298 cubic feet Mod. FAA Major Storage Volume = 8,351 cubic feet Mod. FAA Minor Storage Volume = 0.030 acre-ft Mod. FAA Major Storage Volume = 0.192 acre-ft 15 <- Enter Rainfall Duration Incremental Increase Value Here (e.g. 5 for 5-Minutes) Rainfall Rainfall Inflow Adjustment Average Outflow Storage Rainfall Rainfall Inflow Adjustment Average Outflow Storage Duration Intensity Volume Factor Outflow Volume Volume Duration Intensity Volume Factor Outflow Volume Volume minutes inches / hr acre-feet "m" cfs acre-feet acre-feet minutes inches / hr acre-feet "m" cfs acre-feet acre-feet (input) (output) (output) (output) (output) (output) (output) (input) (output) (output) (output) (output) (output) (output) 0 0.00 0.000 0.00 0.00 0.000 0.000 0 0.00 0.000 0.00 0.00 0.000 0.000 15 1.84 0.021 0.75 0.13 0.003 0.018 15 6.43 0.082 0.75 0.13 0.003 0.079 30 1.27 0.029 0.63 0.11 0.005 0.024 30 4.44 0.113 0.63 0.11 0.005 0.109 45 0.99 0.033 0.58 0.10 0.006 0.027 45 3.45 0.132 0.58 0.10 0.006 0.126 60 0.82 0.037 0.56 0.10 0.008 0.029 60 2.85 0.146 0.56 0.10 0.008 0.138 75 0.70 0.039 0.55 0.10 0.010 0.029 75 2.45 0.156 0.55 0.10 0.010 0.146 90 0.62 0.042 0.54 0.10 0.012 0.030 90 2.15 0.165 0.54 0.10 0.012 0.153 105 0.55 0.044 0.54 0.10 0.014 0.030 105 1.93 0.172 0.54 0.10 0.014 0.159 120 0.50 0.045 0.53 0.09 0.016 0.030 120 1.75 0.179 0.53 0.09 0.016 0.163 135 0.46 0.047 0.53 0.09 0.017 0.029 135 1.61 0.185 0.53 0.09 0.017 0.167 150 0.43 0.048 0.53 0.09 0.019 0.029 150 1.49 0.190 0.53 0.09 0.019 0.171 165 0.40 0.049 0.52 0.09 0.021 0.028 165 1.39 0.195 0.52 0.09 0.021 0.174 180 0.37 0.050 0.52 0.09 0.023 0.027 180 1.30 0.199 0.52 0.09 0.023 0.176 195 0.35 0.051 0.52 0.09 0.025 0.027 195 1.22 0.203 0.52 0.09 0.025 0.178 210 0.33 0.052 0.52 0.09 0.027 0.026 210 1.16 0.207 0.52 0.09 0.027 0.180 225 0.31 0.053 0.52 0.09 0.028 0.025 225 1.10 0.210 0.52 0.09 0.028 0.182 240 0.30 0.054 0.52 0.09 0.030 0.024 240 1.05 0.214 0.52 0.09 0.030 0.183 255 0.29 0.055 0.51 0.09 0.032 0.023 255 1.00 0.217 0.51 0.09 0.032 0.185 270 0.27 0.056 0.51 0.09 0.034 0.022 270 0.96 0.220 0.51 0.09 0.034 0.186 285 0.26 0.056 0.51 0.09 0.036 0.020 285 0.92 0.223 0.51 0.09 0.036 0.187 300 0.25 0.057 0.51 0.09 0.038 0.019 300 0.88 0.225 0.51 0.09 0.038 0.188 315 0.24 0.058 0.51 0.09 0.039 0.018 315 0.85 0.228 0.51 0.09 0.039 0.189 330 0.24 0.058 0.51 0.09 0.041 0.017 330 0.82 0.230 0.51 0.09 0.041 0.189 345 0.23 0.059 0.51 0.09 0.043 0.016 345 0.79 0.233 0.51 0.09 0.043 0.190 360 0.22 0.059 0.51 0.09 0.045 0.014 360 0.77 0.235 0.51 0.09 0.045 0.190 375 0.21 0.060 0.51 0.09 0.047 0.013 375 0.74 0.237 0.51 0.09 0.047 0.191 390 0.21 0.061 0.51 0.09 0.049 0.012 390 0.72 0.240 0.51 0.09 0.049 0.191 405 0.20 0.061 0.51 0.09 0.050 0.011 405 0.70 0.242 0.51 0.09 0.050 0.191 420 0.20 0.062 0.51 0.09 0.052 0.009 420 0.68 0.244 0.51 0.09 0.052 0.191 435 0.19 0.062 0.51 0.09 0.054 0.008 435 0.66 0.246 0.51 0.09 0.054 0.192 450 0.19 0.063 0.51 0.09 0.056 0.007 450 0.65 0.248 0.51 0.09 0.056 0.192 465 0.18 0.063 0.51 0.09 0.058 0.005 465 0.63 0.249 0.51 0.09 0.058 0.192 480 0.18 0.063 0.51 0.09 0.060 0.004 480 0.61 0.251 0.51 0.09 0.060 0.192 495 0.17 0.064 0.51 0.09 0.061 0.003 495 0.60 0.253 0.51 0.09 0.061 0.192 510 0.17 0.064 0.51 0.09 0.063 0.001 510 0.59 0.255 0.51 0.09 0.063 0.191 Project: Basin ID: UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 DETENTION VOLUME BY THE MODIFIED FAA METHOD Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO Q100=2-yr Hist., C100*1.25, Vmajor*1.20 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0 100 200 300 400 500 600 700 800 900 1000 Volume (acre-feet) Duration (Minutes) Inflow and Outflow Volumes vs. Rainfall Duration Minor Storm Inflow Volume Minor Storm Outflow Volume Minor Storm Storage Volume Major Storm Inflow Volume Major Storm Outflow Volume Major Storm Storage Volume 15298UD-Detention_v2.35Disturbedarea.xls, Modified FAA 5/1/2017, 8:19 AM Detention Volume - Mass Balance Method -100-yr (Major Storm) Input 1.00 1.00 0.18 cfs 0.74 acres Results 0.193 0.193 Rainfall Duration (min) Rainfall Intensity (in/hr) Qin (cfs) Volumein (ft 3 ) Qout (cfs) Volumeout (ft 3 ) Volume detained (acre-feet) 5 9.96 7.32 2196.18 0.18 54.00 0.049 10 7.74 5.69 3413.34 0.18 108.00 0.076 15 6.52 4.79 4312.98 0.18 162.00 0.095 20 5.61 4.12 4948.02 0.18 216.00 0.109 25 4.97 3.65 5477.22 0.18 270.00 0.120 30 4.52 3.32 5979.96 0.18 324.00 0.130 35 4.08 3.00 6297.48 0.18 378.00 0.136 40 3.74 2.75 6588.54 0.18 432.00 0.141 45 3.45 2.54 6853.14 0.18 486.00 0.146 50 3.23 2.37 7117.74 0.18 540.00 0.151 55 3.03 2.23 7355.88 0.18 594.00 0.155 60 2.86 2.10 7567.56 0.18 648.00 0.159 65 2.71 1.99 7779.24 0.18 702.00 0.162 70 2.59 1.90 7990.92 0.18 756.00 0.166 75 2.48 1.82 8202.60 0.18 810.00 0.170 80 2.38 1.75 8387.82 0.18 864.00 0.173 85 2.29 1.68 8573.04 0.18 918.00 0.176 90 2.21 1.62 8758.26 0.18 972.00 0.179 95 2.13 1.56 8917.02 0.18 1026.00 0.181 100 2.06 1.52 9102.24 0.18 1080.00 0.184 105 2.00 1.47 9261.00 0.18 1134.00 0.187 110 1.94 1.43 9419.76 0.18 1188.00 0.189 115 1.88 1.38 9552.06 0.18 1242.00 0.191 120 1.835 1.35 9710.82 0.18 1296.00 0.193 125 1.78 1.31 9794.27 0.18 1350.00 0.194 130 1.72 1.27 9868.82 0.18 1404.00 0.194 135 1.67 1.22 9918.95 0.18 1458.00 0.194 140 1.61 1.18 9944.69 0.18 1512.00 0.194 145 1.56 1.14 9946.03 0.18 1566.00 0.192 150 1.50 1.10 9922.96 0.18 1620.00 0.191 155 1.44 1.06 9875.49 0.18 1674.00 0.188 160 1.39 1.02 9803.61 0.18 1728.00 0.185 165 1.33 0.98 9707.34 0.18 1782.00 0.182 170 1.28 0.94 9586.66 0.18 1836.00 0.178 175 1.22 0.90 9441.58 0.18 1890.00 0.173 180 1.17 0.86 9272.10 0.18 1944.00 0.168 Project: Basin ID: Design Information (Input): Width of Basin Bottom, W = 25.00 ft Right Triangle OR… Length of Basin Bottom, L = 60.00 ft Isosceles Triangle X OR… Dam Side-slope (H:V), Zd = 4.00 ft/ft Rectangle OR… Circle / Ellipse OR… Irregular (Use Overide values in cells G32:G52) MINOR MAJOR Storage Requirement from Sheet 'Modified FAA': 0.03 0.19 acre-ft. Stage-Storage Relationship: Storage Requirement from Sheet 'Hydrograph': acre-ft. Storage Requirement from Sheet 'Full-Spectrum': acre-ft. Labels Water Side Basin Basin Surface Surface Volume Surface Volume Target Volumes for WQCV, Minor, Surface Slope Width at Length at Area at Area at Below Area at Below for WQCV, Minor, & Major Storage Elevation (H:V) Stage Stage Stage Stage Stage Stage Stage & Major Storage Stages ft ft/ft ft ft ft2 ft2 User ft3 acres acre-ft Volumes (input) (input) Below El. (output) (output) (output) Overide (output) (output) (output) (for goal seek) 4924.90 (input) 25.00 60.00 750.0 5 0.017 0.000 4925.00 4.00 25.98 62.36 810.2 6 5 0.000 0.000 4925.50 4.00 30.90 74.17 1,146.0 289 79 0.007 0.002 4926.00 4.00 35.82 85.97 1,539.9 980 396 0.022 0.009 WQCV@4926.60 4926.50 4.00 40.74 97.78 1,991.8 1,816 1,095 0.042 0.025 0.030 4927.00 4.00 45.66 109.59 2,501.9 2,545 2,186 0.058 0.050 2-yr+WQCV@4927.15 4927.50 4.00 50.58 121.39 3,070.0 3,169 3,614 0.073 0.083 0.060 4928.00 4.00 55.50 133.20 3,696.2 3,710 5,334 0.085 0.122 4928.50 4.00 60.42 145.00 4,380.5 4,302 7,337 0.099 0.168 WQCV+100-yr @4929.00 4929.00 4.00 65.34 156.81 5,122.8 5,173 9,706 0.119 0.223 0.222 4929.50 4.00 70.26 168.62 5,923.2 6,371 12,592 0.146 0.289 4930.00 4.00 75.18 180.42 6,781.7 7,318 16,014 0.168 0.368 4930.25 4.00 77.64 186.33 7,232.7 7,898 17,916 0.181 0.411 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A 4.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Basin ID: STAGE-STORAGE SIZING FOR DETENTION BASINS 4923.75 4924.75 4925.75 4926.75 4927.75 4928.75 4929.75 4930.75 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 0.40 0.45 Stage (ft. elev.) Storage (acre-feet) STAGE-STORAGE CURVE FOR THE POND 15298UD-Detention_v2.35Disturbedarea.xls, Basin 5/1/2017, 8:27 AM Project: Basin ID: WQCV Design Volume (Input): Catchment Imperviousness, Ia = 92.0 percent Catchment Area, A = 0.74 acres Diameter of holes, D = 0.287 inches Depth at WQCV outlet above lowest perforation, H = 2 feet Number of holes per row, N = 1 Vertical distance between rows, h = 4.00 inches OR Number of rows, NL = 6.00 Orifice discharge coefficient, Co = 0.67 Height of slot, H = inches Slope of Basin Trickle Channel, S = 0.010 ft / ft Width of slot, W = inches Time to Drain the Pond = 40 hours Watershed Design Information (Input): 2 Percent Soil Type A = % Percent Soil Type B = 100 % Percent Soil Type C/D = % Outlet Design Information (Output): Water Quality Capture Volume, WQCV = 0.399 watershed inches Water Quality Capture Volume (WQCV) = 0.025 acre-feet 0.00 Design Volume (WQCV / 12 * Area * 1.2) Vol = 0.030 acre-feet Outlet area per row, Ao = 0.08 square inches Total opening area at each row based on user-input above, Ao = 0.06 square inches Total opening area at each row based on user-input above, Ao = 0.000 square feet 3 Row 1 Row 2 Row 3 Row 4 Row 5 Row 6 Row 7 Row 8 Row 9 Row 10 Row 11 Row 12 Row 13 Row 14 Row 15 Row 16 Row 17 Row 18 Row 19 Row 20 Row 21 Row 22 Row 23 Row 23 S 4924.92 4925.25 4925.59 4925.92 4926.25 4926.59 Flow 4924.90 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00 4925.15 0.0012 0.0000 0.0000 0.0000 0.0000 0.0000 0.00 4925.40 0.0017 0.0009 0.0000 0.0000 0.0000 0.0000 0.00 4925.65 0.0021 0.0015 0.0006 0.0000 0.0000 0.0000 0.00 4925.90 0.0024 0.0019 0.0013 0.0000 0.0000 0.0000 0.01 4926.15 0.0027 0.0023 0.0018 0.0012 0.0000 0.0000 0.01 4926.40 0.0029 0.0026 0.0022 0.0017 0.0009 0.0000 0.01 4926.65 0.0032 0.0029 0.0025 0.0021 0.0015 0.0006 0.01 4926.90 0.0034 0.0031 0.0028 0.0024 0.0019 0.0013 0.01 4927.15 0.0036 0.0033 0.0030 0.0027 0.0023 0.0018 0.02 4927.40 0.0038 0.0035 0.0033 0.0029 0.0026 0.0022 0.02 4927.65 0.0040 0.0037 0.0035 0.0032 0.0029 0.0025 0.02 4927.90 0.0042 0.0039 0.0037 0.0034 0.0031 0.0028 0.02 4928.15 0.0043 0.0041 0.0039 0.0036 0.0033 0.0030 0.02 4928.40 0.0045 0.0043 0.0041 0.0038 0.0035 0.0033 0.02 4928.65 0.0047 0.0045 0.0042 0.0040 0.0037 0.0035 0.02 4928.90 0.0048 0.0046 0.0044 0.0042 0.0039 0.0037 0.03 4929.15 0.0050 0.0048 0.0046 0.0043 0.0041 0.0039 0.03 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Worksheet Protected Project: Basin ID: STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 0.00 1000.00 2000.00 3000.00 4000.00 5000.00 6000.00 0.00 0.01 0.01 0.02 0.02 0.03 0.03 Stage (feet, elev.) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE WQCV OUTLET STRUCTURE 15298UD-Detention_v2.35Disturbedarea.xls, WQCV 5/1/2017, 8:28 AM Water Quality Capture Volume, WQCV 1. Determine the WQCV in Watershed Inches WQCV = a (0.91I 3-1.19I 2+0.78I ) Where: WQCV = Water Quality Capture Volume, watershed inches a = coefficient corresponding to WQCV drain time I = Imperviousness (%/100) Drain Time (hrs) Coefficient (a ) 12 0.8 24 0.9 40 1.0 Coefficient, a 1.00 Imperviousness, I 96 WQCV = 0.46 watershed inches 2. Determine the required storage volume in Acre-Feet V = (WQCV/12)A Where: V = Required Storage Volume, acre-feet A = Tributary catchment area upstream, acres Area, A 0.74 acres V = 0.028 acre-feet Drain Time Coefficients Project: Basin ID: X 1 #1 Vertical #2 Vertical Sizing the Restrictor Plate for Circular Vertical Orifices or Pipes (Input) Orifice Orifice Water Surface Elevation at Design Depth Elev: WS = 4,929.00 feet Pipe/Vertical Orifice Entrance Invert Elevation Elev: Invert = 4,924.90 feet Required Peak Flow through Orifice at Design Depth Q = 0.18 cfs Pipe/Vertical Orifice Diameter (inches) Dia = 15.0 inches Orifice Coefficient Co = 0.67 Full-flow Capacity (Calculated) Full-flow area Af = 1.23 sq ft Half Central Angle in Radians Theta = 3.14 rad Full-flow capacity Qf = 12.3 cfs Percent of Design Flow = 6833% Calculation of Orifice Flow Condition Half Central Angle (0<Theta<3.1416) Theta = 0.41 rad Flow area Ao = 0.02 sq ft Top width of Orifice (inches) To = 5.91 inches Height from Invert of Orifice to Bottom of Plate (feet) Yo = 0.05 feet Elevation of Bottom of Plate Elev Plate Bottom Edge = 4,924.95 feet Resultant Peak Flow Through Orifice at Design Depth Qo = 0.2 cfs Width of Equivalent Rectangular Vertical Orifice Equivalent Width = 0.40 feet Centroid Elevation of Equivalent Rectangular Vertical Orifice Equiv. Centroid El. = 4,924.93 feet Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO RESTRICTOR PLATE SIZING FOR CIRCULAR VERTICAL ORIFICES 15298UD-Detention_v2.35Disturbedarea.xls, Restrictor Plate 5/1/2017, 8:30 AM Project: Basin ID: Design Information (Input): #1 Horiz. #2 Horiz. #1 Vert. #2 Vert. Circular Opening: Diameter in Inches Dia. = inches OR Rectangular Opening: Width in Feet W = 3.00 0.25 ft. Length (Height for Vertical) L or H = 3.00 0.04 ft. Percentage of Open Area After Trash Rack Reduction % open = 50 100 % Orifice Coefficient Co = 0.67 0.62 Weir Coefficient Cw = 3.00 Orifice Elevation (Bottom for Vertical) Eo = 4926.12 4,926.12 ft. Calculation of Collection Capacity: Net Opening Area (after Trash Rack Reduction) Ao = 4.50 0.01 sq. ft. OPTIONAL: User-Overide Net Opening Area Ao = sq. ft. Perimeter as Weir Length Lw = 9.00 ft. OPTIONAL: User-Overide Weir Length Lw = ft. Top Elevation of Vertical Orifice Opening, Top = 4926.16 ft. Center Elevation of Vertical Orifice Opening, Cen = 4926.14 ft. Horizontal Orifices Vertical Orifices Labels Water WQCV #1 Horiz. #1 Horiz. #2 Horiz. #2 Horiz. #1 Vert. #2 Vert. Total Target Volumes for WQCV, Minor, Surface Plate/Riser Weir Orifice Weir Orifice Collection Collection Collection for WQCV, Minor, & Major Storage Elevation Flow Flow Flow Flow Flow Capacity Capacity Capacity & Major Storage W.S. Elevations ft cfs cfs cfs cfs cfs cfs cfs cfs Volumes (input) (linked) (User-linked) (output) (output) (output) (output) (output) (output) (output) (link for goal seek) 4926.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4926.25 0.00 1.27 8.72 0.00 0.00 0.02 0.00 0.02 4926.50 0.00 6.32 14.91 0.00 0.00 0.03 0.00 0.03 4926.75 0.00 13.50 19.20 0.00 0.00 0.04 0.00 0.04 4927.00 0.00 22.29 22.70 0.00 0.00 0.05 0.00 0.05 4927.25 0.01 32.43 25.72 0.00 0.00 0.05 0.00 0.05 4927.50 0.01 43.77 28.42 0.00 0.00 0.06 0.00 0.06 4927.75 0.01 56.19 30.89 0.00 0.00 0.06 0.00 0.06 4928.00 0.01 69.60 33.17 0.00 0.00 0.07 0.00 0.07 4928.25 0.01 83.93 35.31 0.00 0.00 0.07 0.00 0.07 4928.50 0.01 99.14 37.33 0.00 0.00 0.08 0.00 0.08 4928.75 0.01 115.16 39.24 0.00 0.00 0.08 0.00 0.08 4929.00 0.02 131.96 41.06 0.00 0.00 0.08 0.00 0.08 4929.25 0.02 149.51 42.81 0.00 0.00 0.09 0.00 0.09 4929.50 0.02 167.78 44.48 0.00 0.00 0.09 0.00 0.09 4929.75 0.02 186.73 46.10 0.00 0.00 0.09 0.00 0.09 4930.00 0.02 206.35 47.66 0.00 0.00 0.10 0.00 0.10 4930.25 0.02 226.62 49.17 0.00 0.00 0.10 0.00 0.10 4930.50 #N/A 247.50 50.64 0.00 0.00 0.10 0.00 #N/A 4930.75 #N/A 268.99 52.06 0.00 0.00 0.11 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Project: Basin ID: Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) 4926 4926.5 4927 4927.5 4928 4928.5 4929 4929.5 4930 4930.5 4931 0 0.02 0.04 0.06 0.08 0.1 0.12 Stage (feet, elev.) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE OUTLET STRUCTURE UD-Detention_v2.35.xls, Outlet 4/18/2017, 1:40 PM Project: Basin ID: Status: Culvert Data is valid! Design Information (Input): Circular Culvert: Barrel Diameter in Inches D = 15 in. Circular Culvert: Inlet Edge Type (choose from pull-down list) Square End with Headwall OR: Box Culvert: Barrel Height (Rise) in Feet Height (Rise) = ft. Box Culvert: Barrel Width (Span) in Feet Width (Span) = ft. Box Culvert: Inlet Edge Type (choose from pull-down list) Square Edge w/ 90-15 deg. Flared Wingwall Number of Barrels No = 1 Inlet Elevation at Culvert Invert Ielev = 4924.90 ft. elev. Outlet Elevation at Culvert Invert Oelev = 4923.00 ft. elev. Culvert Length in Feet L = 48.0 ft. Manning's Roughness n = 0.0130 Bend Loss Coefficient Kb = 0.00 Exit Loss Coefficient Kx = 1.00 Design Information (calculated): Entrance Loss Coefficient Ke = 0.50 Friction Loss Coefficient Kf = 1.11 Sum of All Loss Coefficients Ks = 2.61 Orifice Inlet Condition Coefficient Cd = 0.86 Minimum Energy Condition Coefficient KElow = -0.09 Calculations of Culvert Capacity (output): Water Surface Tailwater Culvert Culvert Flowrate Controlling Inlet Elevation Surface Inlet-Control Outlet-Control Into Culvert Culvert Equation From Sheet Elevation Flowrate Flowrate From Sheet Flowrate Used "Basin" ft cfs cfs "Outlet" cfs (ft., linked) (input if known) (output) (output) (cfs, linked) (output) (output) 4924.90 4922.50 0.00 0.00 0.00 0.00 No Flow (WS < inlet) 4925.00 4922.50 0.10 5.98 0.00 0.00 Min. Energy. Eqn. 4925.50 4922.50 1.30 6.55 0.00 0.00 Min. Energy. Eqn. 4926.00 4922.50 3.40 7.00 0.00 0.00 Regression Eqn. 4926.50 4922.50 5.50 7.84 0.01 0.01 Regression Eqn. 4927.00 4922.50 7.10 8.61 0.15 0.15 Regression Eqn. 4927.50 4922.50 8.30 9.38 0.17 0.17 Regression Eqn. 4928.00 4922.50 9.40 10.09 0.19 0.19 Regression Eqn. 4928.50 4922.50 10.30 10.73 0.20 0.20 Regression Eqn. 4929.00 4922.50 11.20 11.31 0.22 0.22 Orifice Eqn. 4929.50 4922.50 12.00 11.89 0.23 0.23 Orifice Eqn. 4930.00 4922.50 12.70 12.47 0.24 0.24 Orifice Eqn. 4930.25 4922.50 13.10 12.72 0.25 0.25 Orifice Eqn. 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) Project: Basin ID: STAGE-DISCHARGE SIZING OF THE OUTLET CULVERT (INLET vs. OUTLET CONTROL WITH TAILWATER EFFECTS) Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 4926.00 4926.50 4927.00 4927.50 4928.00 4928.50 4929.00 4929.50 4930.00 4930.50 0.00 0.05 0.10 0.15 0.20 0.25 0.30 Stage (feet, elev.) Discharge (cfs) STAGE-DISCHARGE CURVE FOR THE FINAL OUTLET PIPE CULVERT 15298UD-Detention_v2.35Disturbedarea.xls, Culvert 5/1/2017, 8:41 AM Project: Basin ID: 75.96 4.00000 Design Information (input): Bottom Length of Weir L = 10.00 feet Angle of Side Slope Weir Angle = 75.96 degrees Elev. for Weir Crest EL. Crest = 4,929.00 feet Coef. for Rectangular Weir Cw = 3.00 Coef. for Trapezoidal Weir Ct = 3.00 Calculation of Spillway Capacity (output): Water Rect. Triangle Total Total Surface Weir Weir Spillway Pond Elevation Flowrate Flowrate Release Release ft. cfs cfs cfs cfs (linked) (output) (output) (output) (output) 4924.90 0.00 0.00 0.00 0.00 4925.00 0.00 0.00 0.00 0.00 4925.50 0.00 0.00 0.00 0.00 4926.00 0.00 0.00 0.00 0.00 4926.50 0.00 0.00 0.00 0.01 4927.00 0.00 0.00 0.00 0.15 4927.50 0.00 0.00 0.00 0.17 4928.00 0.00 0.00 0.00 0.19 4928.50 0.00 0.00 0.00 0.20 4929.00 0.00 0.00 0.00 0.22 4929.50 10.61 2.12 12.73 12.96 4930.00 30.00 12.00 42.00 42.24 4930.25 41.93 20.96 62.88 63.13 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Project: Basin ID: STAGE-DISCHARGE SIZING OF THE SPILLWAY Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 4926 4926.5012 4927.0024 4927.5035 4928.0047 4928.5059 4929.0071 4929.5083 4930.0094 4930.5106 0 10 20 30 40 50 60 70 Storage (Acre-Feet) Stage (feet, elev.) Pond Discharge (cfs) STAGE-STORAGE-DISCHARGE CURVES FOR THE POND TOTAL DISCHARGE SPILLWAY DISCHARGE POND STORAGE 15298UD-Detention_v2.35Disturbedarea.xls, Spillway 5/1/2017, 8:42 AM Modified FAA Volume, WQCV, Stage Storage Table Minor Storage Volume = 0.030 acre-ft Major Storage Volume = 0.192 acre-ft WQCV = 0.030 acre-ft WQVC Elevation = 0.030 acre-ft @ 4926.60 ft 2-yr + WQCV = 0.060 acre-ft @ 4927.15 ft 100-ry + WQCV = 0.222 acre-ft @ 4929.00 ft Fort Collins Rational Method Spreadsheet, Detention Volume (Mass Balance), WQCV Major Storage Volume = 0.193 acre-ft WQCV = 0.028 acre-ft APPENDIX D NRCS SOILS MAP United States Department of Agriculture A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants Custom Soil Resource Report for Larimer County Area, Colorado CBA Fort Collins Prospect Site Natural Resources Conservation Service March 17, 2017 Preface Soil surveys contain information that affects land use planning in survey areas. They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers. Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment. Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions. The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations. Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/? cid=nrcs142p2_053951). Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations. The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey. Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information. The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require 2 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer. 3 Contents Preface.................................................................................................................... 2 Soil Map.................................................................................................................. 5 Soil Map................................................................................................................6 Legend..................................................................................................................7 Map Unit Legend.................................................................................................. 8 Map Unit Descriptions.......................................................................................... 8 Larimer County Area, Colorado...................................................................... 10 53—Kim loam, 1 to 3 percent slopes.......................................................... 10 54—Kim loam, 3 to 5 percent slopes...........................................................11 60—Larim gravelly sandy loam, 5 to 40 percent slopes..............................12 101—Stoneham loam, 1 to 3 percent slopes.............................................. 14 References............................................................................................................16 4 Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit. 5 6 Custom Soil Resource Report Soil Map 4490720 4490740 4490760 4490780 4490800 4490820 4490840 4490860 4490720 4490740 4490760 4490780 4490800 4490820 4490840 4490860 496430 496450 496470 496490 496510 496530 496430 496450 496470 496490 496510 496530 40° 34' 6'' N 105° 2' 32'' W 40° 34' 6'' N 105° 2' 26'' W 40° 34' 1'' N 105° 2' 32'' W 40° 34' 1'' N 105° 2' 26'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 35 70 140 210 Feet 0 10 20 40 60 Meters Map Scale: 1:820 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more Map Unit Legend Larimer County Area, Colorado (CO644) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 53 Kim loam, 1 to 3 percent slopes 0.2 13.4% 54 Kim loam, 3 to 5 percent slopes 0.7 39.8% 60 Larim gravelly sandy loam, 5 to 40 percent slopes 0.6 30.6% 101 Stoneham loam, 1 to 3 percent slopes 0.3 16.2% Totals for Area of Interest 1.9 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate Custom Soil Resource Report 8 pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. An identifying symbol precedes the map unit name in the map unit descriptions. Each description includes general facts about the unit and gives important soil properties and qualities. Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement. Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series. Some map units are made up of two or more major soils or miscellaneous areas. These map units are complexes, associations, or undifferentiated groups. A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps. The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example. An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one unit on the maps. Because of present or anticipated uses of the map units in the survey area, it was not considered practical or necessary to map the soils or miscellaneous areas separately. The pattern and relative proportion of the soils or miscellaneous areas are somewhat similar. Alpha-Beta association, 0 to 2 percent slopes, is an example. An undifferentiated group is made up of two or more soils or miscellaneous areas that could be mapped individually but are mapped as one unit because similar interpretations can be made for use and management. The pattern and proportion of the soils or miscellaneous areas in a mapped area are not uniform. An area can be made up of only one of the major soils or miscellaneous areas, or it can be made up of all of them. Alpha and Beta soils, 0 to 2 percent slopes, is an example. Some surveys include miscellaneous areas. Such areas have little or no soil material and support little or no vegetation. Rock outcrop is an example. Custom Soil Resource Report 9 Larimer County Area, Colorado 53—Kim loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: jpwx Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Kim and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Kim Setting Landform: Fans Landform position (three-dimensional): Base slope Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium Typical profile H1 - 0 to 7 inches: loam H2 - 7 to 60 inches: loam, clay loam, sandy clay loam H2 - 7 to 60 inches: H2 - 7 to 60 inches: Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to slightly saline (0.0 to 4.0 mmhos/cm) Available water storage in profile: Very high (about 26.5 inches) Interpretive groups Land capability classification (irrigated): 2e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Ecological site: Loamy Plains (R067XY002CO) Hydric soil rating: No Custom Soil Resource Report 10 Minor Components Fort collins Percent of map unit: 6 percent Hydric soil rating: No Stoneham Percent of map unit: 3 percent Hydric soil rating: No Aquic haplustolls Percent of map unit: 1 percent Landform: Swales Hydric soil rating: Yes 54—Kim loam, 3 to 5 percent slopes Map Unit Setting National map unit symbol: jpwy Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Farmland of statewide importance Map Unit Composition Kim and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Kim Setting Landform: Fans Landform position (three-dimensional): Base slope Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium Typical profile H1 - 0 to 7 inches: loam H2 - 7 to 60 inches: loam, clay loam, sandy clay loam H2 - 7 to 60 inches: H2 - 7 to 60 inches: Properties and qualities Slope: 3 to 5 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Custom Soil Resource Report 11 Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to slightly saline (0.0 to 4.0 mmhos/cm) Available water storage in profile: Very high (about 26.5 inches) Interpretive groups Land capability classification (irrigated): 3e Land capability classification (nonirrigated): 4e Hydrologic Soil Group: B Ecological site: Loamy Plains (R067XY002CO) Hydric soil rating: No Minor Components Thedalund Percent of map unit: 4 percent Hydric soil rating: No Stoneham Percent of map unit: 3 percent Hydric soil rating: No Fort collins Percent of map unit: 2 percent Hydric soil rating: No Aquic haplustolls Percent of map unit: 1 percent Landform: Swales Hydric soil rating: Yes 60—Larim gravelly sandy loam, 5 to 40 percent slopes Map Unit Setting National map unit symbol: jpx5 Elevation: 4,800 to 6,300 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 47 to 49 degrees F Frost-free period: 135 to 150 days Farmland classification: Not prime farmland Map Unit Composition Larim and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Custom Soil Resource Report 12 Description of Larim Setting Landform: Benches, terraces, fans Landform position (three-dimensional): Side slope, base slope, riser Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium Typical profile H1 - 0 to 4 inches: gravelly sandy loam H2 - 4 to 15 inches: very gravelly sandy clay loam, very gravelly clay loam H2 - 4 to 15 inches: very gravelly loamy sand, very gravelly sand H3 - 15 to 60 inches: H3 - 15 to 60 inches: Properties and qualities Slope: 5 to 40 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: High Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Low (about 5.4 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 6e Hydrologic Soil Group: B Ecological site: Gravelly Foothill (R049BY214CO) Hydric soil rating: No Minor Components Midway Percent of map unit: 8 percent Hydric soil rating: No Tassel Percent of map unit: 7 percent Hydric soil rating: No Custom Soil Resource Report 13 101—Stoneham loam, 1 to 3 percent slopes Map Unit Setting National map unit symbol: jptt Elevation: 4,800 to 5,600 feet Mean annual precipitation: 13 to 15 inches Mean annual air temperature: 48 to 50 degrees F Frost-free period: 135 to 150 days Farmland classification: Prime farmland if irrigated Map Unit Composition Stoneham and similar soils: 90 percent Minor components: 10 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Stoneham Setting Landform: Benches, terraces Landform position (three-dimensional): Base slope, tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Mixed alluvium and/or eolian deposits Typical profile H1 - 0 to 4 inches: loam H2 - 4 to 10 inches: clay loam, sandy clay loam, loam H2 - 4 to 10 inches: loam, clay loam, sandy clay loam H2 - 4 to 10 inches: H3 - 10 to 60 inches: H3 - 10 to 60 inches: H3 - 10 to 60 inches: Properties and qualities Slope: 1 to 3 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Well drained Runoff class: Low Capacity of the most limiting layer to transmit water (Ksat): Moderately high to high (0.60 to 2.00 in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Calcium carbonate, maximum in profile: 15 percent Salinity, maximum in profile: Nonsaline to very slightly saline (0.0 to 2.0 mmhos/cm) Available water storage in profile: Very high (about 27.5 inches) Interpretive groups Land capability classification (irrigated): 2e Custom Soil Resource Report 14 Land capability classification (nonirrigated): 3e Hydrologic Soil Group: B Ecological site: Loamy Plains (R067XY002CO) Hydric soil rating: No Minor Components Kim Percent of map unit: 5 percent Hydric soil rating: No Fort collins Percent of map unit: 5 percent Hydric soil rating: No Custom Soil Resource Report 15 References American Association of State Highway and Transportation Officials (AASHTO). 2004. Standard specifications for transportation materials and methods of sampling and testing. 24th edition. American Society for Testing and Materials (ASTM). 2005. Standard classification of soils for engineering purposes. ASTM Standard D2487-00. Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe. 1979. Classification of wetlands and deep-water habitats of the United States. U.S. Fish and Wildlife Service FWS/OBS-79/31. Federal Register. July 13, 1994. Changes in hydric soils of the United States. Federal Register. September 18, 2002. Hydric soils of the United States. Hurt, G.W., and L.M. Vasilas, editors. Version 6.0, 2006. Field indicators of hydric soils in the United States. National Research Council. 1995. Wetlands: Characteristics and boundaries. Soil Survey Division Staff. 1993. Soil survey manual. Soil Conservation Service. U.S. Department of Agriculture Handbook 18. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/national/soils/?cid=nrcs142p2_054262 Soil Survey Staff. 1999. Soil taxonomy: A basic system of soil classification for making and interpreting soil surveys. 2nd edition. Natural Resources Conservation Service, U.S. Department of Agriculture Handbook 436. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053577 Soil Survey Staff. 2010. Keys to soil taxonomy. 11th edition. U.S. Department of Agriculture, Natural Resources Conservation Service. http:// www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/?cid=nrcs142p2_053580 Tiner, R.W., Jr. 1985. Wetlands of Delaware. U.S. Fish and Wildlife Service and Delaware Department of Natural Resources and Environmental Control, Wetlands Section. United States Army Corps of Engineers, Environmental Laboratory. 1987. Corps of Engineers wetlands delineation manual. Waterways Experiment Station Technical Report Y-87-1. United States Department of Agriculture, Natural Resources Conservation Service. National forestry manual. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/ home/?cid=nrcs142p2_053374 United States Department of Agriculture, Natural Resources Conservation Service. National range and pasture handbook. http://www.nrcs.usda.gov/wps/portal/nrcs/ detail/national/landuse/rangepasture/?cid=stelprdb1043084 16 United States Department of Agriculture, Natural Resources Conservation Service. National soil survey handbook, title 430-VI. http://www.nrcs.usda.gov/wps/portal/ nrcs/detail/soils/scientists/?cid=nrcs142p2_054242 United States Department of Agriculture, Natural Resources Conservation Service. 2006. Land resource regions and major land resource areas of the United States, the Caribbean, and the Pacific Basin. U.S. Department of Agriculture Handbook 296. http://www.nrcs.usda.gov/wps/portal/nrcs/detail/national/soils/? cid=nrcs142p2_053624 United States Department of Agriculture, Soil Conservation Service. 1961. Land capability classification. U.S. Department of Agriculture Handbook 210. http:// www.nrcs.usda.gov/Internet/FSE_DOCUMENTS/nrcs142p2_052290.pdf Custom Soil Resource Report 17 APPENDIX E FLOOD INSURANCE RATE MAP and FLOODPLAIN – CHECKLIST 50% City of Fort Collins Floodplain Review Checklist 50% Development Review Submittals Instructions: Complete this checklist by marking all boxes that have been adequately completed. Put an “NA” next to any items that are not applicable to this particular submittal. Any boxes that are left blank and do not have an “NA” marked next to them are considered incomplete. Date of Review:_____________ Reviewer’s Name:____________________________ Plat Map  The following required items are on the plat:  100-year floodplain boundary  City  FEMA  Floodway boundary  City  FEMA  The benchmark number and elevation of benchmark  These items match the FIRM. (FEMA Basin)  These items match the Master Plan. (City Basin)  The benchmark number and elevation match with those published in the City of Fort Collins benchmark system. Site Plan The following required items are on the site plan:  100-year floodplain boundary- FEMA and City  500-year floodplain boundary (if proposed structure is a “critical facility” and a 500-year floodplain is mapped)  Floodway boundary  Erosion buffer zones  Restriction related to use (i.e. critical facility or no residential use of lower floor if floodproofed mixed-use structure) Drainage and/or Grading Plan (or a separate Floodplain Sheet if it is too cluttered on Drainage and Grading Plan) The following required items are on the drainage and/or grading plan:  100-year floodplain boundary- FEMA and City  500-year floodplain boundary (if proposed structure is a “critical facility” and a 500-year floodplain is mapped)  Floodway boundary  Erosion buffer zones  Cross-section locations  BFE lines  Regulatory Flood Protection Elevation for individual lots or groups of lots if structures are to be built in the floodplain.  The floodplain and floodway boundaries are in the correct location and labeled properly.  The cross-section and BFE lines are in the correct location and labeled properly.  Elevations are referred to the appropriate datum:  FEMA basins – list in both NGVD 29 and NAVD 88  City basins – list only in NGVD 29  Floodway regulations have been met.  No fill in the floodway unless a hydraulic analysis shows “no-rise”.  No manufactured homes, except in an existing park, can be placed in the floodway.  No changing a nonconforming non-residential or mixed use structure to a residential structure.  Landscaping meets requirements for no encroachment in the floodway without a hydraulic analysis to show “no-rise”.  No storage of materials or equipment.  Critical facilities regulations have been met:  100 year – No life safety, emergency response, or hazardous material critical facilities  500 year Poudre – No life safety or emergency response critical facilities  Any items in the floodway that can float (Example: picnic tables, bike racks, etc.) are noted as being anchored.  Erosion Buffer Zone requirements have been met:  Design of any allowed development minimizes disturbance to channel bed and banks.  No structures allowed.  No additions to existing structures allowed.  Any fencing is split-rail design and break-away, but cabled. Must be oriented parallel to general flow direction.  No detention or water quality ponds.  No bike or pedestrian paths or trails except as required to cross streams or waterways.  Road, bicycle and pedestrian bridges must span erosion buffer zone.  No fill.  No outdoor storage of non-residential materials or equipment.  No driveways or parking areas.  No irrigated vegetation and non-native trees, grasses, or shrubs.  No utilities except as necessary to cross streams or waterways.  No grading or excavation except as required for permitted activities in erosion buffer zone.  No construction traffic except as required for permitted activities in erosion buffer zone.  Any construction in the erosion buffer zone shows that it will not impact the channel stability.  Any necessary floodplain modeling has been submitted and approved. All modeling must follow the City’s floodplain modeling guidelines. Special Poudre River Regulations  Poudre River Floodway Regulations have been met.  No construction of new residential, non-residential or mixed-use structures.  No redevelopment of residential, non-residential or mixed-use structures.  No additions to residential, non-residential or mixed-use structures.  No fill unless hydraulic analysis shows “no-rise”.  Poudre River floodplain regulations have been met  No construction of new residential or mixed-use structures  No additions to residential structures  No additions to mixed-use structures if there is an expansion in the residential-use area of the structure.  No floatable materials on non-residential sites Information Related to Structures in the Floodplain  The regulatory flood protection elevation shown on the plans is at least 2 ft above the BFE for the Poudre River and at least 18” above the BFE for new development and redevelopment, 6” above the BFE for additions, substantial improvement and accessory structures for all other floodplains.  A note is on the plans that the lowest floor (including basement or crawl space) and HVAC will be required to be elevated above the regulatory flood protection elevation. Non-residential structures can be floodproofed instead of elevated to the regulatory flood protection elevation.  A typical drawing detail is included for each foundation type proposed (slab-on- grade, basement, crawl space) showing the elevation of the HVAC and lowest floor elevation (which includes bottom of the basement or crawl space) relative to the BFE.  If garages are not going to be elevated to the regulatory flood protection elevation, then a note is included stating the following requirements:  There shall be 1 square inch of venting for every 1 square foot of enclosed area.  The bottom of the venting shall not be higher than 1 foot above grade.  The venting shall be on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally).  For manufactured homes, a note is included stating that all submittal requirements on separate sheet titled “Installation of a Mobile Home Located in a Floodplain: Submittal Requirements” shall be met.  A note is on the plans stating that a floodplain use permit will be required for each structure and each site construction element (detention ponds, bike paths, parking lots, utilities, etc.) in the floodplain.  A note is on the plans stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued for any structures in the floodplain. This is required even if property is only in a City floodplain. Drainage Report  The site is described as being in the floodplain. Floodplain name and if the floodplain is a FEMA or City-designated is described. Any floodway or erosion buffer zones on the site are described.  The FEMA FIRM panel # and date and/or the Master Plan information is cited.  A copy of the FIRM panel with the site location marked is included in the report.  If a floodplain modeling report has been submitted, that report is referenced. The reason for the floodplain modeling report is described.  If a FEMA CLOMR or LOMR is going to be needed, the reason for the CLOMR or LOMR is described.  If a FEMA LOMR is required after construction, this is stated in the report.  The location of the structures relative to the floodplain is described. If there is both a FEMA and a City floodplain on the site, the location of the structures relative to both is described.  The use of the structures is described. This is to determine if the structure is residential, non-residential, or mixed-use. Also, structures in all 100- year and Poudre River 500-year floodplains cannot be used as a critical facility. (See Chapter 10 of City Code for definitions.)  The report describes how the development will be in compliance with the applicable floodplain regulations (Chapter 10 of City Code). (Examples: elevation of lowest floor above regulatory flood protection elevation, floodproofing, floodway regulations, erosion buffer zone regulations, no-rise, etc.)  The type of foundation construction for the structures (i.e. slab-on-grade, crawl space, basement, etc.) is discussed in the report.  The type of foundation matches with the details shown on the grading plan.  The report states that the lowest floor (including basement or crawl space) and HVAC will be required to be elevated above the regulatory flood protection elevation. Non- residential structures can be floodproofed instead of elevated to the regulatory flood protection elevation.  If garages are not going to be elevated to the regulatory flood protection elevation, then a note is included stating the following requirements:  There shall be 1 square inch of venting for every 1 square foot of enclosed area.  There bottom of the venting shall not be higher than 1 foot above grade.  The venting shall be on at least two sides, preferably on upstream and downstream sides. (Does not have to be divided equally).  If a non-residential structure is to be floodproofed, then a note is included stating that all requirements on separate sheet titled “Floodproofing Guidelines” shall be met. (Floodproofing guidelines can be obtained at http://fcgov.com/stormwater/pdf/fp- floodproofing.pdf)  For manufactured homes, a note is included stating that all submittal requirements on separate sheet titled “Installation of a Mobile Home Located in a Floodplain: Submittal Requirements” shall be met. (Mobile Home guidelines can be obtained at http://fcgov.com/stormwater/pdf/fp-mobilhome.pdf)  The report states that a floodplain use permit will be required for each structure and each site construction element (detention ponds, bike paths, parking lots, utilities, etc.) in the floodplain.  A note is in the report stating that a FEMA elevation or floodproofing certificate will be completed and approved before the CO is issued.  In the compliance section, Chapter 10 of City Code is listed. FEMA CLOMR Approval  If a FEMA CLOMR is required, the necessary modeling has been submitted and approved by the City. Additional Comments: ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ ________________________________________________________________________ Updated 11/29/2007 Terms to Note Lowest Floor Elevation – Elevation of the lowest floor of the lowest enclosed area (including bottom of basement or crawlspace). This is not the same as finished floor. The lowest floor should be distinguished from finished floor on plans and reports. Regulatory Flood Protection Elevation – For all floodplains except the Poudre River, the regulatory flood protection elevation is eighteen (18) inches above the base flood elevation. For the Poudre River floodplain, the regulatory flood protection elevation is twenty-four (24) inches above the base flood elevation. If there is both a FEMA and a City BFE, the higher BFE should be used to determine the regulatory flood protection elevation. Additional floodplain terminology is defined in Chapter 10 of City Code. NOTE: Issues specific to individual sites may arise that result in additional requirements. These will be discussed during initial meetings with the applicant. APPENDIX F PROPOSED DRAINAGE PLAN 4,995 SF AUTOMOTIVE REPAIR FACILITY accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 7 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A STAGE-DISCHARGE SIZING OF THE SPILLWAY Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 15298UD-Detention_v2.35Disturbedarea.xls, Spillway 5/1/2017, 8:42 AM 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) 0.00 0.00 0.00 0.00 #N/A #N/A No Flow (WS < inlet) STAGE-DISCHARGE SIZING OF THE OUTLET CULVERT (INLET vs. OUTLET CONTROL WITH TAILWATER EFFECTS) Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 15298UD-Detention_v2.35Disturbedarea.xls, Culvert 5/1/2017, 8:41 AM #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A #N/A #N/A #N/A #N/A #N/A #N/A 0.00 #N/A Routing 3: Single Stage - Water flows through WQCV plate and #1 horizontal opening into #1 vertical opening. This flow will be applied to culvert sheet (#2 vertical & horizontal openings is not used). STAGE-DISCHARGE SIZING OF THE WEIRS AND ORIFICES (INLET CONTROL) Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO Current Routing Order is #3 W.S. EL. WQ W.S. EL. Minor W.S. EL. Major WQ H1 H2 V1 V2 Routing Order #1 (Standard) V1 W.S. EL. WQ W.S. EL. Design Storm WQ H1 Routing Order #3 (Single Stage) Routing Order #4 V2 V1 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ W.S. EL. Emergency Spillway Emergency Overflow into Pipe- H2 V2 H1 WQ W.S. EL. Major W.S. EL. Minor W.S. EL. WQ V1 Routing Order #2 UD-Detention_v2.35.xls, Outlet 4/18/2017, 1:40 PM #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A Override Area Row 1 Override Area Row 2 Override Area Row 3 Override Area Row 4 Override Area Row 5 Override Area Row 6 Override Area Row 7 Override Area Row 8 Override Area Row 9 Override Area Row 10 Override Area Row 11 Override Area Row 12 Override Area Row 13 Override Area Row 14 Override Area Row 15 Override Area Row 16 Override Area Row 17 Override Area Row 18 Override Area Row 19 Override Area Row 20 Override Area Row 21 Override Area Row 22 Override Area Row 23 Override Area Row 24 Central Elevations of Rows of Holes in feet Collection Capacity for Each Row of Holes in cfs STAGE-DISCHARGE SIZING OF THE WATER QUALITY CAPTURE VOLUME (WQCV) OUTLET Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO 15298UD-Detention_v2.35Disturbedarea.xls, WQCV 5/1/2017, 8:28 AM #N/A #N/A STAGE-STORAGE SIZING FOR DETENTION BASINS Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO Check Basin Shape 15298UD-Detention_v2.35Disturbedarea.xls, Basin 5/1/2017, 8:27 AM 185 1.11 0.82 9078.22 0.18 1998.00 0.163 190 1.06 0.78 8859.93 0.18 2052.00 0.156 195 1.00 0.74 8617.24 0.18 2106.00 0.149 200 0.95 0.70 8350.15 0.18 2160.00 0.142 205 0.89 0.66 8058.66 0.18 2214.00 0.134 210 0.84 0.61 7742.76 0.18 2268.00 0.126 215 0.78 0.57 7402.47 0.18 2322.00 0.117 220 0.73 0.53 7037.77 0.18 2376.00 0.107 225 0.67 0.49 6648.66 0.18 2430.00 0.097 230 0.61 0.45 6235.16 0.18 2484.00 0.086 235 0.56 0.41 5797.25 0.18 2538.00 0.075 240 0.50 0.37 5334.94 0.18 2592.00 0.063 City of Fort Collins Criteria (120%) Runoff Coefficient, C = Frequency Factor, Cf = 2-yr Release, Qout = Area = Detention Volume Requirement (acre-feet) 525 0.16 0.065 0.51 0.09 0.065 0.000 525 0.57 0.256 0.51 0.09 0.065 0.191 540 0.16 0.065 0.51 0.09 0.067 -0.002 540 0.56 0.258 0.51 0.09 0.067 0.191 555 0.16 0.066 0.51 0.09 0.069 -0.003 555 0.55 0.260 0.51 0.09 0.069 0.191 570 0.15 0.066 0.51 0.09 0.071 -0.005 570 0.54 0.261 0.51 0.09 0.071 0.191 585 0.15 0.066 0.51 0.09 0.072 -0.006 585 0.53 0.263 0.51 0.09 0.072 0.190 600 0.15 0.067 0.51 0.09 0.074 -0.007 600 0.52 0.264 0.51 0.09 0.074 0.190 615 0.15 0.067 0.51 0.09 0.076 -0.009 615 0.51 0.266 0.51 0.09 0.076 0.190 630 0.14 0.067 0.51 0.09 0.078 -0.010 630 0.50 0.267 0.51 0.09 0.078 0.189 645 0.14 0.068 0.51 0.09 0.080 -0.012 645 0.49 0.269 0.51 0.09 0.080 0.189 660 0.14 0.068 0.51 0.09 0.082 -0.013 660 0.48 0.270 0.51 0.09 0.082 0.188 675 0.14 0.069 0.51 0.09 0.083 -0.015 675 0.47 0.271 0.51 0.09 0.083 0.188 690 0.13 0.069 0.51 0.09 0.085 -0.016 690 0.46 0.273 0.51 0.09 0.085 0.187 705 0.13 0.069 0.51 0.09 0.087 -0.018 705 0.46 0.274 0.51 0.09 0.087 0.187 720 0.13 0.070 0.51 0.09 0.089 -0.019 720 0.45 0.275 0.51 0.09 0.089 0.186 735 0.13 0.070 0.51 0.09 0.091 -0.021 735 0.44 0.276 0.51 0.09 0.091 0.186 750 0.12 0.070 0.51 0.09 0.093 -0.022 750 0.43 0.278 0.51 0.09 0.093 0.185 765 0.12 0.070 0.50 0.09 0.094 -0.024 765 0.43 0.279 0.50 0.09 0.094 0.185 780 0.12 0.071 0.50 0.09 0.096 -0.025 780 0.42 0.280 0.50 0.09 0.096 0.184 795 0.12 0.071 0.50 0.09 0.098 -0.027 795 0.42 0.281 0.50 0.09 0.098 0.183 810 0.12 0.071 0.50 0.09 0.100 -0.029 810 0.41 0.282 0.50 0.09 0.100 0.183 825 0.12 0.072 0.50 0.09 0.102 -0.030 825 0.40 0.284 0.50 0.09 0.102 0.182 840 0.11 0.072 0.50 0.09 0.104 -0.032 840 0.40 0.285 0.50 0.09 0.104 0.181 855 0.11 0.072 0.50 0.09 0.105 -0.033 855 0.39 0.286 0.50 0.09 0.105 0.180 870 0.11 0.072 0.50 0.09 0.107 -0.035 870 0.39 0.287 0.50 0.09 0.107 0.180 885 0.11 0.073 0.50 0.09 0.109 -0.036 885 0.38 0.288 0.50 0.09 0.109 0.179 900 0.11 0.073 0.50 0.09 0.111 -0.038 900 0.38 0.289 0.50 0.09 0.111 0.178 Mod. FAA Minor Storage Volume (cubic ft.) = 1,298 Mod. FAA Major Storage Volume (cubic ft.) = 8,351 Mod. FAA Minor Storage Volume (acre-ft.) = 0.0298 Mod. FAA Major Storage Volume (acre-ft.) = 0.1917 Determination of MAJOR Detention Volume Using Modified FAA Method (For catchments less than 160 acres only. For larger catchments, use hydrograph routing method) (NOTE: for catchments larger than 90 acres, CUHP hydrograph and routing are recommended) UDFCD DETENTION BASIN VOLUME ESTIMATING WORKBOOK Version 2.35, Released January 2015 Determination of MINOR Detention Volume Using Modified FAA Method DETENTION VOLUME BY THE MODIFIED FAA METHOD Christian Brothers Automotive 1500 Academy Court, Fort Collins, CO Q100=2-yr Hist., C100*1.25, Vmajor*1.20 15298UD-Detention_v2.35Disturbedarea.xls, Modified FAA 5/1/2017, 8:19 AM . When the Runoff Coefficient in above table is < 0, use 0. When compositing the Runoff Coefficient for different soil types, use the table values above regardless if they are < 0. Type C and D NRCS Hydrologic Soil Groups Type A NRCS Hydrologic Soils Group Values of Runoff Coefficient CCD Values of Runoff Coefficient CA Storm Return Period Values of Correction Factors K CD & K A 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Runoff Coefficient Watershed Impervious Ratio Runoff Coefficient vs. Imperviousness NRCS Hydrologic Soils C & D 100-yr 25-yr 10-yr 5-yr 2-yr 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Runoff Coefficient Watershed Impervious Ratio Runoff Coefficient vs. Imperviousness NRCS Hydrologic Soil A 100-yr 25-yr 10-yr 5-yr 2-yr Page 1