HomeMy WebLinkAboutALTA VISTA (903 BUCKINGHAM ST.) WTF - PDP - PDP160028 - DECISION - FINDINGS, CONCLUSIONS & DECISION1
CITY OF FORT COLLINS
TYPE 1 ADMINISTRATIVE HEARING
FINDINGS AND DECISION
HEARING DATE: January 5, 2017
PROJECT NAME: Alta Vista Project Development Plan
CASE NUMBER: PDP #160028
APPLICANT: Caleb Crossland
4450 Arapahoe Ave., Suite 100
Boulder, CO 80303
OWNER: Colorado Iron and Metal, Inc.
903 Buckingham St.
Fort Collins, CO 80524
HEARING OFFICER: Marcus A. McAskin
PROJECT DESCRIPTION: This is an application filed by Atlas Tower Companies (“Applicant”)
for a Project Development Plan to build a telecommunications tower housed within a 2,000 sq. ft.
wireless facility on a portion of the property located at 903 Buckingham Street (the “Subject
Property”). The proposed tower and facility is proposed to be used for structural support of up to
three wireless providers. The Subject Property is located in the Industrial District (I) and is owned
of record by Colorado Iron and Metal, Inc. City Staff is recommending approval of the Application.
BACKGROUND: Earlier in 2016, the Applicant brought forward a Project Development Plan
(PDP #160004), for a wireless tower at this site located on the Subject Property. In the prior
application, the Applicant proposed an 80’ tower disguised as a grain silo with a round cap to be
painted white. By written decision dated August 16, 2016, the Hearing Officer denied the prior
application project citing the height and design of the tower. The current submittal proposes a 68’
tower disguised as a silo with no round cap (12’ shorter than the prior submittal).
The surrounding zoning and land uses are set forth below:
Direction Zone District Existing Land Uses
North Industrial (I) Brewery, institutional
South Industrial (I) Brewery, storage, light industrial
East Industrial (I) Warehouse, vacant
West
Industrial (I), Low Density
Residential (RL)
Vacant, single-family detached residential
2
SUMMARY OF DECISION: Approved.
ZONE DISTRICT: Industrial (I).
HEARING: The Hearing Officer opened the hearing on Thursday, January 5, 2017, in Conference
Rooms A-D, 281 North College Avenue, Fort Collins, Colorado at approximately 5:30 PM,
following the conclusion of the hearing on the Jefferson and Linden Project Development Plan (PDP
# 160030).
EVIDENCE: Prior to or at the hearing, the Hearing Officer accepted the following documents as
part of the record of this proceeding:
1. Project Zoning and Site Vicinity Map.
2. Planning Department Staff Report prepared for Alta Vista Wireless
Telecommunications Facility (PDP #160028). A copy of the Staff Report is attached
to this decision as ATTACHMENT A and is incorporated herein by reference.
3. Alta Vista Wireless Telecommunications Facility Planning Document Set (including
title sheet, general notes, site plan and compound detail, tower elevation and fence
details.
4. PowerPoint presentation prepared by City Staff for the January 5, 2017 public
hearing.
5. PowerPoint presentation prepared by the Applicant for the public hearing.
6. Affidavit of Publication dated December 29, 2016, evidencing proof of publication
of Notice of Hearing in the Fort Collins Coloradan on December 29, 2016.
7. Notice of Public Hearing dated December 22, 2016.
8. The City’s Comprehensive Plan, Code, and the formally promulgated polices of the
City are all considered part of the record considered by the Hearing Officer.
TESTIMONY: The following persons testified at the hearing:
From the City: Clay Frickey, City Planner
From the Applicant: Caleb Crossland
4450 Arapahoe Ave., Suite 100
Boulder, CO 80303
From the Public: None
FINDINGS
1. Evidence presented to the Hearing Officer established the fact that notice of the public
hearing was properly posted, mailed and published.
3
2. Based on testimony provided at the public hearing and a review of the materials in the record
of this case, the Hearing Officer concludes as follows:
A. The Project Development Plan/Final Plan complies with the process located in
Division 2.2 – Common Development Review Procedures for Development
Applications of Article 2 – Administration;
B. The Project Development Plan/Final Plan complies with relevant standards of
Article 3 – General Development Standards, including Section 3.8.13(C)(2) of the
Code, which requires, in relevant part, that wireless telecommunication facilities
“shall be consistent with the architectural style of the surrounding architectural
environment (planned or existing) considering exterior materials, roof form, scale,
mass, color, texture and character” and that evidence presented to the Hearing
Officer sufficiently demonstrated that the proposed Alta Vista Telecommunications
Facility is consistent with similar silo-shaped structures located at 725 E. Vine Street,
500 Linden Street, 800 E. Lincoln Avenue and 546 Willow Street, all of which are
located within one-quarter to one-half mile from the Subject Property;
C. The Project Development Plan/Final Plan complies with relevant standards located
in Division 4.28, Industrial (I) of Article 4 – Districts.
3. The Application’s satisfaction of the applicable Article 2, 3 and 4 requirements of the Land
Use Code is sufficiently detailed in the Staff Report, a copy of which is attached as
ATTACHMENT A and is incorporated herein by reference.
DECISION
Based on the findings set forth above, the Hearing Officer hereby approves PDP #160028 for the
Alta Vista Telecommunications Facility.
DATED this 10th day of January, 2017.
___________________________________
Marcus A. McAskin
Hearing Officer
4
ATTACHMENT A
Staff Report
Alta VistaWireless Telecommunications Facility
(PDP# 160028)
ITEM NO 1
MEETING DATE Jan. 5, 2017
STAFF Clay Frickey
ADMINISTRATIVE HEARING OFFICER
Planning Services 281 N College Ave – PO Box 580 – Fort Collins, CO 80522-0580
fcgov.com/developmentreview/ 970.221.6750
PROJECT: Alta Vista, PDP160028
APPLICANT: Caleb Crossland
4450 Arapahoe Ave.
Suite 100
Boulder, CO 80303
OWNERS: Colorado Iron and Metal, Inc.
903 Buckingham St.
Fort Collins, CO 80524
PROJECT DESCRIPTION:
This is a request for a Project Development Plan to build a telecommunications tower
housed within a 2,000 sq. ft. wireless facility. This facility will provide critical wireless
coverage to the surrounding area. This is a developing industrial and residential area
where coverage is reaching its capacity limits and there is a growing need for advanced
quality voice and data services. This tower and facility will be used for structural
support of up to three wireless providers. Each provider will install antennas and on-
the-ground base station equipment. The site is located in the Industrial (I) zone district.
RECOMMENDATION: Staff recommends approval of Alta Vista, PDP160028.
EXECUTIVE SUMMARY:
Staff finds the proposed Alta Vista Project Development Plan complies with the
applicable requirements of the City of Fort Collins Land Use Code (LUC), more
specifically:
The Project Development Plan/Final Plan complies with the process located in
Division 2.2 – Common Development Review Procedures for Development
Applications of Article 2 – Administration.
The Project Development Plan/Final Plan complies with relevant standards of
Article 3 – General Development Standards.
Staff Report – Alta Vista – PDP160028
Administrative Hearing 01-05-2017
Page 2
The Project Development Plan/Final Plan complies with relevant standards
located in Division 4.28, Industrial (I) of Article 4 – Districts.
COMMENTS:
1. Background
The property was annexed into the City as part of the Northeast Consolidated
Annexation in June, 1974. The land sat vacant until 1998 when Vanworks built a
warehouse on the site. In 2008, Colorado Iron and Metal moved their operation to 903
Buckingham. Colorado Iron and Metal filed for a replat in 2012 to obtain the parcel to
the west. A hearing officer approved this replat in 2012. Following the replat, Colorado
Iron and Metal submitted the Colorado Iron and Metal Second Filing to expand their
operation onto the newly acquired parcel. Colorado Iron and Metal Second Filing was
approved in 2013 with the final documents recorded with the City on August 5, 2013.
Since recording their final documents, Colorado Iron and Metal has yet to install any of
the necessary public infrastructure to obtain vesting for their development.
Earlier in 2016, the applicant brought forward a Project Development Plan, PDP160004,
for a wireless tower at this site. This applicant proposed an 80’ tower disguised as a
grain silo with a round cap to be painted white. The hearing officer denied this project
citing the height and design of the tower.
The surrounding zoning and land uses are as follows:
Direction Zone District Existing Land Uses
North Industrial (I) Brewery, institutional
South Industrial (I) Brewery, storage, light industrial
East Industrial (I) Warehouse, vacant
West
Industrial (I), Low Density Residential
(RL)
Vacant, single-family detached residential
A zoning and site vicinity map is presented on the following page.
Staff Report – Alta Vista – PDP160028
Administrative Hearing 01-05-2017
Page 3
Figure 1: Alta Vista Zoning & Site Vicinity Map
Staff Report – Alta Vista – PDP160028
Administrative Hearing 01-05-2017
Page 4
2. Compliance with Article 2 of the Land Use Code – Administration
The project complies with all applicable Administrative procedures as follows:
A. Section 2.2.11(D)(9) – Post Denial Re-submittal Delay
Projects denied by a hearing officer may not be re-submitted for a period
of 6 months from the final decision unless the Director determines that the
new plan includes substantial changes in land use, residential density,
and/or non-residential intensity. The new tower is 12’ shorter than
previously proposed, the tower no longer has a cap to enhance
compatibility, and the tower will use a different color to better blend into
the surrounding area. The Director determined these changes constituted
a substantial change in non-residential intensity and was eligible for re-
submittal.
3. Compliance with Article 3 of the Land Use Code – General Development
Standards:
The project complies with all applicable General Development Standards as
follows:
A. Section 3.8.13(C)(1) – Setbacks
For wireless towers, the setback of the facility from the property line shall
be 1 foot for every foot of height unless it can be demonstrated the
structure will collapse rather than topple. The proposed tower is designed
to collapse rather than topple, which exempts the tower from this
standard.
B. Section 3.8.13(C)(2) – Wireless Telecommunications Facilities
Wireless telecommunications facilities should be consistent with the
architectural character of the surrounding environment. If the wireless
telecommunications facility is an accessory use, the facility should be
constructed out of materials equal to or better than the materials of the
principal use. Since this facility will be located on the Colorado Iron and
Metal site, this will be considered an accessory use. Colorado Iron and
Metal is housed in a tan colored building constructed out of metal. The
building features a synthetic stone wainscot with a subtly pitched, metal
roof. The proposed wireless tower will be a 68’ tall silo built out of a
Staff Report – Alta Vista – PDP160028
Administrative Hearing 01-05-2017
Page 5
fiberglass material. The silo will be a green color to match closely the
colors of other nearby silos.
At 68’ tall, this tower will be the tallest structure on the Colorado Iron and
Metal Site and adjacent properties. Other silos in the vicinity are 40-50’
tall. The proposed tower, however, will be 12 – 32’ feet shorter than the
Platte River Power Authority transmission lines nearby. The transmission
lines along Lemay Ave. and the north side of New Belgium’s property
range from 80 – 100’ tall. To mitigate for the tower’s height, the proposed
tower will have a significant setback from the right-of-way. The tower will
be over 500’ from the closest right-of-way. Since the tower is so far on the
interior of the site, the visual impact of the tower will be minimized.
C. Section 3.8.13(C)(3) – Wireless Telecommunications Equipment
Wireless telecommunications equipment shall be the same color as the
tower, be mounted as flush as possible, and not exceed the height of the
structure it is mounted to by 15’. Ground equipment must also be
screened in a manner compatible with the building’s design, color, and
material. All of the antennae for this tower will be housed inside the
fiberglass silo so they will be completely screened and will not exceed the
height of the tower. The ground equipment will be screened by a wood
fence.
D. Section 3.8.13(C)(4) – Landscaping
In certain instances, ground equipment must be screened through
landscaping if no other screening method is employed. For this tower, the
site plan shows a wood fence that will provide screening for the ground
equipment. As such, this proposal is exempt from this standard.
E. Section 3.8.13(C)(5) – Fencing
When fences are used for screening, the fence must be built of wood,
masonry, stucco, or other acceptable, opaque materials. The fence may
not exceed 6 in height’. The proposed fence will be built from wood and
will not be taller than 6’
Staff Report – Alta Vista – PDP160028
Administrative Hearing 01-05-2017
Page 6
F. Section 3.8.13(C)(8) – Color
All wireless telecommunications facilities shall be painted to match as
closely as possible the surrounding built environment. The proposed color
of the tower is green, which will appear similar to the nearby grain silos
employed by New Belgium brewing.
G. Section 3.8.13(C)(15) – Stealth Technology
All wireless facilities must employ stealth technology to mitigate the visual
impact of the tower. In this case, the applicant chose to build a structure
that mimics a grain silo used at one of the nearby breweries.
4. Compliance with Article 4 of the Land Use Code – Division 4.28, Industrial
(I)
The project complies with all applicable Article 4 standards as follows:
A. Section 4.28(B)(1)(a) – Permitted Uses
The proposed use, wireless telecommunications facility, is permitted in the
I zone district and is consistent with the district’s intent to accommodate
uses that are complementary and support work places such as
manufacturing, warehousing, and distributing.
5. Findings of Fact/Conclusion:
In evaluating the request for Alta Vista Wireless Telecommunications Facility
Project Development Plan, Staff makes the following findings of fact:
A. The Project Development Plan/Final Plan complies with process located in
Division 2.2 – Common Development Review Procedures for
Development Applications of Article 2 – Administration.
B. The Project Development Plan/Final Plan complies with relevant
standards of Article 3 – General Development Standards.
C. The Project Development Plan/Final Plan complies with relevant
standards located in Division 4.28, Industrial (I) of Article 4 – Districts.
Staff Report – Alta Vista – PDP160028
Administrative Hearing 01-05-2017
Page 7
RECOMMENDATION:
Staff recommends approval of Alta Vista, PDP160028.
ATTACHMENTS:
1. Zoning & Site Vicinity Map
2. Alta Vista Planning Document Set (including site plan, elevations, and photo
simulations)