Loading...
HomeMy WebLinkAboutTHE HUB ON CAMPUS - PDP - PDP160038 - SUBMITTAL DOCUMENTS - ROUND 2 - VARIANCE REQUEST (3)Hub On Campus – Ft Collins February 2017 Page 1 February 21, 2017 Heather McDowell City of Fort Collins 281 N College Avenue Fort Collins, CO 80524 RE: Utility Separation Variance Request Hub On Campus – Ft Collins 1415 W Elizabeth, Fort Collins, CO Heather, Kimley-Horn serves as the engineering consultant for CORE Fort Collins 1415 Elizabeth, LLC (“CORE”) who is requesting a variance from the standard 10-foot public utility separation requirement for the proposed Hub On Campus – Ft Collins redevelopment. CORE requests approval for a reduction in the required separation from 10-feet to 8-feet. The existing site has multiple public sanitary and storm sewer mains running through the property. These mains serve multiple developments surrounding the site, including the Fairview Apartments, Fairview Shopping Center, Matador Apartments, Pott’s PUD, Uptown Plaza, and other adjacent properties. As a part of the redevelopment, the public sanitary main will be re-routed to the west edge of the property, while the public storm main will be re-routed to the east edge. Although most the storm and sanitary alignments maintain proper separation, there are isolated instances that are deficient. These mainly occur along the south edge of the property where the mains are required to run parallel due to site and existing infrastructure constraints. Relocation of existing infrastructure, such as the existing City of Fort Collins transformer, has been deemed infeasible by both CORE and the City. Please reference sheet 10 of 12 of the Hub On Campus – Ft Collins Utility Plan Set prepared by Kimley-Horn (dated 2/21/2017) for the proposed public main re-routing. Sincerely, Lesley Netzer Project Manager 630-487-5555