Loading...
HomeMy WebLinkAboutVIALE COLLEGIO 2ND FLOOR REMODEL - FDP - FDP160020 - CORRESPONDENCE -Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview May 10, 2016 Brad Massey ALMS2 712 WHALERS WAY, B-100 Fort Collins, CO 80525 RE: Viale Collegio 2nd Floor Remodel, FDP160020, Round Number 1 Comment Summary: Department: Stormwater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic: General 05/02/2016: There does not appear to be any improvements or changes to the parking area and/or impervious areas in the submitted application. If that changes, please contact Heather McDowell with the Stormwater Utility at (970) 224-6065 or hmcdowell@fcgov.com. Comment Number: 1 Comment Originated: 05/02/2016 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: General 05/04/2016: FLOOR PLAN: There is text that needs to be rotated 180 degrees. See redlines. Comment Number: 2 Comment Originated: 05/04/2016 05/04/2016: FLOOR PLAN: There are line over text issues. See redlines. Comment Number: 3 Comment Originated: 05/04/2016 Topic: Site Plan 05/04/2016: Please add a legal description for this property to sheet SD1. Comment Number: 1 Comment Originated: 05/04/2016 Department: Water-Wastewater Engineering Contact: Heather McDowell, 970-224-6065, hmcdowell@fcgov.com Topic: General Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com. Page 1 of 2 05/02/2016: Water Use calculations and a memo are required to be provided so that we have documentation that the existing water and sewer sizes for residential and commercial uses have been verified to be adequately sized. Comment Number: 1 Comment Originated: 05/02/2016 05/02/2016: The residential and commercial sewer fees are based upon the water taps; therefore, the sewer services are allowed to have combined flow from the residential and commercial uses so long as both the residences and commercial areas that are utilizing the same sewer tap are under the same ownership. Please contact Heather McDowell at (970) 224-6065 if you want to discuss this any further. Comment Number: 2 Comment Originated: 05/02/2016 05/02/2016: The 2-4” sewer services will need to be verified that they are sized adequately for the commercial flows and the increased flows that will be generated from the residential uses. Comment Number: 3 Comment Originated: 05/02/2016 05/02/2016: Additional Plant Investment Fees (PIF’s) for water will be due for the additional residential units. Information on fees can be found at http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de velopment-fees or contact Jean Pakech (221- 6375) or Jill White (416-2139) for questions on fees. Comment Number: 4 Comment Originated: 05/02/2016 Page 2 of 2