Loading...
HomeMy WebLinkAboutBEEBE CHRISTIAN SCHOOL - FDP - FDP170011 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANS (3)JOSEPH ALLEN DR. SCHOOL/CHURCH NANCY GRAY AVE. S. TIMBERLINE RD. GRADING PLAN C-2.0 7 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 01/11/2017 LOGO CITY COMMENTS 01/03/2017 GRADING NOTES LEGEND JOSEPH ALLEN DR. SCHOOL/CHURCH NANCY GRAY AVE. S. TIMBERLINE RD. BASIN 2 1.859 AC BASIN 1 0.856 AC BASIN OS7 1.240 AC POLICE STATION BASIN 0.88 AC TOTAL BASIN AREA DRAINING TO POND 5.44 AC DRAINAGE PLAN C-2.1 8 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 01/11/2017 LOGO CITY COMMENTS 01/03/2017 WATER QUALITY TREATMENT LEGEND Minimum 8" Thick Layer of CDOT No. 4 Aggregate Minimum 4" Perforated JOSEPH ALLEN DR. S. TIMBERLINE RD. NANCY GRAY AVE. D D D SCHOOL/CHURCH UTILITY AND PAVEMENT PLAN C-3.0 9 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 01/11/2017 LOGO CITY COMMENTS 01/03/2017 LEGEND Know what'sbelow. Call before you dig. R ADDITIONAL NOTES: GENERAL UTILITY NOTES WATER NOTES SANITARY SEWER NOTES STREET & SW DETAIL SHEET C-4.0 10 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 01/11/2017 LOGO CITY COMMENTS 01/03/2017 WATER AND SEWER DETAIL SHEET C-4.1 11 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 01/11/2017 LOGO CITY COMMENTS 01/03/2017 DRAINAGE DETAIL SHEET C-4.2 12 Of PROJECT TITLE REVISIONS SHEET TITLE SHEET INFORMATION SEAL DATE PREPARED FOR ENGINEERING R IDGE & CONSULTING T OP 5255 Ronald Reagan Blvd., Ste. 210 Johnstown, CO 80534 T (303) 322-6480 W ridgetopeng.com CITY COMMENTS 11/28/2016 DRAWN BY: CHECKED BY: PROJECT NO.: ROCHE CONSTRUCTORS BEEBE CHRISTIAN SCHOOL AND SEVENTH DAY ADVENTIST CHURCH 361 71ST AVE. GREELEY , CO 2103 NANCY GRAY AVE. FORT COLLINS, CO 16-026-001 MRB BSA/RSB 12 SUBMITTAL PROJECT DEVELOPMENT PLAN 01/11/2017 LOGO CITY COMMENTS 01/03/2017 PVC Pipe (Optional Depending on Underlying Soil Conditions) 12" Ponding Depth Minimum 12" Thick Layer of Bioretention Sand Media (see Bioretention Sand Media Specification below) Minimum 6" Thick Layer of Pea Gravel Diaphragm Parking/Building Water Surface Minimum CDOT No. 4 Aggregate Above and Below PVC Pipe Undisturbed Soil CONNECT UNDERDRAIN TO OUTLET STRUCTURE POND BASIN 0.608 AC