HomeMy WebLinkAbout2106 SOUTH TAFT HILL ROAD SINGLE FAMILY - PDP - PDP170002 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE REPORT TAFT HILL VILLAGE Fort Collins, Colorado March 7, 2017 Prepared for: John, Albert, and Samuel Minatta 1313 Fairway Five Drive Fort Collins, CO 80525 Prepared by: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 Fax: 970.221.4159 www.northernengineering.com Project Number: 1076-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. March 7, 2017 City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Preliminary Drainage Report for Taft Hill Village Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage Report for your review. This report accompanies the Conceptual Review submittal for the proposed Taft Hill Village. This report has been prepared in accordance with the City of Fort Collins Stormwater Criteria Manual (FCSCM) and the Urban Drainage and Flood Control District (UDFCD) Urban Storm Drainage Criteria Manual and serves to document the stormwater impacts associated with the proposed Taft Hill Village project. We understand that review by the City of Fort Collins is to assure general compliance with standardized criteria. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Bud Curtiss Blaine Mathisen Vice President Project Engineer Taft Hill Village Preliminary Drainage Report TABLE OF CONTENTS I. General Location and Description ............................................................................... 1 A. Location ............................................................................................................................................. 1 B. Description of Property ..................................................................................................................... 1 C. Floodplain.......................................................................................................................................... 2 II. drainage basins and sub-basins .................................................................................. 3 A. Major Basin Description .................................................................................................................... 3 B. Sub-Basin Description ....................................................................................................................... 3 III. drainage DESIGN CRITERIA ...................................................................................... 4 A. Regulations........................................................................................................................................ 4 B. Four Step Process .............................................................................................................................. 4 C. Development Criteria Reference and Constraints ............................................................................ 5 D. Hydrological Criteria ......................................................................................................................... 5 E. Hydraulic Criteria .............................................................................................................................. 5 F. Floodplain Regulations Compliance .................................................................................................. 6 G. Modifications of Criteria ................................................................................................................... 6 IV. drainage FACILITY DESIGN ....................................................................................... 6 A. General Concept ............................................................................................................................... 6 B. Specific Details .................................................................................................................................. 7 V. CONCLUSIONS ........................................................................................................ 9 A. Compliance with Standards .............................................................................................................. 9 B. Drainage Concept .............................................................................................................................. 9 References ....................................................................................................................... 10 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations B.1 – Detention Facilities APPENDIX C – Water Quality Design Computations APPENDIX D – Erosion Control Report APPENDIX E – Soils Resource Report LIST OF TABLES AND FIGURES: Figure 1 - Aerial Photograph - Google Earth ............................................................................ 1 Figure 2 - Proposed Site Plan ............................................................................................... 2 Figure 3 - Existing City Floodplain ......................................................................................... 3 Figure 4 - LID Table ............................................................................................................ 4 Taft Hill Village Preliminary Drainage Report MAP POCKET: C6.00 - Drainage Exhibit C6.01 – Historic Drainage Exhibit Taft Hill Village Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map Figure 1 - Aerial Photograph - Google Earth 2. Taft Hill Village is in Township 7 North, Range 69 West of the 6th P.M., City of Fort Collins, County of Larimer, State of Colorado. 3. The project site is located on the east side of Taft Hill Villagenear the intersection of Taft Hill Villageand Sheffield Dr. It is directly across the street from Blevins Middle School. The project site is surrounded by residential homes to the north, east, and south. 4. Currently the existing lot remains mostly undeveloped. However, there is currently a two-story house with an associated detached garage and landscaping. This house has a historical tag and therefore cannot be demolished but instead must be incorporated into the over plan for the proposed subdivision. The house sits along the western property line adjacent to the pedestrian cross walk across S. Taft Hill. B. Description of Property 1. Taft Hill Village project site is 2.35 net acres. Taft Hill Village is not proposing any improvements to Taft Hill VillageRd. However, due the lack of storm sewer infrastructure the proposed project will be discharging east into Dover Dr. through a sidewalk chase therefore additional offsite improvements will be necessary near the south-east corner of the project site. Also, Taft Hill Village will leave the historical house untouched other than two landscaping walls that jutted to far south into the private drive isle. Overall, the proposed site will maintain the historic drainage Taft Hill Village Preliminary Drainage Report 2 patterns. 2. Taft Hill Village will be maintaining the overall historic drainage characteristics of this site. There are currently no water quality amenities or even any storm infrastructure. Taft Hill Village is not proposing any storm infrastructure at this time but will be constructing several water quality amenities, this will be discussed in Section IV.B. There is also no offsite runoff entering the site from Taft Hill VillageRd. 3. Per the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey, 100 percent of the site consists of Altvan- Satanta loams, which fall into Hydrologic Soil Groups B. 4. The proposed development will include the clearing of existing vegetation, two (2) tress, the removal of 180 sf. of sidewalk where the proposed entrance is and the removal of roughly 135 sf. of concrete walls behind the existing detached garage. Figure 2 - Proposed Site Plan 5. There are no irrigation facilities, erosion buffer zones, or major drainage ways within the property limits. 6. The project site is within a Low Density Residential zoning district. Therefore, the proposed use is permitted within this zone district. C. Floodplain 1. The subject property does not lie within a FEMA floodplain. The project site falls within the FIRM Panel 08069C986G for Larimer County, dated May 2nd, 2012. 2. Taft Hill Village does not fall within a city floodplain. Taft Hill Village Preliminary Drainage Report 3 Figure 3 - Existing City Floodplain II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. Taft Hill Village is within the Canal Importation drainage basin. This basin, which suffered significant property damage in the flood of 1997, is almost completely urbanized with primarily mixed density residential and isolated commercial land uses. Runoff from the basin empties into the Old Town or Spring creek basins. 2. There are no previous drainage studies for the area associated with this project site. B. Sub-Basin Description 1. Taft Hill Village historically sheet flows from the northwest towards the southeast corner of the project site. This historic condition will be maintained to the best of the engineer’s ability. Basin H1 Basin H1 is associated with the entire project site and has an overall area of 2.35 acres. Basin H1 has one two story house with a detached garage and an associated gravel driveway. There is currently no stormwater infrastructure or water quality amenities. Additionally, there are no offsite flows entering Basin H1. Basin H1 has a historic 2-year flow of 0.81 cfs. 2. A more detailed description of the projects proposed drainage patterns follows in Section IV.A.4., below. Taft Hill Village Preliminary Drainage Report 4 3. There are no offsite flows associated with Taft Hill Village. 4. A full-size copy of the Historic and Proposed Drainage Exhibit can be found in the Map Pocket at the end of this report. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Taft Hill Village project. B. Four Step Process The overall stormwater management strategy employed with the Taft Hill Village project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low-Impact Development (LID) strategies including: Providing as much vegetated open areas as possible along the north, east, west and south portion of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through either a bio-swale or across concrete pavers. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on downstream storm infrastructure. Below is a table that shows the breakdown of the proposed LID amenities compared to the proposed impervious area. Figure 4 - LID Table The porous pavers compose of exactly 25% of the Private Drive aisle. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff and provide the necessary BMPs required for water quality. Stormwater generated along the northern portion of the Design Point Basin ID Basin Area Treatment Type LID System Impervious Area Treated by LID System Percent of Impervious Area Treated by LID System a1 A1 0.557 ac. Bio-Swale Yes 0.067 ac. 9.03% b1 B1 0.725 ac. Pavers Yes 0.385 ac. 51.89% b1 B2 0.452 ac. Extended Detention No 0.142 ac. 0.00% a2 A2 0.618 ac. Extended Detention No 0.148 ac. 0.00% Total 2.352 ac. 0.742 ac. 61% Taft Hill Village Preliminary Drainage Report 5 project site will sheet flow north where it will be collected and routed through a bio-swale. Runoff generated near the middle of the project site will sheet flow south across the private drive aisle where it will pass over concrete pavers. Eventually all the runoff is routed to the pond that borders the southern property line where it will be released at the historic 2-year runoff. Step 3 – Stabilize Drainageways As stated in Section I.B.5, above, there are no drainageways associated with the project site. Step 4 – Implement Site Specific and Other Source Control BMPs. This step typically applies to industrial and commercial developments and is not applicable for this project. C. Development Criteria Reference and Constraints 1. There are no known drainage studies for the existing property. 2. The subject property is essentially an "in-fill" development project as the property is surrounded by currently developed properties. As such, several constraints have been identified during this analysis that will impact the proposed drainage system including: Existing elevations along the east, west, north, and south property lines will be maintained. During the construction of Taft Hill Village, it is imperative that the house that currently sites on the project site remains untouched except for the two concrete walls behind the detached garage that will need to be removed. Overall drainage patterns of the existing site will be maintained. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with this development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. The Rational Formula-based Modified Federal Aviation Administration (FAA) procedure has been utilized for detention storage calculations. 4. Two separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2-year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains from the northwest to the southeast. The entire site drains stormwater via overland flow. 2. All drainage facilities proposed with the Taft Hill Village project are designed in Taft Hill Village Preliminary Drainage Report 6 accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated in Section I.C.1, above, the subject property is not located within a City regulatory floodplain. 4. Taft Hill Village does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, the project site does not fall within a City regulatory floodplain. G. Modifications of Criteria The proposed Taft Hill Village development is requesting that the required amount of freeboard be reduced from a foot to six (6) inches. Due to the lack of space for the detention ponds and to insure the walls along the southern property edge can tie into existing grade and still be under 30” tall Pond A has a freeboard height of 6.12”. Pond B has a freeboard height of 6.96”. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Taft Hill Village drainage design is to maintain existing drainage patterns and ensure no adverse impacts to any adjacent properties or existing infrastructure. 2. As previously mentioned, there are no off-site flows draining onto the existing property. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. Taft Hill Village has been broken down into four major drainage basins, designated as Basins A1, B1, B2, and A2. Basin A1 Basin A1 is located along the northern third of the project site. Runoff from Basin A1 is generated from roofs, back porches, and landscaping. Basin A1 sheet flows south to north where it is collected in bio-swale. The bio-swale conveys the collected runoff towards a 2’ concrete pan that runs north to south along the eastern property line which discharges the runoff into the Pond A along the southern border of the site. From there the runoff will be released east into a swale and concrete chase into Dover Drive at the historic 2-year rate. Basin B1 Basin B1 is in the middle of the project site and drains stormwater via overland flow from the north to the south. Runoff from Basin B1 is generated from roofs, driveways, sidewalk, landscaping, and the drive aisle. All the runoff generated in Basin B1 sheet flows across concrete pavers that are in the middle of the drive aisle. Once, the runoff has been treated by the concrete pavers an underdrain system will then convey the Taft Hill Village Preliminary Drainage Report 7 runoff south into Pond A. Once discharged into Pond A the runoff will then be released east into a swale and concrete chase into Dover Drive at the historic 2-year rate. Basin B2 Basin B2 wraps around the southwest corner of the project site and drains via overland flow from north to south. Runoff from Basin B2 is generated from the drive aisle entrance, the roof of the existing house, and landscaping areas. All of the runoff generated in Basin B2 will initially be collected in Pond B1 and just like Basin B1 it will then be released into Pond A2 and then conveyed to Dover Drive at the historic 2- year rate. Basin A2 Basin A2 encompasses the southeast corner of the project site. Runoff from Basin A2 is generated from the two eastern most lots of the proposed subdivision and a portion of the cul-de-sac and the associated sidewalk. Stormwater from Basin A2 splits flows at the ridge of the two lots. Runoff generated on the eastern side of the lots will sheet flow east where it will be collected in a 2’ concrete pan and runoff generated on the western side of the lots will sheet flow north to south. However, both scenarios will convey the runoff to Pond A. From Pond A the runoff will be conveyed to Dover Drive via a swale and concrete chase just like Basins A1, B1, and B2. B. Specific Details 1. The main drainage problems associated with this project site is the deficiency of existing stormwater infrastructure present and lack of developable area. Basins A1, B1, B2, and A2 will all be treated either by an LID amenity or via extended detention. A restrictor plate will be placed at the outfall of Pond A to ensure that the site is not discharging at a rate greater than the 2-year. Pond B and Pond A were both sized using a reduced historic 2-year release rate. Ultimately though, Pond A will be releasing the entire site at the historic 2-year release rate. 2. The release rate for the undeveloped land (pre-development) was established by calculating the Historic 2-year peak runoff rate for the entire project area (Basin H1) with no reduction because all the runoff generated on the site is being captured and treated. The overall historic 2-year peak runoff rate was calculated to be 0.81 cfs. This release rate was utilized in the FAA procedure detention storage computations (Refer to Appendix B for these calculations). 3. Detention Pond Calculations Taft Hill Village has two ponds that are right next to one another and act hydraulically independent of each other. Pond B is situated directly west of Pond A and they are separated by a berm and headwall that has a weir and restrictor plate on it. However, Pond A will have all runoff from the site eventually passing through it because it is the ultimate discharge location. Pond A will discharge east into a proposed swale and concrete chase into Dover Drive at the historic 2-year rate. Pond B will be releasing into Pond A and Pond A will be releasing into the proposed swale and concrete chase conveying the flows towards Dover Drive. Taft Hill Village Preliminary Drainage Report 8 Pond A The FAA method was used to size Pond A. The overall historic 2-year release rate is 0.81 cfs and Pond A was sized using a release rate of 0.61 cfs and Pond B was sized using a release rate of 0.20 cfs. Based on the characteristics of Basins A1 and A2 with an adjusted release rate of 0.61 cfs, formulate a detention volume of 7058 cu. ft. However, Basin A2 is receiving water quality in the form of extended detention and following UDFCD standards Basin A2 requires 277.49 cu. ft. of volume for water quality. Therefore, the required volume for the 100-yr detention plus the WQCV is 7335.49 cu ft. The top of pond for Pond A is at an elevation of 5084.09’ and the top of freeboard is at 5084.60’ therefore there is slightly more than 6 inches of free board (6.12”). Pond A will be releasing at the full 2-year historic rate (0.81 cfs) and the emergency flow for Pond A is at the southeast corner of the site and discharges east into the swale that will convey the flows into Dover Drive. Pond B The FAA method was used to size Pond B as well. As mentioned in the description of Pond A, Pond B was sized using a release rate of 0.20 cfs. The reason different flow rates were used in sizing the two ponds was because Pond B is in a spot within the project site that allows for a larger pond. Based on characteristics from Basins B1 and B2 with an adjusted release rate of 0.20 cfs, formulate a detention volume of 7906 cu. ft. However, Basin B2 will is receiving water quality in the form of extended detention and following UDFCD standards Basin B2 requires 242.27 cu. ft. of volume for water quality. Basin B1 is receiving its water quality through the porous pavers. Therefore, the required volume for the 100-yr detention plus the WQCV is 8148.27 cu. ft. The top of Pond B is at an elevation of 5085.02’ and the top of freeboard is at 5085.60 therefore there is slightly more than 6 inches of free board (6.96”). Pond B will release at a rate of 0.20 cfs into Pond A through a pipe that connects the two ponds. Once into Pond A it will release at the historic 2-year rate of 0.81 cfs with Pond A’s runoff. The emergency spillway for Pond B is located at the headwall that divides Pond A and Pond B. The excess runoff will flow east until it reaches the swale east of Pond A where it will be conveyed to Dover Drive. 4. Water Quality Results Basin A1 All runoff generated in Basin A1 will enter the bio-swale that is located adjacent to the northern property line. The bio-swale is a landscaped element designed to concentrate and/or remove silt and pollution from surface runoff water. Currently, there are no concrete standards on how to properly size bio-swales but a 10:1 runoff ratio cannot be exceeded. The runoff ratio is a comparison between the impervious area and surface area of the bio-swale (impervious area of basin:bio-swale surface area). Basin A1’s bio-swale has an overall surface area of 1833 sq. ft. and the total impervious area of Basin A1 is 2920 sq. ft. Therefore, the runoff ratio is 1.6:1 which is well below the required 10:1 ratio. Basin B1 Basin B1 will have water quality provided via concrete pavers located in the middle of the private drive aisle. Following UDFCD standards, a required WQCV for Basin B1 is 390 cu. ft. and the volume provided within the permeable pavers is 693 cu. ft. Once the runoff has gone through the permeable pavers it will be conveyed to Pond A via a 6” perforated pipe. Taft Hill Village Preliminary Drainage Report 9 Basin B2 Water quality for Basin B2 will be provided via extended detention in Pond B. Following UDFCD Standards, a required WQCV for Basin B2 is 247 cu. ft. This volume is included within Pond B. Pond B will have an outlet structure located at design point b1 that detains and attenuates runoff and promotes the settlement of pollutants. Basin A2 Water quality for Basin A2 will also be provide via extended detention in Pond A. Following UDFCD Standards, a required WQCV for Basin A2 is 278 cu. ft. This volume is included within in Pond A. Pond A will have an outlet structure located at design point a2 that detains and attenuates runoff and promotes the settlement of pollutants. 5. Pond B’s emergency overflow conveys excess runoff east over the berm/headwall into Pond A. Pond A’s emergency overflow path is located at design point a2. From there all excess flow will overtop the pond wall and flow east via swale into Dover Drive. Both Pond B and Pond A have a free board of roughly 6 inches (6.12”). V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Taft Hill Village project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Taft Hill Village project complies with the City of Fort Collins’ Master Drainage Plan. 3. There are no city regulatory floodplains and/or erosion buffer zones associated with the Taft Hill Village project. 4. The drainage plan and stormwater management measures proposed with the Taft Hill Village development are compliant with all applicable State and Federal regulations governing stormwater discharge. B. Drainage Concept 1. The drainage design proposed with this project will effectively limit potential damage associated with its stormwater runoff. Taft Hill Village will detain and treat the entire project site and release at the historic 2-year rate east into Dover Drive during the developed 100-year storm. 2. Taft Hill Village will provide water quality via LID features as well as extended detention. Taft Hill Village Preliminary Drainage Report 10 References 1. City of Fort Collins Landscape Design Guidelines for Stormwater and Detention Facilities, November 5, 2009, BHA Design, Inc. with City of Fort Collins Utility Services. 2. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Brickstone Apartments CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: South Taft Hill Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year C f = 1.00 100-year C f = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 102457.9 2.352 0.000 0.025 0.043 0.124 0.000 2.16 0.28 0.28 0.35 5% TOTAL 102458 2.352 0.000 0.025 0.043 0.124 0.000 2.16 0.19 0.19 0.24 5% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf Brickstone Apartments Overland Flow, Time of Concentration: Project: South Taft Hill Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Brickstone Apartments Rational Method Equation: Project: South Taft Hill Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: h1 H1 2.35 33 33 31 0.28 0.28 0.35 1.22 2.08 4.47 0.81 1.39 3.72 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) B. Mathisen January 19, 2017 Q = C f ( C )( i )( A ) Page 3 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\Direct-Runoff Brickstone Apartments DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) h1 H1 2.35 0.28 0.35 33.2 30.7 0.81 3.72 Page 7 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\SUMMARY-TABLE Brickstone Apartments CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: South Taft Hill Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: B. Mathisen Asphalt ……....……………...……….....…...……………….………………………………….0.. 95 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.. 50 40% Roofs …….…….………………..……………….…………………………………………….. 0.95 90% Pavers…………………………...………………..…………………………………………….. 0.40 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….. 0.15 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year C f = 1.00 100-year C f = 1.25 Basin ID Basin Area (s.f.) Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A1 24263.9 0.557 0.000 0.023 0.047 0.000 0.000 0.49 0.34 0.34 0.42 11% B1 31583.0 0.725 0.000 0.170 0.149 0.000 0.071 0.34 0.57 0.57 0.72 42% B2 19673.7 0.452 0.000 0.127 0.019 0.000 0.000 0.31 0.48 0.48 0.60 29% A2 26936.5 0.618 0.000 0.080 0.069 0.000 0.000 0.47 0.42 0.42 0.52 22% TOTAL 102457 2.352 0.000 0.400 0.284 0.000 0.071 1.67 0.39 0.39 0.49 26% Brickstone Apartments Overland Flow, Time of Concentration: Project: South Taft Hill Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf =1.00) C*Cf (10-yr Cf =1.00) C*Cf (100-yr Cf =1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Brickstone Apartments Rational Method Equation: Project: South Taft Hill Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: a1 A1 0.56 17 17 16 0.34 0.34 0.42 1.75 2.99 6.41 0.33 0.56 1.51 b1 B1 0.73 7 7 5 0.57 0.57 0.72 2.52 4.31 9.95 1.05 1.79 5.16 b1 B2 0.45 10 10 8 0.48 0.48 0.60 2.26 3.86 8.38 0.49 0.83 2.26 a2 A2 0.62 8 8 7 0.42 0.42 0.52 2.46 4.21 9.06 0.64 1.09 2.93 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) DEVELOPED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Basin(s) B. Mathisen January 23, 2017 Intensity, i10 (in/hr) Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 C10 Q = C f ( C )( i )( A ) Page 3 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Direct-Runoff Brickstone Apartments DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) a1 A1 0.56 0.34 0.42 17.1 15.6 0.33 1.51 b1 B1 0.73 0.57 0.72 7.4 5.4 1.05 5.16 b1 B2 0.45 0.48 0.60 9.8 8.3 0.49 2.26 a2 A2 0.62 0.42 0.52 7.6 6.7 0.64 2.93 Page 7 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\SUMMARY-TABLE APPENDIX B HYDRAULIC COMPUTATIONS B.1 – Detention Facilities APPENDIX B.1 DETENTION FACILITIES Pond No : a2 100-yr 0.52 6.30 min 7058 ft3 1.36 acres 0.162 ac-ft Max Release Rate = 0.61 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 2111 1.00 0.61 183 1928 10 7.720 3276 0.82 0.50 298 2977 15 6.520 4150 0.71 0.43 390 3760 20 5.600 4752 0.66 0.40 481 4271 25 4.980 5283 0.63 0.38 573 4710 30 4.520 5754 0.61 0.37 664 5089 35 4.080 6059 0.59 0.36 756 5303 40 3.740 6348 0.58 0.35 847 5501 45 3.460 6607 0.57 0.35 939 5668 50 3.230 6853 0.56 0.34 1030 5822 55 3.030 7071 0.56 0.34 1122 5950 60 2.860 7281 0.55 0.34 1213 6068 65 2.720 7502 0.55 0.33 1305 6197 70 2.590 7693 0.55 0.33 1396 6297 75 2.480 7892 0.54 0.33 1488 6405 80 2.380 8079 0.54 0.33 1579 6500 85 2.290 8259 0.54 0.33 1671 6589 90 2.210 8440 0.54 0.33 1762 6677 95 2.130 8586 0.53 0.33 1854 6732 100 2.060 8741 0.53 0.32 1945 6796 105 2.000 8911 0.53 0.32 2037 6874 110 1.940 9055 0.53 0.32 2128 6927 115 1.890 9223 0.53 0.32 2220 7003 120 1.840 9369 0.53 0.32 2311 7058 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. A = Tc = Project Location : Design Point C = Design Storm DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado Project Title Date: Project Number Calcs By: Client Pond Designation Invert Elevation Water Quality Volume 100-yr Detention Volume Total Pond Volume Min Sc D = Depth between contours (ft.) A1 = Surface Area lower contour (ft 2 ) t A2 = Surface Area upper contour (ft 2 ) Area/Row No. of Rows 5082.20 170.82 0.00 0.00 0.00 0.0000 5082.40 798.07 0.20 89.21 89.21 0.0020 5082.60 1565.84 0.20 232.12 321.33 0.0074 WQCV 5082.80 2502.34 0.20 403.18 724.50 0.0166 5083.00 3616.63 0.20 608.49 1332.99 0.0306 5083.20 4557.27 0.20 815.58 2148.57 0.0493 5083.40 5154.55 0.20 970.57 3119.14 0.0716 5083.60 5640.89 0.20 1079.18 4198.32 0.0964 5083.80 6251.10 0.20 1188.68 5386.99 0.1237 5084.00 6821.74 0.20 1306.87 6693.86 0.1537 5084.20 7394.76 0.20 1421.26 8115.13 0.1863 Total Vol 5084.40 7980.53 0.20 1537.16 9652.28 0.2216 5084.60 8596.82 0.20 1657.35 11309.64 0.2596 Elevation Depth Volume WQCV 5082.56 0.36 0.0064 100-yr Detention 5084.05 1.85 0.1620 Overall Detention 5084.09 1.89 0.1684 Circular Perforation Sizing Dia (in.) 1 Pond A 0.05 5 0.0064 ac-ft 5082.20 ft Pond A Volume Elevation (ft) n 1/4 0.018 sq-in Surface Area (ft2) Total Outlet Area 0.25 sq. in. Taft Hill Village 3/7/2017 1076-001 B. Mathisen 0.0000 0.1684 ac-ft 0.1620 ac-ft Required Area Pond No : b1 100-yr 0.66 5.00 min 7906 ft3 0.99 acres 0.182 ac-ft Max Release Rate = 0.20 cfs Time (min) Ft Collins 100-yr Intensity (in/hr) Inflow Volume (ft3) Outflow Adjustment Factor Qav (cfs) Outflow Volume (ft3) Storage Volume (ft3) 5 9.950 1950 1.00 0.20 60 1890 10 7.720 3027 0.75 0.15 90 2937 15 6.520 3834 0.67 0.13 120 3714 20 5.600 4391 0.63 0.13 150 4241 25 4.980 4881 0.60 0.12 180 4701 30 4.520 5316 0.58 0.12 210 5106 35 4.080 5598 0.57 0.11 240 5358 40 3.740 5865 0.56 0.11 270 5595 45 3.460 6104 0.56 0.11 300 5804 50 3.230 6331 0.55 0.11 330 6001 55 3.030 6533 0.55 0.11 360 6173 60 2.860 6727 0.54 0.11 390 6337 65 2.720 6931 0.54 0.11 420 6511 70 2.590 7108 0.54 0.11 450 6658 75 2.480 7292 0.53 0.11 480 6812 80 2.380 7464 0.53 0.11 510 6954 85 2.290 7631 0.53 0.11 540 7091 90 2.210 7798 0.53 0.11 570 7228 95 2.130 7933 0.53 0.11 600 7333 100 2.060 8076 0.53 0.11 630 7446 105 2.000 8233 0.52 0.10 660 7573 110 1.940 8366 0.52 0.10 690 7676 115 1.890 8521 0.52 0.10 720 7801 120 1.840 8656 0.52 0.10 750 7906 *Note: Using the method described in Urban Storm Drainage Criteria Manual Volume 2. DETENTION POND CALCULATION; MODIFIED FAA METHOD w/ Ft Collins IDF Input Variables Results Required Detention Volume Fort Collins, Colorado 1076-001 South Taft Hill Project Number : Project Name : Pond B A = Project Title Date: Project Number Calcs By: Client Pond Designation Invert Elevation Water Quality Volume 100-yr Detention Volume Total Pond Volume Min Sc D = Depth between contours (ft.) A1 = Surface Area lower contour (ft 2 ) t A2 = Surface Area upper contour (ft 2 ) Area/Row No. of Rows 5083.20 194.77 0.00 0.00 0.00 0.0000 5083.40 811.59 0.20 93.60 93.60 0.0021 5083.60 1718.55 0.20 247.41 341.01 0.0078 WQCV 5083.80 2931.71 0.20 459.66 800.66 0.0184 5084.00 4439.40 0.20 731.92 1532.58 0.0352 5084.20 5751.29 0.20 1016.24 2548.82 0.0585 5084.40 6558.62 0.20 1230.11 3778.93 0.0868 5084.60 6861.29 0.20 1341.88 5120.81 0.1176 5084.80 7146.38 0.20 1400.67 6521.48 0.1497 5085.00 7465.95 0.20 1461.12 7982.59 0.1833 100-yr Vol 5085.20 7820.36 0.20 1528.49 9511.09 0.2183 Total Vol 5085.40 8188.25 0.20 1600.72 11111.81 0.2551 5085.60 9272.45 0.20 1744.95 12856.76 0.2952 Elevation Depth Volume WQCV 5083.52 0.32 0.0056 100-yr Detention 5084.99 1.79 0.1820 Overall Detention 5085.02 1.82 0.1876 Circular Perforation Sizing Dia (in.) 1 Pond B 0.05 5 0.0056 ac-ft 5083.20 ft Pond B Volume Elevation (ft) n 1/4 0.016 sq-in Surface Area (ft2) Total Outlet Area 0.25 sq. in. Taft Hill Village 3/7/2017 1076-001 B. Mathisen 0.1876 ac-ft 0.1820 ac-ft Required Area Per Row APPENDIX C WATER QUALITY DESIGN COMPUTATIONS Project Title Date: Project Number Calcs By: Client Pond Designation 1 WQCV = Watershed inches of Runoff (inches) 22.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.124 in A = 0.62 ac V = 0.0064 ac-ft 277.49 cu. ft. V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event South Taft Hill January 23, 2017 1076-001 B. Mathisen Pond A 0.124 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq /100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV    Project Title Date: Project Number Calcs By: Client Pond Designation 1 WQCV = Watershed inches of Runoff (inches) 29.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.148 in A = 0.45 ac V = 0.0056 ac-ft 242.27 cu. ft. V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) South Taft Hill January 23, 2017 1076-001 B. Mathisen Pond B Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event 0.148 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq /100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 − 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV    Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Type of Permeable Pavement Section A) What type of section of permeable pavement is used? (Based on the land use and activities, proximity to adjacent structures and soil characteristics.) B) What type of wearing course? 2. Required Storage Volume A) Effective Imperviousness of Area Tributary to Permeable Pavement, Ia Ia = 42.0 % B) Tributary Area's Imperviousness Ratio (I = Ia / 100) i = 0.420 C) Tributary Watershed Area ATotal = 31,583 sq ft (including area of permeable pavement system) D) Area of Permeable Pavement System APPS = 3,080 sq ft (Minimum recommended permeable pavement area = 5481 sq ft) E) Impervious Tributary Ratio RT = 3.9 IMPERVIOUS TRIBUTARY RATIO EXCEEDS 2.0 (Contributing Imperviuos Area / Permeable Pavement Ratio) F) Water Quality Capture Volume (WQCV) Based on 12-hour Drain Time WQCV = 390 cu ft (WQCV = (0.8 * (0.91 * i3 - 1.19 * i2 + 0.78 * i) / 12) * Area) G) Is flood control volume being added? H) Total Volume Needed VTotal = cu ft 3. Depth of Reservoir A) Minimum Depth of Reservoir Dmin = 10.0 inches (Minimum recommended depth is 6 inches) B) Is the slope of the reservoir/subgrade interface equal to 0%? C) Porosity (Porous Gravel Pavement < 0.3, Others < 0.40) P = 0.30 D) Slope of the Base Course/Subgrade Interface S = ft / ft E) Length Between Lateral Flow Barriers L = ft F) Volume Provided Based on Depth of Base Course V = 693 cu ft Flat or Stepped: V = P * ((Dmin-1)/12) * Area Sloped: V = P * [(Dmin - (Dmin - 6*SL-1)) / 12] * Area 4. Lateral Flow Barriers A) Type of Lateral Flow Barriers B) Number of Permeable Pavement Cells Cells = 1 5. Perimeter Barrier A) Is a perimeter barrier provided on all sides of the pavement system? (Recommeded for PICP, concrete grid pavement, or for any no-infiltration section.) South Taft Hill Basin B1 Design Procedure Form: Permeable Pavement Systems (PPS) Blaine Mathisen Northern Engineering January 23, 2017 Choose One No Infiltration Partial Infiltration Section Full Infiltration Section Choose One YES NO Choose One YES- Flat or Stepped Installation NO- Sloped Installation Choose One Concrete Walls Sheet 2 of 2 Designer: Company: Date: Project: Location: 6. Filter Material and Underdrain System A) Is the underdrain placed below a 6-inch thick layer of CDOT Class C filter material? B) Diameter of Slotted Pipe (slot dimensions per Table PPs-2) Detention Vault no Underdrain C) Distance from the Lowest Elevation of the Storage Volume y = 0.3 ft (i.e. the bottom of the base course to the center of the orifice) 7. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is there a minimum 30 mil thick impermeable PVC geomembrane liner on the bottom and sides of the basin, extending up to the top of the base course? B) CDOT Class B Separator Fabric 8. Outlet (Assumes each cell has similar area, subgrade slope, and length between lateral barriers (unless subgrade is flat). Calculate cells individually where this varies.) A) Depth of WQCV in the Reservoir DWQCV = 5.06 inches (Elevation of the Flood Control Outlet) B) Diameter of Orifice for 12-hour Drain Time DOrifice = 0.67 inches (Use a minimum orifice diameter of 3/8-inches) Notes: Basin B1 South Taft Hill Design Procedure Form: Permeable Pavement Systems (PPS) Blaine Mathisen Northern Engineering January 23, 2017 Choose One YES NO Choose One 4-inch 6-inch Choose One Choose One YES NO Placed above the liner Placed above and below the liner N/A 1076-001 Basin B1 PAVER UD-BMP_v3.02.xls, PPS 1/23/2017, 4:10 PM APPENDIX D EROSION CONTROL REPORT South Taft Hill Final Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CB2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. MAP POCKET HISTORIC DRAINAGE EXHIBIT PROPOSED DRAINAGE EXHIBIT CONTROL CONTROL IRR IRR G T T CTV CTV CTV CTV CTV CTV G G T T T T T W X S S M W X X X X SS SS SS SS SS M X X X X X X X X X X X X X X X X X X X X X X X X X 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W H1 LOT 5 OWNER: BLACK J/M/S OWNER: BLACK M/J LOT 8 LOT 21 LOT 22 LOT 23 VILLAGE WEST NINTH FILING VILLAGE WEST FOURTH FILING VILLAGE WEST THIRD FILING CONTROL CONTROL IRR IRR G CTV G G W X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOT 5 OWNER: BLACK J/M/S OWNER: BLACK M/J LOT 8 LOT 21 LOT 22 LOT 23 VILLAGE WEST NINTH FILING VILLAGE WEST FOURTH FILING VILLAGE WEST THIRD FILING LOT 1 LOT 2 LOT 3 LOT 4 LOT 6 LOT 5 LOT 4 SOUTH TAFT HILL (ROW VARIES) B1 A1 A2 a2 a1 B2 UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD UD b1 20' EMERGENCY 12' UTILITY ACCESS EASEMENT EASEMENT 15' DRAINAGE EASEMENT 6' UTILITY EASEMENT LOT 1 LOT 8 LOT 7 LOT 5 LOT 6 LOT 4 LOT 3 LOT 2 TRACT A WQCV EXTENTS WQCV EXTENTS 4' CURB CUT POND B STORAGE VOLUME=8148.27 CU. FT. 100-YR ELEV.=5084.96 WQCV ELEV.=5083.52 POND A STORAGE VOLUME=7335.49 CU. FT. 100-YR ELEV.=5084.09 WQCV ELEV.=5082.57 FES A1 OUTLET STRUCTURE DRYWELL FLAT BOTTOM BIO-SWALE EXISTING INLET GRATE EXISTING DECID. TREE EXISTING CONIF. TREE EXISTING LIGHT POLE EXISTING STUMP EXISTING CURB/GUTTER FLOWLINE 4950 4:1 BANK SLOPE PROPOSED OVERLAND FLOW DIRECTION CONCENTRATED FLOW DIRECTION PROPOSED CONTOUR EXISTING CONTOUR CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A2 a3 DRAINAGE BASIN AREA DESIGN POINT DRAINAGE BASIN ID DRAINAGE BASIN MINOR/MAJOR COEFF. FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION 1. REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR SOUTH TAFT HILL" BY NORTHERN ENGINEERING, DATED 03/07/2017 FOR ADDITIONAL INFORMATION. LID TABLE: Sheet of 11 TAFT HILL VILLAGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com C6.00 DRAINAGE EXHIBIT ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 10 LEGEND: LEGEND: PROPOSED BIO-SWALE TOP OF POND ELEVATION DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) a1 A1 0.56 0.34 0.42 17.1 15.6 0.33 1.51 b1 B1 0.73 0.57 0.72 7.4 5.4 1.05 5.16 b1 B2 0.45 0.48 0.60 9.8 8.3 0.49 2.26 a2 A2 0.62 0.42 0.52 7.6 6.7 0.64 2.93 SUMMARY TABLE: WQCV ELEVATION PROPOSED POROUS PAVERS Design Point Basin ID Basin Area Treatment Type LID System Impervious Area Treated by LID System Percent of Impervious Area Treated by LID System a1 A1 0.557 ac. Bio-Swale Yes 0.067 ac. 9.03% b1 B1 0.725 ac. Pavers Yes 0.385 ac. 51.89% b1 B2 0.452 ac. Extended Detention No 0.142 ac. 0.00% a2 A2 0.618 ac. Extended Detention No 0.148 ac. 0.00% Total 2.352 ac. 0.742 ac. 61% PROPOSED 18" VERTICAL CURB AND GUTTER LOT 1 LOT 2 LOT 3 LOT 4 LOT 6 LOT 5 LOT 4 SOUTH TAFT HILL (ROW VARIES) h1 Sheet of 11 TAFT HILL VILLAGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 200 South College Avenue, Suite 010 Fort Collins, Colorado 80524 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 FAX: 970.221.4159 www.northernengineering.com 4:1 City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R A2 a3 FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION 1. REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR SOUTH TAFT HILL" BY NORTHERN ENGINEERING, DATED 03/07/2017 FOR ADDITIONAL INFORMATION. ( IN FEET ) 0 1 INCH = 30 FEET 30 30 60 90 LEGEND: LEGEND: C6.01 HISTORIC DRAINAGE EXHIBIT 11 SUMMARY TABLE: DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) h1 H1 2.35 0.28 0.35 33.2 30.7 0.81 3.72 PVC geomembrane installed normal to flow N/A- Flat installation Other (Describe): Choose One YES NO Choose One PICP Concrete Grid Pavement Pervious Concrete Porous Gravel 1076-001 Basin B1 PAVER UD-BMP_v3.02.xls, PPS 1/23/2017, 4:10 PM    = 40 hr    = 40 hr Total Vol. (ac-ft) Total Vol. (ft3) Incremental Vol. (ft3) Incremental Depth (ft) Calc. Depths ( ) 3 * * 1 2 1 2 D A A A A V = + + Tc = Project Location : Design Point C = Design Storm Page 1 of 1 1076-001_DetentionVolume_PondB_FAAModified Method.xls Per Row Total Vol. (ac-ft) Total Vol. (ft3) Incremental Vol. (ft3) Incremental Depth (ft) Calc. Depths ( ) 3 * * 1 2 1 2 D A A A A V = + + 1076-001 South Taft Hill Project Number : Project Name : Pond A Page 1 of 1 1076-001_DetentionVolume_PondA_FAAModified Method.xls Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) a1 A1 No 0.34 0.34 0.42 95 1.20% 13.1 13.1 11.6 N/A N/A 380 1.10% 1.57 4.0 17 17 16 b1 B1 No 0.57 0.57 0.72 113 2.90% 7.4 7.4 5.4 N/A N/A N/A N/A N/A 7 7 5 b1 B2 No 0.48 0.48 0.60 75 1.90% 8.1 8.1 6.6 255 1.60% 2.53 1.7 N/A N/A N/A 10 10 8 a2 A2 No 0.42 0.42 0.52 70 6.40% 5.7 5.7 4.9 170 0.60% 1.55 1.8 N/A N/A N/A 8 8 7 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter/Pipe Flow Swale Flow Design Point Basin Overland Flow B. Mathisen January 23, 2017 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 2 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\Tc-10-yr_&_100-yr DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 January 23, 2017 **Soil Classification of site is Clay Loam** Page 1 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Rational-Calcs.xlsx\C-Values Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) h1 H1 No 0.28 0.28 0.35 435 1.30% 29.2 29.2 26.7 N/A N/A 380 1.10% 1.57 4.0 33 33 31 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter/Pipe Flow Swale Flow Design Point Basin Overland Flow B. Mathisen January 19, 2017 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S C Cf L Ti = − Page 2 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\Tc-10-yr_&_100-yr = 1.00 January 19, 2017 **Soil Classification of site is Clay Loam** Page 1 of 23 Proposed D:\Projects\1076-001\Drainage\Hydrology\1076-001_Historic Rational-Calcs.xlsx\C-Values