April 01, 2016
Mike Mcbride
BHA DESIGN
1603 OAKRIDGE DRIVE
Fort Collins, CO 80525
RE: Warren Federal Credit Union - Final Plan, FDP160011, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Jason Holland, at 970-224-6126 or jholland@fcgov.com.
Comment Summary:
Department: Planning Services
Contact: Jason Holland, 970-224-6126, jholland@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/29/2016
03/29/2016: Please add more information to the plans, either on the bldg.
elevations or site plan, clarifying the finish materials that will be used for all four
sides of the trash enclosure as well as the doors. Show the design for the doors,
materials and color, with an appropriate design since the doors will be highly
visible from the street. Note on the plans that the TE will have a separate bin(s)
for recycling. Please show the containers and make sure that circulation inside
the TE works and that the TE is properly sized for potential uses that could
occur on lots 1 and 2, and that there is sufficiant space to encourage recycling. If
an addtional TE location is needed, please add it to the the project.
Response: Trash Enclosure design provided on Architectural Elevations. Conceptual layout of
receptacles provided on Site Plan.
Comment Number: 2 Comment Originated: 03/29/2016
03/29/2016: Add material callouts and/or a detail for the retaining wall.
Response: Descriptive callout has been added to the site plan.
Comment Number: 3 Comment Originated: 03/29/2016
03/29/2016: On the site plan , under lots one and two, please add "Separate
PDP"
Response: Note Added.
Comment Number: 4 Comment Originated: 03/29/2016
03/29/2016: See redlines for minor comments. Need to add CDNS Director to
the signature block.
Response: Revised.
Comment Number: 5 Comment Originated: 04/01/2016
04/01/2016: Add a dashed line that shows a sidewalk connection btw. lots one
and two, and label as "pedestrian connection to be provided with Lot 1-2 PDP"
Response: Walk and Note added.
Comment Number: 6 Comment Originated: 04/01/2016
04/01/2016: Please send me PDF's and a comment response letter so that I
can coordinate a final check routing to staff.
Response: Acknowledged.
Department: Engineering Development Review
Contact: Marc Ragasa, 970.221.6603, mragasa@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/30/2016
03/30/2016: Please show the Illinois Drive cross section from the Rigden Farm
Utility Plans to depict how the cross section will look with the wider sidewalks on
Illinois Drive.
Response: Cross section added to sheet 1.
Comment Number: 2 Comment Originated: 03/30/2016
03/30/2016: The dates in the General Notes and Storm Drainage Notes do not
match the date on the Final Drainage Report that was part of the submittal.
Response: Date has been revised to match.
Comment Number: 3 Comment Originated: 03/30/2016
03/30/2016: Add the street cut note to the Utility Plans:
"LIMITS OF STREET CUT ARE APPROXIMATE. FINAL LIMITS ARE TO BE
DETEREMINED IN THE FILED BY THE CITY ENGINEERING INSPECTOR.
ALL REPAIRS TO BE IN ACCORDANCE WITH CITY STREET REPAIR
STANDARDS."
Response: Note has been added to sheet 3.
Comment Number: 4 Comment Originated: 03/30/2016
03/30/2016: Label surrounding properties on the Utility Plans
Response: Property labels have been added.
Comment Number: 5 Comment Originated: 03/30/2016
03/30/2016: Show existing sidewalk ramps along East Drake Road. See
redlines.
Response: Existing ramps have been added.
Comment Number: 6 Comment Originated: 03/30/2016
03/30/2016: Plans show a concrete plan within the ROW on Illinois Drive.
Please show why this is needed. Engineering would like to see this removed.
Additional grading or possibly adding a berm would help with drainage and
allow for the removal of this pan. The curb cut would need to be perpendicular to
the curb. Based on the grading plan, it looks like the curb cut will create a low
spot, creating a drainage issue. If the pan is the only option and allowed, please
provide the City stormwater drainage pan detail in the Utility Plans.
Response: Drainage pan has been removed.
Comment Number: 7 Comment Originated: 03/30/2016
03/30/2016: The southbound ramp on Illinois Drive will need to match the
existing directional ramps along Illinois Drive. The existing curb may need to be
modified to allow for a wider ramp. See ramps west of Illinois Drive where 12'
walks currently exist. Ramp standards indicate that the width of the ramp shall
be the same as the sidewalk, up to 8'.
Comment Number: 8 Comment Originated: 03/30/2016
03/30/2016: Verify that the tree grate will not interfere with the inlet on Illinois
Drive. At least 1' is needed between the tree grate and inlet.
Response: 2.12’ is provided between the edge of the tree grate and the inlet and 40’ is provided between
the canopy tree and the street light.
Comment Number: 9 Comment Originated: 03/30/2016
03/30/2016: It appears that the storm line and sanitary line on Tract A will serve
both Lots 1 and 2 as well. Please verify with Stormwater if this line will need to
be a public line.
Response: Acknowledged.
Comment Number: 10 Comment Originated: 03/30/2016
03/30/2016: Lots 1, 2 and 3 all have legal access since they front to public
streets. Does it make sense to depict Tract A as an access easement as this
will be the shared parking areas for all three lots?
Response: Tract A has a blanket Access Easement covering it.
Comment Number: 11 Comment Originated: 03/30/2016
03/30/2016: Please add the standard sidewalk repair note to the utility plan
and the site plan:
"Any damaged curb, gutter and sidewalk existing prior to construction, as well
as streets, sidewalks, curbs and gutters, destroyed, damaged or removed due
to construction of this project, shall be replaced or restored to City of Fort
Collins standards at the Developer's expense prior to the acceptance of
completed improvements and/or prior to the issuance of the first Certificate of
Occupancy."
Response: Note has been added to the Site Plan and Sheet 4 of the Utility Plans.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 03/18/2016
03/18/2016: Sheep fescue is considered an invasive exotic species by the
Colorado Native Plant Society. Please consider an alternative species in the
native seed mix, such as buffalograss or western wheatgrass
Response: Sheeps fescue has been replaced with Buffalograss.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
Comment Number: 6 Comment Originated: 03/30/2016
03/30/2016:
Continued:
Move the tree at the corner of Illinois and Drake on Illinois twenty feet away from
the stop sing. This coffee tree is currently shown at 10 feet from the stop sign
but needs to be placed 20 or more from the sign.
Response: Tree location has been adjusted.
12/08/2015:
Show the locations of any other street lights and the locations where stop signs
will be located. Street tree placement from any of these fixtures should be
adjusted to meet the following standard.
Street Lights:
Canopy shade trees 40 feet
Ornamental trees 15 feet
Stop Signs:
All trees 20 feet away from signs
Response: Separation has been provided and separation notes have been defined.
Comment Number: 7 Comment Originated: 03/30/2016
03/30/2016:
Continued:
Eliminate the first tree street tree from the corner of Drake and Illinois located
along Drake for improved line of site
Response: Tree has been eliminated.
12/08/2015:
Evaluate street tree placement for line of site at the following corners:
Illinois and East Drake: The first tree along Illinois and the first tree along Drake.
Illinois and Limon: the first tree on Illinois should be shifted to the north. The first
tree along Limon may be in conflict with where a stop sign will be located and is
also close to the corner.
East Drake and Iowa: Evaluate the first tree for better clearance of east bound
traffic on Drake.
Response: Trees have been pushed back from the corners.
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Comment Number: 1 Comment Originated: 03/30/2016
03/30/2016: PARAPET HEIGHTS
Please confirm parapet heights are still at 4' or less.
Response: Parapet heights have been defined on the building elevations
Comment Number: 2 Comment Originated: 03/30/2016
03/30/2016: FIRE ACCESS
Future development of Lots 1 & 2 may create an out of access condition if one
building ends up spanning both lots. In that case, an Emergency Access
Easement will be required on the property at that time.
Response: Emergency Access Easement has been provided in the parking lot.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 03/08/2016
03/08/2016: Erosion Control Report and Plans have redlines that will need to
be addressed.
Response: Acknowledged.
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 2 Comment Originated: 03/29/2016
03/29/2016: Sheet 4 and 5 do not match regarding the parking lot islands.
Please revise.
Response: Revised.
Comment Number: 3 Comment Originated: 03/29/2016
03/29/2016: Please provide a perforated underdrain detail.
Response: Detail has been provided on the Grading Plan.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 8 Comment Originated: 03/29/2016
03/29/2016: There are line over text issues. See redlines.
Response: Revised.
Topic: Construction Drawings
Comment Number: 9 Comment Originated: 03/29/2016
03/29/2016: There is text that needs to be rotated 180 degrees. See redlines.
Response: Revised.
Comment Number: 10 Comment Originated: 03/29/2016
03/29/2016: Please tie the coordinate values shown for utilities to the project
boundary. We would prefer that this be done by adding property corner values
to each sheet, or showing the property corner values on the horizontal control
plans and adding a note to each sheet with coordinate values.
Response: Revised.
Comment Number: 11 Comment Originated: 03/29/2016
03/29/2016: There are line over text issues. See redlines.
Response: Revised.
Comment Number: 12 Comment Originated: 03/29/2016
03/29/2016: There are text over text issues. See redlines.
Response: Revised.
Topic: Landscape Plans
Comment Number: 7 Comment Originated: 03/28/2016
03/28/2016: There are line over text issues. See redlines.
Response: Revised.
Topic: Plat
Comment Number: 1 Comment Originated: 03/28/2016
03/28/2016: Please add new title commitment information as available.
Response: Revised.
Comment Number: 2 Comment Originated: 03/28/2016
03/28/2016: The Zoning Note is not needed. See redlines.
Response: Revised.
Comment Number: 3 Comment Originated: 03/28/2016
03/28/2016: Who owns & maintains Tract A?
Response: Tract A will be owned and maintained by the Commercial Owners Association.
Comment Number: 4 Comment Originated: 03/28/2016
03/28/2016: The Zoning designations are not needed. See redlines.
Response: Revised.
Comment Number: 5 Comment Originated: 03/28/2016
03/28/2016: A "Chiseled X" does not meet State Statues for boundary
monuments. See redlines.
Response: Revised.
Topic: Site Plan
Comment Number: 6 Comment Originated: 03/28/2016
03/28/2016: No comments.
Response: Acknowledged.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/29/2016
03/29/2016: How will access to lots 1 and 2 work? Will they access through the
parking lot of this proposal, or from the roadway to the west?
Response: Lots 1 and 2 will access through the parking lot in Tract A.
Comment Number: 2 Comment Originated: 03/29/2016
03/29/2016: The walk from the parking area to the buildings will require walking
between cars. Transportation Planning is wondering whether a walkway would
be possible?
Response: A walkway was unable to be included without removing the landscaping along the drive
through.
Department: Water-Wastewater Engineering
Contact: Wes Lamarque, 970-416-2418, wlamarque@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/29/2016
03/29/2016: Please add a thrust block to the fire line tap.
Response: Thrust block has been added.
Comment Number: 2 Comment Originated: 03/29/2016
03/29/2016: Please label 1 1/2 tap a wet tap.
Response: Tap has been labeled.
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 03/29/2016
03/29/2016: Need to include a sheet index on the Site Plan sheet. This will
include all sheets not a part of the Utility plans or plat.
Response: Sheet index has been added
Comment Number: 2 Comment Originated: 03/29/2016
03/29/2016: The lighting fixtures offer different temperature options. A note
needs to be added the 3000k temperature will be used.
Response: Fixture options have been selected on the fixture sheet.