Loading...
HomeMy WebLinkAboutVILLAGE COOPERATIVE FORT COLLINS - PDP - PDP160036 - REPORTS - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT December 07, 2016 The Village Cooperative of Fort Collins Fort Collins, Colorado Prepared for: Village Cooperative of Fort Collins Shane Wright 1400 Corporate Center Circle, Suite 100 Eagan, Minnesota 55121 651-760-8306 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 1284-001  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Preliminary Drainage and Erosion Control Report for The Village Cooperative of Fort Collins Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies Project Development Plan submittal for the proposed The Village Cooperative of Fort Collins development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer The Village Cooperative of Fort Collins Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 2 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description ............................................................................................................... 4 B. Sub-Basin Description .................................................................................................................. 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 4 A. Regulations .................................................................................................................................. 4 B. Four Step Process ........................................................................................................................ 4 C. Development Criteria Reference and Constraints ......................................................................... 5 D. Hydrological Criteria .................................................................................................................... 5 E. Hydraulic Criteria ......................................................................................................................... 6 F. Floodplain Regulations Compliance .............................................................................................. 6 G. Modifications of Criteria .............................................................................................................. 6 IV. DRAINAGE FACILITY DESIGN .................................................................................... 6 A. General Concept .......................................................................................................................... 6 B. Water Quality Treatment ........................................................................................................... 10 C. Specific Details ........................................................................................................................... 10 V. CONCLUSIONS ...................................................................................................... 10 A. Compliance with Standards ........................................................................................................ 10 B. Drainage Concept ...................................................................................................................... 10 References ....................................................................................................................... 11 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (NOT INCLUDED WITH PDP) B.1 – Detention Ponds and Water Quality B.2 – Storm Sewers (NOT INCLUDED WITH PDP) B.3 – Inlets (NOT INCLUDED WITH PDP) APPENDIX C – Erosion Control Report APPENDIX D – LID Exhibit APPENDIX E – References The Village Cooperative of Fort Collins Preliminary Drainage Report LIST OF FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 3 LIST OF TABLES: Table 1 - Historic Rational Basin Summary ............................................................................ 7 Table 2 - Proposed Rational Basin Summary .......................................................................... 8 Table 3 - Detention Pond Summary ....................................................................................... 8 Table 4 - Historic Stormwater Release and Allowable Developed Release.................................... 9 Table 5 - Proposed Stormwater Release ................................................................................. 9 MAP POCKET: HDR1 – Historic Drainage Exhibit DR1 - Drainage Exhibit The Village Cooperative of Fort Collins Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. Located in the southwest quarter of Section 25, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. The site is Lot 1, Bellavista PDP. 3. Bounded to the northeast by the Aspen Leaf Apartments, to the west by Stanford Road, and to the south by Horsetooth Road. 4. No significant offsite flows are directed into the site. The majority of off-site flows are are prevented from entering the site by curb and gutter and a small swale on the northern boundary. The Village Cooperative of Fort Collins Preliminary Drainage Report 2 5. The Village Cooperative of Fort Collins property was studied with the previous Bellavista PDP proposal. B. Description of Property 1. The site is approximately 2.81 acres of on-site basins. An additional 1.44 acres of off-site basins were evaluated with this drainage study. Figure 1 – Aerial Photograph 2. The existing site is comprised of vacant land with natural grasses and vegetation. Off- site basins include portions of adjacent Horsetooth Road and Stanford Road. 3. The site slopes to the southwest corner. Two existing inlets, located adjacent to the site at the intersection of Stanford and Horsetooth Road, collect runoff from the subject property. Existing grades range between 2-20%. 4. A report by Earth Engineering Consultants dated October 21, 2016 lists the soils for the area as consisting of lean sandy clay and clayey sand, and sandstone/siltstone/claystone bedrock ranging from 7.5 to 17 feet below the ground surface. These soils are classified as Hydrologic Soil Group C and have a low infiltration rate. 5. The proposed project site plan is composed of 1 building, sidewalk, asphalt parking lot and detention ponds. This site will employ water quality features and runoff reduction facilities including underground detention and water quality chambers, grass swales with infiltration section and extended detention basins. The Village Cooperative of Fort Collins Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 6. No existing irrigation facilities are known at this time. 7. The project site was studied with the previous Bellavista PDP drainage study. The proposed project is not requesting a change in the land use. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Figure 3 – Existing Floodplains The Village Cooperative of Fort Collins Preliminary Drainage Report 4 II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Village Cooperative of Fort Collins project is located within the Foothills Drainage Basin, which is located between Prospect Road and Larimer #2 Canal from north to south and approximately between Shields Street and Zeigler Road from west to east. 2. This area generally drains to Warren Reservoir. B. Sub-Basin Description 1. The site slopes from the northeast to the southwest corner of the site. Adjacent to the site, at the intersection of Stanford Road and Horsetooth Road, are two inlets. Flows within the site and the eastern half of Stanford Road and the northern half of Horsetooth Road are collected in these two inlets. From there, flows are conveyed and released to Warren Reservoir. 2. The existing inlets are a part of a larger storm network designed and constructed with the Strachan Third Filing. A large storm sewer junction vault is located at the southwest corner of the Village Cooperative site. Three parallel 26” x 43” Concrete Arch pipes enter this structure from the west and exit this structure to the south. These pipes convey the 100-yr flows from the Strachan Third development to Warren Reservoir. 3. The proposed plan will generally detain developed flows and release to the existing storm infrastructure in the southwest corner of the site. This is the historic flow route. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with The Village Cooperative of Fort Collins project. B. Four Step Process The overall stormwater management strategy employed with The Village Cooperative of Fort Collins project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Providing vegetated open areas along the west, east and south portions of the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through StormTech Isolator chambers to remove sediment migration. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on existing storm infrastructure. The Village Cooperative of Fort Collins Preliminary Drainage Report 5 Routing runoff from the proposed impervious areas into StormTech chambers to promote infiltration, increased contact time, and filtration. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed underground Stormtech water quality chambers. Water quality for areas not routed through the Stormtech chambers will be provided within the detention pond volume. Step 3 – Stabilize Drainageways This property discharges detained stormwater to existing storm infrastructure constructed with the Strachan Third Filing. The proposed release from this property is expected to be negligible compared to the total 100-yr design flows in the existing storm infrastructure. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Localized trash enclosures within the development will allow for the disposal of solid waste. Underground Water Quality chambers for water treatment prior to flows entering the extended detention basins. Water Quality measures to protect and prolong the design life of the BMPs delineated in Step 1. C. Development Criteria Reference and Constraints 1. The proposed site is a part of the Foothills Drainage Basin. This basin requires a 2- year historic stormwater release from the developed property. 2. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. The site must either have the following: 75% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP, or 50% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP and 25% of new pavement shall be pervious. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Modified FAA Method calculations were utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- The Village Cooperative of Fort Collins Preliminary Drainage Report 6 year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to the southwest. The stormwater flows are collected in existing inlets at the intersection of Stanford Road and Horsetooth Road releases to Warren Reservoir. 2. All drainage facilities proposed with The Village Cooperative of Fort Collins project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Village Cooperative of Fort Collins project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of The Village Cooperative of Fort Collins drainage design are to maintain the allowable storm runoffs as outlined within Foothills Drainage Basin. 2. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 3. Historic runoff from The Village Cooperative of Fort Collins project site was evaluated. This evaluation provided the historic 2-yr and 100-yr peak runoff rates for the existing site. Basin H1 Basin H1 has an area of 2.04 acres. This basin contains vacant land. The 2-yr and 100-yr peak runoff rates from Basin H1 are 0.84 cfs and 3.83 cfs, respectively. The Village Cooperative of Fort Collins Preliminary Drainage Report 7 Basin H2 Basin H2 has an area of 0.44 acres. This basin contains a portion of the existing Horsetooth Road. The 2-yr and 100-yr peak runoff rates from Basin H2 are 0.75 cfs and 3.28 cfs, respectively. This basin is planned to be detained with the Village Cooperative development plan. Basin H3 Basin H3 has an area of 0.77 acres. This basin contains a portion of the existing site. The existing basin contains vacant land. The 2-yr and 100-yr peak runoff rates from Basin H3 are 0.42 cfs and 1.85 cfs, respectively. Table 1 - Historic Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100- yr Tc (min) Q2 (cfs) Q100 (cfs) 1 H1 2.04 0.25 0.31 19.3 18.0 0.84 3.83 2 H2 0.44 0.60 0.74 5.0 5.0 0.75 3.28 1 H3 0.77 0.25 0.31 10.9 10.4 0.42 1.85 4. The Village Cooperative of Fort Collins project divided the site into five (5) major drainage basins, designated as Basins A, OS and UD. The project further subdivided Basin A in to ten (10) sub-basins and Basin UD into two (2) sub-basins. The drainage patterns anticipated for each basin and sub-basin are further described below. Basin A Basin A consists of proposed building, parking lot, sidewalk, landscape areas and Detention Pond A. Runoff from Basins A1-A7 and A9-A10 are collected in proposed inlets and conveyed by storm sewer to a proposed Stormtech underground water quality chambers. The underground water quality chambers provide a chance for water to infiltrate into the ground. Additionally, the underground Stormtech chambers provide water quality treatment for storm flows prior to being detained in Detention Pond A. Runoff from Basin A8 overland flows into the Detention Pond A without pre- treatment. Basin OS Basin OS1 consists of the existing Horsetooth Road, adjacent to the proposed Village Cooperative development. This basin consists of existing asphalt, proposed asphalt, proposed curb and gutter, proposed sidewalk and proposed landscaping. This area will be detained within Detention Pond A. Due to grading constraints, no additional portions of Horsetooth Avenue or Stanford Road are proposed to be detained on-site. Basin UD Basin UD encompasses all on-site basins that are undetained. The Village Cooperative of Fort Collins Preliminary Drainage Report 8 Basin UD1 and UD2 consist of proposed asphalt driveways, curb and gutter, sidewalk and landscaping. These basins will flow via Horsetooth and Stanford curb and gutter to the proposed inlet at Horsetooth Road and Stanford Road. Table 2 - Proposed Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100- yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 0.02 0.95 1.00 5.0 5.0 0.05 0.18 2 A2 0.07 0.33 0.41 5.0 5.0 0.07 0.30 3 A3 0.21 0.71 0.89 5.0 5.0 0.43 1.90 4 A4 0.10 0.76 0.95 5.0 5.0 0.22 0.94 5 A5 0.35 0.95 1.00 5.0 5.0 0.96 3.53 6 A6 0.44 0.75 0.93 5.9 5.0 0.90 4.06 7 A7 0.02 0.60 0.75 5.0 5.0 0.04 0.18 8 A8 0.50 0.26 0.33 7.7 7.1 0.32 1.44 7 A9 0.36 0.95 1.00 5.0 5.0 0.99 3.62 7 A10 0.03 0.62 0.78 5.0 5.0 0.05 0.24 11 UD1 0.03 0.86 1.00 5.0 5.0 0.06 0.26 11 UD2 0.59 0.35 0.44 5.0 5.0 0.59 2.57 10 OS1 0.44 0.68 0.85 5.8 5.0 0.83 3.76 5. One (1) detention ponds is proposed with The Village Cooperative of Fort Collins development. Detention Pond A is located within Basin A and detains all of Basin A and OS1. The detention pond will release via City of Fort Collins approved outlet structure to a storm sewer that will connect to the existing storm infrastructure in the southwest corner of the site. Detention Pond A Detention Pond A has a total of 0.58 ac-ft storage available. 0.49 ac-ft of storage is required with this project. Water quality control volume for Basin A8 is included in the pond volume. Water quality provided within Detention Pond A does not include the water quality volume provided upstream in the underground water quality chambers. Emergency Overflow from the pond is directed south over the proposed earthern weir and sidewalk to the Horsetooth Road. 1.05 ft of freeboard is provided in Pond A, measured from the proposed building garage elevation. Table 3 - Detention Pond Summary Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr The Village Cooperative of Fort Collins Preliminary Drainage Report 9 Total Stormwater Release from Site The total allowable 100-yr release from the site is a summation of the historic 2-yr runoff from Basin H1-H2, plus the historic 100-yr runoff from Basin H3. Table 4 - Historic Stormwater Release and Allowable Developed Release Historic Stormwater Release Allowable Developed 100-yr Release (cfs) Pond/ Basin 2-yr Flow (cfs) 100-yr Flow (cfs) H1 0.84 3.83 0.84 H2 0.75 3.28 0.75 H3 0.42 1.85 1.85 TOTAL 2.01 8.96 3.44 Total developed 100-yr release from the site is a combination of the undetained 100- year flows from Basins UD1-UD2, plus the detained release from Detention Pond A. Table 5 - Proposed Stormwater Release Proposed Stormwater Release Pond/ Basin 100-yr Flow (cfs) Undetained Basins (UD1-UD2) 2.85 Pond A (Basins A1- A10,OS1) 1.10 TOTAL 3.95 Due to the grading challenges along Horsetooth Road and Stanford Road, the majority of Basin UD2 was unable to be captured and routed to the proposed detention pond. Basin UD2 consists mostly of proposed landscaping and sidewalk along Horsetooth and Stanford. Additionally, due to the increase in slope of this basin, the time of concentration was decreased. These factors account for more runoff from this basin in the 100-yr event as compared to the historic condition. The pond release rate was set based on the capacity of the pond. The total release from the site during a 100-year event is 0.51 cfs more than the allowable release rate. This additional 0.51 cfs is not expected to impact downstream infrastructure. Based on the utility plans for Strachan Third Filing, the downstream infrastructure was designed to convey the 100-yr developed flow of approximately 165 cfs. An additional 0.51 cfs is considered within the range of error for the pipe. Lastly, the total The Village Cooperative of Fort Collins Preliminary Drainage Report 10 runoff during a 100-yr event is proposed to be decreased by 5.01 cfs from historic condition. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Water Quality Treatment 1. Basins A1-A7 and A9-A10 have water quality provided exclusively via StormTech chambers. Following UDFCD standards for a 12-hour drain time, a Water Quality Capture Volume of 1409 cu. ft. is required. Using MC-3500 StormTech chambers designed for water quality, 1523 cu. ft. is provided within the isolator rows. The initial flush of stormwater will be detained within these isolators and released via infiltration through the aggregate section to a subdrain. Stormwater volume exceeding the volume provided in the Stormtech chambers will overflow a weir within the proposed inlet and be directed into the detention pond. 2. Basins A8 and OS1 will be treated for water quality within the bottom of the Detention Pond A through an approved outlet structure. C. Specific Details 1. Additional details to be provided with the FDP submittal. V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with The Village Cooperative of Fort Collins project complies with the City of Fort Collins’ Stormwater Criteria Manual with the exception of an increased release from the site during a 100-year event. 2. The drainage design proposed with The Village Cooperative of Fort Collins project complies with the City of Fort Collins’ Master Drainage Plan for the Foothills Drainage Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves the requirements set forth by the City of Fort Collins for Low Impact Development (LID) by providing 88% total impervious areas as being treated through an LID treatment. Please see LID Exhibit located in the Appendix. B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with the Fort Collins Master Drainage Plan and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 2. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration from the underground water quality chambers. This is currently unable to be calculated with available soils data. The Village Cooperative of Fort Collins Preliminary Drainage Report 11 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Geotechnical Subsurface Exploration Report Proposed Village Cooperative of Fort Collins Horsetooth and Stanford Roads Fort Collins, Colorado, October 21, 2016, Earth Engineering Consultants, Inc.(EEC Project No. 1162088). 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Village Cooperative CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Village Cooperative Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: December 6, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. H1 2.04 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 2.041 0.25 0.25 0.31 0% Village Cooperative Overland Flow, Time of Concentration: Village Cooperative Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 H1 No 0.25 0.25 0.31 290 3.66% 17.6 17.6 16.3 267 1.69% 2.60 1.7 19.3 19.3 18.0 2 H2 No 0.60 0.60 0.74 N/A N/A N/A N/A 93 0.57% 1.51 1.0 5.0 5.0 5.0 1 H3 No 0.25 0.25 0.31 79 5.91% 7.8 7.8 7.2 422 1.28% 2.26 3.1 10.9 10.9 10.4 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. EXISTING TIME OF CONCENTRATION COMPUTATIONS Village Cooperative Rational Method Equation: Project: Village Cooperative Calculations By: Date: Rainfall Intensity: 1 H1 2.04 19 19 18 0.25 0.25 0.31 1.65 2.82 6.01 0.84 1.44 3.83 2 H2 0.44 5 5 5 0.60 0.60 0.74 2.85 4.87 9.95 0.75 1.28 3.28 1 H3 0.77 11 11 10 0.25 0.25 0.31 2.17 3.71 7.72 0.42 0.71 1.85 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 December 6, 2016 Intensity, i10 (in/hr) C10 Q = C f ( C )( i )( A ) 12/6/2016 1:30 PM D:\Projects\1284-001\Drainage\Hydrology\1284-001_Existing_Rational_Calcs.xlsx\Runoff Village Cooperative of Fort Collins CHARACTER OF SURFACE1: Runoff Coefficient Percentage Impervious Project: Village Cooperative Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: December 6, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A1 0.02 0.02 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.000 0.95 0.95 1.00 99% A2 0.07 0.00 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.065 0.33 0.33 0.41 10% A3 0.21 0.10 0.04 0.00 0.00 Clayey | Average 2% to 7% 0.073 0.71 0.71 0.89 64% Village Cooperative of Fort Collins Overland Flow, Time of Concentration: Village Cooperative Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = T i + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S ½ Velocity (Swale Flow), V = 15·S ½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc Village Cooperative of Fort Collins Rational Method Equation: Project: Village Cooperative Calculations By: Date: Rainfall Intensity: 1 A1 0.02 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.05 0.08 0.18 2 A2 0.07 5 5 5 0.33 0.33 0.41 2.85 4.87 9.95 0.07 0.12 0.30 3 A3 0.21 5 5 5 0.71 0.71 0.89 2.85 4.87 9.95 0.43 0.74 1.90 4 A4 0.10 5 5 5 0.76 0.76 0.95 2.85 4.87 9.95 0.22 0.37 0.94 5 A5 0.35 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.96 1.64 3.53 6 A6 0.44 6 6 5 0.75 0.75 0.93 2.76 4.72 9.95 0.90 1.54 4.06 7 A7 0.02 5 5 5 0.60 0.60 0.75 2.85 4.87 9.95 0.04 0.07 0.18 8 A8 0.50 8 8 7 0.26 0.26 0.33 2.46 4.21 8.80 0.32 0.55 1.44 7 A9 0.36 5 5 5 0.95 0.95 1.00 2.85 4.87 9.95 0.99 1.68 3.62 7 A10 0.03 5 5 5 0.62 0.62 0.78 2.85 4.87 9.95 0.05 0.09 0.24 11 UD1 0.03 5 5 5 0.86 0.86 1.00 2.85 4.87 9.95 0.06 0.11 0.26 11 UD2 0.59 5 5 5 0.35 0.35 0.44 2.85 4.87 9.95 0.59 1.01 2.57 10 OS1 0.44 6 6 5 0.68 0.68 0.85 2.76 4.72 9.95 0.83 1.43 3.76 10 TOTAL UNDETAINED BASINS (UD1-UD2) 0.61 6 6 5 0.37 0.37 0.47 2.76 4.72 9.95 0.63 1.08 2.85 8 TOTAL TO POND A (A1-A10, OS1) 2.56 10 10 8 0.68 0.68 0.85 2.26 3.86 8.59 3.94 6.73 18.75 0 TOTAL TO STORMTECH (A1-A7, A9-A10) 1.62 8 8 6 0.81 0.81 1.00 2.40 4.10 9.63 3.14 5.37 15.56 December 6, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION POND SIZING B.2 STORM SEWER (NOT INCLUDED) B.3 INLET (NOT INCLUDED) APPENDIX B.1 DETENTION PONDS AND WATER QUALITY Village Cooperative 1284-001 Fort Collins, Colorado S. Thomas Date: 12/6/2016 Pond No.: Pond A 8 100-yr 0.85 Approx. WQCV 323 ft3 Area (A)= 2.56 acres Quantity Detention 20908 ft3 Max Release Rate = 1.10 cfs Total Volume 21231 ft3 Total Volume 0.49 ac-ft Time Time Ft.Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 21.7 6495 330 6165 10 600 7.72 16.8 10079 660 9419 15 900 6.52 14.2 12769 990 11779 20 1200 5.60 12.2 14623 1320 13303 25 1500 4.98 10.8 16255 1650 14605 30 1800 4.52 9.8 17704 1980 15724 35 2100 4.08 8.9 18644 2310 16334 40 2400 3.74 8.1 19532 2640 16892 45 2700 3.46 7.5 20328 2970 17358 50 3000 3.23 7.0 21085 3300 17785 55 3300 3.03 6.6 21758 3630 18128 60 3600 2.86 6.2 22404 3960 18444 65 3900 2.72 5.9 23083 4290 18793 70 4200 2.59 5.6 23671 4620 19051 75 4500 2.48 5.4 24284 4950 19334 80 4800 2.38 5.2 24859 5280 19579 85 5100 2.29 5.0 25414 5610 19804 90 5400 2.21 4.8 25968 5940 20028 95 5700 2.13 4.6 26419 6270 20149 100 6000 2.06 4.5 26895 6600 20295 105 6300 2.00 4.4 27418 6930 20488 110 6600 1.94 4.2 27862 7260 20602 115 6900 1.89 4.1 28377 7590 20787 120 7200 1.84 4.0 28828 7920 20908 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 12/6/2016 1:22 PM D:\Projects\1284-001\Drainage\Detention\1284-001_Detention Pond A.xlsx\FAA_CoFC idf_Pond 1 1284-001 Fort Collins Co S. Thomas Date: 12/6/2016 Pond No.: Pond A 8 100-yr 0.49 acft 5006.20 ft. Design Storm WQCV Required Volume= 323 ft 3 5001.37 ft. Contour Elevation (Y- values) Contour Area Depth Column Not Used Incremental Volume Total Volume Total Volume ft 3 ft. ft 3 ft 3 ft 3 acre-feet 5,000.80 95 0.00 0 0 0 0 5,001.00 456 0.20 51 51 0.00 5,001.20 796 0.20 124 174 0.00 5,001.40 1071 0.20 186 360 0.01 5,001.60 1339 0.20 240 600 0.01 5,001.80 1603 0.20 293 894 0.02 5,002.00 1862 0.20 346 1239 0.03 5,002.20 2097 0.20 395 1635 0.04 5,002.40 2293 0.20 438 2073 0.05 5,002.60 2496 0.20 478 2552 0.06 5,002.80 2716 0.20 521 3072 0.07 5,003.00 2943 0.20 565 3637 0.08 5,003.20 3179 0.20 611 4249 0.10 5,003.40 3426 0.20 660 4908 0.11 5,003.60 3681 0.20 710 5618 0.13 5,003.80 3948 0.20 762 6380 0.15 5,004.00 4227 0.20 817 7197 0.17 5,004.20 4516 0.20 873 8070 0.19 5,004.40 4818 0.20 932 9002 0.21 5,004.60 5133 0.20 994 9996 0.23 5,004.80 5466 0.20 1059 11055 0.25 5,005.00 5817 0.20 1127 12182 0.28 5,005.20 6186 0.20 1199 13381 0.31 5,005.40 6577 0.20 1275 14656 0.34 5,005.60 7265 0.20 1382 16038 0.37 5,005.80 8314 0.20 1555 17593 0.40 5,006.00 9377 0.20 1766 19359 0.44 5,006.20 9769 0.20 1913 21272 0.49 5,006.40 10192 0.20 1994 23266 0.53 5,006.60 10723 0.20 2089 25355 0.58 Design Point Design Storm POND A Project: The Village Cooperative of Fort Collins By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 2.560 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 59.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5900 <-- CALCULATED Drain Time (hrs) 12 <-- INPUT Drain Time Coefficient 0.8 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.186 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.040 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Stormtech WQCV (ft 3 ) = 1409 <-- CALCULATED Adjusted WQCV (cu-ft) = 322 <-- CALCULATED (minus Stormtech) WQ Depth (ft) = 0.730 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.035 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/5 <-- INPUT from Figure 5 number of rows = 2 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE October 25, 2016 1008 Project Title Date: Project Number Calcs By: Client Basins 0.8 WQCV = Watershed inches of Runoff (inches) 75.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.240 in A = 1.62 ac V = 0.0323 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) Village Cooperative December 5, 2016 1284-001 S. Thomas Basin A1-A7, A9-A10 1409 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event 0.231 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø Vault ID Total Required WQ Volume (cf) Flow, WQ (cfs) Chamber Type Chamber Release Ratea (cfs) Chamber Volumeb (cf) Installed Camber w/ Aggregatec (cf) Mimimum No. of Chambersd Total Release Ratee (cfs) Required Storage Volume by FAA Method (cf) Mimimum No. of Chambersf Storage Provided within the Chambersg (cf) Total Installed System Volumeh (cf) Basin A 1409 2.01 MC-3500 0.010 46.00 178.90 8 0.08 0 0 0 1523 SC-740 a. Release rate per chamber, limited by flow through geotextile with accumulated sediment. b. Volume within chamber only, not accounting for void spaces in surrounding aggregate. c. Volume includes chamber and void spaces (40%) in surrounding aggregate, per chamber unit. d. Number of chambers required to provide full WQCV within total installed system, including aggregate. e. Release rate per chamber times number of chambers. f. Number of chambers required to provide required FAA storage volume stored within the chamber only (no aggregate storage). g. Volume provided in chambers only (no aggregate storage). This number must meet or exceed the required FAA storage volume. h. System volume includes total number of chambers, plus surrounding aggregate. This number must meet or exceed the required WQCV. Chamber Configuration Summary D:\Projects\1284-001\Drainage\WatQual\Basin A WQ Chambers.xlsx APPENDIX B.2 STORM SEWERS APPENDIX B.3 INLETS APPENDIX C EROSION CONTROL REPORT The Village Cooperative of Fort Collins Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX D LID EXHIBIT Project: Village Cooperative Calculations By: Date: L1 A1 785 99% 775 A2 3,181 10% 329 A3 9,336 64% 6,001 A4 4,318 73% 3,141 A5 15,440 90% 13,896 A6 19,046 70% 13,300 A7 1,074 49% 527 A9 15,864 90% 14,278 A10 1,346 48% 643 Total L1 70,390 75% 52,888 1,409 1,523 Total Treated 70,390 75% 52,888 1,409 1,523 A8 21,677 3% 689 UD1 1,117 86% 957 UD2 25,654 13% 3,408 OS1 19,292 60% 11,623 Total Proposed Untreated 67,740 25% 16,677 H2 19,292 49% 9,453 Total Existing Untreated 19,292 49% 9,453 138,130 9,453 69,565 60,112 45,084 1,409 1,523 52,888 52,888 88% PROPOSED LID COMPUTATIONS S. Thomas December 6, 2016 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) Stormtech WQCV Required (Cf) LID TREATMENT SUMMARY PROPOSED LID UNTREATED AREA Total Site Area (sf) PROPOSED LID TREATED AREA LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A X X X X D CABLE VAULT F.O. D ST ST F.O. UD TF X X X X D CABLE VAULT F.O. D ST ST F.O. STRACHAN 3RD OWNER: ARENA I LLC AND ARENA II LLC HORSETOOTH ROAD RIGHT OF WAY VARIES 107.5' TO 108.5' STRACHAN 3RD OWNER: PETERSON-MOORE LLP GREENLEE INVESTMENTS LLLP STRACHAN 1ST OWNER: ASPEN LEAF SPE LLC STANFORD ROAD 98' RIGHT OF WAY A3 A5 A9 A6 A4 A8 A1 A10 A7 A2 UD2 UD1 OS1 PROPOSED CURB INLET AND WATER QUALITY WEIR PROPOSED STORMTECH UNDERGROUND DETENTION AND WATER QUALITY SYSTEM DETENTION POND A LID BASIN L1 TOTAL AREA: 1.62 AC (70,390 SF) APPENDIX E REFERENCES Hydrologic Soil Group—Larimer County Area, Colorado (Village Cooperative of Fort Collins) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/21/2016 Page 1 of 4 4487450 4487480 4487510 4487540 4487570 4487600 4487630 4487450 4487480 4487510 4487540 4487570 4487600 4487630 494020 494050 494080 494110 494140 494170 494200 494230 494260 494290 494020 494050 494080 494110 494140 494170 494200 494230 494260 494290 40° 32' 22'' N 105° 4' 14'' W 40° 32' 22'' N 105° 4' 1'' W 40° 32' 15'' N 105° 4' 14'' W 40° 32' 15'' N 105° 4' 1'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 50 100 200 300 Feet 0 20 40 80 120 Meters Map Scale: 1:1,370 if printed on A landscape (11" x 8.5") sheet. Warning: Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 36 Fort Collins loam, 3 to 5 percent slopes B 0.9 25.2% 49 Heldt clay loam, 3 to 6 percent slopes C 0.3 8.1% 73 Nunn clay loam, 0 to 1 percent slopes C 0.7 18.2% 74 Nunn clay loam, 1 to 3 percent slopes C 1.8 48.6% Totals for Area of Interest 3.6 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Hydrologic Soil Group—Larimer County Area, Colorado Village Cooperative of Fort Collins Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/21/2016 Page 3 of 4 MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT X X X X FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO G G G G G G G G G G G G G G G G G G G SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS D CABLE VAULT ELEC VAULT ELEC ELEC T S VAULT F.O. S S D ST ST S W W W W W W X X X X D CABLE VAULT F.O. D ST ST F.O. UD TF X X X X D CABLE VAULT F.O. D ST ST F.O. 1 2 3 4 5 6 7 8 9 10 DETENTION POND A STRACHAN 3RD OWNER: ARENA I LLC AND ARENA II LLC HORSETOOTH ROAD RIGHT OF WAY VARIES 107.5' TO 108.5' STRACHAN 3RD OWNER: PETERSON-MOORE LLP GREENLEE INVESTMENTS LLLP STRACHAN 1ST OWNER: ASPEN LEAF SPE LLC STANFORD ROAD 78' RIGHT OF WAY A3 A5 A9 A6 A4 A8 A1 A10 A7 A2 UD2 UD1 OS1 PROPOSED CURB INLET PROPOSED DRAIN BASIN PROPOSED CURB INLET PROPOSED CURB INLET BASIN A9 ROOF DRAIN RELEASE TO INLET PROPOSED CURB INLET EXISTING STORM JUNCTION STRUCTURE PROPOSED CURB INLET AND WATER QUALITY WEIR PROPOSED STORMTECH UNDERGROUND DETENTION AND WATER QUALITY SYSTEM PROPOSED OUTLET STRUCTURE BASIN A5 ROOF DRAIN RELEASE TO MANHOLE DR1 DRAINAGE PLAN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner 15 ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR THE VILLAGE COOPERATIVE OF FORT COLLINS" BY NORTHERN ENGINEERING, DATED December 7, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION Sheet Of 15 VILLAGE COOPERATIVE OF FORT COLLINS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com KEYMAP DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 0.02 0.95 1.00 5.0 5.0 0.05 0.18 2 A2 0.07 0.33 0.41 5.0 5.0 0.07 0.30 3 A3 0.21 0.71 0.89 5.0 5.0 0.43 1.90 4 A4 0.10 0.76 0.95 5.0 5.0 0.22 0.94 5 A5 0.35 0.95 1.00 5.0 5.0 0.96 3.53 6 A6 0.44 0.75 0.93 5.9 5.0 0.90 4.06 7 A7 0.02 0.60 0.75 5.0 5.0 0.04 0.18 8 A8 0.50 0.26 0.33 7.7 7.1 0.32 1.44 7 A9 0.36 0.95 1.00 5.0 5.0 0.99 3.62 7 A10 0.03 0.62 0.78 5.0 5.0 0.05 0.24 11 UD1 0.03 0.86 1.00 5.0 5.0 0.06 0.26 11 UD2 0.59 0.35 0.44 5.0 5.0 0.59 2.57 10 OS1 0.44 0.68 0.85 5.8 5.0 0.83 3.76 Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) A 0.50 5006.20 323 5001.37 1.10 W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G FO FO FO FO FO FO FO FO W F 1 .O. H2 H1 STRACHAN 3RD OWNER: ARENA I LLC AND ARENA II LLC HORSETOOTH ROAD RIGHT OF WAY VARIES 107.5' TO 108.5' STRACHAN 3RD OWNER: PETERSON-MOORE LLP GREENLEE INVESTMENTS LLLP STRACHAN 1ST OWNER: ASPEN LEAF SPE LLC STANFORD ROAD 98' RIGHT OF WAY 2 H3 HDR1 HISTORIC DRAINAGE PLAN CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 16 ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR THE VILLAGE COOPERATIVE OF FORT COLLINS BY NORTHERN ENGINEERING, DATED December 7, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION Sheet Of 15 VILLAGE COOPERATIVE OF FORT COLLINS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 H1 2.04 0.25 0.31 19.3 18.0 0.84 3.83 2 H2 0.44 0.60 0.74 5.0 5.0 0.75 3.28 1 H3 0.77 0.25 0.31 10.9 10.4 0.42 1.85 Survey Area Data: Version 10, Sep 22, 2015 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Village Cooperative of Fort Collins) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 10/21/2016 Page 2 of 4 PERCENT IMPERVIOUS: 75% REQUIRED STORMTECH VOLUME: 1,409 CF PROVIDED STORMTECH VOLUME: 1,523 CF LID (LID) EXHIBIT LOW IMPACT DEVELOPMENT CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 15 ( IN FEET ) 0 1 INCH = 40 FEET 40 40 80 120 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER FLOW PATH DRAINAGE BASIN BUBBLE A LID BASIN BOUNDARY PROPOSED STORM SEWER Sheet Of 15 VILLAGE COOPERATIVE OF FORT COLLINS These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com KEYMAP LID TREATMENT LID TREATMENT SUMMARY Total Site Area (sf) 138,130 Total Existing Impervious Area (sf) 9,453 Total Proposed Impervious Area (sf) 69,565 Total Net Proposed Impervious Area (sf) 60,112 75% Required Minimum Area to be Treated by LID measures (sf) 45,084 Stormtech Treatment Total Volume Required (cf) 1,409 Total Volume Provided (cf) 1,523 Area treated by Stormtech (sf) 52,888 Total Treated Impervious Area (sf) 52,888 Percent Impervious Treated by LID measures 88% (sf) Stormtech WQCV Provided (cf) Total Existing Impervious Area (sf) Total Proposed Impervious Area (sf) Total Net Proposed Impervious Area (sf) Total Treated Impervious Area (sf) Percent Impervious Treated by LID measures 75% Required Minimum Area to be Treated by LID measures (sf) Stormtech Treatment Total Volume Required (cf) Total Volume Provided (cf) Area treated by Stormtech (sf) ö ç è = æ 12 hr Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 Q = C f ( C )( i )( A ) 12/6/2016 1:26 PM D:\Projects\1284-001\Drainage\Hydrology\1284-001_Proposed_Rational_Calcs.xlsx\Runoff (min) 100-yr Tc (min) 1 A1 No 0.95 0.95 1.00 57 4.91% 1.2 1.2 0.8 N/A N/A N/A N/A N/A 5.0 5.0 5.0 2 A2 No 0.33 0.33 0.41 29 17.24% 3.0 3.0 2.7 73 0.50% 1.42 0.9 N/A N/A 5.0 5.0 5.0 3 A3 No 0.71 0.71 0.89 98 3.10% 4.9 4.9 2.7 N/A N/A N/A N/A N/A 5.0 5.0 5.0 4 A4 No 0.76 0.76 0.95 67 2.67% 3.7 3.7 1.6 15 0.60% 1.55 0.2 N/A N/A 5.0 5.0 5.0 5 A5 No 0.95 0.95 1.00 58 2.00% 1.7 1.7 1.1 N/A N/A N/A N/A N/A 5.0 5.0 5.0 6 A6 No 0.75 0.75 0.93 89 2.73% 4.5 4.5 2.1 251 2.06% 2.87 1.5 N/A N/A 5.9 5.9 5.0 7 A7 No 0.60 0.60 0.75 17 16.88% 1.5 1.5 1.1 30 5.67% 4.76 0.1 N/A N/A 5.0 5.0 5.0 8 A8 No 0.26 0.26 0.33 120 10.99% 7.7 7.7 7.1 N/A N/A N/A N/A N/A 7.7 7.7 7.1 7 A9 No 0.95 0.95 1.00 58 2.00% 1.7 1.7 1.1 N/A N/A N/A N/A N/A 5.0 5.0 5.0 7 A10 No 0.62 0.62 0.78 32 6.25% 2.7 2.7 1.9 N/A N/A N/A N/A N/A 5.0 5.0 5.0 11 UD1 No 0.86 0.86 1.00 41 6.63% 1.5 1.5 0.6 352 3.38% 3.67 1.6 N/A N/A 5.0 5.0 5.0 11 UD2 No 0.35 0.35 0.44 50 17.18% 3.8 3.8 3.4 251 3.14% 3.55 1.2 N/A N/A 5.0 5.0 5.0 10 OS1 No 0.68 0.68 0.85 24 4.67% 2.3 2.3 1.4 484 1.34% 2.32 3.5 N/A N/A 5.8 5.8 5.0 11 TOTAL UNDETAINED BASINS (UD1- UD2) No 0.37 0.37 0.47 43 5.28% 5.1 5.1 4.5 484 1.34% 2.32 3.5 N/A N/A 5.8 5.8 5.0 8 TOTAL TO POND A (A1-A10, OS1) No 0.68 0.68 0.85 98 3.10% 5.3 5.3 3.1 389 0.54% 1.47 4.4 N/A N/A 9.7 9.7 7.5 TOTAL TO STORMTECH (A1- A7, A9-A10) No 0.81 0.81 1.00 98 3.10% 3.7 3.7 1.3 389 0.54% 1.47 4.4 N/A N/A 8.1 8.1 5.7 PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas December 6, 2016 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/6/2016 1:26 PM D:\Projects\1284-001\Drainage\Hydrology\1284-001_Proposed_Rational_Calcs.xlsx\Tc A4 0.10 0.07 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.027 0.76 0.76 0.95 73% A5 0.35 0.00 0.00 0.00 0.35 Clayey | Average 2% to 7% 0.000 0.95 0.95 1.00 90% A6 0.44 0.26 0.05 0.00 0.00 Clayey | Average 2% to 7% 0.127 0.75 0.75 0.93 70% A7 0.02 0.01 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.012 0.60 0.60 0.75 49% A8 0.50 0.00 0.00 0.04 0.00 Clayey | Average 2% to 7% 0.459 0.26 0.26 0.33 3% A9 0.36 0.00 0.00 0.00 0.36 Clayey | Average 2% to 7% 0.000 0.95 0.95 1.00 90% A10 0.03 0.00 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.015 0.62 0.62 0.78 48% UD1 0.03 0.02 0.01 0.00 0.00 Clayey | Average 2% to 7% 0.003 0.86 0.86 1.00 86% UD2 0.59 0.01 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.504 0.35 0.35 0.44 13% OS1 0.44 0.20 0.07 0.00 0.00 Clayey | Average 2% to 7% 0.169 0.68 0.68 0.85 60% TOTAL UNDETAINED BASINS (UD1-UD2) 0.61 0.03 0.08 0.00 0.00 Clayey | Average 2% to 7% 0.507 0.37 0.37 0.47 16% TOTAL TO POND A (A1-A10, OS1) 2.56 0.66 0.20 0.04 0.72 Clayey | Average 2% to 7% 0.945 0.68 0.68 0.85 59% TOTAL ON-SITE BASINS (A1- A9,UD1-UD3) 2.73 0.49 0.20 0.04 0.72 Clayey | Average 2% to 7% 1.283 0.61 0.61 0.77 49% TOTAL TO STORMTECH (A1-A7, A9-A10) 1.62 0.46 0.12 0.00 0.72 Clayey | Average 2% to 7% 0.303 0.81 0.81 1.00 75% TOTAL SITE 3.17 0.69 0.27 0.04 0.72 Clayey | Average 2% to 7% 1.452 0.62 0.62 0.78 50% Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/6/2016 1:26 PM D:\Projects\1284-001\Drainage\Hydrology\1284-001_Proposed_Rational_Calcs.xlsx\Composite C S. Thomas December 6, 2016 Design Point Sub-Basin Overland Flow Gutter/Pipe Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/6/2016 1:29 PM D:\Projects\1284-001\Drainage\Hydrology\1284-001_Existing_Rational_Calcs.xlsx\Tc H2 0.44 0.20 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.224 0.60 0.60 0.74 49% H3 0.77 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.767 0.25 0.25 0.31 0% TOTAL SITE 3.25 0.20 0.02 0.00 0.00 Clayey | Average 2% to 7% 3.032 0.30 0.30 0.37 7% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/6/2016 1:28 PM D:\Projects\1284-001\Drainage\Hydrology\1284-001_Existing_Rational_Calcs.xlsx\Composite C WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) A 0.50 5006.20 323 5001.37 1.10