HomeMy WebLinkAboutWATERS EDGE - FDP - FDP170013 - SUBMITTAL DOCUMENTS - ROUND 1 - TRAFFIC STUDYWATERS’ EDGE WEST
TRAFFIC IMPACT ANALYSIS
Prepared for:
Waters’ Edge Investments, LLLP
c/o Actual Communities, LLLP
5935 South Zang Street, Suite 230
Littleton, CO 80127
303/858-0250
Project Manager:
Mr. Bill Swalling
Prepared by:
Felsburg Holt & Ullevig
6300 S. Syracuse Way, Suite 600
Centennial, CO 80111
303/721-1440
Project Manager:
Richard R. Follmer, PE, PTOE
January 24, 2017
FHU Reference No. 115358-01
Waters’ Edge West Traffic Impact Analysis
TABLE OF CONTENTS
Page
I. INTRODUCTION -------------------------------------------------------------------------------------------- 1
I.1 Project Description -------------------------------------------------------------------------------- 1
II. SUMMARY OF EXISTING CONDITIONS ------------------------------------------------------------ 4
II.1 Study Area Boundary ----------------------------------------------------------------------------- 4
II.2 Existing Roadways -------------------------------------------------------------------------------- 4
II.3 Existing Traffic Volumes ------------------------------------------------------------------------- 6
II.4 Operational Analyses of Existing Conditions ----------------------------------------------- 8
III. PROJECTED BACKGROUND CONDITIONS ----------------------------------------------------- 11
III.1 Background Traffic Growth -------------------------------------------------------------------- 11
III.2 Background Traffic Operations --------------------------------------------------------------- 11
III.3 Improvements Needed for Background Traffic Conditions ---------------------------- 16
IV. PROJECTED BUILD-OUT CONDITIONS ----------------------------------------------------------- 18
IV.1 Waters’ Edge West Development Characteristics --------------------------------------- 18
IV.2 Trip Generation Estimates --------------------------------------------------------------------- 18
IV.3 Site-Generated Traffic Volumes and Trip Distribution ---------------------------------- 18
IV.4 Total Traffic Volumes ---------------------------------------------------------------------------- 22
IV.5 Operational Analyses & Improvement Requirements ----------------------------------- 25
IV.6 Street Classifications ---------------------------------------------------------------------------- 33
IV.7 Auxiliary Lane Analyses ------------------------------------------------------------------------ 33
IV.8 Pedestrian & Bicycling Facilities -------------------------------------------------------------- 33
IV.9 Infrastructure for Year 2021 & Year 2040 Conditions ----------------------------------- 33
V. SUMMARY CONCLUSIONS --------------------------------------------------------------------------- 36
Waters’ Edge West Traffic Impact Analysis
LIST OF APPENDICES
APPENDIX A ATTACHMENT A, BASE ASSUMPTIONS ATTACHMENT B,
PEDESTRIAN ANALYSIS WORKSHEET
APPENDIX B EXISTING TRAFFIC COUNT DATA
APPENDIX C LEVEL OF SERVICE CRITERIA FOR STOP-CONTROLLED AND
SIGNALIZED INTERSECTIONS
APPENDIX D TRAFFIC ANALYSIS WORKSHEETS – EXISTING CONDITIONS
APPENDIX E TRAFFIC ANALYSIS WORKSHEETS – YEAR 2021 BACKGROUND
CONDITIONS
APPENDIX F TRAFFIC ANALYSIS WORKSHEETS – YEAR 2040 BACKGROUND
CONDITIONS
APPENDIX G TRAFFIC ANALYSIS WORKSHEETS – YEAR 2021 BUILD-OUT
CONDITIONS
APPENDIX H TRAFFIC ANALYSIS WORKSHEETS – YEAR 2040 BUILD-OUT
CONDITIONS
Waters’ Edge West Traffic Impact Analysis
LIST OF FIGURES
Page
Figure 1. Vicinity Map ----------------------------------------------------------------------------------------- 2
Figure 2. Project Site Plan ----------------------------------------------------------------------------------- 3
Figure 3. Roadway Laneage -------------------------------------------------------------------------------- 5
Figure 4. Existing Traffic Volumes ------------------------------------------------------------------------- 7
Figure 5. Existing Levels of Service & Lane Geometry ---------------------------------------------- 10
Figure 6. Year 2021 Background Traffic Volumes ---------------------------------------------------- 12
Figure 7. Year 2040 Background Traffic Volumes ---------------------------------------------------- 13
Figure 8. Year 2021 Background Traffic Operational Conditions --------------------------------- 14
Figure 9. Year 2040 Background Traffic Operational Conditions --------------------------------- 15
Figure 10. Vehicle Trip Distribution ------------------------------------------------------------------------ 19
Figure 11. Site-Generated Traffic Volumes -------------------------------------------------------------- 21
Figure 12. Year 2021 Total Traffic Volumes ------------------------------------------------------------- 23
Figure 13. Year 2040 Total Traffic Volumes ------------------------------------------------------------- 24
Figure 14. Daily Traffic from Waters’ Edge West on Adjacent Streets ---------------------------- 22
Figure 15. Channelized “T” Intersection Configuration ------------------------------------------------ 27
Figure 16. Year 2021 Levels of Service & Lane Geometry ------------------------------------------ 29
Figure 17. Year 2040 Levels of Service & Lane Geometry ------------------------------------------ 31
Figure 18. Waters’ Edge West Street Classifications -------------------------------------------------- 34
LIST OF TABLES
Table 1. Improvement Requirements for Background Traffic Conditions ---------------------- 17
Table 2. Waters’ Edge Trip Generation Estimates -------------------------------------------------- 18
Table 3. Recommended Improvements for Year 2021 Conditions ------------------------------ 28
Table 4. Recommended Improvements for Year 2040 Conditions ------------------------------ 32
Table 5. Recommended Improvements Summary for Waters’ Edge West ------------------- 35
Waters’ Edge West Traffic Impact Analysis
Page 1
I. INTRODUCTION
I.1 Project Description
Waters’ Edge Investments, LLLP is proposing to construct a community of residential homes in
northeast Fort Collins, Colorado on a parcel of land adjacent to Turnberry Road. Specifically,
the project is located on the west side of Turnberry Road and it abuts other existing residential
communities – to the north and west are the Serramonte and Hearthfire communities, while to
the south is the Richards Lake development.
The projects’ name is Waters’ Edge West, and the subject land is currently vacant except for a
City of Fort Collins park (Richards Lake Park) that is in the southwest corner of the property.
Certain public streets exist adjacent to and through Waters’ Edge West. These streets are
located primarily along the south parcel boundaries and through the western part of the property
– Brightwater Drive traverses the south side of Waters’ Edge West, while Brightwater Drive and
Morningstar Way exist within the property boundaries. Morningstar Way makes a connection to
the Hearthfire community with ultimate connection to Douglas Road. Figure 1 provides a
representation of the project site in relation to these streets.
Waters’ Edge West is proposed for only residential uses – a total of 379 single-family and multi-
family dwelling units. Waters’ Edge West will include a community center, and several parks
and open spaces will be provided for community residents. Waters’ Edge West is projected to
be completed by Year 2021.
Several points of access are proposed for the project with primary routes eventually reaching
Turnberry Road. Parcel access will intersect existing Brightwater Drive and Morningstar Way,
and along the new extension of Morningstar Way to Turnberry Road. Figure 2 provides a
representation of the project site plan, street network, and the proposed accesses.
Pedestrian access will be along detached sidewalks following the City roadway typical section
standards. An off-street trail system will also be provided that allows pedestrians opportunities
for access to other areas of Waters’ Edge West and to its parks and open spaces.
Bicycle travel in Waters’ Edge West will occur within the normal footprint of the Local street
system when traveling along the residential streets. Travel along Brightwater Drive and
Turnberry Road will be in established bike lanes. Where needed along the Waters’ Edge West
property, the roadway cross-section will include extensions of the existing bike lane facilities on
Turnberry Road.
This analysis provides information on traffic impacts for the proposed development and it
includes specific information on:
Existing functional and operational conditions
Projected increases in existing traffic volume levels for the Background timeframes
Trip generation estimates for Water’s Edge West
Evaluation of project impacts
Summary of analyses and recommendations
Vicinity Map
Figure 1
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
PROJECT
SITE
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake Rd.
Mountain Vista Dr. (CR 50)
Vine Dr.
Mulberry Rd.
Lemay Ave.
Gregory Rd.
Timberline Rd.
Jefferson St./Riverside Ave.
College Ave.
T
e
r
r
y
L
a
k
e
R
d
.
1 25
25
287
14
Waters' Edge West Site Plan
Figure 2
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - 55+ Report 15-358 10/26/16
BRIGHTWATER DR.
H
E
A
R
T
H
F
I
R
E
W
A
Y
Waters’ Edge West Traffic Impact Analysis
Page 4
II. SUMMARY OF EXISTING CONDITIONS
II.1 Study Area Boundary
The information contained in this report focuses on the transportation impacts and infrastructure
requirements along the surrounding street network which extends from Douglas Road on the
north, to Vine Drive on the south, to State Highway 1 (Terry Lake Road) and Lemay Avenue on
the west, and to Timberline Road on the east.
II.2 Existing Roadways
Existing roadways adjacent to Waters’ Edge West provide access to the local communities,
while also providing for regional access to connecting streets that serve the larger northeast
Fort Collins and Larimer County areas. Streets such as Hearthfire Drive and Brightwater Drive
provide direct access to Douglas and Turnberry Roads, while Turnberry Road makes
connections to Douglas Road, Country Club Road and Mountain Vista Drive, with eventual
access to Lemay Avenue, Timberline Road and ultimately SH 1, SH 14 and I-25.
The City of Fort Collins’ Master Street Plan was consulted to understand the current
classification of the adjacent streets. This document includes the following street classifications:
Morningstar Way = 2-Lane Collector
Brightwater Drive = 2-Lane Collector
Turnberry Road = 2-Lane Arterial
Richards Lake Road = 2-Lane Arterial
Country Club Road = 2-Lane Collector
Douglas Road = 2-Lane Arterial
Lemay Avenue = 4-Lane Arterial (south of Country Club Road)
Mountain Vista Drive = 2-Lane and 4-Lane Arterial (dividing line is at Timberline Road)
Timberline Road = 4-Lane Arterial
Vine Drive = 4-Lane Arterial
Of note, the Master Street Plan includes some realignments of surrounding streets,
specifically, Mountain Vista Drive and Timberline Road will be realigned in the future to
provide better continuity of Timberline Road to/from I-25, while Vine Drive will be
realigned to the north from its current location which is directly adjacent to existing
railroad tracks.
All other nearby streets are classified as Local streets. Arterial streets are expected to carry
higher traffic volume levels than collector streets and they typically have more roadway laneage
with a higher level of pedestrian and bicyclist amenities. Collector streets provide the
connectivity between higher function streets (arterials) and streets for more direct access to
residential communities and local businesses. Figure 3 shows the projected ultimate roadway
laneage for the arterial and collector street classifications while also showing the existing
laneage (exclusive of left turn or right turn auxiliary lanes).
Roadway Laneage
Figure 3
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
PROJECT
SITE
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake Rd.
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave.
Gregory Rd.
Timberline Rd.
T
e
r
r
y
L
a
k
e
R
d
.
= Existing/Future Roadway Laneage
LEGEND
X/X
1 25
25
2/4 2/4
2/4
2/2
2/2 2/2
2/2
2/2
2/2
2/2
Waters’ Edge West Traffic Impact Analysis
Page 6
II.3 Existing Traffic Volumes
Daily traffic volumes were provided by the City of Fort Collins on several adjoining streets;
almost all of which were recorded in 2015 with only a few recorded in 2014. Daily traffic
volumes on typical weekdays varied considerably. These levels ranged from less than
1,000 vehicles per day (vpd) along Brightwater Drive to over 16,000 vpd on Lemay Avenue.
Intersection turning movements were recorded at 12 intersections surrounding the project site
and these locations were coordinated with the City as part of the Base Assumptions
assessment during the preparation of this report. Base Assumptions data, Attachment A, is
included in Appendix A.
The peak hour traffic volumes were recorded during the typical AM and PM hours of commuter
travel times to identify the highest levels of adjacent traffic activity. Figure 4 is a graphical
representation of the recorded peak hour and daily traffic volumes; the traffic count data can be
found in Appendix B.
Existing traffic volume patterns reflect movements that can be expected of primarily residential
areas that are located relatively distant from the main retail and business areas of Fort Collins.
Residents of the developments surrounding Waters’ Edge West typically must travel toward the
south, west and southwest to reach shopping, recreation, and work opportunities. There are a
few patterns/movements that should be noted:
Patterns at the SH 1/Douglas Road intersection (No. 1 on Figure 4) reflect a to/from
downtown Fort Collins pattern with higher movements southbound during the AM peak
hour and northbound during the PM peak hour.
Intersection No. 8 (Turnberry Road/Country Club Road) includes a high level of turning
movements along the north leg of Turnberry Road and the west leg of Country Club
Road. This pattern reflects movements to/from downtown Fort Collins (southbound right
turns/eastbound left turns) which is less convenient along Turnberry Road which does
not have direct connectivity toward the south, i.e., it’s more circuitous along Turnberry
Road, Mountain Vista Drive and Timberline Road.
Intersection No. 7 (Lemay Avenue/Country Club Road) also reflects this basic pattern
but with different turning movements, i.e., westbound left turns during the AM peak hour
and northbound right turns during the PM peak hour.
Turnberry Road and Timberline Road intersections along Mountain Vista Drive
(Intersections 9 and 10) reflect patterns to/from the residential areas and business areas
of Fort Collins being eastbound and southbound during the AM peak hour and
northbound and westbound during the PM peak hour.
Of note, traffic volumes at the Vine Drive/Lemay Avenue intersection reflect reserve capacity
estimates of future traffic based on data furnished by the City of Fort Collins.
Existing Traffic Volumes
Figure 4
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - 55+ Report 15-358 10/13/16
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
= AM(PM) Peak Hour Traffic Volumes
(AM=7-8am; PM=4:45-5:45pm)
= Daily Traffic Volumes
XXX(XXX)
LEGEND
XXXX
5(15)
53(52)
36(33)
178(79)
309(158)
24(11)
67(91)
67(44)
48(51)
16(65)
88(322)
14(61)
58(93)
2(4)
95(89)
5(35)
31(14)
9(4)
3(1)
22(65)
Waters’ Edge West Traffic Impact Analysis
Page 8
II.4 Operational Analyses of Existing Conditions
Level of service (LOS) analyses were conducted for each of the 12 project intersections during
the AM and PM peak hours of vehicle activity. These analyses were conducted using the
Synchro analysis software tool which allows for calculation of control delay using the
methodologies of the Highway Capacity Manual, Transportation Research Board, 2010. These
analyses use the existing traffic volumes, intersection geometry (i.e., the number of through
lanes and left or right turn lanes), and intersection traffic control to estimate levels of service.
Level of service categorizes the ease of traffic flow through an intersection with operational
designations from A through F. Level of service A represents relatively uncongested traffic flow
with little or no vehicle delay, while LOS F represents greater delay and more congestion. Level
of service delay characteristics for stop-controlled and signalized intersections is included in
Appendix C.
Eight of the 12 intersections are controlled by stop signs on the side streets, while the Country
Club Road/Lemay Avenue, Turnberry Road/Mountain Vista Drive, and Vine Drive/Timberline
Road intersections have stop signs on all intersection approaches. The Vine Drive/Lemay
Avenue intersection is the only one controlled by a traffic signal. Traffic signal timing
parameters were provided by the City of Fort Collins for the analysis of existing conditions.
The Larimer County Urban Area Street Standards (LCUASS) provide LOS standards for motor
vehicles in Table 4-3 (recently revised). That table includes standards for both signalized and
unsignalized (stop-controlled or roundabouts) intersections. These standards also provide
clarification for the types of intersecting street classifications when analyzing intersections that
are controlled by stop signs. As such, the following table summarizes the LOS standards for
intersections included in the analyses for this report.
Table 4-3 as reproduced from the Larimer County Urban Area Street Standards
Fort Collins (GMA and City Limits) Motor Vehicle LOS Standards (Intersections)
Overall Any Approach Leg Any Movement
Signalized D1 E E2
Unsignalized
Arterial/Arterial
Collector/Collector
E3 E E
Unsignalized
Arterial/Collector
Arterial/Local
F3 F F
Unsignalized
Collector/Local
Local/Local
C3 C C
Roundabout E3, 4 E4 E4
1 In mixed use district including downtown and campus area as defined by structure plan, LOS E is acceptable
2 Applicable with at least 5% of total entering volume
3 Use weighted average to identify overall delay
4 Apply signalized delay value thresholds to determine LOS
Waters’ Edge West Traffic Impact Analysis
Page 9
The results of these analyses found that only one location does not meet the criteria of LCUASS
for existing conditions:
Intersection No. 11, Vine Drive/Lemay Road (in Mixed-Use District) – The westbound
through/right movements operate at LOS F during the AM peak hour, while the
eastbound and westbound through/right movements operate at LOS F in the PM peak
hour.
Figure 5 includes LOS results for existing conditions, the existing intersection geometry, and
traffic control for the studied locations. Appendix D contains the traffic analysis worksheets for
existing conditions.
Existing Levels of Service
and Lane Geometry
Figure 5
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
Morningstar
Way
= AM/PM Peak Hour Signalized
Intersection Level of Service
= AM/PM Peak Hour Unsignalized
Intersection Level of Service
= Stop Sign
= Traffic Signal
LEGEND
X/X
x/x
b/c
c/c a/a
a/a
c/d
b/b
a/a a/a
a/a
a/a
a/a
a/a
a/b
a/a
b/a
a/a
a/a
a/a
Waters’ Edge West Traffic Impact Analysis
Page 11
III. PROJECTED BACKGROUND CONDITIONS
When evaluating future conditions for a new project, it is necessary to understand how traffic
along the existing roadway system is expected to change over time so that the impacts of the
new project can be easily identified. As such, this section includes information that could be
expected at completion of Waters’ Edge West (Year 2021) and for the long-range planning
horizon (Year 2040).
As noted in the Base Assumptions (Attachment A), two roadway improvements are considered
part of background conditions when understanding roadway laneage and operational conditions
for the Year 2040 timeframe:
The Vine Drive/Lemay Avenue intersection will be relocated toward the north as part of
the entire realignment of Vine Drive between College Avenue and Timberline Road and
as part of the plans to construct a grade-separation on Lemay Avenue over the railroad
tracks that parallel the existing Vine Drive alignment. Intersection laneage reflects that
these streets are 4-Lane Arterials and the number of left or right turn lanes were found in
a report prepared by City staff.
The Vine Drive/Timberline Road intersection will include a traffic signal by this timeframe
as part of these analyses. It must be pointed out, however, that the City’s Master Street
Plan shows that this intersection will also be relocated to the north as part of the City’s
realignment of Vine Drive.
III.1 Background Traffic Growth
Conversations with City staff indicate that a one (1) percent compounded annual growth rate in
existing traffic is appropriate for understanding background traffic growth for the Waters’ Edge
West project.
Year 2021 – Existing traffic volumes were grown by 6.15 percent to estimate traffic volumes at
the subject intersections to accommodate growth in traffic from the time the vehicle movements
were recorded to the build-out year timeframe (6 years). The build-out traffic volumes for
Waters’ Edge West can be found on Figure 6.
Year 2040 – Continuing these estimates, traffic volumes were increased by 28.24 percent to
accommodate the expected growth from Year 2015 to Year 2040, the long-range planning
horizon. The Year 2040 background traffic volumes can be found on Figure 7.
III.2 Background Traffic Operations
Figures 8 and 9 represent the operational analysis results for Years 2021 and 2040,
respectively, using the projected traffic volumes and the anticipated roadway laneage and traffic
control. The only traffic control change for the Year 2021 scenario is that the traffic signal timing
parameters at the Vine Drive/Lemay Avenue intersection were optimized. For Year 2040, the
Vine Drive/Lemay Avenue intersection is considered to be in its relocated location with
additional intersection laneage, while the Vine Drive/Timberline Road intersection includes
traffic signalization with optimized signal timing (no additional laneage) even though it may be
relocated farther to the north by the Year 2040 analysis timeframe.
Year 2021
Background Traffic Volumes
Figure 6
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
WATERS'
EDGE WEST
H
e
a
r
t
h
f
i
r
e
D
r
.
Douglas Rd.
CR 13
Hearthfire Way
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
= AM(PM) Peak Hour Traffic Volumes
= Daily Traffic Volumes
XXX(XXX)
LEGEND
XXXX
5(15)
55(55)
40(35)
190(85)
330(170)
25(15)
70(95)
70(45)
50(55)
20(70)
95(340)
15(65)
60(100)
5(5)
100(95)
5(35)
35(15)
10(5)
5(5)
25(70)
Year 2040
Background Traffic Volumes
Figure 7
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
= AM(PM) Peak Hour Traffic Volumes
= Daily Traffic Volumes
XXX(XXX)
LEGEND
XXXX
5(20)
70(65)
45(40)
230(100)
395(205)
30(15)
85(115)
85(55)
60(65)
20(85)
115(45)
20(80)
75(120)
5(5)
120(115)
5(45)
40(20)
15(5)
5(5)
30(85)
Year 2021
Background Traffic Operational Conditions
Figure 8
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
Morningstar
Way
= AM/PM Peak Hour Signalized
Intersection Level of Service
= AM/PM Peak Hour Unsignalized
Intersection Level of Service
= Stop Sign
= Traffic Signal
LEGEND
X/X
x/x
b/c
c/c a/a
a/a
c/d
b/c
a/a a/a
a/a
a/a
a/a
a/a
a/a
a/a
b/b
a/a
b/b
b/a
Year 2040
Background Traffic Operational Conditions
Figure 9
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
Morningstar
Way
= AM/PM Peak Hour Signalized
Intersection Level of Service
= AM/PM Peak Hour Unsignalized
Intersection Level of Service
= Stop Sign
= Traffic Signal
LEGEND
X/X
x/x
c/c
d/e a/a
a/a
c/f
c/c
a/a a/a
a/b
a/a
a/a
a/a
a/b
a/a
b/b
a/a
b/b
b/b
Waters’ Edge West Traffic Impact Analysis
Page 16
Year 2021 – The results of these analyses found that the critical vehicle movements at 10 of the
12 intersections can meet the LCUASS standards with the growth in traffic identified in Section
III.1. Only two locations will not meet these LOS standards:
Intersection No. 11, Vine Drive/Lemay Avenue (Signalized) – With the increases in traffic
projected for the Year 2021 timeframe, overall intersection operations during the PM
peak hour will degrade to LOS F even with some signal timing optimization (same cycle
length and offset; only modifications to allotted green time). Specifically, the eastbound
and westbound through/right movement, and the northbound and southbound
approaches will operate at LOS F during the PM peak hour.
Intersection No. 12, Vine Drive/Timberline Road (All-Way Stop) – The northbound
approach will reach LOS F during the PM peak hour.
Appendix E contains the traffic analysis worksheets for Year 2021 Background conditions.
Year 2040 – Analyses for the Year 2040 timeframe found that the critical vehicle movements at
most of the stop-sign controlled intersections can continue to meet the LCUASS standards
during both the AM and PM peak hours except for a few specific locations and timeframes:
Intersection No. 1, SH 1 at Douglas Road – The eastbound left turn lane is projected to
operate at LOS F during the PM peak hour.
Intersection No. 10, Timberline Road/Mountain Vista Drive – The northbound left/right
movement is projected to operate at LOS F during the PM peak hour.
Of note, two other movements (or approaches) are projected to operate at LOS F during the PM
peak hour: 1) northbound approach at the Country Club Road/Lemay Avenue intersection, and
2) the eastbound left/through movement at the Turnberry Road/Country Club Road intersection.
Given their street classifications and LCUASS LOS criterion, LOS F is acceptable for these
movements/approaches during peak hour conditions.
Appendix F contains the traffic analysis worksheets for Year 2040 Background conditions.
III.3 Improvements Needed for Background Traffic Conditions
To clearly define the improvements that will be necessary to accommodate the impacts of
Waters’ Edge West, it is first necessary to understand what improvements will be needed in the
Years 2021 and 2040 with only increases in existing traffic (the Background traffic scenario). As
noted in the previous section, only a few intersections or individual movements are identified as
not meeting the LOS criteria contained in LCUASS. Table 1 includes those locations/
movements and an estimate of what is required to meet the LCUASS standards from a physical
and/or operational standpoint.
Waters’ Edge West Traffic Impact Analysis
Page 17
Table 1. Improvement Requirements for Background Traffic Conditions
Intersection Street
Classifications
Level of Service
Without
Improvement
Needed
Improvement to
Meet LCUASS
LOS Criteria
Level of
Service with
Improvement
Year 2021
Base Assumption: Lemay Avenue grade-separation over railroad tracks and realignment of Vine
Drive/Lemay Avenue intersection has not occurred. Vine Drive relocation has not occurred.
Intersection
No. 11, Vine
Drive/Lemay
Avenue – PM
Peak Hour
Vine Drive –
Arterial
Lemay Avenue –
Arterial
LOS F Overall;
EB & WB
Through/Right &
NB/SB
Approaches –
LOS F
Add additional NB
& SB laneage – 2nd
through lane and
exclusive left turn
lanes in both
directions
LOS D Overall;
LOS E or better
for all
movements
Intersection
No. 12, Vine
Drive/Timberline
Road – PM
Peak Hour
Vine Drive –
Arterial
Timberline Road
- Arterial
NB left/through/
right – LOS F
Install traffic
signalization OR
convert to single
lane roundabout
LOS B with
traffic signal;
Waters’ Edge West Traffic Impact Analysis
Page 18
IV. PROJECTED BUILD-OUT CONDITIONS
IV.1 Waters’ Edge West Development Characteristics
Waters’ Edge West is proposing to construct a total of 379 residential dwelling units (249 single-
family homes, 82 townhomes, and 48 condominiums) in the northeast area of the City of Fort
Collins. While the single-family homes will be available for purchase by anyone, each of the
townhome and condominium dwelling units will be age-restricted to residents that are at least 55
years old. Waters’ Edge West will be located on the west side of Turnberry Road between
Brightwater Drive and the Serramonte residential community. Waters’ Edge West will include a
community center and several park and open space amenities.
IV.2 Trip Generation Estimates
Estimates of new vehicle-trips for Waters’ Edge West are based on information contained in the
Institute of Transportation Engineers’ publication Trip Generation. Trip generation data for the
townhome and condominium dwelling units use the Senior Housing (Attached) category per
discussion with City of Fort Collins staff. Trip generation for the Waters’ Edge project is
included in Table 2.
Table 2. Waters’ Edge Trip Generation Estimates
Land Use Unit Size Daily
AM Peak Hour PM Peak Hour
In Out Total In Out Total
Single-Family DU 249 2,431 46 138 184 150 89 239
Townhomes
(Sr. Housing
Trip Category)
DU 82 266 6 11 17 11 10 21
Condominiums
(Sr. Housing
Trip Category)
DU 48 164 4 6 10 7 6 13
TOTAL DU 379 2,861 56 155 211 168 105 273
IV.3 Site-Generated Traffic Volumes and Trip Distribution
Trip Distribution – As noted previously, there is a definitive pattern of traffic flow between
northeast Fort Collins and the downtown area. As such, it is projected that most of the traffic
to/from Waters’ Edge West will be to/from the south, primarily starting along Turnberry Road,
then being distributed among other intersecting streets. As such, the pattern of vehicle
distribution of Waters’ Edge West trips is projected to follow a similar pattern. As can be seen
on Figure 10, 85 percent of Waters’ Edge traffic is projected to travel to/from the south along
Turnberry Road, with 75 percent being to/from the south of Richards Lake Road. Traffic
volumes are then somewhat evenly distributed over the other routes to/from the south, east and
west.
Vehicle Trip Distribution
Figure 10
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
WATERS'
EDGE WEST
6% 10% 5% 5%
1%
10%
75%
10%
85%
20%
3%
20% 40%
15%
15% 12%
15%
5% 35% 20%
3% 3% 0%
5%
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake Rd.
Mountain Vista Dr. (CR 50)
Vine Dr.
Mulberry St.
Lemay Ave. Gregory Rd.
Timberline Rd.
Willox Ln.
Morningstar
Way
Jefferson St./Riverside Ave.
College Ave.
T
e
r
r
y
L
a
Waters’ Edge West Traffic Impact Analysis
Page 20
Site Generated Traffic Volumes – The traffic volume projections of Table 2 were distributed
along the surrounding street network by following the distribution patterns of Figure 10. The
resultant vehicle-trip assignments for Waters’ Edge West can be found on Figure 11.
Adequate Public Facilities – The City of Fort Collins recognizes that certain intersections
adjacent to or near the core of Fort Collins are of specific concern to its residents – intersections
that may have significant negative impacts related to a proposed project. For this project, only
the Vine Drive/Lemay Avenue intersection was identified as needing to satisfy certain Adequate
Public Facilities (APF) criteria.
It is understood that there is an APF exception (Land Use Code Section 3.7.3(F)) for projects
with no more than 50 vehicle-trips during an hour at an APF intersection. Given the restriction
of the townhome and condominium dwelling units to residents that are 55+, the site generated
traffic volume projections of Figure 11 find that 38 and 49 vehicles are projected to traverse this
intersection during the AM and PM peak hours, respectively.
This level of vehicle traffic equates to less than one vehicle per minute from Waters’ Edge West
that is projected to use this intersection during the worst hour of the day, being the PM peak
hour. These vehicle levels are distributed over eight (8) movements at the intersection; the
highest movement is 21 vph – about one vehicle every three minutes (for the northbound
through movement).
Site Generated Traffic Volumes
Figure 11
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - JANUARY UPDATE 15-358 01/18/17
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
= AM(PM) Peak Hour Traffic Volumes
= Daily Traffic Volumes
XXX(XXX)
LEGEND
XXXX
2(1)
9(6)
5(3)
1(2)
3(10)
2(5)
8(5)
3(9)
3(8)
8(5)
3(9)
3(9)
8(5)
8(5)
6(17)
116(78)
16(11)
42(126)
79(54)
53(35)
19(57)
Waters’ Edge West Traffic Impact Analysis
Page 22
IV.4 Total Traffic Volumes
Projected traffic volumes at the completion of Waters’ Edge West are the compilation of the
growth in background traffic and the traffic volume estimates for the new homes. Figures 12
and 13 on the following pages include the traffic volume estimates when adding the values from
Figure 11 with Figures 8 and 9.
As additional information, while the daily traffic volumes of Figures 12 through 13 include the
total amount of projected traffic along the adjacent street system, the specific level of projected
additional daily traffic on nearby neighborhood streets is included on Figure 14. As can be
seen on this figure, traffic from Waters’ Edge West that may proceed onto streets within
Richards Lake subdivision is expected to be less than 20 vpd.
Figure 14. Daily Traffic from Waters’ Edge West on Adjacent Streets
Year 2021
Total Traffic Volumes
Figure 12
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - JANUARY UPDATE 15-358 01/18/17
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
= AM(PM) Peak Hour Traffic Volumes
= Daily Traffic Volumes
XXX(XXX)
LEGEND
XXXX
10(15)
65(60)
45(40)
190(85)
330(170)
25(20)
70(95)
75(55)
50(55)
20(70)
95(340)
20(70)
70(105)
5(5)
105(105)
10(45)
45(20)
10(5)
5(5)
25(70)
Year 2040 Total Traffic Volumes
Figure 13
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - JANUARY UPDATE 15-358 01/23/17
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
= AM(PM) Peak Hour Traffic Volumes
= Daily Traffic Volumes
XXX(XXX)
LEGEND
XXXX
10(20)
80(70)
50(45)
230(100)
395(205)
30(20)
85(115)
90(65)
60(65)
20(85)
115(415)
25(85)
85(125)
5(5)
125(125)
10(55)
50(25)
15(5)
5(5)
30(85)
20(35)
Waters’ Edge West Traffic Impact Analysis
Page 25
IV.5 Operational Analyses & Improvement Requirements
As noted and documented previously, a total of 12 existing intersections were evaluated to
understand current operational conditions as well as the Background condition for the
timeframes when Waters’ Edge West would be completed (Year 2021) and for the long-range
planning horizon (Year 2040). Two additional intersections are included in these analyses,
represented as Intersections A and B on the following figures.
This section provides information on the operational impacts for the Year 2021 and Year 2040
time periods which represent the projected impacts once Waters’ Edge West has been
completed. General comments are provided relative to LOS results for these intersections, but
the City of Fort Collins has specifically requested that the impacts at five intersections be
discussed in this report. Those locations are:
1. SH 1/Douglas Road
2. Turnberry Road/Country Club Road
3. Mountain Vista Drive/Timberline Road
4. Vine Drive/Lemay Avenue
5. Vine Drive/Timberline Road
Following is operational impact information for the build-out of Waters’ Edge West for the Year
2021 and Year 2040 time periods.
IV.5.1 Year 2021
General – With increased traffic volumes from Waters’ Edge West comes additional delay for
motorists at a stop-controlled or signalized intersection. While some increases in delay will
occur, capacity analyses of the Year 2021 traffic volume levels reveal that only three
movements/intersections will operate below the LCUASS LOS criteria that is summarized on
Page 8. Those movements/intersections are:
1. Mountain Vista Drive/Timberline Road (PM peak hour - northbound left/through
movement)
2. Vine Drive/Lemay Avenue (PM peak hour – overall intersection; more detail is provided
later in this section)
3. Vine Drive/Timberline Road (PM peak hour – eastbound and northbound
left/through/right movements)
SH 1/Douglas Road Intersection – Analyses indicate that movements at this intersection will
operate at LOS D or better during the AM and PM peak hours. Only the eastbound
through/right (AM peak hour – LOS B to C) and westbound left turn (PM Peak hour – LOS C to
D) movements see a decrease in LOS from the Background condition. These LOS results meet
the LCUASS criterion. Twenty-seven vehicles are added to this intersection during the PM peak
hour (± 2.5% increase over the Background condition).
Waters’ Edge West Traffic Impact Analysis
Page 26
Turnberry Road/Country Club Road – It is recognized that the Turnberry Road/Country Club
Road intersection can experience significant delay and congestion during peak hours. These
impacts are primarily related to the relative high levels of eastbound left turn and southbound
right turn movements.
While it is recognized that Waters’ Edge West will add traffic to these movements, the
congestion and vehicle queuing issues already exist at this intersection. With stop signs on only
the Country Club Road approaches, motorists on eastbound County Club Road experience
sufficient delay to meet LOS F standards during the PM peak hour, a poor condition.
Several traffic control options would improve intersection operations, be it additional stop signs
on Turnberry Road that would create an all-way stop situation, or the installation of a traffic
signal or roundabout.
Through conversations with City of Fort Collins staff, it is understood that the City would like to
install a traffic signal as the preferred traffic control option. As such, it is projected that a traffic
signal will operate at LOS C or better during peak hour conditions. As part of their development
commitment, Waters’ Edge Investments, LLLP will be responsible for the design and
construction of the traffic signal at this location.
Mountain Vista/Timberline Road Intersection – The northbound left/right movement will
operate at LOS F during the PM peak hour. To alleviate the LOS F condition, subsequent
analyses find that an all-way stop condition could be implemented. An all-way stop-controlled
intersection may not be the best solution, however, for an intersection that is relatively rural in
nature with somewhat higher travel speeds.
An alternative traffic control solution is to construct what is referred to as a channelized “T”
intersection. With this type of traffic control, movements along Mountain Vista Drive still have
free-flow travel, while the northbound left turn movement is provided room to cross only the
eastbound direction of Mountain Vista Drive first, and is then provided space to accelerate
before merging with the westbound travel lane. This type of traffic control change will improve
operations for the northbound left/right movement to LOS C.
Figure 15 includes a graphical representation of this concept. The shaded areas of this graphic
indicate that some form of median should be installed to provide separation between the varying
travel lanes. Since this intersection is planned for future realignment, creating the median areas
via pavement markings and delineators is a viable solution. Waters’ Edge Investments, LLLP
will contribute monies to the City to design and construct a channelized “T” configuration at this
intersection. Figure 14.
Waters’ Edge West Traffic Impact Analysis
Page 27
Figure 15. Channelized “T” Intersection Configuration
Vine Drive/Lemay Avenue Intersection – As generally understood, this intersection operates
poorly during the PM peak hour due to normal traffic patterns and traffic volume levels, and
intersection operations are hindered when railroad trains block Lemay Avenue. With the
addition of Waters’ Edge West traffic, only a relatively small amount of additional delay will
occur since Waters’ Edge West will add less than one vehicle per minute during the worst hour
of a typical weekday (PM peak hour). This one vehicle every minute will be distributed over
varying intersection movements.
While it is understood that this intersection operates at LOS F during the PM peak hour already,
it is recognized that any infrastructure improvements now would conflict with the City’s plan to
create a grade-separation on Lemay Avenue over the existing railroad tracks which results in
the Vine Drive/Lemay Avenue intersection being relocated farther to the north. Additionally,
available space and adjacency to the railroad tracks could make it difficult to install any
improvements.
Vine Drive/Timberline Road Intersection – The eastbound and northbound left/through/right
movements will degrade to LOS E & F during the PM peak hour as increases in Background
traffic occur. Waters’ Edge West will add traffic to this intersection; however, the level of
increase is less than one vehicle per minute that are distributed over several movements.
Regardless, Waters’ Edge Investments, LLLP will contribute monies to the City of Fort Collins
towards the design and construction of a traffic signal at this location, one that has been
identified for installation. With the construction of a traffic signal, it is projected that this
intersection will operate at LOS B during both peak hours.
Waters’ Edge West Traffic Impact Analysis
Page 28
IV.5.2 Recommended Year 2021 Improvements
Table 3 summarizes the recommended improvements for the Year 2021 scenario that are
necessary to meet the LCUASS LOS criteria (exclusive of the Vine Drive intersections at Lemay
Avenue and Timberline Road), while also including improvements that Water’ Edge West is
committed to building to assist with traffic flow near their site, specifically at the Turnberry
Road/Country Club Road intersection.
Figure 16 shows a representation of the LOS information at the project intersections.
Appendix G includes the Year 2021 level of service analysis worksheets for Waters’ Edge
West.
Table 3. Recommended Improvements for Year 2021 Conditions
Intersection Street
Classifications
Level of Service
Without
Improvement
Recommended
Improvement
Level of
Service with
Improvement
Year 2021
Base Assumption: Lemay Avenue grade-separation over railroad tracks and realignment of Vine
Drive/Lemay Avenue intersection has not occurred. Vine Drive relocation has not occurred.
Improvement to Meet LCUASS Requirements
Intersection
No. 10,
Mountain Vista
Drive/Timberline
Road – PM
Peak Hour
Mountain Vista
Drive – Arterial;
Timberline Road
– Arterial
Northbound
Left/Right –
LOS F
Install channelized
“T” roadway
configuration as
shown on
Figure 15
LOS C will result
for the NB left
and right turn
movements
Additional Improvements
Intersection No.
8, Turnberry
Road/Country
Club Road –
PM Peak Hour
Turnberry Road
– Arterial;
Country Club
Road - Collector
Eastbound
Left/Through –
Year 2021
Levels of Service and Lane Geometry
Figure 16
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - JANUARY UPDATE 15-358 01/23/17
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
Morningstar
Way
Turnberry Rd.
= AM/PM Peak Hour Signalized
Intersection Level of Service
= AM/PM Peak Hour Unsignalized
Intersection Level of Service
LEGEND
X/X
x/x
= Change from 2021 Background
= Stop Sign
= Traffic Signal
x
b/c
c/d a/a
a/a
c/d
c/c
a/a a/a
a/b
a/a
a/a
a/a
a/b
a/a
b/c
b/b
Waters’ Edge West Traffic Impact Analysis
Page 30
IV.5.3 Year 2040
General – When considering the Base Assumptions improvements for geometric upgrades and
traffic signalization at the Vine Drive/Lemay Avenue and Vine Drive/Timberline Road
intersections, these two locations will operate above LCUASS standards. With the construction
of a traffic signal at the Turnberry Road/Country Club Road intersection and a channelized “T”
intersection at the Mountain Vista Drive/Timberline Road intersection, all intersections except
one will meet the LCUASS LOS standards.
Only the SH 1/Douglas Road intersection will not meet the LCUASS criterion (further discussion
below). Following is information on the five specific intersections that the City requested
additional discussion on. Figure 17 provides a representation of the LOS results for Year 2040;
Appendix H includes the LOS worksheets.
SH 1/Douglas Road Intersection – Analyses indicate that movements at this intersection will
deteriorate to LOS E (westbound left turn) and to LOS F (eastbound left turn) during the PM
peak hour. A traffic signalization warrant analysis should be conducted periodically to
determine when this intersection meets one of the Manual on Uniform Traffic Control Devices
(MUTCD) criterion for traffic signal installation. As information, one was conducted for existing
conditions as part of this study; however, none of the MUTCD warrants was met.
The Colorado Department of Transportation (CDOT) has indicated that this intersection is one
of its top priority locations (currently ranked #5) for investigation of operational and safety
improvements. The timeframe for evaluation of potential improvements and their eventual
construction is unknown.
Turnberry Road/Country Club Road – With the construction of a traffic signal at this
intersection, it can continue to operate well for the Year 2040 timeframe. Levels of service are
projected to be LOS B or better during the AM and PM peak hours.
Mountain Vista Drive/Timberline Road Intersection – As noted in the previous section, Waters’
Edge Investments LLLP will contribute monies to the City to design and construct a channelized
“T” configuration as part of their development agreement. This configuration will provide good
operations through the build-out of Waters’ Edge West, but additional delay will occur as traffic
volumes increase toward the Year 2040 timeframe; it is projected to meet the LCUASS
standards for the Year 2040. As also noted previously, the City’s Master Street Plan identifies
that this intersection will be reoriented for better flow along Timberline Road to/from I-25. Given
the anticipated realignment of this intersection, improvements beyond the installation of the
channelized “T” intersection is not recommended.
Year 2040
Levels of Service and Lane Geometry
Figure 17
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - JANUARY UPDATE 15-358 01/23/17
WATERS'
EDGE WEST
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Lemay Ave. Gregory Rd.
Timberline Rd.
Morningstar
Way
= AM/PM Peak Hour Signalized
Intersection Level of Service
= AM/PM Peak Hour Unsignalized
Intersection Level of Service
LEGEND
X/X
x/x
= Change from 2040 Background
= Stop Sign
= Traffic Signal
x
c/d
d/e a/a
a/a
d/f
c/c
a/a a/a
b/b
a/a
a/a
a/a
a/b
a/a
b/c
b/a
Waters’ Edge West Traffic Impact Analysis
Page 32
Vine Drive/Lemay Avenue Intersection – With the relocation of this intersection as noted in the
Master Street Plan, along with the grade-separation of Lemay Avenue over the railroad tracks,
the Vine Drive/Lemay Avenue intersection will be improved to the City’s Arterial street cross-
section. It will also include left and right turn auxiliary lanes on each intersection approach. As
such, a traffic signal will provide good operations for the Year 2040 timeframe with LOS C or
better occurring during either peak hour.
Vine Drive/Timberline Road Intersection – One of the Base Assumptions is to add a traffic
signal to this intersection, i.e., one will be installed whether Waters’ Edge West is built or not.
But in addition, the Master Street Plan notes that this intersection is also planned to be
relocated as part of the Vine Drive improvements. As such, it will likely have intersection
laneage similar to the Vine Drive/Lemay Avenue intersection, and it will likely operate very well.
Regardless of the relocation of this intersection, the installation of a new traffic signal at its
current location will result in LOS B operations during both peak hours.
IV.5.4 Recommended Year 2040 Improvements
Table 4 summarizes the recommended improvements for the Year 2040 scenario that are
necessary to meet the LCUASS LOS criteria. As noted in the previous section, only the
installation of a traffic signal or roundabout at the SH 1/Douglas Road intersection is necessary
to meet the LCUASS LOS criterion.
Table 4. Recommended Improvements for Year 2040 Conditions
Intersection Street
Classifications
Level of Service
Without
Improvement
Recommended
Improvement
Level of
Service with
Improvement
Year 2040
Base Assumptions:
- Vine Drive/Lemay Avenue intersection has been upgraded to Arterial/Arterial intersection
characteristics (4 through lanes with separate left & right turn lanes)
- Vine Drive/Timberline Road intersection includes a traffic signal or is relocated to the north as
part of the Vine Drive realignment
Intersection
No. 1, SH 1/
Douglas Road –
PM Peak Hour
SH 1 – Arterial
Douglas Road -
Arterial
Eastbound Left -
LOS F
Install traffic
signalization OR
convert to single
lane roundabout
LOS B if
signalized (all
movements
LOS C or
better); LOS B
with roundabout
Waters’ Edge West Traffic Impact Analysis
Page 33
IV.6 Street Classifications
Review of Table 7-1 of LCUASS finds Traffic Volume Capacity information for the varying street
classifications in the City of Fort Collins. Using that information and the projected traffic
volumes for Waters’ Edge West, an assessment of vehicle-trips along the internal street system
was conducted to determine what the classifications of the new streets should be. Figure 18
provides a graphical representation of the proposed street classifications for those streets with
projected traffic volumes greater than 1,000 vpd. As such, all other internal Waters’ Edge West
streets are considered Residential Local Streets. Other streets, such as existing Turnberry
Road, have street classifications already established in the City’s Master Street Plan for which
Waters’ Edge West will be responsible for widening to meet the criteria of that classification.
Additionally, the extension of Brightwater Drive should follow the Minor Collector section that
already exists along the north edge of the Richards Lake area.
IV.7 Auxiliary Lane Analyses
An analysis was conducted to understand if any left turn or right turn auxiliary lanes are needed
at the site access point (Intersection B) that intersects Turnberry Road. As noted previously in
this report, Turnberry Road is classified as 2-Lane Arterial. As such, the typical section for
these streets include one travel lane and a bike lane in each direction. Additionally, the typical
section includes space for a center turn lane.
Review of how Turnberry Road has been constructed reveals that it includes the City’s typical
cross-section amenities. As such, a left turn lane can be developed within the existing space for
the center lane via roadway pavement markings. As such, and given the projected traffic
volume for this movement, a striped turn lane of 125’ is recommended.
IV.8 Pedestrian & Bicycling Facilities
Pedestrian access will be along detached sidewalks, following the City roadway typical section
standards. An off-street trail system will also be provided that allows pedestrians opportunities
for access to other areas of Waters’ Edge West and to its parks and open spaces.
Bicycle travel in Waters’ Edge West will occur within the normal footprint of the Local street
system when traveling along residential streets. Travel along Brightwater Drive and Turnberry
Road will be in established bike lanes. Where needed along the Waters’ Edge West property,
the roadway cross-section will include extensions of the existing bike lane facilities on Turnberry
Road.
IV.9 Infrastructure for Year 2021 & Year 2040 Conditions
Table 5 summarizes the improvements needed to address the traffic impacts associated with
the increases in Background traffic (without the construction of Waters’ Edge West) to address
capacity and LOS deficiencies, and ones required of the Applicant to meet development needs.
As noted in Section IV.5, Waters’ Edge Investments, LLLP will design and construct a traffic
signal at the Turnberry Road/County Club Road intersection and they will contribute monies to
the City for the design and construction of a channelized “T” intersection at the Mountain Vista
Drive/Timberline Road intersection and for the installation of a traffic signal at the Timberline
Road/Vine Drive intersection as part of their development agreement.
Waters' Edge West Street Classifications
Figure 18
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA - UPDATE 15-358 07/07/16
B
R
I
D
G
E
W
A
T
E
R
D
R
I
V
E
MORNINGSTAR WAY
TURNBERRY WAY
PARKSIDE DRIVE
= 2-Lane Arterial
= Minor Collector (with Parking)
LEGEND
Waters’ Edge West Traffic Impact Analysis
Page 35
Table 5. Recommended Improvements Summary for Waters’ Edge West
Improvement Description and Location
Responsible Party
Applicant
Committed
Background
Committed
Master
Planned
Year 2021
Turnberry Road – Brightwater Drive to
extension of the north boundary of the Waters’
Edge West property; construct 2-Lane Arterial
cross-section
X
Morningstar Way - Construct extension (Minor
Collector with Parking) to connect from its
existing terminus to Turnberry Road
X
Brightwater Drive – Morningstar Way to
Parkside Drive; Construct Minor Collector (with
Parking) cross-section to match existing
Brightwater Drive section
X
Intersection No. 8 – Turnberry Road/Country
Club Road; design and construct traffic signal X
Intersection No. 10 – Mountain
Vista/Timberline Road; construct channelized
“T” intersection
X1
Intersection No. 12 – Timberline Road/Vine
Drive; construct traffic signal X1
Construct internal Waters’ Edge West streets
to Residential Local section X
Construct single lane roundabout at
Morningstar Way/Brightwater Drive
intersection
X
Install stop signs on side street approaches at
intersections along Morningstar Way,
Brightwater Drive, and at the Turnberry
Road/Morningstar Way intersection
X
Year 2040
Base Assumptions:
- Vine Drive/Lemay Avenue intersection has been upgraded to Arterial/Arterial intersection
characteristics (4 through lanes with separate left & right turn lanes)
- Vine Drive/Timberline Road intersection includes a traffic signal
Intersection No. 1 – SH 1/Douglas Road;
install traffic signalization OR convert to single
lane roundabout
X2
1 Monies contributed to the City by Waters’ Edge Investments, LLLP; design and construction by the City.
2 Improvement needed for Year 2040, but may not be identified as committed, i.e., they represent improvements to
meet the LCUASS LOS standards.
Waters’ Edge West Traffic Impact Analysis
Page 36
V. SUMMARY CONCLUSIONS
Waters’ Edge Investments, LLLP is proposing to construct a community of residential homes in
northeast Fort Collins, Colorado on a parcel of land adjacent to Turnberry Road. Specifically,
the project is located on the west side of Turnberry Road and it abuts other existing residential
communities. To the north and west are the Serramonte and Hearthfire communities, while to
the south is the Richards Lake development.
The projects’ name is Waters’ Edge West, and the subject land is currently vacant except for a
City of Fort Collins park (Richards Lake Park) that is in the southwest corner of the property.
Certain public streets exist adjacent to and through Waters’ Edge West. These streets are
located primarily along the south parcel boundaries and through the western part of the property
– Brightwater Drive traverses the south side of Waters’ Edge West, while Brightwater Drive and
Morningstar Way exist within the property boundaries. Morningstar Way makes a connection to
the Hearthfire community with ultimate connection to Douglas Road.
Waters’ Edge West is proposed for 379 residential dwelling units – 249 single-family homes, 82
townhomes, and 48 condominiums. The townhomes and condominiums will be restricted to
residents that are 55 years old or older. Waters’ Edge West will include a community center,
while several parks and open spaces will be provided for community residents. Waters’ Edge
West is projected to be completed by Year 2021.
Several points of access are proposed for the project with primary routes eventually reaching
Turnberry Road. Parcel access will intersect existing Brightwater Drive and Morningstar Way,
and along the new extension of Morningstar Way to Turnberry Road.
Pedestrian access will be along detached sidewalks following the City’s roadway typical section
standards. An off-street trail system will also be provided that allows pedestrians opportunities
for access to other areas of Waters’ Edge West and to its parks and open spaces.
Bicycle travel in Waters’ Edge West will occur within the normal footprint of the Local street
system when traveling along the residential streets. Travel along Brightwater Drive and
Turnberry Road will be in established bike lanes. Where needed along the Waters’ Edge West
property, the roadway cross-section will include extensions of the existing bike lane facilities on
Turnberry Road.
The planned number of residential homes and the other support services are projected to
generate a total of about 2,860 new vehicle-trips on a daily basis, while trips during the AM and
PM peak hours of commuter traffic are projected to be about 210 and 275 per hour,
respectively.
All of the evaluated intersections, with the exception of the SH 1/Douglas Road intersection, will
meet the applicable Larimer County Urban Area Street Standards level of service criteria for
Fort Collins. Waters’ Edge West will be responsible for certain improvements to meet these
standards and they are more thoroughly documented in the table on the next page. These
improvements will result in a better operating scenario than what currently exists and the
impacts of Waters’ Edge West will have been mitigated.
Waters’ Edge West Traffic Impact Analysis
Page 37
Recommended Improvements Summary for Waters’ Edge Development
Improvement Description and Location
Responsible Party
Applicant
Committed
Background
Committed
Master
Planned
Year 2021
Turnberry Road – Brightwater Drive to
extension of the north boundary of the Waters’
Edge West property; construct 2-Lane Arterial
cross-section
X
Morningstar Way - Construct extension (Minor
Collector with Parking) to connect from its
existing terminus to Turnberry Road
X
Brightwater Drive – Morningstar Way to
Parkside Drive; Construct Minor Collector (with
Parking) cross-section to match existing
Brightwater Drive section
X
Intersection No. 8 – Turnberry Road/Country
Club Road; design and construct traffic signal X
Intersection No. 10 – Mountain
Vista/Timberline Road; construct channelized
“T” intersection
X1
Intersection No. 12 – Timberline Road/Vine
Drive; construct traffic signal X1
Construct internal Waters’ Edge West streets
to Residential Local section X
Construct single lane roundabout at
Morningstar Way/Brightwater Drive
intersection
X
Install stop signs on side street approaches at
intersections along Morningstar Way,
Brightwater Drive, and at the Turnberry
Road/Morningstar Way intersection
X
Year 2040
Base Assumptions:
- Vine Drive/Lemay Avenue intersection has been upgraded to Arterial/Arterial intersection
characteristics (4 through lanes with separate left & right turn lanes)
- Vine Drive/Timberline Road intersection includes a traffic signal
Intersection No. 1 – SH 1/Douglas Road;
install traffic signalization OR convert to single
lane roundabout
X2
1 Monies contributed to the City by Waters’ Edge Investments, LLLP; design and construction by the City.
2 Improvement needed for Year 2040, but may not be identified as committed, i.e., they represent improvements to
meet the LCUASS LOS standards.
Waters’ Edge West Traffic Impact Analysis
Appendix A
APPENDIX A ATTACHMENT A, BASE ASSUMPTIONS
ATTACHMENT B, PEDESTRIAN ANALYSIS
WORKSHEET
Trip Distribution
FELSBURG
HOL T &
ULLEVIG
Waters Edge TIA 15-358 01/07/16
6% 10% 5% 5%
1%
10%
75%
10%
85%
20%
3%
20% 40%
15%
15% 12%
15%
5% 35% 20%
3% 3% 0%
5%
Douglas Rd.
CR 13
Hearthfire Way
H
e
a
r
t
h
f
i
r
e
D
r
.
Morningstar
Way
Turnberry Rd.
Brightwater Dr.
Country Club Rd. (CR 52)
Richards Lake
Mountain Vista Dr. (CR 50)
Vine Dr.
Mulberry St.
Lemay Ave. Gregory Rd.
Timberline Rd.
Willox Ln.
PROJECT
SITE
T
Mo
%
C
G
DD
r
.
rr
Br
Estimates of Waters’ Edge West Trip Generation
Based on information from ITE’s Trip Generation publication
Land Use Unit Size Daily
AM Peak Hour PM Peak Hour
In Out Total In Out Total
Single-Family DU 249 2,431 46 138 184 150 89 239
Townhomes
(Sr. Housing
Trip Category)
DU 82 266 6 11 17 11 10 21
Condominiums
(Sr. Housing
Trip Category)
DU 48 164 4 6 10 7 6 13
TOTAL DU 379 2,861 56 155 211 168 105 273
Waters’ Edge West Traffic Impact Analysis
Appendix B
APPENDIX B EXISTING TRAFFIC COUNT DATA
DOUGLAS RD DOUGLAS RD SH 1 SH 1
(303) 216-2439
www.alltrafficdata.net
Location: 4 SH 1 & DOUGLAS RD AM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:15 AM - 07:30 AM
511 160
94
105
393 118
182
247
0.92
N
S
W E
0.85
0.78
0.78
0.93
(841) (317)
(183)
(186)
(391)
(304)
(719) (285)
178
0
24
5
53
36
48
67
67
0
0
309 16
88
14
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
DOUGLAS RD DOUGLAS RD HEARTHFIRE WAY
(303) 216-2439
www.alltrafficdata.net
Location: 6 HEARTHFIRE WAY & DOUGLAS RD AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:15 AM - 07:30 AM
0 0
60
104
7 40
100
89
0.89
N
S
W E
0.00
0.68
0.71
0.83
() ()
(107)
(190)
(159)
(190)
(16) (68)
0
0
0
0
58
2
5
95
0
0
0
0 31
0
9
0
0
0
1
0
N
S
W E
0 0
0 1
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
MORNINGSTAR WAY MORNINGSTAR WAY HEARTHFIRE DR HEARTHFIRE DR
(303) 216-2439
www.alltrafficdata.net
Location: 5 HEARTHFIRE DR & MORNINGSTAR WAY AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:15 AM - 08:15 AM
Peak 15-Minutes: 07:30 AM - 07:45 AM
5 18
15
26
10 34
0
0
0.90
N
S
W E
0.63
0.63
0.85
0.00
(15) (28)
(25)
(46)
()
()
(20) (54)
0
0
4
6
0
9
0
0
0
0
0
1 0
12
22
0
3
5
3
1
N
S
W E
5 0
0 3
3 0
0 1
Left Thru Right Total
Interval Eastbound
Start Time
DOUGLAS RD DOUGLAS RD TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 1 TURNBERRY RD & DOUGLAS RD AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:00 AM - 07:15 AM
8 11
34
84
51 40
121
57
0.96
N
S
W E
0.67
0.61
0.71
0.89
(13) (18)
(74)
(145)
(103)
(201)
(95) (73)
7
0
0
3
22
9
41
74
6
0
0
1 28
2
10
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
BRIGHTWATER DR BRIGHTWATER DR TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 2 TURNBERRY RD & BRIGHTWATER DR AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:15 AM - 07:30 AM
64 38
37
7
136 50
47
17
0.77
N
S
W E
0.76
0.77
0.66
0.65
(99) (59)
(49)
(12)
(31)
(67)
(195) (82)
0
0
3
5
0
32
43
0
4
0
0
61 17
29
4
0
0
0
1
5
N
S
W E
0 0
0 1
0 0
0 5
Left Thru Right Total
Interval Eastbound
Start Time
RICHARDS LAKE RD RICHARDS LAKE RD TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 3 TURNBERRY RD & RICHARDS LAKE RD AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:15 AM - 08:15 AM
Peak 15-Minutes: 07:30 AM - 07:45 AM
191 74
47
21
256 91
30
8
0.85
N
S
W E
0.82
0.84
0.81
0.63
(346) (125)
(90)
(34)
(16)
(52)
(467) (154)
0
0
1
5
0
42
24
5
1
0
0
190 8
68
15
0
2
4
1
1
N
S
W E
4 0
0 1
2 0
0 1
Left Thru Right Total
Interval Eastbound
Start Time
COUNTRY CLUB RD COUNTRY CLUB RD LEMAY AVE GREGORY RD
(303) 216-2439
www.alltrafficdata.net
Location: 3 LEMAY AVE & COUNTRY CLUB RD AM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:30 AM - 08:30 AM
Peak 15-Minutes: 07:45 AM - 08:00 AM
147 72
370
208
444 160
201
154
0.90
N
S
W E
0.92
0.84
0.93
0.93
(299) (126)
(696)
(406)
(293)
(400)
(876) (306)
2
0
18
9
120
241
76
124
1
0
0
127 32
62
66
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
COUNTRY CLUB RD COUNTRY CLUB RD TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 4 TURNBERRY RD & COUNTRY CLUB RD AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:15 AM - 08:15 AM
Peak 15-Minutes: 07:30 AM - 07:45 AM
428 110
46
20
365 160
211
350
0.87
N
S
W E
0.82
0.77
0.85
0.89
(773) (199)
(110)
(34)
(678)
(396)
(663) (295)
228
0
0
0
23
23
142
12
57
0
0
200 99
53
8
0
0
2
0
0
N
S
W E
2 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
MOUNTAIN VISTA DR MOUNTAIN VISTA DR DRIVEWAY TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 2 DRIVEWAY & MOUNTAIN VISTA DR AM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:30 AM - 07:45 AM
409 107
108
433
0 0
35
12
0.94
N
S
W E
0.85
0.61
0.00
0.63
(683) (263)
(263)
(724)
(22)
(63)
() ()
4
0
405
100
8
0
0
28
7
0
0
0 0
0
0
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
MOUNTAIN VISTA DR MOUNTAIN VISTA DR TIMBERLINE DR DRIVEWAY
(303) 216-2439
www.alltrafficdata.net
Location: 1 TIMBERLINE DR & MOUNTAIN VISTA DR AM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:15 AM - 07:30 AM
0 0
193
318
321 109
451
114
0.96
N
S
W E
0.00
0.88
0.78
0.95
() ()
(395)
(518)
(281)
(762)
(587) (229)
0
0
0
0
66
127
194
257
0
0
0
0 48
0
61
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
VINE DR VINE DR LEMAY AVE LEMAY AVE
(303) 216-2439
www.alltrafficdata.net
Location: 8 LEMAY AVE & VINE DR AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:15 AM - 08:15 AM
Peak 15-Minutes: 07:45 AM - 08:00 AM
831 471
352
226
798 421
195
304
0.90
N
S
W E
0.87
0.88
0.87
0.77
(1,503) (894)
(677)
(415)
(559)
(377)
(1,474) (785)
69
0
75
115
186
51
60
117
18
0
0
687 49
338
34
0
0
0
0
1
N
S
W E
0 0
0 0
0 0
0 1
Left Thru Right Total
Interval Eastbound
Start Time
VINE DR VINE DR TIMBERLINE RD TIMBERLINE RD
(303) 216-2439
www.alltrafficdata.net
Location: 7 TIMBERLINE RD & VINE DR AM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 07:00 AM - 08:00 AM
Peak 15-Minutes: 07:30 AM - 07:45 AM
342 130
341
115
562 203
259
338
0.94
N
S
W E
0.91
0.87
0.91
0.76
(616) (260)
(620)
(249)
(635)
(463)
(976) (421)
57
0
4
6
189
146
135
86
38
0
0
281 92
86
25
0
0
0
0
6
N
S
W E
0 0
0 0
0 0
0 6
Left Thru Right Total
Interval Eastbound
Start Time
DOUGLAS RD DOUGLAS RD SH 1 SH 1
(303) 216-2439
www.alltrafficdata.net
Location: 4 SH 1 & DOUGLAS RD PM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 05:00 PM - 05:15 PM
248 428
100
116
242 448
186
196
0.96
N
S
W E
0.93
0.83
0.89
0.88
(464) (833)
(181)
(222)
(374)
(340)
(432) (876)
79
0
11
15
52
33
51
44
91
0
0
158 65
322
61
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
DOUGLAS RD DOUGLAS RD HEARTHFIRE WAY
(303) 216-2439
www.alltrafficdata.net
Location: 6 HEARTHFIRE WAY & DOUGLAS RD PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:15 PM - 05:15 PM
Peak 15-Minutes: 04:15 PM - 04:30 PM
0 0
101
96
37 20
122
110
0.84
N
S
W E
0.00
0.87
0.71
0.82
() ()
(196)
(189)
(216)
(247)
(73) (35)
0
0
0
0
94
7
30
92
0
0
0
0 16
0
4
0
0
0
0
1
N
S
W E
0 0
0 0
0 0
0 1
Left Thru Right Total
Interval Eastbound
Start Time
MORNINGSTAR WAY MORNINGSTAR WAY HEARTHFIRE DR HEARTHFIRE DR
(303) 216-2439
www.alltrafficdata.net
Location: 5 HEARTHFIRE DR & MORNINGSTAR WAY PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 05:00 PM - 06:00 PM
Peak 15-Minutes: 05:45 PM - 06:00 PM
20 10
23
16
32 15
0
0
0.91
N
S
W E
0.83
0.82
0.94
0.00
(37) (24)
(43)
(31)
()
()
(56) (31)
0
0
6
5
0
18
0
0
0
0
0
14 0
5
10
0
0
2
0
0
N
S
W E
2 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
DOUGLAS RD DOUGLAS RD TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 1 TURNBERRY RD & DOUGLAS RD PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:15 PM - 05:15 PM
Peak 15-Minutes: 04:15 PM - 04:30 PM
3 6
87
77
60 64
97
108
0.87
N
S
W E
0.38
0.91
0.84
0.69
(6) (12)
(161)
(148)
(202)
(176)
(101) (120)
0
0
1
1
67
19
39
57
1
0
0
2 41
4
19
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
BRIGHTWATER DR BRIGHTWATER DR TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 2 TURNBERRY RD & BRIGHTWATER DR PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 05:30 PM - 05:45 PM
62 71
18
24
81 114
20
38
0.86
N
S
W E
0.91
0.64
0.86
0.83
(103) (133)
(27)
(39)
(74)
(37)
(140) (219)
1
0
5
6
2
10
15
0
5
0
0
56 35
60
19
0
0
5
1
1
N
S
W E
5 0
0 1
0 0
0 1
Left Thru Right Total
Interval Eastbound
Start Time
RICHARDS LAKE RD RICHARDS LAKE RD TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 3 TURNBERRY RD & RICHARDS LAKE RD PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 05:00 PM - 06:00 PM
Peak 15-Minutes: 05:00 PM - 05:15 PM
105 164
43
50
137 215
9
21
0.92
N
S
W E
0.85
0.83
0.93
0.75
(193) (316)
(76)
(99)
(45)
(20)
(257) (428)
1
0
7
10
2
31
9
0
0
0
0
97 18
154
43
0
0
6
0
1
N
S
W E
6 0
0 0
0 0
0 1
Left Thru Right Total
Interval Eastbound
Start Time
COUNTRY CLUB RD COUNTRY CLUB RD LEMAY AVE GREGORY RD
(303) 216-2439
www.alltrafficdata.net
Location: 3 LEMAY AVE & COUNTRY CLUB RD PM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 05:00 PM - 05:15 PM
78 146
284
477
243 439
284
219
0.92
N
S
W E
0.75
0.87
0.94
0.78
(143) (280)
(538)
(840)
(406)
(494)
(477) (828)
0
0
17
23
132
129
53
223
8
0
0
61 87
115
237
0
0
0
2
2
N
S
W E
0 0
2 0
0 0
2 0
Left Thru Right Total
Interval Eastbound
Start Time
COUNTRY CLUB RD COUNTRY CLUB RD TURNBERRY RD TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 4 TURNBERRY RD & COUNTRY CLUB RD PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 05:30 PM - 05:45 PM
221 370
22
72
238 373
376
312
0.94
N
S
W E
0.89
0.61
0.88
0.85
(401) (705)
(51)
(126)
(551)
(707)
(437) (660)
134
0
2
4
13
5
148
45
183
0
0
85 165
183
25
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
MOUNTAIN VISTA DR MOUNTAIN VISTA DR DRIVEWAY TURNBERRY RD
(303) 216-2439
www.alltrafficdata.net
Location: 2 DRIVEWAY & MOUNTAIN VISTA DR PM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 05:15 PM - 05:30 PM
205 342
361
203
0 0
26
47
0.91
N
S
W E
0.85
0.91
0.00
0.65
(376) (652)
(689)
(378)
(84)
(49)
() ()
19
0
186
332
28
0
0
16
10
1
0
0 0
0
0
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
MOUNTAIN VISTA DR MOUNTAIN VISTA DR TIMBERLINE DR DRIVEWAY
(303) 216-2439
www.alltrafficdata.net
Location: 1 TIMBERLINE DR & MOUNTAIN VISTA DR PM
Date and Start Time: Thursday, November 19, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 04:45 PM - 05:00 PM
0 0
346
269
212 310
218
393
0.93
N
S
W E
0.00
0.89
0.95
0.88
() ()
(639)
(464)
(729)
(407)
(407) (554)
0
0
0
0
230
116
96
122
0
0
0
0 163
0
147
0
0
0
0
0
N
S
W E
0 0
0 0
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
VINE DR VINE DR LEMAY AVE LEMAY AVE
(303) 216-2439
www.alltrafficdata.net
Location: 8 LEMAY AVE & VINE DR PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 05:00 PM - 06:00 PM
Peak 15-Minutes: 05:30 PM - 05:45 PM
650 972
283
397
614 954
307
211
0.95
N
S
W E
0.96
0.92
0.92
0.76
(1,263) (1,842)
(572)
(723)
(441)
(595)
(1,229) (1,805)
43
0
99
122
128
33
73
205
29
0
0
508 40
821
93
0
0
0
0
1
N
S
W E
0 0
0 0
0 0
1 0
Left Thru Right Total
Interval Eastbound
Start Time
VINE DR VINE DR TIMBERLINE RD TIMBERLINE RD
(303) 216-2439
www.alltrafficdata.net
Location: 7 TIMBERLINE RD & VINE DR PM
Date and Start Time: Tuesday, October 20, 2015
Peak Hour - All Vehicles
Traffic Counts
Note: Total study counts contained in parentheses.
Peak Hour - Pedestrians/Bicycles in Crosswalk
Peak Hour: 04:45 PM - 05:45 PM
Peak 15-Minutes: 05:30 PM - 05:45 PM
177 298
234
292
291 407
372
309
0.95
N
S
W E
0.90
0.85
0.93
0.89
(378) (583)
(449)
(548)
(580)
(696)
(615) (803)
44
0
8
11
152
71
95
210
67
0
0
125 113
220
74
0
0
1
1
0
N
S
W E
1 0
0 1
0 0
0 0
Left Thru Right Total
Interval Eastbound
Start Time
Page 1
Street: Douglas
Location: btwn Terry Lake and Turnberry
Traffic Direction: EB and WB
Site Code: DOU02-EW-14B
Date Start: 19-May-14
Date End: 20-May-14
Date Printed: 04-Jun-14
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 19-May-14 Tue Wed Thu Fri Sat Sun Week Average
Time EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB
12:00 AM * * 1 2 * * * * * * * * * * 1 2
01:00 * * 2 1 * * * * * * * * * * 2 1
02:00 * * 0 3 * * * * * * * * * * 0 3
03:00 * * 3 1 * * * * * * * * * * 3 1
04:00 * * 8 2 * * * * * * * * * * 8 2
05:00 * * 36 10 * * * * * * * * * * 36 10
06:00 * * 83 15 * * * * * * * * * * 83 15
07:00 * * 114 45 * * * * * * * * * * 114 45
08:00 * * 68 41 * * * * * * * * * * 68 41
09:00 * * 64 29 * * * * * * * * * * 64 29
10:00 54 38 51 31 * * * * * * * * * * 52 34
11:00 40 32 43 44 * * * * * * * * * * 42 38
12:00 PM 42 43 50 43 * * * * * * * * * * 46 43
01:00 51 36 44 20 * * * * * * * * * * 48 28
02:00 62 42 * * * * * * * * * * * * 62 42
03:00 60 67 * * * * * * * * * * * * 60 67
04:00 68 88 * * * * * * * * * * * * 68 88
05:00 79 84 * * * * * * * * * * * * 79 84
06:00 54 69 * * * * * * * * * * * * 54 69
07:00 28 47 * * * * * * * * * * * * 28 47
08:00 21 41 * * * * * * * * * * * * 21 41
09:00 17 15 * * * * * * * * * * * * 17 15
10:00 4 17 * * * * * * * * * * * * 4 17
11:00 1 7 * * * * * * * * * * * * 1 7
Lane 581 626 567 287 0 0 0 0 0 0 0 0 0 0 961 769
Day 1207 854 0 0 0 0 0 1730
AM Peak 10:00 10:00 07:00 07:00 - - - - - - - - - - 07:00 07:00
Vol. 54 38 114 45 - - - - - - - - - - 114 45
PM Peak 17:00 16:00 12:00 12:00 - - - - - - - - - - 17:00 16:00
Vol. 79 88 50 43 - - - - - - - - - - 79 88
Comb.
Total 1207 854 0 0 0 0 0 1730
ADT ADT 1,742 AADT 1,742
Page 1
Street: Douglas
Location: btwn Turnberry and Giddings
Traffic Direction: EB and WB
Site Code: DOU03-EW-14B
Date Start: 19-May-14
Date End: 20-May-14
Date Printed: 04-Jun-14
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 19-May-14 Tue Wed Thu Fri Sat Sun Week Average
Time EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB
12:00 AM * * 0 1 * * * * * * * * * * 0 1
01:00 * * 0 1 * * * * * * * * * * 0 1
02:00 * * 0 2 * * * * * * * * * * 0 2
03:00 * * 2 0 * * * * * * * * * * 2 0
04:00 * * 7 0 * * * * * * * * * * 7 0
05:00 * * 35 5 * * * * * * * * * * 35 5
06:00 * * 70 11 * * * * * * * * * * 70 11
07:00 * * 91 27 * * * * * * * * * * 91 27
08:00 * * 46 30 * * * * * * * * * * 46 30
09:00 37 24 42 17 * * * * * * * * * * 40 20
10:00 37 22 36 18 * * * * * * * * * * 36 20
11:00 29 22 24 26 * * * * * * * * * * 26 24
12:00 PM 34 30 28 20 * * * * * * * * * * 31 25
01:00 34 21 * * * * * * * * * * * * 34 21
02:00 42 28 * * * * * * * * * * * * 42 28
03:00 42 52 * * * * * * * * * * * * 42 52
04:00 51 63 * * * * * * * * * * * * 51 63
05:00 65 68 * * * * * * * * * * * * 65 68
06:00 39 43 * * * * * * * * * * * * 39 43
07:00 21 37 * * * * * * * * * * * * 21 37
08:00 17 24 * * * * * * * * * * * * 17 24
09:00 8 11 * * * * * * * * * * * * 8 11
10:00 5 12 * * * * * * * * * * * * 5 12
11:00 0 6 * * * * * * * * * * * * 0 6
Lane 461 463 381 158 0 0 0 0 0 0 0 0 0 0 708 531
Day 924 539 0 0 0 0 0 1239
AM Peak 09:00 09:00 07:00 08:00 - - - - - - - - - - 07:00 08:00
Vol. 37 24 91 30 - - - - - - - - - - 91 30
PM Peak 17:00 17:00 12:00 12:00 - - - - - - - - - - 17:00 17:00
Vol. 65 68 28 20 - - - - - - - - - - 65 68
Comb.
Total 924 539 0 0 0 0 0 1239
ADT ADT 1,239 AADT 1,239
Page 1
Street: Turnberry
Location: btwn Dougles and Richards Lake
Traffic Direction: NB and SB
Site Code: TUR01-NS-15B
Date Start: 13-Jul-15
Date End: 15-Jul-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 13-Jul-15 14-Jul-15 15-Jul-15 16-Jul-15 17-Jul-15 18-Jul-15 19-Jul-15 Week Average
Time NB SB NB SB NB SB NB SB NB SB NB SB NB SB NB SB
12:00 AM * * 3 3 3 1 * * * * * * * * 3 2
01:00 * * 4 0 3 2 * * * * * * * * 4 1
02:00 * * 3 1 1 0 * * * * * * * * 2 0
03:00 * * 1 0 1 0 * * * * * * * * 1 0
04:00 * * 1 6 3 4 * * * * * * * * 2 5
05:00 * * 5 10 7 9 * * * * * * * * 6 10
06:00 * * 13 23 13 22 * * * * * * * * 13 22
07:00 * * 26 57 33 65 * * * * * * * * 30 61
08:00 * * 36 49 19 34 * * * * * * * * 28 42
09:00 * * 40 48 * * * * * * * * * * 40 48
10:00 * * 46 36 * * * * * * * * * * 46 36
11:00 39 36 46 40 * * * * * * * * * * 42 38
12:00 PM 50 41 51 42 * * * * * * * * * * 50 42
01:00 42 40 49 37 * * * * * * * * * * 46 38
02:00 58 34 43 39 * * * * * * * * * * 50 36
03:00 48 46 49 32 * * * * * * * * * * 48 39
04:00 67 40 49 40 * * * * * * * * * * 58 40
05:00 76 45 63 51 * * * * * * * * * * 70 48
06:00 50 36 45 32 * * * * * * * * * * 48 34
07:00 34 22 49 24 * * * * * * * * * * 42 23
08:00 20 21 25 21 * * * * * * * * * * 22 21
09:00 16 12 28 18 * * * * * * * * * * 22 15
10:00 9 3 25 9 * * * * * * * * * * 17 6
11:00 5 6 7 6 * * * * * * * * * * 6 6
Total 514 382 707 624 83 137 0 0 0 0 0 0 0 0 696 613
Day 896 1331 220 0 0 0 0 1309
AM Peak 11:00 11:00 10:00 07:00 07:00 07:00 - - - - - - - - 10:00 07:00
Vol. 39 36 46 57 33 65 - - - - - - - - 46 61
PM Peak 17:00 15:00 17:00 17:00 - - - - - - - - - - 17:00 17:00
Vol. 76 46 63 51 - - - - - - - - - - 70 48
Comb.
Total 896 1331 220 0 0 0 0 1309
ADT ADT 1,315 AADT 1,315
Page 1
Street: Brightwater
Location: btwn Morning Star and Turnberry
Traffic Direction: EB and WB
Site Code: BRW01-WE-15B
Date Start: 13-Jul-15
Date End: 15-Jul-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 13-Jul-15 14-Jul-15 15-Jul-15 16-Jul-15 17-Jul-15 18-Jul-15 19-Jul-15 Week Average
Time WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB
12:00 AM * * 1 0 2 2 * * * * * * * * 2 1
01:00 * * 1 2 1 0 * * * * * * * * 1 1
02:00 * * 0 1 0 0 * * * * * * * * 0 0
03:00 * * 1 1 0 0 * * * * * * * * 0 0
04:00 * * 0 2 0 2 * * * * * * * * 0 2
05:00 * * 1 14 1 13 * * * * * * * * 1 14
06:00 * * 3 15 2 24 * * * * * * * * 2 20
07:00 * * 9 31 15 32 * * * * * * * * 12 32
08:00 * * 12 48 6 22 * * * * * * * * 9 35
09:00 * * 18 28 * * * * * * * * * * 18 28
10:00 * * 18 18 * * * * * * * * * * 18 18
11:00 14 21 17 26 * * * * * * * * * * 16 24
12:00 PM 16 19 27 23 * * * * * * * * * * 22 21
01:00 24 22 16 24 * * * * * * * * * * 20 23
02:00 22 17 19 25 * * * * * * * * * * 20 21
03:00 29 21 29 27 * * * * * * * * * * 29 24
04:00 25 20 27 29 * * * * * * * * * * 26 24
05:00 40 19 48 23 * * * * * * * * * * 44 21
06:00 29 17 12 11 * * * * * * * * * * 20 14
07:00 13 13 17 7 * * * * * * * * * * 15 10
08:00 13 8 16 4 * * * * * * * * * * 14 6
09:00 18 7 9 4 * * * * * * * * * * 14 6
10:00 6 1 9 2 * * * * * * * * * * 8 2
11:00 5 4 2 2 * * * * * * * * * * 4 3
Total 254 189 312 367 27 95 0 0 0 0 0 0 0 0 315 350
Day 443 679 122 0 0 0 0 665
AM Peak 11:00 11:00 09:00 08:00 07:00 07:00 - - - - - - - - 09:00 08:00
Vol. 14 21 18 48 15 32 - - - - - - - - 18 35
PM Peak 17:00 13:00 17:00 16:00 - - - - - - - - - - 17:00 15:00
Vol. 40 22 48 29 - - - - - - - - - - 44 24
Comb.
Total 443 679 122 0 0 0 0 665
ADT ADT 671 AADT 671
Page 1
Street: Brightwater
Location: btwn Turnberry and Bar Harbor
Traffic Direction: EB and WB
Site Code: BRW02-WE-15B
Date Start: 13-Jul-15
Date End: 15-Jul-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 13-Jul-15 14-Jul-15 15-Jul-15 16-Jul-15 17-Jul-15 18-Jul-15 19-Jul-15 Week Average
Time WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB
12:00 AM * * 0 2 2 0 * * * * * * * * 1 1
01:00 * * 0 1 0 0 * * * * * * * * 0 0
02:00 * * 0 0 1 0 * * * * * * * * 0 0
03:00 * * 0 0 0 0 * * * * * * * * 0 0
04:00 * * 0 0 0 0 * * * * * * * * 0 0
05:00 * * 1 1 1 2 * * * * * * * * 1 2
06:00 * * 8 1 7 0 * * * * * * * * 8 0
07:00 * * 9 1 9 2 * * * * * * * * 9 2
08:00 * * 6 2 6 6 * * * * * * * * 6 4
09:00 * * 8 5 * * * * * * * * * * 8 5
10:00 * * 3 2 * * * * * * * * * * 3 2
11:00 3 4 4 4 * * * * * * * * * * 4 4
12:00 PM 7 8 4 6 * * * * * * * * * * 6 7
01:00 4 3 2 5 * * * * * * * * * * 3 4
02:00 1 5 2 5 * * * * * * * * * * 2 5
03:00 6 9 3 3 * * * * * * * * * * 4 6
04:00 6 8 4 7 * * * * * * * * * * 5 8
05:00 7 9 8 8 * * * * * * * * * * 8 8
06:00 6 8 2 9 * * * * * * * * * * 4 8
07:00 3 5 5 3 * * * * * * * * * * 4 4
08:00 4 5 0 5 * * * * * * * * * * 2 5
09:00 2 4 6 6 * * * * * * * * * * 4 5
10:00 2 1 0 1 * * * * * * * * * * 1 1
11:00 0 1 0 0 * * * * * * * * * * 0 0
Total 51 70 75 77 26 10 0 0 0 0 0 0 0 0 83 81
Day 121 152 36 0 0 0 0 164
AM Peak 11:00 11:00 07:00 09:00 07:00 08:00 - - - - - - - - 07:00 09:00
Vol. 3 4 9 5 9 6 - - - - - - - - 9 5
PM Peak 12:00 15:00 17:00 18:00 - - - - - - - - - - 17:00 16:00
Vol. 7 9 8 9 - - - - - - - - - - 8 8
Comb.
Total 121 152 36 0 0 0 0 164
ADT ADT 167 AADT 167
Page 1
Street: Richards Lake
Location: btwn Turnberry and Giddings
Traffic Direction: EB and WB
Site Code: RIC01-EW-15B
Date Start: 13-Jul-15
Date End: 15-Jul-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 13-Jul-15 14-Jul-15 15-Jul-15 16-Jul-15 17-Jul-15 18-Jul-15 19-Jul-15 Week Average
Time EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB
12:00 AM * * 0 1 1 0 * * * * * * * * 0 0
01:00 * * 1 0 1 0 * * * * * * * * 1 0
02:00 * * 2 0 1 0 * * * * * * * * 2 0
03:00 * * 2 2 0 1 * * * * * * * * 1 2
04:00 * * 2 0 2 0 * * * * * * * * 2 0
05:00 * * 7 6 3 7 * * * * * * * * 5 6
06:00 * * 8 21 14 16 * * * * * * * * 11 18
07:00 * * 10 49 12 52 * * * * * * * * 11 50
08:00 * * 17 38 * * * * * * * * * * 17 38
09:00 * * 19 22 * * * * * * * * * * 19 22
10:00 20 18 21 17 * * * * * * * * * * 20 18
11:00 19 16 21 28 * * * * * * * * * * 20 22
12:00 PM 25 32 32 30 * * * * * * * * * * 28 31
01:00 13 20 31 22 * * * * * * * * * * 22 21
02:00 24 21 23 25 * * * * * * * * * * 24 23
03:00 23 23 24 26 * * * * * * * * * * 24 24
04:00 31 22 40 23 * * * * * * * * * * 36 22
05:00 62 39 49 37 * * * * * * * * * * 56 38
06:00 34 23 30 38 * * * * * * * * * * 32 30
07:00 24 15 28 26 * * * * * * * * * * 26 20
08:00 20 18 25 17 * * * * * * * * * * 22 18
09:00 16 11 23 20 * * * * * * * * * * 20 16
10:00 6 2 11 7 * * * * * * * * * * 8 4
11:00 2 6 4 5 * * * * * * * * * * 3 6
Total 319 266 430 460 34 76 0 0 0 0 0 0 0 0 410 429
Day 585 890 110 0 0 0 0 839
AM Peak 10:00 10:00 10:00 07:00 06:00 07:00 - - - - - - - - 10:00 07:00
Vol. 20 18 21 49 14 52 - - - - - - - - 20 50
PM Peak 17:00 17:00 17:00 18:00 - - - - - - - - - - 17:00 17:00
Vol. 62 39 49 38 - - - - - - - - - - 56 38
Comb.
Total 585 890 110 0 0 0 0 839
ADT ADT 844 AADT 844
Page 1
Street: Turnberry
Location: btwn Richards Lake and Country Club
Traffic Direction: NB and SB
Site Code: TUR02-NS-15B
Date Start: 06-May-15
Date End: 07-May-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 06-May-15 07-May-15 08-May-15 09-May-15 10-May-15 11-May-15 12-May-15 Week Average
Time NB SB NB SB NB SB NB SB NB SB NB SB NB SB NB SB
12:00 AM * * 9 3 * * * * * * * * * * 9 3
01:00 * * 5 2 * * * * * * * * * * 5 2
02:00 * * 5 2 * * * * * * * * * * 5 2
03:00 * * 7 9 * * * * * * * * * * 7 9
04:00 * * 6 22 * * * * * * * * * * 6 22
05:00 * * 4 82 * * * * * * * * * * 4 82
06:00 * * 36 223 * * * * * * * * * * 36 223
07:00 * * 75 447 * * * * * * * * * * 75 447
08:00 * * 137 338 * * * * * * * * * * 137 338
09:00 * * 123 200 * * * * * * * * * * 123 200
10:00 * * 124 183 * * * * * * * * * * 124 183
11:00 125 145 165 177 * * * * * * * * * * 145 161
12:00 PM 164 142 186 179 * * * * * * * * * * 175 160
01:00 151 155 182 137 * * * * * * * * * * 166 146
02:00 190 159 160 186 * * * * * * * * * * 175 172
03:00 255 195 * * * * * * * * * * * * 255 195
04:00 310 170 * * * * * * * * * * * * 310 170
05:00 375 177 * * * * * * * * * * * * 375 177
06:00 347 163 * * * * * * * * * * * * 347 163
07:00 202 85 * * * * * * * * * * * * 202 85
08:00 162 51 * * * * * * * * * * * * 162 51
09:00 107 38 * * * * * * * * * * * * 107 38
10:00 59 21 * * * * * * * * * * * * 59 21
11:00 35 10 * * * * * * * * * * * * 35 10
Total 2482 1511 1224 2190 0 0 0 0 0 0 0 0 0 0 3044 3060
Day 3993 3414 0 0 0 0 0 6104
AM Peak 11:00 11:00 11:00 07:00 - - - - - - - - - - 11:00 07:00
Vol. 125 145 165 447 - - - - - - - - - - 145 447
PM Peak 17:00 15:00 12:00 14:00 - - - - - - - - - - 17:00 15:00
Vol. 375 195 186 186 - - - - - - - - - - 375 195
Comb.
Total 3993 3414 0 0 0 0 0 6104
ADT ADT 6,061 AADT 6,061
Page 1
Street: Turnberry
Location: btwn Country Club and Mountain Vista
Traffic Direction: NB and SB
Site Code: TUR03-NS-15B
Date Start: 06-May-15
Date End: 07-May-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 06-May-15 07-May-15 08-May-15 09-May-15 10-May-15 11-May-15 12-May-15 Week Average
Time NB SB NB SB NB SB NB SB NB SB NB SB NB SB NB SB
12:00 AM * * 11 2 * * * * * * * * * * 11 2
01:00 * * 8 7 * * * * * * * * * * 8 7
02:00 * * 6 7 * * * * * * * * * * 6 7
03:00 * * 6 19 * * * * * * * * * * 6 19
04:00 * * 4 31 * * * * * * * * * * 4 31
05:00 * * 18 119 * * * * * * * * * * 18 119
06:00 * * 57 264 * * * * * * * * * * 57 264
07:00 * * 117 413 * * * * * * * * * * 117 413
08:00 * * 147 282 * * * * * * * * * * 147 282
09:00 * * 138 192 * * * * * * * * * * 138 192
10:00 * * 132 192 * * * * * * * * * * 132 192
11:00 133 145 152 187 * * * * * * * * * * 142 166
12:00 PM 160 157 171 202 * * * * * * * * * * 166 180
01:00 155 160 177 145 * * * * * * * * * * 166 152
02:00 202 185 130 178 * * * * * * * * * * 166 182
03:00 257 234 * * * * * * * * * * * * 257 234
04:00 320 225 * * * * * * * * * * * * 320 225
05:00 385 212 * * * * * * * * * * * * 385 212
06:00 312 154 * * * * * * * * * * * * 312 154
07:00 181 76 * * * * * * * * * * * * 181 76
08:00 124 72 * * * * * * * * * * * * 124 72
09:00 76 53 * * * * * * * * * * * * 76 53
10:00 45 28 * * * * * * * * * * * * 45 28
11:00 35 14 * * * * * * * * * * * * 35 14
Total 2385 1715 1274 2240 0 0 0 0 0 0 0 0 0 0 3019 3276
Day 4100 3514 0 0 0 0 0 6295
AM Peak 11:00 11:00 11:00 07:00 - - - - - - - - - - 08:00 07:00
Vol. 133 145 152 413 - - - - - - - - - - 147 413
PM Peak 17:00 15:00 13:00 12:00 - - - - - - - - - - 17:00 15:00
Vol. 385 234 177 202 - - - - - - - - - - 385 234
Comb.
Total 4100 3514 0 0 0 0 0 6295
ADT ADT 6,278 AADT 6,278
Page 1
Street: Country Club Road
Location: btwn Warren and Turnberry
Traffic Direction: EB and WB
Site Code: CCR03-EW-15B
Date Start: 06-May-15
Date End: 07-May-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 06-May-15 07-May-15 08-May-15 09-May-15 10-May-15 11-May-15 12-May-15 Week Average
Time EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB
12:00 AM * * 8 8 * * * * * * * * * * 8 8
01:00 * * 8 4 * * * * * * * * * * 8 4
02:00 * * 4 2 * * * * * * * * * * 4 2
03:00 * * 10 4 * * * * * * * * * * 10 4
04:00 * * 16 8 * * * * * * * * * * 16 8
05:00 * * 63 51 * * * * * * * * * * 63 51
06:00 * * 123 135 * * * * * * * * * * 123 135
07:00 * * 182 302 * * * * * * * * * * 182 302
08:00 * * 201 288 * * * * * * * * * * 201 288
09:00 * * 149 198 * * * * * * * * * * 149 198
10:00 136 156 159 165 * * * * * * * * * * 148 160
11:00 168 167 196 168 * * * * * * * * * * 182 168
12:00 PM 198 163 228 189 * * * * * * * * * * 213 176
01:00 185 168 196 172 * * * * * * * * * * 190 170
02:00 200 183 159 122 * * * * * * * * * * 180 152
03:00 302 225 * * * * * * * * * * * * 302 225
04:00 330 255 * * * * * * * * * * * * 330 255
05:00 342 261 * * * * * * * * * * * * 342 261
06:00 285 233 * * * * * * * * * * * * 285 233
07:00 175 132 * * * * * * * * * * * * 175 132
08:00 162 73 * * * * * * * * * * * * 162 73
09:00 109 51 * * * * * * * * * * * * 109 51
10:00 59 26 * * * * * * * * * * * * 59 26
11:00 30 23 * * * * * * * * * * * * 30 23
Total 2681 2116 1702 1816 0 0 0 0 0 0 0 0 0 0 3471 3105
Day 4797 3518 0 0 0 0 0 6576
AM Peak 11:00 11:00 08:00 07:00 - - - - - - - - - - 08:00 07:00
Vol. 168 167 201 302 - - - - - - - - - - 201 302
PM Peak 17:00 17:00 12:00 12:00 - - - - - - - - - - 17:00 17:00
Vol. 342 261 228 189 - - - - - - - - - - 342 261
Comb.
Total 4797 3518 0 0 0 0 0 6576
ADT ADT 6,576 AADT 6,576
Page 1
Street: Lemay
Location: btwn Conifer and Vine
Traffic Direction: NB and SB
Site Code: LEM03-NS-15B
Date Start: 04-May-15
Date End: 05-May-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 04-May-15 05-May-15 06-May-15 07-May-15 08-May-15 09-May-15 10-May-15 Week Average
Time NB SB NB SB NB SB NB SB NB SB NB SB NB SB NB SB
12:00 AM * * 23 13 * * * * * * * * * * 23 13
01:00 * * 16 10 * * * * * * * * * * 16 10
02:00 * * 11 7 * * * * * * * * * * 11 7
03:00 * * 14 17 * * * * * * * * * * 14 17
04:00 * * 16 38 * * * * * * * * * * 16 38
05:00 * * 50 140 * * * * * * * * * * 50 140
06:00 * * 143 380 * * * * * * * * * * 143 380
07:00 * * 325 855 * * * * * * * * * * 325 855
08:00 * * 459 733 * * * * * * * * * * 459 733
09:00 * * 412 584 * * * * * * * * * * 412 584
10:00 428 597 425 536 * * * * * * * * * * 426 566
11:00 493 550 539 534 * * * * * * * * * * 516 542
12:00 PM 610 586 587 582 * * * * * * * * * * 598 584
01:00 581 574 390 416 * * * * * * * * * * 486 495
02:00 618 571 * * * * * * * * * * * * 618 571
03:00 724 597 * * * * * * * * * * * * 724 597
04:00 761 622 * * * * * * * * * * * * 761 622
05:00 789 552 * * * * * * * * * * * * 789 552
06:00 645 404 * * * * * * * * * * * * 645 404
07:00 434 245 * * * * * * * * * * * * 434 245
08:00 309 150 * * * * * * * * * * * * 309 150
09:00 157 89 * * * * * * * * * * * * 157 89
10:00 106 49 * * * * * * * * * * * * 106 49
11:00 41 32 * * * * * * * * * * * * 41 32
Total 6696 5618 3410 4845 0 0 0 0 0 0 0 0 0 0 8079 8275
Day 12314 8255 0 0 0 0 0 16354
AM Peak 11:00 10:00 11:00 07:00 - - - - - - - - - - 11:00 07:00
Vol. 493 597 539 855 - - - - - - - - - - 516 855
PM Peak 17:00 16:00 12:00 12:00 - - - - - - - - - - 17:00 16:00
Vol. 789 622 587 582 - - - - - - - - - - 789 622
Comb.
Total 12314 8255 0 0 0 0 0 16354
ADT ADT 16,482 AADT 16,482
Page 1
Street: Timberline
Location: btwn Mountain Vista and Vine
Traffic Direction: NB and SB
Site Code: TIM01-SN-15B
Date Start: 27-May-15
Date End: 28-May-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 27-May-15 28-May-15 29-May-15 30-May-15 31-May-15 01-Jun-15 02-Jun-15 Week Average
Time SB NB SB NB SB NB SB NB SB NB SB NB SB NB SB NB
12:00 AM * * 5 12 * * * * * * * * * * 5 12
01:00 * * 3 6 * * * * * * * * * * 3 6
02:00 * * 4 6 * * * * * * * * * * 4 6
03:00 * * 5 3 * * * * * * * * * * 5 3
04:00 * * 19 6 * * * * * * * * * * 19 6
05:00 * * 47 33 * * * * * * * * * * 47 33
06:00 * * 199 84 * * * * * * * * * * 199 84
07:00 * * 305 94 * * * * * * * * * * 305 94
08:00 * * 244 129 * * * * * * * * * * 244 129
09:00 * * 214 147 * * * * * * * * * * 214 147
10:00 197 136 199 129 * * * * * * * * * * 198 132
11:00 185 156 194 169 * * * * * * * * * * 190 162
12:00 PM 193 169 183 170 * * * * * * * * * * 188 170
01:00 175 176 166 161 * * * * * * * * * * 170 168
02:00 168 194 * * * * * * * * * * * * 168 194
03:00 228 227 * * * * * * * * * * * * 228 227
04:00 236 279 * * * * * * * * * * * * 236 279
05:00 199 322 * * * * * * * * * * * * 199 322
06:00 182 205 * * * * * * * * * * * * 182 205
07:00 104 183 * * * * * * * * * * * * 104 183
08:00 106 110 * * * * * * * * * * * * 106 110
09:00 31 81 * * * * * * * * * * * * 31 81
10:00 29 45 * * * * * * * * * * * * 29 45
11:00 15 23 * * * * * * * * * * * * 15 23
Total 2048 2306 1787 1149 0 0 0 0 0 0 0 0 0 0 3089 2821
Day 4354 2936 0 0 0 0 0 5910
AM Peak 10:00 11:00 07:00 11:00 - - - - - - - - - - 07:00 11:00
Vol. 197 156 305 169 - - - - - - - - - - 305 162
PM Peak 16:00 17:00 12:00 12:00 - - - - - - - - - - 16:00 17:00
Vol. 236 322 183 170 - - - - - - - - - - 236 322
Comb.
Total 4354 2936 0 0 0 0 0 5910
ADT ADT 5,868 AADT 5,868
Page 1
Street: Vine
Location: btwn Lemay and Timberline
Traffic Direction: EB and WB
Site Code: VIN08-WE-15B
Date Start: 04-May-15
Date End: 05-May-15
City of Fort Collins Traffic Operations
626 Linden Street, PO Box 580
Fort Collins, CO 80522-0580
Average Daily Traffic Study
Start 04-May-15 05-May-15 06-May-15 07-May-15 08-May-15 09-May-15 10-May-15 Week Average
Time WB EB WB EB WB EB WB EB WB EB WB EB WB EB WB EB
12:00 AM * * 13 23 * * * * * * * * * * 13 23
01:00 * * 9 15 * * * * * * * * * * 9 15
02:00 * * 9 15 * * * * * * * * * * 9 15
03:00 * * 17 17 * * * * * * * * * * 17 17
04:00 * * 17 31 * * * * * * * * * * 17 31
05:00 * * 77 71 * * * * * * * * * * 77 71
06:00 * * 153 193 * * * * * * * * * * 153 193
07:00 * * 353 196 * * * * * * * * * * 353 196
08:00 * * 337 179 * * * * * * * * * * 337 179
09:00 204 150 182 203 * * * * * * * * * * 193 176
10:00 180 202 184 181 * * * * * * * * * * 182 192
11:00 204 221 222 193 * * * * * * * * * * 213 207
12:00 PM 221 231 231 245 * * * * * * * * * * 226 238
01:00 210 249 126 123 * * * * * * * * * * 168 186
02:00 238 247 * * * * * * * * * * * * 238 247
03:00 274 311 * * * * * * * * * * * * 274 311
04:00 290 382 * * * * * * * * * * * * 290 382
05:00 267 387 * * * * * * * * * * * * 267 387
06:00 186 241 * * * * * * * * * * * * 186 241
07:00 120 160 * * * * * * * * * * * * 120 160
08:00 101 136 * * * * * * * * * * * * 101 136
09:00 70 79 * * * * * * * * * * * * 70 79
10:00 37 61 * * * * * * * * * * * * 37 61
11:00 29 29 * * * * * * * * * * * * 29 29
Total 2631 3086 1930 1685 0 0 0 0 0 0 0 0 0 0 3579 3772
Day 5717 3615 0 0 0 0 0 7351
AM Peak 09:00 11:00 07:00 09:00 - - - - - - - - - - 07:00 11:00
Vol. 204 221 353 203 - - - - - - - - - - 353 207
PM Peak 16:00 17:00 12:00 12:00 - - - - - - - - - - 16:00 17:00
Vol. 290 387 231 245 - - - - - - - - - - 290 387
Comb.
Total 5717 3615 0 0 0 0 0 7351
ADT ADT 7,410 AADT 7,410
Waters’ Edge West Traffic Impact Analysis
Appendix C
APPENDIX C LEVEL OF SERVICE CRITERIA FOR STOP-
CONTROLLED AND SIGNALIZED INTERSECTIONS
TABLE C1 LEVEL OF SERVICE CRITERIA FOR
TWO-WAY STOP CONTROLLED (TWSC) INTERSECTIONS
Level of Service Control Delay Range
(sec/veh)
A 0.0 - 10.0
B >10.0 - 15.0
C >15.0 - 25.0
D >25.0 - 35.0
E >35.0 - 50.0
F > 50.0
Adapted from: Highway Capacity Manual, Transportation Research Board, 2010.
TABLE C2 LEVEL OF SERVICE CRITERIA FOR SIGNALIZED INTERSECTIONS
Level of
Service
Control Delay Range
(sec/veh)
Qualitative
Description
A < 10.0 Good progression, short cycles, very few vehicle-
stops.
B >10.0 - 20.0 Good progression, and/or short cycle lengths, more
vehicle-stops.
C >20.0 - 35.0 Fair progression and/or longer cycle lengths, some
individual cycle failures, many vehicle-stops
D >35.0 - 55.0 Noticeable congestion and cycle failures, unfavorable
progression, high v/c ratios, several stops.
E >55.0 - 80.0 Limit of acceptable delay, poor progression, long
cycles, high v/c ratios, frequent cycle failures.
F > 80.0 Delay is unacceptable to most drivers; volume
exceeds capacity, breakdown of traffic flow.
Adapted from: Highway Capacity Manual, Transportation Research Board, 2010.
Waters’ Edge West Traffic Impact Analysis
Appendix D
APPENDIX D TRAFFIC ANALYSIS WORKSHEETS – EXISTING
CONDITIONS
HCM 2010 TWSC Intersection #1
Water Edge TIS 1: SH 1 & Douglas Road (CR 54)
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 67 67 48 36 53 5 16 88 14 24 309 178
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 73 73 52 39 58 5 17 96 15 26 336 193
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 558 534 336 589 526 103 336 0 0 111 0 0
Stage 1 388 388 - 138 138 - - - - - - -
Stage 2 170 146 - 451 388 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 440 452 706 420 457 952 1223 - - 1479 - -
Stage 1 636 609 - 865 782 - - - - - - -
Stage 2 832 776 - 588 609 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 385 438 706 331 443 952 1223 - - 1479 - -
Mov Cap-2 Maneuver 385 438 - 331 443 - - - - - - -
Stage 1 627 598 - 853 771 - - - - - - -
Stage 2 755 765 - 470 598 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 15 15.3 1.1 0.4
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1223 - - 385 520 331 464 1479 - -
HCM Lane V/C Ratio 0.014 - - 0.189 0.24 0.118 0.136 0.018 - -
HCM Control Delay (s) 8 - - 16.5 14.1 17.3 14 7.5 - -
HCM Lane LOS A - - C B C B A - -
HCM 95th %tile Q(veh) 0 - - 0.7 0.9 0.4 0.5 0.1 - -
HCM 2010 TWSC Intersection #1
Water Edge TIS 1: SH 1 & Douglas Road (CR 54)
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 91 44 51 33 52 15 65 322 61 11 158 79
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 99 48 55 36 57 16 71 350 66 12 172 86
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 757 754 172 771 720 383 172 0 0 416 0 0
Stage 1 196 196 - 524 524 - - - - - - -
Stage 2 561 558 - 247 196 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 324 338 872 317 354 664 1405 - - 1143 - -
Stage 1 806 739 - 537 530 - - - - - - -
Stage 2 512 512 - 757 739 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 263 318 872 251 333 664 1405 - - 1143 - -
Mov Cap-2 Maneuver 263 318 - 251 333 - - - - - - -
Stage 1 765 731 - 510 503 - - - - - - -
Stage 2 421 486 - 656 731 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 20.5 18.5 1.1 0.4
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1405 - - 263 483 251 375 1143 - -
HCM Lane V/C Ratio 0.05 - - 0.376 0.214 0.143 0.194 0.01 - -
HCM Control Delay (s) 7.7 - - 26.7 14.5 21.7 16.9 8.2 - -
HCM Lane LOS A - - D B C C A - -
HCM 95th %tile Q(veh) 0.2 - - 1.7 0.8 0.5 0.7 0 - -
HCM 2010 TWSC Intersection #2
Water Edge TIS 2: Hearthfire Drive & Douglas Road (CR 54)
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 95 5 2 58 31 9
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 103 5 2 63 34 10
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 103 0 170 103
Stage 1 - - - - 103 -
Stage 2 - - - - 67 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1489 - 820 952
Stage 1 - - - - 921 -
Stage 2 - - - - 956 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1489 - 819 952
Mov Cap-2 Maneuver - - - - 819 -
Stage 1 - - - - 921 -
Stage 2 - - - - 955 -
Approach EB WB NB
HCM Control Delay, s 0 0.2 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 846 - - 1489 -
HCM Lane V/C Ratio 0.051 - - 0.001 -
HCM Control Delay (s) 9.5 - - 7.4 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 2010 TWSC Intersection #2
Water Edge TIS 2: Hearthfire Drive & Douglas Road (CR 54)
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 0.8
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 89 35 4 93 14 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 97 38 4 101 15 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 97 0 207 97
Stage 1 - - - - 97 -
Stage 2 - - - - 110 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1496 - 781 959
Stage 1 - - - - 927 -
Stage 2 - - - - 915 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1496 - 779 959
Mov Cap-2 Maneuver - - - - 779 -
Stage 1 - - - - 927 -
Stage 2 - - - - 913 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 9.5
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 813 - - 1496 -
HCM Lane V/C Ratio 0.024 - - 0.003 -
HCM Control Delay (s) 9.5 - - 7.4 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 2010 TWSC Intersection #3
Water Edge TIS 3: Hearthfire Drive & Morningstar Way
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3
Movement NWL NWR NET NER SWL SWT
Vol, veh/h 9 6 11 21 4 1
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 7 12 23 4 1
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 33 23 0 0 35 0
Stage 1 23 - - - - -
Stage 2 10 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 980 1054 - - 1576 -
Stage 1 1000 - - - - -
Stage 2 1013 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 977 1054 - - 1576 -
Mov Cap-2 Maneuver 977 - - - - -
Stage 1 1000 - - - - -
Stage 2 1010 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.6 0 5.8
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 1006 1576 -
HCM Lane V/C Ratio - - 0.016 0.003 -
HCM Control Delay (s) - - 8.6 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0 0 -
HCM 2010 TWSC Intersection #3
Water Edge TIS 3: Hearthfire Drive & Morningstar Way
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.1
Movement NWL NWR NET NER SWL SWT
Vol, veh/h 14 6 6 8 7 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 15 7 7 9 8 14
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 40 11 0 0 15 0
Stage 1 11 - - - - -
Stage 2 29 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 972 1070 - - 1603 -
Stage 1 1012 - - - - -
Stage 2 994 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 967 1070 - - 1603 -
Mov Cap-2 Maneuver 967 - - - - -
Stage 1 1012 - - - - -
Stage 2 989 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.7 0 2.5
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 996 1603 -
HCM Lane V/C Ratio - - 0.022 0.005 -
HCM Control Delay (s) - - 8.7 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Intersection #4
Water Edge TIS 4: Turnberry Road & Douglas Road (CR 54)
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 6 74 41 9 22 3 28 2 10 0 1 7
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 7 80 45 10 24 3 30 2 11 0 1 8
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 27 0 0 125 0 0 165 163 103 167 183 26
Stage 1 - - - - - - 116 116 - 45 45 -
Stage 2 - - - - - - 49 47 - 122 138 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1587 - - 1462 - - 800 729 952 797 711 1050
Stage 1 - - - - - - 889 800 - 969 857 -
Stage 2 - - - - - - 964 856 - 882 782 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1587 - - 1462 - - 786 720 952 779 702 1050
Mov Cap-2 Maneuver - - - - - - 786 720 - 779 702 -
Stage 1 - - - - - - 885 796 - 964 851 -
Stage 2 - - - - - - 949 850 - 865 778 -
Approach EB WB NB SB
HCM Control Delay, s 0.4 2 9.6 8.7
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 818 1587 - - 1462 - - 989
HCM Lane V/C Ratio 0.053 0.004 - - 0.007 - - 0.009
HCM Control Delay (s) 9.6 7.3 0 - 7.5 0 - 8.7
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0
HCM 2010 TWSC Intersection #4
Water Edge TIS 4: Turnberry Road & Douglas Road (CR 54)
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 52 40 19 65 1 35 4 23 1 3 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 57 43 21 71 1 38 4 25 1 3 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 72 0 0 100 0 0 193 191 78 206 213 71
Stage 1 - - - - - - 78 78 - 113 113 -
Stage 2 - - - - - - 115 113 - 93 100 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1528 - - 1493 - - 767 704 983 752 684 991
Stage 1 - - - - - - 931 830 - 892 802 -
Stage 2 - - - - - - 890 802 - 914 812 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1528 - - 1493 - - 755 693 983 721 674 991
Mov Cap-2 Maneuver - - - - - - 755 693 - 721 674 -
Stage 1 - - - - - - 931 830 - 892 790 -
Stage 2 - - - - - - 872 790 - 886 812 -
Approach EB WB NB SB
HCM Control Delay, s 0 1.7 9.8 10
HCM LOS A B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 821 1528 - - 1493 - - 730
HCM Lane V/C Ratio 0.082 - - - 0.014 - - 0.007
HCM Control Delay (s) 9.8 0 - - 7.4 0 - 10
HCM Lane LOS A A - - A A - B
HCM 95th %tile Q(veh) 0.3 0 - - 0 - - 0
HCM 2010 TWSC Intersection #5
Water Edge TIS 5: Turnberry Road & Brightwater Drive
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 4 0 43 32 0 5 17 29 4 3 61 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 4 0 47 35 0 5 18 32 4 3 66 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 146 146 66 144 144 34 66 0 0 36 0 0
Stage 1 73 73 - 71 71 - - - - - - -
Stage 2 73 73 - 73 73 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 823 745 998 825 747 1039 1536 - - 1575 - -
Stage 1 937 834 - 939 836 - - - - - - -
Stage 2 937 834 - 937 834 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 810 735 998 778 737 1039 1536 - - 1575 - -
Mov Cap-2 Maneuver 810 735 - 778 737 - - - - - - -
Stage 1 926 832 - 928 826 - - - - - - -
Stage 2 921 824 - 891 832 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 8.9 9.7 2.5 0.3
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1536 - - 810 998 805 1575 - -
HCM Lane V/C Ratio 0.012 - - 0.005 0.047 0.05 0.002 - -
HCM Control Delay (s) 7.4 - - 9.5 8.8 9.7 7.3 0 -
HCM Lane LOS A - - AAAAA-
HCM 95th %tile Q(veh) 0 - - 0 0.1 0.2 0 - -
HCM 2010 TWSC Intersection #5
Water Edge TIS 5: Turnberry Road & Brightwater Drive
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 0 15 10 2 6 35 60 19 5 56 1
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 0 16 11 2 7 38 65 21 5 61 1
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 228 234 61 224 225 76 62 0 0 86 0 0
Stage 1 72 72 - 152 152 - - - - - - -
Stage 2 156 162 - 72 73 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 727 666 1004 732 674 985 1541 - - 1510 - -
Stage 1 938 835 - 850 772 - - - - - - -
Stage 2 846 764 - 938 834 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 705 648 1004 705 655 985 1541 - - 1510 - -
Mov Cap-2 Maneuver 705 648 - 705 655 - - - - - - -
Stage 1 915 832 - 829 753 - - - - - - -
Stage 2 817 745 - 920 831 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9 9.8 2.3 0.6
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1541 - - 705 1004 772 1510 - -
HCM Lane V/C Ratio 0.025 - - 0.008 0.016 0.025 0.004 - -
HCM Control Delay (s) 7.4 - - 10.1 8.6 9.8 7.4 0 -
HCM Lane LOS A - - BAAAA-
HCM 95th %tile Q(veh) 0.1 - - 0 0.1 0.1 0 - -
HCM 2010 TWSC Intersection #6
Water Edge TIS 6: Turnberry Road & Richards Lake Road (CR 52)
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 2 4 23 46 0 5 7 61 12 1 194 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 2 4 25 50 0 5 8 66 13 1 211 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 297 295 211 297 295 66 211 0 0 66 0 0
Stage 1 213 213 - 82 82 - - - - - - -
Stage 2 84 82 - 215 213 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 655 616 829 655 616 998 1360 - - 1536 - -
Stage 1 789 726 - 926 827 - - - - - - -
Stage 2 924 827 - 787 726 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 648 612 829 629 612 998 1360 - - 1536 - -
Mov Cap-2 Maneuver 648 612 - 629 612 - - - - - - -
Stage 1 784 726 - 921 822 - - - - - - -
Stage 2 914 822 - 758 726 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.8 10.9 0.7 0
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1360 - - 624 829 629 998 1536 - -
HCM Lane V/C Ratio 0.006 - - 0.01 0.03 0.079 0.005 0.001 - -
HCM Control Delay (s) 7.7 - - 10.8 9.5 11.2 8.6 7.3 - -
HCM Lane LOS A - - BABAA--
HCM 95th %tile Q(veh) 0 - - 0 0.1 0.3 0 0 - -
HCM 2010 TWSC Intersection #6
Water Edge TIS 6: Turnberry Road & Richards Lake Road (CR 52)
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 0 0 7 32 2 10 15 147 43 7 103 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 8 35 2 11 16 160 47 8 112 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 326 319 112 319 319 160 112 0 0 160 0 0
Stage 1 127 127 - 192 192 - - - - - - -
Stage 2 199 192 - 127 127 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 627 598 941 634 598 885 1478 - - 1419 - -
Stage 1 877 791 - 810 742 - - - - - - -
Stage 2 803 742 - 877 791 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 610 588 941 621 588 885 1478 - - 1419 - -
Mov Cap-2 Maneuver 610 588 - 621 588 - - - - - - -
Stage 1 868 787 - 801 734 - - - - - - -
Stage 2 782 734 - 865 787 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 8.9 10.7 0.5 0.5
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1478 - - - 941 621 816 1419 - -
HCM Lane V/C Ratio 0.011 - - - 0.008 0.056 0.016 0.005 - -
HCM Control Delay (s) 7.5 - - 0 8.9 11.1 9.5 7.6 - -
HCM Lane LOS A - - AABAA--
HCM 95th %tile Q(veh) 0 - - - 0 0.2 0 0 - -
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 12.8
Intersection LOS B
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 2 111 83 0 251 121 4 0 21 44 52
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 2 121 90 0 273 132 4 0 23 48 57
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 10.4 15.6 10.1
HCM LOS B C B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 18% 1% 67% 12%
Vol Thru, % 38% 57% 32% 83%
Vol Right, % 44% 42% 1% 5%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 117 196 376 149
LT Vol 21 2 251 18
Through Vol 44 111 121 124
RT Vol 52 83 4 7
Lane Flow Rate 127 213 409 162
Geometry Grp 1111
Degree of Util (X) 0.199 0.305 0.593 0.261
Departure Headway (Hd) 5.647 5.146 5.225 5.795
Convergence, Y/N Yes Yes Yes Yes
Cap 633 697 691 619
Service Time 3.7 3.187 3.259 3.844
HCM Lane V/C Ratio 0.201 0.306 0.592 0.262
HCM Control Delay 10.1 10.4 15.6 10.9
HCM Lane LOS B B C B
HCM 95th-tile Q 0.7 1.3 3.9 1
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 18 124 7
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 20 135 8
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 10.9
HCM LOS B
Lane
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 19.8
Intersection LOS C
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 8 223 53 0 129 132 23 0 87 115 237
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 9 242 58 0 140 143 25 0 95 125 258
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 16.4 17 25.4
HCM LOS C C D
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 20% 3% 45% 22%
Vol Thru, % 26% 79% 46% 78%
Vol Right, % 54% 19% 8% 0%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 439 284 284 78
LT Vol 87 8 129 17
Through Vol 115 223 132 61
RT Vol 237 53 23 0
Lane Flow Rate 477 309 309 85
Geometry Grp 1111
Degree of Util (X) 0.767 0.537 0.548 0.166
Departure Headway (Hd) 5.787 6.258 6.395 7.047
Convergence, Y/N Yes Yes Yes Yes
Cap 625 574 562 507
Service Time 3.832 4.313 4.45 5.121
HCM Lane V/C Ratio 0.763 0.538 0.55 0.168
HCM Control Delay 25.4 16.4 17 11.5
HCM Lane LOS D C C B
HCM 95th-tile Q 7.1 3.2 3.3 0.6
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 17 61 0
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 18 66 0
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 11.5
HCM LOS B
Lane
HCM 2010 TWSC Intersection #8
Water Edge TIS 8: Turnberry Road & Country Club Road
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 51 7 147 20 31 0 41 44 8 0 207 247
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 55 8 160 22 34 0 45 48 9 0 225 268
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 383 371 225 370 366 52 225 0 0 57 0 0
Stage 1 225 225 - 141 141 - - - - - - -
Stage 2 158 146 - 229 225 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 575 559 814 587 562 1016 1344 - - 1547 - -
Stage 1 778 718 - 862 780 - - - - - - -
Stage 2 844 776 - 774 718 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 534 540 814 455 543 1016 1344 - - 1547 - -
Mov Cap-2 Maneuver 534 540 - 455 543 - - - - - - -
Stage 1 752 718 - 833 754 - - - - - - -
Stage 2 779 750 - 615 718 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.1 13 3.4 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1344 - - 535 814 505 1547 - -
HCM Lane V/C Ratio 0.033 - - 0.118 0.196 0.11 - - -
HCM Control Delay (s) 7.8 - - 12.6 10.5 13 0 - -
HCM Lane LOS A - - BBBA--
HCM 95th %tile Q(veh) 0.1 - - 0.4 0.7 0.4 0 - -
HCM 2010 TWSC Intersection #8
Water Edge TIS 8: Turnberry Road & Country Club Road
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 13.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 183 45 148 5 13 4 165 183 25 2 85 134
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 199 49 161 5 14 4 179 199 27 2 92 146
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 677 682 92 692 668 213 92 0 0 226 0 0
Stage 1 97 97 - 571 571 - - - - - - -
Stage 2 580 585 - 121 97 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 367 372 965 358 379 827 1503 - - 1342 - -
Stage 1 910 815 - 506 505 - - - - - - -
Stage 2 500 498 - 883 815 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 321 327 965 240 333 827 1503 - - 1342 - -
Mov Cap-2 Maneuver 321 327 - 240 333 - - - - - - -
Stage 1 802 814 - 446 445 - - - - - - -
Stage 2 424 439 - 691 814 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 31.2 16.4 3.4 0.1
HCM LOS D C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1503 - - 322 965 340 1342 - -
HCM Lane V/C Ratio 0.119 - - 0.77 0.167 0.07 0.002 - -
HCM Control Delay (s) 7.7 - - 45.3 9.5 16.4 7.7 - -
HCM Lane LOS A - - E A C A - -
HCM 95th %tile Q(veh) 0.4 - - 6.1 0.6 0.2 0 - -
HCM 2010 AWSC Intersection #9
Water Edge TIS 9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 11.6
Intersection LOS B
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Vol, veh/h 0 7 28 0 8 100 0 405 4
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 8 30 0 9 109 0 440 4
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.5 8.3 12.7
HCM LOS A A B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 20% 0% 99%
Vol Thru, % 80% 7% 0%
Vol Right, % 0% 93% 1%
Sign Control Stop Stop Stop
Traffic Vol by Lane 35 108 409
LT Vol 7 0 405
Through Vol 28 8 0
RT Vol 0 100 4
Lane Flow Rate 38 117 445
Geometry Grp 1 1 1
Degree of Util (X) 0.055 0.147 0.543
Departure Headway (Hd) 5.192 4.498 4.516
Convergence, Y/N Yes Yes Yes
Cap 693 802 805
Service Time 3.202 2.502 2.516
HCM Lane V/C Ratio 0.055 0.146 0.553
HCM Control Delay 8.5 8.3 12.7
HCM Lane LOS A A B
HCM 95th-tile Q 0.2 0.5 3.3
HCM 2010 AWSC Intersection #9
Water Edge TIS 9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 10
Intersection LOS A
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Vol, veh/h 0 10 16 0 28 332 0 186 19
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 17 0 30 361 0 202 21
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.2 10.1 10.1
HCM LOS A B B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 38% 0% 91%
Vol Thru, % 62% 8% 0%
Vol Right, % 0% 92% 9%
Sign Control Stop Stop Stop
Traffic Vol by Lane 26 360 205
LT Vol 10 0 186
Through Vol 16 28 0
RT Vol 0 332 19
Lane Flow Rate 28 391 223
Geometry Grp 1 1 1
Degree of Util (X) 0.039 0.434 0.305
Departure Headway (Hd) 4.991 3.997 4.928
Convergence, Y/N Yes Yes Yes
Cap 716 904 726
Service Time 3.031 2.016 2.973
HCM Lane V/C Ratio 0.039 0.433 0.307
HCM Control Delay 8.2 10.1 10.1
HCM Lane LOS A B B
HCM 95th-tile Q 0.1 2.2 1.3
HCM 2010 TWSC Intersection #10
Water Edge TIS 10: Timberline Drive & Mountain Vista Drive (CR 50)
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.7
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 257 194 127 66 48 61
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 279 211 138 72 52 66
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 490 0 733 385
Stage 1 - - - - 385 -
Stage 2 - - - - 348 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1073 - 388 663
Stage 1 - - - - 688 -
Stage 2 - - - - 715 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1073 - 336 663
Mov Cap-2 Maneuver - - - - 336 -
Stage 1 - - - - 688 -
Stage 2 - - - - 619 -
Approach EB WB NB
HCM Control Delay, s 0 5.8 15.4
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 464 - - 1073 -
HCM Lane V/C Ratio 0.255 - - 0.129 -
HCM Control Delay (s) 15.4 - - 8.8 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 1 - - 0.4 -
HCM 2010 TWSC Intersection #10
Water Edge TIS 10: Timberline Drive & Mountain Vista Drive (CR 50)
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 12
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 122 96 116 346 163 147
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 133 104 126 376 177 160
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 237 0 813 185
Stage 1 - - - - 185 -
Stage 2 - - - - 628 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1330 - 348 857
Stage 1 - - - - 847 -
Stage 2 - - - - 532 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1330 - 306 857
Mov Cap-2 Maneuver - - - - 306 -
Stage 1 - - - - 847 -
Stage 2 - - - - 468 -
Approach EB WB NB
HCM Control Delay, s 0 2 35.3
HCM LOS E
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 440 - - 1330 -
HCM Lane V/C Ratio 0.766 - - 0.095 -
HCM Control Delay (s) 35.3 - - 8 0
HCM Lane LOS E - - A A
HCM 95th %tile Q(veh) 6.5 - - 0.3 -
HCM 2010 Signalized Intersection Summary Intersection #11
Water Edge TIS 11: Lemay Avenue & Vine Drive
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 9 147 84 127 246 119 39 298 56 58 556 25
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1829 1824 1863 1827 1824 1824 1863 1824 1824 1937 1824
Adj Flow Rate, veh/h 10 171 98 148 286 138 45 347 65 67 647 29
Adj No. of Lanes 110110010010
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 255255222222
Cap, veh/h 99 197 113 209 263 127 112 839 152 115 1039 45
Arrive On Green 0.02 0.18 0.17 0.06 0.23 0.22 0.63 0.64 0.63 0.63 0.64 0.63
Sat Flow, veh/h 1774 1092 626 1774 1165 562 118 1306 236 123 1617 71
Grp Volume(v), veh/h 10 0 269 148 0 424 457 0 0 743 0 0
Grp Sat Flow(s),veh/h/ln 1774 0 1718 1774 0 1727 1660 0 0 1811 0 0
Q Serve(g_s), s 0.5 0.0 16.7 7.0 0.0 24.8 0.0 0.0 0.0 10.2 0.0 0.0
Cycle Q Clear(g_c), s 0.5 0.0 16.7 7.0 0.0 24.8 13.3 0.0 0.0 26.3 0.0 0.0
Prop In Lane 1.00 0.36 1.00 0.33 0.10 0.14 0.09 0.04
Lane Grp Cap(c), veh/h 99 0 310 209 0 389 1087 0 0 1183 0 0
V/C Ratio(X) 0.10 0.00 0.87 0.71 0.00 1.09 0.42 0.00 0.00 0.63 0.00 0.00
Avail Cap(c_a), veh/h 178 0 320 209 0 389 1087 0 0 1183 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 37.3 0.0 44.0 35.3 0.0 42.8 9.5 0.0 0.0 11.6 0.0 0.0
Incr Delay (d2), s/veh 0.4 0.0 21.1 10.4 0.0 71.8 1.2 0.0 0.0 2.5 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 9.7 1.6 0.0 19.5 7.1 0.0 0.0 14.5 0.0 0.0
LnGrp Delay(d),s/veh 37.7 0.0 65.1 45.7 0.0 114.6 10.7 0.0 0.0 14.2 0.0 0.0
LnGrp LOS D E D F B B
Approach Vol, veh/h 279 572 457 743
Approach Delay, s/veh 64.1 96.8 10.7 14.2
Approach LOS E F B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 74.7 11.0 24.3 74.7 6.1 29.3
Change Period (Y+Rc), s * 5 5.0 5.5 5.0 5.0 5.5
Max Green Setting (Gmax), s * 70 6.0 19.5 69.0 6.0 19.5
Max Q Clear Time (g_c+I1), s 28.3 9.0 18.7 15.3 2.5 26.8
Green Ext Time (p_c), s 5.7 0.0 0.1 5.8 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 43.2
HCM 2010 LOS D
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
HCM 2010 Signalized Intersection Summary Intersection #11
Water Edge TIS 11: Lemay Avenue & Vine Drive
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 16 276 104 101 205 135 64 696 207 109 458 40
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1824 1824 1863 1830 1824 1824 1863 1824 1824 1937 1824
Adj Flow Rate, veh/h 19 321 121 117 238 157 74 809 241 127 533 47
Adj No. of Lanes 110110010010
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 255255222222
Cap, veh/h 103 216 81 163 211 139 95 919 268 158 651 55
Arrive On Green 0.02 0.17 0.16 0.06 0.21 0.20 0.80 0.81 0.80 0.80 0.81 0.80
Sat Flow, veh/h 1774 1263 476 1774 1031 680 78 1137 332 151 805 68
Grp Volume(v), veh/h 19 0 442 117 0 395 1124 0 0 707 0 0
Grp Sat Flow(s),veh/h/ln 1774 0 1740 1774 0 1710 1547 0 0 1024 0 0
Q Serve(g_s), s 1.0 0.0 20.5 6.4 0.0 24.6 0.0 0.0 0.0 6.9 0.0 0.0
Cycle Q Clear(g_c), s 1.0 0.0 20.5 6.4 0.0 24.6 62.4 0.0 0.0 74.1 0.0 0.0
Prop In Lane 1.00 0.27 1.00 0.40 0.07 0.21 0.18 0.07
Lane Grp Cap(c), veh/h 103 0 297 163 0 351 1270 0 0 855 0 0
V/C Ratio(X) 0.19 0.00 1.49 0.72 0.00 1.13 0.89 0.00 0.00 0.83 0.00 0.00
Avail Cap(c_a), veh/h 163 0 297 163 0 351 1270 0 0 855 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 41.1 0.0 49.9 38.6 0.0 47.9 7.2 0.0 0.0 6.9 0.0 0.0
Incr Delay (d2), s/veh 0.9 0.0 236.4 13.9 0.0 86.5 9.3 0.0 0.0 9.0 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.0 29.3 3.7 0.0 20.0 30.4 0.0 0.0 21.6 0.0 0.0
LnGrp Delay(d),s/veh 41.9 0.0 286.3 52.5 0.0 134.4 16.5 0.0 0.0 15.9 0.0 0.0
LnGrp LOS D F D F B B
Approach Vol, veh/h 461 512 1124 707
Approach Delay, s/veh 276.2 115.7 16.5 15.9
Approach LOS F F B B
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 101.5 11.0 25.0 101.5 6.9 29.1
Change Period (Y+Rc), s * 5 5.0 5.5 5.0 5.0 5.5
Max Green Setting (Gmax), s * 80 6.0 19.5 79.0 6.0 19.5
Max Q Clear Time (g_c+I1), s 76.1 8.4 22.5 64.4 3.0 26.6
Green Ext Time (p_c), s 3.3 0.0 0.0 13.7 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 77.2
HCM 2010 LOS E
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 21.1
Intersection LOS C
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 38 86 135 0 146 189 6 0 92 86 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 41 93 147 0 159 205 7 0 100 93 27
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 17.1 24.6 16
HCM LOS C C C
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 45% 15% 43% 1%
Vol Thru, % 42% 33% 55% 82%
Vol Right, % 12% 52% 2% 17%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 203 259 341 342
LT Vol 92 38 146 4
Through Vol 86 86 189 281
RT Vol 25 135 6 57
Lane Flow Rate 221 282 371 372
Geometry Grp 1111
Degree of Util (X) 0.444 0.527 0.703 0.692
Departure Headway (Hd) 7.243 6.742 6.831 6.706
Convergence, Y/N Yes Yes Yes Yes
Cap 496 535 530 539
Service Time 5.3 4.799 4.882 4.755
HCM Lane V/C Ratio 0.446 0.527 0.7 0.69
HCM Control Delay 16 17.1 24.6 23.6
HCM Lane LOS CCCC
HCM 95th-tile Q 2.2 3 5.5 5.3
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
Existing 2015 AM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 4 281 57
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 4 305 62
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 23.6
HCM LOS C
Lane
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 26.9
Intersection LOS D
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 67 210 95 0 71 152 11 0 113 220 74
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 73 228 103 0 77 165 12 0 123 239 80
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 28.8 18.2 35.2
HCM LOS D C E
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 28% 18% 30% 5%
Vol Thru, % 54% 56% 65% 71%
Vol Right, % 18% 26% 5% 25%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 407 372 234 177
LT Vol 113 67 71 8
Through Vol 220 210 152 125
RT Vol 74 95 11 44
Lane Flow Rate 442 404 254 192
Geometry Grp 1111
Degree of Util (X) 0.832 0.765 0.521 0.397
Departure Headway (Hd) 6.772 6.813 7.368 7.435
Convergence, Y/N Yes Yes Yes Yes
Cap 535 530 488 483
Service Time 4.83 4.873 5.439 5.513
HCM Lane V/C Ratio 0.826 0.762 0.52 0.398
HCM Control Delay 35.2 28.8 18.2 15.4
HCM Lane LOS E D C C
HCM 95th-tile Q 8.4 6.8 3 1.9
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
Existing 2015 PM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 8 125 44
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 9 136 48
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 15.4
HCM LOS C
Lane
Waters’ Edge West Traffic Impact Analysis
Appendix E
APPENDIX E TRAFFIC ANALYSIS WORKSHEETS –
YEAR 2021 BACKGROUND CONDITIONS
HCM 2010 TWSC Intersection #1
Water Edge TIS 1: SH 1 & Douglas Road (CR 54)
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 5.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 70 70 50 40 55 5 20 95 15 25 330 190
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 76 76 54 43 60 5 22 103 16 27 359 207
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 601 576 359 633 568 111 359 0 0 120 0 0
Stage 1 413 413 - 155 155 - - - - - - -
Stage 2 188 163 - 478 413 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 412 428 685 392 432 942 1200 - - 1468 - -
Stage 1 616 594 - 847 769 - - - - - - -
Stage 2 814 763 - 568 594 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 355 412 685 301 416 942 1200 - - 1468 - -
Mov Cap-2 Maneuver 355 412 - 301 416 - - - - - - -
Stage 1 605 583 - 831 755 - - - - - - -
Stage 2 732 749 - 446 583 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 16 16.4 1.2 0.3
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1200 - - 355 494 301 436 1468 - -
HCM Lane V/C Ratio 0.018 - - 0.214 0.264 0.144 0.15 0.019 - -
HCM Control Delay (s) 8.1 - - 17.9 14.9 19 14.7 7.5 - -
HCM Lane LOS A - - C B C B A - -
HCM 95th %tile Q(veh) 0.1 - - 0.8 1.1 0.5 0.5 0.1 - -
HCM 2010 TWSC Intersection #1
Water Edge TIS 1: SH 1 & Douglas Road (CR 54)
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 95 45 55 35 55 15 70 340 65 15 170 85
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 103 49 60 38 60 16 76 370 71 16 185 92
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 812 809 185 829 774 405 185 0 0 440 0 0
Stage 1 217 217 - 557 557 - - - - - - -
Stage 2 595 592 - 272 217 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 298 314 857 290 329 646 1390 - - 1120 - -
Stage 1 785 723 - 515 512 - - - - - - -
Stage 2 491 494 - 734 723 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 235 293 857 223 307 646 1390 - - 1120 - -
Mov Cap-2 Maneuver 235 293 - 223 307 - - - - - - -
Stage 1 742 713 - 487 484 - - - - - - -
Stage 2 397 467 - 627 713 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 23.3 20.3 1.1 0.5
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1390 - - 235 459 223 346 1120 - -
HCM Lane V/C Ratio 0.055 - - 0.439 0.237 0.171 0.22 0.015 - -
HCM Control Delay (s) 7.7 - - 31.8 15.3 24.4 18.3 8.3 - -
HCM Lane LOS A - - DCCCA--
HCM 95th %tile Q(veh) 0.2 - - 2.1 0.9 0.6 0.8 0 - -
HCM 2010 TWSC Intersection #2
Water Edge TIS 2: Hearthfire Drive & Douglas Road (CR 54)
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.2
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 100 5 5 60 35 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 109 5 5 65 38 11
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 109 0 185 109
Stage 1 - - - - 109 -
Stage 2 - - - - 76 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1481 - 804 945
Stage 1 - - - - 916 -
Stage 2 - - - - 947 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1481 - 801 945
Mov Cap-2 Maneuver - - - - 801 -
Stage 1 - - - - 916 -
Stage 2 - - - - 944 -
Approach EB WB NB
HCM Control Delay, s 0 0.6 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 829 - - 1481 -
HCM Lane V/C Ratio 0.059 - - 0.004 -
HCM Control Delay (s) 9.6 - - 7.4 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 2010 TWSC Intersection #2
Water Edge TIS 2: Hearthfire Drive & Douglas Road (CR 54)
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 95 35 5 100 15 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 103 38 5 109 16 5
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 103 0 223 103
Stage 1 - - - - 103 -
Stage 2 - - - - 120 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1489 - 765 952
Stage 1 - - - - 921 -
Stage 2 - - - - 905 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1489 - 762 952
Mov Cap-2 Maneuver - - - - 762 -
Stage 1 - - - - 921 -
Stage 2 - - - - 902 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 802 - - 1489 -
HCM Lane V/C Ratio 0.027 - - 0.004 -
HCM Control Delay (s) 9.6 - - 7.4 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 2010 TWSC Intersection #3
Water Edge TIS 3: Hearthfire Drive & Morningstar Way
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3
Movement NWL NWR NET NER SWL SWT
Vol, veh/h 10 10 15 25 5 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 11 16 27 5 5
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 46 30 0 0 43 0
Stage 1 30 - - - - -
Stage 2 16 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 964 1044 - - 1566 -
Stage 1 993 - - - - -
Stage 2 1007 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 961 1044 - - 1566 -
Mov Cap-2 Maneuver 961 - - - - -
Stage 1 993 - - - - -
Stage 2 1004 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.7 0 3.7
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 1001 1566 -
HCM Lane V/C Ratio - - 0.022 0.003 -
HCM Control Delay (s) - - 8.7 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Intersection #3
Water Edge TIS 3: Hearthfire Drive & Morningstar Way
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.1
Movement NWL NWR NET NER SWL SWT
Vol, veh/h 15 10 10 10 10 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 11 11 11 11 16
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 54 16 0 0 22 0
Stage 1 16 - - - - -
Stage 2 38 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 954 1063 - - 1593 -
Stage 1 1007 - - - - -
Stage 2 984 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 947 1063 - - 1593 -
Mov Cap-2 Maneuver 947 - - - - -
Stage 1 1007 - - - - -
Stage 2 977 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.7 0 2.9
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 990 1593 -
HCM Lane V/C Ratio - - 0.027 0.007 -
HCM Control Delay (s) - - 8.7 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Intersection #4
Water Edge TIS 4: Turnberry Road & Douglas Road (CR 54)
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 10 80 45 10 25 5 30 5 10 5 5 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 87 49 11 27 5 33 5 11 5 5 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 33 0 0 136 0 0 193 187 111 193 210 30
Stage 1 - - - - - - 133 133 - 52 52 -
Stage 2 - - - - - - 60 54 - 141 158 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1579 - - 1448 - - 767 708 942 767 687 1044
Stage 1 - - - - - - 870 786 - 961 852 -
Stage 2 - - - - - - 951 850 - 862 767 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1579 - - 1448 - - 745 697 942 744 676 1044
Mov Cap-2 Maneuver - - - - - - 745 697 - 744 676 -
Stage 1 - - - - - - 863 780 - 953 845 -
Stage 2 - - - - - - 928 843 - 839 761 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 1.9 10 9.4
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 775 1579 - - 1448 - - 844
HCM Lane V/C Ratio 0.063 0.007 - - 0.008 - - 0.026
HCM Control Delay (s) 10 7.3 0 - 7.5 0 - 9.4
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.2 0 - - 0 - - 0.1
HCM 2010 TWSC Intersection #4
Water Edge TIS 4: Turnberry Road & Douglas Road (CR 54)
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 55 40 20 70 5 35 5 25 5 5 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 60 43 22 76 5 38 5 27 5 5 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 82 0 0 103 0 0 220 217 82 231 236 79
Stage 1 - - - - - - 92 92 - 122 122 -
Stage 2 - - - - - - 128 125 - 109 114 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1515 - - 1489 - - 736 681 978 724 665 981
Stage 1 - - - - - - 915 819 - 882 795 -
Stage 2 - - - - - - 876 792 - 896 801 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1515 - - 1489 - - 717 668 978 689 652 981
Mov Cap-2 Maneuver - - - - - - 717 668 - 689 652 -
Stage 1 - - - - - - 911 816 - 878 783 -
Stage 2 - - - - - - 852 780 - 862 798 -
Approach EB WB NB SB
HCM Control Delay, s 0.4 1.6 10 9.9
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 794 1515 - - 1489 - - 749
HCM Lane V/C Ratio 0.089 0.004 - - 0.015 - - 0.022
HCM Control Delay (s) 10 7.4 0 - 7.5 0 - 9.9
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.3 0 - - 0 - - 0.1
HCM 2010 TWSC Intersection #5
Water Edge TIS 5: Turnberry Road & Brightwater Drive
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 45 35 5 5 20 30 5 5 65 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 49 38 5 5 22 33 5 5 71 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 168 166 73 166 166 35 76 0 0 38 0 0
Stage 1 84 84 - 79 79 - - - - - - -
Stage 2 84 82 - 87 87 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 796 727 989 798 727 1038 1523 - - 1572 - -
Stage 1 924 825 - 930 829 - - - - - - -
Stage 2 924 827 - 921 823 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 777 714 989 744 714 1038 1523 - - 1572 - -
Mov Cap-2 Maneuver 777 714 - 744 714 - - - - - - -
Stage 1 911 823 - 917 817 - - - - - - -
Stage 2 900 815 - 867 821 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9 10 2.7 0.5
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1523 - - 744 989 764 1572 - -
HCM Lane V/C Ratio 0.014 - - 0.015 0.049 0.064 0.003 - -
HCM Control Delay (s) 7.4 - - 9.9 8.8 10 7.3 0 -
HCM Lane LOS A - - AABAA-
HCM 95th %tile Q(veh) 0 - - 0 0.2 0.2 0 - -
HCM 2010 TWSC Intersection #5
Water Edge TIS 5: Turnberry Road & Brightwater Drive
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 15 10 5 10 35 65 20 5 60 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 16 11 5 11 38 71 22 5 65 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 245 247 68 240 240 82 71 0 0 92 0 0
Stage 1 79 79 - 158 158 - - - - - - -
Stage 2 166 168 - 82 82 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 709 655 995 714 661 978 1529 - - 1503 - -
Stage 1 930 829 - 844 767 - - - - - - -
Stage 2 836 759 - 926 827 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 682 637 995 683 643 978 1529 - - 1503 - -
Mov Cap-2 Maneuver 682 637 - 683 643 - - - - - - -
Stage 1 907 827 - 823 748 - - - - - - -
Stage 2 800 740 - 902 825 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.5 9.9 2.2 0.5
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1529 - - 659 995 766 1503 - -
HCM Lane V/C Ratio 0.025 - - 0.016 0.016 0.035 0.004 - -
HCM Control Delay (s) 7.4 - - 10.6 8.7 9.9 7.4 0 -
HCM Lane LOS A - - BAAAA-
HCM 95th %tile Q(veh) 0.1 - - 0.1 0.1 0.1 0 - -
HCM 2010 TWSC Intersection #6
Water Edge TIS 6: Turnberry Road & Richards Lake Road (CR 52)
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 25 50 5 5 10 65 15 5 205 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 27 54 5 5 11 71 16 5 223 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 334 328 226 331 331 71 228 0 0 71 0 0
Stage 1 236 236 - 92 92 - - - - - - -
Stage 2 98 92 - 239 239 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 620 591 813 622 588 991 1340 - - 1529 - -
Stage 1 767 710 - 915 819 - - - - - - -
Stage 2 908 819 - 764 708 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 607 584 813 592 581 991 1340 - - 1529 - -
Mov Cap-2 Maneuver 607 584 - 592 581 - - - - - - -
Stage 1 761 708 - 907 812 - - - - - - -
Stage 2 890 812 - 730 706 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.1 11.4 0.9 0.2
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1340 - - 595 813 592 733 1529 - -
HCM Lane V/C Ratio 0.008 - - 0.018 0.033 0.092 0.015 0.004 - -
HCM Control Delay (s) 7.7 - - 11.2 9.6 11.7 10 7.4 - -
HCM Lane LOS A - - BABBA--
HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0.3 0 0 - -
HCM 2010 TWSC Intersection #6
Water Edge TIS 6: Turnberry Road & Richards Lake Road (CR 52)
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 10 35 5 10 15 155 45 10 110 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 11 38 5 11 16 168 49 11 120 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 353 345 122 348 348 168 125 0 0 168 0 0
Stage 1 144 144 - 201 201 - - - - - - -
Stage 2 209 201 - 147 147 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 602 578 929 607 576 876 1462 - - 1410 - -
Stage 1 859 778 - 801 735 - - - - - - -
Stage 2 793 735 - 856 775 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 582 567 929 587 565 876 1462 - - 1410 - -
Mov Cap-2 Maneuver 582 567 - 587 565 - - - - - - -
Stage 1 850 772 - 792 727 - - - - - - -
Stage 2 769 727 - 833 769 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.2 11.1 0.5 0.6
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1462 - - 574 929 587 740 1410 - -
HCM Lane V/C Ratio 0.011 - - 0.019 0.012 0.065 0.022 0.008 - -
HCM Control Delay (s) 7.5 - - 11.4 8.9 11.6 10 7.6 - -
HCM Lane LOS A - - BABBA--
HCM 95th %tile Q(veh) 0 - - 0.1 0 0.2 0.1 0 - -
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 14
Intersection LOS B
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 5 120 90 0 265 130 5 0 20 45 55
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 5 130 98 0 288 141 5 0 22 49 60
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 11.1 17.6 10.5
HCM LOS B C B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 17% 2% 66% 12%
Vol Thru, % 38% 56% 33% 81%
Vol Right, % 46% 42% 1% 6%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 120 215 400 160
LT Vol 20 5 265 20
Through Vol 45 120 130 130
RT Vol 55 90 5 10
Lane Flow Rate 130 234 435 174
Geometry Grp 1111
Degree of Util (X) 0.211 0.343 0.644 0.288
Departure Headway (Hd) 5.829 5.28 5.333 5.954
Convergence, Y/N Yes Yes Yes Yes
Cap 613 678 674 602
Service Time 3.895 3.334 3.377 4.015
HCM Lane V/C Ratio 0.212 0.345 0.645 0.289
HCM Control Delay 10.5 11.1 17.6 11.4
HCM Lane LOS B B C B
HCM 95th-tile Q 0.8 1.5 4.7 1.2
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2021 No Action AM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 20 130 10
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 22 141 11
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 11.4
HCM LOS B
Lane
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 24
Intersection LOS C
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 10 235 55 0 135 140 25 0 90 120 250
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 11 255 60 0 147 152 27 0 98 130 272
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 18.8 19.5 32.5
HCM LOS C C D
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 20% 3% 45% 22%
Vol Thru, % 26% 78% 47% 72%
Vol Right, % 54% 18% 8% 6%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 460 300 300 90
LT Vol 90 10 135 20
Through Vol 120 235 140 65
RT Vol 250 55 25 5
Lane Flow Rate 500 326 326 98
Geometry Grp 1111
Degree of Util (X) 0.835 0.592 0.604 0.203
Departure Headway (Hd) 6.014 6.535 6.667 7.461
Convergence, Y/N Yes Yes Yes Yes
Cap 600 548 538 484
Service Time 4.083 4.621 4.751 5.461
HCM Lane V/C Ratio 0.833 0.595 0.606 0.202
HCM Control Delay 32.5 18.8 19.5 12.4
HCM Lane LOS D C C B
HCM 95th-tile Q 8.8 3.8 4 0.8
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2021 No Action PM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 20 65 5
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 22 71 5
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 12.4
HCM LOS B
Lane
HCM 2010 TWSC Intersection #8
Water Edge TIS 8: Turnberry Road & Country Club Road
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 55 10 155 20 35 5 45 45 10 5 220 260
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 60 11 168 22 38 5 49 49 11 5 239 283
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 424 408 239 407 402 54 239 0 0 60 0 0
Stage 1 250 250 - 152 152 - - - - - - -
Stage 2 174 158 - 255 250 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 540 533 800 555 537 1013 1328 - - 1544 - -
Stage 1 754 700 - 850 772 - - - - - - -
Stage 2 828 767 - 749 700 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 492 512 800 418 516 1013 1328 - - 1544 - -
Mov Cap-2 Maneuver 492 512 - 418 516 - - - - - - -
Stage 1 726 698 - 819 744 - - - - - - -
Stage 2 753 739 - 580 698 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.5 13.3 3.5 0.1
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1328 - - 495 800 497 1544 - -
HCM Lane V/C Ratio 0.037 - - 0.143 0.211 0.131 0.004 - -
HCM Control Delay (s) 7.8 - - 13.5 10.7 13.3 7.3 - -
HCM Lane LOS A - - BBBA--
HCM 95th %tile Q(veh) 0.1 - - 0.5 0.8 0.4 0 - -
HCM 2010 TWSC Intersection #8
Water Edge TIS 8: Turnberry Road & Country Club Road
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 20.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 195 50 50 5 15 5 175 195 25 5 90 140
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 212 54 54 5 16 5 190 212 27 5 98 152
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 726 729 98 742 715 226 98 0 0 239 0 0
Stage 1 109 109 - 606 606 - - - - - - -
Stage 2 617 620 - 136 109 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 340 350 958 332 356 813 1495 - - 1328 - -
Stage 1 896 805 - 484 487 - - - - - - -
Stage 2 477 480 - 867 805 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 292 304 958 244 310 813 1495 - - 1328 - -
Mov Cap-2 Maneuver 292 304 - 244 310 - - - - - - -
Stage 1 782 802 - 422 425 - - - - - - -
Stage 2 398 419 - 760 802 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 59.5 16.8 3.4 0.2
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1495 - - 294 958 333 1328 - -
HCM Lane V/C Ratio 0.127 - - 0.906 0.057 0.082 0.004 - -
HCM Control Delay (s) 7.8 - - 69.8 9 16.8 7.7 - -
HCM Lane LOS A - - F A C A - -
HCM 95th %tile Q(veh) 0.4 - - 8.4 0.2 0.3 0 - -
HCM 2010 AWSC Intersection #9
Water Edge TIS 9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 12.6
Intersection LOS B
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Vol, veh/h 0 10 30 0 10 105 0 430 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 33 0 11 114 0 467 5
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.7 8.5 14
HCM LOS A A B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 25% 0% 99%
Vol Thru, % 75% 9% 0%
Vol Right, % 0% 91% 1%
Sign Control Stop Stop Stop
Traffic Vol by Lane 40 115 435
LT Vol 10 0 430
Through Vol 30 10 0
RT Vol 0 105 5
Lane Flow Rate 43 125 473
Geometry Grp 1 1 1
Degree of Util (X) 0.064 0.159 0.594
Departure Headway (Hd) 5.289 4.588 4.524
Convergence, Y/N Yes Yes Yes
Cap 676 781 799
Service Time 3.329 2.621 2.554
HCM Lane V/C Ratio 0.064 0.16 0.592
HCM Control Delay 8.7 8.5 14
HCM Lane LOS A A B
HCM 95th-tile Q 0.2 0.6 4
HCM 2010 AWSC Intersection #9
Water Edge TIS 9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 10.4
Intersection LOS B
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Vol, veh/h 0 10 20 0 30 350 0 195 20
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 22 0 33 380 0 212 22
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.3 10.5 10.4
HCM LOS A B B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 33% 0% 91%
Vol Thru, % 67% 8% 0%
Vol Right, % 0% 92% 9%
Sign Control Stop Stop Stop
Traffic Vol by Lane 30 380 215
LT Vol 10 0 195
Through Vol 20 30 0
RT Vol 0 350 20
Lane Flow Rate 33 413 234
Geometry Grp 1 1 1
Degree of Util (X) 0.046 0.463 0.324
Departure Headway (Hd) 5.042 4.037 4.987
Convergence, Y/N Yes Yes Yes
Cap 708 892 717
Service Time 3.09 2.062 3.04
HCM Lane V/C Ratio 0.047 0.463 0.326
HCM Control Delay 8.3 10.5 10.4
HCM Lane LOS A B B
HCM 95th-tile Q 0.1 2.5 1.4
HCM 2010 TWSC Intersection #10
Water Edge TIS 10: Timberline Drive & Mountain Vista Drive (CR 50)
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 275 205 135 70 50 65
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 299 223 147 76 54 71
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 522 0 780 410
Stage 1 - - - - 410 -
Stage 2 - - - - 370 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1044 - 364 642
Stage 1 - - - - 670 -
Stage 2 - - - - 699 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1044 - 310 642
Mov Cap-2 Maneuver - - - - 310 -
Stage 1 - - - - 670 -
Stage 2 - - - - 596 -
Approach EB WB NB
HCM Control Delay, s 0 5.9 16.5
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 438 - - 1044 -
HCM Lane V/C Ratio 0.285 - - 0.141 -
HCM Control Delay (s) 16.5 - - 9 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 1.2 - - 0.5 -
HCM 2010 TWSC Intersection #10
Water Edge TIS 10: Timberline Drive & Mountain Vista Drive (CR 50)
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 14.7
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 130 10 125 365 175 155
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 141 11 136 397 190 168
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 152 0 815 147
Stage 1 - - - - 147 -
Stage 2 - - - - 668 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1429 - 347 900
Stage 1 - - - - 880 -
Stage 2 - - - - 510 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1429 - 305 900
Mov Cap-2 Maneuver - - - - 305 -
Stage 1 - - - - 880 -
Stage 2 - - - - 448 -
Approach EB WB NB
HCM Control Delay, s 0 2 39.8
HCM LOS E
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 442 - - 1429 -
HCM Lane V/C Ratio 0.812 - - 0.095 -
HCM Control Delay (s) 39.8 - - 7.8 0
HCM Lane LOS E - - A A
HCM 95th %tile Q(veh) 7.5 - - 0.3 -
HCM 2010 Signalized Intersection Summary Intersection #11
Water Edge TIS 11: Lemay Avenue & Vine Drive
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 10 155 90 135 260 125 40 315 60 60 590 25
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1829 1824 1863 1826 1824 1824 1863 1824 1824 1937 1824
Adj Flow Rate, veh/h 12 180 105 157 302 145 47 366 70 70 686 29
Adj No. of Lanes 110110010010
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 255255222222
Cap, veh/h 132 240 140 283 331 159 98 743 136 108 946 39
Arrive On Green 0.02 0.22 0.21 0.08 0.28 0.27 0.57 0.58 0.57 0.57 0.58 0.57
Sat Flow, veh/h 1774 1085 633 1774 1167 560 107 1274 234 124 1622 67
Grp Volume(v), veh/h 12 0 285 157 0 447 483 0 0 785 0 0
Grp Sat Flow(s),veh/h/ln 1774 0 1717 1774 0 1728 1615 0 0 1814 0 0
Q Serve(g_s), s 0.6 0.0 17.1 7.2 0.0 27.5 0.0 0.0 0.0 17.6 0.0 0.0
Cycle Q Clear(g_c), s 0.6 0.0 17.1 7.2 0.0 27.5 16.8 0.0 0.0 34.3 0.0 0.0
Prop In Lane 1.00 0.37 1.00 0.32 0.10 0.14 0.09 0.04
Lane Grp Cap(c), veh/h 132 0 381 283 0 489 963 0 0 1076 0 0
V/C Ratio(X) 0.09 0.00 0.75 0.55 0.00 0.91 0.50 0.00 0.00 0.73 0.00 0.00
Avail Cap(c_a), veh/h 209 0 476 283 0 510 963 0 0 1076 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 33.8 0.0 40.1 29.7 0.0 38.3 13.1 0.0 0.0 16.5 0.0 0.0
Incr Delay (d2), s/veh 0.3 0.0 5.0 2.4 0.0 20.5 1.9 0.0 0.0 4.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 8.6 3.7 0.0 16.0 9.0 0.0 0.0 19.1 0.0 0.0
LnGrp Delay(d),s/veh 34.1 0.0 45.1 32.1 0.0 58.8 15.0 0.0 0.0 20.9 0.0 0.0
LnGrp LOS C D C E B C
Approach Vol, veh/h 297 604 483 785
Approach Delay, s/veh 44.7 51.8 15.0 20.9
Approach LOS D D B C
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 68.1 13.0 28.9 68.1 6.2 35.7
Change Period (Y+Rc), s * 5 5.0 5.5 5.0 5.0 5.5
Max Green Setting (Gmax), s * 58 8.0 29.5 57.0 6.0 31.5
Max Q Clear Time (g_c+I1), s 36.3 9.2 19.1 18.8 2.6 29.5
Green Ext Time (p_c), s 5.7 0.0 2.0 6.3 0.0 0.6
Intersection Summary
HCM 2010 Ctrl Delay 31.4
HCM 2010 LOS C
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
HCM 2010 Signalized Intersection Summary Intersection #11
Water Edge TIS 11: Lemay Avenue & Vine Drive
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 20 295 110 105 220 145 70 740 220 115 485 40
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1824 1824 1863 1830 1824 1824 1863 1824 1824 1937 1824
Adj Flow Rate, veh/h 23 343 128 122 256 169 81 860 256 134 564 47
Adj No. of Lanes 110110010010
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 255255222222
Cap, veh/h 112 280 104 163 261 172 92 832 243 118 467 37
Arrive On Green 0.03 0.22 0.21 0.06 0.25 0.24 0.75 0.76 0.75 0.75 0.76 0.75
Sat Flow, veh/h 1774 1267 473 1774 1030 680 80 1097 320 109 616 49
Grp Volume(v), veh/h 23 0 471 122 0 425 1197 0 0 745 0 0
Grp Sat Flow(s),veh/h/ln 1774 0 1740 1774 0 1710 1497 0 0 774 0 0
Q Serve(g_s), s 1.2 0.0 26.5 6.3 0.0 29.6 0.5 0.0 0.0 0.5 0.0 0.0
Cycle Q Clear(g_c), s 1.2 0.0 26.5 6.3 0.0 29.6 90.0 0.0 0.0 90.0 0.0 0.0
Prop In Lane 1.00 0.27 1.00 0.40 0.07 0.21 0.18 0.06
Lane Grp Cap(c), veh/h 112 0 384 163 0 433 1155 0 0 616 0 0
V/C Ratio(X) 0.21 0.00 1.23 0.75 0.00 0.98 1.04 0.00 0.00 1.21 0.00 0.00
Avail Cap(c_a), veh/h 169 0 384 163 0 433 1155 0 0 616 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 37.3 0.0 46.9 35.4 0.0 44.8 14.2 0.0 0.0 11.8 0.0 0.0
Incr Delay (d2), s/veh 0.9 0.0 122.6 17.0 0.0 38.9 36.4 0.0 0.0 108.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.6 0.0 25.8 3.8 0.0 18.7 11.7 0.0 0.0 39.2 0.0 0.0
LnGrp Delay(d),s/veh 38.2 0.0 169.5 52.4 0.0 83.7 50.7 0.0 0.0 120.6 0.0 0.0
LnGrp LOS D F D F F F
Approach Vol, veh/h 494 547 1197 745
Approach Delay, s/veh 163.4 76.7 50.7 120.6
Approach LOS F E D F
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 95.5 11.0 31.0 95.5 7.1 34.9
Change Period (Y+Rc), s * 5 5.0 5.5 5.0 5.0 5.5
Max Green Setting (Gmax), s * 74 6.0 25.5 73.0 6.0 25.5
Max Q Clear Time (g_c+I1), s 92.0 8.3 28.5 92.0 3.2 31.6
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 91.6
HCM 2010 LOS F
Notes
User approved pedestrian interval to be less than phase max green.
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2021 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 14
Intersection LOS B
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 40 90 145 0 155 200 10 0 100 90 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 43 98 158 0 168 217 11 0 109 98 27
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 12.6 16.7 12.9
HCM LOS B C B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 47% 15% 42% 5%
Vol Thru, % 42% 33% 55% 32%
Vol Right, % 12% 53% 3% 63%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 215 275 365 95
LT Vol 100 40 155 5
Through Vol 90 90 200 30
RT Vol 25 145 10 60
Lane Flow Rate 234 299 397 103
Geometry Grp 1111
Degree of Util (X) 0.391 0.442 0.606 0.17
Departure Headway (Hd) 6.018 5.32 5.5 5.942
Convergence, Y/N Yes Yes Yes Yes
Cap 594 673 655 598
Service Time 4.091 3.388 3.562 4.032
HCM Lane V/C Ratio 0.394 0.444 0.606 0.172
HCM Control Delay 12.9 12.6 16.7 10.3
HCM Lane LOS B B C B
HCM 95th-tile Q 1.9 2.3 4.1 0.6
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2021 No Action AM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 5 30 60
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 5 33 65
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 10.3
HCM LOS B
Lane
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2021 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 40
Intersection LOS E
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 70 225 100 0 75 160 15 0 120 235 80
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 76 245 109 0 82 174 16 0 130 255 87
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 44.1 22.8 55.5
HCM LOS E C F
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 28% 18% 30% 5%
Vol Thru, % 54% 57% 64% 71%
Vol Right, % 18% 25% 6% 24%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 435 395 250 190
LT Vol 120 70 75 10
Through Vol 235 225 160 135
RT Vol 80 100 15 45
Lane Flow Rate 473 429 272 207
Geometry Grp 1111
Degree of Util (X) 0.946 0.881 0.607 0.469
Departure Headway (Hd) 7.361 7.385 8.035 8.174
Convergence, Y/N Yes Yes Yes Yes
Cap 496 494 448 440
Service Time 5.361 5.42 6.079 6.232
HCM Lane V/C Ratio 0.954 0.868 0.607 0.47
HCM Control Delay 55.5 44.1 22.8 18.3
HCM Lane LOS F E C C
HCM 95th-tile Q 11.6 9.6 3.9 2.4
HCM 2010 AWSC Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2021 No Action PM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 10 135 45
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 11 147 49
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 18.3
HCM LOS C
Lane
Waters’ Edge West Traffic Impact Analysis
Appendix F
APPENDIX F TRAFFIC ANALYSIS WORKSHEETS –
YEAR 2040 BACKGROUND CONDITIONS
HCM 2010 TWSC Intersection #1
Water Edge TIS 1: SH 1 & Douglas Road (CR 54)
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 6.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 85 85 60 45 70 5 20 115 20 30 395 230
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 92 92 65 49 76 5 22 125 22 33 429 250
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 715 685 429 752 674 136 429 0 0 147 0 0
Stage 1 495 495 - 179 179 - - - - - - -
Stage 2 220 190 - 573 495 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 346 371 626 327 376 913 1130 - - 1435 - -
Stage 1 556 546 - 823 751 - - - - - - -
Stage 2 782 743 - 505 546 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 279 355 626 227 360 913 1130 - - 1435 - -
Mov Cap-2 Maneuver 279 355 - 227 360 - - - - - - -
Stage 1 545 533 - 807 736 - - - - - - -
Stage 2 683 729 - 365 533 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 20.3 20.2 1.1 0.3
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1130 - - 279 432 227 375 1435 - -
HCM Lane V/C Ratio 0.019 - - 0.331 0.365 0.215 0.217 0.023 - -
HCM Control Delay (s) 8.2 - - 24.2 18 25.2 17.2 7.6 - -
HCM Lane LOS A - - CCDCA--
HCM 95th %tile Q(veh) 0.1 - - 1.4 1.6 0.8 0.8 0.1 - -
HCM 2010 TWSC Intersection #1
Water Edge TIS 1: SH 1 & Douglas Road (CR 54)
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 12.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 115 55 65 40 65 20 85 415 80 15 205 100
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 125 60 71 43 71 22 92 451 87 16 223 109
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 981 978 223 1000 934 495 223 0 0 538 0 0
Stage 1 255 255 - 679 679 - - - - - - -
Stage 2 726 723 - 321 255 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 229 250 817 222 266 575 1346 - - 1030 - -
Stage 1 749 696 - 441 451 - - - - - - -
Stage 2 416 431 - 691 696 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 161 229 817 152 244 575 1346 - - 1030 - -
Mov Cap-2 Maneuver 161 229 - 152 244 - - - - - - -
Stage 1 698 685 - 411 420 - - - - - - -
Stage 2 310 402 - 567 685 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 48.6 28.4 1.2 0.4
HCM LOS E D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1346 - - 161 375 152 282 1030 - -
HCM Lane V/C Ratio 0.069 - - 0.776 0.348 0.286 0.328 0.016 - -
HCM Control Delay (s) 7.9 - - 78.8 19.6 37.9 23.9 8.6 - -
HCM Lane LOS A - - F C E C A - -
HCM 95th %tile Q(veh) 0.2 - - 5 1.5 1.1 1.4 0 - -
HCM 2010 TWSC Intersection #2
Water Edge TIS 2: Hearthfire Drive & Douglas Road (CR 54)
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.2
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 120 5 5 75 40 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 130 5 5 82 43 16
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 130 0 222 130
Stage 1 - - - - 130 -
Stage 2 - - - - 92 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1455 - 766 920
Stage 1 - - - - 896 -
Stage 2 - - - - 932 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1455 - 763 920
Mov Cap-2 Maneuver - - - - 763 -
Stage 1 - - - - 896 -
Stage 2 - - - - 929 -
Approach EB WB NB
HCM Control Delay, s 0 0.5 9.9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 800 - - 1455 -
HCM Lane V/C Ratio 0.075 - - 0.004 -
HCM Control Delay (s) 9.9 - - 7.5 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 2010 TWSC Intersection #2
Water Edge TIS 2: Hearthfire Drive & Douglas Road (CR 54)
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 0.9
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 115 45 5 120 20 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 125 49 5 130 22 5
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 125 0 266 125
Stage 1 - - - - 125 -
Stage 2 - - - - 141 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1462 - 723 926
Stage 1 - - - - 901 -
Stage 2 - - - - 886 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1462 - 721 926
Mov Cap-2 Maneuver - - - - 721 -
Stage 1 - - - - 901 -
Stage 2 - - - - 883 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 10
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 754 - - 1462 -
HCM Lane V/C Ratio 0.036 - - 0.004 -
HCM Control Delay (s) 10 - - 7.5 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 2010 TWSC Intersection #3
Water Edge TIS 3: Hearthfire Drive & Morningstar Way
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.4
Movement NWL NWR NET NER SWL SWT
Vol, veh/h 15 10 15 25 5 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 11 16 27 5 5
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 46 30 0 0 43 0
Stage 1 30 - - - - -
Stage 2 16 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 964 1044 - - 1566 -
Stage 1 993 - - - - -
Stage 2 1007 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 961 1044 - - 1566 -
Mov Cap-2 Maneuver 961 - - - - -
Stage 1 993 - - - - -
Stage 2 1004 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.7 0 3.7
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 993 1566 -
HCM Lane V/C Ratio - - 0.027 0.003 -
HCM Control Delay (s) - - 8.7 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Intersection #3
Water Edge TIS 3: Hearthfire Drive & Morningstar Way
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.5
Movement NWL NWR NET NER SWL SWT
Vol, veh/h 20 10 10 10 10 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 22 11 11 11 11 16
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 54 16 0 0 22 0
Stage 1 16 - - - - -
Stage 2 38 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 954 1063 - - 1593 -
Stage 1 1007 - - - - -
Stage 2 984 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 947 1063 - - 1593 -
Mov Cap-2 Maneuver 947 - - - - -
Stage 1 1007 - - - - -
Stage 2 977 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.8 0 2.9
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 983 1593 -
HCM Lane V/C Ratio - - 0.033 0.007 -
HCM Control Delay (s) - - 8.8 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Intersection #4
Water Edge TIS 4: Turnberry Road & Douglas Road (CR 54)
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 10 95 55 15 30 5 35 5 15 5 5 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 103 60 16 33 5 38 5 16 5 5 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 38 0 0 163 0 0 231 226 133 234 253 35
Stage 1 - - - - - - 155 155 - 68 68 -
Stage 2 - - - - - - 76 71 - 166 185 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1572 - - 1416 - - 724 673 916 721 650 1038
Stage 1 - - - - - - 847 769 - 942 838 -
Stage 2 - - - - - - 933 836 - 836 747 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1572 - - 1416 - - 701 660 916 693 637 1038
Mov Cap-2 Maneuver - - - - - - 701 660 - 693 637 -
Stage 1 - - - - - - 840 763 - 934 828 -
Stage 2 - - - - - - 906 826 - 809 741 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 2.3 10.3 9.6
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 744 1572 - - 1416 - - 810
HCM Lane V/C Ratio 0.08 0.007 - - 0.012 - - 0.027
HCM Control Delay (s) 10.3 7.3 0 - 7.6 0 - 9.6
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.3 0 - - 0 - - 0.1
HCM 2010 TWSC Intersection #4
Water Edge TIS 4: Turnberry Road & Douglas Road (CR 54)
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 65 50 25 85 5 45 5 30 5 5 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 71 54 27 92 5 49 5 33 5 5 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 98 0 0 125 0 0 264 261 98 277 285 95
Stage 1 - - - - - - 109 109 - 149 149 -
Stage 2 - - - - - - 155 152 - 128 136 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1495 - - 1462 - - 689 644 958 675 624 962
Stage 1 - - - - - - 896 805 - 854 774 -
Stage 2 - - - - - - 847 772 - 876 784 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1495 - - 1462 - - 668 629 958 636 609 962
Mov Cap-2 Maneuver - - - - - - 668 629 - 636 609 -
Stage 1 - - - - - - 892 802 - 851 759 -
Stage 2 - - - - - - 819 757 - 837 781 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 1.6 10.4 10.2
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 750 1495 - - 1462 - - 705
HCM Lane V/C Ratio 0.116 0.004 - - 0.019 - - 0.023
HCM Control Delay (s) 10.4 7.4 0 - 7.5 0 - 10.2
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.4 0 - - 0.1 - - 0.1
HCM 2010 TWSC Intersection #5
Water Edge TIS 5: Turnberry Road & Brightwater Drive
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 55 40 5 5 20 35 5 5 80 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 60 43 5 5 22 38 5 5 87 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 191 188 90 187 187 41 92 0 0 43 0 0
Stage 1 101 101 - 84 84 - - - - - - -
Stage 2 90 87 - 103 103 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 769 707 968 774 708 1030 1503 - - 1566 - -
Stage 1 905 811 - 924 825 - - - - - - -
Stage 2 917 823 - 903 810 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 750 695 968 712 696 1030 1503 - - 1566 - -
Mov Cap-2 Maneuver 750 695 - 712 696 - - - - - - -
Stage 1 892 809 - 910 813 - - - - - - -
Stage 2 893 811 - 839 808 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.2 10.3 2.5 0.4
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1503 - - 721 968 733 1566 - -
HCM Lane V/C Ratio 0.014 - - 0.015 0.062 0.074 0.003 - -
HCM Control Delay (s) 7.4 - - 10.1 9 10.3 7.3 0 -
HCM Lane LOS A - - BABAA-
HCM 95th %tile Q(veh) 0 - - 0 0.2 0.2 0 - -
HCM 2010 TWSC Intersection #5
Water Edge TIS 5: Turnberry Road & Brightwater Drive
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 20 15 5 10 45 75 25 5 70 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 22 16 5 11 49 82 27 5 76 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 291 297 79 285 285 95 82 0 0 109 0 0
Stage 1 90 90 - 193 193 - - - - - - -
Stage 2 201 207 - 92 92 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 661 615 981 667 624 962 1515 - - 1481 - -
Stage 1 917 820 - 809 741 - - - - - - -
Stage 2 801 731 - 915 819 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 631 593 981 630 601 962 1515 - - 1481 - -
Mov Cap-2 Maneuver 631 593 - 630 601 - - - - - - -
Stage 1 887 817 - 783 717 - - - - - - -
Stage 2 761 707 - 885 816 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.5 10.4 2.3 0.5
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1515 - - 611 981 705 1481 - -
HCM Lane V/C Ratio 0.032 - - 0.018 0.022 0.046 0.004 - -
HCM Control Delay (s) 7.5 - - 11 8.8 10.4 7.4 0 -
HCM Lane LOS A - - BABAA-
HCM 95th %tile Q(veh) 0.1 - - 0.1 0.1 0.1 0 - -
HCM 2010 TWSC Intersection #6
Water Edge TIS 6: Turnberry Road & Richards Lake Road (CR 52)
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 10 5 30 60 5 5 10 80 15 5 250 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 5 33 65 5 5 11 87 16 5 272 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 399 394 274 397 397 87 277 0 0 87 0 0
Stage 1 285 285 - 109 109 - - - - - - -
Stage 2 114 109 - 288 288 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 561 542 765 563 540 971 1286 - - 1509 - -
Stage 1 722 676 - 896 805 - - - - - - -
Stage 2 891 805 - 720 674 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 549 536 765 530 534 971 1286 - - 1509 - -
Mov Cap-2 Maneuver 549 536 - 530 534 - - - - - - -
Stage 1 716 674 - 888 798 - - - - - - -
Stage 2 872 798 - 681 672 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.5 12.4 0.7 0.1
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1286 - - 545 765 530 689 1509 - -
HCM Lane V/C Ratio 0.008 - - 0.03 0.043 0.123 0.016 0.004 - -
HCM Control Delay (s) 7.8 - - 11.8 9.9 12.7 10.3 7.4 - -
HCM Lane LOS A - - BABBA--
HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0.4 0 0 - -
HCM 2010 TWSC Intersection #6
Water Edge TIS 6: Turnberry Road & Richards Lake Road (CR 52)
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 2.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 5 5 10 40 5 15 20 190 55 10 130 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 11 43 5 16 22 207 60 11 141 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 427 416 144 418 418 207 147 0 0 207 0 0
Stage 1 166 166 - 250 250 - - - - - - -
Stage 2 261 250 - 168 168 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 538 527 903 545 526 833 1435 - - 1364 - -
Stage 1 836 761 - 754 700 - - - - - - -
Stage 2 744 700 - 834 759 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 514 515 903 525 514 833 1435 - - 1364 - -
Mov Cap-2 Maneuver 514 515 - 525 514 - - - - - - -
Stage 1 823 755 - 742 689 - - - - - - -
Stage 2 713 689 - 811 753 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10.6 11.7 0.6 0.5
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1435 - - 514 903 525 721 1364 - -
HCM Lane V/C Ratio 0.015 - - 0.021 0.012 0.083 0.03 0.008 - -
HCM Control Delay (s) 7.5 - - 12.2 9 12.5 10.1 7.7 - -
HCM Lane LOS A - - BABBA--
HCM 95th %tile Q(veh) 0 - - 0.1 0 0.3 0.1 0 - -
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 21.6
Intersection LOS C
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 10 140 105 0 320 155 5 0 25 55 65
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 11 152 114 0 348 168 5 0 27 60 71
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 13.9 31.6 12.4
HCM LOS B D B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 17% 4% 67% 13%
Vol Thru, % 38% 55% 32% 82%
Vol Right, % 45% 41% 1% 5%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 145 255 480 195
LT Vol 25 10 320 25
Through Vol 55 140 155 160
RT Vol 65 105 5 10
Lane Flow Rate 158 277 522 212
Geometry Grp 1111
Degree of Util (X) 0.29 0.458 0.834 0.393
Departure Headway (Hd) 6.626 5.954 5.892 6.683
Convergence, Y/N Yes Yes Yes Yes
Cap 544 607 621 540
Service Time 4.655 3.984 3.892 4.709
HCM Lane V/C Ratio 0.29 0.456 0.841 0.393
HCM Control Delay 12.4 13.9 31.6 14
HCM Lane LOS B B D B
HCM 95th-tile Q 1.2 2.4 8.9 1.9
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2040 No Action AM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 25 160 10
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 27 174 11
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 14
HCM LOS B
Lane
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 46
Intersection LOS E
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Vol, veh/h 0 10 285 70 0 165 170 30 0 110 145 305
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 11 310 76 0 179 185 33 0 120 158 332
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 34.1 36.2 65.9
HCM LOS D E F
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 20% 3% 45% 19%
Vol Thru, % 26% 78% 47% 76%
Vol Right, % 54% 19% 8% 5%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 560 365 365 105
LT Vol 110 10 165 20
Through Vol 145 285 170 80
RT Vol 305 70 30 5
Lane Flow Rate 609 397 397 114
Geometry Grp 1111
Degree of Util (X) 1 0.804 0.819 0.273
Departure Headway (Hd) 6.885 7.3 7.429 8.609
Convergence, Y/N Yes Yes Yes Yes
Cap 523 496 488 417
Service Time 4.958 5.347 5.473 6.688
HCM Lane V/C Ratio 1.164 0.8 0.814 0.273
HCM Control Delay 65.9 34.1 36.2 14.9
HCM Lane LOS F D E B
HCM 95th-tile Q 13.9 7.6 7.9 1.1
HCM 2010 AWSC Intersection #7
Water Edge TIS 7: Lemay Avenue & Country Club Road
2040 No Action PM Synchro 8 Report
2/3/2016 Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Vol, veh/h 0 20 80 5
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 22 87 5
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 14.9
HCM LOS B
Lane
HCM 2010 TWSC Intersection #8
Water Edge TIS 8: Turnberry Road & Country Club Road
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 65 10 190 25 40 5 55 55 10 5 265 315
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 71 11 207 27 43 5 60 60 11 5 288 342
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 508 489 288 489 484 65 288 0 0 71 0 0
Stage 1 299 299 - 185 185 - - - - - - -
Stage 2 209 190 - 304 299 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 475 480 751 489 483 999 1274 - - 1529 - -
Stage 1 710 666 - 817 747 - - - - - - -
Stage 2 793 743 - 705 666 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 422 456 751 335 459 999 1274 - - 1529 - -
Mov Cap-2 Maneuver 422 456 - 335 459 - - - - - - -
Stage 1 677 664 - 779 712 - - - - - - -
Stage 2 706 708 - 501 664 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.7 15.5 3.7 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1274 - - 426 751 420 1529 - -
HCM Lane V/C Ratio 0.047 - - 0.191 0.275 0.181 0.004 - -
HCM Control Delay (s) 8 - - 15.4 11.6 15.5 7.4 - -
HCM Lane LOS A - - C B C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.7 1.1 0.7 0 - -
HCM 2010 TWSC Intersection #8
Water Edge TIS 8: Turnberry Road & Country Club Road
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 65.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Vol, veh/h 235 60 60 5 15 5 210 235 30 5 110 170
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 255 65 65 5 16 5 228 255 33 5 120 185
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 869 875 120 891 858 272 120 0 0 288 0 0
Stage 1 130 130 - 728 728 - - - - - - -
Stage 2 739 745 - 163 130 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 272 288 931 263 294 767 1468 - - 1274 - -
Stage 1 874 789 - 415 429 - - - - - - -
Stage 2 409 421 - 839 789 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 226 242 931 171 247 767 1468 - - 1274 - -
Mov Cap-2 Maneuver ~ 226 242 - 171 247 - - - - - - -
Stage 1 738 786 - 351 362 - - - - - - -
Stage 2 328 356 - 713 786 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 205.1 20.5 3.5 0.1
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1468 - - 229 931 259 1274 - -
HCM Lane V/C Ratio 0.155 - - 1.4 0.07 0.105 0.004 - -
HCM Control Delay (s) 7.9 - - 245 9.2 20.5 7.8 - -
HCM Lane LOS A - - F A C A - -
HCM 95th %tile Q(veh) 0.6 - - 18.1 0.2 0.3 0 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 2010 AWSC Intersection #9
Water Edge TIS 9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 16.7
Intersection LOS C
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Vol, veh/h 0 10 35 0 10 130 0 520 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 38 0 11 141 0 565 5
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 9.1 9.2 19.3
HCM LOS A A C
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 22% 0% 99%
Vol Thru, % 78% 7% 0%
Vol Right, % 0% 93% 1%
Sign Control Stop Stop Stop
Traffic Vol by Lane 45 140 525
LT Vol 10 0 520
Through Vol 35 10 0
RT Vol 0 130 5
Lane Flow Rate 49 152 571
Geometry Grp 1 1 1
Degree of Util (X) 0.076 0.205 0.732
Departure Headway (Hd) 5.59 4.847 4.62
Convergence, Y/N Yes Yes Yes
Cap 637 737 782
Service Time 3.658 2.9 2.666
HCM Lane V/C Ratio 0.077 0.206 0.73
HCM Control Delay 9.1 9.2 19.3
HCM Lane LOS A A C
HCM 95th-tile Q 0.2 0.8 6.5
HCM 2010 AWSC Intersection #9
Water Edge TIS 9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Intersection Delay, s/veh 12.5
Intersection LOS B
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Vol, veh/h 0 15 20 0 35 425 0 240 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 16 22 0 38 462 0 261 27
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.8 13.1 12
HCM LOS A B B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 43% 0% 91%
Vol Thru, % 57% 8% 0%
Vol Right, % 0% 92% 9%
Sign Control Stop Stop Stop
Traffic Vol by Lane 35 460 265
LT Vol 15 0 240
Through Vol 20 35 0
RT Vol 0 425 25
Lane Flow Rate 38 500 288
Geometry Grp 1 1 1
Degree of Util (X) 0.057 0.585 0.416
Departure Headway (Hd) 5.354 4.214 5.205
Convergence, Y/N Yes Yes Yes
Cap 663 855 686
Service Time 3.433 2.253 3.291
HCM Lane V/C Ratio 0.057 0.585 0.42
HCM Control Delay 8.8 13.1 12
HCM Lane LOS A B B
HCM 95th-tile Q 0.2 3.9 2.1
HCM 2010 TWSC Intersection #10
Water Edge TIS 10: Timberline Drive & Mountain Vista Drive (CR 50)
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 4.9
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 330 250 165 85 60 80
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 359 272 179 92 65 87
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 630 0 946 495
Stage 1 - - - - 495 -
Stage 2 - - - - 451 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 952 - 290 575
Stage 1 - - - - 613 -
Stage 2 - - - - 642 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 952 - 233 575
Mov Cap-2 Maneuver - - - - 233 -
Stage 1 - - - - 613 -
Stage 2 - - - - 515 -
Approach EB WB NB
HCM Control Delay, s 0 6.4 22.7
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 353 - - 952 -
HCM Lane V/C Ratio 0.431 - - 0.188 -
HCM Control Delay (s) 22.7 - - 9.7 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 2.1 - - 0.7 -
HCM 2010 TWSC Intersection #10
Water Edge TIS 10: Timberline Drive & Mountain Vista Drive (CR 50)
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Intersection
Int Delay, s/veh 67.1
Movement EBT EBR WBL WBT NBL NBR
Vol, veh/h 155 125 150 445 210 190
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 168 136 163 484 228 207
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 304 0 1046 236
Stage 1 - - - - 236 -
Stage 2 - - - - 810 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1257 - 253 803
Stage 1 - - - - 803 -
Stage 2 - - - - 438 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1257 - ~ 208 803
Mov Cap-2 Maneuver - - - - ~ 208 -
Stage 1 - - - - 803 -
Stage 2 - - - - 360 -
Approach EB WB NB
HCM Control Delay, s 0 2.1 210.8
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 321 - - 1257 -
HCM Lane V/C Ratio 1.354 - - 0.13 -
HCM Control Delay (s) 210.8 - - 8.3 0
HCM Lane LOS F - - A A
HCM 95th %tile Q(veh) 21.7 - - 0.4 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 2010 Signalized Intersection Summary Intersection #11
Water Edge TIS 11: Lemay Avenue & Vine Drive
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 15 190 110 165 315 155 50 380 70 75 715 30
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1810 1788 1863 1810 1788 1788 1863 1788 1788 1937 1788
Adj Flow Rate, veh/h 17 221 128 192 366 180 58 442 81 87 831 35
Adj No. of Lanes 121121121121
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 252252222222
Cap, veh/h 247 481 196 376 803 338 365 1822 766 516 1923 777
Arrive On Green 0.03 0.14 0.13 0.12 0.23 0.22 0.03 0.51 0.50 0.04 0.52 0.51
Sat Flow, veh/h 1774 3438 1520 1774 3438 1520 1703 3539 1520 1703 3681 1520
Grp Volume(v), veh/h 17 221 128 192 366 180 58 442 81 87 831 35
Grp Sat Flow(s),veh/h/ln 1774 1719 1520 1774 1719 1520 1703 1770 1520 1703 1840 1520
Q Serve(g_s), s 0.7 5.3 7.2 7.8 8.2 9.4 1.5 6.2 2.5 2.2 12.5 1.0
Cycle Q Clear(g_c), s 0.7 5.3 7.2 7.8 8.2 9.4 1.5 6.2 2.5 2.2 12.5 1.0
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 247 481 196 376 803 338 365 1822 766 516 1923 777
V/C Ratio(X) 0.07 0.46 0.65 0.51 0.46 0.53 0.16 0.24 0.11 0.17 0.43 0.05
Avail Cap(c_a), veh/h 338 745 312 400 936 397 421 1822 766 559 1923 777
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 31.6 35.6 37.3 26.3 29.6 30.9 10.8 12.1 11.7 10.0 13.3 11.0
Incr Delay (d2), s/veh 0.1 0.7 3.7 1.1 0.4 1.3 0.2 0.3 0.3 0.2 0.7 0.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 2.6 3.2 3.9 4.0 4.1 0.7 3.1 1.1 1.0 6.5 0.5
LnGrp Delay(d),s/veh 31.7 36.3 40.9 27.4 30.0 32.1 11.0 12.4 12.0 10.2 14.0 11.1
LnGrp LOS CDDCCCBBBBBB
Approach Vol, veh/h 366 738 581 953
Approach Delay, s/veh 37.7 29.8 12.2 13.5
Approach LOS D C B B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 7.1 51.0 14.8 17.1 7.7 50.3 6.4 25.5
Change Period (Y+Rc), s 4.0 * 5 5.0 5.5 4.0 5.0 5.0 5.5
Max Green Setting (Gmax), s 6.0 * 36 11.0 18.5 6.0 35.0 6.0 23.5
Max Q Clear Time (g_c+I1), s 3.5 14.5 9.8 9.2 4.2 8.2 2.7 11.4
Green Ext Time (p_c), s 0.0 5.9 0.1 2.4 0.0 6.2 0.0 2.7
Intersection Summary
HCM 2010 Ctrl Delay 21.2
HCM 2010 LOS C
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
HCM 2010 Signalized Intersection Summary Intersection #11
Water Edge TIS 11: Lemay Avenue & Vine Drive
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 20 355 135 130 265 175 80 895 265 140 585 50
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1810 1788 1863 1810 1788 1788 1863 1788 1788 1937 1788
Adj Flow Rate, veh/h 23 413 157 151 308 203 93 1041 308 163 680 58
Adj No. of Lanes 121121121121
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 252252222222
Cap, veh/h 269 584 242 285 785 330 426 1725 724 302 1887 762
Arrive On Green 0.03 0.17 0.16 0.09 0.23 0.22 0.05 0.49 0.48 0.07 0.51 0.50
Sat Flow, veh/h 1774 3438 1520 1774 3438 1520 1703 3539 1520 1703 3681 1520
Grp Volume(v), veh/h 23 413 157 151 308 203 93 1041 308 163 680 58
Grp Sat Flow(s),veh/h/ln 1774 1719 1520 1774 1719 1520 1703 1770 1520 1703 1840 1520
Q Serve(g_s), s 0.9 10.2 8.7 6.0 6.8 10.9 2.5 19.2 12.0 4.3 9.9 1.8
Cycle Q Clear(g_c), s 0.9 10.2 8.7 6.0 6.8 10.9 2.5 19.2 12.0 4.3 9.9 1.8
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 269 584 242 285 785 330 426 1725 724 302 1887 762
V/C Ratio(X) 0.09 0.71 0.65 0.53 0.39 0.61 0.22 0.60 0.43 0.54 0.36 0.08
Avail Cap(c_a), veh/h 353 688 287 285 785 330 463 1725 724 390 1887 762
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 29.2 35.2 35.5 26.4 29.4 31.8 11.3 16.8 15.5 13.7 13.1 11.6
Incr Delay (d2), s/veh 0.1 5.9 10.5 1.8 1.2 7.0 0.3 1.6 1.8 1.5 0.5 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 5.3 4.4 3.0 3.4 5.2 1.2 9.8 5.3 2.1 5.1 0.8
LnGrp Delay(d),s/veh 29.3 41.1 46.0 28.3 30.6 38.8 11.5 18.3 17.3 15.2 13.7 11.8
LnGrp LOS CDDCCDBBBBBB
Approach Vol, veh/h 593 662 1442 901
Approach Delay, s/veh 41.9 32.6 17.7 13.8
Approach LOS D C B B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.1 50.1 12.0 19.8 10.3 47.9 6.7 25.1
Change Period (Y+Rc), s 4.0 * 5 5.0 5.5 4.0 5.0 5.0 5.5
Max Green Setting (Gmax), s 6.0 * 41 7.0 17.0 11.0 35.5 6.0 18.0
Max Q Clear Time (g_c+I1), s 4.5 11.9 8.0 12.2 6.3 21.2 2.9 12.9
Green Ext Time (p_c), s 0.0 24.7 0.0 2.1 0.2 13.0 0.0 3.7
Intersection Summary
HCM 2010 Ctrl Delay 23.5
HCM 2010 LOS C
Notes
* HCM 2010 computational engine requires equal clearance times for the phases crossing the barrier.
HCM 2010 Signalized Intersection Summary Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 50 110 175 185 240 10 120 110 30 5 35 75
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 54 120 190 201 261 11 130 120 33 5 38 82
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 117 257 358 279 319 13 378 337 87 53 265 527
Arrive On Green 0.43 0.43 0.43 0.43 0.43 0.43 0.48 0.48 0.48 0.48 0.48 0.48
Sat Flow, veh/h 166 603 840 520 749 30 659 695 179 23 548 1088
Grp Volume(v), veh/h 364 0 0 473 0 0 283 0 0 125 0 0
Grp Sat Flow(s),veh/h/ln 1608 0 0 1299 0 0 1533 0 0 1659 0 0
Q Serve(g_s), s 0.0 0.0 0.0 16.3 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 14.3 0.0 0.0 30.6 0.0 0.0 9.8 0.0 0.0 3.8 0.0 0.0
Prop In Lane 0.15 0.52 0.42 0.02 0.46 0.12 0.04 0.66
Lane Grp Cap(c), veh/h 732 0 0 611 0 0 802 0 0 846 0 0
V/C Ratio(X) 0.50 0.00 0.00 0.77 0.00 0.00 0.35 0.00 0.00 0.15 0.00 0.00
Avail Cap(c_a), veh/h 951 0 0 808 0 0 802 0 0 846 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 18.8 0.0 0.0 24.2 0.0 0.0 14.3 0.0 0.0 12.9 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.0 0.0 3.4 0.0 0.0 1.2 0.0 0.0 0.4 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.7 0.0 0.0 11.2 0.0 0.0 4.6 0.0 0.0 1.8 0.0 0.0
LnGrp Delay(d),s/veh 19.4 0.0 0.0 27.6 0.0 0.0 15.5 0.0 0.0 13.3 0.0 0.0
LnGrp LOS B C B B
Approach Vol, veh/h 364 473 283 125
Approach Delay, s/veh 19.4 27.6 15.5 13.3
Approach LOS B C B B
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 47.6 42.4 47.6 42.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 51.0 31.0 51.0
Max Q Clear Time (g_c+I1), s 11.8 16.3 5.8 32.6
Green Ext Time (p_c), s 2.5 7.0 2.7 5.8
Intersection Summary
HCM 2010 Ctrl Delay 21.0
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2040 No Action AM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 50 110 175 185 240 10 120 110 30 5 35 75
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 54 120 190 201 261 11 130 120 33 5 38 82
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 117 257 358 279 319 13 378 337 87 53 265 527
Arrive On Green 0.43 0.43 0.43 0.43 0.43 0.43 0.48 0.48 0.48 0.48 0.48 0.48
Sat Flow, veh/h 166 603 840 520 749 30 659 695 179 23 548 1088
Grp Volume(v), veh/h 364 0 0 473 0 0 283 0 0 125 0 0
Grp Sat Flow(s),veh/h/ln 1608 0 0 1299 0 0 1533 0 0 1659 0 0
Q Serve(g_s), s 0.0 0.0 0.0 16.3 0.0 0.0 6.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 14.3 0.0 0.0 30.6 0.0 0.0 9.8 0.0 0.0 3.8 0.0 0.0
Prop In Lane 0.15 0.52 0.42 0.02 0.46 0.12 0.04 0.66
Lane Grp Cap(c), veh/h 732 0 0 611 0 0 802 0 0 846 0 0
V/C Ratio(X) 0.50 0.00 0.00 0.77 0.00 0.00 0.35 0.00 0.00 0.15 0.00 0.00
Avail Cap(c_a), veh/h 951 0 0 808 0 0 802 0 0 846 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 18.8 0.0 0.0 24.2 0.0 0.0 14.3 0.0 0.0 12.9 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.0 0.0 3.4 0.0 0.0 1.2 0.0 0.0 0.4 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.7 0.0 0.0 11.2 0.0 0.0 4.6 0.0 0.0 1.8 0.0 0.0
LnGrp Delay(d),s/veh 19.4 0.0 0.0 27.6 0.0 0.0 15.5 0.0 0.0 13.3 0.0 0.0
LnGrp LOS B C B B
Approach Vol, veh/h 364 473 283 125
Approach Delay, s/veh 19.4 27.6 15.5 13.3
Approach LOS B C B B
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 47.6 42.4 47.6 42.4
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 31.0 51.0 31.0 51.0
Max Q Clear Time (g_c+I1), s 11.8 16.3 5.8 32.6
Green Ext Time (p_c), s 2.5 7.0 2.7 5.8
Intersection Summary
HCM 2010 Ctrl Delay 21.0
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Intersection #12
Water Edge TIS 12: Vine Drive & Timberline Drive
2040 No Action PM Synchro 8 Report
2/3/2016 Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Volume (veh/h) 85 270 120 90 195 15 145 280 95 10 160 55
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 92 293 130 98 212 16 158 304 103 11 174 60
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 130 352 147 155 313 21 264 481 155 59 696 231
Arrive On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.54 0.54 0.54 0.54 0.54 0.54
Sat Flow, veh/h 222 941 393 275 837 57 397 894 288 32 1296 431
Grp Volume(v), veh/h 515 0 0 326 0 0 565 0 0 245 0 0
Grp Sat Flow(s),veh/h/ln 1556 0 0 1169 0 0 1579 0 0 1758 0 0
Q Serve(g_s), s 6.0 0.0 0.0 0.0 0.0 0.0 15.6 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 28.2 0.0 0.0 22.2 0.0 0.0 22.2 0.0 0.0 6.6 0.0 0.0
Prop In Lane 0.18 0.25 0.30 0.05 0.28 0.18 0.04 0.24
Lane Grp Cap(c), veh/h 629 0 0 489 0 0 900 0 0 987 0 0
V/C Ratio(X) 0.82 0.00 0.00 0.67 0.00 0.00 0.63 0.00 0.00 0.25 0.00 0.00
Avail Cap(c_a), veh/h 707 0 0 559 0 0 900 0 0 987 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 26.2 0.0 0.0 23.4 0.0 0.0 14.5 0.0 0.0 11.2 0.0 0.0
Incr Delay (d2), s/veh 6.9 0.0 0.0 2.5 0.0 0.0 3.3 0.0 0.0 0.6 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 13.2 0.0 0.0 7.4 0.0 0.0 10.7 0.0 0.0 3.4 0.0 0.0
LnGrp Delay(d),s/veh 33.1 0.0 0.0 25.9 0.0 0.0 17.8 0.0 0.0 11.8 0.0 0.0
LnGrp LOS C C B B
Approach Vol, veh/h 515 326 565 245
Approach Delay, s/veh 33.1 25.9 17.8 11.8
Approach LOS C C B B
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 52.4 37.6 52.4 37.6
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 44.0 38.0 44.0 38.0
Max Q Clear Time (g_c+I1), s 24.2 30.2 8.6 24.2
Green Ext Time (p_c), s 5.6 3.5 6.6 5.0
Intersection Summary
HCM 2010 Ctrl Delay 23.3
HCM 2010 LOS C
Waters’ Edge West Traffic Impact Analysis
Appendix G
APPENDIX G TRAFFIC ANALYSIS WORKSHEETS –
YEAR 2021 BUILD-OUT CONDITIONS
HCM 2010 TWSC Waters'Edge West Build-Out
1: SH 1 & Douglas Road (CR 54) 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 5.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 70 75 50 45 65 10 20 95 20 25 330 190
Future Vol, veh/h 70 75 50 45 65 10 20 95 20 25 330 190
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 76 82 54 49 71 11 22 103 22 27 359 207
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 611 581 359 639 571 114 359 0 0 125 0 0
Stage 1 413 413 - 158 158 - - - - - - -
Stage 2 198 168 - 481 413 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 406 425 685 389 431 939 1200 - - 1462 - -
Stage 1 616 594 - 844 767 - - - - - - -
Stage 2 804 759 - 566 594 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 339 410 685 295 415 939 1200 - - 1462 - -
Mov Cap-2 Maneuver 339 410 - 295 415 - - - - - - -
Stage 1 605 583 - 829 753 - - - - - - -
Stage 2 707 745 - 440 583 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 16.5 16.6 1.2 0.3
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1200 - - 339 488 295 448 1462 - -
HCM Lane V/C Ratio 0.018 - - 0.224 0.278 0.166 0.182 0.019 - -
HCM Control Delay (s) 8.1 - - 18.7 15.2 19.6 14.8 7.5 - -
HCM Lane LOS A - - C C C B A - -
HCM 95th %tile Q(veh) 0.1 - - 0.8 1.1 0.6 0.7 0.1 - -
HCM 2010 TWSC Waters' Edge Build-Out
1: SH 1 & Douglas Road (CR 54) 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 7.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 95 55 55 40 60 15 70 340 70 20 170 85
Future Vol, veh/h 95 55 55 40 60 15 70 340 70 20 170 85
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 103 60 60 43 65 16 76 370 76 22 185 92
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 829 826 185 848 788 408 185 0 0 446 0 0
Stage 1 228 228 - 560 560 - - - - - - -
Stage 2 601 598 - 288 228 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 290 307 857 281 323 643 1390 - - 1114 - -
Stage 1 775 715 - 513 511 - - - - - - -
Stage 2 487 491 - 720 715 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 222 284 857 207 299 643 1390 - - 1114 - -
Mov Cap-2 Maneuver 222 284 - 207 299 - - - - - - -
Stage 1 733 701 - 485 483 - - - - - - -
Stage 2 388 464 - 601 701 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 25 21.9 1.1 0.6
HCM LOS D C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1390 - - 222 427 207 335 1114 - -
HCM Lane V/C Ratio 0.055 - - 0.465 0.28 0.21 0.243 0.02 - -
HCM Control Delay (s) 7.7 - - 34.6 16.7 27 19.2 8.3 - -
HCM Lane LOS A - - DCDCA--
HCM 95th %tile Q(veh) 0.2 - - 2.3 1.1 0.8 0.9 0.1 - -
HCM 2010 TWSC Waters'Edge West Build-Out
2: Hearthfire Drive & Douglas Road (CR 54) 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 2.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 105 10 5 70 45 10
Future Vol, veh/h 105 10 5 70 45 10
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 114 11 5 76 49 11
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 114 0 201 114
Stage 1 - - - - 114 -
Stage 2 - - - - 87 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1475 - 788 939
Stage 1 - - - - 911 -
Stage 2 - - - - 936 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1475 - 785 939
Mov Cap-2 Maneuver - - - - 785 -
Stage 1 - - - - 911 -
Stage 2 - - - - 933 -
Approach EB WB NB
HCM Control Delay, s 0 0.5 9.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 809 - - 1475 -
HCM Lane V/C Ratio 0.074 - - 0.004 -
HCM Control Delay (s) 9.8 - - 7.5 -
HCM Lane LOS A - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
HCM 2010 TWSC Waters' Edge Build-Out
2: Hearthfire Drive & Douglas Road (CR 54) 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 105 45 5 105 20 5
Future Vol, veh/h 105 45 5 105 20 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 114 49 5 114 22 5
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 114 0 239 114
Stage 1 - - - - 114 -
Stage 2 - - - - 125 -
Critical Hdwy - - 4.12 - 7.12 6.22
Critical Hdwy Stg 1 - - - - 6.12 -
Critical Hdwy Stg 2 - - - - 6.12 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1475 - 715 939
Stage 1 - - - - 891 -
Stage 2 - - - - 879 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1475 - 713 939
Mov Cap-2 Maneuver - - - - 713 -
Stage 1 - - - - 891 -
Stage 2 - - - - 876 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 10
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 749 - - 1475 -
HCM Lane V/C Ratio 0.036 - - 0.004 -
HCM Control Delay (s) 10 - - 7.5 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 2010 TWSC Waters'Edge West Build-Out
3: Hearthfire Drive & Morningstar Way 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.9
Movement NWL NWR NET NER SWL SWT
Lane Configurations
Traffic Vol, veh/h 10 20 15 25 10 5
Future Vol, veh/h 10 20 15 25 10 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 22 16 27 11 5
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 57 30 0 0 43 0
Stage 1 30 - - - - -
Stage 2 27 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 950 1044 - - 1566 -
Stage 1 993 - - - - -
Stage 2 996 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 943 1044 - - 1566 -
Mov Cap-2 Maneuver 943 - - - - -
Stage 1 993 - - - - -
Stage 2 989 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.7 0 4.9
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 1008 1566 -
HCM Lane V/C Ratio - - 0.032 0.007 -
HCM Control Delay (s) - - 8.7 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Waters' Edge Build-Out
3: Hearthfire Drive & Morningstar Way 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.8
Movement NWL NWR NET NER SWL SWT
Lane Configurations
Traffic Vol, veh/h 15 15 10 10 20 15
Future Vol, veh/h 15 15 10 10 20 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 16 11 11 22 16
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 76 16 0 0 22 0
Stage 1 16 - - - - -
Stage 2 60 - - - - -
Critical Hdwy 7.12 6.22 - - 4.12 -
Critical Hdwy Stg 1 6.12 - - - - -
Critical Hdwy Stg 2 6.12 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 914 1063 - - 1593 -
Stage 1 1004 - - - - -
Stage 2 951 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 904 1063 - - 1593 -
Mov Cap-2 Maneuver 904 - - - - -
Stage 1 1004 - - - - -
Stage 2 938 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.8 0 4.2
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 977 1593 -
HCM Lane V/C Ratio - - 0.033 0.014 -
HCM Control Delay (s) - - 8.8 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Waters'Edge West Build-Out
4: Turnberry Road & Douglas Road (CR 54) 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 80 50 15 25 5 40 5 20 5 5 10
Future Vol, veh/h 10 80 50 15 25 5 40 5 20 5 5 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 87 54 16 27 5 43 5 22 5 5 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 33 0 0 141 0 0 207 201 114 212 226 30
Stage 1 - - - - - - 136 136 - 63 63 -
Stage 2 - - - - - - 71 65 - 149 163 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1579 - - 1442 - - 751 695 939 745 673 1044
Stage 1 - - - - - - 867 784 - 948 842 -
Stage 2 - - - - - - 939 841 - 854 763 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1579 - - 1442 - - 728 682 939 713 660 1044
Mov Cap-2 Maneuver - - - - - - 728 682 - 713 660 -
Stage 1 - - - - - - 860 778 - 940 833 -
Stage 2 - - - - - - 913 832 - 822 757 -
Approach EB WB NB SB
HCM Control Delay, s 0.5 2.5 10.1 9.5
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 778 1579 - - 1442 - - 828
HCM Lane V/C Ratio 0.091 0.007 - - 0.011 - - 0.026
HCM Control Delay (s) 10.1 7.3 0 - 7.5 0 - 9.5
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.3 0 - - 0 - - 0.1
HCM 2010 TWSC Waters' Edge Build-Out
4: Turnberry Road & Douglas Road (CR 54) 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 55 50 30 70 5 40 5 30 5 5 5
Future Vol, veh/h 5 55 50 30 70 5 40 5 30 5 5 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 60 54 33 76 5 43 5 33 5 5 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 82 0 0 114 0 0 247 245 87 261 269 79
Stage 1 - - - - - - 98 98 - 144 144 -
Stage 2 - - - - - - 149 147 - 117 125 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1515 - - 1475 - - 707 657 971 692 637 981
Stage 1 - - - - - - 908 814 - 859 778 -
Stage 2 - - - - - - 854 775 - 888 792 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1515 - - 1475 - - 684 639 971 651 620 981
Mov Cap-2 Maneuver - - - - - - 684 639 - 651 620 -
Stage 1 - - - - - - 904 811 - 856 760 -
Stage 2 - - - - - - 824 757 - 849 789 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 2.1 10.2 10.1
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 772 1515 - - 1475 - - 720
HCM Lane V/C Ratio 0.106 0.004 - - 0.022 - - 0.023
HCM Control Delay (s) 10.2 7.4 0 - 7.5 0 - 10.1
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.4 0 - - 0.1 - - 0.1
HCM 2010 TWSC Waters'Edge West Build-Out
5: Turnberry Road & Brightwater Drive 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 100 35 5 5 40 60 5 5 145 5
Future Vol, veh/h 5 5 100 35 5 5 40 60 5 5 145 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 109 38 5 5 43 65 5 5 158 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 331 329 160 329 329 68 163 0 0 71 0 0
Stage 1 171 171 - 155 155 - - - - - - -
Stage 2 160 158 - 174 174 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 622 590 885 624 590 995 1416 - - 1529 - -
Stage 1 831 757 - 847 769 - - - - - - -
Stage 2 842 767 - 828 755 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 598 570 885 529 570 995 1416 - - 1529 - -
Mov Cap-2 Maneuver 598 570 - 529 570 - - - - - - -
Stage 1 806 755 - 821 746 - - - - - - -
Stage 2 806 744 - 719 753 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.8 12 2.9 0.2
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1416 - - 584 885 563 1529 - -
HCM Lane V/C Ratio 0.031 - - 0.019 0.123 0.087 0.004 - -
HCM Control Delay (s) 7.6 - - 11.3 9.6 12 7.4 - -
HCM Lane LOS A - - BABA--
HCM 95th %tile Q(veh) 0.1 - - 0.1 0.4 0.3 0 - -
HCM 2010 TWSC Waters' Edge Build-Out
5: Turnberry Road & Brightwater Drive 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 50 10 5 10 95 150 20 5 105 5
Future Vol, veh/h 5 5 50 10 5 10 95 150 20 5 105 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 54 11 5 11 103 163 22 5 114 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 517 519 117 510 510 174 120 0 0 185 0 0
Stage 1 128 128 - 380 380 - - - - - - -
Stage 2 389 391 - 130 130 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 469 461 935 474 467 869 1468 - - 1390 - -
Stage 1 876 790 - 642 614 - - - - - - -
Stage 2 635 607 - 874 789 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 433 427 935 417 433 869 1468 - - 1390 - -
Mov Cap-2 Maneuver 433 427 - 417 433 - - - - - - -
Stage 1 815 787 - 597 571 - - - - - - -
Stage 2 578 564 - 815 786 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.9 12.1 2.7 0.3
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1468 - - 430 935 532 1390 - -
HCM Lane V/C Ratio 0.07 - - 0.025 0.058 0.051 0.004 - -
HCM Control Delay (s) 7.6 - - 13.6 9.1 12.1 7.6 - -
HCM Lane LOS A - - BABA--
HCM 95th %tile Q(veh) 0.2 - - 0.1 0.2 0.2 0 - -
HCM 2010 TWSC Waters'Edge West Build-Out
6: Turnberry Road & Richards Lake Road (CR 52) 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 2.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 25 50 5 10 10 110 15 20 320 5
Future Vol, veh/h 5 5 25 50 5 10 10 110 15 20 320 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 27 54 5 11 11 120 16 22 348 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 543 535 351 538 538 120 353 0 0 120 0 0
Stage 1 394 394 - 141 141 - - - - - - -
Stage 2 149 141 - 397 397 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 451 452 692 454 450 931 1206 - - 1468 - -
Stage 1 631 605 - 862 780 - - - - - - -
Stage 2 854 780 - 629 603 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 433 441 692 424 439 931 1206 - - 1468 - -
Mov Cap-2 Maneuver 433 441 - 424 439 - - - - - - -
Stage 1 625 596 - 854 773 - - - - - - -
Stage 2 830 773 - 590 594 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 11.3 13.7 0.6 0.4
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1206 - - 437 692 424 678 1468 - -
HCM Lane V/C Ratio 0.009 - - 0.025 0.039 0.128 0.024 0.015 - -
HCM Control Delay (s) 8 - - 13.4 10.4 14.7 10.4 7.5 - -
HCM Lane LOS A - - BBBBA--
HCM 95th %tile Q(veh) 0 - - 0.1 0.1 0.4 0.1 0 - -
HCM 2010 TWSC Waters' Edge Build-Out
6: Turnberry Road & Richards Lake Road (CR 52) 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 2.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 10 35 5 30 15 280 45 20 320 5
Future Vol, veh/h 5 5 10 35 5 30 15 280 45 20 320 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 11 38 5 33 16 304 49 22 348 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 750 731 351 734 734 304 353 0 0 304 0 0
Stage 1 394 394 - 337 337 - - - - - - -
Stage 2 356 337 - 397 397 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 328 349 692 336 347 736 1206 - - 1257 - -
Stage 1 631 605 - 677 641 - - - - - - -
Stage 2 661 641 - 629 603 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 302 338 692 319 336 736 1206 - - 1257 - -
Mov Cap-2 Maneuver 302 338 - 319 336 - - - - - - -
Stage 1 623 594 - 668 632 - - - - - - -
Stage 2 618 632 - 603 592 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13.5 14.5 0.4 0.5
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1206 - - 319 692 319 629 1257 - -
HCM Lane V/C Ratio 0.014 - - 0.034 0.016 0.119 0.06 0.017 - -
HCM Control Delay (s) 8 - - 16.7 10.3 17.8 11.1 7.9 - -
HCM Lane LOS A - - C B C B A - -
HCM 95th %tile Q(veh) 0 - - 0.1 0 0.4 0.2 0.1 - -
HCM 2010 AWSC Waters'Edge West Build-Out
7: Lemay Avenue & Country Club Road 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 17.2
Intersection LOS C
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Lane Configurations
Traffic Vol, veh/h 0 5 130 90 0 295 160 5 0 20 45 65
Future Vol, veh/h 0 5 130 90 0 295 160 5 0 20 45 65
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 5 141 98 0 321 174 5 0 22 49 71
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 11.8 23.3 11.1
HCM LOS B C B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 15% 2% 64% 12%
Vol Thru, % 35% 58% 35% 81%
Vol Right, % 50% 40% 1% 6%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 130 225 460 160
LT Vol 20 5 295 20
Through Vol 45 130 160 130
RT Vol 65 90 5 10
Lane Flow Rate 141 245 500 174
Geometry Grp 1111
Degree of Util (X) 0.238 0.373 0.754 0.301
Departure Headway (Hd) 6.063 5.484 5.429 6.229
Convergence, Y/N Yes Yes Yes Yes
Cap 586 651 665 572
Service Time 4.154 3.559 3.489 4.316
HCM Lane V/C Ratio 0.241 0.376 0.752 0.304
HCM Control Delay 11.1 11.8 23.3 12
HCM Lane LOS B B C B
HCM 95th-tile Q 0.9 1.7 6.9 1.3
HCM 2010 AWSC Waters'Edge West Build-Out
7: Lemay Avenue & Country Club Road 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 20 130 10
Future Vol, veh/h 0 20 130 10
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 22 141 11
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 12
HCM LOS B
HCM 2010 AWSC Waters' Edge Build-Out
7: Lemay Avenue & Country Club Road 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 38.4
Intersection LOS E
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Lane Configurations
Traffic Vol, veh/h 0 10 270 55 0 155 160 25 0 90 120 285
Future Vol, veh/h 0 10 270 55 0 155 160 25 0 90 120 285
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 11 293 60 0 168 174 27 0 98 130 310
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 26.7 28.6 57.4
HCM LOS D D F
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 18% 3% 46% 22%
Vol Thru, % 24% 81% 47% 72%
Vol Right, % 58% 16% 7% 6%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 495 335 340 90
LT Vol 90 10 155 20
Through Vol 120 270 160 65
RT Vol 285 55 25 5
Lane Flow Rate 538 364 370 98
Geometry Grp 1111
Degree of Util (X) 0.973 0.721 0.743 0.225
Departure Headway (Hd) 6.509 7.132 7.241 8.279
Convergence, Y/N Yes Yes Yes Yes
Cap 554 506 499 431
Service Time 4.564 5.2 5.309 6.377
HCM Lane V/C Ratio 0.971 0.719 0.741 0.227
HCM Control Delay 57.4 26.7 28.6 13.8
HCM Lane LOS F D D B
HCM 95th-tile Q 13.3 5.8 6.2 0.9
HCM 2010 AWSC Waters' Edge Build-Out
7: Lemay Avenue & Country Club Road 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 20 65 5
Future Vol, veh/h 0 20 65 5
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 22 71 5
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 13.8
HCM LOS B
HCM 2010 TWSC Waters'Edge West Build-Out
8: Turnberry Road & Country Club Road 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 80 10 155 25 25 5 45 85 10 5 275 325
Future Vol, veh/h 80 10 155 25 25 5 45 85 10 5 275 325
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 87 11 168 27 27 5 49 92 11 5 299 353
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 522 511 299 511 506 98 299 0 0 103 0 0
Stage 1 310 310 - 196 196 - - - - - - -
Stage 2 212 201 - 315 310 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 465 466 741 473 469 958 1262 - - 1489 - -
Stage 1 700 659 - 806 739 - - - - - - -
Stage 2 790 735 - 696 659 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 427 446 741 347 449 958 1262 - - 1489 - -
Mov Cap-2 Maneuver 427 446 - 347 449 - - - - - - -
Stage 1 673 657 - 775 710 - - - - - - -
Stage 2 726 706 - 527 657 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 13 15.2 2.6 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1262 - - 429 741 414 1489 - -
HCM Lane V/C Ratio 0.039 - - 0.228 0.227 0.144 0.004 - -
HCM Control Delay (s) 8 - - 15.9 11.3 15.2 7.4 - -
HCM Lane LOS A - - C B C A - -
HCM 95th %tile Q(veh) 0.1 - - 0.9 0.9 0.5 0 - -
HCM 2010 Roundabout Waters'Edge West Build-Out
8: Turnberry Road & Country Club Road 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 10.8
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 266 59 152 657
Demand Flow Rate, veh/h 271 61 155 670
Vehicles Circulating, veh/h 338 233 105 106
Vehicles Exiting, veh/h 438 27 504 188
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 8.5 4.8 5.0 13.6
Approach LOS AAAB
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 271 61 155 670
Cap Entry Lane, veh/h 806 895 1017 1016
Entry HV Adj Factor 0.981 0.975 0.982 0.981
Flow Entry, veh/h 266 59 152 657
Cap Entry, veh/h 790 872 999 997
V/C Ratio 0.336 0.068 0.152 0.659
Control Delay, s/veh 8.5 4.8 5.0 13.6
LOSAAAB
95th %tile Queue, veh 1015
HCM 2010 Signalized Intersection Summary Waters'Edge West Build-Out
8: Turnberry Road & Country Club Road 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 80 10 155 25 25 5 45 85 10 5 275 325
Future Volume (veh/h) 80 10 155 25 25 5 45 85 10 5 275 325
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1863 1900 1863 1900 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 87 11 168 27 27 5 49 92 11 5 299 353
Adj No. of Lanes 011010110111
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 354 37 257 187 152 21 579 948 113 863 1017 864
Arrive On Green 0.16 0.16 0.16 0.16 0.16 0.16 0.04 0.58 0.58 0.01 0.55 0.55
Sat Flow, veh/h 1301 226 1583 472 939 131 1774 1633 195 1774 1863 1583
Grp Volume(v), veh/h 98 0 168 59 0 0 49 0 103 5 299 353
Grp Sat Flow(s),veh/h/ln 1527 0 1583 1541 0 0 1774 0 1828 1774 1863 1583
Q Serve(g_s), s 0.0 0.0 4.7 0.0 0.0 0.0 0.6 0.0 1.2 0.1 4.1 6.2
Cycle Q Clear(g_c), s 2.3 0.0 4.7 2.3 0.0 0.0 0.6 0.0 1.2 0.1 4.1 6.2
Prop In Lane 0.89 1.00 0.46 0.08 1.00 0.11 1.00 1.00
Lane Grp Cap(c), veh/h 390 0 257 360 0 0 579 0 1061 863 1017 864
V/C Ratio(X) 0.25 0.00 0.65 0.16 0.00 0.00 0.08 0.00 0.10 0.01 0.29 0.41
Avail Cap(c_a), veh/h 695 0 598 677 0 0 657 0 1061 1002 1017 864
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 17.7 0.0 18.7 17.3 0.0 0.0 4.4 0.0 4.4 4.8 5.9 6.3
Incr Delay (d2), s/veh 0.3 0.0 2.8 0.2 0.0 0.0 0.1 0.0 0.2 0.0 0.7 1.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 0.0 2.2 0.7 0.0 0.0 0.3 0.0 0.7 0.0 2.3 3.0
LnGrp Delay(d),s/veh 18.0 0.0 21.5 17.5 0.0 0.0 4.5 0.0 4.6 4.8 6.6 7.8
LnGrp LOS B C B A AAAA
Approach Vol, veh/h 266 59 152 657
Approach Delay, s/veh 20.2 17.5 4.6 7.2
Approach LOS C B A A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 31.7 11.7 5.9 30.0 11.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 4.0 26.0 18.0 4.0 26.0 18.0
Max Q Clear Time (g_c+I1), s 2.1 3.2 6.7 2.6 8.2 4.3
Green Ext Time (p_c), s 0.0 3.8 1.1 0.0 3.5 1.2
Intersection Summary
HCM 2010 Ctrl Delay 10.4
HCM 2010 LOS B
HCM 2010 TWSC Waters' Edge Build-Out
8: Turnberry Road & Country Club Road 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 53
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 265 50 160 5 15 5 175 215 25 5 130 185
Future Vol, veh/h 265 50 160 5 15 5 175 215 25 5 130 185
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 288 54 174 5 16 5 190 234 27 5 141 201
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 791 793 141 807 780 247 141 0 0 261 0 0
Stage 1 152 152 - 628 628 - - - - - - -
Stage 2 639 641 - 179 152 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 307 321 907 300 327 792 1442 - - 1303 - -
Stage 1 850 772 - 471 476 - - - - - - -
Stage 2 464 469 - 823 772 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 262 278 907 185 283 792 1442 - - 1303 - -
Mov Cap-2 Maneuver ~ 262 278 - 185 283 - - - - - - -
Stage 1 738 769 - 409 413 - - - - - - -
Stage 2 384 407 - 616 769 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 133.9 18.7 3.3 0.1
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1442 - - 264 907 290 1303 - -
HCM Lane V/C Ratio 0.132 - - 1.297 0.192 0.094 0.004 - -
HCM Control Delay (s) 7.9 - - 196.9 9.9 18.7 7.8 - -
HCM Lane LOS A - - F A C A - -
HCM 95th %tile Q(veh) 0.5 - - 17.2 0.7 0.3 0 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 2010 Roundabout Waters' Edge Build-Out
8: Turnberry Road & Country Club Road 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 11.2
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 516 26 451 347
Demand Flow Rate, veh/h 526 26 461 354
Vehicles Circulating, veh/h 154 727 354 215
Vehicles Exiting, veh/h 415 88 326 538
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 10.9 7.2 13.8 8.5
Approach LOS BABA
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 526 26 461 354
Cap Entry Lane, veh/h 969 546 793 911
Entry HV Adj Factor 0.981 0.988 0.979 0.981
Flow Entry, veh/h 516 26 451 347
Cap Entry, veh/h 950 540 776 894
V/C Ratio 0.543 0.048 0.581 0.388
Control Delay, s/veh 10.9 7.2 13.8 8.5
LOSBABA
95th %tile Queue, veh 3042
HCM 2010 Signalized Intersection Summary Waters' Edge Build-Out
8: Turnberry Road & Country Club Road 01/23/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 265 50 160 5 15 5 175 215 25 5 130 185
Future Volume (veh/h) 265 50 160 5 15 5 175 215 25 5 130 185
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1863 1900 1863 1900 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 288 54 174 5 16 5 190 234 27 5 141 201
Adj No. of Lanes 011010110111
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 313 48 491 115 288 75 622 720 83 542 649 551
Arrive On Green 0.31 0.31 0.31 0.31 0.31 0.31 0.10 0.44 0.44 0.01 0.35 0.35
Sat Flow, veh/h 572 153 1583 88 928 242 1774 1640 189 1774 1863 1583
Grp Volume(v), veh/h 342 0 174 26 0 0 190 0 261 5 141 201
Grp Sat Flow(s),veh/h/ln 725 0 1583 1257 0 0 1774 0 1829 1774 1863 1583
Q Serve(g_s), s 10.9 0.0 4.2 0.1 0.0 0.0 3.0 0.0 4.6 0.1 2.6 4.6
Cycle Q Clear(g_c), s 10.9 0.0 4.2 10.9 0.0 0.0 3.0 0.0 4.6 0.1 2.6 4.6
Prop In Lane 0.84 1.00 0.19 0.19 1.00 0.10 1.00 1.00
Lane Grp Cap(c), veh/h 0 0 491 478 0 0 622 0 803 542 649 551
V/C Ratio(X) 0.00 0.00 0.35 0.05 0.00 0.00 0.31 0.00 0.33 0.01 0.22 0.36
Avail Cap(c_a), veh/h 0 0 811 539 0 0 670 0 803 677 649 551
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 13.1 12.0 0.0 0.0 7.5 0.0 9.0 10.2 11.2 11.9
Incr Delay (d2), s/veh 0.0 0.0 0.4 0.0 0.0 0.0 0.3 0.0 1.1 0.0 0.8 1.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 1.9 0.3 0.0 0.0 1.5 0.0 2.5 0.0 1.5 2.3
LnGrp Delay(d),s/veh 0.0 0.0 13.5 12.0 0.0 0.0 7.8 0.0 10.0 10.2 12.0 13.7
LnGrp LOS B B A BBBB
Approach Vol, veh/h 516 26 451 347
Approach Delay, s/veh 4.5 12.0 9.1 13.0
Approach LOS ABAB
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 25.4 19.1 8.7 21.0 19.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 4.0 19.0 25.0 6.0 17.0 17.0
Max Q Clear Time (g_c+I1), s 2.1 6.6 12.9 5.0 6.6 12.9
Green Ext Time (p_c), s 0.0 2.5 2.3 0.1 2.3 1.1
Intersection Summary
HCM 2010 Ctrl Delay 8.4
HCM 2010 LOS A
Notes
HCM 2010 AWSC Waters'Edge West Build-Out
9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 14.7
Intersection LOS B
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 10 30 0 10 125 0 485 5
Future Vol, veh/h 0 10 30 0 10 125 0 485 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 33 0 11 136 0 527 5
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.9 8.9 16.8
HCM LOS A A C
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 25% 0% 99%
Vol Thru, % 75% 7% 0%
Vol Right, % 0% 93% 1%
Sign Control Stop Stop Stop
Traffic Vol by Lane 40 135 490
LT Vol 10 0 485
Through Vol 30 10 0
RT Vol 0 125 5
Lane Flow Rate 43 147 533
Geometry Grp 1 1 1
Degree of Util (X) 0.066 0.193 0.678
Departure Headway (Hd) 5.482 4.739 4.584
Convergence, Y/N Yes Yes Yes
Cap 650 756 788
Service Time 3.539 2.782 2.624
HCM Lane V/C Ratio 0.066 0.194 0.676
HCM Control Delay 8.9 8.9 16.8
HCM Lane LOS A A C
HCM 95th-tile Q 0.2 0.7 5.4
HCM 2010 AWSC Waters' Edge Build-Out
9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 11.9
Intersection LOS B
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 10 20 0 30 410 0 235 20
Future Vol, veh/h 0 10 20 0 30 410 0 235 20
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 22 0 33 446 0 255 22
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 8.6 12.3 11.6
HCM LOS A B B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 33% 0% 92%
Vol Thru, % 67% 7% 0%
Vol Right, % 0% 93% 8%
Sign Control Stop Stop Stop
Traffic Vol by Lane 30 440 255
LT Vol 10 0 235
Through Vol 20 30 0
RT Vol 0 410 20
Lane Flow Rate 33 478 277
Geometry Grp 1 1 1
Degree of Util (X) 0.048 0.553 0.397
Departure Headway (Hd) 5.267 4.166 5.151
Convergence, Y/N Yes Yes Yes
Cap 675 866 693
Service Time 3.339 2.202 3.229
HCM Lane V/C Ratio 0.049 0.552 0.4
HCM Control Delay 8.6 12.3 11.6
HCM Lane LOS A B B
HCM 95th-tile Q 0.2 3.5 1.9
HCM 2010 TWSC Waters'Edge West Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 305 230 135 80 60 65
Future Vol, veh/h 305 230 135 80 60 65
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 332 250 147 87 65 71
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 582 0 837 457
Stage 1 - - - - 457 -
Stage 2 - - - - 380 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 992 - 337 604
Stage 1 - - - - 638 -
Stage 2 - - - - 691 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 992 - 284 604
Mov Cap-2 Maneuver - - - - 284 -
Stage 1 - - - - 638 -
Stage 2 - - - - 583 -
Approach EB WB NB
HCM Control Delay, s 0 5.8 19
HCM LOS C
Capacity (veh/h) 392 - - 992 -
HCM Lane V/C Ratio 0.347 - - 0.148 -
HCM Control Delay (s) 19 - - 9.3 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 1.5 - - 0.5 -
HCM 2010 TWSC Waters' Edge Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 32
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 150 115 125 400 200 155
Future Vol, veh/h 150 115 125 400 200 155
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 163 125 136 435 217 168
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 288 0 933 226
Stage 1 - - - - 226 -
Stage 2 - - - - 707 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1274 - 295 813
Stage 1 - - - - 812 -
Stage 2 - - - - 489 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1274 - 253 813
Mov Cap-2 Maneuver - - - - 253 -
Stage 1 - - - - 812 -
Stage 2 - - - - 420 -
Approach EB WB NB
HCM Control Delay, s 0 1.9 100.4
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 362 - - 1274 -
HCM Lane V/C Ratio 1.066 - - 0.107 -
HCM Control Delay (s) 100.4 - - 8.2 0
HCM Lane LOS F - - A A
HCM 95th %tile Q(veh) 13.6 - - 0.4 -
HCM 2010 TWSC Waters'Edge West Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 305 230 135 0 60 65
Future Vol, veh/h 305 230 135 0 60 65
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 332 250 147 0 65 71
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 582 0 750 457
Stage 1 - - - - 457 -
Stage 2 - - - - 293 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 992 - 379 604
Stage 1 - - - - 638 -
Stage 2 - - - - 757 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 992 - 323 604
Mov Cap-2 Maneuver - - - - 323 -
Stage 1 - - - - 638 -
Stage 2 - - - - 645 -
Approach EB WB NB
HCM Control Delay, s 0 9.3 17.4
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 426 - - 992 -
HCM Lane V/C Ratio 0.319 - - 0.148 -
HCM Control Delay (s) 17.4 - - 9.3 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 1.4 - - 0.5 -
Channelized T
HCM 2010 TWSC Waters' Edge Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 12.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 150 115 125 0 200 155
Future Vol, veh/h 150 115 125 0 200 155
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 163 125 136 0 217 168
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 288 0 498 226
Stage 1 - - - - 226 -
Stage 2 - - - - 272 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1274 - 532 813
Stage 1 - - - - 812 -
Stage 2 - - - - 774 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1274 - 475 813
Mov Cap-2 Maneuver - - - - 475 -
Stage 1 - - - - 812 -
Stage 2 - - - - 691 -
Approach EB WB NB
HCM Control Delay, s 0 8.2 22.7
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 580 - - 1274 -
HCM Lane V/C Ratio 0.665 - - 0.107 -
HCM Control Delay (s) 22.7 - - 8.2 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 5 - - 0.4 -
Channelized T
HCM 2010 Signalized Intersection Summary Waters'Edge West Build-Out
11: Lemay Avenue & Vine Drive 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 15 155 90 140 260 125 40 320 65 60 610 30
Future Volume (veh/h) 15 155 90 140 260 125 40 320 65 60 610 30
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1829 1824 1863 1826 1824 1824 1863 1824 1824 1937 1824
Adj Flow Rate, veh/h 17 180 105 163 302 145 47 372 76 70 709 35
Adj No. of Lanes 110110010010
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 255255222222
Cap, veh/h 139 244 142 288 331 159 95 724 142 105 937 45
Arrive On Green 0.02 0.23 0.22 0.08 0.28 0.27 0.57 0.58 0.57 0.57 0.58 0.57
Sat Flow, veh/h 1774 1085 633 1774 1167 560 102 1250 245 120 1617 78
Grp Volume(v), veh/h 17 0 285 163 0 447 495 0 0 814 0 0
Grp Sat Flow(s),veh/h/ln 1774 0 1717 1774 0 1728 1597 0 0 1815 0 0
Q Serve(g_s), s 0.8 0.0 17.0 7.5 0.0 27.5 0.0 0.0 0.0 19.5 0.0 0.0
Cycle Q Clear(g_c), s 0.8 0.0 17.0 7.5 0.0 27.5 17.5 0.0 0.0 37.1 0.0 0.0
Prop In Lane 1.00 0.37 1.00 0.32 0.09 0.15 0.09 0.04
Lane Grp Cap(c), veh/h 139 0 387 288 0 489 946 0 0 1071 0 0
V/C Ratio(X) 0.12 0.00 0.74 0.57 0.00 0.91 0.52 0.00 0.00 0.76 0.00 0.00
Avail Cap(c_a), veh/h 209 0 476 288 0 510 946 0 0 1071 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 33.4 0.0 39.8 29.5 0.0 38.3 13.5 0.0 0.0 17.3 0.0 0.0
Incr Delay (d2), s/veh 0.4 0.0 4.6 2.6 0.0 20.5 2.1 0.0 0.0 5.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 0.0 8.6 3.9 0.0 16.0 9.4 0.0 0.0 20.7 0.0 0.0
LnGrp Delay(d),s/veh 33.8 0.0 44.4 32.1 0.0 58.8 15.6 0.0 0.0 22.4 0.0 0.0
LnGrp LOS C D C E B C
Approach Vol, veh/h 302 610 495 814
Approach Delay, s/veh 43.8 51.7 15.6 22.4
Approach LOS D D B C
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 67.7 13.0 29.3 67.7 6.6 35.7
Change Period (Y+Rc), s * 5 5.0 5.5 5.0 5.0 5.5
Max Green Setting (Gmax), s * 58 8.0 29.5 57.0 6.0 31.5
Max Q Clear Time (g_c+I1), s 39.1 9.5 19.0 19.5 2.8 29.5
Green Ext Time (p_c), s 5.7 0.0 2.0 6.6 0.0 0.6
Intersection Summary
HCM 2010 Ctrl Delay 31.8
HCM 2010 LOS C
Notes
HCM 2010 Signalized Intersection Summary Waters' Edge Build-Out
11: Lemay Avenue & Vine Drive 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 25 295 110 110 220 145 70 760 225 115 500 45
Future Volume (veh/h) 25 295 110 110 220 145 70 760 225 115 500 45
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1824 1824 1863 1830 1824 1824 1863 1824 1824 1937 1824
Adj Flow Rate, veh/h 29 343 128 128 256 169 81 884 262 134 581 52
Adj No. of Lanes 110110010010
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 255255222222
Cap, veh/h 114 280 104 163 258 170 91 833 242 116 470 40
Arrive On Green 0.03 0.22 0.21 0.06 0.25 0.24 0.75 0.76 0.75 0.75 0.76 0.75
Sat Flow, veh/h 1774 1267 473 1774 1030 680 78 1098 319 107 620 53
Grp Volume(v), veh/h 29 0 471 128 0 425 1227 0 0 767 0 0
Grp Sat Flow(s),veh/h/ln 1774 0 1740 1774 0 1710 1495 0 0 779 0 0
Q Serve(g_s), s 1.5 0.0 26.5 6.6 0.0 29.8 0.5 0.0 0.0 0.5 0.0 0.0
Cycle Q Clear(g_c), s 1.5 0.0 26.5 6.6 0.0 29.8 90.0 0.0 0.0 90.0 0.0 0.0
Prop In Lane 1.00 0.27 1.00 0.40 0.07 0.21 0.17 0.07
Lane Grp Cap(c), veh/h 114 0 384 163 0 428 1153 0 0 620 0 0
V/C Ratio(X) 0.26 0.00 1.23 0.78 0.00 0.99 1.06 0.00 0.00 1.24 0.00 0.00
Avail Cap(c_a), veh/h 166 0 384 163 0 428 1153 0 0 620 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 37.2 0.0 46.9 35.7 0.0 45.1 14.2 0.0 0.0 11.8 0.0 0.0
Incr Delay (d2), s/veh 1.2 0.0 122.6 21.5 0.0 41.6 45.3 0.0 0.0 120.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.8 0.0 25.8 4.2 0.0 19.0 14.5 0.0 0.0 20.7 0.0 0.0
LnGrp Delay(d),s/veh 38.4 0.0 169.5 57.2 0.0 86.7 59.6 0.0 0.0 132.1 0.0 0.0
LnGrp LOS D F E F F F
Approach Vol, veh/h 500 553 1227 767
Approach Delay, s/veh 161.9 79.9 59.6 132.1
Approach LOS F E E F
Timer 12345678
Assigned Phs 2 3 4 6 7 8
Phs Duration (G+Y+Rc), s 95.5 11.0 31.0 95.5 7.5 34.5
Change Period (Y+Rc), s * 5 5.0 5.5 5.0 5.0 5.5
Max Green Setting (Gmax), s * 74 6.0 25.5 73.0 6.0 25.5
Max Q Clear Time (g_c+I1), s 92.0 8.6 28.5 92.0 3.5 31.8
Green Ext Time (p_c), s 0.0 0.0 0.0 0.0 0.0 0.0
Intersection Summary
HCM 2010 Ctrl Delay 98.3
HCM 2010 LOS F
Notes
HCM 2010 AWSC Waters'Edge West Build-Out
12: Vine Drive & Timberline Drive 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 14.8
Intersection LOS B
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Lane Configurations
Traffic Vol, veh/h 0 45 90 145 0 155 200 10 0 100 100 25
Future Vol, veh/h 0 45 90 145 0 155 200 10 0 100 100 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 49 98 158 0 168 217 11 0 109 109 27
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 13.4 17.9 13.7
HCM LOS B C B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 44% 16% 42% 4%
Vol Thru, % 44% 32% 55% 42%
Vol Right, % 11% 52% 3% 54%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 225 280 365 120
LT Vol 100 45 155 5
Through Vol 100 90 200 50
RT Vol 25 145 10 65
Lane Flow Rate 245 304 397 130
Geometry Grp 1111
Degree of Util (X) 0.418 0.465 0.625 0.225
Departure Headway (Hd) 6.151 5.501 5.67 6.21
Convergence, Y/N Yes Yes Yes Yes
Cap 580 648 631 582
Service Time 4.25 3.598 3.759 4.21
HCM Lane V/C Ratio 0.422 0.469 0.629 0.223
HCM Control Delay 13.7 13.4 17.9 11
HCM Lane LOS B B C B
HCM 95th-tile Q 2.1 2.5 4.4 0.9
HCM 2010 AWSC Waters'Edge West Build-Out
12: Vine Drive & Timberline Drive 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 50 65
Future Vol, veh/h 0 5 50 65
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 5 54 71
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 11
HCM LOS B
HCM 2010 Signalized Intersection Summary Waters'Edge West Build-Out
12: Vine Drive & Timberline Drive 01/23/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 45 90 145 155 200 10 100 100 25 5 50 65
Future Volume (veh/h) 45 90 145 155 200 10 100 100 25 5 50 65
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 49 98 158 168 217 11 109 109 27 5 54 71
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 146 226 303 309 334 15 398 373 81 88 360 441
Arrive On Green 0.35 0.35 0.35 0.35 0.35 0.35 0.48 0.48 0.48 0.48 0.48 0.48
Sat Flow, veh/h 159 648 867 568 957 44 597 781 171 15 753 924
Grp Volume(v), veh/h 305 0 0 396 0 0 245 0 0 130 0 0
Grp Sat Flow(s),veh/h/ln 1674 0 0 1568 0 0 1548 0 0 1692 0 0
Q Serve(g_s), s 0.0 0.0 0.0 2.9 0.0 0.0 1.5 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 6.5 0.0 0.0 9.5 0.0 0.0 4.0 0.0 0.0 2.0 0.0 0.0
Prop In Lane 0.16 0.52 0.42 0.03 0.44 0.11 0.04 0.55
Lane Grp Cap(c), veh/h 675 0 0 659 0 0 852 0 0 889 0 0
V/C Ratio(X) 0.45 0.00 0.00 0.60 0.00 0.00 0.29 0.00 0.00 0.15 0.00 0.00
Avail Cap(c_a), veh/h 1147 0 0 1096 0 0 852 0 0 889 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 11.9 0.0 0.0 12.6 0.0 0.0 7.3 0.0 0.0 6.8 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.0 0.0 0.9 0.0 0.0 0.9 0.0 0.0 0.3 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.1 0.0 0.0 4.5 0.0 0.0 2.0 0.0 0.0 1.0 0.0 0.0
LnGrp Delay(d),s/veh 12.4 0.0 0.0 13.5 0.0 0.0 8.1 0.0 0.0 7.2 0.0 0.0
LnGrp LOS BBAA
Approach Vol, veh/h 305 396 245 130
Approach Delay, s/veh 12.4 13.5 8.1 7.2
Approach LOS BBAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 26.0 20.1 26.0 20.1
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 22.0 30.0 22.0 30.0
Max Q Clear Time (g_c+I1), s 6.0 8.5 4.0 11.5
Green Ext Time (p_c), s 2.0 4.9 2.2 4.6
Intersection Summary
HCM 2010 Ctrl Delay 11.2
HCM 2010 LOS B
HCM 2010 AWSC Waters' Edge Build-Out
12: Vine Drive & Timberline Drive 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 52.4
Intersection LOS F
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Lane Configurations
Traffic Vol, veh/h 0 75 225 100 0 75 160 15 0 120 255 80
Future Vol, veh/h 0 75 225 100 0 75 160 15 0 120 255 80
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 82 245 109 0 82 174 16 0 130 277 87
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 52.7 25 81.7
HCM LOS F C F
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 26% 19% 30% 5%
Vol Thru, % 56% 56% 64% 71%
Vol Right, % 18% 25% 6% 24%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 455 400 250 210
LT Vol 120 75 75 10
Through Vol 255 225 160 150
RT Vol 80 100 15 50
Lane Flow Rate 495 435 272 228
Geometry Grp 1111
Degree of Util (X) 1.046 0.921 0.629 0.53
Departure Headway (Hd) 7.612 7.815 8.556 8.593
Convergence, Y/N Yes Yes Yes Yes
Cap 480 465 424 422
Service Time 5.612 5.815 6.556 6.593
HCM Lane V/C Ratio 1.031 0.935 0.642 0.54
HCM Control Delay 81.7 52.7 25 20.9
HCM Lane LOS F F C C
HCM 95th-tile Q 15 10.5 4.2 3
HCM 2010 AWSC Waters' Edge Build-Out
12: Vine Drive & Timberline Drive 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 10 150 50
Future Vol, veh/h 0 10 150 50
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 11 163 54
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 20.9
HCM LOS C
HCM 2010 Signalized Intersection Summary Waters' Edge Build-Out
12: Vine Drive & Timberline Drive 01/23/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 75 225 100 75 160 15 120 255 80 10 150 50
Future Volume (veh/h) 75 225 100 75 160 15 120 255 80 10 150 50
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 82 245 109 82 174 16 130 277 87 11 163 54
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 155 340 138 196 373 30 258 522 149 84 692 219
Arrive On Green 0.33 0.33 0.33 0.33 0.33 0.33 0.52 0.52 0.52 0.52 0.52 0.52
Sat Flow, veh/h 230 1038 423 330 1140 92 330 998 284 26 1323 419
Grp Volume(v), veh/h 436 0 0 272 0 0 494 0 0 228 0 0
Grp Sat Flow(s),veh/h/ln 1691 0 0 1562 0 0 1612 0 0 1767 0 0
Q Serve(g_s), s 5.4 0.0 0.0 0.0 0.0 0.0 5.0 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 12.2 0.0 0.0 6.8 0.0 0.0 10.5 0.0 0.0 3.7 0.0 0.0
Prop In Lane 0.19 0.25 0.30 0.06 0.26 0.18 0.05 0.24
Lane Grp Cap(c), veh/h 633 0 0 599 0 0 928 0 0 995 0 0
V/C Ratio(X) 0.69 0.00 0.00 0.45 0.00 0.00 0.53 0.00 0.00 0.23 0.00 0.00
Avail Cap(c_a), veh/h 829 0 0 778 0 0 928 0 0 995 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 16.1 0.0 0.0 14.3 0.0 0.0 8.5 0.0 0.0 7.0 0.0 0.0
Incr Delay (d2), s/veh 1.6 0.0 0.0 0.5 0.0 0.0 2.2 0.0 0.0 0.5 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 6.0 0.0 0.0 3.3 0.0 0.0 5.4 0.0 0.0 2.0 0.0 0.0
LnGrp Delay(d),s/veh 17.7 0.0 0.0 14.8 0.0 0.0 10.7 0.0 0.0 7.5 0.0 0.0
LnGrp LOS BBBA
Approach Vol, veh/h 436 272 494 228
Approach Delay, s/veh 17.7 14.8 10.7 7.5
Approach LOS BBBA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 32.0 21.5 32.0 21.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 28.0 24.0 28.0 24.0
Max Q Clear Time (g_c+I1), s 12.5 14.2 5.7 8.8
Green Ext Time (p_c), s 4.4 3.3 5.0 4.2
Intersection Summary
HCM 2010 Ctrl Delay 13.1
HCM 2010 LOS B
HCM 2010 Roundabout Waters'Edge West Build-Out
34: Brightwater Drive & Morningstar Drive Collector & Morningstar Way 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 3.5
Intersection LOS A
Approach WB NB SB SE
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 21 15 21 32
Demand Flow Rate, veh/h 21 15 21 32
Vehicles Circulating, veh/h 15 32 21 21
Vehicles Exiting, veh/h 32 21 15 21
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 3.4 3.4 3.4 3.5
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LR LTR LTR LR
Assumed Moves LR LTR LTR LR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 21 15 21 32
Cap Entry Lane, veh/h 1113 1094 1106 1106
Entry HV Adj Factor 1.000 0.993 0.990 0.997
Flow Entry, veh/h 21 15 21 32
Cap Entry, veh/h 1113 1087 1095 1103
V/C Ratio 0.019 0.014 0.019 0.029
Control Delay, s/veh 3.4 3.4 3.4 3.5
LOSAAAA
95th %tile Queue, veh 0000
HCM 2010 Roundabout Waters' Edge Build-Out
34: Brightwater Drive & Morningstar Drive Collector & Morningstar Way 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 3.5
Intersection LOS A
Approach WB NB SB SE
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 43 21 21 26
Demand Flow Rate, veh/h 44 21 21 26
Vehicles Circulating, veh/h 21 26 38 21
Vehicles Exiting, veh/h 26 21 27 38
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 3.7 3.5 3.5 3.5
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LR LTR LTR LR
Assumed Moves LR LTR LTR LR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 44 21 21 26
Cap Entry Lane, veh/h 1106 1101 1088 1106
Entry HV Adj Factor 0.977 0.990 0.990 0.996
Flow Entry, veh/h 43 21 21 26
Cap Entry, veh/h 1081 1090 1077 1102
V/C Ratio 0.040 0.019 0.019 0.023
Control Delay, s/veh 3.7 3.5 3.5 3.5
LOSAAAA
95th %tile Queue, veh 0000
HCM 2010 TWSC Waters'Edge West Build-Out
14: Turnberry Road & Morningstar Drive Collector 01/16/2017
Year 2021 AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 15 35 20 40 75 5
Future Vol, veh/h 15 35 20 40 75 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 100 0 100 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 38 22 43 82 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 171 84 87 0 - 0
Stage 1 84 - - - - -
Stage 2 87 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 819 975 1509 - - -
Stage 1 939 - - - - -
Stage 2 936 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 807 975 1509 - - -
Mov Cap-2 Maneuver 807 - - - - -
Stage 1 939 - - - - -
Stage 2 922 - - - - -
Approach EB NB SB
HCM Control Delay, s 9 2.5 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1509 - 807 975 - -
HCM Lane V/C Ratio 0.014 - 0.02 0.039 - -
HCM Control Delay (s) 7.4 - 9.6 8.8 - -
HCM Lane LOS A - A A - -
HCM 95th %tile Q(veh) 0 - 0.1 0.1 - -
HCM 2010 TWSC Waters' Edge Build-Out
14: Turnberry Road & Morningstar Drive Collector 01/16/2017
Year 2021 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 55 85 80 70 20
Future Vol, veh/h 10 55 85 80 70 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 100 0 100 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 60 92 87 76 22
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 359 87 98 0 - 0
Stage 1 87 - - - - -
Stage 2 272 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 640 971 1495 - - -
Stage 1 936 - - - - -
Stage 2 774 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 601 971 1495 - - -
Mov Cap-2 Maneuver 601 - - - - -
Stage 1 936 - - - - -
Stage 2 726 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.3 3.9 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1495 - 601 971 - -
HCM Lane V/C Ratio 0.062 - 0.018 0.062 - -
HCM Control Delay (s) 7.6 - 11.1 9 - -
HCM Lane LOS A - B A - -
HCM 95th %tile Q(veh) 0.2 - 0.1 0.2 - -
Waters’ Edge West Traffic Impact Analysis
Appendix H
APPENDIX H TRAFFIC ANALYSIS WORKSHEETS –
YEAR 2040 BUILD-OUT CONDITIONS
HCM 2010 TWSC Waters' Edge West Build-Out
1: SH 1 & Douglas Road (CR 54) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 6.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 85 90 60 50 80 10 20 115 25 30 395 230
Future Vol, veh/h 85 90 60 50 80 10 20 115 25 30 395 230
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 92 98 65 54 87 11 22 125 27 33 429 250
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 726 691 429 758 677 139 429 0 0 152 0 0
Stage 1 495 495 - 182 182 - - - - - - -
Stage 2 231 196 - 576 495 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 340 368 626 324 375 909 1130 - - 1429 - -
Stage 1 556 546 - 820 749 - - - - - - -
Stage 2 772 739 - 503 546 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 265 353 626 221 359 909 1130 - - 1429 - -
Mov Cap-2 Maneuver 265 353 - 221 359 - - - - - - -
Stage 1 545 533 - 804 734 - - - - - - -
Stage 2 659 725 - 359 533 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 21.1 20.7 1 0.3
HCM LOS C C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1130 - - 265 428 221 385 1429 - -
HCM Lane V/C Ratio 0.019 - - 0.349 0.381 0.246 0.254 0.023 - -
HCM Control Delay (s) 8.2 - - 25.7 18.5 26.5 17.5 7.6 - -
HCM Lane LOS A - - DCDCA--
HCM 95th %tile Q(veh) 0.1 - - 1.5 1.8 0.9 1 0.1 - -
HCM 2010 Roundabout Waters' Edge West Build-Out
1: SH 1 & Douglas Road (CR 54) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 8.4
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 255 152 174 712
Demand Flow Rate, veh/h 260 155 178 727
Vehicles Circulating, veh/h 527 243 228 166
Vehicles Exiting, veh/h 111 162 559 232
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 10.9 5.9 6.1 8.6
Approach LOS BAAA
Lane Left Left Left Left Bypass
Designated Moves LTR LTR LTR LT R
Assumed Moves LTR LTR LTR LT R
RT Channelized Yield
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 260 155 178 472 255
Cap Entry Lane, veh/h 667 886 900 957 1011
Entry HV Adj Factor 0.981 0.982 0.980 0.980 0.980
Flow Entry, veh/h 255 152 174 462 250
Cap Entry, veh/h 654 870 882 938 991
V/C Ratio 0.390 0.175 0.198 0.493 0.252
Control Delay, s/veh 10.9 5.9 6.1 10.0 6.1
LOSBAAA A
95th %tile Queue, veh 2113 1
HCM 2010 Signalized Intersection Summary Waters' Edge West Build-Out
1: SH 1 & Douglas Road (CR 54) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 85 90 60 50 80 10 20 115 25 30 395 230
Future Volume (veh/h) 85 90 60 50 80 10 20 115 25 30 395 230
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 92 98 65 54 87 11 22 125 27 33 429 0
Adj No. of Lanes 110110110111
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 338 204 136 282 317 40 658 956 207 896 1199 1019
Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.64 0.64 0.64 0.64 0.64 0.00
Sat Flow, veh/h 1292 1046 694 1218 1622 205 955 1485 321 1230 1863 1583
Grp Volume(v), veh/h 92 0 163 54 0 98 22 0 152 33 429 0
Grp Sat Flow(s),veh/h/ln 1292 0 1740 1218 0 1827 955 0 1806 1230 1863 1583
Q Serve(g_s), s 3.2 0.0 4.1 2.0 0.0 2.3 0.5 0.0 1.6 0.5 5.3 0.0
Cycle Q Clear(g_c), s 5.5 0.0 4.1 6.2 0.0 2.3 5.8 0.0 1.6 2.2 5.3 0.0
Prop In Lane 1.00 0.40 1.00 0.11 1.00 0.18 1.00 1.00
Lane Grp Cap(c), veh/h 338 0 340 282 0 357 658 0 1163 896 1199 1019
V/C Ratio(X) 0.27 0.00 0.48 0.19 0.00 0.27 0.03 0.00 0.13 0.04 0.36 0.00
Avail Cap(c_a), veh/h 606 0 700 534 0 735 658 0 1163 896 1199 1019
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 19.3 0.0 17.8 20.5 0.0 17.0 5.5 0.0 3.4 3.9 4.1 0.0
Incr Delay (d2), s/veh 0.4 0.0 1.0 0.3 0.0 0.4 0.1 0.0 0.2 0.1 0.8 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.2 0.0 2.1 0.7 0.0 1.2 0.2 0.0 0.9 0.2 2.9 0.0
LnGrp Delay(d),s/veh 19.8 0.0 18.8 20.8 0.0 17.4 5.5 0.0 3.7 3.9 4.9 0.0
LnGrp LOS B B C B A A A A
Approach Vol, veh/h 255 152 174 462
Approach Delay, s/veh 19.2 18.6 3.9 4.9
Approach LOS BBAA
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 36.0 13.7 36.0 13.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 32.0 20.0 32.0 20.0
Max Q Clear Time (g_c+I1), s 7.8 7.5 7.3 8.2
Green Ext Time (p_c), s 4.0 1.6 4.0 1.6
Intersection Summary
HCM 2010 Ctrl Delay 10.2
HCM 2010 LOS B
HCM 2010 TWSC Waters' Edge West - Build-Out
1: SH 1 & Douglas Road (CR 54) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 14.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 115 65 65 45 70 20 85 415 85 20 205 100
Future Vol, veh/h 115 65 65 45 70 20 85 415 85 20 205 100
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - Yield
Storage Length 100 - - 115 - - 350 - - 315 - 335
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 125 71 71 49 76 22 92 451 92 22 223 109
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 997 994 223 1019 948 497 223 0 0 543 0 0
Stage 1 266 266 - 682 682 - - - - - - -
Stage 2 731 728 - 337 266 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 223 245 817 215 261 573 1346 - - 1026 - -
Stage 1 739 689 - 440 450 - - - - - - -
Stage 2 413 429 - 677 689 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 151 223 817 139 238 573 1346 - - 1026 - -
Mov Cap-2 Maneuver 151 223 - 139 238 - - - - - - -
Stage 1 688 674 - 410 419 - - - - - - -
Stage 2 303 400 - 542 674 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 54.9 31.6 1.1 0.5
HCM LOS F D
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1346 - - 151 350 139 274 1026 - -
HCM Lane V/C Ratio 0.069 - - 0.828 0.404 0.352 0.357 0.021 - -
HCM Control Delay (s) 7.9 - - 92 22.1 44.3 25.3 8.6 - -
HCM Lane LOS A - - F C E D A - -
HCM 95th %tile Q(veh) 0.2 - - 5.4 1.9 1.4 1.6 0.1 - -
HCM 2010 Roundabout Waters' Edge West - Build-Out
1: SH 1 & Douglas Road (CR 54) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 11.9
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 267 147 635 354
Demand Flow Rate, veh/h 272 150 648 360
Vehicles Circulating, veh/h 299 681 221 222
Vehicles Exiting, veh/h 172 188 349 609
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 8.1 10.0 17.1 6.3
Approach LOS A A C A
Lane Left Left Left Left Bypass
Designated Moves LTR LTR LTR LT R
Assumed Moves LTR LTR LTR LT R
RT Channelized Yield
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 272 150 648 249 111
Cap Entry Lane, veh/h 838 572 906 905 951
Entry HV Adj Factor 0.980 0.983 0.980 0.982 0.980
Flow Entry, veh/h 267 147 635 245 109
Cap Entry, veh/h 821 562 888 889 933
V/C Ratio 0.325 0.262 0.715 0.275 0.117
Control Delay, s/veh 8.1 10.0 17.1 7.0 5.0
LOS A A C A A
95th %tile Queue, veh 1161 0
HCM 2010 Signalized Intersection Summary Waters' Edge West - Build-Out
1: SH 1 & Douglas Road (CR 54) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 115 65 65 45 70 20 85 415 85 20 205 100
Future Volume (veh/h) 115 65 65 45 70 20 85 415 85 20 205 100
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1863 1900 1863 1863 1900 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 125 71 71 49 76 22 92 451 92 22 223 0
Adj No. of Lanes 110110110111
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 336 171 171 295 278 80 829 973 199 564 1207 1026
Arrive On Green 0.20 0.20 0.20 0.20 0.20 0.20 0.65 0.65 0.65 0.65 0.65 0.00
Sat Flow, veh/h 1292 856 856 1241 1390 402 1153 1502 306 860 1863 1583
Grp Volume(v), veh/h 125 0 142 49 0 98 92 0 543 22 223 0
Grp Sat Flow(s),veh/h/ln 1292 0 1712 1241 0 1792 1153 0 1809 860 1863 1583
Q Serve(g_s), s 4.8 0.0 3.8 1.9 0.0 2.4 1.8 0.0 7.9 0.7 2.5 0.0
Cycle Q Clear(g_c), s 7.2 0.0 3.8 5.7 0.0 2.4 4.3 0.0 7.9 8.6 2.5 0.0
Prop In Lane 1.00 0.50 1.00 0.22 1.00 0.17 1.00 1.00
Lane Grp Cap(c), veh/h 336 0 342 295 0 358 829 0 1172 564 1207 1026
V/C Ratio(X) 0.37 0.00 0.42 0.17 0.00 0.27 0.11 0.00 0.46 0.04 0.18 0.00
Avail Cap(c_a), veh/h 520 0 587 473 0 614 829 0 1172 564 1207 1026
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 0.00
Uniform Delay (d), s/veh 20.8 0.0 18.3 20.8 0.0 17.8 4.6 0.0 4.7 6.8 3.7 0.0
Incr Delay (d2), s/veh 0.7 0.0 0.8 0.3 0.0 0.4 0.3 0.0 1.3 0.1 0.3 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.8 0.0 1.9 0.7 0.0 1.2 0.6 0.0 4.4 0.2 1.4 0.0
LnGrp Delay(d),s/veh 21.5 0.0 19.1 21.1 0.0 18.2 4.8 0.0 6.0 7.0 4.0 0.0
LnGrp LOS C B C B A A A A
Approach Vol, veh/h 267 147 635 245
Approach Delay, s/veh 20.2 19.1 5.8 4.3
Approach LOS C B A A
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 38.0 14.5 38.0 14.5
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 34.0 18.0 34.0 18.0
Max Q Clear Time (g_c+I1), s 9.9 9.2 10.6 7.7
Green Ext Time (p_c), s 5.9 1.3 5.8 1.4
Intersection Summary
HCM 2010 Ctrl Delay 10.0
HCM 2010 LOS B
HCM 2010 TWSC Waters' Edge West Build-Out
2: Hearthfire Drive & Douglas Road (CR 54) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 2.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 125 10 5 85 50 15
Future Vol, veh/h 125 10 5 85 50 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 136 11 5 92 54 16
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 136 0 239 136
Stage 1 - - - - 136 -
Stage 2 - - - - 103 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1448 - 749 913
Stage 1 - - - - 890 -
Stage 2 - - - - 921 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1448 - 746 913
Mov Cap-2 Maneuver - - - - 746 -
Stage 1 - - - - 890 -
Stage 2 - - - - 918 -
Approach EB WB NB
HCM Control Delay, s 0 0.4 10.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 779 - - 1448 -
HCM Lane V/C Ratio 0.091 - - 0.004 -
HCM Control Delay (s) 10.1 - - 7.5 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.3 - - 0 -
HCM 2010 TWSC Waters' Edge West - Build-Out
2: Hearthfire Drive & Douglas Road (CR 54) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 125 55 5 125 25 5
Future Vol, veh/h 125 55 5 125 25 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - 165 255 - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 136 60 5 136 27 5
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 136 0 283 136
Stage 1 - - - - 136 -
Stage 2 - - - - 147 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1448 - 707 913
Stage 1 - - - - 890 -
Stage 2 - - - - 880 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1448 - 705 913
Mov Cap-2 Maneuver - - - - 705 -
Stage 1 - - - - 890 -
Stage 2 - - - - 877 -
Approach EB WB NB
HCM Control Delay, s 0 0.3 10.1
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 733 - - 1448 -
HCM Lane V/C Ratio 0.044 - - 0.004 -
HCM Control Delay (s) 10.1 - - 7.5 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
HCM 2010 TWSC Waters' Edge West Build-Out
3: Hearthfire Drive & Morningstar Way 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.2
Movement NWL NWR NET NER SWL SWT
Lane Configurations
Traffic Vol, veh/h 15 20 15 25 10 5
Future Vol, veh/h 15 20 15 25 10 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 22 16 27 11 5
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 57 30 0 0 43 0
Stage 1 30 - - - - -
Stage 2 27 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 950 1044 - - 1566 -
Stage 1 993 - - - - -
Stage 2 996 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 943 1044 - - 1566 -
Mov Cap-2 Maneuver 943 - - - - -
Stage 1 993 - - - - -
Stage 2 989 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.8 0 4.9
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 998 1566 -
HCM Lane V/C Ratio - - 0.038 0.007 -
HCM Control Delay (s) - - 8.8 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Waters' Edge West - Build-Out
3: Hearthfire Drive & Morningstar Way 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 5.1
Movement NWL NWR NET NER SWL SWT
Lane Configurations
Traffic Vol, veh/h 20 15 10 10 20 15
Future Vol, veh/h 20 15 10 10 20 15
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 22 16 11 11 22 16
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 76 16 0 0 22 0
Stage 1 16 - - - - -
Stage 2 60 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 927 1063 - - 1593 -
Stage 1 1007 - - - - -
Stage 2 963 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 914 1063 - - 1593 -
Mov Cap-2 Maneuver 914 - - - - -
Stage 1 1007 - - - - -
Stage 2 950 - - - - -
Approach NW NE SW
HCM Control Delay, s 8.9 0 4.2
HCM LOS A
Minor Lane/Major Mvmt NET NERNWLn1 SWL SWT
Capacity (veh/h) - - 972 1593 -
HCM Lane V/C Ratio - - 0.039 0.014 -
HCM Control Delay (s) - - 8.9 7.3 0
HCM Lane LOS - - A A A
HCM 95th %tile Q(veh) - - 0.1 0 -
HCM 2010 TWSC Waters' Edge West Build-Out
4: Turnberry Road & Douglas Road (CR 54) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 95 60 20 30 5 45 5 25 5 5 10
Future Vol, veh/h 10 95 60 20 30 5 45 5 25 5 5 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 103 65 22 33 5 49 5 27 5 5 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 38 0 0 168 0 0 245 240 136 253 269 35
Stage 1 - - - - - - 158 158 - 79 79 -
Stage 2 - - - - - - 87 82 - 174 190 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1572 - - 1410 - - 709 661 913 700 637 1038
Stage 1 - - - - - - 844 767 - 930 829 -
Stage 2 - - - - - - 921 827 - 828 743 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1572 - - 1410 - - 684 645 913 663 622 1038
Mov Cap-2 Maneuver - - - - - - 684 645 - 663 622 -
Stage 1 - - - - - - 837 761 - 923 816 -
Stage 2 - - - - - - 891 814 - 791 737 -
Approach EB WB NB SB
HCM Control Delay, s 0.4 2.8 10.4 9.7
HCM LOS B A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 743 1572 - - 1410 - - 793
HCM Lane V/C Ratio 0.11 0.007 - - 0.015 - - 0.027
HCM Control Delay (s) 10.4 7.3 0 - 7.6 0 - 9.7
HCM Lane LOS B A A - A A - A
HCM 95th %tile Q(veh) 0.4 0 - - 0 - - 0.1
HCM 2010 TWSC Waters' Edge West - Build-Out
4: Turnberry Road & Douglas Road (CR 54) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 65 60 35 85 5 50 5 35 5 5 5
Future Vol, veh/h 5 65 60 35 85 5 50 5 35 5 5 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 71 65 38 92 5 54 5 38 5 5 5
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 98 0 0 136 0 0 291 288 103 307 318 95
Stage 1 - - - - - - 114 114 - 171 171 -
Stage 2 - - - - - - 177 174 - 136 147 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1495 - - 1448 - - 661 622 952 645 598 962
Stage 1 - - - - - - 891 801 - 831 757 -
Stage 2 - - - - - - 825 755 - 867 775 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1495 - - 1448 - - 637 602 952 600 579 962
Mov Cap-2 Maneuver - - - - - - 637 602 - 600 579 -
Stage 1 - - - - - - 887 798 - 828 736 -
Stage 2 - - - - - - 791 734 - 823 772 -
Approach EB WB NB SB
HCM Control Delay, s 0.3 2.1 10.7 10.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 728 1495 - - 1448 - - 677
HCM Lane V/C Ratio 0.134 0.004 - - 0.026 - - 0.024
HCM Control Delay (s) 10.7 7.4 0 - 7.6 0 - 10.4
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q(veh) 0.5 0 - - 0.1 - - 0.1
HCM 2010 TWSC Waters' Edge West Build-Out
5: Turnberry Road & Brightwater Drive 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 110 40 5 5 40 65 5 5 160 5
Future Vol, veh/h 5 5 110 40 5 5 40 65 5 5 160 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 120 43 5 5 43 71 5 5 174 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 354 351 177 350 350 73 179 0 0 76 0 0
Stage 1 188 188 - 160 160 - - - - - - -
Stage 2 166 163 - 190 190 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 601 573 866 605 574 989 1397 - - 1523 - -
Stage 1 814 745 - 842 766 - - - - - - -
Stage 2 836 763 - 812 743 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 578 554 866 504 555 989 1397 - - 1523 - -
Mov Cap-2 Maneuver 578 554 - 504 555 - - - - - - -
Stage 1 789 743 - 816 742 - - - - - - -
Stage 2 800 740 - 692 741 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 9.9 12.5 2.8 0.2
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1397 - - 566 866 535 1523 - -
HCM Lane V/C Ratio 0.031 - - 0.019 0.138 0.102 0.004 - -
HCM Control Delay (s) 7.7 - - 11.5 9.8 12.5 7.4 - -
HCM Lane LOS A - - BABA--
HCM 95th %tile Q(veh) 0.1 - - 0.1 0.5 0.3 0 - -
HCM 2010 TWSC Waters' Edge West - Build-Out
5: Turnberry Road & Brightwater Drive 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 55 15 5 10 105 160 25 5 125 5
Future Vol, veh/h 5 5 55 15 5 10 105 160 25 5 125 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 135 - - - 200 - - 100 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 60 16 5 11 114 174 27 5 136 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 573 578 139 568 568 188 141 0 0 201 0 0
Stage 1 149 149 - 416 416 - - - - - - -
Stage 2 424 429 - 152 152 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 430 427 909 434 432 854 1442 - - 1371 - -
Stage 1 854 774 - 614 592 - - - - - - -
Stage 2 608 584 - 850 772 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 394 392 909 376 396 854 1442 - - 1371 - -
Mov Cap-2 Maneuver 394 392 - 376 396 - - - - - - -
Stage 1 786 771 - 565 545 - - - - - - -
Stage 2 547 538 - 786 769 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 10 13.3 2.8 0.3
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1442 - - 393 909 467 1371 - -
HCM Lane V/C Ratio 0.079 - - 0.028 0.066 0.07 0.004 - -
HCM Control Delay (s) 7.7 - - 14.4 9.2 13.3 7.6 - -
HCM Lane LOS A - - BABA--
HCM 95th %tile Q(veh) 0.3 - - 0.1 0.2 0.2 0 - -
HCM 2010 TWSC Waters' Edge West Build-Out
6: Turnberry Road & Richards Lake Road (CR 52) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 5 30 60 5 10 10 125 15 20 365 5
Future Vol, veh/h 10 5 30 60 5 10 10 125 15 20 365 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 11 5 33 65 5 11 11 136 16 22 397 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 609 601 399 604 604 136 402 0 0 136 0 0
Stage 1 443 443 - 158 158 - - - - - - -
Stage 2 166 158 - 446 446 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 407 414 651 410 412 913 1157 - - 1448 - -
Stage 1 594 576 - 844 767 - - - - - - -
Stage 2 836 767 - 591 574 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 391 404 651 378 402 913 1157 - - 1448 - -
Mov Cap-2 Maneuver 391 404 - 378 402 - - - - - - -
Stage 1 588 567 - 836 760 - - - - - - -
Stage 2 812 760 - 548 565 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12 15.4 0.5 0.4
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1157 - - 395 651 378 641 1448 - -
HCM Lane V/C Ratio 0.009 - - 0.041 0.05 0.173 0.025 0.015 - -
HCM Control Delay (s) 8.1 - - 14.5 10.8 16.5 10.8 7.5 - -
HCM Lane LOS A - - B B C B A - -
HCM 95th %tile Q(veh) 0 - - 0.1 0.2 0.6 0.1 0 - -
HCM 2010 TWSC Waters' Edge West - Build-Out
6: Turnberry Road & Richards Lake Road (CR 52) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 2.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 10 40 5 25 20 315 55 20 210 5
Future Vol, veh/h 5 5 10 40 5 25 20 315 55 20 210 5
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 0 - - 330 - 240 90 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 5 5 11 43 5 27 22 342 60 22 228 5
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 676 660 231 663 663 342 234 0 0 342 0 0
Stage 1 274 274 - 386 386 - - - - - - -
Stage 2 402 386 - 277 277 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 367 383 808 375 382 701 1333 - - 1217 - -
Stage 1 732 683 - 637 610 - - - - - - -
Stage 2 625 610 - 729 681 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 340 370 808 356 369 701 1333 - - 1217 - -
Mov Cap-2 Maneuver 340 370 - 356 369 - - - - - - -
Stage 1 720 671 - 626 600 - - - - - - -
Stage 2 586 600 - 700 669 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 12.5 14.2 0.4 0.7
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1WBLn2 SBL SBT SBR
Capacity (veh/h) 1333 - - 354 808 356 610 1217 - -
HCM Lane V/C Ratio 0.016 - - 0.031 0.013 0.122 0.053 0.018 - -
HCM Control Delay (s) 7.7 - - 15.5 9.5 16.5 11.2 8 - -
HCM Lane LOS A - - C A C B A - -
HCM 95th %tile Q(veh) 0.1 - - 0.1 0 0.4 0.2 0.1 - -
HCM 2010 TWSC Waters' Edge West Build-Out
8: Turnberry Road & Country Club Road 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 90 10 190 25 40 5 55 75 10 5 320 380
Future Vol, veh/h 90 10 190 25 40 5 55 75 10 5 320 380
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 98 11 207 27 43 5 60 82 11 5 348 413
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 590 571 348 571 566 87 348 0 0 92 0 0
Stage 1 359 359 - 207 207 - - - - - - -
Stage 2 231 212 - 364 359 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver 419 431 695 432 434 971 1211 - - 1503 - -
Stage 1 659 627 - 795 731 - - - - - - -
Stage 2 772 727 - 655 627 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 368 408 695 286 411 971 1211 - - 1503 - -
Mov Cap-2 Maneuver 368 408 - 286 411 - - - - - - -
Stage 1 626 625 - 756 695 - - - - - - -
Stage 2 684 691 - 451 625 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s 14.5 17.3 3.2 0.1
HCM LOS B C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1211 - - 372 695 369 1503 - -
HCM Lane V/C Ratio 0.049 - - 0.292 0.297 0.206 0.004 - -
HCM Control Delay (s) 8.1 - - 18.6 12.4 17.3 7.4 - -
HCM Lane LOS A - - C B C A - -
HCM 95th %tile Q(veh) 0.2 - - 1.2 1.2 0.8 0 - -
HCM 2010 TWSC Waters' Edge West - Build-Out
8: Turnberry Road & Country Club Road 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 148.3
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 305 60 60 5 15 5 210 295 30 5 150 215
Future Vol, veh/h 305 60 60 5 15 5 210 295 30 5 150 215
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 50 - - - 175 - - 300 - 235
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 332 65 65 5 16 5 228 321 33 5 163 234
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 978 984 163 1000 967 337 163 0 0 353 0 0
Stage 1 174 174 - 793 793 - - - - - - -
Stage 2 804 810 - 207 174 - - - - - - -
Critical Hdwy 7.12 6.52 6.22 7.12 6.52 6.22 4.12 - - 4.12 - -
Critical Hdwy Stg 1 6.12 5.52 - 6.12 5.52 - - - - - - -
Critical Hdwy Stg 2 6.12 5.52 - 6.12 5.52 - - - - - - -
Follow-up Hdwy 3.518 4.018 3.318 3.518 4.018 3.318 2.218 - - 2.218 - -
Pot Cap-1 Maneuver ~ 230 248 882 222 254 705 1416 - - 1206 - -
Stage 1 828 755 - 382 400 - - - - - - -
Stage 2 377 393 - 795 755 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver ~ 188 207 882 137 212 705 1416 - - 1206 - -
Mov Cap-2 Maneuver ~ 188 207 - 137 212 - - - - - - -
Stage 1 695 752 - 320 336 - - - - - - -
Stage 2 ~ 299 330 - 670 752 - - - - - - -
Approach EB WB NB SB
HCM Control Delay, s $ 467.2 23.8 3.2 0.1
HCM LOS F C
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR
Capacity (veh/h) 1416 - - 191 882 219 1206 - -
HCM Lane V/C Ratio 0.161 - - 2.077 0.074 0.124 0.005 - -
HCM Control Delay (s) 8 - -$ 542.5 9.4 23.8 8 - -
HCM Lane LOS A - - F A C A - -
HCM 95th %tile Q(veh) 0.6 - - 30.6 0.2 0.4 0 - -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 2010 AWSC Waters' Edge West Build-Out
7: Lemay Avenue & Country Club Road 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 34.1
Intersection LOS D
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Lane Configurations
Traffic Vol, veh/h 0 10 150 105 0 350 185 5 0 25 55 75
Future Vol, veh/h 0 10 150 105 0 350 185 5 0 25 55 75
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 11 163 114 0 380 201 5 0 27 60 82
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 15.4 56 13.4
HCM LOS C F B
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 16% 4% 65% 13%
Vol Thru, % 35% 57% 34% 82%
Vol Right, % 48% 40% 1% 5%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 155 265 540 195
LT Vol 25 10 350 25
Through Vol 55 150 185 160
RT Vol 75 105 5 10
Lane Flow Rate 168 288 587 212
Geometry Grp 1111
Degree of Util (X) 0.325 0.499 0.978 0.415
Departure Headway (Hd) 6.949 6.238 6.001 7.042
Convergence, Y/N Yes Yes Yes Yes
Cap 514 573 605 509
Service Time 5.034 4.313 4.06 5.12
HCM Lane V/C Ratio 0.327 0.503 0.97 0.417
HCM Control Delay 13.4 15.4 56 15.1
HCM Lane LOS B C F C
HCM 95th-tile Q 1.4 2.8 14 2
HCM 2010 AWSC Waters' Edge West Build-Out
7: Lemay Avenue & Country Club Road 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 25 160 10
Future Vol, veh/h 0 25 160 10
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 27 174 11
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 15.1
HCM LOS C
HCM 2010 AWSC Waters' Edge West - Build-Out
7: Lemay Avenue & Country Club Road 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 100.3
Intersection LOS F
Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR
Lane Configurations
Traffic Vol, veh/h 0 10 320 70 0 185 190 30 0 110 145 340
Future Vol, veh/h 0 10 320 70 0 185 190 30 0 110 145 340
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 222222222222
Mvmt Flow 0 11 348 76 0 201 207 33 0 120 158 370
Number of Lanes 001000100010
Approach EB WB NB
Opposing Approach WB EB SB
Opposing Lanes 1 1 1
Conflicting Approach Left SB NB EB
Conflicting Lanes Left 1 1 1
Conflicting Approach Right NB SB WB
Conflicting Lanes Right 1 1 1
HCM Control Delay 53.5 58.6 174.8
HCM LOS F F F
Lane NBLn1 EBLn1 WBLn1 SBLn1
Vol Left, % 18% 3% 46% 19%
Vol Thru, % 24% 80% 47% 76%
Vol Right, % 57% 17% 7% 5%
Sign Control Stop Stop Stop Stop
Traffic Vol by Lane 595 400 405 105
LT Vol 110 10 185 20
Through Vol 145 320 190 80
RT Vol 340 70 30 5
Lane Flow Rate 647 435 440 114
Geometry Grp 1111
Degree of Util (X) 1.307 0.91 0.934 0.291
Departure Headway (Hd) 7.278 8.47 8.578 10.176
Convergence, Y/N Yes Yes Yes Yes
Cap 498 430 427 355
Service Time 5.359 6.47 6.578 8.176
HCM Lane V/C Ratio 1.299 1.012 1.03 0.321
HCM Control Delay 174.8 53.5 58.6 17.3
HCM Lane LOS F F F C
HCM 95th-tile Q 27.5 9.9 10.5 1.2
HCM 2010 AWSC Waters' Edge West - Build-Out
7: Lemay Avenue & Country Club Road 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 2
Intersection
Intersection Delay, s/veh
Intersection LOS
Movement SBU SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 20 80 5
Future Vol, veh/h 0 20 80 5
Peak Hour Factor 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2222
Mvmt Flow 0 22 87 5
Number of Lanes 0010
Approach SB
Opposing Approach NB
Opposing Lanes 1
Conflicting Approach Left WB
Conflicting Lanes Left 1
Conflicting Approach Right EB
Conflicting Lanes Right 1
HCM Control Delay 17.3
HCM LOS C
HCM 2010 Roundabout Waters' Edge West Build-Out
8: Turnberry Road & Country Club Road 01/23/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 14.9
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 316 75 180 766
Demand Flow Rate, veh/h 322 77 183 781
Vehicles Circulating, veh/h 388 272 116 133
Vehicles Exiting, veh/h 526 27 594 216
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 10.3 5.2 5.4 20.0
Approach LOS B A A C
Lane Left Left Left Left
Designated Moves LTR LTR LTR LTR
Assumed Moves LTR LTR LTR LTR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 322 77 183 781
Cap Entry Lane, veh/h 767 861 1006 989
Entry HV Adj Factor 0.981 0.976 0.983 0.981
Flow Entry, veh/h 316 75 180 766
Cap Entry, veh/h 752 840 989 970
V/C Ratio 0.420 0.089 0.182 0.790
Control Delay, s/veh 10.3 5.2 5.4 20.0
LOS B A A C
95th %tile Queue, veh 2018
HCM 2010 Roundabout Waters' Edge West - Build-Out
8: Turnberry Road & Country Club Road 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 15.0
Intersection LOS B
Approach EB WB NB SB
Entry Lanes 1112
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 462 26 582 402
Demand Flow Rate, veh/h 471 26 594 410
Vehicles Circulating, veh/h 176 899 410 254
Vehicles Exiting, veh/h 488 105 237 671
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 10.1 8.7 24.8 6.7
Approach LOS B A C A
Lane Left Left Left Left Right
Designated Moves LTR LTR LTR LT R
Assumed Moves LTR LTR LTR LT R
RT Channelized
Lane Util 1.000 1.000 1.000 0.417 0.583
Critical Headway, s 5.193 5.193 5.193 5.193 5.193
Entry Flow, veh/h 471 26 594 171 239
Cap Entry Lane, veh/h 948 460 750 876 876
Entry HV Adj Factor 0.980 0.988 0.979 0.981 0.979
Flow Entry, veh/h 462 26 582 168 234
Cap Entry, veh/h 929 454 734 860 858
V/C Ratio 0.497 0.057 0.792 0.195 0.273
Control Delay, s/veh 10.1 8.7 24.8 6.2 7.1
LOS B A C A A
95th %tile Queue, veh 3081 1
HCM 2010 Signalized Intersection Summary Waters' Edge West Build-Out
8: Turnberry Road & Country Club Road 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 90 10 190 25 40 5 55 75 10 5 320 380
Future Volume (veh/h) 90 10 190 25 40 5 55 75 10 5 320 380
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1863 1900 1863 1900 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 98 11 207 27 43 5 60 82 11 5 348 413
Adj No. of Lanes 011010110111
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 377 35 297 167 216 20 518 909 122 836 978 831
Arrive On Green 0.19 0.19 0.19 0.19 0.19 0.19 0.05 0.56 0.56 0.01 0.52 0.52
Sat Flow, veh/h 1276 188 1583 362 1153 108 1774 1609 216 1774 1863 1583
Grp Volume(v), veh/h 109 0 207 75 0 0 60 0 93 5 348 413
Grp Sat Flow(s),veh/h/ln 1464 0 1583 1623 0 0 1774 0 1825 1774 1863 1583
Q Serve(g_s), s 1.2 0.0 6.1 0.0 0.0 0.0 0.7 0.0 1.2 0.1 5.4 8.3
Cycle Q Clear(g_c), s 2.9 0.0 6.1 1.7 0.0 0.0 0.7 0.0 1.2 0.1 5.4 8.3
Prop In Lane 0.90 1.00 0.36 0.07 1.00 0.12 1.00 1.00
Lane Grp Cap(c), veh/h 412 0 297 403 0 0 518 0 1031 836 978 831
V/C Ratio(X) 0.26 0.00 0.70 0.19 0.00 0.00 0.12 0.00 0.09 0.01 0.36 0.50
Avail Cap(c_a), veh/h 657 0 575 669 0 0 581 0 1031 970 978 831
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 17.4 0.0 18.8 17.0 0.0 0.0 5.1 0.0 4.9 5.5 6.9 7.6
Incr Delay (d2), s/veh 0.3 0.0 3.0 0.2 0.0 0.0 0.1 0.0 0.2 0.0 1.0 2.1
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 1.3 0.0 2.8 0.9 0.0 0.0 0.4 0.0 0.6 0.0 3.0 4.0
LnGrp Delay(d),s/veh 17.8 0.0 21.8 17.3 0.0 0.0 5.2 0.0 5.1 5.5 7.9 9.7
LnGrp LOS B C B A AAAA
Approach Vol, veh/h 316 75 153 766
Approach Delay, s/veh 20.4 17.3 5.1 8.8
Approach LOS C B A A
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 32.0 13.3 6.2 30.0 13.3
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 4.0 26.0 18.0 4.0 26.0 18.0
Max Q Clear Time (g_c+I1), s 2.1 3.2 8.1 2.7 10.3 3.7
Green Ext Time (p_c), s 0.0 4.3 1.3 0.0 3.9 1.5
Intersection Summary
HCM 2010 Ctrl Delay 11.7
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Waters' Edge West - Build-Out
8: Turnberry Road & Country Club Road 01/23/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 305 60 160 5 15 5 210 295 30 5 150 215
Future Volume (veh/h) 305 60 160 5 15 5 210 295 30 5 150 215
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1863 1900 1863 1900 1863 1863 1900 1863 1863 1863
Adj Flow Rate, veh/h 332 65 174 5 16 5 228 321 33 5 163 234
Adj No. of Lanes 011010110111
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 303 35 532 105 273 71 591 715 74 447 602 512
Arrive On Green 0.34 0.34 0.34 0.34 0.34 0.34 0.11 0.43 0.43 0.01 0.32 0.32
Sat Flow, veh/h 528 103 1583 71 814 211 1774 1662 171 1774 1863 1583
Grp Volume(v), veh/h 397 0 174 26 0 0 228 0 354 5 163 234
Grp Sat Flow(s),veh/h/ln 632 0 1583 1095 0 0 1774 0 1833 1774 1863 1583
Q Serve(g_s), s 13.6 0.0 4.3 0.1 0.0 0.0 4.1 0.0 7.2 0.1 3.4 6.2
Cycle Q Clear(g_c), s 13.6 0.0 4.3 13.7 0.0 0.0 4.1 0.0 7.2 0.1 3.4 6.2
Prop In Lane 0.84 1.00 0.19 0.19 1.00 0.09 1.00 1.00
Lane Grp Cap(c), veh/h 0 0 532 450 0 0 591 0 789 447 602 512
V/C Ratio(X) 0.00 0.00 0.33 0.06 0.00 0.00 0.39 0.00 0.45 0.01 0.27 0.46
Avail Cap(c_a), veh/h 0 0 722 450 0 0 627 0 789 573 602 512
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 0.0 0.0 13.0 12.2 0.0 0.0 8.7 0.0 10.6 11.9 13.2 14.1
Incr Delay (d2), s/veh 0.0 0.0 0.4 0.1 0.0 0.0 0.4 0.0 1.8 0.0 1.1 2.9
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.0 0.0 1.9 0.3 0.0 0.0 2.0 0.0 3.9 0.0 1.9 3.1
LnGrp Delay(d),s/veh 0.0 0.0 13.4 12.2 0.0 0.0 9.1 0.0 12.4 11.9 14.3 17.1
LnGrp LOS B B A BBBB
Approach Vol, veh/h 571 26 582 402
Approach Delay, s/veh 4.1 12.2 11.1 15.9
Approach LOS ABBB
Timer 12345678
Assigned Phs 1 2 4 5 6 8
Phs Duration (G+Y+Rc), s 4.3 26.6 21.7 9.9 21.0 21.7
Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0
Max Green Setting (Gmax), s 4.0 20.0 24.0 7.0 17.0 16.0
Max Q Clear Time (g_c+I1), s 2.1 9.2 15.6 6.1 8.2 15.7
Green Ext Time (p_c), s 0.0 3.0 2.0 0.1 2.7 0.1
Intersection Summary
HCM 2010 Ctrl Delay 9.8
HCM 2010 LOS A
HCM 2010 AWSC Waters' Edge West Build-Out
9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 21.4
Intersection LOS C
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 10 35 0 10 150 0 575 5
Future Vol, veh/h 0 10 35 0 10 150 0 575 5
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 11 38 0 11 163 0 625 5
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 9.4 9.7 25.5
HCM LOS A A D
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 22% 0% 99%
Vol Thru, % 78% 6% 0%
Vol Right, % 0% 94% 1%
Sign Control Stop Stop Stop
Traffic Vol by Lane 45 160 580
LT Vol 10 0 575
Through Vol 35 10 0
RT Vol 0 150 5
Lane Flow Rate 49 174 630
Geometry Grp 1 1 1
Degree of Util (X) 0.079 0.242 0.82
Departure Headway (Hd) 5.793 5.004 4.682
Convergence, Y/N Yes Yes Yes
Cap 613 713 769
Service Time 3.883 3.073 2.742
HCM Lane V/C Ratio 0.08 0.244 0.819
HCM Control Delay 9.4 9.7 25.5
HCM Lane LOS A A D
HCM 95th-tile Q 0.3 0.9 9
HCM 2010 AWSC Waters' Edge West - Build-Out
9: Adriel Drive/Mountain Vista Drive (CR 50) & Turnberry Road 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 15.3
Intersection LOS C
Movement EBU EBL EBT WBU WBT WBR SBU SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 15 20 0 35 485 0 280 25
Future Vol, veh/h 0 15 20 0 35 485 0 280 25
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles, % 2 2 2 2 2222 2
Mvmt Flow 0 16 22 0 38 527 0 304 27
Number of Lanes 0 0 1 0 1001 0
Approach EB WB SB
Opposing Approach WB EB
Opposing Lanes 1 1 0
Conflicting Approach Left SB WB
Conflicting Lanes Left 1 0 1
Conflicting Approach Right SB EB
Conflicting Lanes Right 0 1 1
HCM Control Delay 9.1 16.4 14
HCM LOS A C B
Lane EBLn1 WBLn1 SBLn1
Vol Left, % 43% 0% 92%
Vol Thru, % 57% 7% 0%
Vol Right, % 0% 93% 8%
Sign Control Stop Stop Stop
Traffic Vol by Lane 35 520 305
LT Vol 15 0 280
Through Vol 20 35 0
RT Vol 0 485 25
Lane Flow Rate 38 565 332
Geometry Grp 1 1 1
Degree of Util (X) 0.06 0.683 0.506
Departure Headway (Hd) 5.711 4.352 5.492
Convergence, Y/N Yes Yes Yes
Cap 628 820 660
Service Time 3.736 2.43 3.494
HCM Lane V/C Ratio 0.061 0.689 0.503
HCM Control Delay 9.1 16.4 14
HCM Lane LOS A C B
HCM 95th-tile Q 0.2 5.5 2.9
HCM 2010 TWSC Waters' Edge West Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 5.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 360 275 165 95 70 80
Future Vol, veh/h 360 275 165 95 70 80
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 391 299 179 103 76 87
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 690 0 1003 541
Stage 1 - - - - 541 -
Stage 2 - - - - 462 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 905 - 268 541
Stage 1 - - - - 583 -
Stage 2 - - - - 634 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 905 - 212 541
Mov Cap-2 Maneuver - - - - 212 -
Stage 1 - - - - 583 -
Stage 2 - - - - 501 -
Approach EB WB NB
HCM Control Delay, s 0 6.3 28.2
HCM LOS D
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 314 - - 905 -
HCM Lane V/C Ratio 0.519 - - 0.198 -
HCM Control Delay (s) 28.2 - - 10 0
HCM Lane LOS D - - A A
HCM 95th %tile Q(veh) 2.8 - - 0.7 -
HCM 2010 TWSC Waters' Edge West - Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 103.9
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 175 140 150 480 235 190
Future Vol, veh/h 175 140 150 480 235 190
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 190 152 163 522 255 207
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 342 0 1114 266
Stage 1 - - - - 266 -
Stage 2 - - - - 848 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1217 - ~ 230 773
Stage 1 - - - - 779 -
Stage 2 - - - - 420 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1217 - ~ 187 773
Mov Cap-2 Maneuver - - - - ~ 187 -
Stage 1 - - - - 779 -
Stage 2 - - - - 341 -
Approach EB WB NB
HCM Control Delay, s 0 2 $ 332
HCM LOS F
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 283 - - 1217 -
HCM Lane V/C Ratio 1.632 - - 0.134 -
HCM Control Delay (s) $ 332 - - 8.4 0
HCM Lane LOS F - - A A
HCM 95th %tile Q(veh) 28.5 - - 0.5 -
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
HCM 2010 TWSC Waters' Edge West Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 5.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 360 275 165 0 70 80
Future Vol, veh/h 360 275 165 0 70 80
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 391 299 179 0 76 87
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 690 0 900 541
Stage 1 - - - - 541 -
Stage 2 - - - - 359 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 905 - 309 541
Stage 1 - - - - 583 -
Stage 2 - - - - 707 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 905 - 248 541
Mov Cap-2 Maneuver - - - - 248 -
Stage 1 - - - - 583 -
Stage 2 - - - - 567 -
Approach EB WB NB
HCM Control Delay, s 0 10 24
HCM LOS C
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 349 - - 905 -
HCM Lane V/C Ratio 0.467 - - 0.198 -
HCM Control Delay (s) 24 - - 10 0
HCM Lane LOS C - - A A
HCM 95th %tile Q(veh) 2.4 - - 0.7 -
Channelized T
HCM 2010 TWSC Waters' Edge West - Build-Out
10: Timberline Drive & Mountain Vista Drive (CR 50) 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 23.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 175 140 150 0 235 190
Future Vol, veh/h 175 140 150 0 235 190
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 190 152 163 0 255 207
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 342 0 592 266
Stage 1 - - - - 266 -
Stage 2 - - - - 326 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1217 - 469 773
Stage 1 - - - - 779 -
Stage 2 - - - - 731 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1217 - 406 773
Mov Cap-2 Maneuver - - - - 406 -
Stage 1 - - - - 779 -
Stage 2 - - - - 633 -
Approach EB WB NB
HCM Control Delay, s 0 8.4 46.8
HCM LOS E
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 515 - - 1217 -
HCM Lane V/C Ratio 0.897 - - 0.134 -
HCM Control Delay (s) 46.8 - - 8.4 0
HCM Lane LOS E - - A A
HCM 95th %tile Q(veh) 10.3 - - 0.5 -
Channelize T
HCM 2010 Signalized Intersection Summary Waters' Edge West Build-Out
11: Lemay Avenue & Vine Drive 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 20 190 110 170 315 155 50 385 75 75 735 35
Future Volume (veh/h) 20 190 110 170 315 155 50 385 75 75 735 35
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1810 1788 1863 1810 1788 1788 1863 1788 1788 1937 1788
Adj Flow Rate, veh/h 23 221 128 198 366 180 58 448 87 87 855 41
Adj No. of Lanes 121121121121
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 252252222222
Cap, veh/h 275 537 216 381 761 315 316 1504 624 456 1596 638
Arrive On Green 0.03 0.16 0.14 0.10 0.22 0.21 0.04 0.42 0.41 0.05 0.43 0.42
Sat Flow, veh/h 1774 3438 1520 1774 3438 1520 1703 3539 1520 1703 3681 1520
Grp Volume(v), veh/h 23 221 128 198 366 180 58 448 87 87 855 41
Grp Sat Flow(s),veh/h/ln 1774 1719 1520 1774 1719 1520 1703 1770 1520 1703 1840 1520
Q Serve(g_s), s 0.7 4.1 5.5 6.3 6.5 7.5 1.4 5.8 2.5 2.0 12.0 1.1
Cycle Q Clear(g_c), s 0.7 4.1 5.5 6.3 6.5 7.5 1.4 5.8 2.5 2.0 12.0 1.1
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 275 537 216 381 761 315 316 1504 624 456 1596 638
V/C Ratio(X) 0.08 0.41 0.59 0.52 0.48 0.57 0.18 0.30 0.14 0.19 0.54 0.06
Avail Cap(c_a), veh/h 390 884 369 381 884 369 348 1504 624 521 1596 638
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 23.2 26.6 28.1 20.5 23.8 25.0 12.0 13.3 12.9 11.1 14.6 12.1
Incr Delay (d2), s/veh 0.1 0.5 2.6 1.3 0.5 1.6 0.3 0.5 0.5 0.2 1.3 0.2
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 2.0 2.5 3.2 3.1 3.3 0.7 2.9 1.1 1.0 6.3 0.5
LnGrp Delay(d),s/veh 23.4 27.1 30.7 21.7 24.2 26.6 12.3 13.8 13.4 11.3 15.9 12.3
LnGrp LOS CCCCCCBBBBBB
Approach Vol, veh/h 372 744 593 983
Approach Delay, s/veh 28.1 24.1 13.6 15.4
Approach LOS C C B B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 7.7 35.4 11.0 15.9 8.3 34.7 6.4 20.5
Change Period (Y+Rc), s 5.0 6.0 5.0 6.0 5.0 6.0 5.0 6.0
Max Green Setting (Gmax), s 4.0 21.0 6.0 17.0 6.0 19.0 6.0 17.0
Max Q Clear Time (g_c+I1), s 3.4 14.0 8.3 7.5 4.0 7.8 2.7 9.5
Green Ext Time (p_c), s 0.0 3.5 0.0 2.4 0.0 4.7 0.0 2.1
Intersection Summary
HCM 2010 Ctrl Delay 19.2
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Waters' Edge West - Build-Out
11: Lemay Avenue & Vine Drive 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 25 355 135 135 265 175 80 915 270 140 600 55
Future Volume (veh/h) 25 355 135 135 265 175 80 915 270 140 600 55
Number 7 4 14 3 8 18 1 6 16 5 2 12
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1863 1810 1788 1863 1810 1788 1788 1863 1788 1788 1937 1788
Adj Flow Rate, veh/h 29 413 157 157 308 203 93 1064 314 163 698 64
Adj No. of Lanes 121121121121
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Percent Heavy Veh, % 252252222222
Cap, veh/h 332 656 268 351 869 362 344 1227 505 271 1397 555
Arrive On Green 0.04 0.19 0.18 0.10 0.25 0.24 0.05 0.35 0.33 0.09 0.38 0.37
Sat Flow, veh/h 1774 3438 1520 1774 3438 1520 1703 3539 1520 1703 3681 1520
Grp Volume(v), veh/h 29 413 157 157 308 203 93 1064 314 163 698 64
Grp Sat Flow(s),veh/h/ln 1774 1719 1520 1774 1719 1520 1703 1770 1520 1703 1840 1520
Q Serve(g_s), s 0.9 7.6 6.6 4.6 5.1 8.1 2.5 19.4 12.0 4.3 10.1 1.9
Cycle Q Clear(g_c), s 0.9 7.6 6.6 4.6 5.1 8.1 2.5 19.4 12.0 4.3 10.1 1.9
Prop In Lane 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 332 656 268 351 869 362 344 1227 505 271 1397 555
V/C Ratio(X) 0.09 0.63 0.59 0.45 0.35 0.56 0.27 0.87 0.62 0.60 0.50 0.12
Avail Cap(c_a), veh/h 442 894 373 351 894 373 424 1227 505 296 1397 555
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Uniform Delay (d), s/veh 20.9 25.8 26.2 18.3 21.2 23.2 14.3 21.1 19.5 16.5 16.4 14.6
Incr Delay (d2), s/veh 0.1 1.0 2.0 0.9 0.2 1.8 0.4 8.4 5.7 2.9 1.3 0.4
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.4 3.7 2.9 2.3 2.4 3.5 1.2 10.9 5.8 2.2 5.3 0.9
LnGrp Delay(d),s/veh 21.0 26.8 28.2 19.2 21.5 25.0 14.7 29.5 25.1 19.4 17.7 15.0
LnGrp LOS C C C B C C B C C B B B
Approach Vol, veh/h 599 668 1471 925
Approach Delay, s/veh 26.9 22.0 27.6 17.8
Approach LOS C C C B
Timer 12345678
Assigned Phs 12345678
Phs Duration (G+Y+Rc), s 8.7 31.3 11.0 18.2 11.0 29.0 6.7 22.5
Change Period (Y+Rc), s 5.0 6.0 5.0 6.0 5.0 6.0 5.0 6.0
Max Green Setting (Gmax), s 7.0 23.0 6.0 17.0 7.0 23.0 6.0 17.0
Max Q Clear Time (g_c+I1), s 4.5 12.1 6.6 9.6 6.3 21.4 2.9 10.1
Green Ext Time (p_c), s 0.0 6.7 0.0 2.6 0.0 1.3 0.0 2.5
Intersection Summary
HCM 2010 Ctrl Delay 24.0
HCM 2010 LOS C
HCM 2010 Signalized Intersection Summary Waters' Edge West Build-Out
12: Vine Drive & Timberline Drive 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 55 110 175 185 240 10 120 120 30 5 55 80
Future Volume (veh/h) 55 110 175 185 240 10 120 120 30 5 55 80
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 60 120 190 201 261 11 130 130 33 5 60 87
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 149 260 348 321 357 14 311 289 63 76 256 350
Arrive On Green 0.41 0.41 0.41 0.41 0.41 0.41 0.36 0.36 0.36 0.36 0.36 0.36
Sat Flow, veh/h 169 638 852 547 875 34 583 796 175 14 706 964
Grp Volume(v), veh/h 370 0 0 473 0 0 293 0 0 152 0 0
Grp Sat Flow(s),veh/h/ln 1659 0 0 1456 0 0 1553 0 0 1685 0 0
Q Serve(g_s), s 0.0 0.0 0.0 6.0 0.0 0.0 3.9 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 8.6 0.0 0.0 14.6 0.0 0.0 7.2 0.0 0.0 3.3 0.0 0.0
Prop In Lane 0.16 0.51 0.42 0.02 0.44 0.11 0.03 0.57
Lane Grp Cap(c), veh/h 757 0 0 692 0 0 663 0 0 683 0 0
V/C Ratio(X) 0.49 0.00 0.00 0.68 0.00 0.00 0.44 0.00 0.00 0.22 0.00 0.00
Avail Cap(c_a), veh/h 983 0 0 898 0 0 663 0 0 683 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 11.7 0.0 0.0 13.3 0.0 0.0 12.8 0.0 0.0 11.7 0.0 0.0
Incr Delay (d2), s/veh 0.5 0.0 0.0 1.4 0.0 0.0 2.1 0.0 0.0 0.8 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 4.1 0.0 0.0 6.2 0.0 0.0 3.6 0.0 0.0 1.7 0.0 0.0
LnGrp Delay(d),s/veh 12.2 0.0 0.0 14.7 0.0 0.0 14.9 0.0 0.0 12.4 0.0 0.0
LnGrp LOS BBBB
Approach Vol, veh/h 370 473 293 152
Approach Delay, s/veh 12.2 14.7 14.9 12.4
Approach LOS BBBB
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 25.0 27.3 25.0 27.3
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 19.0 29.0 19.0 29.0
Max Q Clear Time (g_c+I1), s 9.2 10.6 5.3 16.6
Green Ext Time (p_c), s 2.0 5.8 2.4 4.8
Intersection Summary
HCM 2010 Ctrl Delay 13.8
HCM 2010 LOS B
HCM 2010 Signalized Intersection Summary Waters' Edge West - Build-Out
12: Vine Drive & Timberline Drive 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 90 270 120 90 195 15 145 300 95 10 175 60
Future Volume (veh/h) 90 270 120 90 195 15 145 300 95 10 175 60
Number 7 4 14 3 8 18 5 2 12 1 6 16
Initial Q (Qb), veh 000000000000
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Adj Sat Flow, veh/h/ln 1900 1863 1900 1900 1863 1900 1900 1863 1900 1900 1863 1900
Adj Flow Rate, veh/h 98 293 130 98 212 16 158 326 103 11 190 65
Adj No. of Lanes 010010010010
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 222222222222
Cap, veh/h 166 382 157 201 397 27 234 396 117 77 546 180
Arrive On Green 0.37 0.37 0.37 0.37 0.37 0.37 0.41 0.41 0.41 0.41 0.41 0.41
Sat Flow, veh/h 240 1027 421 316 1068 71 368 959 283 24 1323 436
Grp Volume(v), veh/h 521 0 0 326 0 0 587 0 0 266 0 0
Grp Sat Flow(s),veh/h/ln 1688 0 0 1455 0 0 1610 0 0 1783 0 0
Q Serve(g_s), s 6.1 0.0 0.0 0.0 0.0 0.0 12.7 0.0 0.0 0.0 0.0 0.0
Cycle Q Clear(g_c), s 15.2 0.0 0.0 9.2 0.0 0.0 18.5 0.0 0.0 5.7 0.0 0.0
Prop In Lane 0.19 0.25 0.30 0.05 0.27 0.18 0.04 0.24
Lane Grp Cap(c), veh/h 704 0 0 625 0 0 747 0 0 803 0 0
V/C Ratio(X) 0.74 0.00 0.00 0.52 0.00 0.00 0.79 0.00 0.00 0.33 0.00 0.00
Avail Cap(c_a), veh/h 828 0 0 736 0 0 747 0 0 803 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 15.6 0.0 0.0 13.6 0.0 0.0 14.7 0.0 0.0 11.3 0.0 0.0
Incr Delay (d2), s/veh 3.0 0.0 0.0 0.7 0.0 0.0 8.2 0.0 0.0 1.1 0.0 0.0
Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 7.7 0.0 0.0 4.0 0.0 0.0 9.8 0.0 0.0 3.1 0.0 0.0
LnGrp Delay(d),s/veh 18.6 0.0 0.0 14.2 0.0 0.0 22.9 0.0 0.0 12.4 0.0 0.0
LnGrp LOS B B C B
Approach Vol, veh/h 521 326 587 266
Approach Delay, s/veh 18.6 14.2 22.9 12.4
Approach LOS B B C B
Timer 12345678
Assigned Phs 2468
Phs Duration (G+Y+Rc), s 29.0 26.7 29.0 26.7
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 23.0 25.0 23.0 25.0
Max Q Clear Time (g_c+I1), s 20.5 17.2 7.7 11.2
Green Ext Time (p_c), s 1.4 3.5 5.3 5.0
Intersection Summary
HCM 2010 Ctrl Delay 18.3
HCM 2010 LOS B
HCM 2010 Roundabout Waters' Edge West Build-Out
34: Brightwater Drive & Morningstar Drive Collector & Morningstar Way 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 3.5
Intersection LOS A
Approach WB NB SB SE
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 21 15 21 32
Demand Flow Rate, veh/h 21 15 21 32
Vehicles Circulating, veh/h 15 32 21 21
Vehicles Exiting, veh/h 32 21 15 21
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 3.4 3.4 3.4 3.5
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LR LTR LTR LR
Assumed Moves LR LTR LTR LR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 21 15 21 32
Cap Entry Lane, veh/h 1113 1094 1106 1106
Entry HV Adj Factor 1.000 0.993 0.990 0.997
Flow Entry, veh/h 21 15 21 32
Cap Entry, veh/h 1113 1087 1095 1103
V/C Ratio 0.019 0.014 0.019 0.029
Control Delay, s/veh 3.4 3.4 3.4 3.5
LOSAAAA
95th %tile Queue, veh 0000
HCM 2010 Roundabout Waters' Edge West - Build-Out
34: Brightwater Drive & Morningstar Drive Collector & Morningstar Way 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Intersection Delay, s/veh 3.5
Intersection LOS A
Approach WB NB SB SE
Entry Lanes 1111
Conflicting Circle Lanes 1111
Adj Approach Flow, veh/h 43 21 21 26
Demand Flow Rate, veh/h 44 21 21 26
Vehicles Circulating, veh/h 21 26 38 21
Vehicles Exiting, veh/h 26 21 27 38
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 0000
Ped Cap Adj 1.000 1.000 1.000 1.000
Approach Delay, s/veh 3.7 3.5 3.5 3.5
Approach LOS AAAA
Lane Left Left Left Left
Designated Moves LR LTR LTR LR
Assumed Moves LR LTR LTR LR
RT Channelized
Lane Util 1.000 1.000 1.000 1.000
Critical Headway, s 5.193 5.193 5.193 5.193
Entry Flow, veh/h 44 21 21 26
Cap Entry Lane, veh/h 1106 1101 1088 1106
Entry HV Adj Factor 0.977 0.990 0.990 0.996
Flow Entry, veh/h 43 21 21 26
Cap Entry, veh/h 1081 1090 1077 1102
V/C Ratio 0.040 0.019 0.019 0.023
Control Delay, s/veh 3.7 3.5 3.5 3.5
LOSAAAA
95th %tile Queue, veh 0000
HCM 2010 TWSC Waters' Edge West Build-Out
14: Turnberry Road & Morningstar Drive Collector 01/17/2017
Year 2040 - AM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 4.2
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 15 80 30 45 90 5
Future Vol, veh/h 15 80 30 45 90 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 100 0 100 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 16 87 33 49 98 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 215 101 103 0 - 0
Stage 1 101 - - - - -
Stage 2 114 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 773 954 1489 - - -
Stage 1 923 - - - - -
Stage 2 911 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 756 954 1489 - - -
Mov Cap-2 Maneuver 756 - - - - -
Stage 1 923 - - - - -
Stage 2 891 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.3 3 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1489 - 756 954 - -
HCM Lane V/C Ratio 0.022 - 0.022 0.091 - -
HCM Control Delay (s) 7.5 - 9.9 9.2 - -
HCM Lane LOS A - A A - -
HCM 95th %tile Q(veh) 0.1 - 0.1 0.3 - -
HCM 2010 TWSC Waters' Edge West - Build-Out
14: Turnberry Road & Morningstar Drive Collector 01/17/2017
Year 2040 - PM Synchro 9 Report
GCR Page 1
Intersection
Int Delay, s/veh 3.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 10 55 85 90 80 20
Future Vol, veh/h 10 55 85 90 80 20
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 100 0 100 - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 11 60 92 98 87 22
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 381 98 109 0 - 0
Stage 1 98 - - - - -
Stage 2 283 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 621 958 1481 - - -
Stage 1 926 - - - - -
Stage 2 765 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 582 958 1481 - - -
Mov Cap-2 Maneuver 582 - - - - -
Stage 1 926 - - - - -
Stage 2 717 - - - - -
Approach EB NB SB
HCM Control Delay, s 9.4 3.7 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 EBLn2 SBT SBR
Capacity (veh/h) 1481 - 582 958 - -
HCM Lane V/C Ratio 0.062 - 0.019 0.062 - -
HCM Control Delay (s) 7.6 - 11.3 9 - -
HCM Lane LOS A - B A - -
HCM 95th %tile Q(veh) 0.2 - 0.1 0.2 - -
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 14 37 23 0 12 26 3 0 33 54 18 0 2 37 6 265 1,150 0 0 0 0
4:15:00 PM 0 17 36 22 0 27 38 2 0 32 60 17 0 0 45 10 306 1,179 0 0 0 0
4:30:00 PM 0 10 53 18 0 29 32 2 0 22 54 10 0 4 43 12 289 1,166 4 0 0 0
4:45:00 PM 0 15 46 19 0 19 47 3 0 30 53 15 0 1 31 11 290 1,190 0 0 0 0
5:00:00 PM 0 18 55 22 0 18 30 2 0 29 62 18 0 2 24 14 294 1,176 0 0 0 0
5:15:00 PM 0 16 50 26 0 19 32 2 0 38 50 15 0 2 31 12 293 0 0 1 0
5:30:00 PM 0 18 59 28 0 15 43 4 0 16 55 26 0 3 39 7 313 0 0 0 0
5:45:00 PM 0 12 59 23 0 16 26 2 0 23 55 18 0 2 29 11 276 0 0 0 0
Count Total 012039501552740223443016279 18120137 83 2,326 4 0 1 0
Peak Hour 0 67 210 95 0 71 152 11 0 113 220 74 0 8 125 44 1,190 6 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 11 37 28 0 14 23 27 0 18 171 21 0 21 116 9 496 2,041 0 0 0 0
4:15:00 PM 0 7 31 27 0 3 38 27 0 11 196 26 0 13 120 7 506 2,086 0 0 0 0
4:30:00 PM 0 13 60 14 0 13 39 35 0 17 181 10 0 24 127 7 540 2,141 0 0 0 0
4:45:00 PM 0138 8 41 11 0 4 29 37 0 22 157 21 0 21 10 499 2,180 0 0 0 0
5:00:00 PM 0121 5 48 22 0 8 34 35 0 6 198 25 0 23 16 541 2,194 0 0 0 0
5:15:00 PM 0134 11 46 13 0 6 26 37 0 9 218 31 0 23 7 561 0 0 0 0
5:30:00 PM 0136 7 68 26 0 11 43 23 0 11 205 15 0 22 12 579 0 0 0 0
5:45:00 PM 0117 6 43 12 0 8 25 27 0 14 200 22 0 31 8 513 1 0 0 0
Count Total 0683740672570108 153248171 1,0178526 1,009 76 4,235 1 0 0 0
Peak Hour 0 29 205 73 0 33 128 122 0 40 821 93 0 99 508 43 2,194 1 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 0 21 27 0 26 46 0 0 45 0 28 0 0 0 0 193 788 0 0 0 0
4:15:00 PM 0 0 24 22 0 24 49 0 0 35 0 31 0 0 0 0 185 809 0 0 0 0
4:30:00 PM 0 0 29 29 0 29 46 0 0 19 0 23 0 0 0 0 175 839 0 0 0 0
4:45:00 PM 0 0 33 23874 0 36 61 0 0 51 0 31 0 0 0 0 235 0 0 0 0
5:00:00 PM 0 0 39 16812 0 31 53 0 0 31 0 44 0 0 0 0 214 0 0 0 0
5:15:00 PM 0 0 22 23 0 29 64 0 0 43 0 34 0 0 0 0 215 0 0 0 0
5:30:00 PM 0 0 28 34 0 20 52 0 0 38 0 38 0 0 0 0 210 0 0 0 0
5:45:00 PM 0 0 17 20 0 18 55 0 0 41 0 22 0 0 0 0 173 0 0 0 0
Count Total 0021302134260303 1940251 0 0 0 0 0 1,600 0 0 0 0
Peak Hour 0 0 122 96874 0 116 230 0 0 163 0 147 0 0 0 0 0 0 0 1
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 1 7 0 0 0 6 79 0 0 0 0 0 39 0 3 135 542 0 0 0 0
4:15:00 PM 0 2 1 0 0 0 3 73 0 0 0 0 0 39 0 8 126 544 0 0 0 0
4:30:00 PM 0 0 5 0 0 0 6 65 0 0 0 0 0 53 0 3 132 581 0 0 0 0
4:45:00 PM 0 3 7 0592 0 0 6 83 0 0 0 0 0 47 0 3 149 0 0 0 0
5:00:00 PM 0 4 2 0572 1 0 6 81 0 0 0 0 0 36 0 7 137 0 0 0 0
5:15:00 PM 0 2 2 0 0 0 11 88 0 0 0 0 0 54 0 6 163 0 0 0 0
5:30:00 PM 0 1 5 0 0 0 5 80 0 0 0 0 0 49 0 3 143 0 0 0 0
5:45:00 PM 0 0 7 0 0 0 6 90 0 0 0 0 0 24 0 2 129 0 0 0 0
Count Total 0133610490000341 0639 0 0 35 1,114 0 0 0 0
Peak Hour 0 10 16 0592 1 0 28 332 0 0 0 0 0 186 0 19 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 55 2 28 0 0 1 0 0 26 30 11 0 0 16 22 191 846 0 1 0 0
4:15:00 PM 0 47 8 24 0 5 6 0 0 33 33 4 0 0 20 22 202 895 0 0 0 0
4:30:00 PM 0 39 6 25 0 5 7 0 0 30 37 6 0 0 28 32 215 943 0 0 0 0
4:45:00 PM 0 41 9 36992 0 2 6 1 0 37 43 9 0 0 18 36 238 0 0 0 0
5:00:00 PM 0 40 8 33973 0 0 4 0 0 43 43 7 0 0 27 35 240 0 0 0 0
5:15:00 PM 0 49 13 48 0 1 0 2 0 41 41 3 0 1 18 33 250 0 0 0 0
5:30:00 PM 0 53 15 31 0 2 3 1 0 44 56 6 0 1 22 30 264 0 0 0 0
5:45:00 PM 0 57 12 28 0 2 2 1 0 36 36 5 0 0 18 22 219 0 1 0 1
Count Total 03817301729029031902167 253551232 1,819 0 2 0 1
Peak Hour 0 183 45 148992 0 5 13 4 0 165 183 25 0 2 85 134 0 3 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 5 34 8 0 33 29 3 0 18 18 38 0 4 12 0 202 989 0 0 0 0
4:15:00 PM 0 0 35 19 0 35 32 4 0 12 29 61 0 2 15 1 245 1,082 0 0 0 0
4:30:00 PM 0 0 40 14 0 35 24 3 0 21 34 59 0 3 15 1 249 1,083 0 3 0 2
4:45:00 PM 0 2 69 20 0 27 31 6 0 26 32 59 0 9 12 0 293 1,085 2 0 2 0
5:00:00 PM 0 2 60 15 0 36 39 7 0 20 23 67 0 2 24 0 295 1,014 0 0 0 0
5:15:00 PM 0 1 53 8 0 25 31 6 0 22 30 52 0 4 14 0 246 0 0 0 0
5:30:00 PM 0 3 41 10 0 41 31 4 0 19 30 59 0 2 11 0 251 0 0 0 0
5:45:00 PM 0 5 37 13 0 25 25 6 0 24 27 48 0 2 10 0 222 0 0 0 0
Count Total 01836902572420162223028113 10739443 2 2,003 2 3 2 2
Peak Hour 0 8 223 53 0 129 132 23 0 87 115 237 0 17 61 0 ##### 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 1 0 1 0 7 0 1 0 5 49 13 0 0 15 0 92 345 0 2 1 0
4:15:00 PM 0 0 0 3 0 4 1 1 0 6 35 15 0 1 22 1 89 354 0 0 0 0
4:30:00 PM 0 0 0 5 0 6 1 0 0 6 32 8 0 1 28 0 87 354 1 0 0 0
4:45:00 PM 0 0 0 1366 0 10 1 1 0 3 32 9 0 2 18 0 77 0 2 0 0
5:00:00 PM 0 0 0 2372 0 10 0 3 0 5 40 10 0 1 30 0 101 0 3 0 0
5:15:00 PM 0 0 0 2 0 5 0 3 0 2 36 10 0 2 29 0 89 0 3 0 0
5:30:00 PM 0 0 0 2 0 7 1 3 0 5 39 14 0 2 26 0 99 0 0 0 0
5:45:00 PM 0 0 0 3 0 9 1 1 0 6 39 9 0 2 12 1 83 1 0 0 0
Count Total 0100585038302011180717 19 13 88 2 2 10 1 0
Peak Hour 0 0 0 9372 0 31 2 10 0 18 154 43 0 7 97 1 1 4 1 2
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 0 0 2 0 1 0 1 0 9 20 4 0 0 6 0 43 184 0 0 0 0
4:15:00 PM 0 0 0 5 0 1 0 1 0 11 13 0 0 3 13 2 49 189 0 0 0 0
4:30:00 PM 0 0 0 6 0 3 0 0 0 6 15 5 0 0 9 1 45 197 3 0 1 0
4:45:00 PM 0 3 0 1214 0 4 0 1 0 6 16 3 0 1 12 0 47 1 0 1 0
5:00:00 PM 0 0 0 5202 0 2 0 0 0 6 14 4 0 3 14 0 48 0 1 0 0
5:15:00 PM 0 1 0 5 0 2 0 2 0 14 15 3 0 0 15 0 57 0 4 0 0
5:30:00 PM 0 1 0 4 0 2 2 3 0 9 15 9 0 1 15 1 62 0 0 0 0
5:45:00 PM 0 0 0 4 0 2 0 0 0 7 12 3 0 0 7 0 35 2 0 0 0
Count Total 05001720681200891386 32 8 31 4 6 5 2 0
Peak Hour 0 5 0 15214 0 10 2 6 0 35 60 19 0 5 56 1 5 0 1 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 0 16 3 0 1 11 1 0 6 2 8 0 0 0 0 48 237 0 0 0 0
4:15:00 PM 0 0 21 14 0 3 21 0 0 8 2 3 0 0 0 0 72 251 0 0 0 0
4:30:00 PM 0 1 11 4 0 5 19 0 0 13 1 2 0 0 1 0 57 236 0 0 0 0
4:45:00 PM 0 0 15 8244 0 6 15 0 0 9 1 6 0 0 0 0 60 0 0 0 0
5:00:00 PM 0 0 10 13226 0 5 12 1 0 11 0 8 0 1 1 0 62 0 0 0 0
5:15:00 PM 0 0 14 11 0 2 14 0 0 8 2 5 0 0 1 0 57 0 0 0 0
5:30:00 PM 0 0 13 8 0 6 24 0 0 7 1 4 0 0 1 1 65 0 0 0 0
5:45:00 PM 0 0 6 8 0 0 15 0 0 8 0 5 0 0 0 0 42 0 0 0 0
Count Total 011060281310709014463 69 2 41 1 0 0 0 0
Peak Hour 0 1 57 39251 0 19 67 1 0 41 4 19 0 1 2 0 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 0 0 0 0 2 0 2 0 0 2 1 0 1 3 0 11 53 0 0 0 0
4:15:00 PM 0 0 0 0 0 7 0 3 0 0 1 4 0 0 1 0 16 57 0 0 0 8
4:30:00 PM 0 0 0 0 0 3 0 0 0 0 1 4 0 3 3 0 14 56 0 0 0 0
4:45:00 PM 0 0 0 0 0 1 0 2 0 0 3 0 0 2 4 0 12 54 0 0 0 0
5:00:00 PM 0 0 0 0 0 6 0 1 0 0 1 3 0 1 3 0 15 58 0 0 0 0
5:15:00 PM 0 0 0 0 0 4 0 2 0 0 1 3 0 2 3 0 15 0 0 0 0
5:30:00 PM 0 0 0 0 0 3 0 1 0 0 1 2 0 2 3 0 12 0 0 0 0
5:45:00 PM 0 0 0 0 0 5 0 1 0 0 2 2 0 1 5 0 16 0 2 0 0
Count Total 0000310001201225111 0 12 19 0 0 2 0 8
Peak Hour 0 0 0 0 0 18 0 5 0 0 5 10 0 6 14 0 58 0 1 1 2
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 0 25 6 0 0 18 0 0 3 0 0 0 0 0 0 52 242 0 0 0 0
4:15:00 PM 0 0 31 6 0 2 27 0 0 5 0 1 0 0 0 0 72 243 0 0 0 0
4:30:00 PM 0 0 18 5 0 3 25 0 0 2 0 1 0 0 0 0 54 230 0 0 0 0
4:45:00 PM 0 0 23 11239 0 2 21 0 0 6 0 1 0 0 0 0 64 1 0 0 0
5:00:00 PM 0 0 20 8236 0 0 21 0 0 3 0 1 0 0 0 0 53 0 0 0 0
5:15:00 PM 0 0 24 7 0 1 22 0 0 4 0 1 0 0 0 0 59 0 0 0 0
5:30:00 PM 0 0 22 9 0 1 29 0 0 1 0 1 0 0 0 0 63 0 0 0 0
5:45:00 PM 0 0 20 12 0 0 24 0 0 5 0 0 0 0 0 0 61 0 0 0 0
Count Total 00183091870290000478 64 0 6 0 1 0 0 0
Peak Hour 0 0 92 30243 0 7 94 0 0 16 0 4 0 0 0 0 0 0 1 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
4:00:00 PM 0 21 18 2 0 3 10 7 0 18 85 14 0 2 33 21 234 900 0 0 0 0
4:15:00 PM 0 19 12 6 0 8 10 1 0 11 71 13 0 2 36 14 203 922 0 0 0 0
4:30:00 PM 0 18 16 12 0 5 10 2 0 16 75 11 0 1 36 14 216 971 0 0 0 0
4:45:00 PM 0 20 16 12982 0 13 12 5 0 19 75 20 0 5 36 14 247 0 0 0 0
5:00:00 PM 0 28 3 15961 0 4 15 2 0 22 85 19 0 2 39 22 256 0 0 0 0
5:15:00 PM 0 25 14 14 0 9 8 4 0 10 90 11 0 1 50 16 252 0 0 0 0
5:30:00 PM 0 18 11 10 0 7 17 4 0 14 72 11 0 3 33 27 227 0 0 0 0
5:45:00 PM 0 13 5 12 0 5 18 2 0 11 91 12 0 0 32 25 226 0 0 0 0
Count Total 0162950541000121644016295 8327111153 1,861 0 0 0 0
Peak Hour 0 91 44 51982 0 33 52 15 0 65 322 61 0 11 158 79 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 12 17 25 0 40 43 0 0 21 16 6 0 0 80 14 274 1,145 0 0 0 0
7:15:00 AM 0 7 18 35 0 33 38 3 0 19 26 6 0 1 75 15 276 1,105 6 0 0 0
7:30:00 AM 0 12 33 40 0 43 42 1 0 28 22 6 0 2 65 12 306 1,070 0 0 0 0
7:45:00 AM 0 7 18 35 0 30 66 2 0 24 22 7 0 1 61 16 289 1,017 0 0 0 0
8:00:00 AM 0 8 18 21975 0 24 38 2 0 23 28 7 0 1 55 9 234 0 0 0 0
8:15:00 AM 0 4 24 19 0 27 38 0 0 23 26 7 0 2 55 16 241 0 0 0 0
8:30:00 AM 0 6 28 24 0 34 38 2 0 18 22 9 0 2 54 16 253 0 0 0 0
8:45:00 AM 0 6 25 21 0 28 46 2 0 22 24 9 0 2 52 10 247 0 0 0 0
Count Total 06218102593490178186011497 2201257108 2,120 6 0 0 0
Peak Hour 0 38 86 135 0 146 189 6 0 92 86 25 0 4 281 57 1,145 6 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 1 19 12 0 12 41 25 0 15 36 7 0 16 145 4 333 1,726 0 0 0 0
7:15:00 AM 0 2 28 14 0 17 42 23 0 9 60 7 0 20 160 20 402 1,799 1 0 0 0
7:30:00 AM 0 5 40 18 0 8 45 31 0 8 100 13 0 23 192 11 494 1,787 0 0 0 0
7:45:00 AM 0194 4 25 20 0 15 55 30 0 14 90 6 0 23 21 497 1,673 0 0 0 0
8:00:00 AM 0141 7 24 8 0 11 44 31 0 18 88 8 0 9 17 406 1,616 0 0 0 0
8:15:00 AM 0154 7 24 14 0 14 38 24 0 19 65 3 0 16 12 390 0 0 0 0
8:30:00 AM 0119 6 29 20 0 10 40 32 0 12 76 7 0 19 10 380 0 0 0 0
8:45:00 AM 0149 5 31 14 0 13 38 38 0 13 108 3 0 15 13 440 0 0 0 0
Count Total 037220010034301086230141 12023454108 1,254 3,342 1 0 0 0
Peak Hour 0 18 117 60 0 51 186 115 0 49 338 34 0 75 687 69 1,799 1 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 0 60 57 0 31 14 0 0 8 0 12 0 0 0 0 182 753 0 0 0 0
7:15:00 AM 0 0 75 39 0 35 13 0 0 13 0 22 0 0 0 0 197 729 0 0 0 0
7:30:00 AM 0 0 65 54 0 30 15 0 0 8 0 15 0 0 0 0 187 711 0 0 0 0
7:45:00 AM 0 0 57 44673 0 31 24 0 0 19 0 12 0 0 0 0 187 0 0 0 0
8:00:00 AM 0 0 43 33633 0 25 27 0 0 18 0 12 0 0 0 0 158 0 0 0 1
8:15:00 AM 0 0 41 43 0 30 30 0 0 17 0 18 0 0 0 0 179 0 0 0 0
8:30:00 AM 0 0 43 45 0 22 15 0 0 18 0 6 0 0 0 0 149 0 0 0 0
8:45:00 AM 0 0 23 40 0 28 25 0 0 17 0 14 0 0 0 0 147 0 0 0 1
Count Total 0040702321630118 3550111 0 0 0 0 0 1,386 0 0 0 2
Peak Hour 0 0 257 194753 0 127 66 0 0 48 0 61 0 0 0 0 0 0 0 1
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 2 12 0 0 0 2 19 0 0 0 0 0 107 0 0 142 552 0 0 0 0
7:15:00 AM 0 0 4 0 0 0 1 24 0 0 0 0 0 101 0 1 131 536 0 0 0 0
7:30:00 AM 0 1 7 0 0 0 1 17 0 0 0 0 0 118 0 3 147 520 0 0 0 0
7:45:00 AM 0 4 5 0498 0 0 4 40 0 0 0 0 0 79 0 0 132 0 0 0 0
8:00:00 AM 0 4 6 0457 0 0 1 46 0 0 0 0 0 69 0 0 126 0 0 0 0
8:15:00 AM 0 0 3 0 0 0 2 35 0 0 0 0 0 75 0 0 115 0 0 0 0
8:30:00 AM 0 4 6 0 0 0 2 33 0 0 0 0 0 80 0 0 125 0 0 0 0
8:45:00 AM 0 1 4 0 0 0 3 33 0 0 0 0 0 48 0 2 91 0 0 0 0
Count Total 0164700160000677 0247 0 0 6 1,009 0 0 0 0
Peak Hour 0 7 28 0552 0 0 8 100 0 0 0 0 0 405 0 4 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 6 1 41 0 5 11 0 0 13 6 1 0 0 44 64 192 843 0 1 0 0
7:15:00 AM 0 14 0 31 0 3 2 0 0 23 16 2 0 0 66 47 204 845 0 1 0 0
7:30:00 AM 0 17 3 39 0 8 7 0 0 20 14 3 0 0 55 76 242 817 0 0 0 0
7:45:00 AM 0 14 3 36775 0 4 11 0 0 25 8 2 0 0 42 60 205 0 1 0 0
8:00:00 AM 0 12 6 36731 0 8 3 0 0 31 15 1 0 0 37 45 194 0 0 0 0
8:15:00 AM 0 13 1 24 0 3 9 0 0 26 11 4 0 0 42 43 176 0 0 0 0
8:30:00 AM 0 12 2 40 0 6 14 0 0 25 11 2 0 0 38 50 200 0 0 0 0
8:45:00 AM 0 16 2 27 0 4 11 1 0 22 13 1 0 0 24 40 161 0 0 1 0
Count Total 0104180416801859400348 274116425 1,574 0 3 1 0
Peak Hour 0 57 12 142845 0 23 23 0 0 99 53 8 0 0 200 228 0 3 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 0 18 19 0 59 35 1 0 1 7 4 0 5 35 4 188 838 0 0 0 0
7:15:00 AM 0 1 32 22 0 50 24 0 0 3 8 14 0 6 23 3 186 846 0 0 0 0
7:30:00 AM 0 0 33 20 0 60 35 2 0 7 11 19 0 3 30 0 220 878 0 0 0 0
7:45:00 AM 0 1 28 22847 0 82 27 1 0 10 18 15 0 4 36 0 244 0 0 0 0
8:00:00 AM 0 0 28 15863 0 42 31 2 0 9 18 16 0 6 27 2 196 0 0 0 0
8:15:00 AM 0 0 35 19 0 57 27 4 0 6 15 16 0 5 34 0 218 0 0 0 0
8:30:00 AM 0 0 25 20 0 56 14 1 0 5 10 27 0 7 24 0 189 0 0 0 0
8:45:00 AM 0 0 32 30 0 54 29 3 0 20 23 24 0 4 40 1 260 0 0 0 0
Count Total 022310460222061110040249 16714135 10 1,701 0 0 0 0
Peak Hour 0 1 124 76878 0 241 120 9 0 32 62 66 0 18 127 2 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 1 0 4 0 14 0 1 0 1 9 2 0 0 36 0 68 355 0 0 0 0
7:15:00 AM 0 0 1 4 0 10 0 1 0 3 24 1 0 1 57 0 102 359 1 2 0 1
7:30:00 AM 0 1 1 10 0 13 0 1 0 1 18 5 0 0 55 0 105 332 0 1 1 0
7:45:00 AM 0 0 2 5308 0 9 0 2 0 2 10 4 0 0 46 0 80 0 1 0 1
8:00:00 AM 0 0 1 5287 0 10 0 1 0 2 16 5 0 0 32 0 72 0 0 0 0
8:15:00 AM 0 0 0 4 0 9 1 0 0 2 13 5 0 1 40 0 75 0 0 0 0
8:30:00 AM 0 2 0 8 0 13 0 1 0 3 11 1 0 1 41 0 81 0 0 0 0
8:45:00 AM 0 0 0 3 0 3 0 1 0 1 12 3 0 0 36 0 59 0 1 0 0
Count Total 045081101511303343642 43 8 26 0 1 5 1 2
Peak Hour 0 1 5 24359 0 42 0 5 0 8 68 15 0 1 190 0 1 4 1 2
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 0 0 9 0 2 0 2 0 1 7 0 0 0 13 0 34 198 0 0 0 0
7:15:00 AM 0 2 0 16 0 9 0 2 0 8 10 1 0 0 16 0 64 198 1 0 0 0
7:30:00 AM 0 1 0 12 0 11 0 1 0 5 7 3 0 1 13 0 54 161 4 0 1 0
7:45:00 AM 0 1 0 6125 0 10 0 0 0 3 5 0 0 2 19 0 46 0 0 0 0
8:00:00 AM 0 1 0 7 0 2 0 1 0 3 7 1 0 1 10 1 34 99 0 1 0 0
8:15:00 AM 0 0 0 7 0 2 0 0 0 3 7 0 0 0 7 1 27 0 0 0 0
8:30:00 AM 0 0 1 3 0 2 0 0 0 2 2 2 0 0 6 0 18 0 0 0 0
8:45:00 AM 0 0 0 1 0 4 1 0 0 2 3 0 0 0 8 1 20 0 0 0 1
Count Total 0510421027480492297 61 6 7 3 5 1 1 1
Peak Hour 0 4 0 43198 0 32 0 5 0 17 29 4 0 3 61 0 5 0 1 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 2 17 10 0 0 11 1 0 8 0 2 0 0 0 2 53 203 0 0 0 0
7:15:00 AM 0 1 18 14 0 1 2 0 0 10 0 4 0 0 0 0 50 193 0 0 0 0
7:30:00 AM 0 2 22 10 0 2 2 1 0 5 2 3 0 0 0 3 52 184 0 0 0 0
7:45:00 AM 0 1 17 7173 0 6 7 1 0 5 0 1 0 0 1 2 48 0 0 0 0
8:00:00 AM 0 0 16 6158 0 3 8 1 0 5 0 3 0 0 0 1 43 0 0 0 0
8:15:00 AM 0 1 10 8 0 2 8 1 0 6 0 3 0 0 1 1 41 0 0 0 0
8:30:00 AM 0 1 17 5 0 5 4 1 0 7 0 1 0 0 0 0 41 0 0 0 0
8:45:00 AM 0 0 8 8 0 4 2 1 0 4 1 3 0 0 2 0 33 0 0 0 0
Count Total 08125023440503004361 68 7 20 9 0 0 0 0
Peak Hour 0 6 74 41203 0 9 22 3 0 28 2 10 0 0 1 7 0 0 0 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 0 0 0 0 1 0 1 0 0 3 2 0 2 0 0 9 52 0 0 0 1
7:15:00 AM 0 0 0 0 0 3 0 1 0 0 3 5 0 1 0 0 13 54 0 0 0 0
7:30:00 AM 0 0 0 0 0 3 0 3 0 0 2 7 0 0 0 0 15 49 0 1 1 0
7:45:00 AM 0 0 0 0 0 2 0 1 0 0 3 7 0 1 1 0 15 47 0 0 0 1
8:00:00 AM 0 0 0 0 0 1 0 1 0 0 4 3 0 2 0 0 11 42 1 4 2 2
8:15:00 AM 0 0 0 0 0 1 0 1 0 0 0 3 0 1 2 0 8 0 0 0 9
8:30:00 AM 0 0 0 0 0 2 0 1 0 0 2 5 0 2 1 0 13 0 0 0 1
8:45:00 AM 0 0 0 0 0 3 0 0 0 0 2 3 0 2 0 0 10 0 0 0 0
Count Total 0 0 0 0 0 16 0 9 0 0 19 35 0 11 4 0 94 1 5 3 14
Peak Hour 0 0 0 0 0 9 0 6 0 0 12 22 0 4 1 0 54 0 1 1 2
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 0 23 1 0 1 21 0 0 7 0 2 0 0 0 0 55 200 0 0 1 0
7:15:00 AM 0 0 26 2 0 0 14 0 0 10 0 4 0 0 0 0 56 190 0 0 0 0
7:30:00 AM 0 0 30 0 0 1 10 0 0 10 0 3 0 0 0 0 54 183 0 0 0 0
7:45:00 AM 0 0 16 2171 0 0 13 0 0 4 0 0 0 0 0 0 35 0 0 0 0
8:00:00 AM 0 0 21 1165 0 1 11 0 0 10 0 1 0 0 0 0 45 0 0 0 0
8:15:00 AM 0 0 21 3 0 0 18 0 0 6 0 1 0 0 0 0 49 0 0 0 0
8:30:00 AM 0 0 25 1 0 1 9 0 0 6 0 0 0 0 0 0 42 0 0 0 0
8:45:00 AM 0 0 16 2 0 0 7 0 0 3 0 1 0 0 0 0 29 0 0 0 0
Count Total 00178041030560000365 12 0 12 0 0 0 1 0
Peak Hour 0 0 95 5200 0 2 58 0 0 31 0 9 0 0 0 0 0 0 1 0
Rolling
Hour West East South North
Pedestrain Crossings
U-Turn
Westbound Northbound Southbound
U-RightTurn Left Thru U-RightTurn Left Thru U-RightTurn Left Thru
7:00:00 AM 0 16 20 13 0 6 14 1 0 1 21 3 0 6 62 64 227 905 0 0 0 0
7:15:00 AM 0 12 17 11 0 10 18 2 0 4 19 3 0 3 89 58 246 857 0 0 0 0
7:30:00 AM 0 21 12 11 0 6 11 1 0 5 21 3 0 8 83 32 214 779 0 0 0 0
7:45:00 AM 0 18 18 13723 0 14 10 1 0 6 27 5 0 7 75 24 218 0 0 0 0
8:00:00 AM 0 7 11 14708 0 10 8 4 0 9 27 4 0 3 60 22 179 0 0 0 0
8:15:00 AM 0 4 8 7 0 13 7 4 0 12 25 6 0 4 60 18 168 0 0 0 0
8:30:00 AM 0 5 12 12 0 11 7 1 0 3 25 6 0 4 53 19 158 0 0 0 0
8:45:00 AM 0 18 13 11 0 9 12 3 0 9 34 7 0 3 66 18 203 0 0 0 0
Count Total 010111107987049199038548 921737255 1,613 0 0 0 0
Peak Hour 0 67 67 48905 0 36 53 5 0 16 88 14 0 24 309 178 0 0 0 0
= Study Intersections
LEGEND
1
25
287
14
b/b
b/b
b/b
c/c
a/a
b/b
a/a
a/a
a/a
B/C B/B
c/f
b/a
c/c
a/a
a/a
a/c a/a
d/b
a/a
d/f
a/a
c/e
f/f
c/c
c/f
b/f
with Traffic Signal = B/A
with Roundabout = B/B
with Traffic Signal = B/B
with Roundabout = A/B
as Channelized
“T” Intersection
a/a
a/a
a/a
a/a
a/a
a/b
a/a
roundabout
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
11 12
3
7 8 9 10 10
A B
A B
b/b
b/b
b/b
b/c
a/a
b/b
a/a
a/a
a/a
c/f
b/a
c/c
a/a
a/a
a/b a/a
c/b
a/a
c/f
a/a
c/c
c/d
b/b
b/d
b/f
C/F
with Traffic Signal = B/A
with Roundabout = B/B
with Traffic Signal = B/B
as Channelized
“T” Intersection
c/c
b/c
b/f
b/f
a/a
a/a
a/a
a/a
a/a
a/b
a/a
roundabout
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10 10
3
A B
A B
LOS F
Construct traffic
signal1
LOS B or better
during the AM
and PM peak
hours
Intersection No.
12, Timberline
Road/Vine Drive
– PM Peak
Hour
Timberline Road
– Arterial; Vine
Drive - Arterial
Eastbound and
Northbound
Approaches –
LOS F
Construct traffic
signal2
LOS B during
the AM and PM
peak hours
1
Designed and constructed by Waters’ Edge Investments, LLLP.
2 Monies contributed to the City by Waters’ Edge Investments, LLLP; design and construction by the City.
10(5)
5(5)
5(5)
10(5)
95(65)
60(60)
45(50)
5(5)
25(35)
10(25)
5(5)
60(40)
5(5)
365(210)
20(20)
10(5)
5(5)
30(10)
10(20)
125(315)
15(55)
5(10)
5(5)
40(15)
5(5)
160(125)
5(5)
5(5)
5(5)
110(55)
40(105)
65(160)
5(25)
5(5)
40(15)
25(5)
380(215)
290(150)
5(5)
90(305)
10(60)
190(160)
55(210)
100(295)
10(30)
5(30)
185(190)
350(185)
10(5)
160(80)
25(20)
10(10)
150(320)
105(70)
25(110)
55(145)
75(340)
5(20)
90(80)
15(10)
80(55)
30(85)
45(90)
5(10)
10(25)
5(5)
5(5)
10(10)
5(5)
5(5)
20(15)
5(5)
5(5)
5(10)
5(5)
10(15)
240(195)
185(90)
80(60)
55(175)
5(10)
55(90)
110(270)
175(120)
120(145)
120(300)
30(95)
155(175)
315(265)
170(135)
35(55)
735(600)
75(140)
20(25)
190(355)
110(135)
50(80)
385(915)
75(270)
5(15)
10(20)
15(10)
25(10)
20(15)
15(20)
150(485)
10(35)
5(25)
575(280)
10(15)
35(20)
95(480)
165(150)
360(175)
275(140)
70(235)
80(190)
9500
21,400
8000
9085 9975 1965
9575
1360
210
1000
2500 1735
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
A B
A B
15(30)
10(5)
5(5)
5(5)
10(5)
80(55)
50(50)
40(40)
5(5)
20(30)
10(30)
5(5)
50(35)
5(5)
320(190)
20(20)
5(5)
5(5)
25(10)
10(15)
110(280)
15(45)
5(10)
5(5)
35(10)
5(5)
145(115)
5(5)
5(5)
5(5)
100(50)
40(95)
60(150)
5(20)
5(5)
25(15)
25(5)
325(185)
275(130)
5(5)
80(265)
10(50)
155(160)
45(175)
85(215)
10(25)
5(25)
160(160)
295(155)
10(5)
130(65)
20(20)
5(10)
130(270)
90(55)
20(90)
45(120)
65(285)
10(15)
200(160)
155(75)
65(50)
50(150)
5(10)
45(75)
90(225)
145(100)
100(120)
100(255)
25(80)
125(145)
260(220)
140(110)
30(45)
610(500)
60(115)
15(25)
155(295)
90(110)
40(70)
320(760)
65(225)
5(15)
10(20)
15(10)
25(10)
20(15)
10(15)
125(410)
10(30)
5(20)
485(235)
10(10)
30(20)
80(400)
135(125)
305(150)
230(115)
60(200)
65(155)
7875
17,775
6700
7700 8625 1675
8125
1175
175
850
2125 1460
5(10)
10(25)
5(5)
5(5)
10(10)
5(5)
5(5)
20(15)
5(5)
5(5)
5(10)
5(5)
15(10)
80(55)
5(20)
75(70)
30(85)
40(80)
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
A B
A B
29(86)
62(42)
54(37)
22(67)
20(59)
31(21)
31(21)
11(34)
11(34)
4(3)
19(13)
2(5)
7(20)
1(1)
4(2)
4(2)
19(14)
2(4)
0(1)
6(21)
2(4)
3(8)
8(5)
20(59)
54(37)
11(34)
31(21)
23(16)
9(25)
85
430
430
1005 2150 285
1145
285
145
285 145
5(10)
10(25)
5(5)
5(5)
10(10)
5(5)
5(5)
20(15)
5(5)
5(5)
5(10)
5(5)
6(18)
16(10)
79(54)
29(86)
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
A B
A B
k
e
R
d
.
%
C
G
DD
r
.
rr
B
= Study Intersections
LEGEND
1
25
287
14
LOS B with
roundabout
Year 2040
Base Assumptions:
- Vine Drive/Lemay Avenue intersection has been relocated and upgraded to Arterial/Arterial
intersection characteristics (4 through lanes with separate left & right turn lanes)
- Vine Drive/Timberline Road intersection includes a traffic signal or is relocated to the north as
part of the Vine Drive realignment
Intersection
No. 1, SH 1/
Douglas Road –
PM Peak Hour
SH 1 – Arterial
Douglas Road -
Arterial
Eastbound Left -
LOS F
Convert to 4-way
stop OR install
traffic signalization
LOS E or better
for all
movements with
4-way stop; LOS
B with traffic
signal
Intersection
No. 10,
Mountain Vista
Drive/Timberline
Road – PM
Peak Hour
Mountain Vista
Drive - Arterial
Timberline Road
– Arterial
Northbound
Left/Right –
LOS F
Install traffic
signalization OR
convert to single
lane roundabout1
LOS C with
traffic signal;
LOS B with
roundabout
1 As noted previously, the City’s Master Street Plan identifies that this intersection will be realigned to facilitate
movements between Timberline Road and I-25.
The information contained in Table 1 is used as the requirements for which the Year 2021 and
2040 build-out scenarios for Waters’ Edge West are compared to.
a/b
b/b
a/a
b/b
a/a
a/a
a/a
c/f
b/a
c/c
a/a
a/a
a/b a/a
c/b
a/a
c/f
d/e
b/b
b/d
b/f
C/C C/C
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
b/b
b/b
a/a
a/b
a/a
a/a
a/a
b/f
b/a
b/c
a/a
a/a
a/b a/a
b/b
a/a
c/e
c/c
b/b
b/c
b/d
C/F
c/c
b/c
b/e
b/f
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
15(25)
10(5)
5(5)
5(5)
10(5)
95(65)
55(50)
35(45)
5(5)
15(30)
5(15)
5(5)
60(40)
5(5)
250(130)
5(10)
10(5)
5(5)
30(10)
10(20)
80(190)
15(55)
5(10)
5(5)
40(15)
5(5)
80(70)
5(5)
5(5)
5(5)
55(20)
20(45)
35(75)
5(25)
5(5)
40(15)
25(5)
315(170)
265(110)
5(5)
65(235)
10(60)
190(60)
55(210)
55(235)
10(30)
5(30)
155(170)
320(165)
10(5)
160(80)
25(20)
10(10)
140(285)
105(70)
25(110)
55(145)
65(305)
10(15)
240(195)
185(90)
75(55)
35(160)
5(10)
50(85)
110(270)
175(120)
120(145)
110(280)
30(95)
155(175)
315(265)
165(130)
30(50)
715(585)
75(140)
15(20)
190(355)
110(125)
50(80)
380(895)
70(265)
5(15)
5(10)
15(10)
25(10)
10(10)
15(20)
130(425)
10(35)
5(25)
520(240)
10(15)
35(20)
85(445)
165(150)
330(155)
250(125)
60(210)
80(190)
9425
20,970
7580
8080 7825 1680
8430
1075
210
855
2220 1590
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
10(20)
10(5)
5(5)
5(5)
10(5)
80(55)
45(40)
30(35)
5(5)
10(25)
5(10)
5(5)
50(35)
5(5)
205(110)
5(10)
5(5)
5(5)
25(10)
10(15)
65(155)
15(45)
5(10)
5(5)
35(10)
5(5)
65(60)
5(5)
5(5)
5(5)
45(15)
20(35)
30(65)
5(20)
5(5)
35(15)
20(5)
260(140)
220(90)
5(5)
55(195)
10(50)
155(50)
45(175)
45(195)
10(25)
5(25)
130(140)
265(135)
10(5)
130(65)
20(20)
5(10)
120(235)
90(55)
20(90)
45(120)
55(250)
10(15)
200(160)
155(75)
60(45)
30(135)
5(10)
40(70)
90(225)
145(100)
100(120)
90(235)
25(80)
125(145)
260(220)
135(105)
25(40)
590(485)
60(115)
10(20)
155(295)
90(110)
40(70)
315(740)
60(220)
5(15)
5(10)
15(10)
25(10)
10(10)
10(15)
105(350)
10(30)
5(20)
430(195)
10(10)
30(20)
70(365)
135(125)
275(130)
205(100)
50(175)
65(155)
7800
17,355
6275
6690 6475 1390
6980
890
175
705
1835 1315
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
a/a
b/b
a/a
a/b
a/a
a/a
a/a
b/e
b/a
b/c
a/a
a/a
a/b a/a
b/b
a/a
c/e
c/c
b/b
b/c
b/d
D/E
c/c
c/c
c/d
c/e
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
9(19)
7(1)
1(3)
0(1)
6(0)
74(52)
41(40)
28(35)
2(4)
10(23)
5(10)
0(2)
46(32)
0(0)
194(103)
1(7)
2(0)
4(0)
23(7)
7(15)
61(147)
12(43)
5(6)
0(2)
32(10)
0(1)
61(56)
3(5)
4(5)
0(0)
43(15)
17(35)
29(60)
4(19)
0(4)
31(13)
20(5)
247(134)
207(85)
0(2)
51(183)
7(45)
147(148)
41(165)
44(183)
8(25)
4(23)
121(132)
251(129)
7(0)
124(61)
18(17)
2(8)
111(223)
83(53)
21(87)
44(115)
52(237)
6(11)
189(152)
146(71)
57(44)
281(125)
4(8)
38(67)
86(210)
135(95)
92(113)
86(220)
25(74)
119(135)
246(205)
127(101)
25(109)
556(458)
58(40)
9(16)
147(276)
84(104)
39(64)
298(696)
56(207)
1(13)
4(7)
11(6)
21(8)
6(6)
9(14)
100(332)
8(28)
4(19)
405(186)
7(10)
28(16)
66(346)
127(116)
257(122)
194(96)
48(163)
61(147)
7350
16,350
5910
6300 6100 1310
6575
840
165
665
1730 1240
1
1 2 4
5
6
8
9 10
7
3
11 12
1 2
4
5 6
7 8
11 12
9 10
3
2/2
2/2
2/4
2/4