Loading...
HomeMy WebLinkAboutHARMONY COMMONS HOTEL - FDP - FDP170001 - SUBMITTAL DOCUMENTS - ROUND 1 -LETTER OF TRANSMITTAL TO: Brinkman Partners Date: 01/11/2017 3528 Precision Drive, Suite 100 Fort Collins, Colorado 80528 ATTN: Scott Ranweiler Project No. 1592-12-16 Re: Lot 6, Harmony Commons (3520 Timberwood Drive); Fort Collins, Colorado WE ARE SENDING YOU:  Shop Drawings  Prints  Plans  Samples  Specifications  Copy of Letter  Change order  Other  AutoCAD drawing Files COPIES DATE NO. DESCRIPTION 8 - 18 Utility Plans 12 - 3 Landscape Plan, Notes, Details and Irrigation plan 2 Jan 2017 - Final Drainage, Sediment/Erosion Control and Stormwater Quality Report 1 - 6 Emergency Access Easement Dedication document (for Marc Virata) 1 - 6 Access, Utility and Drainage Easement Dedication document (for Mark Virata) 1 - 1 24x36 AutoTurn Exhibit (for Jim Lynxwiler) 1 - 13 Utility Plan Checklist 1 - - CD with above documents 1 - - Redlines THESE ARE TRANSMITTED as checked below:  For Approval  Approved as Submitted  Resubmit ____ Copies for Approval  For your use  Approved as Noted  Submit ____Copies for Distribution  As Requested  Returned for Corrections  Return ____ Corrected Prints  For Review and Comment  For Bids Due ____________, 2017 _________________________________________________ REMARKS: Scott, Please find attached the listed items for the above referenced project for the Project Development Plan submittal – Round 3. If you have any questions or need additional information, please call us at 226-5334. Thank you, SIGNED______________________________________________ Brent Balik cc: William Albrecht; Willco XV, LLLP Tim Briggs; Site Design LLC