Loading...
HomeMy WebLinkAboutRAW URTH DESIGNS - PDP - PDP150007 - CORRESPONDENCE - (3)Community Development and Neighborhood Services 281 North College Avenue PO Box 580 Fort Collins, CO 80522 970.221.6750 970.224.6134 - fax fcgov.com/developmentreview October 12, 2015 Curtis Koldeway Hauser Architects 3780 E. 15th St. Ste 201 Loveland, CO 80538 RE: Raw Urth Designs, PDP150007, Round Number 2 Comment Summary: Department: Planning Services Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com Topic: General 10/06/2015: This comment has been resolved by adding a fence along the property. Please note that the fence will need to be installed prior to the issuance of a CO. 07/06/2015: How will you be screening the trash and recycling enclosure? Please provide elevations of the proposed screening. Comment Number: 4 Comment Originated: 07/06/2015 Department: Engineering Development Review Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com Topic: General Please see the following summary of comments from City staff and outside reviewing agencies for your submittal of the above referenced project. If you have questions about any comments, you may contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at 970-224-6045 or cfrickey@fcgov.com. Page 1 of 8 10/06/2015: The legal descriptions provided pertaining to the two easement dedications and right-of-way dedication should all be titled Exhibit A instead of Exhibits A, B & C, as our standard deeds of dedication would have to have their references changed from their standard Exhibit A reference otherwise. These legals are being checked by Technical Services. We'll need completed deeds of dedication along with $750 total Transportation Development Review Fee for 3 dedications, and recording fees (amount to be determined), prior to approval of the mylars. (Note that a replat of the property with these dedications being done by the replat is another option that negates the need for the fees listed, but I'm unsure what are the cost/time implications with the replat option. Either options is equally acceptable.) 07/07/2015: The project needs to reflect the dedication of additional right-of-way along both Red Cedar Circle and Conifer Street in order for the sidewalk installed along both streets (to the collector standard with an 8 foot parkway and 5 foot detached sidewalk) to be in right-of-way. In addition, dedication of additional utility easement behind the new right-of-way is required in order to ensure a total of a 9 foot utility easement from behind the new right-of-way line. Each deed of dedication for right-of-way and utility easement (if done by separate document and not done via replat) will require a $250 deed of dedication fee as part of our Transportation Development Review Fee schedule as well as recording costs to record the deeds of dedication as assessed by Larimer County. Comment Number: 1 Comment Originated: 07/07/2015 Department: Environmental Planning Contact: Kelly Kimple, , kkimple@fcgov.com Topic: General 10/06/2015: As noted in the prairie dog removal plan, removal methods will follow the Fort Collins Municipal Code standards, as well as the Colorado Division of Parks and Wildlife requirements. Furthermore, if removal is scheduled between March 15 and October 31, a burrowing owl survey will need to be completed following the Colorado Division of Parks and Wildlife survey requirements. Comment Number: 4 Comment Originated: 10/06/2015 Contact: Rebecca Everette, 970-416-2625, reverette@fcgov.com Topic: General 10/07/2015: City staff has not received an ECS. We did receive an environmental report but it is not the standard ECS required by LUC 3.4.1. We are willing to waive the ECS requirement and accept an updated Black-tailed Prairie Dog removal plan, as addressed in comment #2. 08/21/2015: The response to comments notes that an Ecological Characterization Study was completed, but we do not have it in our records. Was this provided prior to the submittal? Please send to Kelly Kimple (kkimple@fcgov.com) and myself (reverette@fcgov.com) for review. Comment Number: 1 Comment Originated: 08/21/2015 08/21/2015: The prairie dog removal plan references a different site than what is currently proposed. Please update the removal plan with the correct site information. Comment Number: 2 Comment Originated: 08/21/2015 Page 2 of 8 10/07/2015: In order to further comply with Section 3.4.1 of the Land Use Code, to replace the lost ecological value from the removal of the site's prairie dog colony, City staff recommends additional landscaping on-site that provides enhanced habitat for birds, insects, and small terrestrial wildlife, such as evergreen trees, fruit-bearing trees and shrubs, and flowering plants. 08/21/2015: As noted at the conceptual review stage, mitigation for the removal of the prairie dog colony will be requried to replace the value of the habitat that will be lost. Please coordinate with Kelly Kimple (kkimple@fcgov.com) or myslef (reverette@fcgov.com) to further discuss how mitigation will occur. Comment Number: 3 Comment Originated: 08/21/2015 Department: Forestry Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com Topic: Landscape Plans 10/07/2015: COMMENT CONTINUED: It appears that the standard notes have not been added. Include the tree protection notes. Obtain these notes from Clay Frickey for placement on the plans. 07/08/2015: Obtain the standard landscape notes from the Planning Department to place on the plan. Standard notes can be obtained from Clay Frickey or Jason Holland in the Planning Department. Use the Planning Departments standard notes on the plan. Comment Number: 6 Comment Originated: 07/08/2015 10/07/2015: Is it feasible to place trees on the north side of the entrance off Red Cedar Street or are there utility constraints to doing so? Comment Number: 7 Comment Originated: 10/07/2015 10/07/2015: It appears that some ornamental grasses shown along the north boundary may be on the other side of the fence. Is this the intent? Comment Number: 8 Comment Originated: 10/07/2015 10/07/2015: Explore adding some xeric small trees in the landscape area on the south side of the building such as Canyon Maple or Russian hawthorn. Comment Number: 8 Comment Originated: 10/07/2015 10/07/2015: Mark on the Landscape and Utility plans that the offside mature Junipers to the north of the project will be protected. It appears that the underdrain in the LID swale is fairly close to these trees. Contact the City Forester for an on-site meeting to evaluate possible impact to these existing trees. Comment Number: 9 Comment Originated: 10/07/2015 Department: Historical Preservation Contact: Karen McWilliams, 970-224-6078, kmcwilliams@fcgov.com Topic: General 06/26/2015: No Historic Preservation concerns Comment Number: 1 Comment Originated: 06/26/2015 Department: Internal Services Page 3 of 8 Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com Topic: Building Insp Plan Review 06/18/2015: Building Permit Pre-Submittal Meeting: Pre-Submittal meetings are offered to assist the designer/builder by assuring, early on in the design, that the new commercial or multi-family projects are on track to complying with all of the adopted City codes and Standards listed below. The proposed project should be in the early to mid-design stage for this meeting to be effective and is typically scheduled after the Current Planning conceptual review meeting. Applicants of new commercial or multi-family projects are advised to call 416-2341 to schedule a pre-submittal meeting. Applicants should be prepared to present site plans, floor plans, and elevations and be able to discuss code issues of occupancy, square footage and type of construction being proposed. Construction shall comply with the following adopted codes as amended: 2012 International Building Code (IBC) 2012 International Residential Code (IRC) 2012 International Energy Conservation Code (IECC) 2012 International Mechanical Code (IMC) 2012 International Fuel Gas Code (IFGC) 2012 International Plumbing Code (IPC) as amended by the State of Colorado 2014 National Electrical Code (NEC) as amended by the State of Colorado Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009. Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF. Frost Depth: 30 inches. Wind Load: 100- MPH 3 Second Gust Exposure B. Seismic Design: Category B. Climate Zone: Zone 5 Energy Code Use 1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC. 2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter. 3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial chapter. City of Fort Collins Building Services Plan Review 416-2341 Comment Number: 1 Comment Originated: 06/18/2015 Department: Light And Power Contact: Coy Althoff, , CAlthoff@fcgov.com Topic: General 09/30/2015: 1-Phase & 3-Phase power is available at the site on both the East and West side of the property. Comment Number: 5 Comment Originated: 09/30/2015 09/30/2015: Please contact Light & Power Engineering if you have any questions at 221-6700. Please reference our policies, development charge processes, and use our fee estimator at http://www.fcgov.com/utilities/business/builders-and-developers. Comment Number: 6 Comment Originated: 09/30/2015 Page 4 of 8 10/09/2015: Contact Light & Power Engineering to coordinate the transformer location. Transformer must be within 10' of an asphalt/concrete surface. An 8' clearance from the front of the transformer and 3' on the sides and back is required. Comment Number: 7 Comment Originated: 10/09/2015 Contact: Rob Irish, 970-224-6167, rirish@fcgov.com Topic: General 06/26/2015: Owner will be responsible to pay for any relocation or modification of existing electric facilities at the proposed site. Comment Number: 1 Comment Originated: 06/26/2015 06/26/2015: Electric Capacity Fee, Building Site charges and any necessary system modification charges will apply. Please see the Electric Estimating Calculator and Electric Construction Policies, Practices & Procedures at the following link http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de velopment-fees Comment Number: 2 Comment Originated: 06/26/2015 06/26/2015: Please provide a one line diagram and a C-1 form to Light and Power Engineering. The C-1 form can be found at: http://zeus.fcgov.com/utils-procedures/files/EngWiki/WikiPdfs/C/C-1Form.pdf Comment Number: 3 Comment Originated: 06/26/2015 06/26/2015: Contact Light & Power Engineering to coordinate the transformer location. Transformer must be within 10' of an asphalt/concrete surface. Pay close attention to the transformer clearances in the Electric Construction Policies, Practices & Procedures. Comment Number: 4 Comment Originated: 06/26/2015 Department: PFA Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org Topic: General 07/08/2015: PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM New buildings require a fire department, emergency communication system evaluation after the core/shell but prior to final build out. For the purposes of this section, fire walls shall not be used to define separate buildings. Where adequate radio coverage cannot be established within a building, public-safety radio amplification systems shall be designed and installed in accordance with criteria established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy #07-01 Comment Number: 3 Comment Originated: 07/08/2015 09/25/2015: EXHIBIT C - PARCEL DESCRIPTION Limits of the easement have been described but not labeled as an Emergency Access Easement in the document as far as I could tell. Please clarify. Comment Number: 6 Comment Originated: 09/25/2015 Department: Stormwater Engineering Contact: Dan Mogen, , dmogen@fcgov.com Topic: Construction Drawings Page 5 of 8 10/06/2015: Slope is shown to be 0.8%, which is less than the recommended 2%. Please consider add a soft pan or concrete pan to mitigate against standing water issues in the future. 07/07/2015: Please show slope for pond bottom. Comment Number: 9 Comment Originated: 07/07/2015 10/06/2015: Please provide additional information on detail including depth that wall is to extend. 07/07/2015: Headwall design does not appear to be stable. Please consider adding footer and/or extending below frost depth. Comment Number: 10 Comment Originated: 07/07/2015 Topic: Drainage Report 10/06/2015: Detail seen. Please provide calculations. 07/07/2015: Please provide calculations for sizing of the sidewalk culvert in the report and provide detail in the plans. Comment Number: 5 Comment Originated: 07/07/2015 Topic: Easements 10/06/2015: Please expand drainageeasement - as is, it does not cover the entire detention basin. 07/08/2015: Please provide easement for detention basin, outfall pipe and spillway. Comment Number: 14 Comment Originated: 07/08/2015 Topic: General 10/06/2015: Please add the spillway elevation to the stage-storage table. Comment Number: 15 Comment Originated: 10/07/2015 10/06/2015: Please show that the detention basin is in compliance with drain times per Colorado Revised Statute 37-92-602(8). Comment Number: 16 Comment Originated: 10/07/2015 Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com Topic: Erosion Control 10/05/2015: Minor issue with rock berm detail not containing an emergancy overflow. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com 06/30/2015: Minor redline on Erosion Control Plan will look for change in FDP. Report OK Escrow OK. If you need clarification concerning this, or if there are any questions please contact Jesse Schlam 970-218-2932 or email @ jschlam@fcgov.com Comment Number: 1 Comment Originated: 06/30/2015 Department: Technical Services Contact: Jeff County, 970-221-6588, jcounty@fcgov.com Topic: Building Elevations 10/05/2015: No comments. 07/08/2015: No comments. Comment Number: 1 Comment Originated: 07/08/2015 Topic: Construction Drawings Page 6 of 8 10/05/2015: Please correct the titleblocks on sheets 2-8 as marked. See redlines. 07/08/2015: Please correct the legal description on sheet 1, and the titleblocks as shown. See redlines. Comment Number: 2 Comment Originated: 07/08/2015 10/05/2015: The Benchmark Statement must match the format shown in the previous comment. 07/08/2015: The Benchmark Statement needs to match the following: PROJECT DATUM: NAVD88 BENCHMARK # w/ DESCRIPTION ELEVATION: BENCHMARK # w/ DESCRIPTION ELEVATION: PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR THEIR VERTICAL DATUMS. IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88 - X.XX¿. Comment Number: 3 Comment Originated: 07/08/2015 10/05/2015: There are still line over text issues. See redlines. 07/08/2015: There are line over text issues. See redlines. Comment Number: 4 Comment Originated: 07/08/2015 Topic: General 10/05/2015: Since right of way & easements are being dedicated, you might consider replatting Lot 20. This would dedicate everything on one document. Comment Number: 12 Comment Originated: 10/05/2015 Topic: Lighting Plan 10/05/2015: No comments. 07/08/2015: No comments. Comment Number: 7 Comment Originated: 07/08/2015 Topic: Site Plan 10/05/2015: The southeast corner of the property does not match the legal description dedicating the new Utility Easement. 07/08/2015: What is the 5' dimension (marked) along the north side of the property? If it is an easement line/dimension, it does not match the Plat. Please see the lines marked at the southeast corner of the property also. If these are easement lines they do not match the Plat. If these lines are easement lines, please correct them. If they are not, please disregard. Comment Number: 9 Comment Originated: 07/08/2015 Department: Traffic Operation Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com Topic: Site Plan Page 7 of 8 10/06/2015: Check on the design details for the sidewalk ramp connection to ensure you're showing the current standards. 07/07/2015: The sidewalk ramps at Red Cedar need to be directional. Comment Number: 1 Comment Originated: 07/07/2015 Department: Water Conservation Contact: Eric Olson, 970-221-6704, eolson@fcgov.com Topic: General 10/06/2015: The irrigation plan is incomplete. Please refer to the provisions outlined in Section 3.2.1(J) of the Land Use Code. Identify master valve and smart controller with weather station on the irrigation legend and on irrigation plan. Direct questions concerning irrigation requirements to Eric Olson, at 221-6704 or eolson@fcgov.com Comment Number: 1 Comment Originated: 10/06/2015 Department: Zoning Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com Topic: General 07/07/2015: ON sheet A-1 under the 'General Notes', specifically note number 6, please include the language " Signs are not approved with this plan. All signs will be approved through a separate sign permit." Comment Number: 1 Comment Originated: 07/07/2015 07/07/2015: In reference to the sign shown on the elevations, this sign does not meet the sign code standards. Comment Number: 2 Comment Originated: 07/07/2015 07/07/2015: Please label the ramp from the handicap loading area to the internal sidewalk. Comment Number: 3 Comment Originated: 07/07/2015 07/07/2015: The plans are only showing an area for trash please include the area for recycling also. Comment Number: 4 Comment Originated: 07/07/2015 07/07/2015: Please, clarify the property line on the landscape plan. It is difficult to discern. Comment Number: 5 Comment Originated: 07/07/2015 Page 8 of 8