HomeMy WebLinkAboutCHOICE CENTER FILING 3 (FORMERLY 1721 S. COLLEGE TOWNHOMES) - PDP - PDP160042 - SUBMITTAL DOCUMENTS - ROUND 3 - EROSION CONTROL LETTER/REPORTProject: Disturbed Acres: 0.58
EROSION CONTROL BMPs Units
Estimated
Quantity
Unit
Price
Total
Price
LF 179 $2.50 $447.50
EA 4 $500.00 $2,000.00
EA 1 $500.00 $500.00
EA 1 $1,250.00 $1,250.00
LF 10 $3.00 $30.00
SY 69 $0.50 $34.50
Sub-Total: $4,262.00
1.5 x Sub-Total: $6,393.00
Amount of security: $6,393.00
AC 0.58 $1,090.00 $632.20
$1,090.00 Sub-Total: $632.20
1.5 x Sub-Total: $948.30
Amount to Re-seed: $948.30
Minimum escrow amount: $3,000.00
Erosion Control Escrow: $6,393.00
Erosion and Sediment Control Escrow/Security Calculation
for The City of Fort Collins
BMP Amount
Silt Fence (SF)
Vehicle Tracking Control (VTC)
Erosion Control Blanket (EB)
Reseeding Amount
Curb Rock Sock
Miniumum Escrow Amount
Choice Center Third Filing
Unit Price of Seeding per acre:
“The amount of the security must be based on one and one-half times the estimate of the cost to install the approved measures, or one and one-half times
the cost to re-vegetate the disturbed land to dry land grasses based upon unit cost determined by the City's Annual Revegetation and Stabilization Bid,
whichever is greater. In no instance, will the amount of security be less than one thousand five hundred dollars ($1,500) for residential development or three
thousand dollars ($3,000) for commercial development”
Inlet Protection (IP)
Concrete Washout (CW)
Final Escrow Amount
4/28/2017 12:58 PM K:\CHS_LDEV\168450002_CORE_FortCollins_CO_(College)\4 Bid & Construction Admin\Cost Estimates (EOPCC)\2017-0427 Erosion Control Escrow_Calculation.xls