Loading...
HomeMy WebLinkAboutCONFLUENCE - PDP - PDP170001 - SUBMITTAL DOCUMENTS - ROUND 1 - UTILITY PLANSJEFFERSON ST. WILLOW ST. LINDEN ST. N. COLLEGE AVE. E. LINCOLN AVE. E. VINE DR. OLD TOWN BASIN CACHE LA POUDRE BASIN CACHE LA POUDRE BASIN DRY CREEK BASIN CONIFER ST. MOUNTAIN AVE. E. MULBERRY ST S. COLLEGE AVE. LAPORTE AVE. MAPLE AVE. S. MASON AVE. S. HOWES AVE. E. MYRTLE ST E. LAUREL ST E. OAK ST S. REMINGTON ST Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com C000 COVER SHEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R UTILITY PLANS FOR CONFLUENCE BEING A REPLAT OF LOTS 2, 4, 6, & 8, BLOCK 2, TOWN OF FORT COLLINS LOCATED IN THE NORTHWEST QUARTER OF SECTION 12, TOWNSHIP 7 NORTH, RANGE 69 WEST OF THE 6TH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO JANUARY 2017 CONTACT INFORMATION PROJECT TEAM: Northern Engineering Services, Inc. Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com C001 GENERAL & CONSTRUCTION NOTES CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R 1. All materials, workmanship, and construction of public improvements shall meet or exceed the standards and specifications set forth in the Larimer County Urban Area Street Standards and applicable state and federal regulations. Where there is conflict between these plans and the specifications, or any applicable standards, the most restrictive standard shall apply. All work shall be inspected and approved by the City of Fort Collins. 2. All references to any published standards shall refer to the latest revision of said standard, unless specifically stated otherwise. 3. These public improvement construction plans shall be valid for a period of three years from the date of approval by the City of Fort Collins Engineer. Use of these plans after the expiration date will require a new review and approval process by the City of Fort Collins prior to commencement of any work shown in these plans. 4. The engineer who has prepared these plans, by execution and/or seal hereof, does hereby affirm responsibility to the City of Fort Collins, as beneficiary of said engineer's work, for any errors and omissions contained in these plans, and approval of these plans by the City of Fort Collins Engineer shall not relieve the engineer who has prepared these plans of all such responsibility. Further, to the extent permitted by law, the engineer hereby agrees to hold harmless and indemnify the City of Fort Collins, and its officers and employees, from and against all liabilities, claims, and demands which may arise from any errors and omissions contained in these plans. 5. All sanitary sewer, storm sewer, and water line construction, as well as power and other "dry" utility installations, shall conform to the City of Fort Collins standards and specifications current at the date of approval of the plans by the City of Fort Collins Engineer. 6. The type, size, location and number of all known underground utilities are approximate when shown on the drawings. It shall be the responsibility of the Developer to verify the existence and location of all underground utilities along the route of the work before commencing new construction. The Developer shall be responsible for unknown underground utilities. 7. The Developer shall contact the Utility Notification Center of Colorado (UNCC) at 1-800-922-1987, at least 2 working days prior to beginning excavation or grading, to have all registered utility locations marked. Other unregistered utility entities (i.e. ditch / irrigation company) are to be located by contacting the respective representative. Utility service laterals are also to be located prior to beginning excavation or grading. It shall be the responsibility of the Developer to relocate all existing utilities that conflict with the proposed improvements shown on these plans. 8. The Developer shall be responsible for protecting all utilities during construction and for coordinating with the appropriate utility company for any utility crossings required. 9. If a conflict exists between existing and proposed utilities and/or a design modification is required, the Developer shall coordinate with the engineer to modify the design. Design modification(s) must be ELEC C T T T T T T T T T T T X X X X X X X X X X X X X X X X X SS SS SS SS SS SS C .O. SS SS SS SS SS SS SS SS SS SS SS SS CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E AC AC ELEC C T T T T T T T T T T T X X X X X X X X X X X X X X X X X SS SS SS SS SS SS C .O. SS AC AC POUDRE STREET (20' ROW) 316 WILLOW STREET NORTHING: 132464.51 EASTING: 195849.25 (OUTSIDE FACE OF WALL) NORTHING: 132386.86 EASTING: 195806.88 (OUTSIDE FACE OF WALL) NORTHING: 132386.85 EASTING: 195806.64 (PROPERTY CORNER) NORTHING: 132471.09 EASTING: 195854.89 (PROPERTY CORNER) 0.17' 0.17' 0.17' 8' 21' 8.67' MATCHLINE EX. RIGHT-OF-WAY PARALLEL PARKING APPROX. LOCATION OF RELOCATED SHED TO BE COORDINATED WITH ADJACENT PROPERTY OWNER PARKING GARAGE ENTRANCE 0.17' 0.17' 0.17' 310 WILLOW STREET 0.17' 5.00' MIN. 5.00' MIN EX. PROPERTY LINE N41°41'10"E 47.50' N48°18'50"W 20.00' N41°41'10"E 47.50' AC X X X X X X X X X X X X X X X X X X X X X X X X X X X X ELEC C T T T T T T T T T T T SS SS SS SS SS SS C .O. SS SS SS SS SS SS SS SS SS SS SS SS CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E AC AC EXISTING SANITARY SEWER SERVICE THAT RUNS UNDER PROPOSED BUILDING WILL NEED TO BE RELOCATED AND COORDINATED WITH ADJACENT PROPERTY OWNER AT 316 WILLOW STREET. MATCHLINE EX. PROPERTY LINE POUDRE STREET (20' ROW) EX. RIGHT-OF-WAY 310 WILLOW STREET 316 WILLOW STREET PROPOSED BUILDING APPROX. LOCATION OF RELOCATED SHED TO BE COORDINATED WITH ADJACENT PROPERTY OWNER EXISTING TRANSFORMER TO BE RELOCATED TO OPPOSITE SIDE OF POUDRE STREET WITHIN EXISTING EASEMENT EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT E AC IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR AC AC POUDRE STREET (20' ROW) 316 WILLOW STREET 310 WILLOW STREET EX. PROPERTY LINE EX. RIGHT-OF-WAY 4.0% 4.1% 69.00 TC/FF SEE INSERT ON THIS SHEET MATCHLINE PROPOSED BUILDING (SEE ARCHITECTURAL DRAWINGS FOR GARAGE FIRST FLOOR GRADING) 68.75 TC 69.00 TC/FF 71.25 FF APPROX. LOCATION OF RELOCATED SHED TO BE COORDINATED WITH ADJACENT PROPERTY OWNER EXISTING DOOR THRESHOLD ELEV. = 4971.11 (12.7%) (8.3%) (5.8%) (4.2%) (3.0%) (1.5%) (2.0%) (3.1%) 2.5% AC D X X ST X X X X X X X X X X X X X X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST S S S D S D D D S S GAS X ST ST X X X X X X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST C.O. X X X X X X X X X X X M M M M ST ST ST ST ST ST ST ST ST ST LINDEN STREET (100' ROW) EX. SIDEWALK POUDRE STREET (20' ROW) EX. SIDEWALK WITH PAVERS EXISTING DECK 409 LINDEN STREET 405 LINDEN STREET 320 WILLOW STREET 316 WILLOW STREET 310 WILLOW STREET WILLOW STREET (ROW VARIES) STAIRS STAIRS PROPOSED SIDEWALK PROPOSED ASPHALT WALK EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. RIGHT-OF-WAY PROPOSED 1' WIDE METAL SIDEWALK CULVERT WITH FL @ 0.6% PROPOSED STORM SEWER MANHOLE PROPOSED AREA INLET PROPOSED CONNECT TO EXISTING CURB INLET STORM SEWER MANHOLE PROPOSED STORM SEWER UNDER FLOWLINE PROPOSED AREA INLET PROPOSED TOP BACK OF VERTICAL CURB 1 3 2 BASIN 1 WATER QUALITY TREATMENT PROVIDED IN PROPOSED SAND FILTER (SEE DRAINAGE REPORT) BASIN 3 WATER QUALITY TREATMENT PROVIDED IN EXISTING BAYSAVER PER DOWNTOWN RIVER DISTRICT REPORT AND PLANS (SEE DRAINAGE REPORT) 1 3 2 NO BUILD EASEMENT PROPOSED RIGHT-OF-WAY EX. 36" RCP STORM SEWER @ 1.89% EX. 36" RCP STORM SEWER @ 0.36% EX. 36" RCP STORM SEWER @ 0.11% ULTIMATE CURB & GUTTER PER CITY OF FORT COLLINS Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R C500 DRAINAGE PLAN DRAINAGE SUMMARY TABLE DESIGN POINT BASIN ID TOTAL AREA (acres) C2 C100 2-yr Tc (min) 100-yr Tc (min) Q2 (cfs) Q100 (cfs) 1 1 0.23 0.97 1.00 5.0 5.0 0.6 2.3 2 2 0.03 0.97 1.00 5.0 5.0 0.1 0.3 3 3 0.15 0.97 1.00 5.0 5.0 0.4 1.5 A B2 1.45 ac 1. EXISTING UNDERGROUND AND OVERHEAD PUBLIC AND PRIVATE UTILITIES AS SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. EXISTING UTILITY MAINS AND SERVICES MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THESE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE TO CALL ALL UTILITY COMPANIES (PUBLIC AND PRIVATE) PRIOR TO ANY CONSTRUCTION TO VERIFY EXACT UTILITY LOCATIONS. 2. REFER TO THE "PRELIMINARY DRAINAGE REPORT FOR CONFLUENCE" BY NORTHERN ENGINEERING, DATED JANUARY 11, 2017 FOR ADDITIONAL INFORMATION. NOTES: UD VAULT ELEC LEGEND: ( IN FEET ) 0 1 INCH = 20 FEET 20 20 40 60 ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST X X X X X X X X X X X X X X X X X M AC AC ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST LINDEN STREET (100' ROW) EX. SIDEWALK POUDRE STREET (20' ROW) EX. SIDEWALK WITH PAVERS NO BUILD EASEMENT EXISTING DECK 409 LINDEN STREET 405 LINDEN STREET PROPOSED BUILDING 320 WILLOW STREET EX. ASPHALT PATH WILLOW STREET (ROW VARIES) PROPOSED BUILDING (SEE ARCHITECTURAL DRAWINGS FOR GARAGE FIRST FLOOR GRADING) STAIRS STAIRS PROPOSED SIDEWALK PROPOSED ASPHALT WALK EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE EX. RIGHT-OF-WAY PRESERVE & PROTECT EX. BLOCK RETAINING WALL PRESERVE & PROTECT EXISTING FENCE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PROPOSED TOP BACK OF VERTICAL CURB PRESERVE & PROTECT EX. TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY) SAWCUT LINE (TYP.) MATCH INTO EX. CURB, GUTTER, & SIDEWALK EXISTING HANDICAP RAMP (TYP.) MATCH INTO EXISTING MATCH INTO EX. SIDEWALK MATCH INTO EXISTING CURB & GUTTER SAWCUT LINE (TYP.) PROPOSED 1' WIDE METAL SIDEWALK CULVERT WITH FL @ 0.6% MATCH INTO EX. SIDEWALK MATCH INTO EX. CURB & GUTTER (68.31) FL 69.14 FL TOG:69.75 INV:69.25 70.39 FL 70.47 FL (70.56) FL 70.83 70.04 TC TOG:70.04 INV:69.34 69.93 TC 69.88 TC 69.83 GRD 69.83 GRD 69.87 FL 71.06 FL 69.35 GRATE 69.95 FL 69.46 FL 2.0% 4.4% 3.4% 3.5% 2.0% 2.0% 2.0% 2.0% 1.9% 1.6% 1.6% 1.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 1.9% 2.0% 1.9% 3.5% 2.0% 2.0% 2.7% 4.0% 4.0% 3.3% 4.0% 2.7% 0.9% 2.8% 0.6% LOWER FINISH FLOOR ELEV = 4970.08 UPPER FINISH FLOOR ELEV = 4971.25 71.23 TC 71.23 TC 71.23 TC 71.23 TC 71.23 TC 70.91 GRD 71.23 TC 71.23 TC 71.23 TC PROPOSED STORM SEWER MANHOLE 6.7% (70.93) FL 69.25 TC/FF 69.25 TC 69.00 TC/FF SEE INSERT ON THIS SHEET MATCHLINE 69.45 (69.45) 69.90 (69.94) (69.45) 5.8% 5.5% 2.7% 4.9% 70.35 GRD 4.9% 5.1% 70.08 GRD GRD:70.06 TS:(71.10) (69.44) 2.0% 2.4% 71.12 TC/TS 69.97 TC 69.92 TC 69.46 GRATE 2.0% 69.25 TC/FF 2.0% 1.5% 1.6% PROPOSED AREA INLET PROPOSED CURB INLET CONNECT TO EXISTING STORM SEWER MANHOLE 70.06 TC 1.5% 0.9% EXISTING DOOR THRESHOLD ELEV. = 4971.42 EXISTING DOOR THRESHOLD ELEV. = 4971.42 PROPOSED STORM SEWER UNDER FLOWLINE PROPOSED AREA INLET 71.25 FF PROPOSED TOP BACK OF VERTICAL CURB 2.0% 5.0% 68.71 FL 70.06 GRD/BW 70.06 TC 4.5% (69.46) (69.80) 2.0% 2.0% (3.6%) (69.93) GRD (70.17) GRD EXISTING DOOR THRESHOLD ELEV. = 4970.74 EXISTING DOOR THRESHOLD ELEV. = 4971.20 EXISTING DOOR THRESHOLD ELEV. = 4970.28 (1.1%) (1.5%) (7.0%) (12.7%) (3.0%) (1.0%) (2.7%) (4.4%) (3.1%) (2.0%) (7.3%) (3.0%) (4.3%) (71.73) REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA (1.7%) 5.0% ULTIMATE CURB & GUTTER PER CITY OF FORT COLLINS 71.16 BW 70.01 BW INSTALL VAPOR/MEMBRANE AGAINST EXISTING BUILDING AS RECOMMENDED OR SPECIFIED BY BUILDING ARCHITECT 69.50 (69.68) Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com LEGEND: ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R INSERT NOTES: C400 GRADING PLAN VAULT ELEC 77.71 (77.90) 1.8% (1.8%) AC IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR S S S T VAULT ELEC C S VAULT CABLE CONTROL IRR CONTROL IRR CONTROL IRR C S CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR VAULT ELEC VAULT CABLE T C C S T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T X X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W X X X X X X X X X X X X X X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS C ABLE TELE VAULT CABLE VAULT ELEC W W W CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G IRR X X X X X X X X X X X X X X X X X M AC AC EX. 12" WATER MAIN EX. 12" WATER MAIN EX. 6" WATER MAIN RELOCATE EXISTING CABLE AMPLIFIER & TELEPHONE BOX RELOCATE EXISTING CABLE TELEVISION PRESERVE & PROTECT EX. TELEPHONE PEDESTAL PROPOSE GAS SERVICES. SEE MEP PLANS FOR CONTINUATION. RELOCATE BANK OF IRRIGATION VAULTS, CONTROLS, & WATER METER (SEE EMAIL) PROPOSED TWO (2) 6" SANITARY SEWER SERVICES (1 COMMERCIAL, 1 RESIDENTIAL). SEE PLUMBING PLANS FOR CONTINUATION. PROPOSED TWO (2) 6" SANITARY SEWER SERVICES (1 COMMERCIAL, 1 RESIDENTIAL) CONNECT BUILDING GREASE INTERCEPTOR & SAND/OIL INTERCEPTOR INTO PROPOSED SANITARY SEWER COMMERCIAL SERVICE. SEE PLUMBING PLANS FOR CONTINUATION. RELOCATED FIRE HYDRANT REMOVE EX. FIRE HYDRANT & CONNECT PROPOSE FIRE SERVICE TO 6" LATERAL TWO (2) PROPOSED WATER SERVICES (1 COMMERCIAL, 1 RESIDENTIAL) PROPOSED FIRE SERVICE RELOCATE EXISTING ELECTRIC SERVICE PRESERVE & PROTECT EXISTING TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY) EX. PROPERTY LINE PRESERVE & PROTECT EX. CABLE TELEVISION VAULT EX.WATER SERVICE EX. RIGHT-OF-WAY EX. RIGHT-OF-WAY EX. PROPERTY LINE EX. PROPERTY LINE EX. SAN. SEWER MH RIM: 4968.40 INV IN: 4959.06 (NE) INV OUT: 4959.01 (SW) EX. SANITARY SEWER MH RIM: 4968.87 INV OUT: 4963.28 (NW) EX. 8" PVC SANITARY SEWER @ 0.74% SEE INSERT ON THIS SHEET MATCHLINE EX. ASPHALT PATH EX.WATER SERVICE EX.WATER SERVICE EX. 8" SANITARY SEWER @ 0.40% EX. 36" RCP STORM SEWER @ 1.89% EX. SIDEWALK LINDEN STREET (100' ROW) WILLOW STREET (ROW VARIES) EX. SIDEWALK POUDRE STREET (20' ROW) EX. PROPERTY LINE EX. RIGHT-OF-WAY EX. PROPERTY LINE EX. PROPERTY LINE EX. SIDEWALK EX. RIGHT-OF-WAY EXISTING DECK 409 LINDEN STREET PROPOSED BUILDING 405 LINDEN STREET 320 WILLOW STREET CONNECT INTO EXISTING 12" WATER MAIN PER CITY'S STANDARDS & REGULATIONS CONNECT TO EXISTING GAS MAIN PER UTILITY COMPANY'S STANDARDS & REGULATIONS PROPOSED STORM SEWER UNDER FLOWLINE CONNECT TO EXISTING STORM SEWER WITH PROPOSED MANHOLE CONNECT TO EXISTING ELECTRIC LINE CONNECT ELECTRIC SERVICE TO BUILDING SERVICE AT EXISTING ELECTRIC METER (RE: MEP) 6" F 6" F 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS 6" SS CTV 2" W 2" W 2" W 2" W ST ST ST ST ST ST ST G G ELEC VAULT ST ST ST ST ST ST ST ST ST ST ST ST ST E E E E E E E E CONNECT VAULT TO EX. ELECTRIC LINE PER UTILITY COMPANY'S SPECIFICATIONS. 1 2 3 PROPOSED NYLOPLAST INLET CONNECT TO SAND FILTER (RE: MEP) 1 4 3 PRESERVE & PROTECT EX. WATER METER & CURB STOP 2 1 CONNECT INTO EXISTING 12" WATER MAIN WITH 12"x6" TAPPING SADDLE, THRUST BLOCK, AND 6" GATE VALVE. CONNECT TO EXISTING SANITARY SEWER WITH 8"x4" WYE SADDLE AT INVERT ELEVATION 4959.21. CONNECT TO EXISTING SANITARY SEWER WITH 8"x4" WYE SADDLE AT INVERT ELEVATION 4959.22. PROPOSED STORM SEWER 1 4 PROPOSED AREA INLET PROPOSED CURB INLET PROPOSED BUILDING 5' MIN. PROPOSED AREA INLET PROPOSE ELECTRIC SERVICE. SEE MEP PLANS FOR CONTINUATION. 5' MIN. EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA ULTIMATE CURB & GUTTER PER CITY OF FORT COLLINS 5 5 Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com C300 UTILITY PLAN LEGEND: ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R INSERT E 6" SS 2" W 6" F T CTV SS W VAULT ELEC H Y D G T ST E CTV FO NOTES: DRY UTILITY NOTES PRESERVE & PROTECT EXISTING ELECTRIC VAULT. 1 PRESERVE & PROTECT EXISTING LIGHT POLE. KEY NOTES: PRESERVE & PROTECT EXISTING CABLE VAULT. 2 3 4 PRESERVE & PROTECT EXISTING IRRIGATION VAULT. 5 PROPOSED TREE (RE: LANDSCAPE ARCHITECT) X X X X X X M AC AC LINDEN STREET (100' ROW) EX. SIDEWALK POUDRE STREET (20' ROW) EX. SIDEWALK WITH PAVERS NO BUILD EASEMENT EXISTING DECK 409 LINDEN STREET 405 LINDEN STREET PROPOSED BUILDING EX. ASPHALT PATH WILLOW STREET (ROW VARIES) PROPOSED BUILDING 86' 106' 81' 80' NORTHING: 132265.32 EASTING: 195832.78 (OUTSIDE FACE OF WALL) NORTHING: 132320.35 EASTING: 195881.56 (OUTSIDE FACE OF WALL) NORTHING: 132213.20 EASTING: 195888.80 (OUTSIDE FACE OF WALL) NORTHING: 132272.17 EASTING: 195935.17 (OUTSIDE FACE OF WALL) NORTHING: 132394.24 EASTING: 195928.16 (OUTSIDE FACE OF WALL) NORTHING: 132327.25 EASTING: 195897.63 (OUTSIDE FACE OF WALL) NORTHING: 132400.60 EASTING: 195934.05 (PROPERTY CORNER) NORTHING: 132276.85 EASTING: 195949.71 (PROPERTY CORNER) NORTHING: 132332.13 EASTING: 195902.19 (PROPERTY CORNER) NORTHING: 132318.58 EASTING: 195902.85 (PROPERTY CORNER) NORTHING: 132211.13 EASTING: 195891.19 (PROPERTY CORNER) NORTHING: 132258.04 EASTING: 195825.84 (PROPERTY CORNER) NORTHING: 132320.34 EASTING: 195881.32 (PROPERTY CORNER) STAIRS STAIRS 0.29' 0.29' 0.34' 10' 0.17' 0.17' 0.17' PROPOSED SIDEWALK (WIDTH VARIES) 7.8' 13.4' 8.5' 7.75' 15.6' 8' TYP. 21' TYP. SEE INSERT ON THIS SHEET MATCHLINE PROPOSED 5' WIDE ASPHALT WALK EX. RIGHT-OF-WAY PRESERVE & PROTECT EX. BLOCK RETAINING WALL PRESERVE & PROTECT EXISTING FENCE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PRESERVE & PROTECT TREE PROPOSED TOP BACK OF VERTICAL CURB PRESERVE & PROTECT EXISTING TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY) SAWCUT LINE (TYP.) MATCH INTO EX. SIDEWALK MATCH INTO EX. CURB, EXISTING HANDICAP RAMP (TYP.) GUTTER, & SIDEWALK MATCH INTO EXISTING MATCH INTO EX. SIDEWALK MATCH INTO EXISTING CURB & GUTTER SAWCUT LINE (TYP.) PROPOSED 1' WIDE METAL SIDEWALK CULVERT WITH FL @ 0.6% 1 PARALLEL PARKING PARALLEL PARKING 13.2' 3.0' 3.0' PARKING GARAGE EXIT PARKING GARAGE ENTRANCE RECONSTRUCT EXISTING HANDICAP RAMP IN ORIGINAL LOCATION EXISTING PARKING AND HANDICAP STRIPING TO REMAIN IN ORIGINAL LOCATION (TYP.) 3.17' 0.29' 0.34' 0.17' 0.17' 8.67' 0.17' 0.17' 1.00' 2.00' 0.29' CONTRACTOR SHALL REPLACE EXISTING TIMELINE/PAVERS WITHIN DEMOLITION AREAS. CONTRACTOR SHALL REPLACE EXISTING TREE GRATE IN ORIGINAL LOCATION EX. PROPERTY LINE EX. PROPERTY LINE EX. PROPERTY LINE 320 WILLOW STREET EX. FENCE N41°41'10"E 83.42' N48°18'50"W 100.00' S48°18'50"E 106.00' S41°41'10"W 47.50' S48°18'50"E 94.00' S41°41'10"W 122.5' N54°19'22"W 80.44' S48°18'50"E 62.75' S41°41'10"W 4.00' S48°18'50"E 9.50' S41°41'10"W 30.50' EXTEND EX. TIMELINE (RE: LANDSCAPE ARCHITECT) RAISED PLANTER (RE: LANDSCAPE ARCHITECT) PROPOSED VERTICAL CURB PROPOSED PLANTER (RE: LANDSCAPE ARCHITECT) 2 2 3.0' ULTIMATE CURB & GUTTER PER CITY OF FORT COLLINS PLANTER AREA (RE: LANDSCAPE ARCHITECT) 0.5' 1.9' PLANTER AREA (RE: LANDSCAPE ARCHITECT) Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com LEGEND: ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R INSERT NOTES: C200 HORIZONTAL CONTROL PLAN VAULT ELEC 1 KEY NOTES: REMOVE AND RECONSTRUCT IN SAME LOCATION FIRST 5' OF EXISTING METAL & WOOD RAMP. STRIPING AND SIGNAGE LEGEND: 1 1 1 2 PROPOSED TREE (RE: LANDSCAPE ARCHITECT) SS SS SS SS SS SS SS SS SS SS SS CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E AC AC MATCHLINE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / EX. PROPERTY LINE DEMOLISH WOOD SHED EXISTING TRANSFORMER TO BE RELOCATED TO OPPOSITE SIDE OF POUDRE STREET WITHIN EXISTING EASEMENT APPROXIMATE LOCATION OF EX. SANITARY SEWER SERVICE RELOCATE EXISTING SHED. COORDINATE NEW SHED LOCATION WITH OWNER OF 310 WILLOW STREET POUDRE STREET (20' ROW) EX. RIGHT-OF-WAY 316 WILLOW STREET 310 WILLOW STREET REMOVE EXISTING CONCRETE PAD REMOVE EX. FENCE N41°41'10"E 47.50' N48°18'50"W 20.00' N41°41'10"E 47.50' EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT E E AC IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR S S S T VAULT ELEC C S VAULT CABLE CONTROL IRR CONTROL IRR H Y D CONTROL IRR C S CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR G CONTROL IRR VAULT ELEC VAULT CABLE T C C S T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W X X X X X X X X X X X X X X X X X X X X X X X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS C ABLE TELE VAULT CABLE VAULT ELEC W W W W CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G E IRR X X X X X X X X X X X X X X X X X X X M AC AC E E AC IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR IRR S S S T VAULT ELEC C S VAULT CABLE CONTROL IRR CONTROL IRR H Y D CONTROL IRR C S CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR CONTROL IRR G CONTROL IRR VAULT ELEC VAULT CABLE T C C S T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T FO FO T T T T T T T T T T T T T T T FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T X X X X X X X X X X X X X X X X X X X X X W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W X X X X X X X X X X X X X X X X X X X X X X X X ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS C ABLE TELE VAULT CABLE VAULT ELEC W W W W CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV CTV E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G E IRR X X X X X X X X X X X X X X X X X X X M AC AC SEE INSERT ON THIS SHEET MATCHLINE / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / RELOCATE EXISTING CABLE & TELEPHONE BOXES PER UTILITY COMPANY'S SPECIFICATIONS. RELOCATE EXISTING CABLE TELEVISION / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / LINDEN STREET (100' ROW) EX. SIDEWALK POUDRE STREET (20' ROW) EX. 12" WATER MAIN EX. 12" WATER MAIN PRESERVE & PROTECT EX. TELEPHONE PEDESTAL EX. PROPERTY LINE PRESERVE & PROTECT EX. CABLE TELEVISION VAULT EX.WATER SERVICE EX. RIGHT-OF-WAY EX. PROPERTY LINE EX. PROPERTY LINE EX. SAN. SEWER MH RIM: 4968.40 INV IN: 4959.06 (NE) INV OUT: 4959.01 (SW) EX. SANITARY SEWER MH RIM: 4968.87 INV OUT: 4963.28 (NW) EX. 8" PVC SANITARY SEWER @ 0.74% REMOVE EXISTING CONCRETE CHASE WITH SIDEWALK CULVERT EX.WATER SERVICE EX.WATER SERVICE EX. SANITARY SEWER @ 0.40% EX. 36" RCP STORM SEWER @ 1.89% EX. SIDEWALK REMOVE EIXISTING CONCRETE DRIVEWAY DEMOLISH BRICK SHED NO BUILD EASEMENT DEMOLISH 1 STORY STUCCO BUILDING REMOVE & RELOCATE EXISTING BENCH IF NECESSARY EXISTING CABLE TELEVISION PEDESTAL TO BE REMOVED AND RESPLICED INTO A VAULT EX. TELEPHONE PEDESTAL TO BE REMOVED & TERMINATED IN PLACE EX. RIGHT-OF-WAY REMOVE & REPLACE EXISTING AIR CONDITIONING UNIT FOR REGRADING IN THIS AREA EXISTING DECK PRESERVE & PROTECT EX. BLOCK RETAINING WALL PRESERVE & PROTECT EXISTING FENCE PRESERVE & PROTECT EXISTING FENCE 409 LINDEN STREET 401 LINDEN STREET 405 LINDEN STREET 320 WILLOW STREET REMOVE EX. BIKE RACK REMOVE EXISTING CONCRETE CHASE REMOVE EXISTING CONCRETE PAD REMOVE EXISTING CONCRETE PAD EX. 6" WATER MAIN EX. ASPHALT PATH WILLOW STREET (ROW VARIES) CONTRACTOR TO REMOVE & PLUG EXISTING 3 4" WATER SERVICE AT THE MAIN PER CITY OF FORT COLLINS STANDARDS & REGULATIONS REMOVE EXISTING CURB STOP AND WATER METER. REMOVE EX. ELECTRIC SERVICE AND METER PER UTILITY COMPANY'S SPECIFICATIONS. PRESERVE & PROTECT TREE REMOVE TREES (TYP.) REMOVE EX. FENCE REMOVE EX. FENCE REMOVE & REPLACE EXISTING FENCE REMOVE EX. FENCE REMOVE EX. FENCE RELOCATE ELECTRIC SERVICE PER UTILITY COMPANY'S SPECIFICATIONS. (SEE UTILITY & MEP PLANS) 2 3 4 2 5 2 6 7 REMOVE EX. BIKE RACK PRESERVE & PROTECT EX. TREE PRESERVE & PROTECT EX. WATER METER & CURB STOP 6 4 PRESERVE & PROTECT EX. TREE RELOCATE BANK OF IRRIGATION VAULTS, CONTROLS, & WATER METER PER CITY OF FORT COLLINS. 8 1 PRESERVE & PROTECT EX. WATER METER & CURB STOP 3 2 PRESERVE & PROTECT EXISTING TREE (TRUNK LOCATED ON NEIGHBORS PROPERTY) EX. 6" LATERAL TO FIRE HYDRANT REMOVE EXISTING CONCRETE PAD CONTRACTOR SHALL SAVE & RESTORE ANY DISTURBED EXISTING PAVERS/TIMELINE EX. FENCE REMOVE & REPLACE EXISTING FENCE REMOVE EX. BOLLARDS REMOVE GAS METER REMOVE EX. GAS SERVICE PER UTILITY COMPANY'S SPECIFICATIONS. N41°41'10"E 83.42' N48°18'50"W 100.00' S48°18'50"E 106.00' S41°41'10"W 47.50' S48°18'50"E 94.00' S41°41'10"W 122.5' N54°19'22"W 80.44' REMOVE EXISTING TREE NEXT TO BUILDING EXISTING SHED MAY NEED TO BE RELOCATED FOR DRAINAGE AND NEW CONSTRUCTION IMPROVEMENTS Sheet of 9 CONFLUENCE These drawings are instruments of service provided by Northern Engineering Services, Inc. and are not to be used for any type of construction unless signed and sealed by a Professional Engineer in the employ of Northern Engineering Services, Inc. NOT FOR CONSTRUCTION REVIEW SET 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 ENGINEER ING N O R T H E RN PHONE: 970.221.4158 www.northernengineering.com C100 & DEMOLITION PLAN EXISTING CONDITIONS LEGEND: FIELD SURVEY BY: ORIGINAL FIELD SURVEY NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 998-003 DATE: OCTOBER 2016 ( IN FEET ) 10 0 10 20 30 1 INCH = 10 FEET CALL 2 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CALL UTILITY NOTIFICATION CENTER OF COLORADO Know what'sbelow. Call before you dig. R INSERT SS W CONTROL IRR G T ST E / / / / / / / / / / C S H Y D WV W ELEC E VAULT ELEC C VAULT CABLE T G D S / / / / / / / / / / / / / / / / / X / / / / / / / / / / / / / / / / X NOTES: 1 PRESERVE & PROTECT EXISTING ELECTRIC VAULT. 2 PRESERVE & PROTECT EXISTING LIGHT POLE. KEY NOTES: PRESERVE & PROTECT EXISTING CABLE VAULT. 3 REMOVE EXISTING FIRE HYDRANT. 4 5 PRESERVE & PROTECT EXISTING WATER VALVE. 6 PRESERVE & PROTECT EXISTING IRRIGATION VAULT. REMOVE EXISTING SIGN 7 8 REMOVE AND RECONSTRUCT IN SAME LOCATION FIRST 10' OF EXISTING METAL & WOOD RAMP. approved by the City of Fort Collins prior to beginning construction. 10. The Developer shall coordinate and cooperate with the City of Fort Collins, and all utility companies involved, to assure that the work is accomplished in a timely fashion and with a minimum disruption of service. The Developer shall be responsible for contacting, in advance, all parties affected by any disruption of any utility service as well as the utility companies. 11. No work may commence within any public storm water, sanitary sewer or potable water system until the Developer notifies the utility provider. Notification shall be a minimum of 2 working days prior to commencement of any work. At the discretion of the water utility provider, a pre-construction meeting may be required prior to commencement of any work. 12. The Developer shall sequence installation of utilities in such a manner as to minimize potential utility conflicts. In general, storm sewer and sanitary sewer should be constructed prior to installation of the water lines and dry utilities. 13. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the Water Utility. 14. A State Construction Dewatering Wastewater Discharge Permit is required if dewatering is required in order to install utilities or if water is discharged into a storm sewer, channel, irrigation ditch or any waters of the United States. 15. The Developer shall comply with all terms and conditions of the Colorado Permit for Storm Water Discharge (Contact Colorado Department of Health, Water Quality Control Division, (303) 692-3590), the Storm Water Management Plan, and the Erosion Control Plan. 16. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 17. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must be submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. 18. The City of Fort Collins shall not be responsible for any damages or injuries sustained in this Development as a result of groundwater seepage, whether resulting from groundwater flooding, structural damage or other damage unless such damage or injuries are sustained as a result of the City of Fort Collins failure to properly maintain its water, wastewater, and/or storm drainage facilities in the development. 19. All recommendations of the Preliminary Drainage Report for Confluence dated January 11, 2017 by Northern Engineering Services, Inc., shall be followed and implemented. 20. Temporary erosion control during construction shall be provided as shown on the Erosion Control Plan. All erosion control measures shall be maintained in good repair by the Developer, until such time as the entire disturbed areas is stabilized with hard surface or landscaping. 21. The Developer shall be responsible for insuring that no mud or debris shall be tracked onto the existing public street system. Mud and debris must be removed within 24 hours by an appropriate mechanical method (i.e. machine broom sweep, light duty front-end loader, etc.) or as approved by the the City of Fort Collins street inspector. 22. No work may commence within any improved or unimproved public Right-of-Way until a Right-of-Way Permit or Development Construction Permit is obtained, if applicable. 23. The Developer shall be responsible for obtaining all necessary permits for all applicable agencies prior to commencement of construction. The Developer shall notify the the City of Fort Collins Inspector (Fort Collins - 221-6605) and the City of Fort Collins Erosion Control Inspector (Fort Collins - 221-6700) at least 2 working days prior to the start of any earth disturbing activity, or construction on any and all public improvements. If the City of Fort Collins Engineer is not available after proper notice of construction activity has been provided, the Developer may commence work in the Engineer's absence. However, the City of Fort Collins reserves the right not to accept the improvement if subsequent testing reveals an improper installation. 24. The Developer shall be responsible for obtaining soils tests within the Public Right-of-Way after right of way grading and all utility trench work is complete and prior to the placement of curb, gutter, sidewalk and pavement. If the final soils/pavement design report does not correspond with the results of the original geotechnical report, the Developer shall be responsible for a re-design of the subject pavement section or, the Developer may use the City of Fort Collins' default pavement thickness section(s). Regardless of the option used, all final soils/pavement design reports shall be prepared by a licensed Professional Engineer. The final report shall be submitted to the Inspector a minimum of 10 working days prior to placement of base and asphalt. Placement of curb, gutter, sidewalk, base and asphalt shall not occur until the City of Fort Collins Engineer approves the final report. 25. The contractor shall hire a licensed engineer or land surveyor to survey the constructed elevations of the street subgrade and the gutter flowline at all intersections, inlets, and other locations requested by the the City of Fort Collins inspector. The engineer or surveyor must certify in a letter to the City of Fort Collins that these elevations conform to the approved plans and specifications. Any deviations shall be noted in the letter and then resolved with the City of Fort Collins before installation of base course or asphalt will be allowed on the streets. 26. All utility installations within or across the roadbed of new residential roads must be completed prior to the final stages of road construction. For the purposes of these standards, any work except c/g above the subgrade is considered final stage work. All service lines must be stubbed to the property lines and marked so as to reduce the excavation necessary for building connections. 27. Portions of Larimer County are within overlay districts. The Larimer County Flood Plain Resolution should be referred to for additional criteria for roads within these districts. 28. All road construction in areas designated as Wild Fire Hazard Areas shall be done in accordance with the construction criteria as established in the Wild Fire Hazard Area Mitigation Regulations in force at the time of final plat approval. 29. Prior to the commencement of any construction, the contractor shall contact the Local Entity Forester to schedule a site inspection for any tree removal requiring a permit. 30. The Developer shall be responsible for all aspects of safety including, but not limited to, excavation, trenching, shoring, traffic control, and security. Refer to OSHA Publication 2226, Excavating and Trenching. 31. The Developer shall submit a Construction Traffic Control Plan, in accordance with MUTCD, to the appropriate Right-of-Way authority. (The the City of Fort Collins, Larimer County, Colorado), for approval, prior to any construction activities within, or affecting, the Right-of-Way. The Developer shall be responsible for providing any and all traffic control devices as may be required by the construction activities. 32. Prior to the commencement of any construction that will affect traffic signs of any type, the contractor shall contact the City of Fort Collins Traffic Operations Department, who will temporarily remove or relocate the sign at no cost to the contractor, however, if the contractor moves the traffic sign then the contractor will be charged for the labor, materials and equipment to reinstall the sign as needed. 33. The Developer is responsible for all costs for the initial installation of traffic signing and striping for the Development related to the Development's local street operations. In addition, the Developer is responsible for all costs for traffic signing and striping related to directing traffic access to and from the Development. 34. There shall be no site construction activities on Saturdays, unless specifically approved by the City of Fort Collins Engineer, and no site construction activities on Sundays or holidays, unless there is prior written approval by the City of Fort Collins. 35. The Developer is responsible for providing all labor and materials necessary for the completion of the intended improvements, shown on these drawings, or designated to be provided, installed, or constructed, unless specifically noted otherwise. 36. Dimensions for layout and construction are not to be scaled from any drawing. If pertinent dimensions are not shown, contact the Designer for clarification, and annotate the dimension on the as-built record drawings. 37. The Developer shall have, onsite at all times, one (1) signed copy of the approved plans, one (1) copy of the appropriate standards and specifications, and a copy of any permits and extension agreements needed for the job. 38. If, during the construction process, conditions are encountered which could indicate a situation that is not identified in the plans or specifications, the Developer shall contact the Designer and the City of Fort Collins Engineer immediately. 39. The Developer shall be responsible for recording as-built information on a set of record drawings kept on the construction site, and available to the City of Fort Collins Inspector at all times. Upon completion of the work, the contractor(s) shall submit record drawings to the City of Fort Collins Engineer. 40. The Designer shall provide, in this location on the plan, the location and description of the nearest survey benchmarks (2) for the project as well as the basis of bearings. The information shall be as follows: PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 3-00 on parapet wall at the northwest end of the Lincoln Ave. Bridge near the Northeast Corner of Lincoln Ave. and Willow St. ELEVATION: 4967.33 BENCHMARK #2: City of Fort Collins Benchmark 3-13 approximately 40 ft south of the Linden St. Bridge over the Poudre River, on the west side of Linden St., on a storm inlet. ELEVATION: 4962.27 PLEASE NOTE: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted Datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.18' BASIS OF BEARINGS Basis of Bearings is the Northwesterly right-of-way line of Linden Street as bearing S41°41'10" W (assumed bearing) as shown on the plat. 41. All stationing is based on centerline of roadways unless otherwise noted. 42. Damaged curb, gutter and sidewalk existing prior to construction, as well as existing fences, trees, streets, sidewalks, curbs and gutters, landscaping, structures, and improvements destroyed, damaged or removed due to construction of this project, shall be replaced or restored in like kind at the Developer's expense, unless otherwise indicated on these plans, prior to the acceptance of completed improvements and/or prior to the issuance of the first Certificate of Occupancy. 43. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the City of Fort Collins Construction Inspector before any cuts are made. Patching shall be done in accordance with the City of Fort Collins Street Repair Standards. The finished patch shall blend in smoothly into the existing surface. All large patches shall be paved with an asphalt lay-down machine. In streets where more than one cut is made, an overlay of the entire street width, including the patched area, may be required. The determination of need for a complete overlay shall be made by the Larimer County Engineer and/or the City of Fort Collins Inspector at the time the cuts are made. 44. Upon completion of construction, the site shall be cleaned and restored to a condition equal to, or better than, that which existed before construction, or to the grades and condition as required by these plans. 45. Standard Handicap ramps are to be constructed at all curb returns and at all "T" intersections. 46. After acceptance by the City of Fort Collins, public improvements depicted in these plans shall be guaranteed to be free from material and workmanship defects for a minimum period of two years from the date of acceptance. 47. The City of Fort Collins shall not be responsible for the maintenance of roadway and appurtenant improvements, including storm drainage structures and pipes, for the following private streets: N.A. 48. Approved Variances are listed as follows: - None GENERAL NOTES: 1. It should be noted that any erosion control plan serves only as a guideline to the Contractor. Staging and/or phasing of Best Management Practices (BMPS) is expected. Additional and/or different BMPS from those originally depicted may be necessary during construction due to changing site conditions or as required by local authorities. 2. The Erosion Control Plan is schematic in nature. As such, graphical symbols may not be to scale, nor are they necessarily shown in their exact location. 3. The Contractor shall be responsible for all permitting (city, state discharge permit, etc.) and compliance with governing authorities. It shall be the responsibility of the Contractor (or Permit Holder) to ensure erosion control measures are properly maintained and followed. 4. Erosion control practices, site protection, and revegetation methods shall follow city regulations. 5. See landscape plans for additional information on seeding/planting, revegetation, erosion fabric/blankets, irrigation, hardscape and other temporary and permanent site stabilization methods. 6. Contractor shall implement the appropriate erosion control measures according the the construction sequencing and level of site stabilization. 7. Contractor shall implement appropriate inlet protection for all storm drains, swales, ponds and rain gardens until site is fully stabilized. 8. Inlet protection shall be adapted, as necessary, to the surrounding surface type and condition (i.e., stake-driven wattles for bare soil, sand bags or gravel socks for pavement, etc.) 9. Contractor is responsible for stabilizing all slopes, particularly those steeper than 6:1. Crimp mulching, hydro mulching, erosion mats, temporary irrigation, and additional wattles or silt fencing may be necessary to establish vegetative cover and stabilize the slope. 10. Additional wattles, silt fence, or other measures, may be necessary to insure that each building pad is stabilized throughout construction. At no time shall sediment be allowed to cross the public sidewalks. 11. Construction waste storage (dumpsters) and portable sanitation units (construction toilets) shall be located at least fifty (50) feet from any stormwater inlet, wetland, or drainage way. Said facilities must be set in a containment area that will not allow pollutants to directly flow, seep, run off, or be washed into a body of water, wetland or drainage way. Dumpsters shall be located on flat, stable ground, and construction toilets shall be staked down. 12. The contractor and all subcontractors will cooperate with the City's Construction Inspectors by ceasing operations when winds are of sufficient velocity to create blowing dust which, in the Inspector's opinion, is hazardous to the public health and welfare. 13. See Standard Grading and Erosion and Sediment Control Construction Plan Notes on this sheet for additional erosion control notes. EROSION CONTROL NOTES: A. STANDARD GRADING AND EROSION AND SEDIMENT CONTROL CONSTRUCTION PLAN NOTES 1. The erosion control inspector must be notified at least twenty-four (24) hours prior to any construction on this site. 2. There shall be no earth-disturbing activity outside the limits designated on the accepted plans. 3. All required perimeter silt and construction fencing shall be installed prior to any land disturbing activity (stockpiling, stripping, grading, etc). All other required erosion control measures shall be installed at the appropriate time in the construction sequence as indicated in the approved project schedule, construction plans, and erosion control report. 4. At all times during construction, the Developer shall be responsible for preventing and controlling on-site erosion including keeping the property sufficiently watered so as to minimize wind blown sediment. The Developer shall also be responsible for installing and maintaining all erosion control facilities shown herein. 5. Pre-disturbance vegetation shall be protected and retained wherever possible. Removal or disturbance of existing vegetation shall be limited to the area(s) required for immediate construction operations, and for the shortest practical period of time. 6. All soils exposed during land disturbing activity (stripping, grading, utility installations, stockpiling, filling, etc.) shall be kept in a roughened condition by ripping or disking along land contours until mulch, vegetation, or other permanent erosion control BMPs are installed. No soils in areas outside project street rights-of-way shall remain exposed by land disturbing activity for more than thirty (30) days before required temporary or permanent erosion control (e.g. seed/mulch, landscaping, etc.) is installed, unless otherwise approved by the City/County. 7. In order to minimize erosion potential, all temporary (structural) erosion control measures shall: a. Be inspected at a minimum of once every two (2) weeks and after each significant storm event and repaired or reconstructed as necessary in order to ensure the continued performance of their intended function. b. Remain in place until such time as all the surrounding disturbed areas are sufficiently stabilized as determined by the erosion control inspector. c. Be removed after the site has been sufficiently stabilized as determined by the erosion control inspector. 8. When temporary erosion control measures are removed, the Developer shall be responsible for the clean up and removal of all sediment and debris from all drainage infrastructure and other public facilities. 9. The contractor shall immediately clean up any construction materials inadvertently deposited on existing streets, sidewalks, or other public rights of way, and make sure streets and walkways are cleaned at the end of each working day. 10. All retained sediments, particularly those on paved roadway surfaces, shall be removed and disposed of in a manner and location so as not to cause their release into any waters of the United States. 11. No soil stockpile shall exceed ten (10) feet in height. All soil stockpiles shall be protected from sediment transport by surface roughening, watering, and perimeter silt fencing. Any soil stockpile remaining after thirty (30) days shall be seeded and mulched. 12. The stormwater volume capacity of detention ponds will be restored and storm sewer lines will be cleaned upon completion of the project and before turning the maintenance over to the City/County or Homeowners Association (HOA). 13. City Ordinance and Colorado Discharge Permit System (CDPS) requirements make it unlawful to discharge or allow the discharge of any pollutant or contaminated water from construction sites. Pollutants include, but are not limited to discarded building materials, concrete truck washout, chemicals, oil and gas products, litter, and sanitary waste. The developer shall at all times take whatever measures are necessary to assure the proper containment and disposal of pollutants on the site in accordance with any and all applicable local, state, and federal regulations. 14. A designated area shall be provided on site for concrete truck chute washout. The area shall be constructed so as to contain washout material and located at least fifty (50) feet away from any waterway during construction. Upon completion of construction activities the concrete washout material will be removed and properly disposed of prior to the area being restored. 15. Conditions in the field may warrant erosion control measures in addition to what is shown on these plans. The Developer shall implement whatever measures are determined necessary, as directed by the City. B. STREET IMPROVEMENTS NOTES 1. All street construction is subject to the General Notes on the cover sheet of these plans as well as the Street Improvements Notes listed here. 2. A paving section design, signed and stamped by a Colorado licensed Engineer, must be submitted to the City of Fort Collins Engineer for approval, prior to any street construction activity, (full depth asphalt sections are not permitted at a depth greater than 8 inches of asphalt). The job mix shall be submitted for approval prior to placement of any asphalt. 3. Where proposed paving adjoins existing asphalt, the existing asphalt shall be saw cut, a minimum distance of 12 inches from the existing edge, to create a clean construction joint. The Developer shall be required to remove existing pavement to a distance where a clean construction joint can be made. Wheel cuts shall not be allowed unless approved by the City of Fort Collins Engineer in Fort Collins. 4. Street subgrades shall be scarified the top 12 inches and re-compacted prior to subbase installation. No base material shall be laid until the subgrade has been inspected and approved by the City of Fort Collins Engineer. 5. Ft. Collins only. Valve boxes and manholes are to be brought up to grade at the time of pavement placement or overlay. Valve box adjusting rings are not allowed. 6. When an existing asphalt street must be cut, the street must be restored to a condition equal to or better than its original condition. The existing street condition shall be documented by the Inspector before any cuts are made. Cutting and patching shall be done in conformance with Chapter 25, Reconstruction and Repair. The finished patch shall blend smoothly into the existing surface. The determination of need for a complete overlay shall be made by the City of Fort Collins Engineer. All overlay work shall be coordinated with adjacent landowners such that future projects do not cut the new asphalt overlay work. 7. All traffic control devices shall be in conformance with these plans or as otherwise specified in M.U.T.C.D. (including Colorado supplement) and as per the Right-of-Way Work Permit traffic control plan. 8. The Developer is required to perform a gutter water flow test in the presence of the City of Fort Collins Inspector and prior to installation of asphalt. Gutters that hold more than 1/4 inch deep or 5 feet longitudinally, of water, shall be completely removed and reconstructed to drain properly. 9. Prior to placement of H.B.P. or concrete within the street and after moisture/density tests have been taken on the subgrade material (when a full depth section is proposed) or on the subgrade and base material (when a composite section is proposed), a mechanical "proof roll" will be required. The entire subgrade and/or base material shall be rolled with a heavily loaded vehicle having a total GVW of not less than 50,000 lbs. and a single axle weight of at least 18,000 lbs. with pneumatic tires inflated to not less that 90 p.s.i.g. "Proof roll" vehicles shall not travel at speeds greater than 3 m.p.h. Any portion of the subgrade or base material which exhibits excessive pumping or deformation, as determined by the City of Fort Collins Engineer, shall be reworked, replaced or otherwise modified to form a smooth, non-yielding surface. The City of Fort Collins Engineer shall be notified at least 24 hours prior to the "proof roll." All "proof rolls" shall be preformed in the presence of an Inspector. C. TRAFFIC SIGNING AND PAVEMENT MARKING CONSTRUCTION NOTES 1. All signage and marking is subject to the General Notes on the cover sheet of these plans, as well as the Traffic Signing and Marking Construction Notes listed here. 2. All symbols, including arrows, ONLYS, crosswalks, stop bars, etc. shall be pre-formed thermo-plastic. 3. All signage shall be per the City of Fort Collins Standards and these plans or as otherwise specified in MUTCD. 4. All lane lines for asphalt pavement shall receive two coats of latex paint with glass beads. 5. All lane lines for concrete pavement should be epoxy paint. 6. Prior to permanent installation of traffic striping and symbols, the Developer shall place temporary tabs or tape depicting alignment and placement of the same. Their placement shall be approved by the City of Fort Collins Traffic Engineer prior to permanent installation of striping and symbols. 7. Pre-formed thermo-plastic applications shall be as specified in these Plans and/or these Standards. 8. Epoxy applications shall be applied as specified in CDOT Standard Specifications for Road and Bridge Construction. 9. All surfaces shall be thoroughly cleaned prior to installation of striping or markings. 10. All sign posts shall utilize break-away assemblies and fasteners per the Standards. 11. A field inspection of location and installation of all signs shall be performed by the City of Fort Collins Traffic Engineer or their designate. All discrepancies identified during the field inspection must be corrected before the 2-year warranty period will begin. 12. The Developer installing signs shall be responsible for locating and protecting all underground utilities. 13. Special care shall be taken in sign location to ensure an unobstructed view of each sign. 14. Signage and striping has been determined by information available at the time of review. Prior to initiation of the warranty period,the City of Fort Collins Traffic Engineer reserves the right to require additional signage and/or striping if the City of Fort Collins Traffic Engineer determines that an unforeseen condition warrants such signage according to the MUTCD or the CDOT M and S Standards. All signage and striping shall fall under the requirements of the 2-year warranty period for new construction (except fair wear on traffic markings). 15. Sleeves for sign posts shall be required for use in islands/medians. Refer to Chapter 14, Traffic Control Devices, for additional detail. D. STORM DRAINAGE NOTES 1. The City of Fort Collins shall not be responsible for the maintenance of storm drainage facilities located on private property. Maintenance of onsite drainage facilities shall be the responsibility of the property owner(s). 2. All recommendations of the Preliminary Drainage Report for Confluence dated January 11, 2017 by Northern Engineering Services, Inc., shall be followed and implemented. 3. Prior to final inspection and acceptance by the City of Fort Collins, certification of the drainage facilities, by a registered engineer, must by submitted to and approved by the Stormwater Utility Department. Certification shall be submitted to the Stormwater Utility Department at least two weeks prior to the release of a certificate of occupancy for single family units. For commercial properties, certification shall by submitted to the Stormwater Utility Department at least two weeks prior to the release of any building permits in excess of those allowed prior to certification per the Development Agreement. E. WATERLINE NOTE 1. All waterline and sanitary sewer construction shall conform to the Fort Collins Utility standards and specifications current to date of construction. 2. The minimum cover over water lines is 4.5 feet and the maximum cover is 5.5 feet unless otherwise noted in the plans and approved by the water utility. 3. Water mains shall be poly-wrapped D.I.P, or PVC with tracer wire. 4. HDPE pipe may be used for 1-1/2 and 2 inch water services. The pipe shall meet the standards of AWWA 901, NSF Standard 61 and ASTM. The HDPE pipe shall be SDR 9 having a pressure rating of 200 psi. Stiffeners shall be used at all fittings and connections. Tracer wire shall be installed with the HDPE service, and shall extend up the curb stop. The curb stop shall be covered with a metal box and tracer wire test lid per City Water Detail 25. CONSTRUCTION NOTES: 1. The general notes for this project were taken verbatim from the adopted April 1, 2007 adopted LCUASS. Minor spelling corrections were made to those notes and the notes below are intended to amend the general notes for the project. 2. Where the General and Construction Notes refer to "Developer" substitute "Contractor". 3. Where the General and Construction Notes refer to "Local Entity" substitute "City of Fort Collins". 4. Contractor to verify specifications with the applicable addendums, revisions, and errata sheets. PROJECT SPECIFIC NOTES: 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 Northern Engineering Services, Inc. 301 North Howes Street, Suite 100 Fort Collins, Colorado 80521 (970) 221-4158 I hereby affirm that these final construction plans were prepared under my direct supervision, in accordance with all applicable City of Fort Collins and State of Colorado standards and statutes, respectively; and that I am fully responsible for the accuracy of all design. revisions, and record conditions that I have noted on these plans. These plans have been reviewed by the City of Fort Collins for concept only. The review does not imply responsibility by the reviewing department, the City of Fort Collins Engineer, or the City of Fort Collins for accuracy and correctness of the calculations. Furthermore, the review does not imply that quantities of items on the plans are the final quantities required. The review shall not be construed for any reason as acceptance of financial responsibility by the City of Fort Collins for additional quantities of items shown that may be required during the construction phase. DISCLAIMER STATEMENT: CERTIFICATION STATEMENT: PROJECT LOCATION VICINITY MAP BUILDING ARCHITECT SITE ENGINEER SURVEYOR PROJECT DATUM: NAVD88 BENCHMARK #1: City of Fort Collins Benchmark 3-00 on parapet wall at the northwest end of the Lincoln Ave. Bridge near the Northeast Corner of Lincoln Ave. and Willow St. ELEVATION: 4967.33 BENCHMARK #2: City of Fort Collins Benchmark 3-13 approximately 40 ft south of the Linden St. Bridge over the Poudre River, on the west side of Linden St., on a storm inlet. ELEVATION: 4962.27 PLEASE NOTE: This plan set is using NAVD88 for a vertical datum. Surrounding developments have used NGVD29 Unadjusted for their vertical datums. If NGVD29 Unadjusted Datum is required for any purpose, the following equation should be used: NGVD29 Unadjusted = NAVD88 - 3.18' BASIS OF BEARINGS Basis of Bearings is the Northwesterly right-of-way line of Linden Street as bearing S41°41'10" W (assumed bearing) as shown on the plat. ORIGINAL FIELD SURVEY BY: PROJECT BENCHMARKS: SHEET INDEX DEVELEPOR C000 COVER SHEET C001 GENERAL & CONSTRUCTION NOTES SUBDIVISION PLAT (FOR REFERENCE ONLY) C100 EXISTING CONDITIONS & DEMOLITION PLAN C200 HORIZONTAL CONTROL PLAN C300 UTILITY PLAN C400 GRADING PLAN GAS----------------- Xcel Energy----------------------------- Stephanie Rich (970) 225-7828 C500 DRAINAGE PLAN ELECTRIC-------- City of Fort Collins Light & Power-- Rob Irish (970) 224-6167 CABLE------------- Xfinity-------------------------------------- Don Kapperman (970) 567-0245 TELECOM.--------Centurylink------------------------------- Bill Johnson (970) 490-7501 WATER------------ City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 WASTEWATER--City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 STORMWATER- City of Fort Collins Utilities----------- Shane Boyle (970) 221-6339 UTILITY CONTACT LIST: * UTILITY COMPANY * This list is provided as a courtesy reference only. Northern Engineering Services assumes no responsibility for the accuracy or completeness of this list. In no way shall this list relinquish the Contractor's responsibility for locating all utilities prior to commencing any construction activity. Please contact the Utility Notification Center of Colorado (UNCC) at 811 for additional information. PHONE NUMBER ** The underground utility locates are based upon the best available information at the time of locating. Contractor acknowledges that it is common for underground facility owner maps to have errors and omissions of data shown. Consequently, it is the Contractor's sole responsibility to field verify the location of all utilities prior to construction, and notify the Engineer of any discrepancies found. AU Workshop 405 Linden Street Fort Collins, Colorado 80524 (970) 430-5220 ENGINEER ING N O R T H E RN ENGINEER ING N O R T H E RN Confluence LLC 6950 South Jordan Road Centennial, Colorado 80112 (303) 386-9223 ORIGINAL FIELD SURVEY NORTHERN ENGINEERING SERVICES, INC. PROJECT NUMBER: 998-003 DATE: OCTOBER 2016