HomeMy WebLinkAboutGATEWAY AT PROSPECT AMENDED ODP ..... TO P & Z BOARD HEARING 1/12/17 - ODP160001 - PLANS - ODP (3)W
T
CONTROL
IRR
V.P.
TEST
STA TEST
STA
MH
COMMUNICATIONS
MANHOLE
1445' SETBACK FROM I-25 FOR SECONDARY USES
C
PRIMARY &/OR
SECONDARY USES
+/- 21.4 ACRES
POTENTIAL
NEIGHBORHOOD
CENTER
1445' SETBACK FROM I-25 FOR SECONDARY USES
205' BUILDING
SETBACK
225'
275''
LMN
(*APU PARCEL)
MF
276 TOTAL UNITS & 13 DU/AC WITHIN
APU BOUNDARY& E BOUNDARY
WITH MF DESIGNATION
+/- 12.4 AC
BOXELDER
ESTATES
LMN
PRIMARY USES
197 TO 399 DU
+/- 49.3 ACRES
BOXELDER BUFFER: PERMANENT OPEN SPACE
OWNED BY BOXELDER HOA
UE
CLUSTERED
WITH
50% OPEN
SPACE
43-49 DU*
+/- 13.8 ACRES
*BASED ON
COMBINED
ACREAGE OF
PARCEL a, d, e
E
PRIMARY USES
+/- 29.1 ACRES
UE
OPEN SPACE
(PART OF 50% OPEN
SPACE/CLUSTER DEVELOPMENT
CALCULATION
REF DATA IN PARCEL e)
+/- 8.1 ACRES
E
SECONDARY
USES
+/- 4.8 ACRES
INTERSTATE 25
RI/RO
APPROXIMATE
LOCATION OF
NON-POTABLE
POND LMN
OPEN SPACE
+/- 5.9 ACRES
REFER TO
ATTACHED APU
REQUEST
3
4 ACCESS
RI/RO
AN APU HAS
BEEN
SUBMITTED
CONCURRENTLY
WITH THIS ODP
TO ALLOW THE
PROPOSED MF
PROJECT
RIGHT OF WAY TO
BE ABANDONED
OR VACATED
EXISTING
COMMERCIAL
NOT
PART
OF THIS
ODP
E
SECONDARY
USES
+/-1.3 AC
E
PRIMARY USES
LIMITED DEVELOPMENT
DUE TO FLOODPLAIN
+/- 16.9 ACRES
BOXELDER CREEK
PROSPECT ROAD (ARTERIAL)
E
MF
REFER TO
DATA ABOVE
+/- 8.4 AC
1445' SETBACK FROM I-25 FOR SECONDARY USES
1445' SETBACK FROM I-25 FOR SECONDARY USES
UE
REF DU/AC
DATA
BELOW
CACHE LA POUDRE INLET CANAL
RI/RO
COLLECTOR
FRONTAGE ROAD
NOT A PART
OF THIS ODP
NOT A PART
OF THIS ODP
COLORADO
WELCOME CENTER
SUNRISE ACRES
SECOND SUBDIVISION
FUTURE
ROUNDABOUT
CROSSROADS EAST
BUSINESS CENTER
SMITHFIELD
FUTURE
RIGHT OF WAY
COLLECTOR
W/ PARKING E
MF
50' DITCH
BUFFER FROM
TOP OF BANK
100' BOXELDER
CREEK BUFFER
FROM TOP OF
BANK
1320' SETBACK FROM I-25 FOR SINGLE FAMILY RESIDENTIAL
COLORADO STATE UNIVERSITY RESEARCH FACILITY
a
b
c
d
e
f
g
h
i
j
k
m
BOXELDER BUFFER: PERMANENT OPEN SPACE
OWNDED BY BOXELDER HOA
NO VEHICULAR
CONNECTION
APPROXIMATE
PUBLIC
NEIGHBORHOOD
PARK
LOCATION
+/- 3-6 ACRES
n
6'-8'
PEDESTRIAN/
BICYLCE
TRAIL
CONNECTION
TO
NEIGHBORHOOD
COMMERCIAL
FUTURE
RIGHT OF WAY
LOCAL ROAD
LAKE CANAL
LAKE CANAL
l
BOXELDER DRIVE
50' DITCH
BUFFER FROM
TOP OF BANK
FUTURE
RIGHT OF WAY
TBD
BOXELDER REGIONAL TRAIL
BUFFER
YARD
C
PRIMARY &/OR
SECONDARY
USES
+/-5.2 ACRES
POTENTIAL
NEIGHBORHOOD
CENTER
PROPERTY BOUNDARY
ZONE DISTRICT BOUNDARY
PEDESTRIAN/BIKE ROUTE
EXTENTS OF EXISTING FEMA FLOODPLAIN
EXTENTS OF REVISED FLOODPLAIN, PER AYRES
ENGINEERING,PENDING LOMR APPROVAL
ACCESS POINT
DITCH BUFFER
REVISED FLOODPLAIN HATCH
TOP OF BANK
EASEMENT
REVISED FLOODWAY HATCH
a PARCEL LABEL
BOXELDER REGIONAL TRAIL (CONCEPTUAL ALIGNMENT)
RIGHT OF WAY
DEVELOPMENT PARCEL BULBBLES
(FOR GRAPHICAL PURPOSES ONLY)
MAXIMUM 40' BUILDING HEIGHT
MAXIMUM 20' BUILDING HEIGHT
OVERALL
DEVELOPMENT
PLAN
SCALE 1" = 200'-0"
0 200' 300' 400' NORTH
Ft Collins, Colorado
GROUP
landscape architecture|planning|illustration
444 Mountain Ave.
Behtroud,CO 80513
TEL
WEB
970.532.5891
TBGroup.us
PROJECT TITLE
REVISIONS
ISSUE DATE
SHEET TITLE
SHEET INFORMATION
DATE
SEAL
MAY 3, 2016
DATE
PREPARED FOR
Gateway at Prospect
Overall Development
Plan
An Amendment To The
Interstate Land ODP
2 NORTH CASCADE AVE.
SUITE 1490
COLORADO SPRINGS, CO 80903
719.540.5800
CONTACT: TIM MCKENNA
NOT FOR CONSTRUCTION
FOR REVIEW ONLY
CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU
DIG, GRADE, OR EXCAVATE FOR THE MARKING OF
UNDERGROUND MEMBER UTILITIES.
CALL UTILITY NOTIFICATION CENTER OF
COLORADO
Know what'sbelow.
Call before you dig.
R
Staff Comments 8.11.16
Staff Comments 10.28.16
2 OF 2
SITE LEGEND
NOTES
1. ZONE DISTRICT BOUNDARIES ARE APPROXIMATE BASED ON CITY OF FORT
COLLINS ZONING MAPS.
2. AYRES FLOODPLAIN LINE TO BE FINALIZED WITH THE LOMR/CLOMR. BUILDING
AND CONSTRUCTION PERMITS MUST MEET THE FLOODPLAIN REQUIREMENTS
BASED ON THE REGULATORY FLOODPLAIN IN EFFECT AT THE TIME OF PERMIT
ISSUANCE. THE REVISED BOXELDER CREEK FLOODPLAIN WILL NOT BE
REGULATORY UNTIL THE LOMR IS APPROVED BY FEMA. FINAL FLOOD FRINGE
AND FLOODWAY BOUNDARIES MAY DIFFER FROM THOSE IN THE CLOMR.
3. THIS OVERALL DEVELOPMENT PLAN SHOWS THE GENERAL LOCATION AND
APPROXIMATE SIZE OF ALL NATURAL AREAS, HABITATS, AND FEATURES
WITHIN ITS BOUNDARIES AND THE PROPOSED ROUGH ESTIMATE OF THE
NATURAL AREA BUFFER ZONES AS REQUIRED BY THE LAND USE CODE
SECTION 3.4.1 (E). DETAILED MAPPING OF A SITE'S NATURAL AREAS, HABITATS,
AND FEATURES WILL BE PROVIDED AT THE TIME OF INDIVIDUAL PDP
SUBMITTALS. GENERAL BUFFER ZONES SHOWN ON THIS ODP MAY BE REDUED
OR ENLARGED BY THE DECISION MAKER DURING THE PDP PROCESS.
4. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES
WITHIN THE NATURAL HABITAT BUFFER ZONES.
5. MAXIMUM NUMBER OF UNITS PER PARCEL IS BASED ON NET ACREAGE. A 10%
REDUCTION IN UNITS WAS USED TO ACCOUNT FOR FUTURE LAND USE THAT
WILL NOT BE PERMITTED IN THE NET ACREAGE CALCULATION PER THE LAND
USE CODE SECTION 3.8.18.