Loading...
HomeMy WebLinkAboutAFFORDABLE SELF STORAGE - PDP - PDP170005 - SUBMITTAL DOCUMENTS - ROUND 1 - PLANNING OBJECTIVESAffordable Self Storage Conifer Street and Red Cedar Dr. FORT COLLINS, CO 80524 STATEMENT OF PLANNING OBJECTIVES January 31, 2017 Owner: Randy and Deb Milan Architect/Planner: Alan Hauser, AIA; Hauser Architects, PC Landscape Architect: Tim Briggs, Site Design Civil Engineer: Tricia Kroetch, PE; North Star Design, Inc. Contractor: McCauley Constructors Inc. LEGAL DESCRIPTION BEING A REPLAT OF LOTS 7, 8, & 9, BLOCK 4, REPLAT NO. 1 OF EVERGREEN PARK AND LOT 1, A MINOR SUBDIVISION PLAT OF CONIFER INDUSTRIAL PARK, ALL SITUATE IN SECTION 1, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH P.M., CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO PROJECT DETAILS Zoning – (I) Industrial. This is a new self-storage facility that contains 6 buildings with a total of 87,905 square feet. The construction type for all 6 buildings will be type II-B. The multistory building will be fully sprinkled and the single-story buildings will be compartmentalized to a maximum of 5,000 square foot fire areas. NEIGHBORHOOD MEETING A neighborhood meeting was not required for this project, this project is subject to Administrative (Type 1) review in the Industrial zone district. PROJECT STATEMENT/NARRATIVE Currently the site is undeveloped, with a storage yard on roughly half of the proposed development. The new buildings will have a variety of finish’s including split face cmu, stucco, and metal panel on the interior buildings of the development. The primary building, the two story on the corner of Conifer and Red Cedar will predominately screen the site, the materials will consist of CMU split face block veneer, stucco, and concealed fastener metal panels that mimic a wood finish. All mechanical equipment will be on the roof of the two-story building and will be fully screened. The single-story building on site will be unconditioned building. We have designed the site to fully screen the self-storage activity and the visibility of the coiling self-storage doors is limited. We are providing 5 standard parking spaces and 1 handicap van accessible space for the office use a total of 6 spaces. We also have striped dedicated loading zones for the two-story building. Offsite parking is allowed along Conifer and Red Cedar. The civil engineering and public improvement construction have addressed all applicable comments in the CRT review letter and subsequent staff preliminary review comments. Likewise, the landscape plans have also addressed all applicable and pertinent comments to the maximum extent feasible on this site. A new five-foot-wide detached concrete sidewalk will be provided with an eight-foot-wide landscaped parkway with new landscaping. A 30-foot landscape yard will also be provided on Conifer Street. The owners anticipate not more than 2 employees on site during business hours, with a lot of the time having only 1 employee managing the office. The hours of the office will be 8:00am to 5:00 pm Monday thru Friday with the weekends by appointment only. The site will be accessible 24 hours a day 7 days a week for people that rent storage lockers. RESPONSE TO CONCEPTUAL REVIEW COMMENTS A Conceptual Review Team Meeting for this project was held on January 11, 2016. We believe that our Project Development Plan complies with all questions and concerns raised in the CRT letter. PROJECT SCHEDULE CITYPDP CITY OF FORT COLLINS - PDP RRRREEEESSSSPPPPOOOONNNNSSSSIIIIBBBBIIIILLLLIIIITTTTYYYY DDDDUUUURRRRAAAATTTTIIIIOOOONNNN DUEON DUE ON DDDDAAAAYYYY PROJECT KICKOFF HAUSER / McCAULEY 0 12/9/2016 Fri SEND PLANS AND ELEVATIONS TO CLAY W/ FORT COLLINS PLANNING HAUSER 0 12/12/2016 Mon ISSUE SITE PLAN BASE TEAM 1 12/13/2016 Tue SUBMIT PDP PACKAGE TEAM 51 2/1/2017 Wed ANTICIPATED 1ST COMMENTS CITY 21 2/22/2017 Wed 2ND SUBMITTAL OF PDP TEAM 12 3/7/2017 Tue ANTICIPATED 2ND COMMENTS CITY 21 3/28/2017 Tue 3RD SUBMITTAL OF PDP TEAM 21 4/18/2017 Tue ANTICIPATED PDP APPROVAL CITY 14 5/2/2017 Tue CONSTUCTIONDOCUMENTS CONSTUCTION DOCUMENTS RRRREEEESSSSPPPPOOOONNNNSSSSIIIIBBBBIIIILLLLIIIITTTTYYYY DDDDUUUURRRRAAAATTTTIIIIOOOONNNN Dueon Due on DDDDAAAAYYYY BIGIN BUILDING CD'S HAUSER 0 2/23/2017 Thu BACKGROUND TO CONSULTANTS HAUSER 0 2/23/2017 Thu KICKOFF MEETING W/ CONSULTANTS TEAM 0 2/28/2017 Tue 70% DRAWINGS REVIEW TEAM 28 3/28/2017 Tue 70% BUDGET ESTTIMATE McCAULEY 14 4/11/2017 Tue 100% STAMPED SETS TO McCAULEY TEAM 21 4/18/2017 Tue 100% FINAL ESTIMATE McCAULEY 28 5/16/2017 Tue PERMITPROCESS PERMIT REVIEW PROCESS RRRREEEESSSSPPPPOOOONNNNSSSSIIIIBBBBIIIILLLLIIIITTTTYYYY DDDDUUUURRRRAAAATTTTIIIIOOOONNNN Dueon Due on DDDDAAAAYYYY SUMBIT TO CITY OF FORT COLLINS McCAULEY 3 3/31/2017 Fri BLDG DEPARTMENT REVIEW CITY 21 4/18/2017 Tue RESPOND TO COMMENTS TEAM 7 4/25/2017 Tue BLDG DEPARTMENT REVIEW CITY 14 5/9/2017 Tue ANTICIPATED PERMIT RELEASE CITY 1 5/10/2017 Wed PERMITPROCESS PERMIT REVIEW PROCESS RRRREEEESSSSPPPPOOOONNNNSSSSIIIIBBBBIIIILLLLIIIITTTTYYYY DDDDUUUURRRRAAAATTTTIIIIOOOONNNN Dueon Due on DDDDAAAAYYYY DEVELOP CONTRACT McCAULEY 0 2/28/2017 Tue SIGN CONSRUCTION CONTRACT McCAULEY 0 3/28/2017 Tue MOBILIZE ON SITE McCAULEY 0 5/9/2017 Tue SUB COMPLETION McCAULEY 276 2/9/2018 Fri INSPECTIONS CITY 14 2/23/2018 Fri PUNCH LIST McCAULEY 0 2/26/2018 Mon CONSTRUCTION COMPLETE McCAULEY 4 3/2/2018 Fri