Loading...
HomeMy WebLinkAboutGATEWAY AT PROSPECT AMENDED ODP ..... TO P & Z BOARD HEARING 1/12/17 - ODP160001 - PLANS - ODP (3)W T CONTROL IRR V.P. TEST STA TEST STA MH COMMUNICATIONS MANHOLE 1445' SETBACK FROM I-25 FOR SECONDARY USES C PRIMARY &/OR SECONDARY USES +/- 21.4 ACRES POTENTIAL NEIGHBORHOOD CENTER 1445' SETBACK FROM I-25 FOR SECONDARY USES 205' BUILDING SETBACK 225' 275'' LMN (*APU PARCEL) MF 276 TOTAL UNITS & 13 DU/AC WITHIN APU BOUNDARY& E BOUNDARY WITH MF DESIGNATION +/- 12.4 AC BOXELDER ESTATES LMN PRIMARY USES 197 TO 399 DU +/- 49.3 ACRES BOXELDER BUFFER: PERMANENT OPEN SPACE OWNED BY BOXELDER HOA UE CLUSTERED WITH 50% OPEN SPACE 43-49 DU* +/- 13.8 ACRES *BASED ON COMBINED ACREAGE OF PARCEL a, d, e E PRIMARY USES +/- 29.1 ACRES UE OPEN SPACE (PART OF 50% OPEN SPACE/CLUSTER DEVELOPMENT CALCULATION REF DATA IN PARCEL e) +/- 8.1 ACRES E SECONDARY USES +/- 4.8 ACRES INTERSTATE 25 RI/RO APPROXIMATE LOCATION OF NON-POTABLE POND LMN OPEN SPACE +/- 5.9 ACRES REFER TO ATTACHED APU REQUEST 3 4 ACCESS RI/RO AN APU HAS BEEN SUBMITTED CONCURRENTLY WITH THIS ODP TO ALLOW THE PROPOSED MF PROJECT RIGHT OF WAY TO BE ABANDONED OR VACATED EXISTING COMMERCIAL NOT PART OF THIS ODP E SECONDARY USES +/-1.3 AC E PRIMARY USES LIMITED DEVELOPMENT DUE TO FLOODPLAIN +/- 16.9 ACRES BOXELDER CREEK PROSPECT ROAD (ARTERIAL) E MF REFER TO DATA ABOVE +/- 8.4 AC 1445' SETBACK FROM I-25 FOR SECONDARY USES 1445' SETBACK FROM I-25 FOR SECONDARY USES UE REF DU/AC DATA BELOW CACHE LA POUDRE INLET CANAL RI/RO COLLECTOR FRONTAGE ROAD NOT A PART OF THIS ODP NOT A PART OF THIS ODP COLORADO WELCOME CENTER SUNRISE ACRES SECOND SUBDIVISION FUTURE ROUNDABOUT CROSSROADS EAST BUSINESS CENTER SMITHFIELD FUTURE RIGHT OF WAY COLLECTOR W/ PARKING E MF 50' DITCH BUFFER FROM TOP OF BANK 100' BOXELDER CREEK BUFFER FROM TOP OF BANK 1320' SETBACK FROM I-25 FOR SINGLE FAMILY RESIDENTIAL COLORADO STATE UNIVERSITY RESEARCH FACILITY a b c d e f g h i j k m BOXELDER BUFFER: PERMANENT OPEN SPACE OWNDED BY BOXELDER HOA NO VEHICULAR CONNECTION APPROXIMATE PUBLIC NEIGHBORHOOD PARK LOCATION +/- 3-6 ACRES n 6'-8' PEDESTRIAN/ BICYLCE TRAIL CONNECTION TO NEIGHBORHOOD COMMERCIAL FUTURE RIGHT OF WAY LOCAL ROAD LAKE CANAL LAKE CANAL l BOXELDER DRIVE 50' DITCH BUFFER FROM TOP OF BANK FUTURE RIGHT OF WAY TBD BOXELDER REGIONAL TRAIL BUFFER YARD C PRIMARY &/OR SECONDARY USES +/-5.2 ACRES POTENTIAL NEIGHBORHOOD CENTER PROPERTY BOUNDARY ZONE DISTRICT BOUNDARY PEDESTRIAN/BIKE ROUTE EXTENTS OF EXISTING FEMA FLOODPLAIN EXTENTS OF REVISED FLOODPLAIN, PER AYRES ENGINEERING,PENDING LOMR APPROVAL ACCESS POINT DITCH BUFFER REVISED FLOODPLAIN HATCH TOP OF BANK EASEMENT REVISED FLOODWAY HATCH a PARCEL LABEL BOXELDER REGIONAL TRAIL (CONCEPTUAL ALIGNMENT) RIGHT OF WAY DEVELOPMENT PARCEL BULBBLES (FOR GRAPHICAL PURPOSES ONLY) MAXIMUM 40' BUILDING HEIGHT MAXIMUM 20' BUILDING HEIGHT OVERALL DEVELOPMENT PLAN SCALE 1" = 200'-0" 0 200' 300' 400' NORTH Ft Collins, Colorado GROUP landscape architecture|planning|illustration 444 Mountain Ave. Behtroud,CO 80513 TEL WEB 970.532.5891 TBGroup.us PROJECT TITLE REVISIONS ISSUE DATE SHEET TITLE SHEET INFORMATION DATE SEAL MAY 3, 2016 DATE PREPARED FOR Gateway at Prospect Overall Development Plan An Amendment To The Interstate Land ODP 2 NORTH CASCADE AVE. SUITE 1490 COLORADO SPRINGS, CO 80903 719.540.5800 CONTACT: TIM MCKENNA NOT FOR CONSTRUCTION FOR REVIEW ONLY CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R Staff Comments 8.11.16 Staff Comments 10.28.16 2 OF 2 SITE LEGEND NOTES 1. ZONE DISTRICT BOUNDARIES ARE APPROXIMATE BASED ON CITY OF FORT COLLINS ZONING MAPS. 2. AYRES FLOODPLAIN LINE TO BE FINALIZED WITH THE LOMR/CLOMR. BUILDING AND CONSTRUCTION PERMITS MUST MEET THE FLOODPLAIN REQUIREMENTS BASED ON THE REGULATORY FLOODPLAIN IN EFFECT AT THE TIME OF PERMIT ISSUANCE. THE REVISED BOXELDER CREEK FLOODPLAIN WILL NOT BE REGULATORY UNTIL THE LOMR IS APPROVED BY FEMA. FINAL FLOOD FRINGE AND FLOODWAY BOUNDARIES MAY DIFFER FROM THOSE IN THE CLOMR. 3. THIS OVERALL DEVELOPMENT PLAN SHOWS THE GENERAL LOCATION AND APPROXIMATE SIZE OF ALL NATURAL AREAS, HABITATS, AND FEATURES WITHIN ITS BOUNDARIES AND THE PROPOSED ROUGH ESTIMATE OF THE NATURAL AREA BUFFER ZONES AS REQUIRED BY THE LAND USE CODE SECTION 3.4.1 (E). DETAILED MAPPING OF A SITE'S NATURAL AREAS, HABITATS, AND FEATURES WILL BE PROVIDED AT THE TIME OF INDIVIDUAL PDP SUBMITTALS. GENERAL BUFFER ZONES SHOWN ON THIS ODP MAY BE REDUED OR ENLARGED BY THE DECISION MAKER DURING THE PDP PROCESS. 4. PLEASE SEE SECTION 3.4.1 OF THE LAND USE CODE FOR ALLOWABLE USES WITHIN THE NATURAL HABITAT BUFFER ZONES. 5. MAXIMUM NUMBER OF UNITS PER PARCEL IS BASED ON NET ACREAGE. A 10% REDUCTION IN UNITS WAS USED TO ACCOUNT FOR FUTURE LAND USE THAT WILL NOT BE PERMITTED IN THE NET ACREAGE CALCULATION PER THE LAND USE CODE SECTION 3.8.18.