Loading...
HomeMy WebLinkAboutMOUNTAIN'S EDGE (FORMERLY 2430 OVERLAND TRAIL - RESIDENTIAL) - PDP - PDP160045 - SUBMITTAL DOCUMENTS - ROUND 2 - DRAINAGE REPORTPRELIMINARY DRAINAGE AND EROSION CONTROL REPORT February 14, 2017 Mountain’s Edge Fort Collins, Colorado Prepared for: Lorson South Land Corp Jeff Mark 212 N. Wahsatch Avenue, Suite 301 Colorado Springs, CO 80903 719-635-3200 Prepared by: 301 N. Howes Street, Suite 100 Fort Collins, Colorado 80521 Phone: 970.221.4158 www.northernengineering.com Project Number: 911-007  This Drainage Report is consciously provided as a PDF. Please consider the environment before printing this document in its entirety. When a hard copy is absolutely necessary, we recommend double-sided printing. RE: Preliminary Drainage and Erosion Control Report for Mountain’s Edge Dear Staff: Northern Engineering is pleased to submit this Preliminary Drainage and Erosion Control Report for your review. This report accompanies Project Development Plan submittal for the proposed Mountain’s Edge development. This report has been prepared in accordance to Fort Collins Stormwater Criteria Manual (FCSCM), and serves to document the stormwater impacts associated with the proposed project. We understand that review by the City is to assure general compliance with standardized criteria contained in the FCSCM. If you should have any questions as you review this report, please feel free to contact us. Sincerely, NORTHERN ENGINEERING SERVICES, INC. Stephanie Thomas, PE Project Engineer Mountain’s Edge Preliminary Drainage Report TABLE OF CONTENTS I. GENERAL LOCATION AND DESCRIPTION ................................................................... 1 A. Location ....................................................................................................................................... 1 B. Description of Property ................................................................................................................ 1 C. Floodplain .................................................................................................................................... 3 II. DRAINAGE BASINS AND SUB-BASINS ....................................................................... 4 A. Major Basin Description ............................................................................................................... 4 B. Sub-Basin Description .................................................................................................................. 4 III. DRAINAGE DESIGN CRITERIA ................................................................................... 5 A. Regulations .................................................................................................................................. 5 B. Four Step Process ........................................................................................................................ 5 C. Development Criteria Reference and Constraints ......................................................................... 6 D. Hydrological Criteria .................................................................................................................... 6 E. Hydraulic Criteria ......................................................................................................................... 6 F. Floodplain Regulations Compliance .............................................................................................. 6 G. Modifications of Criteria .............................................................................................................. 7 IV. DRAINAGE FACILITY DESIGN .................................................................................... 7 A. General Concept .......................................................................................................................... 7 B. Water Quality Treatment ........................................................................................................... 12 C. Specific Details ........................................................................................................................... 12 V. CONCLUSIONS ...................................................................................................... 13 A. Compliance with Standards ........................................................................................................ 13 B. Drainage Concept ...................................................................................................................... 13 References ....................................................................................................................... 14 APPENDICES: APPENDIX A – Hydrologic Computations APPENDIX B – Hydraulic Computations (NOT INCLUDED WITH PDP) B.1 – Detention Ponds and Water Quality B.2 – Storm Sewers (NOT INCLUDED WITH PDP) B.3 – Inlets (NOT INCLUDED WITH PDP) APPENDIX C – Erosion Control Report APPENDIX D – LID Exhibit APPENDIX E - SWMM Modeling APPENDIX F – References Mountain’s Edge Preliminary Drainage Report LIST OF FIGURES: Figure 1 – Aerial Photograph ................................................................................................ 2 Figure 2– Proposed Site Plan ................................................................................................ 3 Figure 3 – Existing Floodplains ............................................................................................. 4 LIST OF TABLES: Table 1 - Historic Rational Basin Summary ............................................................................ 8 Table 2 - Proposed Rational Basin Summary ........................................................................ 10 Table 3 - Detention Pond Summary ..................................................................................... 11 Table 4 - Historic Stormwater Release and Allowable Developed Release.................................. 11 Table 5 - Proposed Stormwater Release ............................................................................... 12 MAP POCKET: HDR1 – Historic Drainage Exhibit DR1 - Drainage Exhibit Mountain’s Edge Preliminary Drainage Report 1 I. GENERAL LOCATION AND DESCRIPTION A. Location 1. Vicinity Map 2. A tract located in the southwest quarter of Section 21, Township 7 North, Range 69 West of the 6th Prime Meridian, City of Fort Collins, County of Larimer, State of Colorado. 3. Bounded to the north by private property, to the west by Overland Trail, to the east by the Brown Farm Subdivision, and to the south by Drake Road. 4. Significant offsite flows are directed into the site through Dixon Creek. Dixon Creek traverses the Mountain’s Edge site within the southern half. Additionally, two existing culverts cross Overland Trail. These culverts convey stormwater runoff from the property to the west. These off-site flows will be conveyed safely to ultimate outfall locations within the Mountain’s Edge site. 5. The Mountain’s Edge property has not been studied with the previous proposals or drainage studies. B. Description of Property 1. The site is approximately 19.67 acres. This acreage includes a portion of the adjacent Overland Trail Right of Way. Mountain’s Edge Preliminary Drainage Report 2 Figure 1 – Aerial Photograph 2. The existing site is generally comprised of vacant land with natural grasses and vegetation. A house, gravel drive, and out-structures exist on the site. Off-site basins include portions of adjacent Overland Trail. 3. The north half of the site is within the Canal Importation Basin. The northern 1/3 of the site slopes to the northern property line. A portion of the center of the site slopes to the east and overland flows across the existing single-family lots. The southern half of the site is located within the Spring Creek Basin and slopes south to the Dixon Creek drainage channel. 4. A report by Soilogic dated June 11, 2015 lists the soils for the area as consisting of silty/clayey sand, gravel, cobble and sandy lean clay ranging from 9 to 15 feet below the ground surface. A Web Soil Survey by the Natural Resources Conservation Service indicates soils are classified as Hydrologic Soil Group B and have a moderate infiltration rate. For this study, the soils were modeled as a Soil Group C with a slow infiltration rate to account for the soil variations within the soil borings. 5. The proposed project site plan is composed of 19 townhome buildings, 17 single-family lots, public local streets, sidewalk, private asphalt drives, and detention ponds. 6. This site will employ water quality features and runoff reduction facilities including rain gardens, minimization of directed connected areas of imperviousness, grass swales with infiltration section, grass buffers, and extended detention basins. Mountain’s Edge Preliminary Drainage Report 3 Figure 2– Proposed Site Plan 7. No existing irrigation facilities are known at this time. 8. The project site has not been a part of any known previous drainage study. C. Floodplain 1. The subject property is not located in a FEMA or City regulatory floodplain. Mountain’s Edge Preliminary Drainage Report 4 Figure 3 – Existing Floodplains II. DRAINAGE BASINS AND SUB-BASINS A. Major Basin Description 1. The Mountain’s Edge project is located within two major drainage basins. The northern half of the site is located within the Canal Importation Basin. The southern half of the site is located within the Spring Creek Basin. B. Sub-Basin Description 1. Historically, the stormwater runoff and off-site flows within the northern half of the site generally flow in two directions. Stormwater runoff in the northern 1/3 of the site generally flows to the northern boundary and is collected within a swale along the access roadway on the adjacent property. Flows are conveyed to a channel in the Brown’s Farm 3rd Subdivision. Stormwater within the remainder of the northern half of the site overland flows across the existing single-family lots along the eastern boundary of the site. 2. Historically, stormwater runoff within the southern half of the site overland flows to the Dixon Creek channel. Once collected in the channel it is conveyed under Drake Road and ultimately outfalling to Spring Creek. 3. The proposed plan will generally detain developed flows and release to the historical Mountain’s Edge Preliminary Drainage Report 5 outfall locations at the historical flow rates. III. DRAINAGE DESIGN CRITERIA A. Regulations There are no optional provisions outside of the FCSCM proposed with the Mountain’s Edge project. B. Four Step Process The overall stormwater management strategy employed with the Mountain’s Edge project utilizes the “Four Step Process” to minimize adverse impacts of urbanization on receiving waters. The following is a description of how the proposed development has incorporated each step. Step 1 – Employ Runoff Reduction Practices Several techniques have been utilized with the proposed development to facilitate the reduction of runoff peaks, volumes, and pollutant loads as the site is developed from the current use by implementing multiple Low Impact Development (LID) strategies including: Preserving natural areas south of the Dixon Creek. Minimizing site disturbance. Proposed smaller private streets will allow for greater open space in the center of the site. This approach allows for a lower percent imperviousness. Providing vegetated open areas throughout the site to reduce the overall impervious area and to minimize directly connected impervious areas (MDCIA). Routing flows, to the extent feasible, through rain gardens, grass-lined channels or grass buffers to provide additional infiltration. Providing on-site detention to increase time of concentration, promote infiltration and reduce loads on existing storm infrastructure. Step 2 – Implement BMPs That Provide a Water Quality Capture Volume (WQCV) with Slow Release The efforts taken in Step 1 will facilitate the reduction of runoff; however, this development will still generate stormwater runoff that will require additional BMPs and water quality. The majority of stormwater runoff from the site will ultimately be intercepted and treated in proposed rain gardens and extended detention basins. Water quality for areas not routed through the rain gardens will be provided within the extended detention basin volume. Step 3 – Stabilize Drainageways This property discharges detained stormwater to an existing drainage channel (Dixon Creek). The proposed release from this property is expected to require erosion control mats to stabilize the drainage way at the proposed pipe outfalls. Additionally, any proposed 4:1 grading will be required to be stabilized with erosion control blankets along the Dixon Creek. The majority of the Dixon Creek channel will remain undisturbed. Step 4 – Implement Site Specific and Other Source Control BMPs. The proposed project will improve upon site specific source controls compared to historic conditions: Trash receptacles within home will allow for the disposal of solid waste. Rain Gardens and extended detention basins to provide for water treatment prior to flows being released to existing drainageways and storm infrastructure. Mountain’s Edge Preliminary Drainage Report 6 Standard Operating Procedures (SOPs) for BMP maintenance of Rain Gardens, Detention ponds, and associated drainage infrastructure to remove sediment accumulation regularly. C. Development Criteria Reference and Constraints 1. The proposed site is a part of the Spring Creek and Canal Importation Drainage Basins. This basin requires a 2-year historic stormwater release from the developed property. 2. This site is subject to the LID requirements per the City of Fort Collins. Please see the LID Exhibit located in the Appendix for calculations concerning LID treatment. The site must either have the following: 75% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP, or 50% of total new impervious areas must be treated through an LID (Low Impact Development) treatment BMP and 25% of new pavement shall be pervious. D. Hydrological Criteria 1. The City of Fort Collins Rainfall Intensity-Duration-Frequency Curves, as depicted in Figure RA-16 of the FCSCM, serve as the source for all hydrologic computations associated with the development. Tabulated data contained in Table RA-7 has been utilized for Rational Method runoff calculations. 2. The Rational Method has been employed to compute stormwater runoff utilizing coefficients contained in Tables RO-11 and RO-12 of the FCSCM. 3. Modified FAA Method calculations were utilized for detention storage calculations. 4. Three separate design storms have been utilized to address distinct drainage scenarios. The first event analyzed is the “Minor,” or “Initial” Storm, which has a 2- year recurrence interval. The second event considered is the “Major Storm,” which has a 100-year recurrence interval. The third storm computed, for comparison purposes only, is the 10-year event. 5. No other assumptions or calculation methods have been used with this development that are not referenced by current City of Fort Collins criteria. E. Hydraulic Criteria 1. As previously noted, the subject property historically drains to the north and south. 2. All drainage facilities proposed with the Mountain’s Edge project are designed in accordance with criteria outlined in the FCSCM and/or the Urban Drainage and Flood Control District’s (UDFCD) Urban Storm Drainage Criteria Manual. 3. As stated previously, the subject property is not located within a FEMA regulatory floodplain. 4. The Mountain’s Edge project does not propose to modify any natural drainageways. F. Floodplain Regulations Compliance 1. As previously mentioned, all structures are located outside of any FEMA 100-year floodplain, and thus are not subject to any floodplain regulations. Mountain’s Edge Preliminary Drainage Report 7 G. Modifications of Criteria 1. The proposed development is not requesting any modifications to criteria at this time. IV. DRAINAGE FACILITY DESIGN A. General Concept 1. The main objectives of the Mountain’s Edge drainage design are to maintain the allowable storm runoffs as outlined within both the Spring Creek and Canal Importation Basin master plans, and to maintain the historic discharge locations. 2. Per the development guidelines, half of any existing adjacent roadway is required to be detained and treated on-site, as is feasible and reasonable. With this development, half of Overland Trail (north of Bluegrass) is proposed to be detained and treated within the Mountain’s Edge project. Overland Trail (south of Bluegrass) and Drake Road are adjacent to the site, but are not adjacent to the planned development. As such, detention and treatment of these areas will be significantly challenging. In order to meet this guideline, extensive storm infrastructure and disturbance of existing vegetation would be required. With this in mind, these areas of Overland Trail (south of Bluegrass) and Drake Road are not proposed to be detained and treated on the Mountain’s Edge site. 3. A list of tables and figures used within this report can be found in the Table of Contents at the front of the document. The tables and figures are located within the sections to which the content best applies. 4. Historic runoff from the Mountain’s Edge project site was evaluated. This evaluation provided the historic 2-yr and 100-yr peak runoff rates for the existing site and historic discharge locations. Basin HA Basin HA is generally the southern half of the property. Stormwater within this portion of the existing property generally flows via overland to Dixon Creek, from there it is conveyed to Spring Creek through existing drainage infrastructure. Basin HA is within the Spring Creek Basin. Basin HA was subdivided into 3 sub-basins to further aid in design. Basin HA1 contains the area of the site that will remain mostly undisturbed and pervious. This area includes Dixon Creek. Basin HA2 contains area north of Dixon Creek that will be developed with this project. Basin HA3 contains existing Overland Trail Right of Way proposed to be detained and treated with this project. Basin HB Basin HB is generally the northern half of the property. Stormwater within this portion of the existing property generally flows via overland the existing single-family development or to a swale adjacent the existing access road, north of the property boundary. These stormwater flows are conveyed through existing drainage infrastructure to the detention ponds within the Brown’s Farm Subdivision. Basin HB is within the Canal Importation Basin. Mountain’s Edge Preliminary Drainage Report 8 Basin HB was subdivided into 3 sub-basins to further aid in design. Basin HB1 contains the northern 1/3 of the property. This area generally drains to the northern property line and is collected in a swale along the off-site access road. From there, flows are conveyed to a City owned and maintained drainage easement through the Brown’s Farm Subdivision. Basin HB2 contains existing Overland Trail Right of Way proposed to be detained and treated with this project. Basin HB3 contains a portion of the property that generally flows via overland to the eastern boundary. Stormwater from this location historically flows through the adjacent single-family lots to Compass Court. Table 1 - Historic Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 HA1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 1 HA2 4.18 0.25 0.31 31.8 29.9 1.31 5.95 1 HA3 0.33 0.57 0.71 24.0 19.4 0.27 1.33 2 HB1 5.60 0.25 0.31 21.4 20.3 2.18 9.80 2 HB2 0.47 0.57 0.71 15.9 13.5 0.49 2.29 3 HB3 4.66 0.25 0.31 37.2 34.5 1.32 6.06 5. The Mountain’s Edge project divided the site into six (6) major drainage basins, designated as Basins A, B, C, D, OS and UD. The drainage patterns anticipated for each basin and sub-basin are further described below. Basin A Basin A consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 1. Basin A is subdivided into 3 sub-basins (A1-A3). Runoff from Basins A1-A3 is detained in Detention Pond 1. Stormwater runoff within Basin A2 is treated for water quality and LID in Rain Garden 1. Stormwater runoff from Basin A1 and A3 is treated for water quality within Detention Pond 1. LID treatment for Basin A3 is provided through grass swales with infiltration section. Basin B Basin B consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 2. Basin B is subdivided into 5 sub-basins (B1-B5). Runoff from Basins B1-B5 is detained in Detention Pond 2. Stormwater runoff for Basins B1-B5 will be treated for water quality within Detention Pond 2. Stormwater runoff from Basins B1, B2 and B5 is treated for LID through grass-lined swales with infiltration section. Off-site stormwater from Basin OS2 is conveyed in an existing culvert under Overland Trail. These flows will be passed safely through Basin B1and Detention Pond 2 undetained. Mountain’s Edge Preliminary Drainage Report 9 Basin C Basin C consists of proposed single-family attached buildings, sidewalk, roadways, landscape areas and Detention Pond 3. Basin C is subdivided into 2 sub-basins (C1- C2). Runoff from Basins C1-C2 is detained in Detention Pond 3. Stormwater runoff for Basins C1-C2 will be treated for water quality within Detention Pond 3. Basin C2 will be treated for LID with grass swales with infiltration section. Off-site stormwater from an existing culvert under Overland Trail, within Basin C1, will be safely routed through Detention Pond 3 undetained. The off-site basin contributing to this culvert is relatively small and contributions to any proposed storm infrastructure is expected to be minimal. Basin D Basin D consists of proposed single-family attached buildings, single-family lots, sidewalk, roadways, landscape areas and Detention Pond 4. Basin D is subdivided into 5 sub-basins (D1-D5). Runoff from Basins D1-D5 is detained in Detention Pond 4. Stormwater runoff for Basins D1-D5 will be treated for water quality and LID within Rain Garden 2. No additional water quality treatment is planned within Detention Pond 4. Basin UD Basin UD1 consists of proposed sidewalk and roadways. Runoff from Basin UD1 will not be detained. Stormwater runoff for Basin UD1 generally will be conveyed through existing roadways within the Brown’s Farm Subdivision. No LID treatment is planned for Basin UD1. Basin UD2 consists of open space and Dixon Creek. No detention is proposed for this basin as it is not being developed and generally will remain undisturbed. Minor grading is proposed within this basin. Basin OS Basin OS1 is an off-site basin that consists of the existing drive-in theater. This basin is generally a dirt parking lot with a paved access drive. Existing stormwater flows from this site are directed toward the back lots lines of the Brown’s Farm Subdivsion. An improved drainage channel is shown along the back lot lines in order to direct off- site flows to the existing drainage channel on within Brown’s Farm. Basin OS2 is an off-site basin west of Overland Trail. This basin stretches to west to Horsetooth Reservoir. Based on existing topography, this basin was determined to be approximately 14.7 acres. During a 100-year event, stormwater from this basin will be conveyed to a culvert passing under Overland Trail within Basin B1. A SWMM model was utilized to determine the maximum flow that would pass through the existing culvert during a 100-year event. The maximum flow was determined to be 16.2 cfs with ponding west of Overland Trail. This flow will be safely passed through Basin B and Detention Pond 2. Basin OS3 is an off-site basin west of Overland Trail. This basin stretches to west to the Dixon Creek Reservoir. This off-site basin contributes to Dixon Creek. Based on the Fort Collins SWMM model for the Spring Creek Basin, this basin was determined to be approximately 72.2 acres minus 8.58 acres of historic on-site basin, for a total 63.62 acres. During a 100-year event, stormwater from this basin will be conveyed Mountain’s Edge Preliminary Drainage Report 10 to an existing 18” culvert passing under Overland Trail within Basin UD2. The full 100-year flow is restricted by the 18” culvert and stormwater will pool west of Overland Trail. At a depth approximately 6 feet above the culvert invert, the water will bypass the culvert and continue south down a roadside swale on the west side of Overland Trail. A SWMM model was utilized to determine the maximum flow that would pass through the existing culvert during a 100-year event. The maximum flow was determined to be 22.0 cfs with 18 cfs continuing south along Overland Trail. Table 2 - Proposed Rational Basin Summary DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 1.74 0.64 0.80 7.3 5.6 2.81 13.43 2 A2 2.24 0.75 0.94 5.0 5.0 4.80 20.96 3 A3 1.46 0.39 0.49 10.1 9.3 1.26 5.73 4 B1 0.47 0.83 1.00 6.2 5.0 1.03 4.63 5 B2 0.57 0.57 0.71 6.2 5.3 0.86 4.01 6 B3 1.27 0.84 1.00 5.0 5.0 3.04 12.67 7 B4 0.23 0.65 0.81 6.1 5.0 0.39 1.83 8 B5 1.31 0.28 0.35 12.6 11.9 0.74 3.35 9 C1 0.36 0.65 0.81 5.0 5.0 0.67 2.91 10 C2 0.48 0.40 0.50 6.1 5.4 0.52 2.40 11 D1 0.33 0.85 1.00 5.9 5.0 0.76 3.24 11 D2 1.71 0.67 0.84 5.0 5.0 3.28 14.34 12 D3 0.98 0.72 0.90 6.3 5.0 1.87 8.73 13 D4 0.66 0.59 0.73 5.1 5.0 1.10 4.81 14 D5 1.38 0.36 0.45 9.9 9.2 1.11 4.92 15 UD1 0.05 0.85 1.00 5.0 5.0 0.13 0.52 16 UD2 4.07 0.26 0.33 14.2 13.7 2.04 9.07 17 OS1 17.23 0.32 0.40 36.2 32.5 6.34 29.84 18 OS2 14.72 0.32 0.40 23.7 23.2 6.95 30.62 6. Four (4) detention ponds are proposed with the Mountain’s Edge development. These ponds will restrict all runoff from the site to historic 2-yr flowrate based on the master drainage basins, Spring Creek Basin and Canal Importation Basin. Detention Pond 1 Detention Pond 1 detains developed runoff from Basin A. Detention Pond 1 has a total 3.34 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. Additionally, the emergency spill location is 1.58 feet below the lowest proposed top of foundation. Water Quality is proposed within the pond volume through an approved outlet structure. Detention Pond 2 Detention Pond 2 detains developed runoff from Basin B. All minimum opening Mountain’s Edge Preliminary Drainage Report 11 Detention Pond 3 Detention Pond 3 detains developed runoff from Basin C. Detention Pond 3 has a total 3.05 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. The emergency spill for Pond 3 will be directed through an emergency spill weir designed with final design. Water Quality is proposed within the pond volume through an approved outlet structure. Additionally, Pond 3 will be designed to pass off-site flow safely through the pond undetained. Detention Pond 4 Detention Pond 4 detains developed runoff from Basin D. Detention Pond 4 has a total 2.33 feet of freeboard from the 100-yr WSEL to the lowest proposed top of foundation. The emergency spill for Pond 4 will be directed through an emergency spill weir designed with final design. Water Quality is provided upstream of the detention pond within Rain Garden 2. Table 3 - Detention Pond Summary Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) 1 1.30 5144.99 2,506 5142.41 0.20 2 0.47 5138.97 2,991 5136.89 3.40 3 0.14 5145.23 495 5143.13 0.20 4 1.00 5142.43 n/a n/a 0.80 Total Stormwater Release from Site The total allowable 100-yr release from the site was evaluated based on historic Basins HA and HB. These basins correlate with the Spring Creek Basin and Canal Importation Basin, respectively. The allowable release for the Spring Creek Basin is a summation of the 100-yr historic runoff from Basin HA1 and the 2-yr historic runoff from Basins HA2 and HA3. The allowable release for the Canal Importation Basin is a summation of the 2-yr historic runoff from Basins HB1-HB3. Table 4 - Historic Stormwater Release and Allowable Developed Release Historic Stormwater Release Allowable Developed 100- yr Release (cfs) Pond/ Basin 2-yr Flow (cfs) 100-yr Flow (cfs) HA1 1.96 8.68 8.68 HA2 1.31 5.95 1.31 HA3 0.27 1.33 0.27 TOTAL BASIN HA 3.54 15.96 10.26 HB1 2.18 9.80 2.18 HB2 0.49 2.29 0.49 HB3 1.32 6.06 1.32 TOTAL BASIN HB 3.99 18.15 3.99 Mountain’s Edge Preliminary Drainage Report 12 Total developed 100-yr release in to the Spring Creek Basin (Historic Basin HA) is a summation of the release rates from Ponds 1, 3, and 4, and the 100-yr flowrate for Basin UD2. Total developed 100-yr release in to the Canal Importation Basin (Historic Basin HB) is a summation of the release rate from Pond 2, and the 100-yr flowrate for Basin UD1. Table 5 - Proposed Stormwater Release Proposed Stormwater Release Pond/ Basin 100-yr Flow (cfs) Basin HA Pond 1 0.20 Pond 3 0.20 Pond 4 0.80 Basin UD2 9.07 Total Basin HA 10.27 Basin HB Pond 2 3.40 UD1 0.52 Total Basin HB 3.92 The proposed ponds will generally detain all developed flows from the property to the 2-year historic release for both the Spring Creek and Canal Importation Basins. An additional 0.01 cfs is shown to be released to the Spring Creek Basin. This is considered minimal and is expected to have no negative effects on downstream drainage infrastructure. A full-size copy of the Drainage Exhibit can be found in the Map Pocket at the end of this report. B. Water Quality Treatment 1. A combination of 12-hr Rain Gardens and 40-hr Extended Detention Basins will provide water quality for the site, including a portion of the Overland Trail right of way. 2. Water Quality within the Detention Ponds will be provided through approved outlet structures. C. Specific Details 1. Additional details to be provided with the FDP submittal. Mountain’s Edge Preliminary Drainage Report 13 V. CONCLUSIONS A. Compliance with Standards 1. The drainage design proposed with the Mountain’s Edge project complies with the City of Fort Collins’ Stormwater Criteria Manual. 2. The drainage design proposed with the Mountain’s Edge project complies with the City of Fort Collins’ Master Drainage Plan for the Spring Creek Basin and Canal Importation Basin. 3. There are no regulatory floodplains associated with the development. 4. The drainage plan and stormwater management measures proposed with the development are compliant with all applicable State and Federal regulations governing stormwater discharge. 5. The site achieves LID treatment for 72% of total impervious areas. This is 3% less than the requirements set forth by the City of Fort Collins for Low Impact Development (LID). Due to site grading constraints and rules regarding LID treatment of private development within City of Fort Collins Right of Way, full compliance was unable to be achieved. Please see LID Exhibit located in the Appendix. B. Drainage Concept 1. The drainage design proposed with this project will effectively comply with the Fort Collins Master Drainage Plan and will limit any potential damage or erosion associated with its stormwater runoff. All existing downstream drainage facilities are expected to not be impacted negatively by this development 2. The drainage design is anticipated to be very conservative. We have omitted any runoff reduction that will manifest due to infiltration within rain gardens and grass swales. This is currently unable to be calculated with available soils data. Mountain’s Edge Preliminary Drainage Report 14 References 1. Fort Collins Stormwater Criteria Manual, City of Fort Collins, Colorado, as adopted by Ordinance No. 174, 2011, and referenced in Section 26-500 (c) of the City of Fort Collins Municipal Code. 2. Preliminary Geotechnical Subsurface Exploration Report Proposed Single-Family Residential Development Herring Property – 2430 South Overland Trail, Fort Collins, Colorado, June 11, 2015, Soilogic, Inc. (Soilogic Project No. 15-1132). 3. Larimer County Urban Area Street Standards, Adopted January 2, 2001, Repealed and Reenacted, Effective October 1, 2002, Repealed and Reenacted, Effective April 1, 2007. 4. Soils Resource Report for Larimer County Area, Colorado, Natural Resources Conservation Service, United States Department of Agriculture. 5. Urban Storm Drainage Criteria Manual, Volumes 1-3, Urban Drainage and Flood Control District, Wright-McLaughlin Engineers, Denver, Colorado, Revised April 2008. APPENDIX A HYDROLOGIC COMPUTATIONS Mountain's Edge CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Mountain's Edge Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: December 20, 2016 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Pavers…………………………...………………..……………………………………………………………………… 0.40 22% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Pavers (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. HA1 4.07 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.075 0.25 0.25 0.31 0% Mountain's Edge Overland Flow, Time of Concentration: Mountain's Edge Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) 1 HA1 No 0.25 0.25 0.31 87 11.64% 6.5 6.5 6.1 681 0.94% 1.46 7.8 14.3 14.3 13.9 1 HA2 Yes 0.25 0.25 0.31 547 3.21% 25.2 25.2 23.4 583 0.96% 1.47 6.6 31.8 31.8 29.9 1 HA3 Yes 0.57 0.57 0.71 620 2.89% 17.4 17.4 12.8 583 0.96% 1.47 6.6 24.0 24.0 19.4 2 HB1 No 0.25 0.25 0.31 252 5.17% 14.6 14.6 13.5 590 0.94% 1.45 6.8 21.4 21.4 20.3 2 HB2 No 0.57 0.57 0.71 252 5.17% 9.1 9.1 6.7 590 0.94% 1.45 6.8 15.9 15.9 13.5 Mountain's Edge Rational Method Equation: Project: Mountain's Edge Calculations By: Date: Rainfall Intensity: 1 HA1 4.07 14 14 14 0.25 0.25 0.31 1.92 3.29 6.82 1.96 3.35 8.68 1 HA2 4.18 32 32 30 0.25 0.25 0.31 1.26 2.14 4.56 1.31 2.24 5.95 1 HA3 0.33 24 24 19 0.57 0.57 0.71 1.48 2.52 5.75 0.27 0.47 1.33 2 HB1 5.60 21 21 20 0.25 0.25 0.31 1.56 2.67 5.60 2.18 3.74 9.80 2 HB2 0.47 16 16 13 0.57 0.57 0.71 1.84 3.14 6.92 0.49 0.83 2.29 3 HB3 4.66 37 37 34 0.25 0.25 0.31 1.13 1.93 4.16 1.32 2.25 6.06 EXISTING RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 December 20, 2016 Intensity, i10 (in/hr) C10 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) Q = C f ( C )( i )( A ) 12/20/2016 3:48 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Runoff Mountain's Edge CHARACTER OF SURFACE 1 : Runoff Coefficient Percentage Impervious Project: Mountain's Edge Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: S. Thomas Asphalt ……....……………...……….....…...……………….………………………………………………………….0.95 . 100% Date: February 13, 2017 Concrete …….......……………….….……….………………..….…………………………………………………….0.95 . 90% Gravel (packed) ……….…………………….….…………………………..………………………………………….0.50 . 40% Roofs …….…….………………..……………….……………………………………………………………………… 0.95 90% Single Family Lots 0.30 30% Lawns and Landscaping Sandy Soil Flat <2% ……………………………………………………………………………………………………………… 0.10 0% Average 2% to 7% ………………………………………………………………………………………………….0.15 . 0% Steep >7% …………………………………………………………………………………………………………… 0.20 0% Clayey Soil Flat <2% ……………………………………………………………………………………………………………… 0.20 0% Average 2% to 7% ………………………………………………………………………………………………….0.25 . 0% Steep >7% …………………………………………………………………………………………………………… 0.35 0% 2-year Cf = 1.00 10-year Cf = 1.00 100-year Cf = 1.25 Runoff Coefficients are taken from the Fort Collins Stormwater Criteria Manual, Table RO-11 Sub-Basin ID Sub- BasinBasin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Single-Family Lots (ac) Area of Roofs (ac) Soil Type and Average Slope Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. Mountain's Edge Overland Flow, Time of Concentration: Mountain's Edge Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc (min) Mountain's Edge Rational Method Equation: Project: Mountain's Edge Calculations By: Date: Rainfall Intensity: 1 A1 1.74 7 7 6 0.64 0.64 0.80 2.52 4.31 9.63 2.81 4.81 13.43 2 A2 2.24 5 5 5 0.75 0.75 0.94 2.85 4.87 9.95 4.80 8.21 20.96 3 A3 1.46 10 10 9 0.39 0.39 0.49 2.21 3.78 8.03 1.26 2.16 5.73 3 TOTAL BASIN A 5.44 8 8 7 0.62 0.62 0.77 2.46 4.21 9.06 8.30 14.18 38.17 4 B1 0.47 6 6 5 0.83 0.83 1.00 2.67 4.56 9.95 1.03 1.76 4.63 5 B2 0.57 6 6 5 0.57 0.57 0.71 2.67 4.56 9.95 0.86 1.47 4.01 6 B3 1.27 5 5 5 0.84 0.84 1.00 2.85 4.87 9.95 3.04 5.20 12.67 7 B4 0.23 6 6 5 0.65 0.65 0.81 2.67 4.56 9.95 0.39 0.67 1.83 8 B5 1.31 13 13 12 0.28 0.28 0.35 2.02 3.45 7.29 0.74 1.26 3.35 8 TOTAL BASIN B 3.84 11 11 10 0.60 0.60 0.74 2.13 3.63 7.88 4.88 8.31 22.55 9 C1 0.36 5 5 5 0.65 0.65 0.81 2.85 4.87 9.95 0.67 1.14 2.91 10 C2 0.48 6 6 5 0.40 0.40 0.50 2.67 4.56 9.95 0.52 0.88 2.40 10 TOTAL BASIN C 0.85 5 5 5 0.50 0.50 0.63 2.85 4.87 9.95 1.22 2.08 5.31 11 D1 0.33 6 6 5 0.85 0.85 1.00 2.76 4.72 9.95 0.76 1.30 3.24 11 D2 1.71 5 5 5 0.67 0.67 0.84 2.85 4.87 9.95 3.28 5.61 14.34 12 D3 0.98 6 6 5 0.72 0.72 0.90 2.67 4.56 9.95 1.87 3.20 8.73 13 D4 0.66 5 5 5 0.59 0.59 0.73 2.85 4.87 9.95 1.10 1.88 4.81 14 D5 1.38 10 10 9 0.36 0.36 0.45 2.26 3.86 8.03 1.11 1.89 4.92 14 TOTAL BASIN D 5.05 11 11 9 0.60 0.60 0.74 2.17 3.71 8.03 6.53 11.14 30.19 15 UD1 0.05 5 5 5 0.85 0.85 1.00 2.85 4.87 9.95 0.13 0.21 0.52 16 UD2 4.07 14 14 14 0.26 0.26 0.33 1.92 3.29 6.82 2.04 3.50 9.07 17 OS1 17.23 36 36 32 0.32 0.32 0.40 1.15 1.96 4.33 6.34 10.81 29.84 18 OS2 14.72 24 24 23 0.32 0.32 0.40 1.48 2.52 5.20 6.95 11.87 30.62 Area, A (acres) Intensity, i2 (in/hr) 100-yr Tc (min) PROPOSED RUNOFF COMPUTATIONS C100 Design Point Flow, Q100 (cfs) Flow, Q2 (cfs) 10-yr Tc (min) 2-yr Tc (min) C2 Flow, Q10 (cfs) Intensity, i100 (in/hr) Sub-Basin(s) APPENDIX B HYDRAULIC COMPUTATIONS B.1 DETENTION POND SIZING B.2 STORM SEWER (NOT INCLUDED) B.3 INLET (NOT INCLUDED) APPENDIX B.1 DETENTION PONDS AND WATER QUALITY Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 2/13/2017 Pond No.: 1 Pond 1 100-yr 0.77 WQCV 2506 ft3 Area (A)= 5.44 acres Quantity Detention 54053 ft3 Max Release Rate = 0.2 cfs Total Volume 56559 ft3 Total Volume 1.298 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 41.7 12504 60 12444 10 600 7.72 32.3 19403 120 19283 15 900 6.52 27.3 24580 180 24400 20 1200 5.60 23.5 28149 240 27909 25 1500 4.98 20.9 31290 300 30990 30 1800 4.52 18.9 34080 360 33720 35 2100 4.08 17.1 35890 420 35470 40 2400 3.74 15.7 37599 480 37119 45 2700 3.46 14.5 39132 540 38592 50 3000 3.23 13.5 40589 600 39989 55 3300 3.03 12.7 41884 660 41224 60 3600 2.86 12.0 43128 720 42408 65 3900 2.72 11.4 44435 780 43655 70 4200 2.59 10.8 45566 840 44726 75 4500 2.48 10.4 46747 900 45847 80 4800 2.38 10.0 47853 960 46893 85 5100 2.29 9.6 48921 1020 47901 90 5400 2.21 9.3 49989 1080 48909 95 5700 2.13 8.9 50856 1140 49716 100 6000 2.06 8.6 51774 1200 50574 105 6300 2.00 8.4 52779 1260 51519 110 6600 1.94 8.1 53633 1320 52313 115 6900 1.89 7.9 54626 1380 53246 120 7200 1.84 7.7 55493 1440 54053 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 2/13/2017 7:16 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 1.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 2/13/2017 Pond No.: 1 Pond 1 WQCV 2506 ft3 5142.41 ft. Design Storm 100-yr Required Volume= 56559 ft3 5144.99 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,141.60 196 0.00 0 0 0 0 5,141.80 1084 0.20 128 128 116 116 5,142.00 2642 0.20 373 501 361 477 5,142.20 4699 0.20 734 1235 724 1202 5,142.40 7382 0.20 1208 2443 1198 2400 5,142.60 10397 0.20 1778 4221 1769 4169 5,142.80 13236 0.20 2363 6584 2358 6527 5,143.00 15745 0.20 2898 9482 2894 9421 5,143.20 17952 0.20 3370 12852 3367 12788 5,143.40 19,800 0.20 3775 16627 3774 16562 5,143.60 21,376 0.20 4118 20745 4117 20679 5,143.80 22,862 0.20 4424 25168 4423 25101 5,144.00 24,087 0.20 4695 29863 4694 29796 5,144.20 25,287 0.20 4937 34801 4937 34733 5,144.40 26,412 0.20 5170 39971 5169 39902 5,144.60 27,517 0.20 5393 45364 5392 45295 5,144.80 28,603 0.20 5612 50976 5612 50906 5,145.00 29,445 0.20 5805 56780 5805 56711 5,145.20 30,301 0.20 5975 62755 5974 62686 5,145.40 31,206 0.20 6151 68906 6151 68836 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 2/13/20177:16 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 1.xlsm\Stage_Storage POND 1 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 5.440 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 52.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5200 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.212 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.096 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 1676 <-- CALCULATED Adjusted WQCV (cu-ft) = 2506 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.000 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.235 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 5/9 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE February 11, 2017 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 66.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.660 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.21 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 97,422 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 1,676 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 12 in B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 1286 sq ft D) Actual Flat Surface Area AActual = 1469 sq ft E) Area at Design Depth (Top Surface Area) ATop = 3989 sq ft F) Rain Garden Total Volume VT= 2,729 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 1,676 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 1 in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering February 13, 2017 Mountain's Edge - Rain Garden 1 Drake and Overland, Fort Collins, CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden 1.xlsm, RG 2/13/2017, 7:15 AM Slotted underdrain will provided, no orifice is required per FC guidelines Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation NO SPRINKLER HEADS ON FLAT SURFACE A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering February 13, 2017 Mountain's Edge - Rain Garden 1 Drake and Overland, Fort Collins, CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Rain Garden 1.xlsm, RG 2/13/2017, 7:15 AM Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 2/13/2017 Pond No.: Pond 2 Pond 2 100-yr 0.74 WQCV 2991 ft3 Area (A)= 3.84 acres Quantity Detention 17366 ft3 Max Release Rate = 3.4 cfs Total Volume 20357 ft3 Total Volume 0.467 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 28.3 8482 1020 7462 10 600 7.72 21.9 13162 2040 11122 15 900 6.52 18.5 16675 3060 13615 20 1200 5.60 15.9 19096 4080 15016 25 1500 4.98 14.2 21227 5100 16127 30 1800 4.52 12.8 23119 6120 16999 35 2100 4.08 11.6 24347 7140 17207 40 2400 3.74 10.6 25506 8160 17346 45 2700 3.46 9.8 26546 9180 17366 50 3000 3.23 9.2 27535 10200 17335 55 3300 3.03 8.6 28413 11220 17193 60 3600 2.86 8.1 29257 12240 17017 65 3900 2.72 7.7 30144 13260 16884 70 4200 2.59 7.4 30911 14280 16631 75 4500 2.48 7.0 31712 15300 16412 80 4800 2.38 6.8 32462 16320 16142 85 5100 2.29 6.5 33187 17340 15847 90 5400 2.21 6.3 33912 18360 15552 95 5700 2.13 6.1 34500 19380 15120 100 6000 2.06 5.9 35122 20400 14722 105 6300 2.00 5.7 35804 21420 14384 110 6600 1.94 5.5 36384 22440 13944 115 6900 1.89 5.4 37057 23460 13597 120 7200 1.84 5.2 37646 24480 13166 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 2/13/2017 7:17 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 2.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 2/13/2017 Pond No.: Pond 2 Pond 2 WQCV 2991 ft3 5136.89 ft. Design Storm 100-yr Required Volume= 20357 ft3 5138.97 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,135.80 30 0.00 0 0 0 0 5,136.00 619 0.20 65 65 52 52 5,136.20 1747 0.20 237 302 227 279 5,136.40 3046 0.20 479 781 473 753 5,136.60 4335 0.20 738 1519 734 1487 5,136.80 5443 0.20 978 2497 976 2463 5,137.00 6188 0.20 1163 3660 1162 3625 5,137.20 6758 0.20 1295 4954 1294 4919 5,137.40 7212 0.20 1397 6351 1397 6316 5,137.60 7646 0.20 1486 7837 1486 7802 5,137.80 8080 0.20 1573 9410 1572 9374 5,138.00 8518 0.20 1660 11070 1660 11034 5,138.20 8957 0.20 1747 12817 1747 12781 5,138.40 9393 0.20 1835 14652 1835 14616 5,138.60 9823 0.20 1922 16574 1921 16537 5,138.80 10249 0.20 2007 18581 2007 18544 5,139.00 10672 0.20 2092 20673 2092 20636 5,139.20 11094 0.20 2177 22849 2176 22812 5,139.40 11532 0.20 2263 25112 2262 25075 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 2/13/20177:17 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 2.xlsm\Stage_Storage POND 2 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 3.840 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 53.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5300 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.215 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.069 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 0 <-- CALCULATED Adjusted WQCV (cu-ft) = 2991 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.090 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.271 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 3/5 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE February 11, 2017 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 2/13/2017 Pond No.: Pond 3 Pond 3 100-yr 0.63 WQCV 495 ft3 Area (A)= 0.85 acres Quantity Detention 5654 ft3 Max Release Rate = 0.2 cfs Total Volume 6149 ft3 Total Volume 0.141 ac-ft Time Time Larimer County Area II 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 5.3 1598 60 1538 10 600 7.72 4.1 2480 120 2360 15 900 6.52 3.5 3142 180 2962 20 1200 5.60 3.0 3599 240 3359 25 1500 4.98 2.7 4000 300 3700 30 1800 4.52 2.4 4357 360 3997 35 2100 4.08 2.2 4588 420 4168 40 2400 3.74 2.0 4807 480 4327 45 2700 3.46 1.9 5003 540 4463 50 3000 3.23 1.7 5189 600 4589 55 3300 3.03 1.6 5354 660 4694 60 3600 2.86 1.5 5514 720 4794 65 3900 2.72 1.5 5681 780 4901 70 4200 2.59 1.4 5825 840 4985 75 4500 2.48 1.3 5976 900 5076 80 4800 2.38 1.3 6118 960 5158 85 5100 2.29 1.2 6254 1020 5234 90 5400 2.21 1.2 6391 1080 5311 95 5700 2.13 1.1 6502 1140 5362 100 6000 2.06 1.1 6619 1200 5419 105 6300 2.00 1.1 6747 1260 5487 110 6600 1.94 1.0 6857 1320 5537 115 6900 1.89 1.0 6983 1380 5603 120 7200 1.84 1.0 7094 1440 5654 Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = 2/13/2017 7:18 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 3.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 2/13/2017 Pond No.: Pond 3 Pond 3 WQCV 495 ft3 5143.13 ft. Design Storm 100-yr Required Volume= 6149 ft3 5145.23 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,142.00 9 0.00 0 0 0 0 5,142.20 73 0.20 8 8 7 7 5,142.40 199 0.20 27 35 26 33 5,142.60 389 0.20 59 94 58 91 5,142.80 640 0.20 103 197 102 193 5,143.00 955 0.20 160 357 158 352 5,143.20 1,336 0.20 229 586 228 580 5,143.40 1,746 0.20 308 894 307 887 5,143.60 1,900 0.20 365 1259 364 1251 5,143.80 2,062 0.20 396 1655 396 1647 5,144.00 2,266 0.20 433 2088 433 2080 5,144.20 2,522 0.20 479 2566 478 2559 5,144.40 2,828 0.20 535 3101 535 3093 5,144.60 3,185 0.20 601 3703 601 3694 5,144.80 3,592 0.20 678 4380 677 4371 5,145.00 4,049 0.20 764 5144 764 5135 5,145.20 4,569 0.20 862 6006 861 5996 5,145.40 5,182 0.20 975 6981 974 6971 Design Point Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 2/13/20177:19 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 3.xlsm\Stage_Storage POND 3 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 0.850 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 33.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.3300 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 1.0 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.161 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.011 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 0 <-- CALCULATED Adjusted WQCV (cu-ft) = 495 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.130 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.049 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 1/4 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE February 11, 2017 Mountain's Edge 911-007 Fort Collins, Colorado S. Thomas Date: 2/13/2017 Pond No.: 4 Pond 4 100-yr 0.74 WQCV 0 ft3 Area (A)= 5.05 acres Quantity Detention 43748 ft3 Max Release Rate = 0.8 cfs Total Volume 43748 ft3 Total Volume 1.004 ac-ft Time Time Fort Collins 100-yr Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft3) (ft3) (ft3) 5 300 9.95 37.2 11155 240 10915 10 600 7.72 28.8 17310 480 16830 15 900 6.52 24.4 21929 720 21209 20 1200 5.60 20.9 25113 960 24153 25 1500 4.98 18.6 27915 1200 26715 30 1800 4.52 16.9 30404 1440 28964 35 2100 4.08 15.2 32019 1680 30339 40 2400 3.74 14.0 33543 1920 31623 45 2700 3.46 12.9 34911 2160 32751 50 3000 3.23 12.1 36212 2400 33812 55 3300 3.03 11.3 37366 2640 34726 60 3600 2.86 10.7 38476 2880 35596 65 3900 2.72 10.2 39642 3120 36522 70 4200 2.59 9.7 40651 3360 37291 75 4500 2.48 9.3 41705 3600 38105 80 4800 2.38 8.9 42691 3840 38851 85 5100 2.29 8.6 43644 4080 39564 90 5400 2.21 8.3 44597 4320 40277 95 5700 2.13 8.0 45371 4560 40811 100 6000 2.06 7.7 46189 4800 41389 105 6300 2.00 7.5 47086 5040 42046 110 6600 1.94 7.2 47849 5280 42569 115 6900 1.89 7.1 48734 5520 43214 120 7200 1.84 6.9 49508 5760 43748 Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = Detention Pond Calculation | FAA Method Project Number: Project Location: Calculations By: 2/13/2017 11:00 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 4.xlsm\FAA_LarmCnty idf Mountain's Edge 911-007 Fort Collins, CO S. Thomas Date: 2/13/2017 Pond No.: 4 Pond 4 WQCV 0 ft3 5136.60 ft. Design Storm 100-yr Required Volume= 43748 ft3 5142.43 ft. Contour Elevation (Y- values) Contour Area Depth Incremental Area Avg. End Cumulative Volume Avg. End Incremental Volume Conic Cummulative Volume Conic (X- values) ft3 ft. ft3 ft3 ft3 ft3 5,136.60 66 0.00 0 0 0 0 5,136.80 410 0.20 48 48 43 43 5,137.00 857 0.20 127 174 124 167 5,137.20 1333 0.20 219 393 217 384 5,137.40 1832 0.20 316 710 315 699 5,137.60 2,207 0.20 404 1114 403 1102 5,137.80 2,554 0.20 476 1590 476 1578 5,138.00 2,924 0.20 548 2138 547 2126 5,138.20 3,279 0.20 620 2758 620 2746 5,138.40 3,530 0.20 681 3439 681 3426 5,138.60 3,787 0.20 732 4171 732 4158 5,138.80 4,059 0.20 785 4955 784 4942 5,139.00 4,344 0.20 840 5795 840 5782 5,139.20 4,642 0.20 899 6694 898 6681 5,139.40 6,397 0.20 1104 7798 1099 7780 5,139.60 6,892 0.20 1329 9127 1329 9109 5,139.80 7,414 0.20 1431 10557 1430 10539 5,140.00 7,957 0.20 1537 12094 1537 12075 5,140.20 8,522 0.20 1648 13742 1648 13723 5,140.40 9,110 0.20 1763 15505 1763 15486 5,140.60 9,725 0.20 1884 17389 1883 17369 5,140.80 13,580 0.20 2331 19720 2320 19689 5,141.00 14,614 0.20 2819 22539 2819 22508 5,141.20 15,718 0.20 3033 25572 3032 25540 5,141.40 12,761 0.20 2848 28420 2843 28383 5,141.60 13,565 0.20 2633 31053 2632 31015 5,141.80 14,408 0.20 2797 33850 2797 33812 5,142.00 15,302 0.20 2971 36821 2970 36783 5,142.20 16,263 0.20 3156 39977 3156 39939 5,142.40 17,301 0.20 3356 43334 3356 43294 5,142.60 18,413 0.20 3571 46905 3571 46865 5,142.80 19,593 0.20 3801 50706 3800 50665 5,143.00 20,830 0.20 4042 54748 4042 54707 Design Point POND 4 Project: Mountain's Edge By: S. Thomas REQUIRED STORAGE & OUTLET WORKS: BASIN AREA (acres)= 5.050 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS PERCENT = 52.00 <-- INPUT from impervious calcs BASIN IMPERVIOUSNESS RATIO = 0.5200 <-- CALCULATED Drain Time (hrs) 40 <-- INPUT Drain Time Coefficient 0.8 <-- CALCULATED from Figure Table 3-2 WQCV (watershed inches) = 0.169 <-- CALCULATED from Figure 3-2 WQCV (ac-ft) = 0.071 <-- CALCULATED from UDFCD DCM V.3 Section 6.5 Rain Garden WQCV (ft 3 ) = 3104 <-- CALCULATED Adjusted WQCV (cu-ft) = 0 <-- CALCULATED (minus Rain Garden) WQ Depth (ft) = 1.000 <-- INPUT from stage-storage table AREA REQUIRED PER ROW, a (in 2 ) = 0.000 <-- CALCULATED from Figure EDB-3 CIRCULAR PERFORATION SIZING: dia (in) = 0 <-- INPUT from Figure 5 number of rows = 3 t (in) = 0.500 <-- INPUT from Figure 5 number of columns = 1.000 <-- CALCULATED from WQ Depth and row spacing WATER QUALITY CONTROL STRUCTURE PLATE February 11, 2017 Sheet 1 of 2 Designer: Company: Date: Project: Location: 1. Basin Storage Volume A) Effective Imperviousness of Tributary Area, Ia Ia = 52.0 % (100% if all paved and roofed areas upstream of rain garden) B) Tributary Area's Imperviousness Ratio (i = Ia/100) i = 0.520 C) Water Quality Capture Volume (WQCV) for a 12-hour Drain Time WQCV = 0.17 watershed inches (WQCV= 0.8 * (0.91* i3 - 1.19 * i2 + 0.78 * i) D) Contributing Watershed Area (including rain garden area) Area = 219,874 sq ft E) Water Quality Capture Volume (WQCV) Design Volume VWQCV = 3,104 cu ft Vol = (WQCV / 12) * Area F) For Watersheds Outside of the Denver Region, Depth of d6 = in Average Runoff Producing Storm G) For Watersheds Outside of the Denver Region, VWQCV OTHER = cu ft Water Quality Capture Volume (WQCV) Design Volume H) User Input of Water Quality Capture Volume (WQCV) Design Volume VWQCV USER = cu ft (Only if a different WQCV Design Volume is desired) 2. Basin Geometry A) WQCV Depth (12-inch maximum) DWQCV = 16 in 12-INCH MAXIMUM B) Rain Garden Side Slopes (Z = 4 min., horiz. dist per unit vertical) Z = 4.00 ft / ft (Use "0" if rain garden has vertical walls) C) Mimimum Flat Surface Area AMin = 2287 sq ft D) Actual Flat Surface Area AActual = 1446 sq ft ACTUAL FLAT AREA < MINIMUM FLAT AREA E) Area at Design Depth (Top Surface Area) ATop = 3365 sq ft F) Rain Garden Total Volume VT= 3,207 cu ft (VT= ((ATop + AActual) / 2) * Depth) 3. Growing Media 4. Underdrain System A) Are underdrains provided? B) Underdrain system orifice diameter for 12 hour drain time i) Distance From Lowest Elevation of the Storage y = 2.0 ft Volume to the Center of the Orifice ii) Volume to Drain in 12 Hours Vol12 = 3,104 cu ft iii) Orifice Diameter, 3/8" Minimum DO = 1 2/7 in Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering February 13, 2017 Mountain's Edge - Rain Garden 2 Drake and Overland, Fort Collins CO UD-BMP (Version 3.06, November 2016) Choose One Choose One 18" Rain Garden Growing Media Other (Explain): YES NO Rain Garden 2.xlsm, RG 2/13/2017, 7:15 AM Slotted underdrain will provided, no orifice is required per FC guidelines Sheet 2 of 2 Designer: Company: Date: Project: Location: 5. Impermeable Geomembrane Liner and Geotextile Separator Fabric A) Is an impermeable liner provided due to proximity of structures or groundwater contamination? 6. Inlet / Outlet Control A) Inlet Control 7. Vegetation 8. Irrigation A) Will the rain garden be irrigated? Notes: Design Procedure Form: Rain Garden (RG) Stephanie Thomas Northern Engineering February 13, 2017 Mountain's Edge - Rain Garden 2 Drake and Overland, Fort Collins CO Choose One Choose One Choose One Sheet Flow- No Energy Dissipation Required Concentrated Flow- Energy Dissipation Provided Plantings Seed (Plan for frequent weed control) Sand Grown or Other High Infiltration Sod Choose One YES NO YES NO Rain Garden 2.xlsm, RG 2/13/2017, 7:15 AM APPENDIX B.2 STORM SEWERS APPENDIX B.3 INLETS APPENDIX C EROSION CONTROL REPORT Mountain’s Edge Preliminary Erosion Control Report A comprehensive Erosion and Sediment Control Plan (along with associated details) will be included with the final construction drawings. It should be noted, however, that any such Erosion and Sediment Control Plan serves only as a general guide to the Contractor. Staging and/or phasing of the BMPs depicted, and additional or different BMPs from those included may be necessary during construction, or as required by the authorities having jurisdiction. It shall be the responsibility of the Contractor to ensure erosion control measures are properly maintained and followed. The Erosion and Sediment Control Plan is intended to be a living document, constantly adapting to site conditions and needs. The Contractor shall update the location of BMPs as they are installed, removed or modified in conjunction with construction activities. It is imperative to appropriately reflect the current site conditions at all times. The Erosion and Sediment Control Plan shall address both temporary measures to be implemented during construction, as well as permanent erosion control protection. Best Management Practices from the Volume 3, Chapter 7 – Construction BMPs will be utilized. Measures may include, but are not limited to, silt fencing along the disturbed perimeter, gutter protection in the adjacent roadways and inlet protection at existing and proposed storm inlets. Vehicle tracking control pads, spill containment and clean-up procedures, designated concrete washout areas, dumpsters, and job site restrooms shall also be provided by the Contractor. Grading and Erosion Control Notes can be found on Sheet CS2 of the Utility Plans. The Utility Plans at final design will also contain a full-size Erosion Control Plan as well as a separate sheet dedicated to Erosion Control Details. In addition to this report and the referenced plan sheets, the Contractor shall be aware of, and adhere to, the applicable requirements outlined in any existing Development Agreement(s) of record, as well as the Development Agreement, to be recorded prior to issuance of the Development Construction Permit. Also, the Site Contractor for this project will be required to secure a Stormwater Construction General Permit from the Colorado Department of Public Health and Environment (CDPHE), Water Quality Control Division – Stormwater Program, before commencing any earth disturbing activities. Prior to securing said permit, the Site Contractor shall develop a comprehensive StormWater Management Plan (SWMP) pursuant to CDPHE requirements and guidelines. The SWMP will further describe and document the ongoing activities, inspections, and maintenance of construction BMPs. APPENDIX D LID EXHIBIT Project: Mountain's Edge Calculations By: S. Thomas Date: February 13, 2017 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) LID Treatment L1 A2 97,422 66% 64,148 Rain Garden 1 A3 63,689 18% 11,513 Grass-Lined Swale w/ Infiltration Section Total L1 161,111 47% 75,661 L2 B1 20,289 82% 16,641 B2 24,873 41% 10,081 B5 56,915 21% 12,156 Total L2 102,077 38% 38,878 L3 C2 21,094 19% 4,027 Total L3 21,094 19% 4,027 L4 D1 14,166 85% 12,078 D2 74,422 62% 45,999 D3 42,668 64% 27,116 D4 28,680 60% 17,322 D5 59,938 20% 12,171 Total L4 219,874 52% 114,686 Total Treated 504,156 46% 233,251 LID BASIN NODE Sub-Basin(s) Area, A (sf) Percent Impervious Impervious Area, A (sf) A1 75,924 63% 47,926 B3 55,488 78% 43,280 B4 9,903 64% 6,346 C1 15,762 51% 8,046 UD1 2,263 83% 1,872 Total Proposed Untreated 159,340 67% 107,471 HA3 14,166 45% 6,375 HB2 20,289 45% 9,130 Total Existing 34,455 45% 15,505 Grass-Lined Swale w/ Infilatration Section PROPOSED LID COMPUTATIONS PROPOSED LID UNTREATED AREA PROPOSED LID TREATED AREA Rain Garden 2 Grass-Lined Swale w/ Infiltration Section Project: Mountain's Edge Calculations By: S. Thomas Date: February 13, 2017 PROPOSED LID COMPUTATIONS 663,496 15,505 340,721 325,216 243,912 233,251 72% Rain Garden 1 Rain Garden 2 Total Contributing Area (sf) 97,422 219,874 Percent Impervious 66% 52% Total Volume Required (cf) 1,676 3,104 Total Volume Provided (cf) 1,676 3,104 RAIN GARDEN SUMMARY LID TREATMENT SUMMARY Total Site Area (sf) Total Existing Impervious Area (sf) Total Proposed Impervious Area (sf) Total Treated Impervious Area (sf) Percent Impervious Treated by LID measures 75% Required Minimum Area to be Treated by LID measures (sf) Total Net Proposed Impervious Area (sf) APPENDIX E SWMM Modeling SUB-A SUB-B SUB-C SUB-D OS1 OS2 OS3 SUB-UD2 1 2 3 8 9 BYPASS OUT1 OUT2 OUT3 OUT4 OUTOS2 OUTOS3 J1 J2 J3 J4 J5 O1 O2 O3 POND1 POND2 POND3 POND4 PONDOS2 PONDOS3 FORTCOLLINS100YR 03/15/2016 00:05:00 SWMM 5.1 Page 1 Mountains Edge - SWMM 100yr.inp [TITLE] ;;Project Title/Notes [OPTIONS] ;;Option Value FLOW_UNITS CFS INFILTRATION HORTON FLOW_ROUTING KINWAVE LINK_OFFSETS DEPTH MIN_SLOPE 0 ALLOW_PONDING NO SKIP_STEADY_STATE NO START_DATE 03/15/2016 START_TIME 00:00:00 REPORT_START_DATE 03/15/2016 REPORT_START_TIME 00:00:00 END_DATE 03/15/2016 END_TIME 06:00:00 SWEEP_START 01/01 SWEEP_END 12/31 DRY_DAYS 0 REPORT_STEP 00:05:00 WET_STEP 00:05:00 DRY_STEP 01:00:00 ROUTING_STEP 0:00:15 INERTIAL_DAMPING PARTIAL NORMAL_FLOW_LIMITED BOTH FORCE_MAIN_EQUATION H-W VARIABLE_STEP 0.75 LENGTHENING_STEP 0 MIN_SURFAREA 12.557 Page 1 Mountains Edge - SWMM 100yr.inp MAX_TRIALS 8 HEAD_TOLERANCE 0.005 SYS_FLOW_TOL 5 LAT_FLOW_TOL 5 MINIMUM_STEP 0.5 THREADS 1 [EVAPORATION] ;;Data Source Parameters ;;-------------- ---------------- CONSTANT 0.0 DRY_ONLY NO [RAINGAGES] ;;Name Format Interval SCF Source ;;-------------- --------- ------ ------ ---------- FORTCOLLINS100YR INTENSITY 0:05 1.0 TIMESERIES 100-YR [SUBCATCHMENTS] ;;Name Rain Gage Outlet Area %Imperv Width %Slope CurbLen SnowPack ;;-------------- ---------------- ---------------- -------- -------- -------- -------- -------- ---------------- SUB-A FORTCOLLINS100YR POND1 5.44 52 4739 2 0 SUB-B FORTCOLLINS100YR POND2 3.84 53 3350 2 0 SUB-C FORTCOLLINS100YR POND3 .85 33 740 2 0 SUB-D FORTCOLLINS100YR POND4 5.05 52 4400 2 0 OS1 FORTCOLLINS100YR J4 17.23 10 750 2 0 Page 2 Mountains Edge - SWMM 100yr.inp OS2 FORTCOLLINS100YR PONDOS2 14.72 10 1000 2 0 OS3 FORTCOLLINS100YR PONDOS3 63.62 10 3000 2 0 SUB-UD2 FORTCOLLINS100YR J2 4.07 25 1772 2 0 [SUBAREAS] ;;Subcatchment N-Imperv N-Perv S-Imperv S-Perv PctZero RouteTo PctRouted ;;-------------- ---------- ---------- ---------- ---------- ---------- ---------- ---------- SUB-A .016 .25 .1 .3 0 OUTLET SUB-B .016 .25 .1 .3 0 OUTLET SUB-C .016 .25 .1 .3 0 OUTLET SUB-D .016 .25 .1 .3 0 OUTLET OS1 .016 .25 .1 .3 0 OUTLET OS2 .016 .25 .1 .3 0 OUTLET OS3 .016 .25 .1 .3 0 OUTLET SUB-UD2 .016 .25 .1 .3 0 OUTLET [INFILTRATION] ;;Subcatchment MaxRate MinRate Decay DryTime MaxInfil ;;-------------- ---------- ---------- ---------- ---------- ---------- SUB-A 3.0 0.5 4 7 0 SUB-B 3.0 0.5 4 7 0 SUB-C 3.0 0.5 4 7 0 SUB-D 3.0 0.5 4 7 0 OS1 3.0 0.5 4 7 0 OS2 3.0 0.5 4 7 0 OS3 3.0 0.5 4 7 0 SUB-UD2 3.0 0.5 4 7 0 [JUNCTIONS] ;;Name Elevation MaxDepth InitDepth SurDepth Aponded Page 3 Mountains Edge - SWMM 100yr.inp ;;-------------- ---------- ---------- ---------- ---------- ---------- J1 40.7 5 0 0 0 J2 39.1 5 0 0 0 J3 34.2 5 0 0 0 J4 38.22 3 0 0 0 J5 45.6 3 0 0 0 [OUTFALLS] ;;Name Elevation Type Stage Data Gated Route To ;;-------------- ---------- ---------- ---------------- -------- ---------------- O1 35.5 FREE NO O2 33.6 FREE NO O3 48 FREE NO [STORAGE] ;;Name Elev. MaxDepth InitDepth Shape Curve Name/Params N/A Fevap Psi Ksat IMD ;;-------------- -------- ---------- ----------- ---------- ---------------------------- -------- -------- -------- -------- POND1 41.6 4 .8 TABULAR POND1 0 0 POND2 35.8 4 1.09 TABULAR POND2 0 0 POND3 42 4 1.13 TABULAR POND3 0 0 POND4 36.6 6.5 .8 TABULAR POND4 0 0 PONDOS2 47 7 0 TABULAR PONDOS2 0 0 PONDOS3 44 7 0 TABULAR PONDOS3 0 0 [CONDUITS] Page 4 Mountains Edge - SWMM 100yr.inp ;;Name From Node To Node Length Roughness InOffset OutOffset InitFlow MaxFlow ;;-------------- ---------------- ---------------- ---------- ---------- ---------- ---------- ---------- ---------- 1 J1 J2 300 .025 0 0 0 0 2 J2 J3 300 .025 0 0 0 0 3 J3 O2 100 .025 0 0 0 0 8 J5 J4 400 .025 0 0 0 0 9 J4 O1 155 .025 0 0 0 0 [WEIRS] ;;Name From Node To Node Type CrestHt Qcoeff Gated EndCon EndCoeff Surcharge RoadWidth RoadSurf ;;-------------- ---------------- ---------------- ------------ ---------- ---------- -------- -------- ---------- ---------- ---------- ---------- BYPASS PONDOS3 O3 TRANSVERSE 6 3.33 NO 0 0 YES [OUTLETS] ;;Name From Node To Node Offset Type QTable/Qcoeff Qexpon Gated ;;-------------- ---------------- ---------------- ---------- --------------- ---------------- ---------- -------- OUT1 POND1 J2 0 TABULAR/DEPTH POND1ORIFICE NO OUT2 POND2 O1 0 TABULAR/DEPTH POND2ORIFICE NO OUT3 POND3 J1 0 TABULAR/DEPTH POND3ORIFICE Page 5 Mountains Edge - SWMM 100yr.inp NO OUT4 POND4 J3 0 TABULAR/DEPTH POND4ORIFICE NO OUTOS2 PONDOS2 J5 0 TABULAR/DEPTH PONDOS2ORIFICE NO OUTOS3 PONDOS3 J1 0 TABULAR/DEPTH PONDOS3ORIFICE NO [XSECTIONS] ;;Link Shape Geom1 Geom2 Geom3 Geom4 Barrels Culvert ;;-------------- ------------ ---------------- ---------- ---------- ---------- ---------- ---------- 1 TRIANGULAR 5 40 0 0 1 2 TRIANGULAR 5 40 0 0 1 3 TRIANGULAR 5 40 0 0 1 8 TRIANGULAR 1 24 0 0 1 9 TRIANGULAR 3 24 0 0 1 BYPASS RECT_OPEN 1 100 0 0 [CURVES] ;;Name Type X-Value Y-Value ;;-------------- ---------- ---------- ---------- POND1ORIFICE Rating 0 0 POND1ORIFICE 3.3 .2 POND1ORIFICE 3.8 .23 ; POND2ORIFICE Rating 0 0 Page 6 Mountains Edge - SWMM 100yr.inp POND2ORIFICE 3.6 3.4 POND2ORIFICE 4 3.8 ; POND3ORIFICE Rating 0 0 POND3ORIFICE 3.2 .2 POND3ORIFICE 3.4 .22 ; POND4ORIFICE Rating 0 0 POND4ORIFICE 5.87 .8 POND4ORIFICE 6.4 .9 ; PONDOS2ORIFICE Rating 0.00 0.00 PONDOS2ORIFICE 0.50 11.76 PONDOS2ORIFICE 1.00 16.63 PONDOS2ORIFICE 1.50 20.37 PONDOS2ORIFICE 2.00 23.52 PONDOS2ORIFICE 2.50 26.30 PONDOS2ORIFICE 3.00 28.80 PONDOS2ORIFICE 3.50 31.11 PONDOS2ORIFICE 4.00 33.26 PONDOS2ORIFICE 4.50 35.28 PONDOS2ORIFICE 5.00 37.19 PONDOS2ORIFICE 5.50 39.00 PONDOS2ORIFICE 6.00 40.74 PONDOS2ORIFICE 6.50 42.40 PONDOS2ORIFICE 7.00 44.00 ; PONDOS3ORIFICE Rating 0.00 0.00 PONDOS3ORIFICE 0.50 6.35 PONDOS3ORIFICE 1.00 8.98 PONDOS3ORIFICE 1.50 11.00 PONDOS3ORIFICE 2.00 12.70 PONDOS3ORIFICE 2.50 14.20 Page 7 Mountains Edge - SWMM 100yr.inp PONDOS3ORIFICE 3.00 15.56 PONDOS3ORIFICE 3.50 16.80 PONDOS3ORIFICE 4.00 17.96 PONDOS3ORIFICE 4.50 19.05 PONDOS3ORIFICE 5.00 20.08 PONDOS3ORIFICE 5.50 21.06 PONDOS3ORIFICE 6.00 22.00 ; POND1 Storage 0 195.82 POND1 0.2 1084.42 POND1 0.4 2641.83 POND1 0.6 4698.99 POND1 0.8 7382.11 POND1 1 10396.95 POND1 1.2 13235.5 POND1 1.4 15744.69 POND1 1.6 17951.92 POND1 1.8 19800.35 POND1 2 21376.02 POND1 2.2 22862.1 POND1 2.4 24087.47 POND1 2.6 25287.06 POND1 2.8 26411.82 POND1 3 27516.87 POND1 3.2 28603.07 POND1 3.4 29445.4 POND1 3.6 30300.87 POND1 3.8 31206.37 ; POND2 Storage 0 29.98 POND2 0.2 618.86 POND2 0.4 1747.49 POND2 0.6 3045.67 Page 8 Mountains Edge - SWMM 100yr.inp POND2 0.8 4335.41 POND2 1 5442.92 POND2 1.2 6187.71 POND2 1.4 6757.69 POND2 1.6 7212.28 POND2 1.8 7645.63 POND2 2 8080.34 POND2 2.2 8517.69 POND2 2.4 8957.28 POND2 2.6 9392.94 POND2 2.8 9823.05 POND2 3 10248.93 POND2 3.2 10671.54 POND2 3.4 11093.73 POND2 3.6 11532.03 ; POND3 Storage 0 9.07 POND3 0.2 73.23 POND3 0.4 199.32 POND3 0.6 388.82 POND3 0.8 640.23 POND3 1 955.09 POND3 1.2 1335.94 POND3 1.4 1745.81 POND3 1.6 1900.27 POND3 1.8 2061.76 POND3 2 2265.69 POND3 2.2 2521.51 POND3 2.4 2828.3 POND3 2.6 3185.02 POND3 2.8 3591.72 POND3 3 4049.28 POND3 3.2 4569.41 Page 9 Mountains Edge - SWMM 100yr.inp POND3 3.4 5181.81 ; POND4 Storage 0 65.77 POND4 0.2 410.36 POND4 0.4 857.42 POND4 0.6 1332.88 POND4 0.8 1831.52 POND4 1 2207.33 POND4 1.2 2554.41 POND4 1.4 2924 POND4 1.6 3278.84 POND4 1.8 3529.72 POND4 2 3787.15 POND4 2.2 4058.76 POND4 2.4 4343.84 POND4 2.6 4641.83 POND4 2.8 6397.24 POND4 3 6891.51 POND4 3.2 7413.64 POND4 3.4 7956.87 POND4 3.6 8521.85 POND4 3.8 9110.47 POND4 4 9725.39 POND4 4.2 13580.32 POND4 4.4 14613.97 POND4 4.6 15717.51 POND4 4.8 12761.36 POND4 5 13564.85 POND4 5.2 14407.69 POND4 5.4 15301.59 POND4 5.6 16262.69 POND4 5.8 17301.39 POND4 6 18412.79 Page 10 Mountains Edge - SWMM 100yr.inp POND4 6.2 19593.12 ; PONDOS2 Storage 0 7453.84 PONDOS2 1 17466.34 PONDOS2 2 28633.01 PONDOS2 3 47631.06 PONDOS2 4 69976.41 PONDOS2 5 92755.43 PONDOS2 6 117217.13 PONDOS2 7 143723.75 ; PONDOS3 Storage 0 2031.79 PONDOS3 1 9775.88 PONDOS3 2 17701.44 PONDOS3 3 25195.74 PONDOS3 4 30910.42 PONDOS3 5 36766.41 PONDOS3 6 41957.84 PONDOS3 7 41957 [TIMESERIES] ;;Name Date Time Value ;;-------------- ---------- ---------- ---------- 100-YR 0:05 1 100-YR 0:10 1.14 100-YR 0:15 1.33 100-YR 0:20 2.23 100-YR 0:25 2.84 100-YR 0:30 5.49 100-YR 0:35 9.95 100-YR 0:40 4.12 100-YR 0:45 2.48 100-YR 0:50 1.46 Page 11 Mountains Edge - SWMM 100yr.inp 100-YR 0:55 1.22 100-YR 1:00 1.06 100-YR 1:05 1 100-YR 1:10 .95 100-YR 1:15 .91 100-YR 1:20 .87 100-YR 1:25 .84 100-YR 1:30 .81 100-YR 1:35 .78 100-YR 1:40 .75 100-YR 1:45 .73 100-YR 1:50 .71 100-YR 1:55 .69 100-YR 2:00 .67 [REPORT] ;;Reporting Options INPUT NO CONTROLS NO SUBCATCHMENTS ALL NODES ALL LINKS ALL [TAGS] [MAP] DIMENSIONS -1395.210 0.000 11395.210 10000.000 Units None [COORDINATES] ;;Node X-Coord Y-Coord ;;-------------- ------------------ ------------------ J1 7766.467 3508.982 Page 12 Mountains Edge - SWMM 100yr.inp J2 8461.078 4946.108 J3 10077.844 7017.964 J4 -508.982 6491.018 J5 -401.198 2826.347 O1 -628.743 8095.808 O2 10161.677 7688.623 O3 10928.144 2347.305 POND1 4113.772 5365.269 POND2 556.886 7377.246 POND3 6269.461 3029.940 POND4 9191.617 7269.461 PONDOS2 329.341 1928.144 PONDOS3 7970.060 2107.784 [VERTICES] ;;Link X-Coord Y-Coord ;;-------------- ------------------ ------------------ 9 -640.719 8179.641 BYPASS 10353.294 1976.048 [Polygons] ;;Subcatchment X-Coord Y-Coord ;;-------------- ------------------ ------------------ SUB-A 3251.497 5257.485 SUB-B 1035.928 6071.856 SUB-C 5646.707 3353.293 SUB-D 6437.126 5952.096 OS1 -1011.976 5616.766 OS2 377.246 946.108 OS3 8041.916 958.084 SUB-UD2 9455.090 4467.066 [SYMBOLS] Page 13 Mountains Edge - SWMM 100yr.inp ;;Gage X-Coord Y-Coord ;;-------------- ------------------ ------------------ FORTCOLLINS100YR 1335.329 9161.677 [BACKDROP] FILE "D:\Projects\911-007\Drainage\SWMM\911-007_DRNG DR1 (1).jpg" DIMENSIONS -1395.210 1334.229 11395.210 8665.771 Page 14 Mountains Edge - SWMM 100yr.rpt EPA STORM WATER MANAGEMENT MODEL - VERSION 5.1 (Build 5.1.010) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES RDII ................... NO Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Ponding Allowed ........ NO Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... KINWAVE Starting Date ............ MAR-15-2016 00:00:00 Ending Date .............. MAR-15-2016 06:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:05:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Page 1 Mountains Edge - SWMM 100yr.rpt Routing Time Step ........ 15.00 sec ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 35.108 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 19.223 2.009 Surface Runoff ........... 15.860 1.658 Final Storage ............ 0.153 0.016 Continuity Error (%) ..... -0.365 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 15.860 5.168 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 0.000 0.000 External Outflow ......... 13.879 4.523 Flooding Loss ............ 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Exfiltration Loss ........ 0.000 0.000 Initial Stored Volume .... 0.153 0.050 Final Stored Volume ...... 2.131 0.694 Continuity Error (%) ..... 0.014 Page 2 Mountains Edge - SWMM 100yr.rpt ******************************** Highest Flow Instability Indexes ******************************** Link OUTOS2 (8) Link OUTOS3 (6) Link 9 (4) Link 8 (3) ************************* Routing Time Step Summary ************************* Minimum Time Step : 15.00 sec Average Time Step : 15.00 sec Maximum Time Step : 15.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 1.00 Percent Not Converging : 0.00 *************************** Subcatchment Runoff Summary *************************** -------------------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS Page 3 Mountains Edge - SWMM 100yr.rpt -------------------------------------------------------------------------------------------------------- SUB-A 3.67 0.00 0.00 0.92 2.75 0.41 48.53 0.749 SUB-B 3.67 0.00 0.00 0.90 2.77 0.29 34.43 0.754 SUB-C 3.67 0.00 0.00 1.29 2.40 0.06 6.77 0.654 SUB-D 3.67 0.00 0.00 0.92 2.75 0.38 45.06 0.749 OS1 3.67 0.00 0.00 2.24 1.42 0.67 26.13 0.388 OS2 3.67 0.00 0.00 2.10 1.56 0.63 26.35 0.427 OS3 3.67 0.00 0.00 2.22 1.45 2.51 99.12 0.395 SUB-UD2 3.67 0.00 0.00 1.47 2.21 0.24 24.37 0.601 ****************** Node Depth Summary ****************** --------------------------------------------------------------------------------- Average Maximum Maximum Time of Max Reported Depth Depth HGL Occurrence Max Depth Node Type Feet Feet Feet days hr:min Feet --------------------------------------------------------------------------------- J1 JUNCTION 0.99 1.31 42.01 0 02:07 1.31 J2 JUNCTION 1.00 1.31 40.41 0 02:08 1.31 Page 4 Mountains Edge - SWMM 100yr.rpt J3 JUNCTION 1.06 1.57 35.77 0 00:41 1.51 J4 JUNCTION 0.44 1.25 39.47 0 00:41 1.23 J5 JUNCTION 0.21 0.61 46.21 0 01:02 0.61 O1 OUTFALL 0.43 1.25 36.75 0 00:41 1.23 O2 OUTFALL 1.06 1.56 35.16 0 00:41 1.52 O3 OUTFALL 0.00 0.00 48.00 0 00:00 0.00 POND1 STORAGE 3.00 3.36 44.96 0 02:10 3.36 POND2 STORAGE 2.03 3.60 39.40 0 01:05 3.60 POND3 STORAGE 2.87 3.33 45.33 0 02:07 3.33 POND4 STORAGE 5.19 5.97 42.57 0 02:09 5.97 PONDOS2 STORAGE 0.20 0.96 47.96 0 01:02 0.95 PONDOS3 STORAGE 3.22 6.15 50.15 0 01:37 6.15 ******************* Node Inflow Summary ******************* ------------------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Flow Lateral Total Time of Max Inflow Inflow Balance Inflow Inflow Occurrence Volume Volume Error Node Type CFS CFS days hr:min 10^6 gal 10^6 gal Percent ------------------------------------------------------------------------------------------------- J1 JUNCTION 0.00 22.21 0 02:07 0 2.25 0.000 J2 JUNCTION 24.37 37.61 0 00:40 0.244 2.53 0.000 J3 JUNCTION 0.00 37.58 0 00:41 0 2.64 0.000 J4 JUNCTION 26.13 35.57 0 00:41 0.666 1.29 0.000 J5 JUNCTION 0.00 16.20 0 01:02 0 0.625 0.000 O1 OUTFALL 0.00 38.23 0 00:42 0 1.6 0.000 O2 OUTFALL 0.00 37.52 0 00:41 0 2.64 0.000 Page 5 Mountains Edge - SWMM 100yr.rpt O3 OUTFALL 0.00 18.83 0 01:37 0 0.281 0.000 POND1 STORAGE 48.53 48.53 0 00:40 0.406 0.424 -0.001 POND2 STORAGE 34.43 34.43 0 00:40 0.288 0.311 0.050 POND3 STORAGE 6.77 6.77 0 00:40 0.0554 0.0591 -0.001 POND4 STORAGE 45.06 45.06 0 00:40 0.377 0.382 -0.001 PONDOS2 STORAGE 26.35 26.35 0 00:40 0.626 0.626 0.067 PONDOS3 STORAGE 99.12 99.12 0 00:40 2.51 2.51 0.018 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- J1 JUNCTION 6.00 1.314 3.686 J2 JUNCTION 6.00 1.314 3.686 J3 JUNCTION 6.00 1.566 3.434 J4 JUNCTION 6.00 1.254 1.746 J5 JUNCTION 6.00 0.609 2.391 POND1 STORAGE 6.00 3.355 0.645 POND2 STORAGE 6.00 3.604 0.396 POND3 STORAGE 6.00 3.332 0.668 POND4 STORAGE 6.00 5.972 0.528 PONDOS2 STORAGE 6.00 0.956 6.044 PONDOS3 STORAGE 6.00 6.147 0.853 Page 6 Mountains Edge - SWMM 100yr.rpt ********************* Node Flooding Summary ********************* No nodes were flooded. ********************** Storage Volume Summary ********************** -------------------------------------------------------------------------------------------------- Average Avg Evap Exfil Maximum Max Time of Max Maximum Volume Pcnt Pcnt Pcnt Volume Pcnt Occurrence Outflow Storage Unit 1000 ft3 Full Loss Loss 1000 ft3 Full days hr:min CFS -------------------------------------------------------------------------------------------------- POND1 46.963 62 0 0 55.472 74 0 02:10 0.20 POND2 11.045 37 0 0 25.158 84 0 01:04 3.40 POND3 4.932 46 0 0 6.637 62 0 02:07 0.21 POND4 36.615 64 0 0 46.385 82 0 02:08 0.82 PONDOS2 2.128 0 0 0 11.701 3 0 01:01 16.20 PONDOS3 64.696 35 0 0 148.527 81 0 01:37 40.83 *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg Max Total Page 7 Mountains Edge - SWMM 100yr.rpt Freq Flow Flow Volume Outfall Node Pcnt CFS CFS 10^6 gal ----------------------------------------------------------- O1 100.00 9.91 38.23 1.602 O2 99.93 16.35 37.52 2.640 O3 14.93 11.64 18.83 0.281 ----------------------------------------------------------- System 71.62 37.90 75.70 4.522 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence |Veloc| Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- 1 CONDUIT 22.21 0 02:08 3.22 0.03 0.26 2 CONDUIT 37.00 0 00:41 5.58 0.03 0.26 3 CONDUIT 37.52 0 00:41 3.84 0.05 0.31 8 CONDUIT 16.20 0 01:03 3.65 0.27 0.61 9 CONDUIT 35.55 0 00:41 5.66 0.10 0.42 BYPASS WEIR 18.83 0 01:37 0.00 OUT1 DUMMY 0.20 0 02:10 OUT2 DUMMY 3.40 0 01:05 OUT3 DUMMY 0.21 0 02:07 OUT4 DUMMY 0.82 0 02:09 OUTOS2 DUMMY 16.20 0 01:02 OUTOS3 DUMMY 22.00 0 01:26 Page 8 Mountains Edge - SWMM 100yr.rpt ************************* Conduit Surcharge Summary ************************* No conduits were surcharged. Analysis begun on: Mon Feb 13 10:32:15 2017 Analysis ended on: Mon Feb 13 10:32:15 2017 Total elapsed time: < 1 sec Page 9 APPENDIX F REFERENCES Hydrologic Soil Group—Larimer County Area, Colorado (Mountain's Edge) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 1 of 4 4489080 4489140 4489200 4489260 4489320 4489380 4489440 4489500 4489560 4489080 4489140 4489200 4489260 4489320 4489380 4489440 4489500 4489560 488580 488640 488700 488760 488820 488880 488940 488580 488640 488700 488760 488820 488880 488940 40° 33' 24'' N 105° 8' 5'' W 40° 33' 24'' N 105° 7' 50'' W 40° 33' 8'' N 105° 8' 5'' W 40° 33' 8'' N 105° 7' 50'' W N Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 13N WGS84 0 100 200 400 600 Feet 0 35 70 140 210 Meters Map Scale: 1:2,410 if printed on A portrait (8.5" x 11") sheet. Warning: Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Rating Polygons A A/D B B/D C C/D D Not rated or not available Soil Rating Lines A A/D B B/D C C/D D Not rated or not available Soil Rating Points A A/D B B/D C C/D D Not rated or not available Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: http://websoilsurvey.nrcs.usda.gov Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Larimer County Area, Colorado Hydrologic Soil Group Hydrologic Soil Group— Summary by Map Unit — Larimer County Area, Colorado (CO644) Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 3 Altvan-Satanta loams, 0 to 3 percent slopes B 8.7 42.7% 4 Altvan-Satanta loams, 3 to 9 percent slopes B 11.6 57.3% Totals for Area of Interest 20.3 100.0% Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Hydrologic Soil Group—Larimer County Area, Colorado Mountain's Edge Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 3 of 4 Component Percent Cutoff: None Specified Tie-break Rule: Higher Hydrologic Soil Group—Larimer County Area, Colorado Mountain's Edge Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 4 of 4 MAP POCKET DR1 – OVERALL DRAINAGE EXHIBIT X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com DR1 CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what's R City Engineer Date Date Date Date Date Stormwater Utility Parks & Recreation Traffic Engineer Date Water & Wastewater Utility City of Fort Collins, Colorado UTILITY PLAN APPROVAL Environmental Planner ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE"Preliminary Drainage Report for Mountains Edge " BY NORTHERN ENGINEERING, DATED February 14, 2017 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 A1 1.74 0.64 0.80 7.3 5.6 2.81 13.43 2 A2 2.24 0.75 0.94 5.0 5.0 4.80 20.96 3 A3 1.46 0.39 0.49 10.1 9.3 1.26 5.73 4 B1 0.47 0.83 1.00 6.2 5.0 1.03 4.63 5 B2 0.57 0.57 0.71 6.2 5.3 0.86 4.01 6 B3 1.27 0.84 1.00 5.0 5.0 3.04 12.67 7 B4 0.23 0.65 0.81 6.1 5.0 0.39 1.83 8 B5 1.31 0.28 0.35 12.6 11.9 0.74 3.35 9 C1 0.36 0.65 0.81 5.0 5.0 0.67 2.91 10 C2 0.48 0.40 0.50 6.1 5.4 0.52 2.40 11 D1 0.33 0.85 1.00 5.9 5.0 0.76 3.24 11 D2 1.71 0.67 0.84 5.0 5.0 3.28 14.34 12 D3 0.98 0.72 0.90 6.3 5.0 1.87 8.73 13 D4 0.66 0.59 0.73 5.1 5.0 1.10 4.81 14 D5 1.38 0.36 0.45 9.9 9.2 1.11 4.92 15 UD1 0.05 0.85 1.00 5.0 5.0 0.13 0.52 16 UD2 4.07 0.26 0.33 14.2 13.7 2.04 9.07 17 OS1 17.23 0.32 0.40 36.2 32.5 6.34 29.84 18 OS2 14.72 0.32 0.40 23.7 23.2 6.95 30.62 Detention Pond Summary | Proposed Condition Pond 100-yr Volume (ac-ft) 100-yr WSEL WQCV (ft3) WQCV WSEL Max Release (cfs) 1 1.30 5144.99 2,506 5142.41 0.20 2 0.47 5138.97 2,991 5136.89 3.40 3 0.14 5145.23 495 5143.13 0.20 4 1.00 5142.43 n/a n/a 0.80 X X X X / / / / / / / / / / / / / / / / X X X X X X X X X X X X X X X X OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / GAS MM T W VAULT F.O. B M D T C F E S C ONTROL IRR S H2O H2O H2O 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 20" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W 16" W HA1 HA2 HB1 HB2 HA3 1 2 HB3 3 8" SS 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 6" W 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 8" SS 6" W 6" W S 6" W S S OVERLAND TRAIL BLUEGRASS DRIVE DRAKE ROAD Sheet MOUNTAIN'S EDGE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 E NGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com of 23 HDR1 HISTORIC DRAINAGE EXHIBIT CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R ( IN FEET ) 0 1 INCH = 60 FEET 60 60 120 180 LEGEND: 5013 PROPOSED CONTOUR 93 EXISTING CONTOUR PROPERTY BOUNDARY EXISTING STORM SEWER 1. THE SIZE, TYPE AND LOCATION OF ALL KNOWN UNDERGROUND UTILITIES ARE APPROXIMATE WHEN SHOWN ON THESE DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL UNDERGROUND UTILITIES IN THE AREA OF THE WORK. BEFORE COMMENCING NEW CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL BE RESPONSIBLE FOR FOR ALL UNKNOWN UNDERGROUND UTILITIES. 2. REFER TO THE "PRELIMINARY DRAINAGE AND EROSION CONTROL REPORT FOR MOUNTAIN'S EDGE" BY NORTHERN ENGINEERING, DATED DECEMBER 20TH, 2016 FOR ADDITIONAL INFORMATION. NOTES: FLOW PATH DRAINAGE BASIN BUBBLE A DESIGN POINT A BASIN BOUNDARY PROPOSED STORM SEWER FOR DRAINAGE REVIEW ONLY NOT FOR CONSTRUCTION DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 HA1 4.07 0.25 0.31 14.3 13.9 1.96 8.68 1 HA2 4.18 0.25 0.31 31.8 29.9 1.31 5.95 1 HA3 0.33 0.57 0.71 24.0 19.4 0.27 1.33 2 HB1 5.60 0.25 0.31 21.4 20.3 2.18 9.80 2 HB2 0.47 0.57 0.71 15.9 13.5 0.49 2.29 3 HB3 4.66 0.25 0.31 37.2 34.5 1.32 6.06 Survey Area Data: Version 11, Sep 23, 2016 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 22, 2011—Apr 28, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Hydrologic Soil Group—Larimer County Area, Colorado (Mountain's Edge) Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey 12/21/2016 Page 2 of 4 Design Storm Require Volume= Stage - Storage Calculation Project Number: Project Location: Calculations By: Required Volume Water Surface Elevation (WSE) 2/13/201711:00 AM D:\Projects\911-007\Drainage\Detention\911-007_Detention Pond 4.xlsm\Stage_Storage S. Thomas Rainfall Intensity taken from the Fort Collins Stormwater Criteria Manual (FCSCM), Tables RA-7 and RA-8 February 13, 2017 Intensity, i10 (in/hr) C10 Q = C f ( C )( i )( A ) 2/13/2017 7:09 AM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Runoff 10-yr Tc (min) 100-yr Tc (min) 1 A1 No 0.64 0.64 0.80 61 2.34% 5.1 5.1 3.3 N/A N/A N/A 227 0.70% 1.67 2.3 7.3 7.3 5.6 2 A2 No 0.75 0.75 0.94 35 3.54% 2.5 2.5 1.1 N/A N/A N/A 249 0.80% 1.79 2.3 5.0 5.0 5.0 3 A3 No 0.39 0.39 0.49 69 7.35% 5.7 5.7 4.9 163 1.04% 1.53 1.8 264 0.68% 1.65 2.7 10.1 10.1 9.3 3 TOTAL BASIN A No 0.62 0.62 0.77 35 3.54% 3.5 3.5 2.4 163 1.04% 1.53 1.8 264 0.68% 1.65 2.7 7.9 7.9 6.8 4 B1 No 0.83 0.83 1.00 46 2.83% 2.4 2.4 0.9 N/A N/A N/A 358 0.63% 1.59 3.7 6.2 6.2 5.0 5 B2 No 0.57 0.57 0.71 47 10.83% 3.1 3.1 2.3 389 1.99% 2.11 3.1 N/A N/A N/A 6.2 6.2 5.3 6 B3 No 0.84 0.84 1.00 39 3.28% 2.1 2.1 0.8 N/A N/A N/A 349 1.45% 2.41 2.4 5.0 5.0 5.0 7 B4 No 0.65 0.65 0.81 60 2.62% 4.8 4.8 3.1 N/A N/A N/A 216 1.94% 2.79 1.3 6.1 6.1 5.0 8 B5 No 0.28 0.28 0.35 50 2.00% 8.6 8.6 7.9 311 2.41% 2.33 2.2 157 0.52% 1.44 1.8 12.6 12.6 11.9 8 TOTAL BASIN B No 0.60 0.60 0.74 46 2.83% 4.5 4.5 3.2 389 1.99% 2.11 3.1 358 0.63% 1.59 3.7 11.3 11.3 10.0 9 C1 No 0.65 0.65 0.81 35 5.14% 2.9 2.9 1.9 N/A N/A N/A 106 0.47% 1.37 1.3 5.0 5.0 5.0 10 C2 No 0.40 0.40 0.50 52 6.00% 5.2 5.2 4.5 132 2.46% 2.35 0.9 N/A N/A N/A 6.1 6.1 5.4 10 TOTAL BASIN C No 0.50 0.50 0.63 52 6.00% 4.4 4.4 3.5 132 2.46% 2.35 0.9 N/A N/A N/A 5.4 5.4 5.0 11 D1 No 0.85 0.85 1.00 42 2.64% 2.2 2.2 0.9 N/A N/A N/A 639 2.04% 2.86 3.7 5.9 5.9 5.0 11 D2 No 0.67 0.67 0.84 N/A N/A N/A N/A N/A N/A N/A 368 2.42% 3.11 2.0 5.0 5.0 5.0 12 D3 No 0.72 0.72 0.90 78 3.21% 4.3 4.3 2.3 217 1.43% 1.79 2.0 N/A N/A N/A 6.3 6.3 5.0 13 D4 No 0.59 0.59 0.73 18 2.94% 2.8 2.8 2.0 N/A N/A N/A 266 0.94% 1.94 2.3 5.1 5.1 5.0 14 D5 No 0.36 0.36 0.45 57 6.11% 5.7 5.7 5.1 487 1.71% 1.96 4.1 N/A N/A N/A 9.9 9.9 9.2 14 TOTAL BASIN D No 0.60 0.60 0.74 42 2.64% 4.4 4.4 3.1 247 1.23% 1.66 2.5 639 2.04% 2.86 3.7 10.6 10.6 9.3 15 UD1 No 0.85 0.85 1.00 165 3.33% 4.0 4.0 1.6 N/A N/A N/A N/A N/A N/A 5.0 5.0 5.0 16 UD2 No 0.26 0.26 0.33 87 11.64% 6.5 6.5 6.0 681 0.94% 1.46 7.8 N/A N/A N/A 14.2 14.2 13.7 17 OS1 Yes 0.32 0.32 0.40 1103 2.40% 36.2 36.2 32.5 2.00% N/A N/A N/A N/A N/A 36.2 36.2 32.5 18 OS2 No 0.32 0.32 0.40 20 2.00% 5.2 5.2 4.6 2420 2.10% 2.17 18.6 N/A N/A N/A 23.7 23.7 23.2 * Time of Concentrations are calculated for the entire basin and used for both the Impervious and Pervious portions of the basins. PROPOSED TIME OF CONCENTRATION COMPUTATIONS S. Thomas Design Point Sub-Basin Overland Flow SwaleConcentration Flow Gutter/Pipe Flow Time of February 13, 2017 (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 2/13/2017 7:09 AM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Tc A1 1.74 0.42 0.28 0.55 0.24 Clayey | Average 2% to 7% 0.262 0.64 0.64 0.80 63% A2 2.24 0.24 0.55 0.00 0.82 Clayey | Average 2% to 7% 0.627 0.75 0.75 0.94 66% A3 1.46 0.00 0.08 0.00 0.21 Clayey | Average 2% to 7% 1.168 0.39 0.39 0.49 18% TOTAL BASIN A 5.44 0.66 0.91 0.55 1.26 Clayey | Average 2% to 7% 2.058 0.62 0.62 0.77 52% B1 0.47 0.36 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.082 0.83 0.83 1.00 82% B2 0.57 0.00 0.06 0.00 0.19 Clayey | Average 2% to 7% 0.314 0.57 0.57 0.71 41% B3 1.27 0.29 0.34 0.00 0.44 Clayey | Average 2% to 7% 0.203 0.84 0.84 1.00 78% B4 0.23 0.09 0.04 0.06 0.00 Clayey | Average 2% to 7% 0.040 0.65 0.65 0.81 64% B5 1.31 0.00 0.01 0.68 0.00 Clayey | Average 2% to 7% 0.621 0.28 0.28 0.35 21% TOTAL BASIN B 3.84 0.74 0.47 0.74 0.63 Clayey | Average 2% to 7% 1.259 0.60 0.60 0.74 53% C1 0.36 0.00 0.08 0.00 0.12 Clayey | Average 2% to 7% 0.157 0.65 0.65 0.81 51% C2 0.48 0.00 0.05 0.00 0.05 Clayey | Average 2% to 7% 0.382 0.40 0.40 0.50 19% TOTAL BASIN C 0.85 0.00 0.13 0.00 0.18 Clayey | Average 2% to 7% 0.538 0.50 0.50 0.63 33% D1 0.33 0.26 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.046 0.85 0.85 1.00 85% D2 1.71 0.47 0.32 0.23 0.23 Clayey | Average 2% to 7% 0.460 0.67 0.67 0.84 62% D3 0.98 0.35 0.15 0.00 0.16 Clayey | Average 2% to 7% 0.327 0.72 0.72 0.90 64% D4 0.66 0.12 0.11 0.30 0.07 Clayey | Average 2% to 7% 0.065 0.59 0.59 0.73 60% D5 1.38 0.00 0.05 0.27 0.14 Clayey | Average 2% to 7% 0.914 0.36 0.36 0.45 20% TOTAL BASIN D 5.05 1.20 0.64 0.80 0.60 Clayey | Average 2% to 7% 1.812 0.60 0.60 0.74 52% UD1 0.05 0.03 0.02 0.00 0.00 Clayey | Average 2% to 7% 0.007 0.85 0.85 1.00 83% UD2 4.07 0.00 0.07 0.00 0.00 Clayey | Average 2% to 7% 4.010 0.26 0.26 0.33 1% TOTAL SITE 19.31 2.63 2.23 2.09 2.67 Clayey | Average 2% to 7% 9.684 0.53 0.53 0.66 41% OS1 17.23 1.72 0.00 0.00 0.00 Clayey | Average 2% to 7% 15.506 0.32 0.32 0.40 10% OS2 14.72 1.47 0.00 0.00 0.00 Clayey | Average 2% to 7% 13.248 0.32 0.32 0.40 10% Composite Runoff Coefficient with Adjustment PROPOSED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 2/13/2017 7:08 AM D:\Projects\911-007\Drainage\Hydrology\911-007_Proposed_Rational_Calcs.xlsx\Composite C 3 HB3 Yes 0.25 0.25 0.31 541 0.98% 37.2 37.2 34.5 0 N/A N/A N/A 37.2 37.2 34.5 EXISTING TIME OF CONCENTRATION COMPUTATIONS S. Thomas December 20, 2016 Design Point Sub-Basin Overland Flow Swale Flow Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - = 12/20/2016 3:48 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Tc HA2 4.18 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.178 0.25 0.25 0.31 0% HA3 0.33 0.15 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.178 0.57 0.57 0.71 45% HB1 5.60 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 5.602 0.25 0.25 0.31 0% HB2 0.47 0.21 0.00 0.00 0.00 Clayey | Average 2% to 7% 0.254 0.57 0.57 0.71 45% HB3 4.66 0.00 0.00 0.00 0.00 Clayey | Average 2% to 7% 4.661 0.25 0.25 0.31 0% 1. Table RO-11 | Rational Method Runoff Coefficients for Composite Analysis Composite Runoff Coefficient with Adjustment EXISTING COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS 12/20/2016 3:47 PM D:\Projects\911-007\Drainage\Hydrology\911-007_Existing_Rational_Calcs.xlsx\Composite C elevations (MOEs) will need to be set at least 1 ft above the 100-yr WSEL with final design. Water Quality is proposed within the pond volume through an approved outlet structure. Additionally, Pond 2 will be designed to pass off-site flow safely through the pond undetained.