HomeMy WebLinkAboutVILLAGE COOPERATIVE FORT COLLINS - FDP - FDP170009 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number: 1284-001 Location: Fort Collins, CO
Date: February 22, 2017 Total Acres: 2.81
EROSION CONTROL MEASURE Units
Estimated
Quantity
Unit
Price
Total
Price
each 9 $350.00 $3,150.00
Outlet Protection each 1 $500.00 $500.00
LF 55 $5.00 $275.00
Silt Fence LF 1004 $2.00 $2,008.00
Turf Reinforcement Mat each 2 $200.00 $400.00
each 1 $1,300.00 $1,300.00
each 1 $1,200.00 $1,200.00
Erosion Control Blanket sq. yd. 1528 $10.00 $15,280.00
acre 1.2 $1,000.00 $1,200.00
TOTAL = $25,313.00
TOTAL = $37,969.50
TOTAL = $4,215.00
REQUIRED AMOUNT OF SECURITY = $37,969.50
NOTE: 'Total Acres' represents total disturbed area.
Concrete Washout Area
Straw Wattles
- OR -
COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5
(WHICHEVER IS GREATER)
The Village Cooperative of Fort Collins
Erosion Control Cost Estimate
Vehicle Tracking Control Pads
AMOUNT OF SECURITY = 1.5 x $25,313.00
Vegetate Landscaped Areas
Inlet Protection
=
=
D:\Projects\1284-001\Drainage\Erosion\1284-001_Erosion-Escrow-Estimate.xls