Loading...
HomeMy WebLinkAboutBEEBE CHRISTIAN SCHOOL - FDP - FDP170011 - SUBMITTAL DOCUMENTS - ROUND 1 - DRAINAGE REPORTDrainage Report for BeBee Christian School/Church 2103 Nancy Gray Avenue Fort Collins, CO 80525 Prepared by: Mike Beach, P.E. Project #:16‐026‐001 Dated: March 14, 2017 5255 Ronald Reagan Blvd, Suite 210 Johnstown, CO 80534 (303) 322‐6480 EMAIL: mbeach@ridgetopeng.com 2 | Page Section Page 1. Project Engineer’s Certification ........................................................................................ 3 2. Project Location & Overview ............................................................................................ 4 3. Drainage Design Criteria ................................................................................................... 5 4. Hydraulic Calculations ....................................................................................................... 6 5. Facility Design .................................................................................................................... 7 6. Conclusion ......................................................................................................................... 8 7. References ......................................................................................................................... 8 Appendix A – Site Vicinity Map Appendix B – Flood Insurance Rate Map Appendix C – NRCS Soils Map Appendix D – Hydrologic Criteria Fort Collins Rainfall Intensity Curve Fort Collins Rainfall Intensity Table Table RO‐3 – Recommended Percentage Imperviousness Values Appendix E – Hydraulic Calculations Runoff Coefficients & Imperviousness Time of Concentration ‐ SF‐2 Rational Method Runoff Flows – SF‐3 (2‐Year Event) Rational Method Runoff Flows – SF‐3 (10‐Year Event) Rational Method Runoff Flows – SF‐3 (100‐Year Event) Detention Volume by Modified FAA Method Rain Garden Calculations (both Subbasins) LID Summary Drain Times Appendix F – Maps Drainage Plan/Subbasin Map Appendix G – References Table of Contents 3 | Page Section 1: PROJECT ENGINEER’S CERTIFICATION I hereby attest that this Final Drainage Report for the design of stormwater management facilities for BeBee Christian School on 2103 Nancy Gray Ave. was prepared by me, or under my direct supervision, in accordance with the provisions of the City of Fort Collins Storm Drainage Design Criteria and Construction Standards for the responsible parties thereof. __________________________ Mike Beach, P.E. Registered Professional Engineer State of Colorado No. 45088 4 | Page Section 2: Project Location & Overview Location The sites address is 2103 Nancy Gray Avenue, Fort Collins, CO; which is described as a portion of Outlot A, Spring Creek Farms North, City of Fort Collins, County of Larimer, State of Colorado. For Recording purposes: Part of the Southeast Quarter of Section 19, TP 7 N, R 68 W of the 6th PM. Located along the north side of Nancy Gray Ave. and east of South Timberline Road, the site is described as above and contains 3.326 acres of undeveloped vacant land. (See Appendix A – Site Vicinity Map) Existing Condition The existing site is covered by native vegetation and slopes predominately towards South Timberline Road at approximately 0.5% slope. Stormwater runoff collected into an existing stormwater detention pond along the eastern side of the site. Currently the detained water is released at 2.0 cfs via an existing outlet structure and conveyed via piping to “Storm 2” as delineated in previous storm reports. Storm 2 connects to Sidehill Filing 2 Storm system. The Sidehill report requires the outlet be contained to a 1.1 cfs release rate and it appears existing pond has not been updated since its original construction, therefore, as part of this project the pond is being redesigned to accommodate the slower release rate. Proposed Condition The intent of the development is to construct a new building of approximately 26,200 SF, asphalt concrete parking, curb and gutter, playground area containing grass and gravel material, and landscaping. It has been determined by the survey that the existing pond does not have sufficient detention capacity for this project. Existing pond size of 0.866 ac‐ft is will be slightly regraded along the west side to increase overall pond volume to meet the minimum required. Floodplain FEMA Floodplain mapping in this neighborhood is located on map‐panel 08069C1000F, Effective December 18, 2006, (Not Printed), however it appears the subject property is located in Zone X, which is outside the 100‐year floodplain. Flood Insurance Rate Map not available for printing. Existing Soils The Natural Resource Conservation Service mapped the historic soils on the site as part of the Nunn clay loam. The Hydrologic Class is Type ‘C’ Soils. (Appendix C – NRCS Soils Map) 5 | Page Section 3: Drainage Design Criteria Reference Manuals Storm drainage design criteria is defined in the City of Fort Collins “Storm Drainage Design Criteria and Construction Standards Manual (FCSDCM) and Amendments, which references to the “Urban Drainage and Flood Control District” (UDFCD) and the “Urban Storm Drainage Criteria Manual” (USDCM), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual), are used and referenced in this report. Low Impact Development (LID) Requirements The proposed development is required to meet the City’s current Land Use Code, which includes: ‐ 50% of the newly added or modified impervious area must be treated by LID techniques and 25% of new paved areas must be pervious. ‐ 75% of all newly added or modified impervious area must be treated by LID techniques. Four Step Process The City of Fort Collins has adopted the “Four Step Process” that is recommended in Volume 3 of the USDCM for selecting BMP’s in urban redevelopment areas. The goal of this process is to minimize adverse impacts on receiving waters. The following describe how each step of the process are incorporated in the proposed development: Step 1 – Employ Runoff Reduction Practices By selecting a site that is undeveloped that currently does not have water quality treatment, the impacts of the proposed development will be less due to the addition of the water quality capture volume included. The project proposes to install a rain garden with underdrains to aid in conveyance and infiltration opportunities which will reduce the effects of the added impervious area from the development of the site. Step 2 – Water Quality Capture Volume (WQCV) In order to reduce the sediment load and other pollutants leaving the site, it is important to provide WQCV to minimize the downstream impacts. This project proposes to provide rain garden prior to the stormwater entering the detention pond, both located on the site. These facilities are sized to release at or below the historic runoff rates. Step 3 – Stabilize Drainageways Since this site is in close proximity to Poudre River it is important to take this Step into consideration. By providing stormwater detention and water quality and lowering the historic runoff and providing a metered outflow the project impacts to the drainageway are essentially reduced. The majority of the drainageway leaving the site is already stabilized. 6 | Page Step 4 – Implement Site Specific and Other Source Control BMP’s The proposed project will contain the following BMP’s: Rain Garden: All runoff from the site will be directed into and through the proposed BMP facilities prior to leaving the site. Rain gardens utilize native plants that act as sponges to reduce the amount of stormwater runoff and absorb contaminants. Maintenance: In order for BMP’s to remain effective proper maintenance needs are required. Scheduled visual inspections and routine repair after larger storm events are critical in the maintenance and effectiveness of the installed BMP’s. The sites owner will be advised of these practices during installation in order to maximize the efficiency of the installed BMP’s. Section 4: Hydraulic Calculations Criteria Runoff criteria for the proposed sites was analyzed for the 2‐YR, 10‐YR, and 100‐YR storm events. The Rational Method is being used for the design of the proposed improvements. Rainfall Intensities used in the proposed design were determined as a function of the Time of Concertation for each subbasin. The values used were determined by the City of Fort Collins Rainfall Intensity/Duration/Frequency curve (Figure RA‐16 and Table RA‐7 (see Appendix D). Imperviousness Values from Table RO‐11 (Fort Collins Amendment to the USDCM) were used in determining the sites imperviousness. The overall proposed site improvements and landscaping equate to a total onsite proposed Imperviousness of 46%, while the total basin reaching the pond is 53%. Time of Concentration & Runoff Coefficient The onsite area was separated into three (3) subbasins with slopes varying between 0.5% to 1.5%. The calculated Time of Concentration (TC) for each subbasin are listed in Appendix E. See Basin Map in Appendix F for more information. WQCV The UD‐BMP_v3.03 (UDFCD) spreadsheet was used to calculated the required Rain Garden water quality capture volume. See Appendix E for design information. The existing detention pond design also included a volume allotted for the WQCV. Per the previous report by Stantec, a volume of 0.033 ac‐ft is required for WQCV. This report calculates a required WQCV for a 40 hour release to be 0.046 ac‐ft. This volume is accounted for within the regraded pond and the volume calculations. The previous pond design did not allow for an extended WQ drain time, so therefore a new orifice plate is being designed and included with this project. The revised pond will outlet the WQCV over a 40‐hour period as allowed by the Manual. 7 | Page Detention The existing detention pond is already constructed and was designed by Stantec with an allowable release rate of 1.1 cfs. The design was also discussed in the “Interim Timberline Road Widening – Drake to Prospect” and “Spring Creek Farms North Filing No. 2”. See existing report information in Appendix G. The detention facility Drain Time Spreadsheet and Stage Storage relationship spreadsheet have been calculated and is included within Appendix E of this report. The calculated drain time for 99% of the inflow volume of the pond with the proposed project and off‐site area included is approximately 23 hours for the 100‐year event, which is below the maximum allowed drain time. Section 5: Facility Design The proposed improvements will increase the amount of impervious area; however, measures have been included in the design to minimize the amount of stormwater released from the site. Per previous design reports, specifically the Spring Creek Farms North, the outlet structure is designed to release at 1.1 cfs. The existing water quality plate in the existing pond will need to be replaced to meet current requirements and drain times. The plate will be designed with a single 1‐3/16” diameter orifice to release the WQCV at 0.045 cfs, and a single 2‐5/16” diameter orifice above the WQCV to release the 100‐year event at 1.1 cfs. Per our report, the predeveloped 2‐year event release rate is 2.44 cfs per for the entire 3.32‐acre site (see Appendix E for historic calcs). The runoff will sheet flow until a concentrated point and then be conveyed via trickle channel or gutters and then deposited into the water quality device and/or detention pond. The site was broken into three developed subbasins for water quality purposes; Subbasin 1.0 (0.856 acres), Subbasin 2.0 (1.859 acres), and Subbasin Pond (0.608 acres). OS‐7 and PS‐1 (as described below) was also modeled and included in the detention calculations. See Appendix E for breakdown of the different area types for each subbasin and Appendix F for the Subbasin Map. Subbasin 1.0 contains half of the proposed building and the parking and paved areas south of the building. The runoff will be conveyed to the east side of the building and outlet into a proposed rain garden. The rain garden will outlet to the modified detention pond. Subbasin 2.0 contains half of the building, the parking and paved areas to the west of the building, and the playground area. All areas drain to the north and east. Water Quality for this subbasin will be provided via a rain garden. The rain garden will outlet to the modified detention pond. Pond Basin is that area within the existing Drainage Easement on the east side of the site. The existing detention pond was already sized for a release of 1.1 cfs, however current regulations 8 | Page require slight modifications to the steel orifice plate to meet drain times. Currently it has one 3.5” diameter orifice plate that will be replaced with a new plate containing a single 1‐3/16” diameter orifice to release the WQCV at 0.045 cfs, and a single 2‐5/16” diameter orifice above the WQCV to release the 100‐year event at 1.1 cfs.. The existing pond was modeled with the proposed project and the 100‐year WSEL’s is indicated on the Drainage Plan in Appendix F. OS‐7 – This off‐site basin is the area of Nancy Gray and a portion of Timberline that drain to the existing detention pond. Full design calculations are included in order to determine the required detention volume is being provided within the existing pond. PS‐1 – This off‐site basin is the northeast portion of the Police Services site that drains to the existing type R in Nancy Gray that is conveyed to the existing detention pond on‐site. Since there is only one detention pond modeled with this report we have provided a summary of the proposed design below. See supporting calculations within the Appendix of this report. Area (ac) Sub 1.0 0.86 1.33 2.32 6.21 0.013 ‐ ‐ ‐ ‐ ‐ Sub 2.0 1.86 2.19 3.73 10.20 0.028 ‐ ‐ ‐ ‐ ‐ Pond 0.61 0.17 0.29 0.74 ‐ ‐ ‐ ‐ ‐ OS‐7 1.24 1.81 3.85 11.07 ‐ ‐ ‐ ‐ ‐ ‐ PS‐1 0.88 1.19 2.05 5.79 ‐ ‐ ‐ ‐ ‐ ‐ Total Site 3.32 3.28 5.63 14.48 ‐ ‐ ‐ ‐ ‐ ‐ Total Untreated 2.73 3.15 5.37 14.58 0.046 0.046 ‐ ‐ ‐ ‐ Total Basin 5.44 5.77 10.02 25.62 ‐ ‐ 1.168 1.031 1.213 1.1 Release Rate (cfs) 2‐Year Flow (cfs) 100‐Year Flow (cfs) WQCV (ac‐ft) 100‐Year Vol. (ac‐ft) Detention Req'd (ac‐ft) Tot. Volume Provided (ac‐ft) 10‐Year Flow (cfs) WQCV Req'd Section 6: Conclusions All computations that have been reviewed or completed within this report are in compliance with the City of Fort Collins Storm Drainage Design Criteria and Construction Standards manual and the Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual Volumes 1 &2. The proposed drainage concepts presented in this report and on the construction plans adequately provide for stormwater detention and water quality treatment of impervious areas by releasing the 100‐Year storm event at the required allowable release rate of 1.1 cfs, which is less than the Predeveloped 2‐Year runoff rates. The Water Quality design will benefit the site by reducing the initial discharge from the site and removal of any sediments or other pollutants generated by the developed site. As well, with the modified steel outlet plate, water quality is now being provided for the offsite basins that drain to the existing pond. 9 | Page Section 7: References  The Natural Resource Conservation Service Soil Survey for Larimer County and the WSS website.  FEMA FIRM map‐panel 08069C1000F Effective 12/18/2006. – Not Printed.  “City of Fort Collins Stormwater Criteria Manual” dated December 2011  Urban Drainage and Flood Control District Urban Storm Drainage Criteria Manual (UDFCD), Volumes 1, 2, and 3, dated 2008 with revisions (the Manual).  Drainage Report: Police Services Building  Drainage Report – Spring Creek Farms North  Drainage Report – Timberline Road Widening  Drainage Report – Sidehill Filing 2 – Stormwater Pipe Reduction w Appendix A Site Vicinity Map Appendix B Flood Insurance Rate Map (Not available to Print) Appendix C NRCS Soils Map Appendix D Hydrologic Criteria Appendix E Hydraulic Calculations 15 | Page Appendix F Maps 16 | Page Appendix G References