Loading...
HomeMy WebLinkAboutPOUDRE RIVER WHITEWATER PARK (FORMERLY POUDRE RIVER DOWNTOWN PARK) - PDP - PDP160039 - SUBMITTAL DOCUMENTS - ROUND 2 - PHOTOMETRIC PLAN0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 11-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E0.3-E0.5-ELECTRICAL CUTSHEETS.DWG 31 January 2017 2:45:33 PM ELECTRICAL CUTSHEETS 1 OF 3 E0.3 AA AA AA AA AA2 AA3 AA4 AA5 AAX 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 11-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E0.3-E0.5-ELECTRICAL CUTSHEETS.DWG 31 January 2017 2:46:37 PM ELECTRICAL CUTSHEETS 2 OF 3 E0.4 TYPE: HR1, PR1 TYPE: HR1, PR1 SP1 SP1 SP1 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 11-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E0.3-E0.5-ELECTRICAL CUTSHEETS.DWG 31 January 2017 2:47:14 PM ELECTRICAL CUTSHEETS 3 OF 3 E0.5 TYPE: SP1 ALT1 TYPE: SP1 ALT2 TYPE: SP1 ALT2 TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED NORTH WEST PATHWAY ELECTRICAL E2.4 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E1.0-E2.0-E2.5-ELECTRICAL SITE PLAN.DWG 31 January 2017 10:28:23 AM TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 LIGHTING SITE PLAN E3.0 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:03:29 PM SCALE IN FEET 0 50 100 LIGHT FIXTURE SCHEDULE TYPE LAMPS DESCRIPTION FINISH MOUNTING VOLTAGE (120/277) MANUFACTURER AND PRODUCT # HR1 1.5W LED LED POD HAND RAIL LIGHT WITH WHITE SYMMETRIC DISTRIBUTION KILK USA # 1.5W-LED-350mA-LEDPOD-3000K AAx 32W LED POLE LIGHT FIXTURE, UNIVERSE MEDIUM WITHOUT LUMINOUS ELEMENT, 48W, TYPE 3, 3000K, FLAT DIFFUSED GLASS LENS, WHERE X REPRESENTS DISTRIBUTION DARK BRONZE POLE 120/277 ARCHITECTURAL AREA LIGHTING # UCM-STR-TX-32LED-3K-450-DBZ-FLD-120-277/MOD PH1 2W LED LED POD LIGHT IN WOOD BEAM WITH WHITE SYMMETRIC DISTRIBUTION KILK USA # 2W-LED-500mA-LEDPOD-3000K SP1 6W LED LED STEP LIGHT FOR WET LOCATION BRONZE RECESSED MVOLT WINONA #STP13-WL-6LONG-L-LLST2A-WHT27K-MVOLT-DMD-LBPS SP1-ALT1 11W LED LED BEGA STEP LIGHT FOR WET LOCATION STAINLESS STEEL RECESSED BEGA # 22137 SP1-ALT2 9W LED GHOST HORIZONTAL STEP LIGHT FOR WET LOCATION - RECESSED GHOST # C8026W-ALED13W24VCC TB = 68.0 TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED SOUTH STEP LIGHTS PHOTOMETRIC PLAN E3.1 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:04:19 PM TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED GROUND LEVEL BRIDGE PHOTOMETRIC PLAN E3.2 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:05:17 PM TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED PARKING LOT PHOTOMETRIC PLAN E3.3 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:06:12 PM TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED NORTH WEST PATHWAY PHOTOMETRIC PLAN E3.4 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:07:41 PM TB = 68.0 61 60 59 FG = 59.0 61 60 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED EAST PATHWAY PHOTOMETRIC PLAN E3.5 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.0-E3.5-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:08:25 PM TB = 68.0 61 60 59 FG = 59.0 0 02/01/16 DA ISSUE FOR PRELIMINARY REVIEW 1 2 3 YS PRELIMINARY DEVELOPMENT PLAN 31-Jan-17 POUDRE RIVER WHITEWATER PARK No Date Drawn Designed Checked Revisions APPROVED BY: Proj. No. YS XXX 216-418 ENLARGED BRIDGE DECK PHOTOMETRIC PLAN E3.6 P:\200'S\216\418-ANDERSON CONSULTING ENGINEERS, INC.-POUDRE RIVER DOWNTOWN PROJECT REACH 3 PHASE 1\ESC DRAWINGS\E3.6-PHOTOMETRIC ELECTRICAL SITE PLAN.DWG 31 January 2017 1:02:30 PM