THE EXCHANGE - BASIC DEVELOPMENT REVIEW - BDR160019 - REPORTS - DRAINAGE REPORT
Drainage Letter and LID Report – The Exchange Date: December 21, 2016 Project: The Exchange Project No. 379-060 Basic Development Review (BDR) Fort Collins, Colorado Attn: City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 To whom it may concern: This letter serves to address the stormwater impacts of the proposed project known as “The Exchange”. The project is a redevelopment of the 200 block of North College Avenue. The redevelopment consists primarily of façade improvements to the existing buildings, along with a small expansion of the southern- most building. Also, the existing parking lot is being replaced by a pedestrian area with seating areas and a grassy central lawn. Impervious Area The total impervious area of the site will be reduced due to the removal of the existing parking area and the addition of the large grassy area in the center of the site. For this reason, the total runoff was assumed to also be reduced and, therefore, no stormwater detention is proposed. An exhibit depicting the existing vs. proposed impervious areas has been provided to document the decrease. Although stormwater quantity detention is not required, stormwater quality will be addressed by permanent Best Management Practices (BMPs) and Low Impact Development (LID) requirements. Drainage Patterns The project will maintain the existing overall drainage patterns for the most part, however modifications to the interior drainage patterns will be made in order to capture and treat as much of the affected project site as possible with LID methods. In general, the central grass area will be lowered so that all adjacent areas of paving can drain to the area inlets located at the corners of the grass area. These inlets will direct flows into an underground detention facility that will provide storage for the water quality capture volume (WQCV). The vaults will have an open bottom to allow the WQCV to infiltrate into the underlying soils. Flows in excess of the WQCV will pass over a weir in the downstream inlet and proceed via a storm drain into an existing area inlet located at the intersection of the alley and Pine Street. Erosion and Sediment Control During construction, the Contractor will follow the appropriate and applicable City of Fort Collins standards for erosion and sediment control. Since the approximately 18,000 sf area of disturbance for the project is more than 10,000 sf, a comprehensive Stormwater Management Plan will be prepared for this project at Final Design. Post construction water quality and erosion control will be achieved by a fully established and stabilized site. All areas disturbed during construction will receive permanent hardscape, landscape, or building structure. Floodplains There are no regulatory floodplains associated with the project. LID Requirements The City LID requirements specify that either 75% of all impermeable areas are provided LID treatment OR 50% LID treatment by which 25% is treated by permeable pavers. In the case of this project, we will meet or exceed the 75% treatment of impermeable areas through the use of LID. The treatment will be provided by an infiltration gallery that will treat 18,319 square-feet of impervious area on the site, which is 83.1% of the total impervious area within the affected project areas, which exceeds the amount required by city code. A LID Treatment Exhibit is provided with this report. Storm Outfall Modeling The project site is located within the study area identified in the “Downtown River District (DTRD) Final Design Report”, by Ayres Associates, dated February 2012. The site lies within two master plan sub- basins, specifically Basins 118 and 200 (Please see Attachment 3, Exhibits 1 and 2). The project takes a portion of Basin 118 (0.42 acre), and incorporates this into Basin 200. In doing so, we are routing the project site into the Pine Street storm line system. This system is to be improved in the future and is noted in the Downtown River District plans as “Storm Line B”. Hydrologic modeling was completed for this report utilizing the computer program EPA SWMM 5. Proposed Condition modeling completed for this study incorporates the 0.42-acre shift from Basin 118 to Basin 200 as discussed above. We note that Basin 200 had an assumed percent impervious value of 95% in the original Ayres model, and we have not changed this parameter. The proposed site plan will not exceed this percent impervious assumption. Please see Attachment 4 for SWMM modeling output. Table 1, below, summarizes changes in Peak 100-year discharge at SWMM Conduit B9 through B11 as well as 100-year HGL at upstream ends of these conduits. Please see Attachment 5 for selected portions of the Downtown River District “Storm Line B” plan set. We note that the minor increases in HGL summarized in Table 1, below will not bring HGL above junction rim elevation at any junction. Table 1 – SWMM Modeling Summary Conduit Effective Model Peak 100-Yr Discharge (CFS) Effective Model Upstream 100-Yr HGL (FT) Proposed Condition Model Peak 100-Yr Discharge (CFS) Proposed Condition Model Upstream 100-Yr HGL (FT) B9 69.24 4971.1 69.16 4971.1 B10 52.64 4971.65 57.15 4971.79 B11 50.46 4972.04 54.15 4972.22 To summarize, the proposed grading concept closely matches existing elevations and drainage patterns. On-site detention is proven to be unnecessary. Stormwater quality has been provided, and meets the city requirements for Low Impact Development treatment. Therefore, it is my professional opinion that The Exchange satisfies all applicable stormwater criteria. Please do not hesitate to contact me if you have questions or require additional information. Sincerely, Andy Reese Project Manager ATTACHMENT 1 HYDROLOGIC CALCULATIONS CHARACTER OF SURFACE: Runoff Coefficient Percentage Impervious Project: The Exchange Streets, Parking Lots, Roofs, Alleys, and Drives: Calculations By: A. Reese Asphalt ……....……………...……….....…...……………….………………………………….0.95 . 100% Date: Concrete …….......……………….….……….………………..….………………………………… 0.95 90% Gravel ……….…………………….….…………………………..……………………………….0.50 . 40% Roofs …….…….………………..……………….…………………………………………….0.95 . 90% Pavers…………………………...………………..…………………………………………….0.40 . 22% Lawns and Landscaping Sandy Soil ……..……………..……………….…………………………………………….0.15 . 0% Clayey Soil ….….………….…….…………..………………………………………………. 0.25 0% 2-year Cf = 1.00 100-year Cf = 1.25 Basin ID Basin Area (ac) Area of Asphalt (ac) Area of Concrete (ac) Area of Roofs (ac) Area of Gravel (ac) Area of Pavers (ac) Area of Lawns and Landscaping (ac) 2-year Composite Runoff Coefficient 10-year Composite Runoff Coefficient 100-year Composite Runoff Coefficient Composite % Imperv. A1 0.42 0.00 0.19 0.04 0.07 0.00 0.19 0.71 0.71 0.89 55% OS1 0.04 0.00 0.01 0.01 0.01 0.00 0.01 0.83 0.83 1.00 68% DEVELOPED COMPOSITE % IMPERVIOUSNESS AND RUNOFF COEFFICIENT CALCULATIONS Runoff Coefficients are taken from the City of Fort Collins Storm Drainage Design Criteria and Construction Standards, Table 3-3. % Impervious taken from UDFCD USDCM, Volume I. 10-year Cf = 1.00 December 21, 2016 Overland Flow, Time of Concentration: Project: The Exchange Calculations By: Date: Gutter/Swale Flow, Time of Concentration: Tt = L / 60V Tc = Ti + Tt (Equation RO-2) Velocity (Gutter Flow), V = 20·S½ Velocity (Swale Flow), V = 15·S½ NOTE: C-value for overland flows over grassy surfaces; C = 0.25 Is Length >500' ? C*Cf (2-yr Cf=1.00) C*Cf (10-yr Cf=1.00) C*Cf (100-yr Cf=1.25) Length, L (ft) Slope, S (%) Ti 2-yr (min) Ti 10-yr (min) Ti 100-yr (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) Length, L (ft) Slope, S (%) Velocity, V (ft/s) Tt (min) 2-yr Tc Rational Method Equation: Project: The Exchange Calculations By: Date: From Section 3.2.1 of the CFCSDDC Rainfall Intensity: Design Point Basin(s) Area, A (acres) 2-yr Tc (min) 10-yr Tc (min) 100-yr Tc (min) C2 C10 C100 Intensity, i2 (in/hr) Intensity, i10 (in/hr) Intensity, i100 (in/hr) Flow, Q2 (cfs) Flow, Q10 (cfs) Flow, Q100 (cfs) Flow, WQ (cfs) A1 A1 0.42 8 8 7 0.71 0.71 0.89 2.46 4.21 8.80 0.7 1.3 3.3 0.37 OS1 OS1 0.04 5 5 5 0.83 0.83 1.00 2.85 4.87 9.95 0.1 0.2 0.4 0.05 DEVELOPED RUNOFF COMPUTATIONS A. Reese December 21, 2016 Rainfall Intensity taken from the City of Fort Collins Storm Drainage Design Criteria (CFCSDDC), Figure 3.1 Q = C f ( C )( i )( A ) ATTACHMENT 2 LID/WATER QUALITY CALCULATIONS Project Title Date: Project Number Calcs By: Basin(S) 0.8 WQCV = Watershed inches of Runoff (inches) 55.00% a = Runoff Volume Reduction (constant) i = Total imperviousness Ratio (i = Iwq/100) 0.176 in A = 0.42 ac V = 0.0062 ac-ft V = Water Quality Design Volume (ac-ft) WQCV = Water Quality Capture Volume (inches) A = Watershed Area (acres) 269 cu. ft. Drain Time a = i = WQCV = Figure EDB-2 - Water Quality Capture Volume (WQCV), 80th Percentile Runoff Event The Exchange December 21, 2016 379-060 A. Reese A1 0.176 0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4 0.45 0.5 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 WQCV (watershed inches) Total Imperviousness Ratio (i = Iwq/100) Water Quality Capture Volume 6 hr 12 hr 24 hr 40 hr WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) WQCV = a ( 0.91 i 3 - 1 . 19 i 2 + 0 . 78 i ) V * A 12 WQCV ÷ ø ö ç Project Title: The Exchange Date: Project Number: 379-060 Calcs By: Basin(s): A1 Vault ID Total Required WQ Volume (cf) Flow, WQ (cfs) Chamber Type Chamber Release Rate (cfs) Chamber Volume (cfs) Installed Chamber Volume (cfs) Mimimum No. of Chambers Minimum Release Rate (cfs) Provided Number of Chambers Actual Release Rate from Chambers (cfs) Required Chamber Volume by FAA Method (cf) Provided Chamber Volume (cf) Total Installed Chamber Volume (cf) 1 269 0.37 SC-740 0.024 45.90 74.90 4 0.09 6 0.14 193 275 449 Vault Configuration Summary Note: "Chamber Volume" refers to the open volume within the vaults. "Installed Chamber Volume" refers to the total volume provided, including the surrounding aggregates. December 21, 2016 A. Reese D:\Projects\379-060\Drainage\LID\379-060_Vault Summary.xlsx Chamber Dimensions SC-310 SC-740 Width (in) 34.00 51.00 Length (in) 85.40 85.40 Height (in) 16.00 30.00 Floor Area (sf) 20.16 30.25 Chamber Volume (cf) 14.70 45.90 Chamber/Aggregate Volume (cf) 29.30 74.90 Flow Rate** 0.35 gpm/sf 1 cf = 7.48052 gal 1 gallon = 0.133681 cf 1 GPM = 0.002228 cfs **Flow rate based on 1/2 of Nov 07 QMAX in Figure 17 of UNH Testing Report SC-310 SC-740 Flow Rate/chamber (cfs) 0.015724 0.023586 StormTech Chamber Data Chamber Flow Rate Conversion (gpm/sf to cfs) Chamber Flow Rate D:\Projects\379-060\Drainage\LID\379-060_Vault Summary.xlsx The Exchange Fort Collins, Colorado A. Reese Date: December 21, 2016 Pond No.: Vault 1 A1 WQ 0.89 Area (A)= 0.42 acres Quantity Detention 193 ft 3 Max Release Rate = 0.14 cfs Time Time Ft.Collins WQ Intensity Q100 Inflow (Runoff) Volume Outflow (Release) Volume Storage Detention Volume (mins) (secs) (in/hr) (cfs) (ft 3 ) (ft 3 ) (ft 3 ) 5 300 1.43 0.5 160 42 118 10 600 1.11 0.4 248 84 164 15 900 0.94 0.3 315 126 189 20 1200 0.81 0.3 361 168 193 25 1500 0.72 0.3 401 210 191 30 1800 0.65 0.2 437 252 185 35 2100 0.59 0.2 459 294 165 40 2400 0.54 0.2 480 336 144 45 2700 0.50 0.2 500 378 122 50 3000 0.46 0.2 516 420 96 55 3300 0.44 0.2 537 462 75 60 3600 0.41 0.2 552 504 48 65 3900 0.39 0.1 561 546 15 70 4200 0.37 0.1 573 588 -15 75 4500 0.35 0.1 580 630 -50 80 4800 0.33 0.1 592 672 -80 85 5100 0.32 0.1 601 714 -113 90 5400 0.31 0.1 616 756 -140 95 5700 0.29 0.1 618 798 -180 100 6000 0.28 0.1 628 840 -212 105 6300 0.27 0.1 636 882 -246 110 6600 0.26 0.1 641 924 -283 115 6900 0.3 0.1 658 966 -308 120 7200 0.25 0.1 659 1008 -349 Input Variables Results Design Point Design Storm Required Detention Volume Developed "C" = Vault Volume Calculation | FAA Method Project: ATTACHMENT 3 DOWNTOWN RIVER DISTRICT MASTERPLAN SUBBASINS PROJECT SITE PROJECT SHIFTS 0.42 AC. TO BASIN 200 FROM BASIN 118. EXHIBIT 1 Selected Por�on of DTRD Basin Exhibit EXHIBIT 2 Selected Por�on of DTRD SWMM SCHMATIC ATTACHMENT 4 SWMM MODELING OUTPUTS EPA STORM WATER MANAGEMENT MODEL - VERSION 5.0 (Build 5.0.015) -------------------------------------------------------------- ********************************************************* NOTE: The summary statistics displayed in this report are based on results found at every computational time step, not just on results from each reporting time step. ********************************************************* **************** Analysis Options **************** Flow Units ............... CFS Process Models: Rainfall/Runoff ........ YES Snowmelt ............... NO Groundwater ............ NO Flow Routing ........... YES Water Quality .......... NO Infiltration Method ...... HORTON Flow Routing Method ...... DYNWAVE Starting Date ............ MAR-17-2006 00:00:00 Ending Date .............. MAR-17-2006 23:00:00 Antecedent Dry Days ...... 0.0 Report Time Step ......... 00:01:00 Wet Time Step ............ 00:05:00 Dry Time Step ............ 01:00:00 Routing Time Step ........ 1.00 sec WARNING 02: maximum depth increased for Node CustomInlet-River WARNING 02: maximum depth increased for Node EXMH_B1 ************* Element Count ************* Number of rain gages ...... 1 Number of subcatchments ... 43 Number of nodes ........... 76 Number of links ........... 69 Number of pollutants ...... 0 Number of land uses ....... 0 **************** Raingage Summary **************** Data Interval Name Data Source Type hours ------------------------------------------------------------ 1 100-year INTENSITY 0.08 ******************** Subcatchment Summary ******************** Name Area Width %Imperv %Slope Rain Gage Outlet ------------------------------------------------------------------------------------------------------- 100 1.20 185.00 95.00 0.8000 1 INLET-B1B 101 2.30 337.00 95.00 0.3400 1 INLET-B2B 102 2.90 423.00 95.00 1.0800 1 INLET-C2B 103 0.80 582.00 95.00 0.8000 1 INLET-B3B 104 4.50 2930.00 95.00 0.4800 1 EXMH_B1 105 1.20 2197.00 95.00 0.6600 1 EXINLET-B4B 106 3.70 537.00 95.00 0.8600 1 EXINLET-B3C 107 0.80 524.00 95.00 0.7100 1 EXINLET-B4C 108 1.90 274.00 95.00 0.3200 1 INLET-B10A 109 0.80 1618.00 60.00 0.2900 1 INLET-B5A 110 2.00 289.00 80.00 1.2600 1 INLET-A3B 123 0.30 527.00 95.00 1.0400 1 CustomInlet-River 124 0.70 603.00 95.00 2.1400 1 INLET-A1A 125 0.50 893.00 95.00 0.9100 1 INLET-C2A 126 5.00 184.00 95.00 1.2400 1 EXMH_C1 127 2.30 328.00 95.00 1.5000 1 INLET-C1B 128 0.30 1406.00 95.00 2.1100 1 INLET-A2A 200 0.72 418.00 95.00 1.6900 1 EXINLET-B10B 201 0.20 271.00 95.00 0.9600 1 EXINLET-B9B 202 0.40 420.00 95.00 1.4200 1 INLET-B9A 203 0.30 447.00 95.00 0.3900 1 EXINLET-B8A 204 0.40 203.00 95.00 0.0300 1 203 205 0.10 121.00 95.00 0.8700 1 INLET-B4A 206 0.20 102.00 90.00 1.2200 1 INLET-A4A 207 0.90 1123.00 95.00 0.4400 1 EXINLET-B5B 208 0.70 327.00 95.00 0.6500 1 EXSTUB-B6 210 2.90 414.00 80.00 0.6200 1 INLET-D2B 211 0.20 224.00 95.00 0.4700 1 INLET-D2A 212 0.60 918.00 95.00 0.5700 1 INLET-D3A 213 1.20 360.00 95.00 0.7100 1 INLET-D3B 300 2.20 325.00 95.00 1.7300 1 O300 ************ Node Summary ************ Invert Max. Ponded External Name Type Elev. Depth Area Inflow ------------------------------------------------------------------------------ CustomInlet-River JUNCTION 4956.94 5.91 0.0 EXINLET-B10B JUNCTION 4972.71 3.71 0.0 EXINLET-B3A JUNCTION 4960.63 9.45 0.0 EXINLET-B3C JUNCTION 4963.76 6.34 0.0 EXINLET-B4B JUNCTION 4971.23 2.42 0.0 EXINLET-B4C JUNCTION 4972.04 2.29 0.0 EXINLET-B5B JUNCTION 4971.25 2.42 0.0 EXINLET-B8A JUNCTION 4971.38 3.08 0.0 EXINLET-B9B JUNCTION 4971.42 4.24 0.0 EXMH_B1 JUNCTION 4959.16 11.13 0.0 EXMH_C1 JUNCTION 4956.26 9.15 0.0 EXSTUB-B6 JUNCTION 4970.40 3.00 0.0 INLET-A1A JUNCTION 4955.50 3.02 0.0 INLET-A2A JUNCTION 4955.01 7.94 0.0 INLET-A3A JUNCTION 4965.04 3.40 0.0 INLET-A3B JUNCTION 4962.01 6.48 0.0 INLET-A4A JUNCTION 4969.60 2.65 0.0 INLET-B10A JUNCTION 4972.40 2.99 0.0 INLET-B1A JUNCTION 4960.79 4.02 0.0 INLET-B1B JUNCTION 4960.92 4.08 0.0 INLET-B2A JUNCTION 4964.00 3.80 0.0 INLET-B2B JUNCTION 4963.85 3.86 0.0 INLET-B3B JUNCTION 4960.96 8.28 0.0 INLET-B4A JUNCTION 4965.45 7.45 0.0 INLET-B5A JUNCTION 4971.06 2.50 0.0 INLET-B7A JUNCTION 4970.39 3.50 0.0 INLET-B9A JUNCTION 4971.49 3.65 0.0 INLET-C1A JUNCTION 4957.82 5.00 0.0 INLET-C1B JUNCTION 4958.34 5.12 0.0 INLET-C2A JUNCTION 4961.50 2.98 0.0 INLET-C2B JUNCTION 4960.76 4.14 0.0 INLET-D1 JUNCTION 4960.24 7.94 0.0 INLET-D2A JUNCTION 4963.74 4.00 0.0 INLET-D2B JUNCTION 4963.78 4.87 0.0 MH_B7A JUNCTION 4969.79 5.39 0.0 MH_B8 JUNCTION 4963.76 10.62 0.0 MH_B9 JUNCTION 4965.12 10.25 0.0 MH_C1 JUNCTION 4941.23 7.06 0.0 MH_C2 JUNCTION 4942.08 6.69 0.0 MH_C3 JUNCTION 4945.12 14.60 0.0 MH_C4/B1 JUNCTION 4946.00 17.83 0.0 MH_C5 JUNCTION 4954.89 7.75 0.0 MH_C6 JUNCTION 4955.47 9.01 0.0 MH_C7 JUNCTION 4956.24 8.23 0.0 MH_D2 JUNCTION 4959.98 8.30 0.0 MH_D3 JUNCTION 4960.65 7.21 0.0 MH_D4 JUNCTION 4961.91 5.11 0.0 MNT_STRT JUNCTION 4973.00 1.00 0.0 Yes O112 JUNCTION 0.00 0.00 0.0 O113 JUNCTION 0.00 0.00 0.0 O114 JUNCTION 0.00 0.00 0.0 O115 JUNCTION 0.00 0.00 0.0 O300 JUNCTION 0.00 0.00 0.0 A1_POUDRE OUTFALL 4949.89 3.00 0.0 FESB1-POUDRE OUTFALL 4953.73 4.00 0.0 FESC1-UDALL_POND OUTFALL 4941.03 2.00 0.0 ************ Link Summary ************ Name From Node To Node Type Length %Slope Roughness ------------------------------------------------------------------------------------------ A1 MH_A1 A1_POUDRE CONDUIT 73.0 0.1781 0.0130 A2 MH_A2 MH_A1 CONDUIT 27.0 0.0741 0.0130 A3 MH_A3 MH_A2 CONDUIT 173.0 1.8905 0.0130 A4 MH_A4-MH_D1 MH_A3 CONDUIT 325.0 1.9050 0.0130 A5 MH_A5 MH_A4-MH_D1 CONDUIT 65.5 1.4342 0.0130 B1 MH_C4/B1 FESB1-POUDRE CONDUIT 139.0 1.4966 0.0130 B2 MH_B2 MH_C4/B1 CONDUIT 100.0 1.5102 0.0130 B3 MH_B3 MH_B2 CONDUIT 353.0 0.3683 0.0130 B4 MH_B4 MH_B3 CONDUIT 74.0 0.3514 0.0130 B5 MH_B5 MH_B4 CONDUIT 470.0 0.3489 0.0130 B6 MH_B6 MH_B5 CONDUIT 485.0 0.5815 0.0130 B7 MH_B7 MH_B6 CONDUIT 68.0 0.3529 0.0130 B8 MH_B8 MH_B7 CONDUIT 74.5 0.2470 0.0130 B9 MH_B9 MH_B8 CONDUIT 367.0 0.3695 0.0130 B10 MH_B10 MH_B9 CONDUIT 63.0 0.7778 0.0130 B11 MH_B11 MH_B10 CONDUIT 165.0 0.7879 0.0130 B12 MH_B12 MH_B11 CONDUIT 134.0 0.7911 0.0130 B13 MH_B13 MH_B12 CONDUIT 33.0 1.6063 0.0130 C1 MH_C1 FESC1-UDALL_PONDCONDUIT 34.0 0.5882 0.0130 C2 MH_C2 MH_C1 CONDUIT 138.0 0.6160 0.0130 C3 MH_C3 MH_C2 CONDUIT 494.0 0.6154 0.0100 C4 MH_C4/B1 MH_C3 CONDUIT 144.0 0.6111 0.0130 C5 MH_C5 MH_C4/B1 CONDUIT 45.0 0.3111 0.0130 C6 MH_C6 MH_C5 CONDUIT 194.0 0.2990 0.0130 C7 MH_C7 MH_C6 CONDUIT 274.0 0.2810 0.0130 D2 MH_D2 MH_A4-MH_D1 CONDUIT 74.0 0.5270 0.0130 D3 MH_D3 MH_D2 CONDUIT 173.0 0.3873 0.0130 D4 MH_D4 MH_D3 CONDUIT 322.0 0.3913 0.0130 EXLAT-B3C EXINLET-B3C MH_B3A CONDUIT 36.0 2.1116 0.0130 EXLAT-B4B EXINLET-B4B MH_B4B CONDUIT 34.4 2.2415 0.0130 EXLAT-B4C EXINLET-B4C MH_B4B CONDUIT 29.0 5.4564 0.0130 LAT-A1A INLET-A1A MH_A2 CONDUIT 41.0 1.2684 0.0130 LAT-A2A INLET-A2A MH_A3 CONDUIT 25.0 2.6009 0.0130 LAT-B9B EXINLET-B9B MH_B10 CONDUIT 36.0 2.0004 0.0130 LAT-B10A INLET-B10A MH_B11 CONDUIT 30.0 1.9003 0.0130 LAT-B10B EXINLET-B10B MH_B11 CONDUIT 44.0 2.0004 0.0130 LAT-B11A EXMH_B1 MH_B4 CONDUIT 61.0 0.4590 0.0130 LAT-C1A INLET-C1A MH_C5 CONDUIT 36.0 0.3889 0.0130 LAT-C1B INLET-C1B MH_C5 CONDUIT 33.0 2.0004 0.0130 LAT-C2A INLET-C2A MH_C7 CONDUIT 55.0 1.7821 0.0130 LAT-C2B INLET-C2B MH_C7 CONDUIT 12.0 1.3182 0.0130 LAT-C3A EXMH_C1 MH_C7 CONDUIT 18.0 0.1111 0.0130 LAT-D2A INLET-D2A MH_D3 CONDUIT 51.0 0.4510 0.0130 LAT-D2B INLET-D2B MH_D3 CONDUIT 14.0 1.7760 0.0130 LAT-D3A INLET-D3A MH_D4 CONDUIT 40.0 0.5000 0.0130 LAT-D3B INLET-D3B MH_D4 CONDUIT 24.0 2.0004 0.0130 MNT_STRT MNT_STRT EXMH_B1 CONDUIT 720.0 0.4458 0.0160 12DIP CustomInlet-RiverMH_A2 CONDUIT 80.6 6.1031 0.0130 LAT-D1 INLET-D1 MH_D2 CONDUIT 13.0 1.8691 0.0130 ********************* Cross Section Summary ********************* Full Full Hyd. Max. No. of Full Conduit Shape Depth Area Rad. Width Barrels Flow --------------------------------------------------------------------------------------- A1 CIRCULAR 3.00 7.07 0.75 3.00 1 28.15 A2 CIRCULAR 3.00 7.07 0.75 3.00 1 18.15 A3 CIRCULAR 3.00 7.07 0.75 3.00 1 91.71 A4 CIRCULAR 3.00 7.07 0.75 3.00 1 92.06 A5 CIRCULAR 2.00 3.14 0.50 2.00 1 27.09 B1 RECT_CLOSED 4.00 24.00 1.20 6.00 1 378.99 B2 RECT_CLOSED 4.00 28.00 1.27 7.00 1 461.92 B3 RECT_CLOSED 4.00 28.00 1.27 7.00 1 228.11 B4 RECT_CLOSED 4.00 28.00 1.27 7.00 1 222.81 B5 RECT_CLOSED 4.00 24.00 1.20 6.00 1 183.00 B6 CIRCULAR 4.00 12.57 1.00 4.00 1 109.53 B7 CIRCULAR 4.00 12.57 1.00 4.00 1 85.34 B8 CIRCULAR 4.00 12.57 1.00 4.00 1 71.39 B9 CIRCULAR 4.00 12.57 1.00 4.00 1 87.31 B10 CIRCULAR 3.50 9.62 0.88 3.50 1 88.73 B11 CIRCULAR 3.50 9.62 0.88 3.50 1 89.31 B12 CIRCULAR 3.00 7.07 0.75 3.00 1 59.32 B13 CIRCULAR 3.00 7.07 0.75 3.00 1 84.53 C1 CIRCULAR 2.00 3.14 0.50 2.00 1 17.35 C2 CIRCULAR 2.00 3.14 0.50 2.00 1 17.75 C3 CIRCULAR 2.00 3.14 0.50 2.00 1 23.07 C4 CIRCULAR 2.00 3.14 0.50 2.00 1 17.68 C5 CIRCULAR 4.00 12.57 1.00 4.00 1 80.12 C6 CIRCULAR 4.00 12.57 1.00 4.00 1 78.54 C7 CIRCULAR 3.50 9.62 0.88 3.50 1 53.33 D2 CIRCULAR 3.00 7.07 0.75 3.00 1 48.42 D3 CIRCULAR 3.00 7.07 0.75 3.00 1 41.51 D4 CIRCULAR 2.50 4.91 0.63 2.50 1 25.66 EXLAT-B3C CIRCULAR 2.50 4.91 0.63 2.50 1 59.60 EXLAT-B4B CIRCULAR 1.25 1.23 0.31 1.25 1 9.67 EXLAT-B4C CIRCULAR 1.25 1.23 0.31 1.25 1 15.09 LAT-A1A CIRCULAR 1.50 1.77 0.38 1.50 1 11.83 LAT-A2A CIRCULAR 1.50 1.77 0.38 1.50 1 16.94 LAT-A3A CIRCULAR 1.50 1.77 0.38 1.50 1 17.61 LAT-A3B CIRCULAR 1.50 1.77 0.38 1.50 1 10.16 LAT-A4A CIRCULAR 1.00 0.79 0.25 1.00 1 1.82 LAT-B1A CIRCULAR 1.50 1.77 0.38 1.50 1 8.51 LAT-B1B CIRCULAR 1.50 1.77 0.38 1.50 1 18.47 LAT-C1B CIRCULAR 1.50 1.77 0.38 1.50 1 14.86 LAT-C2A CIRCULAR 1.50 1.77 0.38 1.50 1 14.02 LAT-C2B CIRCULAR 2.00 3.14 0.50 2.00 1 32.00 LAT-C3A CIRCULAR 2.00 3.14 0.50 2.00 1 7.54 LAT-D2A CIRCULAR 1.50 1.77 0.38 1.50 1 7.05 LAT-D2B CIRCULAR 1.50 1.77 0.38 1.50 1 14.59 LAT-D3A CIRCULAR 1.50 1.77 0.38 1.50 1 7.43 LAT-D3B CIRCULAR 1.50 1.77 0.38 1.50 1 14.86 MNT_STRT TRAPEZOIDAL 0.50 62.50 0.42 150.00 1 216.21 12DIP CIRCULAR 1.00 0.79 0.25 1.00 1 8.80 LAT-D1 CIRCULAR 2.00 3.14 0.50 2.00 1 38.69 ************************** Volume Depth Runoff Quantity Continuity acre-feet inches ************************** --------- ------- Total Precipitation ...... 18.407 3.669 Evaporation Loss ......... 0.000 0.000 Infiltration Loss ........ 0.605 0.121 Surface Runoff ........... 17.452 3.479 Final Surface Storage .... 0.461 0.092 Continuity Error (%) ..... -0.598 ************************** Volume Volume Flow Routing Continuity acre-feet 10^6 gal ************************** --------- --------- Dry Weather Inflow ....... 0.000 0.000 Wet Weather Inflow ....... 17.466 5.692 Groundwater Inflow ....... 0.000 0.000 RDII Inflow .............. 0.000 0.000 External Inflow .......... 3.509 1.143 External Outflow ......... 17.550 5.719 Internal Outflow ......... 0.000 0.000 Evaporation Loss ......... 0.000 0.000 Initial Stored Volume .... 0.039 0.013 Final Stored Volume ...... 0.040 0.013 Continuity Error (%) ..... 16.296 *************************** Time-Step Critical Elements *************************** None ******************************** Highest Flow Instability Indexes ******************************** All links are stable. ************************* Routing Time Step Summary ************************* Minimum Time Step : 0.50 sec Average Time Step : 1.00 sec Maximum Time Step : 1.00 sec Percent in Steady State : 0.00 Average Iterations per Step : 2.02 *************************** Subcatchment Runoff Summary *************************** ---------------------------------------------------------------------------------------------- Total Total Total Total Total Total Peak Runoff Precip Runon Evap Infil Runoff Runoff Runoff Coeff Subcatchment in in in in in 10^6 gal CFS ---------------------------------------------------------------------------------------------- 100 3.669 0.000 0.000 0.068 3.531 0.115 11.133 0.962 101 3.669 0.000 0.000 0.069 3.529 0.220 19.839 0.962 110 3.669 0.000 0.000 0.285 3.329 0.181 17.936 0.907 111 3.669 0.000 0.000 1.531 2.139 0.052 2.676 0.583 112 3.669 0.000 0.000 0.139 3.465 0.122 11.963 0.944 113 3.669 0.000 0.000 0.068 3.531 0.173 17.249 0.962 114 3.669 0.000 0.000 0.068 3.531 0.336 33.711 0.962 115 3.669 0.000 0.000 0.068 3.529 0.268 27.414 0.962 116 3.669 0.000 0.000 0.066 3.520 0.019 2.001 0.959 117 3.669 0.000 0.000 0.068 3.529 0.115 11.761 0.962 118 3.669 0.000 0.000 0.068 3.531 0.132 12.784 0.962 119 3.669 0.000 0.000 0.139 3.466 0.339 33.639 0.945 120 3.669 0.000 0.000 0.066 3.521 0.038 4.003 0.960 121 3.669 0.000 0.000 0.067 3.521 0.029 3.002 0.960 122 3.669 0.000 0.000 0.067 3.522 0.057 6.002 0.960 123 3.669 0.000 0.000 0.067 3.521 0.029 3.002 0.960 124 3.669 0.000 0.000 0.067 3.522 0.067 7.004 0.960 125 3.669 0.000 0.000 0.067 3.521 0.048 5.004 0.960 126 3.669 0.000 0.000 0.071 3.522 0.478 35.378 0.960 127 3.669 0.000 0.000 0.068 3.531 0.221 21.859 0.962 128 3.669 0.000 0.000 0.066 3.518 0.029 3.002 0.959 200 3.669 0.000 0.000 0.067 3.523 0.069 7.196 0.960 201 3.669 0.000 0.000 0.067 3.521 0.019 2.001 0.960 202 3.669 0.000 0.000 0.067 3.522 0.038 4.002 0.960 203 3.669 4.707 0.000 0.078 8.215 0.067 4.752 0.981 204 3.669 0.000 0.000 0.069 3.529 0.038 3.469 0.962 205 3.669 0.000 0.000 0.067 3.522 0.010 1.001 0.960 206 3.669 0.000 0.000 0.135 3.463 0.019 1.988 0.944 207 3.669 0.000 0.000 0.067 3.523 0.086 8.998 0.960 208 3.669 0.000 0.000 0.067 3.528 0.067 6.931 0.961 210 3.669 0.000 0.000 0.292 3.321 0.262 24.604 0.905 211 3.669 0.000 0.000 0.067 3.523 0.019 1.999 0.960 212 3.669 0.000 0.000 0.067 3.522 0.057 6.003 0.960 213 3.669 1.605 0.000 0.072 5.127 0.167 12.687 0.972 300 3.669 0.000 0.000 0.068 3.531 0.211 21.093 0.962 -------------------------------------------------------------------------------------------- System 3.669 0.055 0.000 0.121 3.534 5.777 555.112 0.949 ****************** Node Depth Summary ****************** --------------------------------------------------------------------- Average Maximum Maximum Time of Max Depth Depth HGL Occurrence Node Type Feet Feet Feet days hr:min --------------------------------------------------------------------- CustomInlet-River JUNCTION 4.88 5.31 4962.25 0 00:40 EXINLET-B10B JUNCTION 0.03 1.04 4973.75 0 00:40 EXINLET-B3A JUNCTION 0.13 8.14 4968.77 0 00:38 EXINLET-B3C JUNCTION 0.06 6.07 4969.83 0 00:38 EXINLET-B4B JUNCTION 0.04 1.68 4972.91 0 00:39 EXINLET-B4C JUNCTION 0.03 1.10 4973.14 0 00:40 EXINLET-B5B JUNCTION 0.04 1.58 4972.83 0 00:40 EXINLET-B8A JUNCTION 0.02 0.55 4971.93 0 00:41 EXINLET-B9B JUNCTION 0.02 0.46 4971.88 0 00:40 EXMH_B1 JUNCTION 0.13 6.39 4965.55 0 00:39 EXMH_C1 JUNCTION 0.18 6.47 4962.73 0 00:40 EXSTUB-B6 JUNCTION 0.03 1.06 4971.46 0 00:40 INLET-A1A JUNCTION 0.03 0.96 4956.46 0 00:40 INLET-A2A JUNCTION 0.03 5.70 4960.71 0 00:38 INLET-A3A JUNCTION 0.02 0.73 4965.77 0 00:40 INLET-A3B JUNCTION 0.08 4.45 4966.46 0 00:40 INLET-A4A JUNCTION 0.03 0.95 4970.55 0 00:40 MH_A1 JUNCTION 9.47 11.83 4953.86 0 00:41 MH_A2 JUNCTION 1.46 6.10 4956.17 0 00:41 MH_A3 JUNCTION 0.09 6.33 4959.67 0 00:38 MH_A4-MH_D1 JUNCTION 0.08 2.41 4962.00 0 00:41 MH_A5 JUNCTION 0.05 1.55 4962.76 0 00:40 MH_B10 JUNCTION 0.11 4.71 4971.82 0 00:42 MH_B11 JUNCTION 0.09 3.85 4972.26 0 00:42 MH_B12 JUNCTION 0.07 3.09 4972.56 0 00:42 MH_B13 JUNCTION 0.06 2.66 4972.66 0 00:41 MH_B2 JUNCTION 0.10 4.09 4961.41 0 00:41 MH_B3 JUNCTION 0.14 5.42 4964.04 0 00:41 MH_B3A JUNCTION 0.15 7.76 4968.62 0 00:38 MH_B4 JUNCTION 0.15 6.03 4964.91 0 00:40 MH_B4A JUNCTION 0.03 4.07 4969.49 0 00:41 MH_B4B JUNCTION 0.04 3.17 4969.58 0 00:41 MH_B5 JUNCTION 0.14 8.58 4969.10 0 00:38 MH_B6 JUNCTION 0.14 6.14 4969.48 0 00:41 MH_B7 JUNCTION 0.14 6.32 4969.90 0 00:41 MH_B7A JUNCTION 0.05 1.32 4971.11 0 00:42 MH_B8 JUNCTION 0.15 6.44 4970.20 0 00:41 MH_B9 JUNCTION 0.13 6.01 4971.13 0 00:42 MH_C1 JUNCTION 2.35 10.25 4951.48 0 00:00 MH_C2 JUNCTION 1.77 6.60 4948.68 0 00:40 MH_C3 JUNCTION 0.74 10.63 4955.75 0 00:40 MH_C4/B1 JUNCTION 0.97 14.19 4960.19 0 00:40 MH_C5 JUNCTION 0.20 5.71 4960.60 0 00:40 MH_C6 JUNCTION 0.16 5.60 4961.07 0 00:40 MH_C7 JUNCTION 0.16 6.09 4962.33 0 00:40 MH_D2 JUNCTION 0.10 3.21 4963.19 0 00:41 MH_D3 JUNCTION 0.10 3.36 4964.01 0 00:41 MH_D4 JUNCTION 0.07 2.77 4964.68 0 00:41 MNT_STRT JUNCTION 0.01 0.37 4973.37 0 00:37 O112 JUNCTION 0.00 0.00 0.00 0 00:10 O113 JUNCTION 0.00 0.00 0.00 0 00:10 O114 JUNCTION 0.00 0.00 0.00 0 00:10 O115 JUNCTION 0.00 0.00 0.00 0 00:10 O300 JUNCTION 0.00 0.00 0.00 0 00:10 A1_POUDRE OUTFALL 1.59 2.67 4952.56 0 00:41 FESB1-POUDRE OUTFALL 0.07 3.27 4957.00 0 00:40 FESC1-UDALL_POND OUTFALL 2.47 2.47 4943.50 0 00:00 ******************* Node InFlow Summary ******************* ------------------------------------------------------------------------------------- Maximum Maximum Lateral Total Lateral Total Time of Max Inflow Inflow Inflow Inflow Occurrence Volume Volume Node Type CFS CFS days hr:min 10^6 gal 10^6 gal ------------------------------------------------------------------------------------- CustomInlet-River JUNCTION 3.00 3.00 0 00:40 0.029 0.029 EXINLET-B10B JUNCTION 7.20 7.20 0 00:40 0.069 0.069 EXINLET-B3A JUNCTION 11.76 11.76 0 00:40 0.115 0.115 EXINLET-B3C JUNCTION 34.23 34.23 0 00:40 0.355 0.355 EXINLET-B4B JUNCTION 12.01 12.01 0 00:40 0.115 0.115 EXINLET-B4C JUNCTION 7.98 7.98 0 00:40 0.077 0.077 EXINLET-B5B JUNCTION 9.00 9.00 0 00:40 0.086 0.086 EXINLET-B8A JUNCTION 4.75 4.75 0 00:40 0.067 0.067 EXINLET-B9B JUNCTION 2.00 2.00 0 00:40 0.019 0.019 EXMH_B1 JUNCTION 44.73 157.98 0 00:38 0.431 1.018 EXMH_C1 JUNCTION 35.38 35.38 0 00:40 0.478 0.478 INLET-C2B JUNCTION 27.19 27.19 0 00:40 0.278 0.278 INLET-D1 JUNCTION 0.00 0.14 0 00:36 0.000 0.000 INLET-D2A JUNCTION 2.00 2.00 0 00:40 0.019 0.019 INLET-D2B JUNCTION 24.60 24.60 0 00:40 0.262 0.262 INLET-D3A JUNCTION 6.00 6.00 0 00:40 0.057 0.057 INLET-D3B JUNCTION 12.69 12.69 0 00:40 0.167 0.167 MH_A1 JUNCTION 0.00 71.41 0 00:41 0.000 0.862 MH_A2 JUNCTION 0.00 71.48 0 00:41 0.000 0.855 MH_A3 JUNCTION 0.00 62.86 0 00:41 0.000 0.753 MH_A4-MH_D1 JUNCTION 0.00 61.19 0 00:40 0.000 0.725 MH_A5 JUNCTION 0.00 21.90 0 00:40 0.000 0.219 MH_B10 JUNCTION 0.00 60.82 0 00:40 0.000 0.647 MH_B11 JUNCTION 0.00 56.54 0 00:40 0.000 0.590 MH_B12 JUNCTION 0.00 33.60 0 00:40 0.000 0.339 MH_B13 JUNCTION 33.64 33.64 0 00:40 0.339 0.339 MH_B2 JUNCTION 0.00 317.98 0 00:40 0.000 3.775 MH_B3 JUNCTION 0.00 310.99 0 00:38 0.000 3.631 MH_B3A JUNCTION 10.00 48.84 0 00:38 0.539 0.970 MH_B4 JUNCTION 0.00 291.66 0 00:38 0.000 3.391 MH_B4A JUNCTION 0.00 4.71 0 00:39 0.000 0.011 MH_B4B JUNCTION 0.00 19.91 0 00:40 0.000 0.192 MH_B5 JUNCTION 0.00 152.23 0 00:43 0.000 2.373 MH_B6 JUNCTION 0.00 103.01 0 00:43 0.000 1.288 MH_B7 JUNCTION 0.00 87.28 0 00:44 0.000 1.067 MH_B7A JUNCTION 0.00 17.52 0 00:40 0.000 0.199 MH_B8 JUNCTION 0.00 73.30 0 00:39 0.000 0.914 MH_B9 JUNCTION 0.00 74.74 0 00:39 0.000 0.846 MH_C1 JUNCTION 0.00 33.57 0 00:40 0.000 1.760 MH_C2 JUNCTION 0.00 33.57 0 00:40 0.000 1.756 MH_C3 JUNCTION 0.00 33.57 0 00:40 0.000 1.747 MH_C4/B1 JUNCTION 0.00 406.59 0 00:40 0.000 4.861 MH_C5 JUNCTION 0.00 92.46 0 00:40 0.000 1.085 MH_C6 JUNCTION 0.00 65.28 0 00:40 0.000 0.805 MH_C7 JUNCTION 0.00 67.05 0 00:40 0.000 0.804 MH_D2 JUNCTION 0.00 41.16 0 00:41 0.000 0.506 MH_D3 JUNCTION 0.00 42.29 0 00:40 0.000 0.506 MH_D4 JUNCTION 0.00 18.60 0 00:40 0.000 0.225 MNT_STRT JUNCTION 169.17 169.17 0 00:35 0.586 0.586 O112 JUNCTION 11.96 11.96 0 00:40 0.122 0.122 O113 JUNCTION 17.25 17.25 0 00:40 0.173 0.173 O114 JUNCTION 33.71 33.71 0 00:40 0.336 0.336 O115 JUNCTION 27.41 27.41 0 00:40 0.269 0.269 O300 JUNCTION 21.09 21.09 0 00:40 0.211 0.211 A1_POUDRE OUTFALL 0.00 71.42 0 00:41 0.000 0.863 FESB1-POUDRE OUTFALL 0.00 369.90 0 00:40 0.000 3.114 FESC1-UDALL_POND OUTFALL 0.00 33.57 0 00:40 0.000 1.760 ********************** Node Surcharge Summary ********************** Surcharging occurs when water rises above the top of the highest conduit. --------------------------------------------------------------------- Max. Height Min. Depth Hours Above Crown Below Rim Node Type Surcharged Feet Feet --------------------------------------------------------------------- EXINLET-B3A JUNCTION 0.27 6.136 1.314 EXINLET-B3C JUNCTION 0.07 3.569 0.271 EXINLET-B4B JUNCTION 0.04 0.432 0.738 EXINLET-B5B JUNCTION 0.01 0.078 0.842 EXMH_C1 JUNCTION 0.30 4.474 2.676 MH_C1 JUNCTION 22.99 8.250 6.810 MH_C2 JUNCTION 2.12 4.604 0.086 MH_C3 JUNCTION 1.93 8.634 3.966 MH_C4/B1 JUNCTION 0.05 0.382 3.638 MH_C5 JUNCTION 0.13 1.419 2.041 MH_C6 JUNCTION 0.12 1.602 3.408 MH_D2 JUNCTION 0.04 0.208 5.092 O112 JUNCTION 23.00 0.000 5.000 O113 JUNCTION 23.00 0.000 5.000 O114 JUNCTION 23.00 0.000 5.000 O115 JUNCTION 23.00 0.000 5.000 O300 JUNCTION 23.00 0.000 5.000 ********************* Node Flooding Summary ********************* No nodes were flooded. *********************** Outfall Loading Summary *********************** ----------------------------------------------------------- Flow Avg. Max. Total Freq. Flow Flow Volume Outfall Node Pcnt. CFS CFS 10^6 gal ----------------------------------------------------------- A1_POUDRE 79.15 1.82 71.42 0.863 FESB1-POUDRE 7.96 66.39 369.90 3.114 FESC1-UDALL_POND 99.73 2.88 33.57 1.760 ----------------------------------------------------------- System 62.28 71.09 470.97 5.737 ******************** Link Flow Summary ******************** ----------------------------------------------------------------------------- Maximum Time of Max Maximum Max/ Max/ |Flow| Occurrence Velocity Full Full Link Type CFS days hr:min ft/sec Flow Depth ----------------------------------------------------------------------------- A1 CONDUIT 71.42 0 00:41 10.33 2.54 0.95 A2 CONDUIT 71.41 0 00:41 10.10 3.93 1.00 A3 CONDUIT 62.87 0 00:41 8.89 0.69 1.00 A4 CONDUIT 60.40 0 00:41 11.58 0.66 0.90 A5 CONDUIT 21.80 0 00:40 8.92 0.80 0.81 B1 CONDUIT 369.90 0 00:40 17.47 0.98 0.90 B2 CONDUIT 314.46 0 00:40 12.54 0.68 1.00 B3 CONDUIT 304.24 0 00:40 11.28 1.33 1.00 B4 CONDUIT 291.63 0 00:38 10.42 1.31 1.00 B5 CONDUIT 152.26 0 00:43 6.84 0.83 1.00 B6 CONDUIT 109.68 0 00:43 8.76 1.00 1.00 B7 CONDUIT 89.06 0 00:44 7.17 1.04 1.00 B8 CONDUIT 78.83 0 00:44 6.27 1.10 1.00 B9 CONDUIT 69.70 0 00:44 5.81 0.80 1.00 B10 CONDUIT 57.66 0 00:39 7.37 0.65 1.00 B11 CONDUIT 54.87 0 00:40 6.43 0.61 1.00 B12 CONDUIT 33.29 0 00:40 5.96 0.56 1.00 B13 CONDUIT 33.60 0 00:40 7.22 0.40 0.94 C1 CONDUIT 33.57 0 00:40 10.69 1.93 1.00 C2 CONDUIT 33.57 0 00:40 10.69 1.89 1.00 C3 CONDUIT 33.57 0 00:40 10.69 1.46 1.00 C4 CONDUIT 33.57 0 00:40 10.68 1.90 1.00 C5 CONDUIT 92.40 0 00:40 7.35 1.15 1.00 LAT-B1A CONDUIT 2.98 0 00:40 3.64 0.35 0.54 LAT-B1B CONDUIT 11.13 0 00:40 7.53 0.60 0.78 LAT-B2A CONDUIT 1.98 0 00:40 3.69 0.21 0.34 LAT-B2B CONDUIT 19.85 0 00:40 7.25 0.72 0.81 LAT-B3A CONDUIT 12.18 0 00:38 3.88 1.09 1.00 LAT-B3B CONDUIT 9.02 0 00:38 1.84 0.42 1.00 LAT-B3C CONDUIT 50.23 0 00:38 7.40 0.98 1.00 LAT-B4A CONDUIT 2.32 0 00:39 1.74 0.26 1.00 LAT-B4B CONDUIT 4.71 0 00:39 1.91 0.38 1.00 LAT-B4C CONDUIT 19.72 0 00:39 10.18 0.34 1.00 LAT-B5A CONDUIT 7.61 0 00:40 5.95 0.60 0.68 LAT-B5B CONDUIT 9.00 0 00:40 5.93 0.68 0.80 LAT-B6A CONDUIT 6.91 0 00:40 6.49 0.74 0.72 LAT-B7A CONDUIT 12.77 0 00:40 6.35 0.36 0.63 LAT-B7C CONDUIT 17.50 0 00:40 7.41 0.17 0.48 LAT-B8A CONDUIT 4.85 0 00:42 5.89 0.23 0.60 LAT-B9A CONDUIT 3.98 0 00:40 6.06 0.24 0.53 LAT-B9B CONDUIT 1.99 0 00:40 4.97 0.13 0.50 LAT-B10A CONDUIT 16.19 0 00:40 7.20 0.52 0.67 LAT-B10B CONDUIT 7.15 0 00:40 6.58 0.48 0.59 LAT-B11A CONDUIT 158.82 0 00:37 12.64 1.63 1.00 LAT-C1A CONDUIT 6.00 0 00:40 3.85 0.92 1.00 LAT-C1B CONDUIT 21.85 0 00:40 12.37 1.47 1.00 LAT-C2A CONDUIT 5.04 0 00:39 5.80 0.36 0.84 LAT-C2B CONDUIT 27.16 0 00:40 9.35 0.85 0.95 LAT-C3A CONDUIT 35.36 0 00:40 11.26 4.69 1.00 LAT-D2A CONDUIT 1.97 0 00:40 3.04 0.28 0.39 LAT-D2B CONDUIT 24.60 0 00:40 13.92 1.69 1.00 LAT-D3A CONDUIT 5.95 0 00:40 4.09 0.80 0.77 LAT-D3B CONDUIT 12.68 0 00:40 7.88 0.85 0.86 MNT_STRT CONDUIT 121.76 0 00:37 2.95 0.56 0.70 12DIP CONDUIT 2.99 0 00:40 10.13 0.34 0.40 LAT-D1 CONDUIT 0.16 0 00:45 0.34 0.00 1.00 *************************** Flow Classification Summary *************************** ----------------------------------------------------------------------------------------- Adjusted --- Fraction of Time in Flow Class ---- Avg. Avg. /Actual Up Down Sub Sup Up Down Froude Flow Conduit Length Dry Dry Dry Crit Crit Crit Crit Number Change ----------------------------------------------------------------------------------------- A1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.04 0.0001 A2 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.03 0.0001 A3 1.00 0.00 0.61 0.00 0.39 0.00 0.00 0.00 0.06 0.0000 A4 1.00 0.00 0.00 0.00 0.00 0.01 0.00 0.99 0.63 0.0000 A5 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.42 0.0000 B1 1.00 0.92 0.00 0.00 0.00 0.08 0.00 0.00 0.15 0.0000 B2 1.00 0.00 0.00 0.00 0.00 0.03 0.00 0.97 1.06 0.0000 B3 1.00 0.00 0.00 0.00 0.87 0.13 0.00 0.00 0.60 0.0000 B4 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.43 0.0000 B5 1.00 0.00 0.23 0.00 0.77 0.00 0.00 0.00 0.24 0.0000 B6 1.00 0.23 0.23 0.00 0.34 0.20 0.00 0.00 0.46 0.0000 B7 1.00 0.00 0.01 0.00 0.99 0.00 0.00 0.00 0.30 0.0000 B8 1.00 0.01 0.00 0.00 0.99 0.00 0.00 0.00 0.26 0.0000 B9 1.00 0.01 0.46 0.00 0.53 0.00 0.00 0.00 0.27 0.0000 B10 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.51 0.0000 B11 1.00 0.01 0.46 0.00 0.42 0.10 0.00 0.00 0.35 0.0000 B12 1.00 0.47 0.23 0.00 0.23 0.07 0.00 0.00 0.21 0.0000 B13 1.00 0.70 0.00 0.00 0.14 0.16 0.00 0.00 0.33 0.0000 C1 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.0001 LAT-B2A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.12 0.0000 LAT-B2B 1.20 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.68 0.0000 LAT-B3A 1.00 0.23 0.54 0.00 0.23 0.00 0.00 0.00 0.05 0.0000 LAT-B3B 1.00 0.63 0.21 0.00 0.16 0.00 0.00 0.00 0.01 0.0000 LAT-B3C 1.00 0.23 0.40 0.00 0.19 0.17 0.00 0.00 0.39 0.0000 LAT-B4A 1.00 0.01 0.86 0.00 0.14 0.00 0.00 0.00 0.05 0.0000 LAT-B4B 1.00 0.01 0.00 0.00 0.01 0.00 0.00 0.98 0.09 0.0000 LAT-B4C 1.00 0.00 0.00 0.00 0.01 0.00 0.00 0.99 0.28 0.0000 LAT-B5A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.16 0.0000 LAT-B5B 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.19 0.0000 LAT-B6A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.27 0.0000 LAT-B7A 1.00 0.01 0.00 0.00 0.83 0.17 0.00 0.00 0.38 0.0000 LAT-B7C 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.43 0.0000 LAT-B8A 1.00 0.01 0.72 0.00 0.16 0.11 0.00 0.00 0.29 0.0000 LAT-B9A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.21 0.0000 LAT-B9B 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.19 0.0000 LAT-B10A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.79 0.0000 LAT-B10B 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.23 0.0000 LAT-B11A 1.00 0.00 0.01 0.00 0.87 0.12 0.00 0.00 0.62 0.0000 LAT-C1A 1.00 0.01 0.00 0.00 0.01 0.00 0.00 0.98 0.11 0.0000 LAT-C1B 1.00 0.01 0.00 0.00 0.01 0.00 0.00 0.98 0.49 0.0000 LAT-C2A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.18 0.0000 LAT-C2B 1.52 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.49 0.0000 LAT-C3A 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.43 0.0001 LAT-D2A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.12 0.0000 LAT-D2B 1.09 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.60 0.0000 LAT-D3A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.11 0.0000 LAT-D3B 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.38 0.0000 MNT_STRT 1.00 0.02 0.00 0.00 0.00 0.00 0.00 0.98 0.34 0.0000 12DIP 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.31 0.0000 LAT-D1 1.56 0.63 0.28 0.00 0.09 0.00 0.00 0.00 0.00 0.0000 ************************* Conduit Surcharge Summary ************************* ---------------------------------------------------------------------------- Hours Hours --------- Hours Full -------- Above Full Capacity Conduit Both Ends Upstream Dnstream Normal Flow Limited ---------------------------------------------------------------------------- A1 0.01 0.01 0.01 0.30 0.01 A2 0.14 0.14 0.14 0.45 0.14 A3 0.10 0.10 0.10 0.01 0.01 B2 0.02 0.02 0.02 0.01 0.01 B3 0.02 0.02 0.02 0.15 0.02 B4 0.10 0.10 0.10 0.15 0.10 B5 0.10 0.10 0.10 0.01 0.09 B6 0.10 0.10 0.10 0.01 0.05 B7 0.10 0.10 0.10 0.05 0.09 B8 0.10 0.10 0.10 0.06 0.09 B9 0.09 0.09 0.09 0.01 0.01 B10 0.07 0.07 0.07 0.01 0.07 B11 0.03 0.03 0.03 0.01 0.01 B12 0.01 0.01 0.01 0.01 0.01 C1 22.99 22.99 22.99 1.98 2.04 C2 2.12 2.12 2.12 1.97 2.02 C3 1.93 1.93 1.93 1.87 1.88 C4 1.93 1.93 1.93 1.96 1.93 C5 0.15 0.15 0.15 0.06 0.15 C6 0.12 0.12 0.12 0.01 0.01 C7 0.15 0.15 0.15 0.09 0.11 Analysis begun on: Wed Dec 14 14:48:08 2016 Analysis ended on: Wed Dec 14 14:48:15 2016 Total elapsed time: 00:00:07 SWMM 5 Page 12 ATTACHMENT 5 DOWNTOWN RIVER DISTRICT PLAN EXCERPTS Engineers/Scientists/Surveyors P.O. Box 270460 Fort Collins, CO 80527 (970) 223-5556 3665 JFK Parkway, Building 2, Suite 200 46 DOWNTOWN RIVER DISTRICT CITY OF FORT COLLINS VICINITY MAP PROPOSED LEGEND SAN W12 WS F F S S NOTES MATCH LINE STA 32+50 MATCH LINE STA 27+50 FUTURE STORM LINE B STORM B PLAN & PROFILE STA 27+50 TO 32+50 C-207 14 80% FOR CONSTRUCTION Engineers/Scientists/Surveyors P.O. Box 270460 Fort Collins, CO 80527 (970) 223-5556 3665 JFK Parkway, Building 2, Suite 200 46 DOWNTOWN RIVER DISTRICT CITY OF FORT COLLINS VICINITY MAP PROPOSED LEGEND SAN W12 WS F F S S NOTES MATCH LINE STA 32+50 FUTURE STORM LINE B STORM B PLAN & PROFILE STA 32+50 TO END AND C-208 15 FUTURE LATERAL B11 LATERAL B11 PLAN & PROFILE 80% FOR CONSTRUCTION D3 0.04 0.04 0.04 0.01 0.04 D4 0.03 0.03 0.03 0.01 0.01 EXLAT-B3C 0.07 0.07 0.07 0.01 0.01 EXLAT-B4B 0.03 0.03 0.04 0.06 0.03 LAT-A2A 0.10 0.10 0.10 0.01 0.01 LAT-A3B 0.02 0.02 0.02 0.15 0.02 LAT-A4A 0.01 0.01 0.01 0.03 0.01 LAT-B3A 0.27 0.27 0.27 0.02 0.01 LAT-B3B 0.18 0.18 0.18 0.01 0.01 LAT-B3C 0.16 0.16 0.16 0.01 0.01 LAT-B4A 0.09 0.09 0.09 0.01 0.01 LAT-B4B 0.09 0.09 0.09 0.01 0.01 LAT-B4C 0.05 0.05 0.05 0.01 0.01 LAT-B11A 0.13 0.13 0.13 0.14 0.10 LAT-C1A 0.12 0.12 0.12 0.01 0.06 LAT-C1B 0.13 0.13 0.13 0.11 0.13 LAT-C3A 0.29 0.29 0.29 0.62 0.29 LAT-D2B 0.11 0.11 0.11 0.15 0.11 LAT-D1 0.12 0.12 0.12 0.01 0.01 SWMM 5 Page 11 C2 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.01 0.0001 C3 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.03 0.0000 C4 1.00 0.00 0.00 0.00 0.79 0.21 0.00 0.00 0.78 0.0001 C5 1.00 0.00 0.00 0.00 0.08 0.00 0.00 0.92 0.60 0.0000 C6 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.37 0.0000 C7 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.49 0.0000 D2 1.00 0.00 0.63 0.00 0.26 0.12 0.00 0.00 0.29 0.0000 D3 1.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.24 0.0000 D4 1.00 0.00 0.73 0.00 0.27 0.00 0.00 0.00 0.11 0.0000 EXLAT-B3C 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.99 0.64 0.0000 EXLAT-B4B 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.22 0.0000 EXLAT-B4C 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.38 0.0000 LAT-A1A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.18 0.0000 LAT-A2A 1.00 0.01 0.00 0.00 0.01 0.00 0.00 0.98 0.16 0.0000 LAT-A3A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.20 0.0000 LAT-A3B 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.33 0.0000 LAT-A4A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.11 0.0000 LAT-B1A 1.00 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.11 0.0000 LAT-B1B 1.58 0.01 0.00 0.00 0.00 0.00 0.00 0.99 0.60 0.0000 SWMM 5 Page 10 C6 CONDUIT 65.24 0 00:40 5.29 0.83 1.00 C7 CONDUIT 65.28 0 00:40 6.78 1.22 1.00 D2 CONDUIT 41.16 0 00:41 6.87 0.85 0.90 D3 CONDUIT 41.16 0 00:41 6.97 0.99 1.00 D4 CONDUIT 17.40 0 00:41 3.63 0.68 1.00 EXLAT-B3C CONDUIT 35.26 0 00:38 11.75 0.59 1.00 EXLAT-B4B CONDUIT 12.01 0 00:40 9.78 1.24 1.00 EXLAT-B4C CONDUIT 7.94 0 00:40 8.71 0.53 0.70 LAT-A1A CONDUIT 6.92 0 00:40 6.54 0.58 0.71 LAT-A2A CONDUIT 4.82 0 00:39 5.11 0.28 1.00 LAT-A3A CONDUIT 3.99 0 00:40 5.92 0.23 0.41 LAT-A3B CONDUIT 17.93 0 00:40 10.15 1.77 1.00 LAT-A4A CONDUIT 1.92 0 00:40 2.95 1.05 0.77 SWMM 5 Page 9 INLET-A2A JUNCTION 0.10 4.199 2.241 INLET-A3B JUNCTION 0.22 2.951 2.029 INLET-B1B JUNCTION 0.05 0.388 2.192 INLET-B2B JUNCTION 0.07 0.324 1.536 INLET-B3B JUNCTION 0.18 5.762 0.018 INLET-B4A JUNCTION 0.09 2.041 3.409 INLET-C1A JUNCTION 0.12 1.464 2.036 INLET-C1B JUNCTION 0.15 3.256 0.364 INLET-C2B JUNCTION 0.12 1.226 0.914 INLET-D1 JUNCTION 0.12 0.828 4.992 INLET-D2B JUNCTION 0.12 0.508 2.862 INLET-D3B JUNCTION 0.10 0.743 1.887 MH_A1 JUNCTION 0.14 0.814 3.196 MH_A3 JUNCTION 0.10 3.275 3.605 MH_B12 JUNCTION 0.01 0.094 5.966 MH_B3A JUNCTION 0.09 3.124 1.836 MH_B4 JUNCTION 0.13 2.031 4.189 MH_B4A JUNCTION 0.09 2.069 3.761 MH_B5 JUNCTION 0.11 4.577 1.293 SWMM 5 Page 8 EXSTUB-B6 JUNCTION 6.93 6.93 0 00:40 0.067 0.067 INLET-A1A JUNCTION 7.00 7.00 0 00:40 0.067 0.067 INLET-A2A JUNCTION 3.00 3.00 0 00:40 0.029 0.029 INLET-A3A JUNCTION 4.00 4.00 0 00:40 0.038 0.038 INLET-A3B JUNCTION 17.93 17.93 0 00:40 0.181 0.181 INLET-A4A JUNCTION 1.99 1.99 0 00:40 0.019 0.019 INLET-B10A JUNCTION 16.24 16.24 0 00:40 0.182 0.182 INLET-B1A JUNCTION 3.00 3.00 0 00:40 0.029 0.029 INLET-B1B JUNCTION 11.13 11.13 0 00:40 0.115 0.115 INLET-B2A JUNCTION 2.00 2.00 0 00:40 0.019 0.019 INLET-B2B JUNCTION 19.84 19.84 0 00:40 0.220 0.220 INLET-B3B JUNCTION 7.99 7.99 0 00:40 0.077 0.077 INLET-B4A JUNCTION 1.00 2.45 0 00:39 0.010 0.010 INLET-B5A JUNCTION 7.65 7.65 0 00:40 0.067 0.067 INLET-B7A JUNCTION 12.78 12.78 0 00:40 0.132 0.132 INLET-B9A JUNCTION 4.00 4.00 0 00:40 0.038 0.038 INLET-C1A JUNCTION 6.00 6.00 0 00:40 0.057 0.057 INLET-C1B JUNCTION 21.86 21.86 0 00:40 0.221 0.221 INLET-C2A JUNCTION 5.00 5.00 0 00:40 0.048 0.048 SWMM 5 Page 7 INLET-B10A JUNCTION 0.06 1.68 4974.08 0 00:40 INLET-B1A JUNCTION 0.03 0.80 4961.59 0 00:40 INLET-B1B JUNCTION 0.05 1.89 4962.81 0 00:40 INLET-B2A JUNCTION 0.02 0.56 4964.56 0 00:40 INLET-B2B JUNCTION 0.08 2.32 4966.17 0 00:40 INLET-B3B JUNCTION 0.13 8.26 4969.22 0 00:38 INLET-B4A JUNCTION 0.03 4.04 4969.49 0 00:41 INLET-B5A JUNCTION 0.03 1.21 4972.27 0 00:40 INLET-B7A JUNCTION 0.04 1.38 4971.77 0 00:40 INLET-B9A JUNCTION 0.02 0.70 4972.19 0 00:40 INLET-C1A JUNCTION 0.05 2.96 4960.78 0 00:40 INLET-C1B JUNCTION 0.07 4.76 4963.10 0 00:40 INLET-C2A JUNCTION 0.02 1.01 4962.51 0 00:40 INLET-C2B JUNCTION 0.08 3.23 4963.99 0 00:40 INLET-D1 JUNCTION 0.18 2.95 4963.19 0 00:41 INLET-D2A JUNCTION 0.02 0.66 4964.40 0 00:40 INLET-D2B JUNCTION 0.06 2.01 4965.79 0 00:40 INLET-D3A JUNCTION 0.04 1.36 4965.36 0 00:40 INLET-D3B JUNCTION 0.06 2.24 4966.52 0 00:40 SWMM 5 Page 6 102 3.669 0.000 0.000 0.068 3.531 0.278 27.189 0.962 103 3.669 0.000 0.000 0.067 3.524 0.077 7.989 0.960 104 3.669 0.000 0.000 0.067 3.526 0.431 44.735 0.961 105 3.669 0.000 0.000 0.067 3.521 0.115 12.008 0.960 106 3.669 0.000 0.000 0.068 3.531 0.355 34.230 0.962 107 3.669 0.000 0.000 0.067 3.525 0.077 7.976 0.961 108 3.669 0.000 0.000 0.069 3.529 0.182 16.241 0.962 109 3.669 0.000 0.000 0.547 3.086 0.067 7.655 0.841 SWMM 5 Page 5 LAT-B2A CIRCULAR 1.50 1.77 0.38 1.50 1 9.40 LAT-B2B CIRCULAR 2.00 3.14 0.50 2.00 1 27.71 LAT-B3A CIRCULAR 2.00 3.14 0.50 2.00 1 11.18 LAT-B3B CIRCULAR 2.50 4.91 0.63 2.50 1 21.62 LAT-B3C CIRCULAR 3.00 7.07 0.75 3.00 1 51.51 LAT-B4A CIRCULAR 2.00 3.14 0.50 2.00 1 8.99 LAT-B4B CIRCULAR 2.00 3.14 0.50 2.00 1 12.48 LAT-B4C CIRCULAR 2.50 4.91 0.63 2.50 1 58.01 LAT-B5A CIRCULAR 1.50 1.77 0.38 1.50 1 12.70 LAT-B5B CIRCULAR 1.50 1.77 0.38 1.50 1 13.29 LAT-B6A CIRCULAR 1.33 1.39 0.33 1.33 1 9.35 LAT-B7A CIRCULAR 2.00 3.14 0.50 2.00 1 35.05 LAT-B7C CIRCULAR 3.50 9.62 0.88 3.50 1 100.61 LAT-B8A CIRCULAR 1.50 1.77 0.38 1.50 1 21.36 LAT-B9A CIRCULAR 1.50 1.77 0.38 1.50 1 16.51 LAT-B9B CIRCULAR 1.50 1.77 0.38 1.50 1 14.86 LAT-B10A CIRCULAR 2.00 3.14 0.50 2.00 1 31.19 LAT-B10B CIRCULAR 1.50 1.77 0.38 1.50 1 14.86 LAT-B11A CIRCULAR 4.00 12.57 1.00 4.00 1 97.32 LAT-C1A CIRCULAR 1.50 1.77 0.38 1.50 1 6.55 SWMM 5 Page 4 LAT-A3A INLET-A3A MH_A5 CONDUIT 21.0 2.8106 0.0130 LAT-A3B INLET-A3B MH_A5 CONDUIT 46.0 0.9348 0.0130 LAT-A4A INLET-A4A MH_B6 CONDUIT 104.0 0.2596 0.0130 LAT-B1A INLET-B1A MH_B2 CONDUIT 32.0 0.6563 0.0130 LAT-B1B INLET-B1B MH_B2 CONDUIT 11.0 1.9546 0.0130 LAT-B2A INLET-B2A MH_B3 CONDUIT 45.0 0.8000 0.0130 LAT-B2B INLET-B2B MH_B3 CONDUIT 14.0 1.2468 0.0130 LAT-B3A EXINLET-B3A MH_B5 CONDUIT 45.0 0.2444 0.0130 LAT-B3B INLET-B3B MH_B3A CONDUIT 36.0 0.2778 0.0130 LAT-B3C MH_B3A MH_B5 CONDUIT 57.0 0.5965 0.0130 LAT-B4A INLET-B4A MH_B4A CONDUIT 19.0 0.1579 0.0130 LAT-B4B MH_B4A MH_B6 CONDUIT 92.0 0.3043 0.0130 LAT-B4C MH_B4B MH_B6 CONDUIT 52.0 2.0004 0.0130 LAT-B5A INLET-B5A MH_B7 CONDUIT 39.0 1.4617 0.0130 LAT-B5B EXINLET-B5B MH_B7 CONDUIT 20.0 1.6002 0.0130 LAT-B6A EXSTUB-B6 MH_B8 CONDUIT 21.0 1.5049 0.0130 LAT-B7A INLET-B7A MH_B7A CONDUIT 25.0 2.4007 0.0130 LAT-B7C MH_B7A MH_B9 CONDUIT 71.0 1.0001 0.0130 LAT-B8A EXINLET-B8A MH_B7A CONDUIT 38.5 4.1334 0.0130 LAT-B9A INLET-B9A MH_B10 CONDUIT 32.0 2.4695 0.0130 SWMM 5 Page 3 INLET-D3A JUNCTION 4964.00 1.88 0.0 INLET-D3B JUNCTION 4964.28 4.13 0.0 MH_A1 JUNCTION 4942.03 15.03 0.0 MH_A2 JUNCTION 4950.07 9.37 0.0 MH_A3 JUNCTION 4953.34 9.94 0.0 MH_A4-MH_D1 JUNCTION 4959.59 9.05 0.0 MH_A5 JUNCTION 4961.21 7.65 0.0 MH_B10 JUNCTION 4967.11 8.78 0.0 MH_B11 JUNCTION 4968.41 8.65 0.0 MH_B12 JUNCTION 4969.47 9.06 0.0 MH_B13 JUNCTION 4970.00 9.39 0.0 MH_B2 JUNCTION 4957.32 7.71 0.0 MH_B3 JUNCTION 4958.62 9.59 0.0 MH_B3A JUNCTION 4960.86 9.60 0.0 Yes MH_B4 JUNCTION 4958.88 10.22 0.0 MH_B4A JUNCTION 4965.42 7.83 0.0 MH_B4B JUNCTION 4966.41 8.22 0.0 MH_B5 JUNCTION 4960.52 9.87 0.0 MH_B6 JUNCTION 4963.34 10.85 0.0 MH_B7 JUNCTION 4963.58 10.62 0.0 SWMM 5 Page 2 111 0.90 124.00 10.00 1.0600 1 213 112 1.30 191.00 90.00 0.8900 1 O112 113 1.80 265.00 95.00 1.7200 1 O113 114 3.50 502.00 95.00 2.0800 1 O114 115 2.80 407.00 95.00 3.5700 1 O115 116 0.20 582.00 95.00 0.7900 1 INLET-B2A 117 1.20 459.00 95.00 0.5400 1 EXINLET-B3A 118 1.38 198.00 95.00 0.9000 1 INLET-B7A 119 3.60 880.00 90.00 0.4200 1 MH_B13 120 0.40 743.00 95.00 1.2800 1 INLET-A3A 121 0.30 456.00 95.00 1.2000 1 INLET-B1A 122 0.60 1177.00 95.00 0.2800 1 INLET-C1A SWMM 5 Page 1 Project Location: Calculations By: D:\Projects\379-060\Drainage\LID\379-060_FAA_Vault 1.xlsm\ è = æ 12 hr D:\Projects\379-060\Drainage\WatQual\379-060_WQ Volume.xls (min) 10-yr Tc (min) 100-yr Tc (min) A1 A1 No 0.25 0.25 0.31 39 1.94% 8.0 8.0 7.4 0 n/a N/A N/A 0 n/a N/A N/A 8 8 7 OS1 OS1 No 0.95 0.25 1.00 21 5.19% 0.7 4.2 0.5 0 n/a N/A N/A 0 n/a N/A N/A 5 5 5 DEVELOPED TIME OF CONCENTRATION COMPUTATIONS Gutter Flow Swale Flow Design Point Basin Overland Flow A. Reese December 21, 2016 Time of Concentration (Equation RO-4) ( ) 3 1 1 . 87 1 . 1 * S Ti C Cf L - =