Loading...
HomeMy WebLinkAboutCOUNTRY CLUB CORNERS SIXTH FILING (CARWASH) - PDP - PDP170003 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSSITE Vicinity Map Scale: 1" = 1000' ABBREVIATION LIST AD ALGEBRAIC DIFFERENCE AE ACCESS EASEMENT ARCH ARCHITECT ARV AIR RELEASE VALVE ASPH ASPHALT BLDG BUILDING BOV BLOW OFF VALVE BOS BOTTOM OF STEP BOW BACK OF WALK BW BOTTOM OF WALL CATV CABLE TELEVISION CL CENTERLINE CMP CORRUGATED METAL PIPE CO CLEAN OUT CoFC CITY OF FORT COLLINS COMM COMMUNICATION CONC CONCRETE COORD COORDINATION DE DRAINAGE EASEMENT DEMO DEMOLITION DIA DIAMETER E EAST(ING) EAE EMERGENCY ACCESS EASEMENT EG EXISTING GROUND EL ELEVATION ELEC ELECTRIC EOA EDGE OF ASPHALT EOC EDGE OF CONCRETE EX EXISTING ESMT EASEMENT F FIRE LINE FES FLARED END SECTION FF FINISHED FLOOR FFE FINISHED FLOOR ELEVATION FG FINISHED GRADE FH FIRE HYDRANT FL FLOWLINE FO FIBER OPTIC G GAS GB GRADE BREAK GF GARAGE FLOOR GV GATE VALVE HORZ HORIZONTAL HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT IE IRRIGATION EASEMENT INV INVERT IRR IRRIGATION LA LANDSCAPE (PLAN/ACRH) LF LINEAR FEET LP LOW POINT LT LEFT MAX MAXIMUM MC MOISTURE CONDITION ME MATCH EXISTING LOT 1 LOT 2 LOT 3 TRACT A TRACT A PRIVATE DRIVE PRIVATE DRIVE 0 20' 20 10 20 40 SCALE: 1" = CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NOTES: 1. ALL EXISTING UTILITY LOCATIONS SHOWN HAVE BEEN DETERMINED FROM A COMBINATION OF RECORD DRAWINGS, SURVEYED FIELD MARK-OUTS AND PHYSICAL OBSERVATIONS. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THE DRAWINGS WHICH PRESENTLY EXIST IN THE AREA OF CONSTRUCTION. THEREFORE, THE CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES IN THE PROJECT VICINITY PRIOR TO BEGINNING WORK. THE CONTRACTOR SHALL COORDINATE AND PROVIDE PROTECTION OF CONFLICTING UTILITIES. NOTIFY OWNER/ENGINEER IF ANY CONFLICTS ARE ENCOUNTERED. THE OWNER AND/OR ENGINEER ASSUMES NO RESPONSIBILITY FOR THE ACCURACY OR COMPLETENESS SHOWN. 2. COORDINATE DEMOLITION REQUIREMENTS, LIMITS OF DEMOLITION, SALVAGE ITEMS, PROTECTION OF ITEMS TO REMAIN, TREES, FENCING, ETC. WITH OWNER, ARCHITECT, AND RELEVANT CONSTRUCTION AND/OR PHASING PLANS. ADDITIONAL DEMOTION OF PAVING, TREES, UTILITIES, STRUCTURES, ETC. TO BE PERFORMED AS REQUIRED. 3. CONTRACTOR RESPONSIBLE FOR ALL SURFACE REPAIR/REPLACEMENT TO RESTORE SIDEWALKS, PAVEMENT, CURB/GUTTER AND SOD AREAS DISTURBED BY NEW WORK. REPAIR/REPLACEMENTS SHALL BE COMPLETED PER CITY OF FORT COLLINS STANDARDS AT CONTRACTOR EXPENSE. 4. EXISTING CONCRETE AND ASPHALT PAVING SHALL BE SAWCUT AND REMOVED PRIOR TO EXCAVATION. REMOVE CONCRETE TO THE NEAREST JOINT. MECH LOT 1 LOT 2 TRACT A TRACT A PRIVATE DRIVE PRIVATE DRIVE PRIVATE DRIVE LOT 3 CARWASH RAIN GARDEN CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NOTES: 1. VERIFY BUILDING PLAN DIMENSIONS PRIOR TO CONSTRUCTION 2. ALL PAVEMENTS AND EARTHWORK SHALL CONFORM TO THE GEOTECHNICAL REPORT FOR THE SITE. 3. ALL WORK SHALL CONFORM TO THE CITY OF FORT COLLINS CONSTRUCTION SPECIFICATIONS AND STANDARDS. 4. COORDINATE LOCATION, HEIGHTS, ETC. OF WALLS FENCES, AND SITE FEATURES WITH ARCH AND LANDSCAPE. 5. ALL SURFACES SHALL BE THOROUGHLY CLEANED PRIOR TO INSTALLATION OF STRIPING OR MARKING. 6. FINAL STRIPING AND SYMBOL LOCATIONS SHALL BE FIELD COORDINATED WITH OWNER. PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: MECH LOT 1 LOT 2 LOT 3 TRACT A TRACT A PRIVATE DRIVE PRIVATE DRIVE PRIVATE DRIVE CARWASH RAIN GARDEN CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date NOTES: 1. ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION OF PUBLIC WATER AND WASTEWATER SYSTEM IMPROVEMENTS SHALL MEET OR EXCEED THE STANDARDS SET FORTH IN THE CITY OF FORT COLLINS WATER AND WASTEWATER DEVELOPMENT STANDARDS. 2. FIRE HYDRANT WATER MAINS SHALL BE DUCTILE IRON PIPE. ALL FITTINGS SHALL BE FULLY RESTRAINED JOINTS PER CITY STANDARDS (MEGA-LUG OR APPROVED EQUAL). 3. ALL WATER SERVICES SHALL BE TYPE K SOFT COPPER. 4. ALL WATER MAINS AND SERVICES SHALL HAVE A MINIMUM COVER OF 4.5' AND A MAXIMUM OF 5.5', UNLESS OTHERWISE NOTED. 5. ALL SANITARY SEWER & STORM SEWER CLEANOUTS LOCATED WITHIN THE PAVEMENT SHALL BE TRAFFIC RATED CLEANOUTS. 6. ALL PROPOSED STORM SEWER IMPROVEMENTS SHALL BE IN ACCORDANCE WITH THE CITY OF FORT COLLINS STANDARDS AND SPECIFICATIONS. 7. STORM PIPES SHALL BE REINFORCED CONCRETE PIPE (RCP) BEDDED PER STANDARDS. RCP SHALL HAVE FLEXIBLE GASKET MATERIAL (WATER TIGHT RUBBER GASKETS) CONFORMING TO ASTM C443 AND TYPE 4-G BELL SPIGOT JOINTS. MECH LOT 1 LOT 2 LOT 3 TRACT A TRACT A TRACT A RAIN GARDEN CARWASH PRIVATE DRIVE PRIVATE DRIVE PRIVATE DRIVE CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date LEGEND BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH INLET PROTECTION CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL SEDIMENT CONTROL LOG OUTLET STRUCTURE PROTECTION ROCK SOCKS CONCRETE WASHOUT AREA LEGEND BASIN COEFFICIENT (100-YR) BASIN DESIGNATION BASIN AREA DESIGN POINT DRAINAGE FLOW ARROW DRAINAGE BASIN BOUNDARY DRAINAGE BASIN FLOW PATH INLET PROTECTION CONSTRUCTION ENTRANCE W/ VEHICLE TRACKING CONTROL SEDIMENT CONTROL LOG OUTLET STRUCTURE PROTECTION ROCK SOCKS CONCRETE WASHOUT AREA PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME COUNTRY CLUB CORNERS SIXTH FILING GRADING, DRAINAGE & EROSION CONTROL PLAN 01/25/17 1"= 20' N/A JTC JTC 1303-158-00 5 of 5 C-THREE, LLC 2500 SOUTH TIMBERLINE ROAD FORT COLLINS, CO 80525 ---- ---- 0 20' 20 10 20 40 SCALE: 1" = NOTES 1. CONTRACTOR TO PROVIDE AND MAINTAIN ALL NECESSARY EROSION CONTROL MEASURES PRIOR TO AND THROUGHOUT CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL EXISTING INLETS DOWNSTREAM FROM THE CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED WITH OWNER'S APPROVAL FOR REMOVAL. 2. THE EXTENT OF EROSION CONTROL PROTECTION SHALL BE OBSERVED AND ADJUSTED AS NEEDED DURING CONSTRUCTION BASED ON SITE CONDITIONS AND THE PERFORMANCE OF THE EROSION CONTROL CONTROL MEASURES SHOWN, TO SUPPLY SUFFICIENT EROSION CONTROL AND MINIMIZE DOWNSTREAM WATERWAY POLLUTION. 3. LIMIT DISTURBANCE TO AREAS WITHIN EROSION CONTROL BOUNDARIES. ADJUST EROSION CONTROL BOUNDARIES AS NECESSARY TO ADEQUATELY COMPLETE PROPOSED WORK. ALL DISTURBED AREAS SHALL BE PREPARED (SEEDED & MULCHED, SURFACE ROUGHENING, ETC.) TO MINIMIZE EROSION POTENTIAL AND SOIL MIGRATION. 4. STORMWATER MANAGEMENT PLAN SHALL BE PREPARED AND SUBMITTED BY CONTRACTOR PRIOR TO CONSTRUCTION COMMENCEMENT. 5. SEE LANDSCAPE PLAN FOR REVEGETATION METHODS AND DETAILS. DURING CONSTRUCTION, ANY SOIL DISTURBED AND NOT UNDER ACTIVE CONSTRUCTION SHALL BE SEEDED AND MULCHED PER LCUASS STANDARDS. 6. ANY DISTURBED LAND MUST RECEIVE SURFACE ROUGHENING, INCLUDING BUT NOT LIMITED TO SLOPED AREAS. 7. FOLLOW MANUFACTURER RECOMMENDATIONS FOR THE INSTALLATION OF SCOURSTOP. IT IS RECOMMENDED THAT THE SCOURSTOP BE PLACED OVER SEEDED NA GREEN S150 (TEMP TURF REINFORCEMENT MAT) AND DOWNSTREAM TO PROTECT THE SOILS PRIOR TO VEGETATION BEING WELL ESTABLISHED. 8. REFERENCE SHEET 10 FOR EROSION CONTROL DETAILS. CoFC Standard erosion and sediment control notes: 1. THE CITY STORMWATER DEPARTMENT EROSION CONTROL INSPECTOR MUST BE NOTIFIED AT LEAST 24 HOURS PRIOR TO ANY CONSTRUCTION ON THIS SITE. 2. ALL REQUIRED BMPS MUST BE INSTALLED PRIOR TO ANY LAND DISTURBING ACTIVITY (STOCKPILING, STRIPPING, GRADING, ETC). ALL REQUIRED EROSION CONTROL MEASURES MUST BE INSTALLED AT THE APPROPRIATE TIME IN THE CONSTRUCTION SEQUENCE AS INDICATED IN THE APPROVED PROJECT SCHEDULE, CONSTRUCTION PLANS, AND EROSION CONTROL REPORT. 3. PRE-DISTURBANCE VEGETATION SHALL BE PROTECTED AND RETAINED WHEREVER POSSIBLE. REMOVAL OR DISTURBANCE OF EXISTING VEGETATION SHALL BE LIMITED TO THE AREA REQUIRED FOR IMMEDIATE CONSTRUCTION OPERATIONS, AND FOR THE SHORTEST PRACTICAL PERIOD OF TIME. 4. ALL SOILS EXPOSED DURING LAND DISTURBING ACTIVITY (STRIPPING, GRADING, UTILITY INSTALLATIONS, STOCKPILING, FILLING, ETC.) SHALL BE KEPT IN A ROUGHENED CONDITION BY RIPPING OR DISKING ALONG LAND CONTOURS UNTIL MULCH, VEGETATION, OR OTHER PERMANENT EROSION CONTROL IS INSTALLED. NO SOILS IN AREAS OUTSIDE PROJECT STREET RIGHTS OF WAY SHALL REMAIN EXPOSED BY LAND DISTURBING ACTIVITY FOR MORE THAN THIRTY (30) DAYS BEFORE REQUIRED TEMPORARY OR PERMANENT EROSION CONTROL (E.G. SEED/MULCH, LANDSCAPING, ETC.) IS INSTALLED, UNLESS OTHERWISE APPROVED BY THE STORMWATER DEPARTMENT. 5. THE PROPERTY MUST BE WATERED AND MAINTAINED AT ALL TIMES DURING CONSTRUCTION ACTIVITIES SO AS TO PREVENT WIND-CAUSED EROSION. ALL LAND DISTURBING ACTIVITIES SHALL BE IMMEDIATELY DISCONTINUED WHEN FUGITIVE DUST IMPACTS ADJACENT PROPERTIES, AS DETERMINED BY THE CITY ENGINEERING DEPARTMENT. 6. ALL TEMPORARY (STRUCTURAL) EROSION CONTROL MEASURES MUST BE INSPECTED AND REPAIRED OR RECONSTRUCTED AS NECESSARY AFTER EACH RUNOFF EVENT AND EVERY 14 DAYS IN ORDER TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION. ALL RETAINED SEDIMENTS, PARTICULARLY THOSE ON PAVED ROADWAY SURFACES, SHALL BE REMOVED AND DISPOSED OF IN A MANNER AND LOCATION SO AS NOT TO CAUSE THEIR RELEASE INTO ANY DRAINAGEWAY. 7. NO SOIL STOCKPILE SHALL EXCEED TEN (10) FEET IN HEIGHT. ALL SOIL STOCKPILES SHALL BE PROTECTED FROM SEDIMENT TRANSPORT BY SURFACE ROUGHENING, WATERING, AND PERIMETER SILT FENCING. ANY SOIL STOCKPILE REMAINING AFTER 30 DAYS SHALL BE SEEDED AND MULCHED. 8. CITY ORDINANCE PROHIBITS THE TRACKING, DROPPING, OR DEPOSITING OF SOILS OR ANY OTHER MATERIAL ONTO CITY STREETS BY OR FROM ANY VEHICLE. ANY INADVERTENT DEPOSITED MATERIAL SHALL BE CLEANED IMMEDIATELY BY THE CONTRACTOR. 8. ALL MANHOLE RIM AND INLET GRATE ELEVATIONS SHOWN ARE APPROXIMATE. CONFIRM FINAL ELEVATIONS PRIOR TO INSTALLATION. 9. PIPE LENGTHS ARE PROVIDED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE. LENGTH OF FLARED END SECTIONS ARE INCLUDED IN PIPE LENGTHS. 10. ADJUST ALL EXISTING UTILITY MANHOLES, VALVE COVERS, ETC TO WITHIN LIMITS OF NEW WORK TO FINISHED GRADE. 11. TRENCH DRAIN SHALL BE 4" WIDE SLOPED CHANNEL ACO KLASSIKDRAIN K100 WITH LOAD CLASS E GRATE (TYPE 478Q). PROVIDE IN-LINE CATCH BASIN (K1-901G) AT DOWNSTREAM END OF TRENCH DRAIN WITH REMOVABLE TRASH BUCKET. TRENCH DRAIN INVERTS ARE ESTIMATED AND TO BE VERIFIED IN THE FIELD. PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME COUNTRY CLUB CORNERS SIXTH FILING UTILITY PLAN 01/25/17 1"= 20' N/A JTC JTC 1303-158-00 4 of 5 C-THREE, LLC 2500 SOUTH TIMBERLINE ROAD FORT COLLINS, CO 80525 ---- ---- 0 20' 20 10 20 40 SCALE: 1" = PROJECT NAME COUNTRY CLUB CORNERS SIXTH FILING HORIZONTAL CONTROL PLAN 01/25/17 1"=20' N/A JTC JTC 1303-158-00 3 of 5 C-THREE, LLC 2500 SOUTH TIMBERLINE ROAD FORT COLLINS, CO 80525 ---- ---- 0 20' 20 10 20 40 SCALE: 1" = HEAVY CONCRETE PAVEMENT LIGHT DUTY CONCRETE HEAVY DUTY ASPHALT PAVEMENT LEGEND CURB AND SPILL GUTTER 5. CONTRACTOR TO PROVIDE ALL NECESSARY EROSION CONTROL MEASURES DURING CONSTRUCTION. PLACE EROSION CONTROL PROTECTION AT ALL PROPOSED AND EXISTING INLETS DOWNSTREAM FROM CONSTRUCTION AREA. EROSION CONTROL PROTECTION SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE AND ALL DISTURBED GROUND IS ADEQUATELY VEGETATED. 6. LIMITS OF STREET CUTS, ASPHALT, AND CONCRETE REMOVALS ARE APPROXIMATE. LIMITS OF REMOVAL TO BE DETERMINED IN THE FIELD TO ADEQUATELY COMPLETE THE PROPOSED IMPROVEMENTS, WHILE MAINTAINING, IF NOT IMPROVING, EXISTING CONDITIONS. ADDITIONAL REMOVAL IDENTIFIED IN THE FIELD SHALL BE COMPLETED AT CONTRACTOR EXPENSE. ALL REPAIRS TO BE COMPLETED IN ACCORDANCE WITH CITY STREET REPAIRS STANDARDS. 7. REFER TO LANDSCAPE TREE MITIGATION PLAN FOR TREE REMOVAL, RELOCATION AND PROTECTION. TREE REMOVAL INFORMATION SHOWN FOR COORDINATION PURPOSES ONLY. 8. REFERENCE LANDSCAPE AND ARCHITECTURAL PLANS FOR ADDITIONAL SITE DEMOLITION. PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME COUNTRY CLUB CORNERS SIXTH FILING EXISTING CONDITIONS & DEMOLITION PLAN 01/25/17 1"= 20' N/A JTC JTC 1303-158-00 2 of 5 C-THREE, LLC 2500 SOUTH TIMBERLINE ROAD FORT COLLINS, CO 80525 ---- ---- APPROX LIMITS OF SAWCUT LINE DEMO UTILITIES / FENCE / ETC DEMO STRUCTURE/UTILITY/ LIGHT/ ETC DEMO ASPHALT / CONCRETE TREE REMOVAL/RELOCATION (RE: LA) PROTECT EXISTING TREE (RE: LA) LEGEND MEP MECHANICAL, ELECTRICAL, PLUMBING ENGINEER MH MANHOLE MIN MINIMUM N NORTH(ING) NA NOT APPLICABLE NHBZ NATURAL HABITAT BUFFER ZONE NTS NOT TO SCALE OC ON CENTER OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE OHU OVERHEAD UTILITY PE PEDESTRIAN EASEMENT PC POINT OF CURVATURE PCR POINT OF CURB RETURN PKWY PARKWAY PI POINT OF INTERSECTION PL PROPERTY LINE PT POINT OF TANGENCY PVC POLYVINYL CHLORIDE RC RECOMPACT RCP REINFORCED CONCRETE PIPE RD ROOF DRAIN RE REFERENCE ROW RIGHT-OF-WAY RT RIGHT SS SANITARY SEWER STA STATION SD STORM DRAIN PIPE SDMH STORM DRAIN MANHOLE SSMH SANITARY SEWER MANHOLE SWMP STORMWATER MANAGEMENT PLAN T TELEPHONE TB THRUST BLOCK TBC TOP BACK OF CURB TBV TO BE VACATED TC TOP OF CONCRETE TELE TELEPHONE TEMP TEMPORARY TF TOP OF FOUNDATION TOS TOP OF STEP TW TOP OF WALL TYP TYPICAL UE UTILITY EASEMENT UGE UNDERGROUND ELECTRIC UTIL UTILITY VCP VITRIFIED CLAY PIPE VERT VERTICAL VPC VERTICAL POINT OF CURVATURE VPI VERTICAL POINT OF INTERSECTION VPT VERTICAL POINT OF TANGENCY W WATERLINE WQCE WATER QUALITY CONTROL ELEVATION WM WATER METER WSE WATER SURFACE ELEVATION PROPOSED STREET LIGHT PROPOSED STORM SEWER EXISTING SANITARY SEWER MAIN PROPOSED TELEPHONE LINE EXISTING GAS EXISTING STORM SEWER EXISTING WATER MAIN EXISTING MANHOLE PROPOSED STORM INLET LEGEND PROPOSED CONCRETE PROPOSED MINOR CONTOUR EXISTING SPOT ELEVATION PROPOSED SPOT ELEVATION PROPOSED MAJOR CONTOUR EXISTING MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING UTILITY POLE EXISTING GUY WIRE PROPOSED GAS EXISTING ELECTRIC LINE PROPOSED ELECTRIC LINE EXISTING TELEPHONE LINE EXISTING FIRE HYDRANT PROPOSED FIRE HYDRANT EXISTING WATER VALVE PROPOSED SANITARY SEWER MAIN PROPOSED WATER MAIN EXISTING CONCRETE EXISTING FLOWLINE, CURB & GUTTER PROPOSED FLOWLINE, CURB & GUTTER PROPOSED FENCE LIMITS OF CONSTRUCTION EXISTING OVERHEAD UTILITY EXISTING STORM SEWER INLET PROPOSED WATER VALVE PROPOSED MANHOLE PROPOSED UTILITY POLE EXISTING STREET LIGHT PROPOSED SWALE PROPOSED DIRECTION OF OVERLAND FLOW PROPOSED EMERGENCY OVERFLOW ROUTE EXISTING FIBER OPTIC LINE PROPOSED HANDICAP RAMP EXISTING OVERHEAD ELECTRIC LINE EXISTING OVERHEAD TELEPHONE LINE PROPOSED OVERHEAD ELECTRIC LINE PROPOSED FIBER OPTIC LINE PROPOSED OVERHEAD TELEPHONE LINE EXISTING FENCE PROPOSED WATER SERVICE W/ PROPOSED SANITARY SEWER SERVICE CURB STOP AND METER PIT W/ CLEANOUT PROPOSED OVERHEAD UTILITY PROPOSED LIGHT POLES PROJECT DATUM: NAVD88 CITY OF FORT COLLINS BENCHMARK #42-97 ON TOP OF A STORM INLET STRUCTURE ON THE EAST SIDE OF REDWOOD ST., 400 FEET SOUTH OF WILLOX LANE. ELEV= 4969.93 CITY OF FORT COLLINS BENCHMARK #V401 AT THE JUNCTION OF U.S. HIGHWAY 287 AND BRISTLECONE DRIVE, 194.9 FT EAST OF THE CENTERLINE OF THE NORTH BOUND LANES OF THE HIGHWAY, 48.2 FT NORTH OF THE CENTER OF THE DRIVE, AND 3.6 FT NORTH OF A UTILITY POLE AND POWERLINE CROSSING THE DRIVE ELEV= 4977.81 PLEASE NOTE: THIS PLAN SET IS USING NAVD88 FOR A VERTICAL DATUM. IF NGVD29 UNADJUSTED IS REQUIRED FOR ANY PURPOSE, THE FOLLOWING EQUATIONS SHOULD BE USED: NGVD UNADJUSTED = 4969.93 (NAVD88) - 3.18 NGVD UNADJUSTED = 4977.81 (NAVD88) - 3.17 HORIZONTAL DATUM: COLORADO STATE PLAN COORDINATES NAD 83(2007) DATUM. HORIZONTAL CONTROL BASED VRS. UTILITY CONTACTS: LIGHT & POWER City of Fort Collins Light & Power Contact: Janet McTague Ph. 970.224.6154 STORMWATER,WATER & WASTEWATER City of Fort Collins Utilities 700 Wood Street Fort Collins, Colorado 80522 Contact: Shane Boyle Ph. 970.221.6339 NATURAL GAS Xcel Energy 1901 E. Horsetooth Road Fort Collins, Colorado 80525 Contact: Stephanie Rich Ph. 970.225.7828 TELEPHONE SERVICE Century Link (Qwest) 3351 Eastbrook Drive Fort Collins, Colorado 80525 Contact: Bill Johnson Ph. 970.490.7501 CABLE SERVICE Comcast 1201 University Dr. Fort Collins, Colorado 80521 Contact: Don Kapperman Ph. 970.567.0245 I HEREBY AFFIRM THAT THESE FINAL CONSTRUCTION PLANS WERE PREPARED UNDER MY DIRECT SUPERVISION, IN ACCORDANCE WITH ALL APPLICABLE CITY OF FORT COLLINS AND STATE OF COLORADO STANDARDS AND STATUTES, RESPECTIVELY, AND THAT I AM FULLY RESPONSIBLE FOR THE ACCURACY OF ALL DESIGN, REVISIONS AND RECORD CONDITIONS THAT I HAVE NOTED ON THESE PLANS. Utility Plans For COUNTRY CLUB CORNERS SIXTH FILING BEING A REPLAT OF LOT 8, COUNTRY CLUB CORNERS THIRD FILING P.U.D. AND LOT 1, COUNTRY CLUB CORNERS FIFTH FILING, ALL SITUATE IN THE NORTHWEST QUARTER OF SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO January 2017 CALL BEFORE YOU DIG CALL UTILITY NOTIFICATION CENTER OF COLORADO 1-800-922-1987 or 8-1-1 CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CHECKED BY: Date City of Fort Collins, Colorado UTILITY PLAN APPROVAL Parks and Recreation Traffic Engineer Stormwater Utility Water & Wastewater Utility City Engineer CHECKED BY: APPROVED: Environmental Planner CHECKED BY: CHECKED BY: CHECKED BY: CHECKED BY: Date Date Date Date Date Date OWNER / DEVELOPER C-Three, LLC 2500 S. Timberline Road Fort Collins, CO 80524 Ph. ENGINEER Interwest Consulting Group 1218 W. Ash, Suite A Windsor, Colorado 80550 Ph. 970.674.3300 LANDSCAPE ARECHTIECT Russell + Mills Studio 141 S College Ave, Suite 104 Fort Collins, CO, 80524 Ph. 970.484.8855 SURVEYOR Intermill Land Surveying 1301 Cleveland Ave, Loveland, CO 80537 Ph. 970.669.0516 ARCHITECT Freeman Architects 2024 Blue Mesa Court Loveland, CO 80538 Ph. 970.667.3939 Fax. 970.667.3940 INDEMNIFICATION STATEMENT: THESE PLANS HAVE BEEN REVIEWED BY THE LOCAL ENTITY FOR CONCEPT ONLY. THE REVIEW DOES NOT IMPLY RESPONSIBILITY BY THE REVIEWING DEPARTMENT, THE LOCAL ENTITY ENGINEER, OR THE LOCAL ENTITY FOR ACCURACY AND CORRECTNESS OF THE CALCULATIONS. FURTHERMORE, THE REVIEW DOES NOT IMPLY THAT QUANTITIES OF ITEMS ON THE PLANS ARE THE FINAL QUANTITIES REQUIRED. THE REVIEW SHALL NOT BE CONSTRUED IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE LOCAL ENTITY FOR ADDITIONAL QUANTITIES OF ITEMS SHOWN THAT MAY BE REQUIRED DURING THE CONSTRUCTION PHASE. JASON T. CLAEYS P.E. NO. 42122 PREPARED FOR PROJ. NO. DATE: SCALE (H): SCALE (V): CHECKED BY: DESIGNED BY: PROJECT NAME COUNTRY CLUB CORNERS SIXTH FILING COVER SHEET 01/25/17 N/A N/A JTC JTC 1303-158-00 1 of 5 C-THREE, LLC 2500 SOUTH TIMBERLINE ROAD FORT COLLINS, CO 80525 ---- ---- INDEX OF SHEETS Sheet No. Description of Sheets 1 COVER SHEET 2 EXISTING CONDITIONS & DEMOLITION PLAN 3 HORIZONTAL CONTROL PLAN 4 UTILITY PLAN 5 GRADING, DRAINAGE & EROSION CONTROL PLAN