Loading...
HomeMy WebLinkAboutFOSSIL CREEK APARTMENTS (FORMERLY WATERSTONE APARTMENTS) - PDP - PDP170010 - SUBMITTAL DOCUMENTS - ROUND 1 - GEOTECHNICAL (SOILS) REPORTPreliminary Geotechnical Engineering Report Goldelm at Fossil Creek Northwest of South College Avenue and Crestridge Drive Fort Collins, Colorado April 14, 2015 Terracon Project No. 20155011 Prepared for: GOLDELM Apartments Lakeside, Montana Prepared by: Terracon Consultants, Inc. Fort Collins, Colorado TABLE OF CONTENTS Page EXECUTIVE SUMMARY ............................................................................................................ i 1.0 INTRODUCTION ............................................................................................................ 1 2.0 PROJECT INFORMATION ............................................................................................ 1 2.1 Project Description .............................................................................................. 1 2.2 Site Location and Description ............................................................................. 2 3.0 SUBSURFACE CONDITIONS ....................................................................................... 2 3.1 Typical Subsurface Profile .................................................................................. 2 3.2 Laboratory Testing .............................................................................................. 3 3.3 Groundwater ....................................................................................................... 3 4.0 PRELIMINARY RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION ............ 3 4.1 Preliminary Geotechnical Considerations ............................................................ 3 4.1.1 Expansive Soils ....................................................................................... 4 4.1.2 Sandstone Bedrock ................................................................................. 4 4.1.3 Preliminary Foundation Recommendations ............................................. 4 4.2 Earthwork ........................................................................................................... 5 4.2.1 Site Preparation........................................................................................ 5 4.2.2 Excavation ............................................................................................... 5 4.2.3 Subgrade Preparation .............................................................................. 6 4.2.4 Fill Materials and Placement ..................................................................... 7 4.2.5 Compaction Requirements ....................................................................... 8 4.2.6 Utility Trench Backfill ............................................................................... 9 4.2.7 Grading and Drainage .............................................................................. 9 4.2.8 Exterior Slab Design and Construction ...................................................10 4.2.9 Corrosion Protection ...............................................................................10 4.3 Preliminary Foundation Recommendations ..........................................................10 4.3.1 Post-Tensioned Slabs – Preliminary Design Recommendations .............10 4.3.3 Spread Footings – Preliminary Design Recommendations .....................11 4.4 Seismic Considerations......................................................................................11 4.5 Floor Systems ....................................................................................................12 4.5.1 Floor System - Preliminary Design Recommendations ...........................12 4.6 Swimming Pool - Preliminary Recommendations ...............................................12 4.7 Preliminary Pavements ......................................................................................12 4.7.1 Pavements – Subgrade Preparation .......................................................12 4.7.2 Pavements – Preliminary Design Recommendations .............................13 4.7.3 Pavements – Construction Considerations .............................................15 4.7.4 Pavements – Maintenance .....................................................................15 5.0 GENERAL COMMENTS ...............................................................................................16 TABLE OF CONTENTS (continued) Appendix A – FIELD EXPLORATION Exhibit A-1 Site Location Map Exhibit A-2 Exploration Plan Exhibit A-3 Field Exploration Description Exhibits A-4 to A-10 Boring Logs Appendix B – LABORATORY TESTING Exhibit B-1 Laboratory Testing Description Exhibit B-2 Atterberg Limits Test Results Exhibit B-3 Grain-size Distribution Test Results Exhibits B-4 and B-5 Swell-consolidation Test Results Exhibit B-6 Corrosion Test Results Appendix C – SUPPORTING DOCUMENTS Exhibit C-1 General Notes Exhibit C-2 Unified Soil Classification System Exhibit C-3 Description of Rock Properties Exhibit C-4 Laboratory Test Significance and Purpose Exhibits C-5 and C-6 Report Terminology Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable i EXECUTIVE SUMMARY A preliminary geotechnical investigation has been performed for the proposed Goldelm at Fossil Creek apartments to be constructed northwest of South College Avenue and Crestridge Drive in Fort Collins, Colorado. Seven (7) borings, presented as Exhibits A-4 through A-10 and designated as Boring No. 1 through Boring No. 7, were performed to depths of approximately 15 to 25 feet below existing site grades. This report specifically addresses the preliminary recommendations for the proposed apartment buildings, swimming pool, clubhouse, and associate pavements. Borings performed in these areas are for informational purposes and will be utilized by others. Based on the information obtained from our preliminary subsurface exploration, the site can be developed for the proposed project. However, the following geotechnical considerations were identified and will need to be considered:  Supplementary geotechnical engineering exploration should be performed at the site upon completion of initial design studies in order to confirm or modify the recommendations contained in this preliminary report and to allow the development of recommendations more specific to the proposed construction.  The proposed buildings may be supported on shallow foundation systems bearing on properly prepared on-site soils, newly placed engineered fill, and/or sandstone bedrock. We understand spread footing foundation and post-tensioned slab foundations are being considered as possible foundation systems for the proposed structures.  A slab-on-grade floor system is recommended for the proposed buildings. If post-tensioned slabs are chosen as the foundations system, the foundations will function as the floor-slabs. On-site soils are suitable for use as engineered fill.  If the proposed building foundations will be supported partially on soil and partially on sandstone bedrock, we recommend over-excavating to a depth of 2 feet below the design bearing level where bedrock is present below foundations. The over-excavation should be backfilled with approved materials. The purpose of the over-excavation is to reduce differential settlement due to differing bearing materials.  Hard to very hard sandstone bedrock was encountered in the borings completed at this site at depths of about ½ to 19 feet below the existing site grades. Excavation for site development, foundations, and utilities into the sandstone bedrock underlying this site will require greater efforts including ripping, and/or jackhammering procedures to achieve desired grades.  The 2012 International Building Code, Table 1613.5.2 IBC seismic site classification for this site is D. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable ii  Close monitoring of the construction operations discussed herein will be critical in achieving the design subgrade support. We therefore recommend that Terracon be retained to monitor this portion of the work. This summary should be used in conjunction with the entire report for design purposes. It should be recognized that details were not included or fully developed in this section, and the report must be read in its entirety for a comprehensive understanding of the items contained herein. The section titled GENERAL COMMENTS should be read for an understanding of the report limitations. Responsive ■ Resourceful ■ Reliable 1 PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Goldelm at Fossil Creek Northwest of South College Avenue and Crestridge Drive Fort Collins, Colorado Terracon Project No. 20155011 April 14, 2015 1.0 INTRODUCTION This preliminary report presents the results of our preliminary geotechnical engineering services performed for the proposed Goldelm at Fossil Creek apartments to be located northwest of South College Avenue and Crestridge Drive in Fort Collins, Colorado. The purpose of these services is to provide information and preliminary geotechnical engineering recommendations relative to:  subsurface soil and bedrock conditions  foundation design and construction  groundwater conditions  floor slab design and construction  grading and drainage  pavement construction  lateral earth pressures  earthwork  seismic considerations Our preliminary geotechnical engineering scope of work for this project included the initial site visit, the advancement of seven test borings to depths ranging from approximately 15 to 25 feet below existing site grades, laboratory testing for soil engineering properties and engineering analyses to provide foundation, floor system and pavement design and construction recommendations. Logs of the borings along with an Exploration Plan (Exhibit A-2) are included in Appendix A. The results of the laboratory testing performed on soil and bedrock samples obtained from the site during the field exploration are included in Appendix B. 2.0 PROJECT INFORMATION 2.1 Project Description Item Description Site layout Refer to the Exploration Plan (Exhibit A-2 in Appendix A) Proposed construction We understand the proposed development will include apartment buildings with a clubhouse, swimming pool, and detached garages. There will be eleven 3-story apartment buildings likely constructed on post-tensioned slab foundation systems or possibly on spread footings. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 2 Item Description Building construction We anticipate the buildings will be wood-framed structures. Maximum loads Columns: 100 kips (assumed) Walls: 3 klf (assumed) Slabs: 150 psf max (assumed) Grading We anticipate cuts and fills of up to about 10 feet may be required for portion of the site. Cut and fill slopes Assumed to be no steeper than 3H:1V (Horizontal to Vertical) Retaining walls We have not been requested to provide geotechnical recommendations for a retaining wall system at this site. We are available to assist with the subsurface exploration and/or design of earth retaining structures being considered as part of the site development. Below-grade areas No below-grade areas are planned excluding the outdoor swimming pool. Traffic loading We anticipate traffic loading will consist primarily of passenger vehicles with drive lanes accommodating refuse disposal vehicles, moving vehicles, and delivery trucks. 2.2 Site Location and Description Item Description Location The approximately 12.34-acre site is located northwest of the intersection of South College Avenue and Crestridge Drive in Fort Collins, Colorado. Existing improvements Office and retail development is to the east, vacant land is to the west with the Burlington Northern Railroad and residential development beyond, Fossil Creek is to the north with vacant land beyond, and a car dealership is to the south with residential development beyond. Current ground cover The ground surface is covered with native grasses and weeds as well as some walking trails. Existing topography A ridge is located near the southern portion of the site. The site slopes from the ridge down to the south and to the north towards Fossil Creek. The grading plan provided to us indicates total relief across the site of about 40 feet. 3.0 SUBSURFACE CONDITIONS 3.1 Typical Subsurface Profile Specific conditions encountered at each boring location are indicated on the individual boring logs included in Appendix A. Stratification boundaries on the boring logs represent the approximate Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 3 location of changes in soil types; in-situ, the transition between materials may be gradual. Based on the results of the borings, subsurface conditions on the project site can be generalized as follows: Material Description Approximate Depth to Bottom of Stratum (feet) Consistency/Density/Hardness Lean clay with varying amounts of sand About 15 feet below existing site grades in Boring No. 1 only. Stiff to very stiff Sand with varying amounts of silt and gravel About 1 to 19 feet below existing site grades. Loose to medium dense Sandstone bedrock To the maximum depth of exploration of about 25 feet. Hard to very hard 3.2 Laboratory Testing Representative soil samples were selected for swell-consolidation testing and exhibited 2.9 to 1.5 percent compression when wetted. The sandstone bedrock is considered to be non-expansive. Samples of site soils and bedrock selected for plasticity testing exhibited low to medium plasticity with liquid limits ranging from non-plastic to 32 and plasticity indices of 17. Laboratory test results are presented in Appendix B. 3.3 Groundwater The boreholes were observed while drilling and after completion for the presence and level of groundwater. Groundwater was not observed in the borings while drilling, or for the short duration that the borings were allowed to remain open. Groundwater level fluctuations occur due to seasonal variations in the amount of rainfall, runoff and other factors not evident at the time the borings were performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring logs. The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project. 4.0 PRELIMINARY RECOMMENDATIONS FOR DESIGN AND CONSTRUCTION 4.1 Preliminary Geotechnical Considerations The preliminary recommendations presented in this report are based on the assumption that the subsurface conditions encountered in the widely spaced preliminary borings provide an accurate representation of the entire site. Supplementary geotechnical engineering exploration should be performed at the site upon completion of initial design studies in order to confirm or modify the Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 4 recommendations contained in this preliminary report and to allow the development of recommendations more specific to the proposed construction. 4.1.1 Expansive Soils Laboratory testing indicates the native soils exhibited 2.9 to 1.5 percent compression at the samples in-situ moisture content. However, it is our opinion these materials will exhibit a higher expansive potential if the clays undergo a significant loss of moisture. This report provides recommendations to help mitigate the effects of soil shrinkage and expansion. However, even if these procedures are followed, some movement and cracking in the structures, pavements, and flatwork should be anticipated. The severity of cracking and other damage such as uneven floor slabs will probably increase if any modification of the site results in excessive wetting or drying of the expansive clays. Eliminating the risk of movement and distress is generally not feasible, but it may be possible to further reduce the risk of movement if significantly more expensive measures are used during construction. It is imperative the recommendations described in section 4.2.7 Grading and Drainage of this report be followed to reduce movement. 4.1.2 Sandstone Bedrock Hard to very hard sandstone bedrock was encountered in all of the borings completed as part of our study at this site. The upper portions of the sandstone bedrock below this site can typically be excavated with large excavation equipment fitted with rock teeth using concentrated effort or ripped with large bulldozers. Very hard or cemented layers of the bedrock below this site could require breaking with pneumatic rock breakers. If the new building foundations are supported partially on soil and partially on sandstone bedrock, we recommend over-excavation to a depth of 2 feet below the design bearing level where bedrock is present below foundations. The over-excavation should also extend laterally a sufficient distance to provide room for installation of a bond break with the sides of the foundation excavation. The over-excavation into the bedrock should be backfilled with moisture conditioned, properly compacted on-site soils or imported fill materials. The purpose of the over-excavation is to reduce differential movement due to differing bearing materials. 4.1.3 Preliminary Foundation Recommendations The proposed structures may be supported on shallow foundation systems bearing on properly prepared subgrade soils, imported engineered fill, and/or sandstone bedrock. We recommend a slab-on-grade for the interior floor system of the proposed buildings. If post tensioned slabs are chosen as the preferred foundations system, the foundation will function as the floor slab. Even when bearing on properly prepared soils, movement of the slab-on-grade floor system is possible should the subgrade soils undergo an increase in moisture content. We estimate movement of about 1 inch is possible. If the owner cannot accept the risk of slab movement, a structural floor Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 5 should be used. 4.2 Earthwork The following presents preliminary recommendations for site preparation, excavation, subgrade preparation and placement of engineered fills on the project. All earthwork on the project should be observed and evaluated by Terracon on a full-time basis. The evaluation of earthwork should include observation of over-excavation operations, testing of engineered fills, subgrade preparation, subgrade stabilization, and other geotechnical conditions exposed during the construction of the project. 4.2.1 Site Preparation Prior to placing any fill, strip and remove existing vegetation and any other deleterious materials from the proposed construction areas. Stripped organic materials should be wasted from the site or used to re-vegetate landscaped areas or exposed slopes after completion of grading operations. Prior to the placement of fills, the site should be graded to create a relatively level surface to receive fill, and to provide for a relatively uniform thickness of fill beneath proposed structures. If fill is placed in areas of the site where existing slopes are steeper than 5:1 (horizontal:vertical), the area should be benched to reduce the potential for slippage between existing slopes and fills. Benches should be wide enough to accommodate compaction and earth moving equipment, and to allow placement of horizontal lifts of fill. 4.2.2 Excavation It is anticipated that excavations for the proposed construction can be accomplished with conventional earthmoving equipment. Excavations into the on-site soils may encounter weak and/or saturated soil conditions with possible caving conditions. Excavation penetrating the bedrock may require the use of specialized heavy-duty equipment, together with ripping or jack-hammering to advance the excavation and facilitate rock break-up and removal. Consideration should be given to obtaining a unit price for difficult excavation in the contract documents for the project. The soils to be excavated can vary significantly across the site as their classifications are based solely on the materials encountered in widely-spaced exploratory test borings. The contractor should verify that similar conditions exist throughout the proposed area of excavation. If different subsurface conditions are encountered at the time of construction, the actual conditions should be evaluated to determine any excavation modifications necessary to maintain safe conditions. Although evidence of fills or underground facilities such as septic tanks, vaults, basements, and utilities was not observed during the site reconnaissance, such features could be encountered Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 6 during construction. If unexpected fills or underground facilities are encountered, such features should be removed and the excavation thoroughly cleaned prior to backfill placement and/or construction. Any over-excavation that extends below the bottom of foundation elevation should extend laterally beyond all edges of the foundation at least 8 inches per foot of over-excavation depth below the foundation base elevation. The over-excavation should be backfilled to the foundation base elevation in accordance with the recommendations presented in this report. Depending upon depth of excavation and seasonal conditions, surface water infiltration and/or groundwater may be encountered in excavations on the site. It is anticipated that pumping from sumps may be utilized to control water within excavations. The subgrade soil conditions should be evaluated during the excavation process and the stability of the soils determined at that time by the contractors’ Competent Person. Slope inclinations flatter than the OSHA maximum values may have to be used. The individual contractor(s) should be made responsible for designing and constructing stable, temporary excavations as required to maintain stability of both the excavation sides and bottom. All excavations should be sloped or shored in the interest of safety following local, and federal regulations, including current OSHA excavation and trench safety standards. If any excavation, including a utility trench, is extended to a depth of more than 20 feet, it will be necessary to have the side slopes and/or shoring system designed by a professional engineer. As a safety measure, it is recommended that all vehicles and soil piles be kept a minimum lateral distance from the crest of the slope equal to the slope height. The exposed slope face should be protected against the elements 4.2.3 Subgrade Preparation After the deleterious materials have been removed from the construction areas, the top 8 inches of the exposed ground surface should be scarified, moisture conditioned, and recompacted to at least 95 percent of the maximum dry unit weight as determined by ASTM D698 before any new fill, foundation, or pavement is placed. If pockets of soft, loose, or otherwise unsuitable materials are encountered at the bottom of the foundation excavations and it is inconvenient to lower the foundations, the proposed foundation elevations may be reestablished by over-excavating the unsuitable soils and backfilling with compacted engineered fill. After the bottom of the excavation has been compacted, engineered fill can be placed to bring the building pads and pavement subgrade to the desired grade. Engineered fill should be placed in accordance with the recommendations presented in subsequent sections of this report. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 7 The stability of the subgrade may be affected by precipitation, repetitive construction traffic or other factors. If unstable conditions develop, workability may be improved by scarifying and drying. Alternatively, over-excavation of wet zones and replacement with granular materials may be used, or crushed gravel and/or rock can be tracked or “crowded” into the unstable surface soil until a stable working surface is attained. Lightweight excavation equipment may also be used to reduce subgrade pumping. 4.2.4 Fill Materials and Placement The on-site soils or approved granular and low plasticity cohesive imported materials may be used as fill material. The soil removed from this site that is free of organic or objectionable materials, as defined by a field technician who is qualified in soil material identification and compaction procedures, can be re-used as fill for the building pads and pavement subgrade. It should be noted that on-site soils will require reworking to adjust the moisture content to meet the compaction criteria. CDOT Class 1 structure backfill should meet the following material property requirements: Gradation Percent finer by weight (ASTM C136) 2” 100 No. 4 Sieve 30-100 No.50 Sieve 10-60 No. 200 Sieve 5-20 Soil Properties Value Liquid Limit 35 (max.) Plastic Limit 6 (max.) Imported soils (if required) should meet the following material property requirements: Gradation Percent finer by weight (ASTM C136) 4” 100 3” 70-100 No. 4 Sieve 50-100 No. 200 Sieve 15-50 Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 8 Soil Properties Value Liquid Limit 30 (max.) Plastic Limit 15 (max.) Maximum Expansive Potential (%) Non-expansive1 1. Measured on a sample compacted to approximately 95 percent of the maximum dry unit weight as determined by ASTM D698 at optimum moisture content. The sample is confined under a 100 psf surcharge and submerged. The recommendations for placement and compaction criteria presented assume that fill depths will be less than eight feet. Fills on the order of eight feet in depth, when placed and compacted as recommended in this report, will experience some settlement, generally one inch or less. The amount and rate of settlement will be increased if water is introduced into the fill. It is noted that settlement of the fill material due to self-weight is in addition to settlements due to structural induced loads. It is possible to reduce the settlement due to self-weight by increasing the compactive effort when placing the fill. 4.2.5 Compaction Requirements Engineered fill should be placed and compacted in horizontal lifts, using equipment and procedures that will produce recommended moisture contents and densities throughout the lift. Item Description Fill lift thickness 9 inches or less in loose thickness when heavy, self- propelled compaction equipment is used 4 to 6 inches in loose thickness when hand-guided equipment (i.e. jumping jack or plate compactor) is used Minimum compaction requirements 95 percent of the maximum dry unit weight as determined by ASTM D698 Moisture content cohesive soil (clay) -1 to +3 % of the optimum moisture content Moisture content cohesionless soil (sand) -3 to +2 % of the optimum moisture content 1. We recommend engineered fill be tested for moisture content and compaction during placement. Should the results of the in-place density tests indicate the specified moisture or compaction limits have not been met, the area represented by the test should be reworked and retested as required until the specified moisture and compaction requirements are achieved. 2. Specifically, moisture levels should be maintained low enough to allow for satisfactory compaction to be achieved without the fill material pumping when proofrolled. 3. Moisture conditioned clay materials should not be allowed to dry out. A loss of moisture within these materials could result in an increase in the material’s expansive potential. Subsequent wetting of these materials could result in undesirable movement. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 9 4.2.6 Utility Trench Backfill All trench excavations should be made with sufficient working space to permit construction including backfill placement and compaction. All underground piping within or near the proposed structures should be designed with flexible couplings, so minor deviations in alignment do not result in breakage or distress. Utility knockouts in foundation walls should be oversized to accommodate differential movements. It is imperative that utility trenches be properly backfilled with relatively clean materials. If utility trenches are backfilled with relatively clean granular material, they should be capped with at least 18 inches of cohesive fill in non-pavement areas to reduce the infiltration and conveyance of surface water through the trench backfill. Utility trenches are a common source of water infiltration and migration. All utility trenches that penetrate beneath the buildings should be effectively sealed to restrict water intrusion and flow through the trenches that could migrate below the buildings. We recommend constructing an effective clay “trench plug” that extends at least 5 feet out from the face of the building exteriors. The plug material should consist of clay compacted at a water content at or above the soil’s optimum water content. The clay fill should be placed to completely surround the utility line and be compacted in accordance with recommendations in this report. It is strongly recommended that a representative of Terracon provide full-time observation and compaction testing of trench backfill within building and pavement areas. 4.2.7 Grading and Drainage All grades must be adjusted to provide effective drainage away from the proposed structures during construction and maintained throughout the life of the proposed project. Infiltration of water into foundation excavations must be prevented during construction. Landscape irrigation adjacent to foundations should be minimized or eliminated. Water permitted to pond near or adjacent to the perimeter of the structures (either during or post-construction) can result in significantly higher soil movements than those discussed in this report. As a result, any estimations of potential movement described in this report cannot be relied upon if positive drainage is not obtained and maintained, and water is allowed to infiltrate the fill and/or subgrade. Exposed ground (if any) should be sloped at a minimum of 10 percent grade for at least 10 feet beyond the perimeter of the proposed structures, where possible. The use of swales, chases and/or area drains may be required to facilitate drainage in unpaved areas around the perimeter of the structures. Backfill against foundations and exterior walls should be properly compacted and free of all construction debris to reduce the possibility of moisture infiltration. After construction of the proposed structures and prior to project completion, we recommend verification of final grading be performed to document positive drainage, as described above, has been achieved. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 10 Flatwork and pavements will be subject to post-construction movement. Maximum grades practical should be used for paving and flatwork to prevent areas where water can pond. In addition, allowances in final grades should take into consideration post-construction movement of flatwork, particularly if such movement would be critical. Where paving or flatwork abuts the structures, care should be taken that joints are properly sealed and maintained to prevent the infiltration of surface water. Planters located adjacent to structures should preferably be self-contained. Sprinkler mains and spray heads should be located a minimum of 5 feet away from the building line(s). Low-volume, drip style landscaped irrigation should not be used near the building. Roof drains should discharge on to pavements or be extended away from the structures a minimum of 10 feet through the use of splash blocks or downspout extensions. A preferred alternative is to have the roof drains discharge by solid pipe to storm sewers or to a detention pond or other appropriate outfall. 4.2.8 Exterior Slab Design and Construction Exterior slabs on-grade, exterior architectural features, and utilities founded on, or in backfill or the site soils will likely experience some movement due to the volume change of the material. Potential movement could be reduced by:  Minimizing moisture increases in the backfill;  Controlling moisture-density during placement of the backfill;  Using designs which allow vertical movement between the exterior features and adjoining structural elements; and  Placing control joints on relatively close centers. 4.2.9 Corrosion Protection Results of water-soluble sulfate testing indicate that ASTM Type I or II portland cement should be specified for all project concrete on and below grade. Foundation concrete should be designed for low sulfate exposure in accordance with the provisions of the ACI Design Manual, Section 318, Chapter 4. 4.3 Preliminary Foundation Recommendations The proposed buildings can be supported by shallow foundation systems bearing on properly prepared on-site soils, imported engineered fill, and/or sandstone bedrock. Preliminary design recommendations for foundations for the proposed structure and related structural elements are presented in the following paragraphs. 4.3.1 Post-Tensioned Slabs – Preliminary Design Recommendations Based on the soil conditions encountered, use of post-tensioned slabs is feasible for support of the structures provided some foundation movement can be tolerated and:  The post-tensioned slab foundations are properly designed and constructed. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 11  Approved materials supporting the foundation are properly placed and compacted.  Proper surface drainage is maintained throughout the life of the structures.  Prudent landscaping measures are used. Provided foundations are properly designed, foundation movements could result in periodic, and possibly seasonal, cosmetic distress to drywall, window frames, door frames and other features. We would anticipate that the frequency of distress and amount of movement would generally diminish with time provided proper drainage is established and/or maintained. Based on the subsurface conditions encountered during our preliminary study, we estimate a maximum allowable net bearing pressure in the range of 1,000 to 3,000 psf may be used for the design of post-tensioned slabs. 4.3.3 Spread Footings – Preliminary Design Recommendations Description Value Bearing material Properly prepared on-site soil, new, properly placed engineered fill, and/or sandstone bedrock. Maximum allowable bearing pressure 1 1,000 to 3,000 psf Minimum embedment depth below finished grade 3 30 inches Estimated differential movement About ½ to ¾ of total movement 1. The recommended maximum allowable bearing pressure assumes any unsuitable fill or soft soils, if encountered, will be over-excavated and replaced with properly compacted engineered fill. The design bearing pressure applies to a dead load plus design live load condition. The design bearing pressure may be increased by one-third when considering total loads that include wind or seismic conditions. 2. For frost protection and to reduce the effects of seasonal moisture variations in the subgrade soils. The minimum embedment depth is for perimeter footings beneath unheated areas and is relative to lowest adjacent finished grade, typically exterior grade. 4.4 Seismic Considerations Code Used Site Classification 2012 International Building Code (IBC) 1 D 2 1. In general accordance with the 2012 International Building Code, Table 1613.5.2. 2. The 2012 International Building Code (IBC) requires a site soil profile determination extending a depth of 100 feet for seismic site classification. The current scope requested does not include the required 100 foot soil profile determination. The borings completed for this project extended to a maximum depth of about 25 feet and this seismic site class definition considers that similar soil and bedrock conditions exist below the maximum depth of the subsurface exploration. Additional exploration to deeper depths could be performed to confirm the conditions below the current depth of exploration. Alternatively, a geophysical exploration could be utilized in order to attempt to justify a more favorable seismic site class. However, we believe a higher seismic site class for this site is unlikely. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 12 4.5 Floor Systems A slab-on-grade may be utilized for the interior floor system for the proposed buildings provided some movement can be tolerated. If the very little movement can be tolerated, a structurally- supported floor system, supported independent of the subgrade materials, is recommended. If post tensioned slabs are chosen as the foundation system, the foundation system will function as the floor slab. 4.5.1 Floor System - Preliminary Design Recommendations Even when bearing on properly prepared soils, movement of the slab-on-grade floor system is possible should the subgrade soils undergo an increase in moisture content. If the owner cannot accept the risk of slab movement, a structural floor should be used. If conventional slab-on-grade is utilized, the subgrade soils should be prepared as presented in the 4.2 Earthwork section of this report. For preliminary structural design of concrete slabs-on-grade subjected to point loadings, a modulus of subgrade reaction of 100 pounds per cubic inch (pci) may be used for floors supported on re-compacted existing soils at the site. A modulus of 200 pci may be used for floors supported on at least 1 foot of non-expansive, imported granular fill. 4.6 Swimming Pool - Preliminary Recommendations We understand a swimming pool is conceptually planned near the clubhouse in the southeastern portion of the project site. Although groundwater was not encountered in our exploratory borings completed at this site, it is possible that groundwater could accumulate on top of the bedrock surface below this site. Considering the sandstone bedrock was encountered at a depth of about 7 to 15 feet below existing site grades in the borings completed nearest the proposed swimming pool, it is likely the swimming pool excavation will penetrate the bedrock surface. If groundwater does accumulate on top of the bedrock surface, groundwater could affect the proposed swimming pool. If groundwater levels rise above the bottom of the pool when the pool is empty, uplift loads could be imposed on the pool bottom slab and hydrostatic pressure could be imposed on the pool walls, which could cause heaving, cracking, or other damage to the pool bottom slab and walls. The pool designs should include pressure relief valves that will allow backflow of groundwater into the empty pool in order to help reduce the potential for hydrostatic loading and subsequent heaving, cracking, or other damage. A drainage system should be provided around and beneath the pool. 4.7 Preliminary Pavements 4.7.1 Pavements – Subgrade Preparation On most project sites, the site grading is accomplished relatively early in the construction phase. Fills are typically placed and compacted in a uniform manner. However as construction proceeds, Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 13 the subgrade may be disturbed due to utility excavations, construction traffic, desiccation, or rainfall/snow melt. As a result, the pavement subgrade may not be suitable for pavement construction and corrective action will be required. The subgrade should be carefully evaluated at the time of pavement construction for signs of disturbance or instability. We recommend the pavement subgrade be thoroughly proofrolled with a loaded tandem-axle dump truck prior to final grading and paving. All pavement areas should be moisture conditioned and properly compacted to the recommendations in this report immediately prior to paving. 4.7.2 Pavements – Preliminary Design Recommendations Design of new privately-maintained pavements for the project has been based on the procedures described by the National Asphalt Pavement Associations (NAPA) and the American Concrete Institute (ACI). If some pavements will be city-maintained, the design of the pavements must use Larimer County Urban Area Streets Standards (LCUASS). We assumed the following design parameters for NAPA flexible pavement thickness design:  Automobile Parking Areas  Class I - Parking stalls and parking lots for cars and pick-up trucks, with Equivalent Single Axle Load (ESAL) up to 7,000 over 20 years  Main Traffic Corridors  Class II – Parking lots with a maximum of 10 trucks per day with Equivalent Single Axle Load (ESAL) up to 27,000 over 20 years (Including trash trucks)  Subgrade Soil Characteristics  USCS Classification – CL, classified by NAPA as poor We assumed the following design parameters for ACI rigid pavement thickness design based upon the average daily truck traffic (ADTT):  Automobile Parking Areas  ACI Category A: Automobile parking with an ADTT of 1 over 20 years  Main Traffic Corridors  ACI Category A: Automobile parking area and service lanes with an ADTT of up to 10 over 20 years  Subgrade Soil Characteristics  USCS Classification – CL  Concrete modulus of rupture value of 600 psi We should be contacted to confirm and/or modify the recommendations contained herein if actual traffic volumes differ from the assumed values shown above. Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 14 Recommended preliminary alternatives for flexible and rigid pavements are summarized for each traffic area as follows: Traffic Area Alternative Recommended Pavement Thickness (Inches) Asphaltic Concrete Surface Aggregate Base Course Portland Cement Concrete Total Automobile Parking (NAPA Class I and ACI Category A) A 3 6 -- 9 B -- -- 5½ 5½ Service Lanes (NAPA Class II and ACI Category A) A 4½ 6 -- 10½ B -- -- 6 6 Aggregate base course (if used on the site) should consist of a blend of sand and gravel which meets strict specifications for quality and gradation. Use of materials meeting Colorado Department of Transportation (CDOT) Class 5 or 6 specifications is recommended for aggregate base course. Aggregate base course should be placed in lifts not exceeding 6 inches and compacted to a minimum of 95 percent of the maximum dry unit weight as determined by ASTM D698. Asphaltic concrete should be composed of a mixture of aggregate, filler and additives (if required) and approved bituminous material. The asphalt concrete should conform to approved mix designs stating the Superpave properties, optimum asphalt content, job mix formula and recommended mixing and placing temperatures. Aggregate used in asphalt concrete should meet particular gradations. Material meeting CDOT Grading S specifications or equivalent is recommended for asphalt concrete. Mix designs should be submitted prior to construction to verify their adequacy. Asphalt material should be placed in maximum 3-inch lifts and compacted within a range of 92 to 96 percent of the theoretical maximum (Rice) density (ASTM D2041). Where rigid pavements are used, the concrete should be produced from an approved mix design with the following minimum properties: Properties Value Compressive strength 4,000 psi Cement type Type I or II portland cement Entrained air content (%) 5 to 8 Concrete aggregate ASTM C33 and CDOT Section 703 Concrete should be deposited by truck mixers or agitators and placed a maximum of 90 minutes from the time the water is added to the mix. Longitudinal and transverse joints should be provided Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 15 as needed in concrete pavements for expansion/contraction and isolation per ACI 325. The location and extent of joints should be based upon the final pavement geometry. Although not required for structural support, a minimum 4-inch thick aggregate base course layer is recommended for the PCC pavements to help reduce the potential for slab curl, shrinkage cracking, and subgrade “pumping” through joints. Proper joint spacing will also be required for PCC pavements to prevent excessive slab curling and shrinkage cracking. All joints should be sealed to prevent entry of foreign material and dowelled where necessary for load transfer. For areas subject to concentrated and repetitive loading conditions (if any) such as dumpster pads, truck delivery docks and ingress/egress aprons, we recommend using a portland cement concrete pavement with a thickness of at least 6 inches underlain by at least 4 inches of granular base. Prior to placement of the granular base, the areas should be thoroughly proofrolled. For dumpster pads, the concrete pavement area should be large enough to support the container and tipping axle of the refuse truck. Pavement performance is affected by its surroundings. In addition to providing preventive maintenance, the civil engineer should consider the following recommendations in the design and layout of pavements:  Site grades should slope a minimum of 2 percent away from the pavements;  The subgrade and the pavement surface have a minimum 2 percent slope to promote proper surface drainage;  Consider appropriate edge drainage and pavement under drain systems;  Install pavement drainage surrounding areas anticipated for frequent wetting;  Install joint sealant and seal cracks immediately;  Seal all landscaped areas in, or adjacent to pavements to reduce moisture migration to subgrade soils; and  Placing compacted, low permeability backfill against the exterior side of curb and gutter. 4.7.3 Pavements – Construction Considerations Openings in pavement, such as landscape islands, are sources for water infiltration into surrounding pavements. Water collects in the islands and migrates into the surrounding subgrade soils thereby degrading support of the pavement. This is especially applicable for islands with raised concrete curbs, irrigated foliage, and low permeability near-surface soils. The civil design for the pavements with these conditions should include features to restrict or to collect and discharge excess water from the islands. Examples of features are edge drains connected to the storm water collection system or other suitable outlet and impermeable barriers preventing lateral migration of water such as a cutoff wall installed to a depth below the pavement structure. 4.7.4 Pavements – Maintenance Preventative maintenance should be planned and provided for an ongoing pavement management program in order to enhance future pavement performance. Preventive Preliminary Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable 16 maintenance consists of both localized maintenance (e.g. crack and joint sealing and patching) and global maintenance (e.g. surface sealing). Preventative maintenance is usually the first priority when implementing a planned pavement maintenance program and provides the highest return on investment for pavements. 5.0 GENERAL COMMENTS Terracon’s Scope of Services has been provided under the belief that this site will be used as apartments. As such, Terracon would like to inform the Client that if this apartment project is converted at any time to another purpose such as condominiums, the Client understands the services Terracon is providing is not applicable for a condominium project and that a separate consultant will need to be retained for such services. Terracon will have no liability for any such unintended use of our services and Client agrees to defend, indemnify, and hold harmless Terracon for any such unintended usage. Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon also should be retained to provide observation and testing services during grading, excavation, foundation construction and other earth-related construction phases of the project. The analysis and recommendations presented in this report are based upon the data obtained from the borings performed at the indicated locations and from other information discussed in this report. This report does not reflect variations that may occur between borings, across the site, or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during or after construction. If variations appear, we should be immediately notified so that further evaluation and supplemental recommendations can be provided. The scope of services for this project does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, and bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken. This report has been prepared for the exclusive use of our client for specific application to the project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranties, either express or implied, are intended or made. Site safety, excavation support, and dewatering requirements are the responsibility of others. In the event that changes in the nature, design, or location of the project as described in this report are planned, the conclusions and recommendations contained in this report shall not be considered valid unless Terracon reviews the changes and either verifies or modifies the conclusions of this report in writing. APPENDIX A FIELD EXPLORATION SITE LOCATION MAP TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY QUADRANGLES INCLUDE: FORT COLLINS, CO (1/1/1984) and LOVELAND, CO (1/1/1984). 1901 Sharp Point Dr Suite C Ft. Collins, CO 80525 20155011 Project Manager: Drawn by: Checked by: Approved by: BCR EDB EDB 1:24,000 Goldelm at Fossil Creek Northwest of South College Avenue and Crestridge Drive 3/19/2015 Fort Collins, CO Project No. Scale: File Name: Date: A-1 EDB Exhibit 0’ 60’ 120’ APPROXIMATE SCALE Scale: EDB EDB BCR EDB Project Manager: Drawn by: Checked by: Approved by: EXPLORATION PLAN Goldelm at Fossil Creek Northwest of South College Avenue and Crestridge Drive Fort Collins, Colorado 1 20155011 Figure 3/23/2015 1=120’ Project No. File Name: Date: DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES 2 Approximate Location of Preliminary Borings LEGEND 1 2 3 7 6 4 5 Approximate Location of Temporary Benchmark (Survey Marker Labeled Control Point RR – Interpolated Elevation 5007.2’) 1901 Sharp Point Drive, Suite C Fort Collins, Colorado 80525 PH. (970) 484-0359 FAX. (970) 484-0454 Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable Exhibit A-3 Field Exploration Description The locations of borings were based upon the proposed development shown on the provided site plan. The borings were located in the field by measuring from existing site features. The ground surface elevation was surveyed at each boring location referencing the temporary benchmark shown on Exhibit A-2 using an engineer’s level. The borings were drilled with a CME-75 truck-mounted rotary drill rig with solid-stem augers. During the drilling operations, lithologic logs of the borings were recorded by the field engineer. Disturbed samples were obtained at selected intervals utilizing a 2-inch outside diameter split- spoon sampler and a 3-inch outside diameter ring-barrel sampler. Penetration resistance values were recorded in a manner similar to the standard penetration test (SPT). This test consists of driving the sampler into the ground with a 140-pound hammer free-falling through a distance of 30 inches. The number of blows required to advance the ring-barrel sampler 12 inches (18 inches for standard split-spoon samplers, final 12 inches are recorded) or the interval indicated, is recorded as a standard penetration resistance value (N-value). The blow count values are indicated on the boring logs at the respective sample depths. Ring-barrel sample blow counts are not considered N-values. A CME automatic SPT hammer was used to advance the samplers in the borings performed on this site. A greater efficiency is typically achieved with the automatic hammer compared to the conventional safety hammer operated with a cathead and rope. Published correlations between the SPT values and soil properties are based on the lower efficiency cathead and rope method. This higher efficiency affects the standard penetration resistance blow count value by increasing the penetration per hammer blow over what would be obtained using the cathead and rope method. The effect of the automatic hammer's efficiency has been considered in the interpretation and analysis of the subsurface information for this report. The standard penetration test provides a reasonable indication of the in-place density of sandy type materials, but only provides an indication of the relative stiffness of cohesive materials since the blow count in these soils may be affected by the moisture content of the soil. In addition, considerable care should be exercised in interpreting the N-values in gravelly soils, particularly where the size of the gravel particle exceeds the inside diameter of the sampler. Groundwater measurements were obtained in the borings at the time of site exploration. After completion of drilling, the borings were backfilled with auger cuttings. Some settlement of the backfill may occur and should be repaired as soon as possible. 0.5 15.0 24.4 TOPSOIL - 6 inches LEAN CLAY WITH SAND (CL), trace calcareous nodules, brown, stiff to very stiff SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown and olive, very hard A highly cemented lense was encountered from a depth of approximately 15 to 17 feet below the ground surface. Boring Terminated at 24.4 Feet 8-12 6-5-6 N=11 4-4-6 N=10 7-10 50/6" N=50/6" 50/5" N=50/5" 0.065 10 78 10 9 9 14 11 102 122 32-15-17 4982 4967.5 4958.5 -2.9 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.509115° Longitude: -105.078349° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 1 CLIENT: GOLDELM Apartments Lakeside, MT 0.5 7.0 19.3 TOPSOIL - 6 inches SILTY SAND (SM), fine grained, brown to light brown, loose to medium dense SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown and olive, very hard A highly cemented lense was encountered from a depth of approximately 13 to 16 feet below the ground surface. Boring Terminated at 19.3 Feet 6-9 5-5-5 N=10 50/3" N=50/3" 50/3" N=50/3" 7 42 7 9 10 87 NP 4980 4973.5 4961 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.508383° Longitude: -105.079042° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 2 CLIENT: GOLDELM Apartments Lakeside, MT Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-5 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. 0.5 4.5 19.2 TOPSOIL - 6 inches SILTY SAND, fine grained, brown, loose to medium dense SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown to gray, very hard Boring Terminated at 19.2 Feet 5-7 13-33-50 N=83 50/6" N=50/6" 50/3" N=50/3" 50/2" N=50/2" 6 7 11 10 11 86 4994.5 4990.5 4975.5 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.507952° Longitude: -105.079821° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 3 CLIENT: GOLDELM Apartments Lakeside, MT Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-6 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. 0.5 19.0 24.3 TOPSOIL - 6 inches SILTY SAND WITH GRAVEL (SM), fine grained, brown, loose to medium dense SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown and olive, very hard A highly cemented lense was encountered from a depth of approximately 19 to 20 feet below the ground surface. Boring Terminated at 24.3 Feet 3-5 2-3-3 N=6 3-6-15 N=21 7-5-6 N=11 50/2" N=50/2" 50/3" N=50/3" 0.001 16 6 6 7 9 5 13 72 NP 4977.5 4959 4954 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.508491° Longitude: -105.080592° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 4 CLIENT: GOLDELM Apartments Lakeside, MT 0.5 2.0 19.3 TOPSOIL - 6 inches SILTY SAND, fine grained, brown to light brown SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown, very hard Boring Terminated at 19.3 Feet 50/3" N=50/3" 50/2" N=50/2" 50/4" N=50/4" 50/3" N=50/3" 50/4" N=50/4" 17 11 10 11 12 69 4981 4979.5 4962 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.508459° Longitude: -105.082096° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 5 CLIENT: GOLDELM Apartments Lakeside, MT Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-8 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and 0.5 1.0 19.3 TOPSOIL - 6 inches SILTY SAND, fine grained, brown SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown, very hard A highly cemented lense was encountered from a depth of approximately 14 to 16 feet below the ground surface. Boring Terminated at 19.3 Feet 50/6" N=50/6" 50/6" N=50/6" 50/3" N=50/3" 50/0" N=50/0" 50/3" N=50/3" 0.004 11 17 4996.5 4996 4977.5 0 0 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.50743° Longitude: -105.08272° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 6 CLIENT: GOLDELM Apartments Lakeside, MT Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-9 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and 0.5 14.2 TOPSOIL - 6 inches SEDIMENTARY BEDROCK - SANDSTONE, fine grained, brown to gray, very hard A highly cemented lense was encountered from a depth of approximately 4 to 6 feet below the ground surface. A highly cemented lense was encountered from a depth of approximately 12 to 13 feet below the ground surface. Boring Terminated at 14.2 Feet 50/3" N=50/3" 50/3" N=50/3" 50/3" N=50/3" 50/2" N=50/2" 5 11 13 5003.5 4989.5 1 0 Stratification lines are approximate. In-situ, the transition may be gradual. Hammer Type: Automatic LOCATION DEPTH Latitude: 40.507252° Longitude: -105.081498° GRAPHIC LOG See Exhibit A-2 THIS BORING LOG IS NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GEO SMART LOG-NO WELL 20155011.GPJ TERRACON2012.GDT 3/23/15 NW of S College Ave and Crestridge Dr Fort Collins, Colorado SITE: Page 1 of 1 Advancement Method: 4 inch solid-stem augers Abandonment Method: Borings backfilled with soil cuttings upon completion. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado Notes: Project No.: 20155011 Drill Rig: CME-75 Boring Started: 3/4/2015 BORING LOG NO. 7 CLIENT: GOLDELM Apartments Lakeside, MT Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-10 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. APPENDIX B LABORATORY TESTING Geotechnical Engineering Report Goldelm at Fossil Creek ■ Fort Collins, Colorado April 14, 2015 ■ Terracon Project No. 20155011 Responsive ■ Resourceful ■ Reliable Exhibit B-1 Laboratory Testing Description The soil and bedrock samples retrieved during the field exploration were returned to the laboratory for observation by the project geotechnical engineer. At that time, the field descriptions were reviewed and an applicable laboratory testing program was formulated to determine engineering properties of the subsurface materials. Laboratory tests were conducted on selected soil and bedrock samples. The results of these tests are presented on the boring logs and in this appendix. The test results were used for the geotechnical engineering analyses, and the development of preliminary foundation and earthwork recommendations. The laboratory tests were performed in general accordance with applicable locally accepted standards. Soil samples were classified in general accordance with the Unified Soil Classification System described in Appendix C. Rock samples were visually classified in general accordance with the description of rock properties presented in Appendix C. Procedural standards noted in this report are for reference to methodology in general. In some cases variations to methods are applied as a result of local practice or professional judgment.  Water content  Plasticity index  Grain-size distribution  Consolidation/swell  Dry density  Water-soluble sulfate content 0 10 20 30 40 50 60 0 20 40 60 80 100 CL or OL CH or OH ML or OL MH or OH Boring ID Depth PL PI Description LEAN CLAY with SAND SILTY SAND SILTY SAND with GRAVEL CL SM SM Fines P L A S T I C I T Y I N D E X LIQUID LIMIT "U" Line "A" Line 32 NP NP 15 NP NP 17 NP NP 78 42 16 LL USCS 1 2 4 ATTERBERG LIMITS RESULTS ASTM D4318 2 - 3 2 - 3 9 - 10.5 PROJECT NUMBER: 20155011 PROJECT: Goldelm at Fossil Creek 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 100 10 1 0.1 0.01 0.001 6 16 20 30 40 50 1.5 6 200 810 78.0 41.7 16.2 0.0 1.5 30.9 14 LL PL PI %Silt %Clay 1 4 3/4 1/2 60 fine U.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS HYDROMETER 15 NP NP 17 NP NP D100 Cc Cu SILT OR CLAY 4 D30 D10 %Gravel %Sand 1 2 4 LEAN CLAY with SAND(CL) SILTY SAND(SM) SILTY SAND with GRAVEL(SM) 32 NP -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 2.9 percent compression upon wetting under an applied pressure of 500 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155011 PROJECT: Goldelm at Fossil Creek SITE: NW of S College Ave and Crestridge Dr Fort Collins, Colorado CLIENT: GOLDELM Apartments Lakeside, MT EXHIBIT: B-4 Specimen Identification Classification , pcf 1 100 5 WC, % 2 - 3 ft LEAN CLAY with SAND(CL) LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155011.GPJ TERRACON2012.GDT 3/19/15 -10 -9 -8 -7 -6 -5 -4 -3 -2 -1 0 1 2 100 1,000 10,000 AXIAL STRAIN, % PRESSURE, psf SWELL CONSOLIDATION TEST ASTM D4546 NOTES: Sample exhibited 1.5 percent compression upon wetting under an applied pressure of 500 psf. 1901 Sharp Point Drive, Suite C Fort Collins, Colorado PROJECT NUMBER: 20155011 PROJECT: Goldelm at Fossil Creek SITE: NW of S College Ave and Crestridge Dr Fort Collins, Colorado CLIENT: GOLDELM Apartments Lakeside, MT EXHIBIT: B-5 Specimen Identification Classification , pcf 2 92 4 WC, % 2 - 3 ft SILTY SAND(SM) LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. TC_CONSOL_STRAIN-USCS 20155011.GPJ TERRACON2012.GDT 3/19/15 TASK NO: 150310027 Analytical Results Terracon, Inc. - Fort Collins Bryce C. Reeves Company: Report To: Company: Bill To: 1901 Sharp Point Drive Suite C Fort Collins CO 80525 Accounts Payable Terracon, Inc. - Lenexa 13910 W. 96th Terrace Lenexa KS 66215 Goldelm at Fossil Creek 20155011 Date Reported: 3/17/15 Task No.: 150310027 Matrix: Soil - Geotech Date Received: 3/10/15 Client Project: Client PO: Customer Sample ID Borehole #1 @ 4 Ft. Test Method Lab Number: 150310027-01 Result Sulfate - Water Soluble 0.065 % AASHTO T290-91/ ASTM D4327 Customer Sample ID Borehole #4 @ 4-5.5 Ft. Test Method Lab Number: 150310027-02 Result Sulfate - Water Soluble 0.001 % AASHTO T290-91/ ASTM D4327 Customer Sample ID Borehole #6 @ 4 Ft. Test Method Lab Number: 150310027-03 Result Sulfate - Water Soluble 0.004 % AASHTO T290-91/ ASTM D4327 240 South Main Street / Brighton, CO 80601-0507 / 303-659-2313 Mailing Address: P.O. Box 507 / Brighton, CO 80601-0507 / Fax: 303-659-2315 DATA APPROVED FOR RELEASE BY Abbreviations/ References: 150310027 AASHTO - American Association of State Highway and Transportation Officials. ASTM - American Society for Testing and Materials. ASA - American Society of Agronomy. DIPRA - Ductile Iron Pipe Research Association Handbook of Ductile Iron Pipe. xhibit B-6 APPENDIX C SUPPORTING DOCUMENTS Exhibit: C-1 Unconfined Compressive Strength Qu, (psf) 500 to 1,000 2,000 to 4,000 > 8,000 less than 500 1,000 to 2,000 4,000 to 8,000 Non-plastic Low Medium High DESCRIPTION OF SYMBOLS AND ABBREVIATIONS SAMPLING WATER LEVEL FIELD TESTS GENERAL NOTES Over 12 in. (300 mm) 12 in. to 3 in. (300mm to 75mm) 3 in. to #4 sieve (75mm to 4.75 mm) #4 to #200 sieve (4.75mm to 0.075mm Passing #200 sieve (0.075mm) Particle Size < 5 5 - 12 > 12 Percent of Dry Weight Descriptive Term(s) of other constituents RELATIVE PROPORTIONS OF FINES 0 1 - 10 11 - 30 > 30 Plasticity Index Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency. LOCATION AND ELEVATION NOTES Percent of Dry Weight Major Component of Sample Trace With Modifier RELATIVE PROPORTIONS OF SAND AND GRAVEL GRAIN SIZE TERMINOLOGY Trace With Modifier DESCRIPTIVE SOIL CLASSIFICATION Boulders Cobbles UNIFIED SOIL CLASSIFICATION SYSTEM Exhibit C-2 Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification Group Symbol Group Name B Coarse Grained Soils: More than 50% retained on No. 200 sieve Gravels: More than 50% of coarse fraction retained on No. 4 sieve Clean Gravels: Less than 5% fines C Cu  4 and 1  Cc  3 E GW Well-graded gravel F Cu  4 and/or 1  Cc  3 E GP Poorly graded gravel F Gravels with Fines: More than 12% fines C Fines classify as ML or MH GM Silty gravel F,G,H Fines classify as CL or CH GC Clayey gravel F,G,H Sands: 50% or more of coarse fraction passes No. 4 sieve Clean Sands: Less than 5% fines D Cu  6 and 1  Cc  3 E SW Well-graded sand I Cu  6 and/or 1  Cc  3 E SP Poorly graded sand I Sands with Fines: More than 12% fines D Fines classify as ML or MH SM Silty sand G,H,I Fines classify as CL or CH SC Clayey sand G,H,I Fine-Grained Soils: 50% or more passes the No. 200 sieve Silts and Clays: Liquid limit less than 50 Inorganic: PI  7 and plots on or above “A” line J CL Lean clay K,L,M PI  4 or plots below “A” line J ML Silt K,L,M Organic: Liquid limit - oven dried  0.75 OL Organic clay K,L,M,N Liquid limit - not dried Organic silt K,L,M,O Silts and Clays: Liquid limit 50 or more Inorganic: PI plots on or above “A” line CH Fat clay K,L,M PI plots below “A” line MH Elastic Silt K,L,M Organic: Liquid limit - oven dried  0.75 OH Organic clay K,L,M,P Liquid limit - not dried Organic silt K,L,M,Q Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name. DESCRIPTION OF ROCK PROPERTIES Exhibit C-3 WEATHERING Fresh Rock fresh, crystals bright, few joints may show slight staining. Rock rings under hammer if crystalline. Very slight Rock generally fresh, joints stained, some joints may show thin clay coatings, crystals in broken face show bright. Rock rings under hammer if crystalline. Slight Rock generally fresh, joints stained, and discoloration extends into rock up to 1 in. Joints may contain clay. In granitoid rocks some occasional feldspar crystals are dull and discolored. Crystalline rocks ring under hammer. Moderate Significant portions of rock show discoloration and weathering effects. In granitoid rocks, most feldspars are dull and discolored; some show clayey. Rock has dull sound under hammer and shows significant loss of strength as compared with fresh rock. Moderately severe All rock except quartz discolored or stained. In granitoid rocks, all feldspars dull and discolored and majority show kaolinization. Rock shows severe loss of strength and can be excavated with geologist’s pick. Severe All rock except quartz discolored or stained. Rock “fabric” clear and evident, but reduced in strength to strong soil. In granitoid rocks, all feldspars kaolinized to some extent. Some fragments of strong rock usually left. Very severe All rock except quartz discolored or stained. Rock “fabric” discernible, but mass effectively reduced to “soil” with only fragments of strong rock remaining. Complete Rock reduced to ”soil”. Rock “fabric” not discernible or discernible only in small, scattered locations. Quartz may be present as dikes or stringers. HARDNESS (for engineering description of rock – not to be confused with Moh’s scale for minerals) Very hard Cannot be scratched with knife or sharp pick. Breaking of hand specimens requires several hard blows of geologist’s pick. Hard Can be scratched with knife or pick only with difficulty. Hard blow of hammer required to detach hand specimen. Moderately hard Can be scratched with knife or pick. Gouges or grooves to ¼ in. deep can be excavated by hard blow of point of a geologist’s pick. Hand specimens can be detached by moderate blow. Medium Can be grooved or gouged 1/16 in. deep by firm pressure on knife or pick point. Can be excavated in small chips to pieces about 1-in. maximum size by hard blows of the point of a geologist’s pick. Soft Can be gouged or grooved readily with knife or pick point. Can be excavated in chips to pieces several inches in size by moderate blows of a pick point. Small thin pieces can be broken by finger pressure. Very soft Can be carved with knife. Can be excavated readily with point of pick. Pieces 1-in. or more in thickness can be broken with finger pressure. Can be scratched readily by fingernail. Joint, Bedding, and Foliation Spacing in Rock a Spacing Joints Bedding/Foliation Less than 2 in. Very close Very thin 2 in. – 1 ft. Close Thin 1 ft. – 3 ft. Moderately close Medium 3 ft. – 10 ft. Wide Thick More than 10 ft. Very wide Very thick a. Spacing refers to the distance normal to the planes, of the described feature, which are parallel to each other or nearly so. Rock Quality Designator (RQD) a Joint Openness Descriptors RQD, as a percentage Diagnostic description Openness Descriptor Exceeding 90 Excellent No Visible Separation Tight 90 – 75 Good Less than 1/32 in. Slightly Open 75 – 50 Fair 1/32 to 1/8 in. Moderately Open 50 – 25 Poor 1/8 to 3/8 in. Open Less than 25 Very poor 3/8 in. to 0.1 ft. Moderately Wide a. RQD (given as a percentage) = length of core in pieces Greater than 0.1 ft. Wide 4 in. and longer/length of run. References: American Society of Civil Engineers. Manuals and Reports on Engineering Practice - No. 56. Subsurface Investigation for Design and Construction of Foundations of Buildings. New York: American Society of Civil Engineers, 1976. U.S. Department of the Interior, Bureau of Reclamation, Engineering Geology Field Manual. Exhibit C-4 LABORATORY TEST SIGNIFICANCE AND PURPOSE Test Significance Purpose California Bearing Ratio Used to evaluate the potential strength of subgrade soil, subbase, and base course material, including recycled materials for use in road and airfield pavements. Pavement Thickness Design Consolidation Used to develop an estimate of both the rate and amount of both differential and total settlement of a structure. Foundation Design Direct Shear Used to determine the consolidated drained shear strength of soil or rock. Bearing Capacity, Foundation Design, and Slope Stability Dry Density Used to determine the in-place density of natural, inorganic, fine-grained soils. Index Property Soil Behavior Expansion Used to measure the expansive potential of fine-grained soil and to provide a basis for swell potential classification. Foundation and Slab Design Gradation Used for the quantitative determination of the distribution of particle sizes in soil. Soil Classification Liquid & Plastic Limit, Plasticity Index Used as an integral part of engineering classification systems to characterize the fine-grained fraction of soils, and to specify the fine-grained fraction of construction materials. Soil Classification Permeability Used to determine the capacity of soil or rock to conduct a liquid or gas. Groundwater Flow Analysis pH Used to determine the degree of acidity or alkalinity of a soil. Corrosion Potential Resistivity Used to indicate the relative ability of a soil medium to carry electrical currents. Corrosion Potential R-Value Used to evaluate the potential strength of subgrade soil, subbase, and base course material, including recycled materials for use in road and airfield pavements. Pavement Thickness Design Soluble Sulfate Used to determine the quantitative amount of soluble sulfates within a soil mass. Exhibit C-5 REPORT TERMINOLOGY (Based on ASTM D653) Allowable Soil Bearing Capacity The recommended maximum contact stress developed at the interface of the foundation element and the supporting material. Alluvium Soil, the constituents of which have been transported in suspension by flowing water and subsequently deposited by sedimentation. Aggregate Base Course A layer of specified material placed on a subgrade or subbase usually beneath slabs or pavements. Backfill A specified material placed and compacted in a confined area. Bedrock A natural aggregate of mineral grains connected by strong and permanent cohesive forces. Usually requires drilling, wedging, blasting or other methods of extraordinary force for excavation. Bench A horizontal surface in a sloped deposit. Caisson (Drilled Pier or Shaft) A concrete foundation element cast in a circular excavation which may have an enlarged base. Sometimes referred to as a cast-in-place pier or drilled shaft. Coefficient of Friction A constant proportionality factor relating normal stress and the corresponding shear stress at which sliding starts between the two surfaces. Colluvium Soil, the constituents of which have been deposited chiefly by gravity such as at the foot of a slope or cliff. Compaction The densification of a soil by means of mechanical manipulation Concrete Slab-on- Grade A concrete surface layer cast directly upon a base, subbase or subgrade, and typically used as a floor system. Differential Movement Unequal settlement or heave between, or within foundation elements of structure. Earth Pressure The pressure exerted by soil on any boundary such as a foundation wall. ESAL Equivalent Single Axle Load, a criteria used to convert traffic to a uniform standard, (18,000 pound axle loads). Engineered Fill Specified material placed and compacted to specified density and/or moisture conditions under observations of a representative of a geotechnical engineer. Equivalent Fluid A hypothetical fluid having a unit weight such that it will produce a pressure against a lateral support presumed to be equivalent to that produced by the actual soil. This simplified approach is valid only when deformation conditions are such that the pressure increases linearly with depth and the wall friction is neglected. Existing Fill (or Man-Made Fill) Materials deposited throughout the action of man prior to exploration of the site. Existing Grade The ground surface at the time of field exploration. Exhibit C-6 REPORT TERMINOLOGY (Based on ASTM D653) Expansive Potential The potential of a soil to expand (increase in volume) due to absorption of moisture. Finished Grade The final grade created as a part of the project. Footing A portion of the foundation of a structure that transmits loads directly to the soil. Foundation The lower part of a structure that transmits the loads to the soil or bedrock. Frost Depth The depth at which the ground becomes frozen during the winter season. Grade Beam A foundation element or wall, typically constructed of reinforced concrete, used to span between other foundation elements such as drilled piers. Groundwater Subsurface water found in the zone of saturation of soils or within fractures in bedrock. Heave Upward movement. Lithologic The characteristics which describe the composition and texture of soil and rock by observation. Native Grade The naturally occurring ground surface. Native Soil Naturally occurring on-site soil, sometimes referred to as natural soil. Optimum Moisture Content The water content at which a soil can be compacted to a maximum dry unit weight by a given compactive effort. Perched Water Groundwater, usually of limited area maintained above a normal water elevation by the presence of an intervening relatively impervious continuous stratum. Scarify To mechanically loosen soil or break down existing soil structure. Settlement Downward movement. Skin Friction (Side Shear) The frictional resistance developed between soil and an element of the structure such as a drilled pier. Soil (Earth) Sediments or other unconsolidated accumulations of solid particles produced by the physical and chemical disintegration of rocks, and which may or may not contain organic matter. Strain The change in length per unit of length in a given direction. Stress The force per unit area acting within a soil mass. Strip To remove from present location. Subbase A layer of specified material in a pavement system between the subgrade and base course. Subgrade The soil prepared and compacted to support a structure, slab or pavement system. Corrosion Potential Unconfined Compression To obtain the approximate compressive strength of soils that possess sufficient cohesion to permit testing in the unconfined state. Bearing Capacity Analysis for Foundations Water Content Used to determine the quantitative amount of water in a soil mass. Index Property Soil Behavior C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay. D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay E Cu = D60/D10 Cc = 10 60 2 30 D x D (D ) F If soil contains  15% sand, add “with sand” to group name. G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM. H If fines are organic, add “with organic fines” to group name. I If soil contains  15% gravel, add “with gravel” to group name. J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay. K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant. L If soil contains  30% plus No. 200 predominantly sand, add “sandy” to group name. M If soil contains  30% plus No. 200, predominantly gravel, add “gravelly” to group name. N PI  4 and plots on or above “A” line. O PI  4 or plots below “A” line. P PI plots on or above “A” line. Q PI plots below “A” line. Gravel Sand Silt or Clay Descriptive Term(s) of other constituents N (HP) (T) (DCP) (PID) (OVA) < 15 15 - 29 > 30 Term PLASTICITY DESCRIPTION Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated. Groundwater level variations will occur over time. In low permeability soils, accurate determination of groundwater levels is not possible with short term water level observations. Water Level After a Specified Period of Time Water Level After a Specified Period of Time Water Initially Encountered Modified Dames & Moore Ring Sampler Standard Penetration Test Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation. Instead, the surface elevation was approximately determined from topographic maps of the area. Standard Penetration Test Resistance (Blows/Ft.) Hand Penetrometer Torvane Dynamic Cone Penetrometer Photo-Ionization Detector Organic Vapor Analyzer STRENGTH TERMS BEDROCK Loose Medium Dense Dense 0 - 3 4 - 9 10 - 29 30 - 50 7 - 18 19 - 58 Very Soft Soft Medium-Stiff Stiff Very Stiff Standard Penetration or N-Value Blows/Ft. 2 - 4 4 - 8 8 - 15 < 3 5 - 9 19 - 42 > 42 30 - 49 50 - 89 20 - 29 Medium Hard Very Dense RELATIVE DENSITY OF COARSE-GRAINED SOILS Descriptive Term (Density) Very Loose > 50 Ring Sampler Blows/Ft. 0 - 6 59 - 98 > 99 Descriptive Term (Consistency) Hard 0 - 1 Ring Sampler Blows/Ft. 3 - 4 10 - 18 Ring Sampler Blows/Ft. < 30 90 - 119 Standard Penetration or N-Value Blows/Ft. Descriptive Term (Consistency) Weathered Firm Very Hard CONSISTENCY OF FINE-GRAINED SOILS (More than 50% retained on No. 200 sieve.) Density determined by Standard Penetration Resistance (50% or more passing the No. 200 sieve.) Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance Standard Penetration or N-Value Blows/Ft. _ 15 - 30 > 30 > 119 < 20 30 - 49 50 - 79 >79 Hard NP 0.111 0.099 0.339 4.75 12.5 25 1 2 4 GRAIN SIZE IN MILLIMETERS PERCENT FINER BY WEIGHT coarse fine 2 - 3 2 - 3 9 - 10.5 3/8 3 100 3 2 140 COBBLES GRAVEL SAND USCS Classification 22.0 56.8 52.9 D60 coarse medium Boring ID Depth Boring ID Depth GRAIN SIZE DISTRIBUTION ASTM D422 2 - 3 2 - 3 9 - 10.5 PROJECT NUMBER: 20155011 PROJECT: Goldelm at Fossil Creek SITE: NW of S College Ave and Crestridge Dr Fort Collins, Colorado CLIENT: GOLDELM Apartments Lakeside, MT EXHIBIT: B-3 1901 Sharp Point Drive, Suite C Fort Collins, Colorado LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. GRAIN SIZE: USCS-2 20155011.GPJ TERRACON2012.GDT 3/19/15 SITE: NW of S College Ave and Crestridge Dr Fort Collins, Colorado CLIENT: GOLDELM Apartments Lakeside, MT EXHIBIT: B-2 1901 Sharp Point Drive, Suite C Fort Collins, Colorado LABORATORY TESTS ARE NOT VALID IF SEPARATED FROM ORIGINAL REPORT. ATTERBERG LIMITS 20155011.GPJ TERRACON2012.GDT 3/19/15 CL-ML PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 5003.9 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS abbreviations. PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4997.0 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS abbreviations. PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4981.4 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-7 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4978.2 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4994.8 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4980.3 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS Driller: Drilling Engineers, Inc. Boring Completed: 3/4/2015 Exhibit: A-4 See Exhibit A-3 for description of field procedures. See Appendix B for description of laboratory procedures and additional data (if any). See Appendix C for explanation of symbols and abbreviations. PROJECT: Goldelm at Fossil Creek FIELD TEST RESULTS SULFATES (%) PERCENT FINES WATER CONTENT (%) DRY UNIT WEIGHT (pcf) ATTERBERG LIMITS LL-PL-PI Surface Elev.: 4982.7 (Ft.) ELEVATION (Ft.) SAMPLE TYPE WATER LEVEL OBSERVATIONS DEPTH (Ft.) 5 10 15 20 RECOVERY () SWELL (%) No free water observed WATER LEVEL OBSERVATIONS