July 10, 2015
Curtis Koldeway
Hauser Architects
3780 E. 15th St. Ste 201
Loveland, CO 80538
RE: Raw Urth Designs, PDP150007, Round Number 1
Comment Summary:
Department: Planning Services
Contact: Clay Frickey, 970-224-6045, cfrickey@fcgov.com
Topic: Building Elevations
07/06/2015: The west elevation has very little detail on the main level. Please
provide windows, steel panels and/or other architectural details to break up this
mass.
Comment Number: 2 Comment Originated: 07/06/2015
07/06/2015: Please provide an elevation of the proposed fence for the storage yard.
Comment Number: 5 Comment Originated: 07/06/2015
Topic: General
07/06/2015: How will you be screening the trash and recycling enclosure? Please
provide elevations of the proposed screening.
Comment Number: 4 Comment Originated: 07/06/2015
07/07/2015: The Prairie Dog Colony Removal Plan submitted has errors that may
indicate the wrong site was surveyed. Please submit a corrected version of the
Prairie Dog Colony Removal Plan.
Comment Number: 7 Comment Originated: 07/07/2015
Topic: Landscape Plans
07/06/2015: Please show the trash and recycling enclosure and bike parking on the
landscape plan.
Comment Number: 3 Comment Originated: 07/06/2015
07/06/2015: Please remove the aspen trees proposed on the landscape plan and
replace with different trees. Staff recommends replacing with evergreen trees.
Comment Number: 6 Comment Originated: 07/06/2015
Topic: Site Plan
Please see the following summary of comments from City staff and outside reviewing agencies for
your submittal of the above referenced project. If you have questions about any comments, you may
contact the individual commenter or direct your questions through the Project Planner, Clay Frickey, at
970-224-6045 or cfrickey@fcgov.com.
Page 1 of 10
07/01/2015: The project narrative states that Raw Urth employs 17 people. The site
plan indicates the parking requirement was calculated for 10 employees. The
project should provide 13 spaces per the project narrative. Please reconcile this
difference.
Comment Number: 1 Comment Originated: 07/01/2015
Department: Engineering Development Review
Contact: Marc Virata, 970-221-6567, mvirata@fcgov.com
Topic: General
07/07/2015: The project needs to reflect the dedication of additional right-of-way
along both Red Cedar Circle and Conifer Street in order for the sidewalk installed
along both streets (to the collector standard with an 8 foot parkway and 5 foot
detached sidewalk) to be in right-of-way. In addition, dedication of additional utility
easement behind the new right-of-way is required in order to ensure a total of a 9
foot utility easement from behind the new right-of-way line. Each deed of dedication
for right-of-way and utility easement (if done by separate document and not done via
replat) will require a $250 deed of dedication fee as part of our Transportation
Development Review Fee schedule as well as recording costs to record the deeds
of dedication as assessed by Larimer County.
Comment Number: 1 Comment Originated: 07/07/2015
07/07/2015: City Engineering Capital Projects has done some recent work in the
area. This includes the installation of a new storm line running along the north side
of Conifer Street abutting the property and an inlet installed abutting the property just
east of the alley. The Engineer should have this information included on the plan set
(especially with the utility connections shown now crossing the new line). Interwest
(Bob Almirall) can provide the information for inclusion into the civil design for this
project.
Comment Number: 2 Comment Originated: 07/07/2015
07/07/2015:The sidewalk north of the driveway out to Red Cedar Circle should be
built as detached from the street to have it aligned with the detached sidewalk along
the south side of the driveway, and to additionally ensure that the drive approach can
be built with a radius style driveway (Type III) as required in LCUASS.
Comment Number: 3 Comment Originated: 07/07/2015
07/07/2015: Please provide 20 foot curb return radii for the driveway approach in
conjunction with the previous comment.
Comment Number: 4 Comment Originated: 07/07/2015
07/07/2015: The access ramp at the corner of Red Cedar Circle and Conifer Street
should be shown to face directly east with the truncated dome detection placed
perpendicular (north-south) to the line of travel. A receiving access ramp is also
required to be installed at the northeast corner of the Red Cedar Circle and Conifer
Street intersection.
Comment Number: 5 Comment Originated: 07/07/2015
07/07/2015: The access ramp at the alley should be shown continuing directly west
and in the same alignment without the curve as the overall sidewalk along Conifer
Street. Note that the City project will be looking to have the sidewalk and access
ramp built west of the alley to match in alignment with the 8 foot parkway and 5 foot
detached sidewalk. (Also, note that there isn't an existing curb opening at the corner
of this intersection as shown on the plans. The curb return for the alley was rebuilt
as part of the City project.)
Comment Number: 6 Comment Originated: 07/07/2015
Page 2 of 10
07/07/2015: Does the new inlet installed east of the alley abutting the property afford
any additional option for design that wasn't available previously? Perhaps a pond
design that could negate the need for the modular block wall, which is awkward in
an existing utility easement? Additional parking could be provided if desired/needed?
Comment Number: 7 Comment Originated: 07/07/2015
Department: Forestry
Contact: Tim Buchanan, 970-221-6361, tbuchanan@fcgov.com
Topic: Landscape Plans
07/08/2015:
Triumph Elm is used as a City street tree. This cultivar of elm is not on the City of
Fort Collins Street Tree List. Change the Triumph Elms to Accolade Elm which is
on the street tree list.
Comment Number: 1 Comment Originated: 07/08/2015
07/08/2015:
An aspen tree is shown along Conifer Street very close to the sidewalk. It appears to
be about 2 feet from the walk and will cause a conflict as it grows. Position this tree
further away from the sidewalk at 4 feet or more. Increasing the width of the planting
bed could accommodate repositioning the location of the aspen.
Comment Number: 2 Comment Originated: 07/08/2015
07/08/2015:
Two Crimson Sentry Maple trees are proposed in parking lot peninsula areas.
Norway Maples don’t typical survive long term or thrive in hot exposed locations.
Consider using Crimson Spire Oak in place of the Crimson Sentry Maple for a tree
of similar shape and that is better adapted to this location.
Comment Number: 3 Comment Originated: 07/08/2015
07/08/2015:
Show locations of street lights and stop signs and position street trees to meet Land
Use Code separation standards. Street trees should be at least 20 feet from stop
signs. Street tree placement by any City street light should be as follows.
Canopy shade trees 40 feet from street light
Ornamental trees 15 feet from street light
Comment Number: 4 Comment Originated: 07/08/2015
07/08/2015:
The first street tree from the corner along Conifer Street is quite close to the corner.
Evaluate site-distance issues for positioning this tree further away from the corner. It
appears it should be placed at least 10 feet or more further to the west. Evaluate by
contacting the City Traffic Department for their direction.
Comment Number: 5 Comment Originated: 07/08/2015
07/08/2015:
Obtain the standard landscape notes from the Planning Department to place on the
plan. Standard notes can be obtained from Clay Frickey or Jason Holland in the
Planning Department. Use the Planning Departments standard notes on the plan.
Comment Number: 6 Comment Originated: 07/08/2015
Department: Historical Preservation
Contact: Karen McWilliams, 970-224-6078, kmcwilliams@fcgov.com
Topic: General
06/26/2015:
No Historic Preservation concerns
Comment Number: 1 Comment Originated: 06/26/2015
Page 3 of 10
Department: Internal Services
Contact: Russell Hovland, 970-416-2341, rhovland@fcgov.com
Topic: Building Insp Plan Review
06/18/2015:
Building Permit Pre-Submittal Meeting:
Pre-Submittal meetings are offered to assist the designer/builder by assuring, early
on in the design, that the new commercial or multi-family projects are on track to
complying with all of the adopted City codes and Standards listed below. The
proposed project should be in the early to mid-design stage for this meeting to be
effective and is typically scheduled after the Current Planning conceptual review
meeting. Applicants of new commercial or multi-family projects are advised to call
416-2341 to schedule a pre-submittal meeting. Applicants should be prepared to
present site plans, floor plans, and elevations and be able to discuss code issues of
occupancy, square footage and type of construction being proposed.
Construction shall comply with the following adopted codes as amended:
2012 International Building Code (IBC)
2012 International Residential Code (IRC)
2012 International Energy Conservation Code (IECC)
2012 International Mechanical Code (IMC)
2012 International Fuel Gas Code (IFGC)
2012 International Plumbing Code (IPC) as amended by the State of Colorado
2014 National Electrical Code (NEC) as amended by the State of Colorado
Accessibility: State Law CRS 9-5 & ICC/ANSI A117.1-2009.
Snow Load Live Load: 30 PSF / Ground Snow Load 30 PSF.
Frost Depth: 30 inches.
Wind Load: 100- MPH 3 Second Gust Exposure B.
Seismic Design: Category B.
Climate Zone: Zone 5
Energy Code Use
1. Single Family; Duplex; Townhomes: 2012 IRC Chapter 11 or 2012 IECC.
2. Multi-family and Condominiums 3 stories max: 2012 IECC residential chapter.
3. Commercial and Multi-family 4 stories and taller: 2012 IECC commercial
chapter.
City of Fort Collins
Building Services
Plan Review
416-2341
Comment Number: 1 Comment Originated: 06/18/2015
Department: Light And Power
Contact: Rob Irish, 970-224-6167, rirish@fcgov.com
Topic: General
06/26/2015: Owner will be responsible to pay for any relocation or modification of
existing electric facilities at the proposed site.
Comment Number: 1 Comment Originated: 06/26/2015
Page 4 of 10
06/26/2015: Electric Capacity Fee, Building Site charges and any necessary
system modification charges will apply. Please see the Electric Estimating
Calculator and Electric Construction Policies, Practices & Procedures at the
following link
http://www.fcgov.com/utilities/business/builders-and-developers/plant-investment-de
velopment-fees
Comment Number: 2 Comment Originated: 06/26/2015
06/26/2015: A C-1 Form and a One-line diagram must be submitted to Light &
Power Engineering.
Comment Number: 3 Comment Originated: 06/26/2015
06/26/2015: Contact Light & Power Engineering @ 970-221-6700 to coordinate the
transformer location. Transformer must be within 10' of an asphalt/concrete
surface. Pay close attention to the transformer clearances in the Electric
Construction Policies, Practices & Procedures.
Comment Number: 4 Comment Originated: 06/26/2015
Department: PFA
Contact: Jim Lynxwiler, 970-416-2869, jlynxwiler@poudre-fire.org
Topic: General
Page 5 of 10
07/08/2015: FIRE LANES
Fire access is required to within 150' of all portions of the building. Based upon
building footprint and location, an Emergency Access Easement is required. Code
language and fire lane specifications provided below.
> IFC 503.1.1: Approved fire Lanes shall be provided for every facility, building or
portion of a building hereafter constructed or moved into or within the jurisdiction.
The fire apparatus access road shall comply with the requirements of this section
and shall extend to within 150 feet of all portions of the facility and all portions of the
exterior walls of the first story of the building as measured by an approved route
around the exterior of the building or facility. When any portion of the facility or any
portion of an exterior wall of the first story of the building is located more than 150
feet from fire apparatus access, the fire code official is authorized to increase the
dimension if the building is equipped throughout with an approved, automatic
fire-sprinkler system.
FIRE LANE SPECIFICATIONS
A fire lane plan shall be submitted for approval prior to installation. In addition to the
design criteria already contained in relevant standards and policies, any new fire
lane must meet the following general requirements:
> Shall be designated on the plat as an Emergency Access Easement.
> Maintain the required 20 foot minimum unobstructed width & 14 foot minimum
overhead clearance.
> Be designed as a flat, hard, all-weather driving surface capable of supporting 40
tons.
> Dead-end fire access roads in excess of 150 feet in length shall be provided with
an approved area for turning around fire apparatus.
> The required turning radii of a fire apparatus access road shall be a minimum of
25 feet inside and 50 feet outside. Turning radii shall be detailed on submitted plans.
> Be visible by painting and/or signage, and maintained unobstructed at all times.
> Additional access requirements exist for buildings greater than 30' in height. Refer
to Appendix D of the 2012 IFC or contact PFA for details.
International Fire Code 503.2.3, 503.2.4, 503.2.5, 503.3, 503.4 and Appendix D;
FCLUC 3.6.2(B)2006 and Local Amendments.
SECURITY GATES
> IFC 503.6: The installation of security gates across a fire apparatus access road
shall be approved by the fire chief. Where security gates are installed, they shall
have an approved means of emergency operation. The security gates and the
emergency operation shall be maintained operational at all times. A Knox Padlock is
required.
Comment Number: 1 Comment Originated: 07/08/2015
07/08/2015: WATER SUPPLY
Hydrant spacing and flow must meet minimum requirements based on type of
occupancy. For this commercial application, a hydrant is required within 300' of the
building. This requirement appears to have been satisfied with the current utility
infrastructure. Applicant is responsible for verifying minimum flow requirement.
Code language provided below.
> IFC 508.1 and Appendix B: COMMERCIAL REQUIREMENTS: Hydrants to provide
1,500 gpm at 20 psi residual pressure, spaced not further than 300 feet to the
building.
Comment Number: 2 Comment Originated: 07/08/2015
Page 6 of 10
07/08/2015: PUBLIC-SAFETY RADIO AMPLIFICATION SYSTEM
New buildings require a fire department, emergency communication system
evaluation after the core/shell but prior to final build out. For the purposes of this
section, fire walls shall not be used to define separate buildings. Where adequate
radio coverage cannot be established within a building, public-safety radio
amplification systems shall be designed and installed in accordance with criteria
established by the Poudre Fire Authority. Poudre Fire Authority Bureau Admin Policy
#07-01
Comment Number: 3 Comment Originated: 07/08/2015
07/08/2015: AUTOMATIC FIRE SPRINKLER SYSTEM
The automatic fire sprinkler system will be reviewed under a separate permit.
Please contact Assistant Fire Marshal, Joe Jaramillo with any fire sprinkler related
questions at 970-416-2868.
Comment Number: 4 Comment Originated: 07/08/2015
07/08/2015: Other fire department comments related to occupancy classification
and use may be needed at time of building permit.
Comment Number: 5 Comment Originated: 07/08/2015
Department: Stormwater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: Construction Drawings
07/07/2015: Please clarify right of way, easements, and existing vs. proposed.
Comment Number: 2 Comment Originated: 07/07/2015
07/07/2015: Please update details to current revisions.
Comment Number: 6 Comment Originated: 07/07/2015
07/07/2015: Please show slope for pond bottom.
Comment Number: 9 Comment Originated: 07/07/2015
07/07/2015: Headwall design does not appear to be stable. Please consider adding
footer and/or extending below frost depth.
Comment Number: 10 Comment Originated: 07/07/2015
07/07/2015: Please provide detail for block wall.
Comment Number: 11 Comment Originated: 07/07/2015
07/07/2015: Please add underdrain to LID swale and update detail -- see redline.
Comment Number: 12 Comment Originated: 07/07/2015
Topic: Drainage Report
07/07/2015: Please quantify and discuss and undetained releases outside of the
right of way.
Comment Number: 3 Comment Originated: 07/07/2015
07/07/2015: Please provide inlet sizing calculations in report and call out detail in
plans.
Comment Number: 4 Comment Originated: 07/07/2015
07/07/2015: Please provide calculations for sizing of the sidewalk culvert in the
report and provide detail in the plans.
Comment Number: 5 Comment Originated: 07/07/2015
07/07/2015: Please provide LID table.
Comment Number: 7 Comment Originated: 07/07/2015
Page 7 of 10
07/07/2015: Please use Fort Collins rainfall in all calculations.
Comment Number: 8 Comment Originated: 07/07/2015
Topic: Easements
07/08/2015: Please provide easement for detention basin, outfall pipe and spillway.
Comment Number: 14 Comment Originated: 07/08/2015
Topic: General
07/07/2015: Additional comments may be forthcoming as additional details are
provided with future submittals.
Comment Number: 13 Comment Originated: 07/07/2015
Contact: Jesse Schlam, 970-218-2932, jschlam@fcgov.com
Topic: Erosion Control
06/30/2015: Minor redline on Erosion Control Plan will look for change in FDP.
Report OK Escrow OK. If you need clarification concerning this, or if there are any
questions please contact Jesse Schlam 970-218-2932 or email @
jschlam@fcgov.com
Comment Number: 1 Comment Originated: 06/30/2015
Department: Technical Services
Contact: Jeff County, 970-221-6588, jcounty@fcgov.com
Topic: Building Elevations
07/08/2015: No comments.
Comment Number: 1 Comment Originated: 07/08/2015
Topic: Construction Drawings
07/08/2015: Please correct the legal description on sheet 1, and the titleblocks as
shown. See redlines.
Comment Number: 2 Comment Originated: 07/08/2015
07/08/2015: The Benchmark Statement needs to match the following:
PROJECT DATUM: NAVD88
BENCHMARK # w/ DESCRIPTION
ELEVATION:
BENCHMARK # w/ DESCRIPTION
ELEVATION:
PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM.
SURROUNDING DEVELOPMENTS HAVE USED NGVD29 UNADJUSTED FOR
THEIR VERTICAL DATUMS.
IF NGVD29 UNADJUSTED DATUM IS REQUIRED FOR ANY PURPOSE, THE
FOLLOWING EQUATION SHOULD BE USED: NGVD29 UNADJUSTED = NAVD88
- X.XX¿.
Comment Number: 3 Comment Originated: 07/08/2015
07/08/2015: There are line over text issues. See redlines.
Comment Number: 4 Comment Originated: 07/08/2015
Page 8 of 10
07/08/2015: There is text that needs to be masked. Mask all text in hatched areas.
See redlines.
Comment Number: 5 Comment Originated: 07/08/2015
Topic: Landscape Plans
07/08/2015: There are line over text issues. See redlines.
Comment Number: 6 Comment Originated: 07/08/2015
Topic: Lighting Plan
07/08/2015: No comments.
Comment Number: 7 Comment Originated: 07/08/2015
Topic: Site Plan
07/08/2015: Please correct the legal description as marked. See redlines.
Comment Number: 8 Comment Originated: 07/08/2015
07/08/2015: What is the 5' dimension (marked) along the north side of the property?
If it is an easement line/dimension, it does not match the Plat. Please see the lines
marked at the southeast corner of the property also. If these are easement lines
they do not match the Plat. If these lines are easement lines, please correct them. If
they are not, please disregard.
Comment Number: 9 Comment Originated: 07/08/2015
07/08/2015: The lighter background text & linework marked is not acceptable. It will
not scan or reproduce. Please darken it up. See redlines.
Comment Number: 10 Comment Originated: 07/08/2015
07/08/2015: There are text over text issues. See redlines.
Comment Number: 11 Comment Originated: 07/08/2015
Department: Traffic Operation
Contact: Martina Wilkinson, 970-221-6887, mwilkinson@fcgov.com
Topic: General
07/07/2015: The sidewalk ramp on the west-end at the alley needs to be straight to
the west.
Comment Number: 2 Comment Originated: 07/07/2015
07/07/2015: The anticipated traffic volume is not expected to rise to the threshold of
needing a TIS. Based on section 4.2.3.D of LCUASS, the Traffic Impact Study
requirement can be waived.
Comment Number: 3 Comment Originated: 07/07/2015
Topic: Site Plan
07/07/2015: The sidewalk ramps at Red Cedar need to be directional.
Comment Number: 1 Comment Originated: 07/07/2015
Department: Water-Wastewater Engineering
Contact: Dan Mogen, , dmogen@fcgov.com
Topic: General
07/07/2015: Please call out/detail vertical clearance of services crossing the sewer
main in Conifer.
Comment Number: 2 Comment Originated: 07/07/2015
Page 9 of 10
07/07/2015: Please see redlines.
Comment Number: 3 Comment Originated: 07/07/2015
Topic: Landscape Plans
07/07/2015: Please include note on the landscape plans regarding separations -- no
trees within 10' of water mains and 6' of service lines, no shrubs within 4' of water
mains and service lines.
Comment Number: 1 Comment Originated: 07/07/2015
Department: Zoning
Contact: Noah Beals, 970-416-2313, nbeals@fcgov.com
Topic: General
07/07/2015: ON sheet A-1 under the 'General Notes', specifically note number 6,
please include the language " Signs are not approved with this plan. All signs will be
approved through a separate sign permit."
Comment Number: 1 Comment Originated: 07/07/2015
07/07/2015: In reference to the sign shown on the elevations, this sign does not
meet the sign code standards.
Comment Number: 2 Comment Originated: 07/07/2015
07/07/2015: Please label the ramp from the handicap loading area to the internal
sidewalk.
Comment Number: 3 Comment Originated: 07/07/2015
07/07/2015: The plans are only showing an area for trash please include the area
for recycling also.
Comment Number: 4 Comment Originated: 07/07/2015
07/07/2015: Please, clarify the property line on the landscape plan. It is difficult to
discern.
Comment Number: 5 Comment Originated: 07/07/2015
Page 10 of 10