Loading...
HomeMy WebLinkAboutWEST PLUM HOUSING - FDP - FDP160048 - REPORTS - EROSION CONTROL LETTER/REPORT (3)Project Number: 1252-001 Location: Fort Collins, CO Date: February 22, 2017 Total Acres: 1.38 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price L.F. 0 $1.50 $0.00 Construction Fence w/Rock Sock L.F. 1137 $4.50 $5,116.50 each 1 $75.00 $75.00 Wattle Dike Inlet Protection each 0 $100.00 $0.00 each 0 $75.00 $0.00 Wattle Dike Swale Protection each 0 $100.00 $0.00 each 1 $300.00 $300.00 each 0 $150.00 $0.00 each 1 $200.00 $200.00 each 11 $75.00 $825.00 L.F. 864 $1.00 $864.00 per hour 20 $60.00 $1,200.00 Sub-Total: $8,580.50 1.5 x Sub-Total: $12,870.75 Amount of security: $12,870.75 Total Acres x $1325/acre: $1,828.50 Sub-Total: $1,828.50 1.5 x Sub-Total: $2,742.75 Cost to Re-seed: $2,742.75 Minimum escrow amount: $3,000.00 Erosion Control Escrow: $12,870.75 NOTE: 'Total Acres' represents total disturbed area. Vehicle Tracking Control Pads Option 2 | Cost to Re-seed Disturbed acreage Option 3 | Miniumum Escrow Amount Final Escrow Amount Sediment Trap Concrete Washout Area Rock Sock Sawcutting Pollution Prevention Street Sweeping and Cleaning Option 1 | BMP Costs West Plum Housing Erosion Control Cost Estimate Silt Fencing Inlet Protection Wattle Dike Curb Side Check Dam