February 26, 2016
Brad Massey
ALM2S
712 WHALERS WAY, SUITE B-100
Fort Collins, CO 80525
RE: 625 S Peterson Multi-Family, PDP160005, Round Number 1
Please see the following summary of comments from City staff and outside reviewing
agencies for your submittal of the above referenced project. If you have questions about
any comments, you may contact the individual commenter or direct your questions through
the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com.
Comment Response Letter - Responses shown below in highlighted red text. 5/31/16 alm2s and TST
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Building Elevations
Comment Number: 4 Comment Originated: 02/23/2016
02/23/2016: It appears there are a few discrepancies between the elevations
and perspectives shown. Please revise the elevations so they match the
elevations.
Response: Perspectives have been deleted. Elevations have been updated based on comments
from the two rounds of LPC review.
Comment Number: 5 Comment Originated: 02/24/2016
02/24/2016: Portions of the building along both the northern and southern
property line does not comply with the maximum wall height standards outlined
in Land Use Code section 4.8(E)(4). This standard states that any wall that
exceeds 18' in height as measured from the natural grade at the interior lot line
adjacent to the wall must be setback an additional 1' for every 2' the wall
exceeds 18'. In order to have a wall height of 29' as shown, the building would
have to be set back at least 11' from the north property line. Alternatively, the
building can step back 1' for every 2' above 18'. You will either need a
modification to this standard or will need to adjust the elevations accordingly.
Response: A modification to the standard is being requested. A setback illustration in elevation
and roof plan is shown on sheet 6, Architectural Elevations. The need to request a variance could
be avoided by using a standard hip or dutch hip vs. a straight gable roofline but we feel that a gable
roof form is more appropriate for the neighborhood context.
Topic: General
Comment Number: 1 Comment Originated: 02/17/2016
02/17/2016: Comment from GIS - Projects with three or more tenant units
require the Unit Level Addressing form to be completed and submitted to the
GIS Department after plans have met final approval through Development
Review and are recorded with the City. This can occur anytime during
construction, but before any utilities or address signs are installed. All
addressing will be determined by the GIS Department and submitted to Poudre
Fire Authority, USPS, Building Services, and Fort Collins Utilities. Failure to
contact GIS and determining addresses through other means may result in
address change
The Unit Level Addressing form can be obtained by contacting the GIS office
after the plans are recorded at gis@fcgov.com or (970) 416-2483.
Response: As noted, will be completed after plans have met final approval.
Comment Number: 2 Comment Originated: 02/23/2016
02/23/2016: Since a portion of the proposed fence on the southern property
line exceeds 6' in height, you will need to submit a modification request to Land
Use Code section 3.8.11(C)(3).
Response: Extending the fence up to 8’ along a portion of the south property was a request from the
neighbor to the south for additional privacy. We will include this in our modification request.
Comment Number: 3 Comment Originated: 02/23/2016
02/23/2016: Please submit proposed elevations for the fence to be installed
along the south property line.
Response: An elevation of the 8’ high section of fence is included on the site plan sheet.
Department: Engineering Development Review
Contact: Katie Sexton, 970-221-6501, ksexton@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/22/2016
02/22/2016: Please show required utility easements (8¿' along alley, 9¿'
behind sidewalk along Peterson) on site plan and utility plan. If the property is
not being re-platted, the easements will need to be dedicated by separate
document per the procedures outlined here:
http://www.fcgov.com/engineering/pdf/Easrowdedications2010.pdf
Response: These are now shown on the Utility and Site Plans. They will be registered by separate
document.
Comment Number: 2 Comment Originated: 02/22/2016
02/22/2016: The scale indicated by the site plan suggests that the trash
enclosure is partially within the area where there will be a required utility
easement (8'¿ width along alley). If the enclosure requires a building permit, it
will not be permitted in the easement (this is height dependent and a zoning
topic).
Response: The height of the trash enclosure has been reduced to 5’-8” with elevations shown on the
site plan sheet, therefore a building permit will not be required.
Comment Number: 3 Comment Originated: 02/22/2016
02/22/2016: Please add visual/bar scale to the site plan so that distances can
be measured even if the image gets printed or reproduced not to scale.
Response: This has been added to the plans.
Comment Number: 4 Comment Originated: 02/22/2016
02/22/2016: The most recent detail for the chase drain with detached sidewalk
is City of Fort Collins Utilities Stormwater Construction Detail D-10B. I can send
a copy of this to you.
Response: This has been added to the plans.
Department: Environmental Planning
Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 02/12/2016
02/12/2016: A detailed planting plan should be provided, including species
names, numbers, and sizes for all trees, shrubs, perennials and grasses.
Response: This will be provided at final design, after P&Z.
Topic: Lighting Plan
Comment Number: 2 Comment Originated: 02/12/2016
02/12/2016: Please add a note to the lighting plan that fixture A2 shall be
installed using the down-directional option.
Response: A note calling for “DOWN DIRECTIONAL” was added to the fixture schedule.
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: General
Comment Number: 6 Comment Originated: 02/25/2016
02/25/2016:
The following are a couple of types of trees that the project may want to
consider in landscape areas near the buildings.
Chanticleer Pear Pyrus calleryana ‘Chanticleer’
Thunderchild Crabapple Malus ‘Thunderchild’
Response: These have been added to the plant table.
Comment Number: 7 Comment Originated: 02/25/2016
02/25/2016:
In the landscape areas along the south and north boundary to the parking area
these are some narrow crowed trees the project may want to consider.
Skyrocket Juniper
Woodward juniper
Crimson Spire Oak
Response: These have been added to the plant table.
Topic: Landscape Plans
Comment Number: 1 Comment Originated: 02/25/2016
02/25/2016:
Please use the City of Fort Collins General landscape notes on the plan. These
notes are available from Clay Frickey the Project Planner or from The City
Forester 221 6361.
Response: These have been added to the plans.
Comment Number: 2 Comment Originated: 02/25/2016
02/25/2016:
Add to the tree inventory and mitigation table an additional column that provides
a brief explanation why each removed tree will not be retained. This may
include a full statement at the bottom of the table identify with a code number or
letter placed in the table.
Response: This has been added to the table.
Comment Number: 3 Comment Originated: 02/25/2016
02/25/2016:
Provide a brief explanation why additional major trees cannot be retained.
Reference the definition of Retaining trees to the extent reasonably feasible.
Extent reasonably feasible shall mean that, under the circumstances,
reasonable efforts have been undertaken to comply with the regulation, that the
costs of compliance clearly outweigh the potential benefits to the public or would
unreasonably burden the proposed project, and reasonable steps have been
undertaken to minimize any potential harm or adverse impacts resulting from
noncompliance with the regulation.
Response: This note has been added to the plans
Comment Number: 4 Comment Originated: 02/25/2016
02/25/2016:
Please place the following note on the utility plan Demolition plan sheet 3 of 9.
All tree inventory, retention and protection requirements on Landscape Plan
sheet 4 of 6 shall be followed.
Response: This note has been added to the Demo Plan.
Comment Number: 5 Comment Originated: 02/25/2016
02/25/2016:
Identify all the species of trees, shrubs and other landscape plants in the plant
schedule and also provide a direct label to these plants.
Response: This will be provided at final design, after P&Z.
Comment Number: 8 Comment Originated: 02/25/2016
02/25/2016:
Review the appropriate spacing of these narrow crowed trees with the project
Landscape Architect. A wider spacing than shown may be advised.
Response: The tree spacing has been adjusted.
Comment Number: 9 Comment Originated: 02/25/2016
02/25/2016:
List the percentage of each tree species used as a percentage of total trees.
Check percentages used to meet the minimum species diversity standard in
LUC 3.2.1 D 3.
Response: This will be provided at final design, after P&Z.
Comment Number: 10 Comment Originated: 02/25/2016
02/25/2016:
The project may want to review the tree planting details with a qualified
horticultural or landscape professional and make changes as recommended.
Things like backfill amendment, the removal or partial removal of burlap and
wire basket and possibly other items could be reviewed.
Response: This will be provided at final design, after P&Z.
Department: Internal Services
Contact: Sarah Carter, 970-416-2748, scarter@fcgov.com
Topic: Building Insp Plan Review
Comment Number: 1 Comment Originated: 02/26/2016
02/26/2016: Construction shall comply with the following adopted codes as
amended:
2012 International Building Code (IBC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Fort Collins has amendments to most of the codes listed above. See the
fcgov.com/building web page to view them.
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
Response: A pre-submittal meeting was held with the Building Department and the codes noted
above will be followed as a part of our final construction drawing package to be submitted for
building permit review.
Department: Light And Power
Contact: Todd Vedder, 970-224-6152, tvedder@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/23/2016
02/23/2016: Dwelling unit charges will apply for the additional units being
added. Each unit must be individually metered.
Response: Noted.
Comment Number: 2 Comment Originated: 02/23/2016
02/23/2016: Developer will be responsible for getting to the transformer with
secondary service. Currently the nearest source of power is single phase
power coming from the alley. Coordinate with Light & Power on this
interconnection.
Response: Noted.
Comment Number: 3 Comment Originated: 02/23/2016
02/23/2016: Please review our Electric Construction Policies, Practices &
Procedures for transformer and metering requirements. A link to this document
is below.
http://www.fcgov.com/utilities/business/builders-and-developers/development-fo
rms-guidelines-regulations
Response: This has been reviewed.
Comment Number: 4 Comment Originated: 02/23/2016
02/23/2016: Need to ensure power has a 10' separation with all water lines and
3' separation between gas lines. This only applies to parallel runs and not
crossings.
Response: Noted.
Comment Number: 5 Comment Originated: 02/23/2016
02/23/2016: Will the units be gas or electric heat? Also please identify main
breaker sizing for each unit so transformer sizing can be met.
Response: The units will have gas-fired furnaces. Panel sizing & circuiting will be done as
a part of the construction drawings once entitlement approval is completed.
Department: Stormwater Engineering
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
Comment Number: 1 Comment Originated: 02/19/2016
02/19/2016: The site disturbs more than 10,000 sq-ft, therefore Erosion and
Sediment Control Materials need to be submitted for FDP. The erosion control
requirements are in the Stormwater Design Criteria under the Amendments of
Volume 3 Chapter 7 Section 1.3.3. Current Erosion Control Materials
Submitted do not meet requirements. Please submit; Erosion Control Plan
(With redlines) , Erosion Control Report (not found), and an Escrow / Security
Calculation (not found). If you need clarification concerning the erosion control
section, or if there are any questions please contact Jesse Schlam
970-218-2932 or email @ jschlam@fcgov.com
Response: A report and calcs are being submitted at this time.
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
Topic: Construction Drawings
Comment Number: 2 Comment Originated: 02/23/2016
02/23/2016: The maximum allowable side slope permitted for grass-lined and
rock mulch slopes is 4:1. Would Swale D work better as a concrete pan?
Additionally, the outlet for this swale will need to be through a concrete chase as
runoff across a sidewalk is not allowed.
Response: Swale D has been changed to a concrete pan with a chase under the sidewalk.
Comment Number: 3 Comment Originated: 02/23/2016
02/23/2016: The existing impervious area documentation only applies to the
detention requirement. For LID and water quality, all new or modified
impervious area will need to be treated. Please revise the LID appropriately
since only Basin A is being treated, which does not equal 93.54% of the new or
modified impervious area. Additionally, water quality will need to be provided
for the new or modified impervious area in Basins B and C. Assuming the LID
treatment in Basin A meets the 50% site treatment requirement, the remainder
of the site can either be treated through LID or standard water quality methods.
Response: After further discussion on site constraints, a variance is being submitted to
cover WQCV in Basins B and C.
Topic: Drainage Report
Comment Number: 4 Comment Originated: 02/23/2016
02/23/2016: Please modify the calculations and text in the drainage report to
be consistent with modifications required in Comment 3.
Response: This has been updated.
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
Comment Number: 6 Comment Originated: 02/22/2016
02/22/2016: There are line over text issues. See redlines.
Response: These lines have been removed from the building elevations.
Topic: Construction Drawings
Comment Number: 7 Comment Originated: 02/22/2016
02/22/2016: There are line over text issues. See redlines.
Response: These have been corrected.
Topic: Lighting Plan
Comment Number: 4 Comment Originated: 02/22/2016
02/22/2016: Please remove "Site &" from the sheet title. See redlines.
Response: Correction made.
Comment Number: 5 Comment Originated: 02/22/2016
02/22/2016: There are line over text issues. See redlines.
Response: Correction made.
Topic: Site Plan
Comment Number: 1 Comment Originated: 02/22/2016
02/22/2016: Sheet 1 of 6 is missing from the set.
Response: Sheet 1 was submitted as a part of the overall package. It is the cover sheet with a
vicinity map, general notes, ownership information and required signature blocks. Please
coordinate with Clay if you did not receive a copy.
Comment Number: 2 Comment Originated: 02/22/2016
02/22/2016: Please remove "& Lighting" from the sheet title. See redlines.
Response: Correction made.
Comment Number: 3 Comment Originated: 02/22/2016
02/22/2016: There are line over text issues. See redlines.
Response: Correction made.
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
Comment Number: 1 Comment Originated: 02/24/2016
02/24/2016: no comments
Department: Water-Wastewater Engineering
Contact: Shane Boyle, 970-221-6339, sboyle@fcgov.com
Topic: Construction Drawings
Comment Number: 1 Comment Originated: 02/23/2016
02/23/2016: Please label pipe material for all proposed and existing water and
sewer mains and services.
Response: Proposed material has been added. Existing material is unknown at this time.
Comment Number: 2 Comment Originated: 02/23/2016
02/23/2016: Is the existing sewer service assumed to be coming from
Peterson St to remain or be abandoned? Please clarify in the plans.
Response: We were unable to locate the existing service location, but nearby lots are serviced from
Peterson and the assumption is that this lot is also. Regardless, the existing sewer service will be
abandon.
Comment Number: 3 Comment Originated: 02/23/2016
02/23/2016: Please move the meter pit behind the property line and label the
proposed water service connection.
Response: Meter pit has been moved and connection to ex main has been called out on the Utility
Plan.
Comment Number: 4 Comment Originated: 02/23/2016
02/23/2016: Please add the bedding details for water and wastewater.
Response: Bedding details have been added.
Department: Zoning
Contact: Ali van Deutekom, 970-416-2743, avandeutekom@fcgov.com
Topic: Site Plan
Comment Number: 1 Comment Originated: 02/23/2016
02/23/2016: Rear yard fences can not exceed 6' tall. Is there a reason you are
purposing an 8' tall fence?
Response: Only a short section of fence along the south property line just east of the existing
detached garage is being proposed as 8’ high. This was a specific request by the neighbors directly
to the south for increased privacy. The remainder of the fence is proposed as 6’ high.
Comment Number: 2 Comment Originated: 02/23/2016
02/23/2016: Trash enclosures over 6' tall require a separate building permit.
Response: The proposed trash enclosure height has been reduced to 5’-8”. Reference the
elevations on the site plan sheet.