Loading...
HomeMy WebLinkAboutVILLAGE COOPERATIVE FORT COLLINS - FDP - FDP170009 - SUBMITTAL DOCUMENTS - ROUND 1 - EROSION CONTROL LETTER/REPORTProject Number: 1284-001 Location: Fort Collins, CO Date: February 22, 2017 Total Acres: 2.81 EROSION CONTROL MEASURE Units Estimated Quantity Unit Price Total Price each 9 $350.00 $3,150.00 Outlet Protection each 1 $500.00 $500.00 LF 55 $5.00 $275.00 Silt Fence LF 1004 $2.00 $2,008.00 Turf Reinforcement Mat each 2 $200.00 $400.00 each 1 $1,300.00 $1,300.00 each 1 $1,200.00 $1,200.00 Erosion Control Blanket sq. yd. 1528 $10.00 $15,280.00 acre 1.2 $1,000.00 $1,200.00 TOTAL = $25,313.00 TOTAL = $37,969.50 TOTAL = $4,215.00 REQUIRED AMOUNT OF SECURITY = $37,969.50 NOTE: 'Total Acres' represents total disturbed area. Concrete Washout Area Straw Wattles - OR - COST TO VEGETATE: TOTAL ACRES x ($1000/acre) x 1.5 (WHICHEVER IS GREATER) The Village Cooperative of Fort Collins Erosion Control Cost Estimate Vehicle Tracking Control Pads AMOUNT OF SECURITY = 1.5 x $25,313.00 Vegetate Landscaped Areas Inlet Protection = = D:\Projects\1284-001\Drainage\Erosion\1284-001_Erosion-Escrow-Estimate.xls