HomeMy WebLinkAboutPOUDRE RIVER WHITEWATER PARK (FORMERLY POUDRE RIVER DOWNTOWN PARK) - PDP - PDP160039 - SUBMITTAL DOCUMENTS - ROUND 2 - PHOTOMETRIC PLAN0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
11-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E0.3-E0.5-ELECTRICAL CUTSHEETS.DWG 31 January 2017 2:45:33 PM
ELECTRICAL CUTSHEETS 1 OF 3
E0.3
AA
AA
AA AA
AA2
AA3
AA4
AA5
AAX
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
11-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E0.3-E0.5-ELECTRICAL CUTSHEETS.DWG 31 January 2017 2:46:37 PM
ELECTRICAL CUTSHEETS 2 OF 3
E0.4
TYPE:
HR1, PR1
TYPE:
HR1, PR1
SP1 SP1 SP1
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
11-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E0.3-E0.5-ELECTRICAL CUTSHEETS.DWG 31 January 2017 2:47:14 PM
ELECTRICAL CUTSHEETS 3 OF 3
E0.5
TYPE: SP1
ALT1
TYPE: SP1
ALT2
TYPE: SP1
ALT2
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED NORTH WEST PATHWAY ELECTRICAL
E2.4
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E1.0-E2.0-E2.5-ELECTRICAL SITE PLAN.DWG 31 January 2017 10:28:23 AM
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
LIGHTING SITE PLAN
E3.0
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:03:29
PM
SCALE IN FEET
0 50 100
LIGHT FIXTURE SCHEDULE
TYPE LAMPS DESCRIPTION FINISH MOUNTING
VOLTAGE
(120/277) MANUFACTURER AND PRODUCT #
HR1 1.5W LED LED POD HAND RAIL LIGHT WITH WHITE SYMMETRIC
DISTRIBUTION KILK USA # 1.5W-LED-350mA-LEDPOD-3000K
AAx 32W LED
POLE LIGHT FIXTURE, UNIVERSE MEDIUM WITHOUT
LUMINOUS ELEMENT, 48W, TYPE 3, 3000K, FLAT DIFFUSED
GLASS LENS, WHERE X REPRESENTS DISTRIBUTION
DARK BRONZE POLE 120/277 ARCHITECTURAL AREA LIGHTING #
UCM-STR-TX-32LED-3K-450-DBZ-FLD-120-277/MOD
PH1 2W LED LED POD LIGHT IN WOOD BEAM WITH WHITE SYMMETRIC
DISTRIBUTION KILK USA # 2W-LED-500mA-LEDPOD-3000K
SP1 6W LED LED STEP LIGHT FOR WET LOCATION BRONZE RECESSED MVOLT WINONA #STP13-WL-6LONG-L-LLST2A-WHT27K-MVOLT-DMD-LBPS
SP1-ALT1 11W LED LED BEGA STEP LIGHT FOR WET LOCATION STAINLESS STEEL RECESSED BEGA # 22137
SP1-ALT2 9W LED GHOST HORIZONTAL STEP LIGHT FOR WET LOCATION - RECESSED GHOST # C8026W-ALED13W24VCC
TB = 68.0
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED SOUTH STEP LIGHTS PHOTOMETRIC PLAN
E3.1
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:04:19
PM
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED GROUND LEVEL BRIDGE PHOTOMETRIC PLAN
E3.2
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:05:17
PM
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED PARKING LOT PHOTOMETRIC PLAN
E3.3
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:06:12
PM
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED NORTH WEST PATHWAY PHOTOMETRIC PLAN
E3.4
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:07:41
PM
TB = 68.0
61
60
59
FG = 59.0
61
60
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED EAST PATHWAY PHOTOMETRIC PLAN
E3.5
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:08:25
PM
TB = 68.0
61
60
59
FG = 59.0
0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW
1
2
3
YS
PRELIMINARY
DEVELOPMENT PLAN
31-Jan-17
POUDRE RIVER WHITEWATER PARK
No Date Drawn Designed Checked Revisions
APPROVED BY:
Proj. No.
YS XXX 216-418
ENLARGED BRIDGE DECK PHOTOMETRIC PLAN
E3.6
P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.6-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:02:30 PM