Loading...
HomeMy WebLinkAboutTHE EXCHANGE - BASIC DEVELOPMENT REVIEW - BDR160019 - SUBMITTAL DOCUMENTS - ROUND 2 - ROUTING SHEETProject Routing Sheet New: Revision: X Project Name: Project Type: Project Number: Items for New Projects & Resubmittals Final Redlines Date Received: Review Round: Planner: Engineer: # Label Sets Needed (1,2,3….): Labels Received Y/N: RETURN ALL REDLINES 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 14 14 12 8 7 5 4 3 6 0 0 0 0 0 0 0 0 0 0 Revised: 1-29-2016 P P P P P P P P P P P P P P P P P P P P X X X X X X X X X Lighting Plan Plat Building Elevations Lighting Plan Drainage Report Turnaround Time: 2 weeks Comments Due: 01.04.2017 The Exchange BDR BDR160019 2 Total: Format Required: (P)aper, Digital (CD) Xcel Energy Zoning City Water Utilities Eng. (Stormwater) City Erosion Control (SWMP Review) Received: County Assessor CDOT Ditch Co: Railroad: ___________________ School District Other: Extra-Public File Outside Agency Sanitation Dist: Outside Agency Water District: Street Oversizing Technical Services Traffic Operations Transfort Transportation Planning Water Conservation Neighborhood Services Park Planning Pavement Management Post Office Poudre Fire Authority Real Estate Planning Economic Development Environmental Planner Forestry GIS Historic Preservation CFC Light & Power Item Waived(W); Deferred (D); or n/a File: Project Planner Building Inspection Century Link Comcast Development Review Engineering Drainage Report Building Materials Exhibit Easements (As Needed) SWMP (Erosion Report) Utility Plan Site Plan Landscape Plan Plat Building Elevations Wetland Delineation Ecological Study (ECS) Hazmat Review Soils Study- New/Update Digital copy of all materials L.U.C. Mod. Requests T.I.A.(letter or full report) Utility Plans 12/21/2016 Planning Objectives Comment Response Letter Site Plan Landscape Plan New projects: APO labels & list: Ted Shepard K. A.